Rapid pre-fixing structure for curtain wall installation of building device

By introducing adjustment components and dampers into the architectural curtain wall installation structure, the problem of inconvenient adjustment of positioning columns is solved, flexible installation and stable use are achieved, and the applicability and durability of the curtain wall are improved.

CN118933377APending Publication Date: 2024-11-12CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411228184.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The installation of fast prefixed structures in existing architectural curtain walls is inconvenient when adjusting the positioning columns, which affects the applicability and use effect.

Method used

Using a structure including adjustment assembly one and adjustment assembly two, the vertical and horizontal distance adjustment of the sliding frame and installation assembly is achieved through a bidirectional screw, bevel gear and thread engagement mechanism, and the positioning cylinder, slide plate and damper ensures flexibility in installation. Sex and stability.

Benefits of technology

It improves the applicability and use effect of curtain wall installation, can flexibly adjust the installation size, reduce the impact of wind and vibration on the curtain wall, and ensures the stability and durability of installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933377A_ABST
    Figure CN118933377A_ABST
Patent Text Reader

Abstract

The invention discloses a building device curtain wall installation rapid pre-fixing structure, and relates to the technical field of building curtain wall installation, the building device curtain wall installation rapid pre-fixing structure comprises two fixing frames, two connecting blocks are symmetrically fixed to one sides of the two fixing frames respectively, and one ends of every two adjacent connecting blocks are fixedly connected with fixing plates; two mounting holes are symmetrically formed in the inner sides of the two fixing plates; the multiple connecting rods can be controlled to be far away from or close to each other by arranging the first adjusting assemblies, finally adjustment of the vertical distance between the two sliding frames and the multiple mounting assemblies is completed, and the two adjacent sliding rods and the mounting assemblies can be controlled to be far away from or close to each other by arranging the two second adjusting assemblies. And the dampers and the buffer springs are installed between the multiple positioning cylinders and the sliding plate, and after the building curtain wall is installed, vibration of the building curtain wall can be buffered, so that the using effect of the building curtain wall is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building curtain wall installation, in particular to a fast pre-fixing structure for installing a building device curtain wall. Background Art

[0002] Building curtain wall refers to the non-load-bearing exterior wall enclosure of a building, which is usually composed of panels (glass, metal plates, stone slabs, ceramic plates, etc.) and the supporting structure behind it (aluminum beams and columns, steel structures, glass ribs, etc.). The building curtain wall is composed of a supporting structure system and panels, and has a certain displacement capacity relative to the main structure. It is an exterior protective structure or decorative structure of the building that does not share the effects on the main structure. The curtain wall is the exterior wall enclosure of the building, which is non-load-bearing and is hung like a curtain, so it is also called a hanging wall. It is a lightweight wall with decorative effects commonly used in modern large and high-rise buildings. It is composed of a structural frame and inlaid panels. It is a building enclosure structure that does not bear the load and effects of the main structure. In order to facilitate the installation of the building curtain wall, a pre-fixed structure is usually pre-installed on the outside of the building structure.

[0003] After searching the patent with application number 202311821226.3, a rapid pre-fixing structure for the installation of curtain walls of building devices is disclosed, which includes a central body, and the outer wall of the central body is provided with one end of an electric telescopic rod, and the other end of the electric telescopic rod is fixedly connected to a positioning column, and a positioning device is provided inside the positioning column. The rapid pre-fixing structure for the installation of curtain walls of building devices can perform different depth adjustments through the positioning device, so that the positioning column is suitable for wall installation of positioning columns of various depths, thereby improving the applicability of the positioning device to different depth ranges of positioning columns, and the positioning nail is directionally knocked by an external tool so that the end of the adjusting nail is completely inserted into the positioning hole, thereby improving the installation convenience of the positioning device, and the circular groove acts on the expansion strip, so that after the expansion strip is embedded in the inner wall of the positioning hole, the friction between the expansion strip and the inner wall of the positioning hole is increased, thereby improving the positioning effect of the positioning device.

[0004] Combining the existing technology and the modified device, it is found that:

[0005] When installing building curtain walls of different sizes, it is necessary to adjust the position of the installed positioning columns. The above solution is not convenient for adjusting the position of the positioning columns during use, which affects the applicability of the pre-fixed structure of the building curtain wall and affects the use effect of the pre-fixed structure of the building curtain wall. Summary of the invention

[0006] The object of the present invention is to provide a fast pre-fixing structure for installing a curtain wall of a building device, so as to solve the problems raised in the above-mentioned background technology.

[0007] The technical solution of the present invention is: a fast pre-fixing structure for curtain wall installation of a building device, comprising two fixing frames, two connecting blocks are symmetrically fixed on one side of the two fixing frames, one end of the two adjacent connecting blocks is fixedly connected to a fixing plate, and the inner sides of the two fixing plates are symmetrically provided with two mounting holes, and also comprises: an adjusting component 1 and two adjusting components 2, the adjusting component 1 is arranged between the two fixing frames; the two adjusting components 2 are respectively arranged at the upper and lower positions of the two fixing frames; the adjusting component 1 comprises two bidirectional screw rods 1 rotatably connected to the inner sides of the two fixing frames, and a screw rod 1 fixedly connected to the inner sides of the two fixing frames. A connecting frame is provided between the two bidirectional screw rods, a driven bevel gear 1 is fixed to the outer sides of the two bidirectional screw rods, and the outer sides of the two bidirectional screw rods are symmetrically rotatably connected to two connecting rods through threads, a rotating rod 1 is rotatably connected to the inner side of the connecting frame at the middle section, a rotating block 1 is fixed to the outer end of the rotating rod 1, and a driving bevel gear 2 is fixed to the other end of the rotating rod 1, a rotating shaft is rotatably connected to the inner side of the connecting frame, a driving bevel gear 1 meshing with two driven bevel gears 1 is fixed to the outer ends of the rotating shaft, and a driven bevel gear 2 meshing with the driