Fabricated component connecting structure and construction method

By using a combined structure of steel bar sleeves and ultra-high performance concrete in prefabricated buildings, combined with gap avoidance and hydraulic bending technology, the problem of longitudinal steel bar misalignment is solved, the connection strength and fault tolerance are improved, and the overall connection of building components is enhanced. Strength.

CN118933184APending Publication Date: 2024-11-12CSCEC STRAIT CONSTR & DEV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411242079.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In prefabricated building construction, due to installation errors, the longitudinal reinforcement between the superstructure members and the lower building members is misaligned, resulting in a decrease in connection strength. It is difficult for the prior art to effectively solve the connection problem of dislocated longitudinal reinforcement.

Method used

Using a combined structure of steel bar sleeve and ultra-high performance concrete, by setting avoidance notches and digging areas in the sleeve, the dislocation longitudinal reinforcement is inserted, and the ultra-high performance concrete is filled to improve the connection strength, combining hydraulic steel bar bending machine and Technology such as sealing plates to achieve correct connection of longitudinal steel bars.

Benefits of technology

The connection tolerance and overall connection strength between the steel bar sleeve and the longitudinal steel bar are improved, the amount of concrete is reduced, and the connection strength between the superstructure members and the substructure members is enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933184A_ABST
    Figure CN118933184A_ABST
Patent Text Reader

Abstract

The invention relates to an assembly type component connecting structure and a construction method. The assembly type component connecting structure comprises a steel bar sleeve and an upper-layer ultra-high-performance concrete part. The rebar sleeve is embedded in the bottom of the lower-layer building component, an avoiding notch is formed in the side, close to the building component, of the rebar sleeve, and the avoiding notch is blocked by the upper-layer building component. An upper-layer digging area for avoiding the staggered lower-layer longitudinal steel bars is dug in the upper-layer building component, and the upper-layer digging area is located on the periphery of the avoiding notch; after the staggered lower-layer longitudinal steel bars are bent and penetrate through the avoiding notches, the staggered lower-layer longitudinal steel bars are inserted into the staggered steel bar sleeves, and the staggered lower-layer longitudinal steel bars are in grouting connection with the staggered steel bar sleeves; and the upper-layer digging area is filled with the upper-layer ultra-high-performance concrete part. According to the connecting structure, the staggered lower-layer longitudinal steel bars are bent and inserted into the staggered steel bar sleeves, the staggered steel bar sleeves and the staggered lower-layer longitudinal steel bars are fixedly connected again, and the connecting strength of the upper-layer building component and the lower-layer building component is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of prefabricated building construction, and in particular to a prefabricated component connection structure and a construction method. Background Art

[0002] Prefabricated construction is an emerging construction model. Its core is to transfer the on-site work of traditional construction to the factory, produce prefabricated components in the factory, and then transport the prefabricated components to the construction site for rapid assembly.

[0003] During the use of prefabricated buildings, workers need to connect building components in different parts. Sleeve grouting connection is the mainstream connection method for vertical components such as prefabricated columns and prefabricated shear walls in prefabricated buildings in my country.

[0004] In the prior art, the upper structure components (such as shear wall components) and the lower structure components (such as beam and slab components) are connected by sleeve grouting. A steel sleeve is embedded at the bottom of the upper structure component, and the upper longitudinal steel bars of the upper structure component are fixedly connected to the steel sleeve or arranged in the displaced steel sleeve. Correspondingly, the lower longitudinal steel bars are arranged on the top of the lower structure component, and the lower longitudinal steel bars are arranged in the steel sleeve. When the grouting grout in the sleeve hardens to form a whole, the connection between the upper longitudinal steel bars and the lower longitudinal steel bars is achieved.

[0005] However, in actual operation, due to installation errors by the staff, the dislocated steel bar sleeves of the upper structure components are staggered with the lower longitudinal steel bars of the lower structure components, which makes it difficult to insert the dislocated lower longitudinal steel bars into the dislocated steel bar sleeves. The staff needs to cut off the dislocated lower longitudinal steel bars, which makes the dislocated lower longitudinal steel bars lose connection with the steel bar sleeves, affecting the connection strength between the upper structure components and the lower structure components. Summary of the invention

[0006] In order to improve the fault tolerance of the connection between the steel sleeve and the lower longitudinal steel bars and to improve the connection strength between the upper building components and the lower building components, the present application provides a prefabricated component connection structure and a construction method.

[0007] The present application provides an assembled component connection structure and a construction method, which adopts the following technical solutions: A prefabricated component connection structure, wherein the upper structure component comprises an upper longitudinal steel bar, and the lower structure component comprises a lower longitudinal steel bar, wherein the lower longitudinal steel bar comprises a normal lower longitudinal steel bar and a dislocated lower longitudinal steel bar, wherein the normal lower longitudinal steel bar is located directly below the upper longitudinal steel bar, and the dislocated lower longitudinal steel bar is dislocated with the upper longitudinal steel bar; and the connection structure is used to connect the upper longitudinal steel bar with the dislocated lower longitudinal steel bar; The connection structure includes a steel sleeve and an upper ultra-high performance concrete member; the steel sleeve is buried at the bottom of the superstructure component, and the steel sleeve is provided with an avoidance gap on one side close to the building component, and the superstructure component blocks the avoidance gap, and the steel sleeve includes a positive steel sleeve and a dislocated steel sleeve; the positive lower longitudinal steel bars are inserted into the positive steel sleeve, and the positive lower longitudinal steel bars are connected to the positive steel sleeve by grouting; the superstructure component is excavated with an upper excavation area for avoiding the dislocated lower longitudinal steel bars, and the upper excavation area is located at the outer periphery of the avoidance gap; after the dislocated lower longitudinal steel bars are bent and passed through the avoidance gap, the dislocated lower longitudinal steel bars are inserted into the dislocated steel sleeve, and the dislocated lower longitudinal steel bars are connected to the dislocated steel sleeve by grouting; the upper ultra-high performance concrete member is filled in the upper excavation area.

[0008] By adopting the above technical scheme, for the staggered steel bar sleeves and the staggered lower longitudinal steel bars, the staggered lower longitudinal steel bars are bent and inserted into the staggered steel bar sleeves; then, the staff connects the staggered lower longitudinal steel bars with the staggered steel bar sleeves by grouting; that is, the staggered steel bar sleeves and the staggered lower longitudinal steel bars are re-fixed and connected, thereby improving the connection strength between the upper building components and the lower building components.

[0009] Specifically, the staff chiseled the concrete around the bottom of the dislocated steel bar sleeve to reveal the avoidance gap at the bottom of the dislocated steel bar sleeve, so that the bent dislocated lower longitudinal steel bars can be inserted into the dislocated steel bar sleeve through the avoidance gap.

[0010] The upper excavation area formed by excavating the concrete around the dislocated steel bar sleeve also provides space for the bending and deformation of the dislocated lower longitudinal steel bars; the workers can use a hydraulic steel bar bending machine to bend the dislocated lower longitudinal steel bars so that the dislocated lower longitudinal steel bars can be inserted into the dislocated steel bar sleeve through the avoidance gap. Subsequently, the workers use ultra-high performance concrete to fill the upper excavation area to form an ultra-high performance concrete piece. The ultra-high performance concrete piece wraps the dislocated steel bar sleeve and part of the dislocated lower longitudinal steel bars, which can further improve the connection strength between the upper and lower building components.

[0011] Optionally, the steel sleeve includes a cylinder body, a grouting pipe, and a slurry outlet pipe; the grouting pipe and the slurry outlet pipe are connected to the cylinder body, the grouting pipe and the slurry outlet pipe are arranged on both sides of the cylinder body, the slurry outlet pipe is located on the side of the cylinder body away from the lower building components, and the grouting pipe and the slurry outlet pipe are located on the same vertical line; the avoidance gap is arranged at the end of the cylinder body, and there are two avoidance gaps, and the two avoidance gaps are arranged on both sides of the grouting pipe.

[0012] By adopting the above technical solution, the avoidance gap is set on both sides of the grouting pipe, so as to facilitate the chiseling of concrete around the dislocated steel bar sleeve and reduce the amount of concrete removed from the upper building components. At the same time, it is also convenient for the bent dislocated lower longitudinal steel bar to be inserted into the dislocated steel bar sleeve.

[0013] Optionally, the steel sleeve further includes a blocking plate, which is detachably connected to the cylinder body and is used to block the avoidance gap.

[0014] By adopting the above technical solution, after the blocking plate is connected to the cylinder, the avoidance gap is blocked, so that it is convenient for the staff to bury the steel sleeve in the superstructure component.

[0015] Optionally, the avoidance gap is a step hole, and the outer periphery of the blocking plate is provided with a step surface abutting against the step hole; the blocking plate is clamped at the avoidance gap, and the blocking plate is bonded and fixed to the cylinder.

[0016] By adopting the above technical solution, the plugging plate and the avoidance gap are fixedly connected through the step hole, so as to facilitate the initial installation of the plugging plate and the cylinder. At the same time, the plugging plate and the cylinder are bonded and fixed, which, on the one hand, facilitates the staff to pre-embed the dislocated steel sleeve in the superstructure component; on the other hand, when the staff excavates the upper excavation area, it is convenient for the staff to separate the closing plate from the cylinder.

[0017] Optionally, it also includes a concrete protection piece, which is arranged on the outer periphery of the avoidance gap and blocks the avoidance gap; the structural strength of the concrete protection piece is lower than the structural strength of the superstructure component, and the concrete protection piece is arranged in the upper excavation area.

[0018] By adopting the above technical solution, low-strength concrete is poured around the outer periphery of the steel sleeve, and the low-strength concrete is solidified and hardened into a concrete protective part; then the steel sleeve and the concrete protective part are set in the template to cast the superstructure components. The proportion of the concrete protective part in the superstructure components is relatively small, so that the superstructure components still have a large overall strength. When the staff excavates the concrete around the dislocated steel sleeve, the staff mainly excavates the concrete protective part with lower structural strength, so that it is convenient for the staff to excavate the upper excavation area.

[0019] Optionally, it also includes a lower ultra-high performance concrete body, the lower building component is excavated with a lower excavation area, the lower excavation area is used to accommodate the lower ultra-high performance concrete body, the lower excavation area is arranged around the staggered lower longitudinal steel bars, and the lower excavation area is arranged opposite to the upper excavation area, and the upper ultra-high performance concrete body and the lower ultra-high performance concrete body are formed as one piece.

[0020] By adopting the above technical solution, by excavating the lower excavation area on the periphery of the dislocated lower longitudinal steel bars, on the one hand, the bending length of the dislocated lower longitudinal steel bars is extended to reduce the bending amplitude of the dislocated lower longitudinal steel bars, thereby facilitating the force transmission of the dislocated lower longitudinal steel bars and facilitating the bending of the dislocated lower longitudinal steel bars by the staff. On the other hand, the upper ultra-high performance concrete body and the lower ultra-high performance concrete body are integrally cast, thereby further improving the connection strength between the upper structure components and the lower structure components.

[0021] Optionally, along the direction away from the lower building component, the offset lower longitudinal steel bars include a first straight segment, a first bent segment, a second bent segment and a second straight segment in sequence; the first straight segment is fixedly connected to the lower building component, the first bent segment is in opposite directions to the second bent segment, and the second straight segment is inserted into the cylinder; the offset lower longitudinal steel bars are passed through the avoidance gap.

[0022] By adopting the above technical scheme, the dislocated lower longitudinal steel bars are bent into a first straight segment, a first bent segment, a second bent segment and a second straight segment, so that the force transmission path of the dislocated lower longitudinal steel bars is clear; at the same time, the second straight segment is vertically inserted into the dislocated steel bar sleeve, and when the second straight segment is connected to the dislocated steel bar sleeve by grouting, the integrity of the connection between the second straight segment, the dislocated steel bar sleeve and the upper longitudinal steel bar can be improved.

[0023] Optionally, it also includes connecting steel bars, which include a first connecting section, a second transition section and a third connecting section in sequence; the first connecting section is welded and fixed to the lower layer of longitudinal steel bars, and the third connecting section is welded and fixed to the outer periphery of the steel bar sleeve.

[0024] By adopting the above technical scheme, the dislocated steel bar sleeve is connected to the dislocated lower longitudinal steel bar through connecting steel bars, thereby further improving the connection strength between the dislocated steel bar sleeve and the lower longitudinal steel bar, and improving the connection strength between the upper building components and the lower building components.

[0025] A construction method for an assembled component comprises the following steps: Finding the dislocated lower longitudinal steel bars (212): hoisting the superstructure component (1), aligning the steel bar sleeve (3) of the superstructure component (1) with the dislocated lower longitudinal steel bars (212) of the lower structure component (2), and finding the dislocated lower longitudinal steel bars (212) dislocated with the steel bar sleeve (3), wherein the steel bar sleeve (3) corresponding to the dislocated lower longitudinal steel bars (212) is the dislocated steel bar sleeve (36); Construction of the upper excavation area (12): excavating the concrete of the upper structure component (1) located at the outer periphery of the dislocated steel sleeve (36), excavating the upper excavation area (12) at the outer periphery of the dislocated steel sleeve (36) to reveal the avoidance gap (311) of the dislocated steel sleeve (36); Construction of the upper excavation area (12): excavating the concrete of the lower building component (2) located at the periphery of the dislocated lower longitudinal reinforcement (212), and excavating the lower excavation area (22) at the periphery of the dislocated lower longitudinal reinforcement (212); Construction of the dislocated lower longitudinal steel bars (212): the dislocated lower longitudinal steel bars (212) are bent in the direction of the dislocated steel bar sleeve (36) into a first straight section (2121), a first bent section (2122), a second bent section (2123) and a second straight section (2124), and the second straight section (2124) is vertically arranged directly below the dislocated steel bar sleeve (36), and the dislocated lower longitudinal steel bars (212) are clamped at the avoidance notch (311); Installing the superstructure component (1): hoisting the superstructure component (1) so that the dislocated lower longitudinal steel bars (212) are inserted into the dislocated steel bar sleeves (36), and the oriented lower longitudinal steel bars (211) are inserted into the oriented steel bar sleeves (35); grouting the oriented lower longitudinal steel bars (211) and the oriented steel bar sleeves (35); Sealing the avoidance gap (311): Use early-strength concrete to seal the avoidance gap (311); Construction of the upper ultra-high performance concrete body and the lower ultra-high performance concrete body (5): installing a formwork on the outer periphery of the offset steel sleeve (36), and pouring ultra-high performance concrete into the lower excavation area (22) and the upper excavation area (12) to form the upper ultra-high performance concrete body and the lower ultra-high performance concrete body (5); Construction of the dislocated steel bar sleeve (36): the dislocated lower longitudinal steel bars (212) are connected to the dislocated steel bar sleeve (36) by grouting, so as to connect the upper longitudinal steel bars (11), the dislocated steel bar sleeve (36) and the dislocated lower longitudinal steel bars (212) into a whole.

[0026] Optionally, a construction method of an assembled component comprises the following steps: Construction of the connecting steel bar (7): the first connecting section of the connecting steel bar (7) is connected to the lower longitudinal rigid joint by lap welding to form a weld, and the third connecting section of the connecting steel bar (7) is connected to the outer periphery of the dislocated steel bar sleeve (36) by lap welding to form a weld.

[0027] In summary, the present application includes at least one of the following beneficial technical effects: 1. When the dislocated steel sleeve of the upper structure component is staggered with the lower longitudinal steel bars of the lower structure component; that is, by setting an avoidance gap, it is convenient for the staff to re-grout the dislocated steel sleeve and the lower longitudinal steel bars, thereby improving the fault tolerance of the connection between the steel sleeve and the lower longitudinal steel bars; 2. By excavating a lower excavation area on the outer periphery of the dislocated lower longitudinal steel bars, the bending length of the dislocated lower longitudinal steel bars is extended to reduce the bending amplitude of the dislocated lower longitudinal steel bars, thereby facilitating the force transmission of the dislocated lower longitudinal steel bars and making it easier for workers to bend the dislocated lower longitudinal steel bars; 3. The dislocated steel bar sleeve is connected to the dislocated lower longitudinal steel bar by connecting the steel bars, thereby further improving the connection strength between the dislocated steel bar sleeve and the lower longitudinal steel bar, and improving the connection strength between the upper structure components and the lower structure components. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the connection structure in Example 1.

[0029] Figure 2 yes Figure 1 Enlarged view of point A in the middle.

[0030] Figure 3 It is an exploded view of the connection structure in Example 1.

[0031] Figure 4 It is a partial schematic diagram of the connection structure in Example 1.

[0032] Figure 5 It is a cross-sectional view showing the first state of the connection structure in Embodiment 1.

[0033] Figure 6 It is a cross-sectional view showing the second state of the connection structure in the first embodiment.

[0034] Figure 7 It is a cross-sectional view showing the connection structure in the second embodiment.

[0035] Figure 8 It is a cross-sectional view showing the connection structure in the fourth embodiment.

[0036] Fig. 9 It is a schematic diagram showing the first state of the connection structure in Example 5.

[0037] Fig.10 It is a schematic diagram showing the second state of the connection structure in Example 5.

[0038] Fig.11 It is a schematic diagram showing the first state of the connection structure in Example 6.

[0039] Fig.12It is a schematic diagram showing the second state of the connection structure in Example 6.

[0040] Explanation of the reference numerals in the accompanying drawings: 1. Superstructure components; 11. Upper longitudinal reinforcements; 12. Upper excavation area; 2. Lowerstructure components; 21. Lower longitudinal reinforcements; 211. Correct lower longitudinal reinforcements; 212. Offset lower longitudinal reinforcements; 2121. First straight segment; 2122. First bending segment; 2123. Second bending segment; 2124. Second straight segment; 22. Lower excavation area; 3. Rebar sleeve; 31. Cylinder body; 311. Avoidance gap; 32. Grouting pipe; 33. Grouting pipe; 34. Sealing plate; 35. Correct reinforcement sleeve; 36. Offset reinforcement sleeve; 4. Upper ultra-high performance concrete member; 5. Lower ultra-high performance concrete body; 6. Concrete protection member; 7. Connecting reinforcement. DETAILED DESCRIPTION

[0041] The following is combined with Figure 1-12 This application is described in further detail.

[0042] Example 1 The present application discloses an assembled component connection structure and a construction method. Figure 1 The prefabricated component connection structure is used to connect the superstructure component 1 and the substructure component 2. In this embodiment, the superstructure component 1 is a shear wall component, and the substructure component 2 is a beam-slab component. In other embodiments, the superstructure component 1 and the substructure component 2 may also be column components.

[0043] Reference Figure 2 and Figure 3 , the upper structure component 1 includes an upper longitudinal steel bar 11; the lower structure component 2 includes a lower longitudinal steel bar 21, and the lower longitudinal steel bar 21 includes a normal lower longitudinal steel bar 211 and a dislocated lower longitudinal steel bar 212. The normal lower longitudinal steel bar 211 is located directly below the upper longitudinal steel bar 11, and the dislocated lower longitudinal steel bar 212 is dislocated with the upper longitudinal steel bar 11; the connecting structure is used to connect the upper longitudinal steel bar 11 with the lower longitudinal steel bar 21. In the lower structure fixtures, most of the lower longitudinal steel bars 21 are normal lower longitudinal steel bars 211, and only a few of the lower longitudinal steel bars 21 are dislocated lower longitudinal steel bars 212 and need to be processed twice. In order to facilitate the description of the technical solution of the present application, the present application only shows individual normal lower longitudinal steel bars 211.

[0044] The assembled connection structure includes a steel sleeve 3 and an upper ultra-high performance concrete member 4.

[0045] Reference Figure 2 and Figure 3 The steel sleeve 3 is buried at the bottom of the superstructure component 1, and the steel sleeve 3 is arranged at intervals along the length direction of the superstructure component 1.

[0046] Reference Figure 2 and Figure 3 The steel sleeve 3 includes a cylinder 31, a grouting pipe 32 and a grouting pipe 33. The grouting pipe 32 and the grouting pipe 33 are connected to the cylinder 31, and the grouting pipe 32 and the grouting pipe 33 are arranged on both sides of the cylinder 31. The grouting pipe 33 is located on the side of the cylinder 31 away from the lower building component 2, and the grouting pipe 32 and the grouting pipe 33 are located on the same vertical line. An avoidance gap 311 is provided on the side of the steel sleeve 3 close to the building component; in this embodiment, there are two avoidance gaps 311, which are arranged on both sides of the grouting pipe 32, and the upper building component 1 blocks the avoidance gap 311.

[0047] Reference Figure 2 and Figure 3 The upper longitudinal steel bar 11 is fixedly connected to the steel sleeve 3. The upper longitudinal steel bar 11 and the steel sleeve 3 can be mechanically connected, or the upper longitudinal steel bar 11 and the steel sleeve 3 are connected by grouting. In this embodiment, the upper longitudinal steel bar 11 is connected to the steel sleeve 3 by grouting, and the upper longitudinal steel bar 11 is inserted into the steel sleeve 3. The sleeve grouting process is a prior art and will not be described in detail in this application.

[0048] Reference Figure 2 and Figure 3 The steel sleeve 3 includes a normal steel sleeve 35 and a dislocated steel sleeve 36, and the normal steel sleeve 35 and the dislocated steel sleeve 36 have the same structure. The normal lower longitudinal steel bar 211 is located directly below the normal steel sleeve 35, and the dislocated lower longitudinal steel bar 212 is dislocated with the dislocated steel sleeve 36.

[0049] Reference Figures 3 to 5 When the staff connects the upper structure component 1 and the lower structure component 2, the lower longitudinal steel bar 211 is inserted into the steel bar sleeve 35, and the lower longitudinal steel bar 211 is connected with the steel bar sleeve 35 by grouting.

[0050] Reference Figure 4 and Figure 5 The upper structure component 1 is excavated with an upper excavation area 12 for avoiding the dislocated lower longitudinal steel bars 212, and the upper excavation area 12 is located at the periphery of the avoidance gap 311. Specifically, the staff excavates the concrete around the bottom of the dislocated steel bar sleeve 36 to reveal the avoidance gap 311 at the bottom of the dislocated steel bar sleeve 36. At the same time, the upper excavation area 12 also provides space for the bending deformation of the dislocated lower longitudinal steel bars 212.

[0051] Reference Figure 4 and Figure 5For the dislocated steel bar sleeve 36 and the dislocated lower longitudinal steel bar 212 , the staff bends the dislocated lower longitudinal steel bar 212 and inserts it into the dislocated steel bar sleeve 36 .

[0052] Reference Figure 3 and Figure 5 Specifically, the staff can use a hydraulic steel bar bending machine to bend the dislocated lower longitudinal steel bar 212. And along the distance from the lower building component 2, the dislocated lower longitudinal steel bar 212 is bent into a first straight segment 2121, a first bent segment 2122, a second bent segment 2123 and a second straight segment 2124. The first straight segment 2121 is buried in the lower building component 2, the first bent segment 2122 is opposite to the second bent segment 2123, and the second straight segment 2124 is vertically inserted into the cylinder 31. At this time, the dislocated lower longitudinal steel bar 212 is inserted into the avoidance gap 311.

[0053] Reference Figure 5 On the one hand, the avoidance notch 311 can reduce the bending amplitude of the dislocated lower longitudinal steel bars 212, thereby improving the stress of the dislocated lower longitudinal steel bars 212, and also facilitates the staff to bend the dislocated lower longitudinal steel bars 212. On the other hand, the amount of concrete removed from the superstructure component 1 and the cutting of the steel sleeve 3 can be reduced, thereby reducing the loss of the superstructure component 1.

[0054] Reference Figure 6 The staff hoist the superstructure component 1 to the top of the lower structure component 2, and then slowly lower the superstructure component 1 so that the correct lower longitudinal steel bars 211 are inserted into the correct steel bar sleeves 35, and the second straight line segments 2124 of the misaligned lower longitudinal steel bars 212 are inserted into the misaligned steel bar sleeves 36.

[0055] Reference Figure 6 The staff grouts the lower longitudinal reinforcement 211 and the reinforcement sleeve 35, and seals the avoidance gap 311 with early-strength concrete.

[0056] Reference Figure 6 The workers set up a template around the upper excavation area 12, and use ultra-high performance concrete to fill the upper excavation area 12 to form an ultra-high performance concrete piece. The ultra-high performance concrete piece wraps the dislocated steel bar sleeve 36 and part of the dislocated lower longitudinal steel bars 212, which can further improve the connection strength between the upper building component 1 and the lower building component 2.

[0057] Reference Figure 6Finally, the staff grouted the dislocated lower longitudinal steel bars 212 and the dislocated steel bar sleeves 36; that is, the dislocated steel bar sleeves 36 and the dislocated lower longitudinal steel bars 212 were re-fixed and connected, thereby improving the connection strength between the upper structure component 1 and the lower structure component 2, and improving the fault tolerance rate of the connection between the steel bar sleeves 3 and the lower longitudinal steel bars 21.

[0058] In this embodiment, the second straight segment 2124 is vertically inserted into the offset steel bar sleeve 36. When the second straight segment 2124 is connected to the offset steel bar sleeve 36 by grouting, the integrity of the connection between the second straight segment 2124, the offset steel bar sleeve 36 and the upper longitudinal steel bar 11 can be improved.

[0059] Example 2 The difference between this embodiment 2 and embodiment 1 is that: When the offset distance between the dislocated lower longitudinal steel bar 212 and the dislocated steel bar sleeve 36 is large, in order to facilitate the bending of the dislocated lower longitudinal steel bar, the bending amplitude of the dislocated lower longitudinal steel bar 212 is reduced. This embodiment further improves the connection structure.

[0060] Reference Figure 7 , the prefabricated component connection structure also includes a lower ultra-high performance concrete body 5. The lower building component 2 is excavated with a lower excavation area 22, which is used to accommodate the lower ultra-high performance concrete body 5. The lower excavation area 22 is arranged on the periphery of the dislocated lower longitudinal steel bars 212, and the lower excavation area 22 is arranged opposite to the upper excavation area 12, and the upper ultra-high performance concrete body and the lower ultra-high performance concrete body 5 are integrally formed. By excavating the lower excavation area 22 on the periphery of the dislocated lower longitudinal steel bars 212, on the one hand, the bending length of the dislocated lower longitudinal steel bars 212 is extended to reduce the bending amplitude of the dislocated lower longitudinal steel bars 212, thereby facilitating the force transmission of the dislocated lower longitudinal steel bars 212 and facilitating the bending of the dislocated lower longitudinal steel bars 212 by the staff. On the other hand, the upper ultra-high performance concrete body and the lower ultra-high performance concrete body 5 are integrally cast, so that the connection strength between the upper building component 1 and the lower building component 2 can be further improved.

[0061] Example 3 This embodiment 3 discloses the construction method of the assembled component connection structure in embodiment 2: Find the dislocated lower longitudinal steel bars 212: hoist the superstructure component 1, make the steel bar sleeve 3 of the superstructure component 1 correspond to the dislocated lower longitudinal steel bars 212 of the lower structure component 2, find the dislocated lower longitudinal steel bars 212 dislocated with the steel bar sleeve 3, and the steel bar sleeve 3 corresponding to the dislocated lower longitudinal steel bars 212 is the dislocated steel bar sleeve 36; Construction of the upper excavation area 12: excavating the concrete of the upper structure component 1 located at the periphery of the dislocated steel sleeve 36, excavating the upper excavation area 12 at the periphery of the dislocated steel sleeve 36 to reveal the avoidance gap 311 of the dislocated steel sleeve 36; Construction of the upper excavation area 12: excavating the concrete of the lower building component 2 located at the periphery of the dislocated lower longitudinal steel bars 212, and excavating the lower excavation area 22 at the periphery of the dislocated lower longitudinal steel bars 212; Construction of the dislocated lower longitudinal steel bars 212: bend the dislocated lower longitudinal steel bars 212 toward the dislocated steel bar sleeve 36 into a first straight segment 2121, a first bent segment 2122, a second bent segment 2123 and a second straight segment 2124, and the second straight segment 2124 is vertically arranged directly below the dislocated steel bar sleeve 36, and the dislocated lower longitudinal steel bars 212 are clamped at the avoidance gap 311; Install the superstructure component 1: hoist the superstructure component 1 so that the dislocated lower longitudinal steel bars 212 are inserted into the dislocated steel bar sleeves 36, and the normal lower longitudinal steel bars 211 are inserted into the normal steel bar sleeves 35; connect the normal lower longitudinal steel bars 211 and the normal steel bar sleeves 35 by grouting; Blocking the avoidance gap 311: Use early-strength concrete to block the avoidance gap 311; Construction of upper ultra-high performance concrete and lower ultra-high performance concrete body 5: installing formwork on the periphery of the offset steel sleeve 36, pouring ultra-high performance concrete into the lower excavation area 22 and the upper excavation area 12 to form upper ultra-high performance concrete and lower ultra-high performance concrete body 5; Construction of the dislocated steel bar sleeve 36: connect the dislocated lower longitudinal steel bar 212 and the dislocated steel bar sleeve 36 by grouting; so as to connect the upper longitudinal steel bar 11, the dislocated steel bar sleeve 36 and the dislocated lower longitudinal steel bar 212 into a whole.

[0062] Example 4 The difference between this embodiment 4 and embodiment 1 is that: Reference Figure 8 The prefabricated component connection structure also includes a concrete protection member 6, which is arranged on the periphery of the avoidance gap 311, and the concrete protection member 6 blocks the avoidance gap 311; the structural strength of the concrete protection member 6 is lower than the structural strength of the superstructure component 1, and the concrete protection member 6 is arranged in the upper excavation area 12.

[0063] By pouring low-strength concrete around the outer periphery of the steel sleeve 3, the low-strength concrete solidifies and hardens into a concrete protection member 6; then the steel sleeve 3 and the concrete protection member 6 are placed in a template to pour the superstructure component 1. The concrete protection member 6 is relatively small in the superstructure component 1, so that the superstructure component 1 still has a relatively large overall strength. When the staff excavates the concrete around the dislocated steel sleeve 36, the staff mainly excavates the concrete protection member 6 with a relatively low structural strength, so that it is convenient for the staff to excavate the upper excavation area 12.

[0064] Example 5 The difference between this embodiment 5 and embodiment 1 is that: Reference Fig. 9 The steel sleeve 3 further includes a blocking plate 34, which is detachably connected to the cylinder 31 and is used to block the avoidance gap 311. In this embodiment, the avoidance gap 311 is a step hole, and the outer periphery of the blocking plate 34 is provided with a step surface abutting against the step hole; the blocking plate 34 is clamped at the avoidance gap 311, and the blocking plate 34 is bonded and fixed to the cylinder 31.

[0065] Reference Fig.10 After the plugging plate 34 is connected to the cylinder 31, the avoidance gap 311 is blocked. This makes it easier for the staff to bury the steel sleeve 3 in the superstructure component 1. The plugging plate 34 is fixedly connected to the avoidance gap 311 through the step hole, which facilitates the initial installation of the plugging plate 34 and the cylinder 31. At the same time, the plugging plate 34 is bonded and fixed to the cylinder 31. On the one hand, it is easier for the staff to pre-bury the dislocated steel sleeve 36 in the superstructure component 1; on the other hand, when the staff excavates the upper excavation area 12, it is easier for the staff to separate the closing plate from the cylinder 31.

[0066] Example 6 The difference between this embodiment 6 and embodiment 1 is that: Reference Fig.11 The prefabricated component connection structure also includes a connecting steel bar 7, which includes a first connecting section, a second transition section and a third connecting section in sequence; a section of the first connecting section is welded and fixed to the lower longitudinal steel bar 21, and the third connecting section is welded and fixed to the outer periphery of the cylinder 31.

[0067] Reference Fig.12 Subsequently, the staff poured ultra-high performance concrete into the upper excavation area 12 and the lower excavation area 22 to integrally form an upper ultra-high performance concrete body and a lower ultra-high performance concrete body 5 .

[0068] The dislocated steel bar sleeve 36 is connected to the dislocated lower longitudinal steel bar 212 by connecting the steel bar 7, thereby further improving the connection strength between the dislocated steel bar sleeve 36 and the lower longitudinal steel bar 21, and improving the connection strength between the upper building component 1 and the lower building component 2.

[0069] Example 7 This embodiment 7 discloses a construction method of an assembled component, which further includes the following steps: Reference Fig.11 and Fig.12 , construction of connecting steel bars 7: the first connecting section of the connecting steel bars 7 is connected to the lower longitudinal rigid lap welding to form a weld, and the third connecting section of the connecting steel bars 7 is connected to the outer periphery of the dislocated steel bar sleeve 36 by lap welding to form a weld.

[0070] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An assembled component connection structure, wherein an upper structure component (1) comprises an upper longitudinal steel bar (11), and a lower structure component (2) comprises a lower longitudinal steel bar (21), wherein the lower longitudinal steel bar (21) comprises a normal lower longitudinal steel bar (211) and a dislocated lower longitudinal steel bar (212), wherein the normal lower longitudinal steel bar (211) is located directly below the upper longitudinal steel bar (11), and the dislocated lower longitudinal steel bar (212) is dislocated with the upper longitudinal steel bar (11); the connection structure is used to connect the upper longitudinal steel bar (11) and the dislocated lower longitudinal steel bar (212); and the characteristics are: The connection structure comprises a steel sleeve (3) and an upper ultra-high performance concrete member (4); the steel sleeve (3) is buried at the bottom of the superstructure component (1); a side of the steel sleeve (3) close to the building component is provided with an avoidance gap (311); the superstructure component (1) blocks the avoidance gap (311); the steel sleeve (3) comprises a positive steel sleeve (35) and a misaligned steel sleeve (36); the positive lower longitudinal steel bars (211) are inserted into the positive steel sleeve (35); the positive lower longitudinal steel bars (211) and the positive steel sleeve (35) are connected to each other. Grouting connection; the upper structure component (1) is excavated with an upper excavation area (12) for avoiding the dislocated lower longitudinal steel bars (212), and the upper excavation area (12) is located at the periphery of the avoidance gap (311); after the dislocated lower longitudinal steel bars (212) are bent and inserted into the avoidance gap (311), the dislocated lower longitudinal steel bars (212) are inserted into the dislocated steel bar sleeve (36), and the dislocated lower longitudinal steel bars (212) are connected to the dislocated steel bar sleeve (36) by grouting; the upper ultra-high performance concrete member (4) is filled in the upper excavation area (12).

2. The assembled component connection structure according to claim 1, characterized in that: The steel sleeve (3) comprises a cylinder (31), a grouting pipe (32), and a grouting pipe (33); the grouting pipe (32) and the grouting pipe (33) are in communication with the cylinder (31); the grouting pipe (32) and the grouting pipe (33) are arranged on both sides of the cylinder (31); the grouting pipe (32) and the grouting pipe (33) are located on a side of the cylinder (31) away from the lower building component (2); and the grouting pipe (32) and the grouting pipe (33) are located on the same vertical line; the avoidance notch (311) is arranged at an end of the cylinder (31); two avoidance notches (311) are provided, and the two avoidance notches (311) are arranged on both sides of the grouting pipe (32).

3. The assembled component connection structure according to claim 2, characterized in that: The steel bar sleeve (3) further comprises a blocking plate (34), the blocking plate (34) being detachably connected to the cylinder (31), and the blocking plate (34) being used to block the avoidance gap (311).

4. The assembled component connection structure according to claim 3, characterized in that: The avoidance notch (311) is a step hole, and the outer periphery of the blocking plate (34) is provided with a step surface abutting against the step hole; the blocking plate (34) is clamped at the avoidance notch (311), and the blocking plate (34) is bonded and fixed to the cylinder (31).

5. The assembled component connection structure according to claim 1, characterized in that: It also comprises a concrete protection member (6), the concrete protection member (6) being arranged on the periphery of the avoidance gap (311), the concrete protection member (6) blocking the avoidance gap (311); the structural strength of the concrete protection member (6) is lower than the structural strength of the upper building component (1), and the concrete protection member (6) is arranged in the upper excavation area (12).

6. The assembled component connection structure according to claim 1, characterized in that: It also includes a lower layer ultra-high performance concrete body (5), the lower layer building component (2) is excavated with a lower layer excavation area (22), the lower layer excavation area (22) is used to accommodate the lower layer ultra-high performance concrete body (5), the lower layer excavation area (22) is arranged on the periphery of the dislocated lower layer longitudinal steel bars (212), and the lower layer excavation area (22) is arranged opposite to the upper layer excavation area (12), and the upper layer ultra-high performance concrete body and the lower layer ultra-high performance concrete body (5) are integrally formed.

7. The assembled component connection structure according to claim 6, characterized in that: Along a direction away from the lower building component (2), the dislocated lower longitudinal steel bar (212) comprises in sequence a first straight section (2121), a first bent section (2122), a second bent section (2123) and a second straight section (2124); the first straight section (2121) is fixedly connected to the lower building component (2), the first bent section (2122) and the second bent section (2123) are in opposite directions, and the second straight section (2124) is inserted into the steel bar sleeve (3); the dislocated lower longitudinal steel bar (212) is inserted into the avoidance notch (311).

8. The assembled component connection structure according to claim 1, characterized in that: It also includes connecting steel bars (7), the connecting steel bars (7) sequentially including a first connecting section, a second transition section, and a third connecting section; the first connecting section is welded and fixed to the lower layer longitudinal steel bars (21), and the third connecting section is welded and fixed to the outer periphery of the steel bar cylinder (31).

9. A construction method for the assembled component connection structure according to any one of claims 1 to 8, characterized in that: Finding the dislocated lower longitudinal steel bars (212): hoisting the superstructure component (1), aligning the steel bar sleeve (3) of the superstructure component (1) with the dislocated lower longitudinal steel bars (212) of the lower structure component (2), and finding the dislocated lower longitudinal steel bars (212) dislocated with the steel bar sleeve (3), wherein the steel bar sleeve (3) corresponding to the dislocated lower longitudinal steel bars (212) is the dislocated steel bar sleeve (36); Construction of the upper excavation area (12): excavating the concrete of the upper structure component (1) located at the outer periphery of the dislocated steel sleeve (36), excavating the upper excavation area (12) at the outer periphery of the dislocated steel sleeve (36) to reveal the avoidance gap (311) of the dislocated steel sleeve (36); Construction of the upper excavation area (12): excavating the concrete of the lower building component (2) located at the periphery of the dislocated lower longitudinal reinforcement (212), and excavating the lower excavation area (22) at the periphery of the dislocated lower longitudinal reinforcement (212); Construction of the dislocated lower longitudinal steel bars (212): the dislocated lower longitudinal steel bars (212) are bent in the direction of the dislocated steel bar sleeve (36) into a first straight section (2121), a first bent section (2122), a second bent section (2123) and a second straight section (2124), and the second straight section (2124) is vertically arranged directly below the dislocated steel bar sleeve (36), and the dislocated lower longitudinal steel bars (212) are clamped at the avoidance notch (311); Installing the superstructure component (1): hoisting the superstructure component (1) so that the dislocated lower longitudinal steel bars (212) are inserted into the dislocated steel bar sleeves (36), and the oriented lower longitudinal steel bars (211) are inserted into the oriented steel bar sleeves (35); grouting the oriented lower longitudinal steel bars (211) and the oriented steel bar sleeves (35); Sealing the avoidance gap (311): Use early-strength concrete to seal the avoidance gap (311); Construction of the upper ultra-high performance concrete body and the lower ultra-high performance concrete body (5): installing a formwork on the outer periphery of the offset steel sleeve (36), and pouring ultra-high performance concrete into the lower excavation area (22) and the upper excavation area (12) to form the upper ultra-high performance concrete body and the lower ultra-high performance concrete body (5); Construction of the dislocated steel bar sleeve (36): the dislocated lower longitudinal steel bars (212) are connected to the dislocated steel bar sleeve (36) by grouting, so as to connect the upper longitudinal steel bars (11), the dislocated steel bar sleeve (36) and the dislocated lower longitudinal steel bars (212) into a whole.

10. A construction method for the assembled component connection structure according to claim 9, characterized in that: The following steps are also included: Construction of the connecting steel bar (7): the first connecting section of the connecting steel bar (7) is connected to the lower longitudinal rigid joint by lap welding to form a weld, and the third connecting section of the connecting steel bar (7) is connected to the outer periphery of the dislocated steel bar sleeve (36) by lap welding to form a weld.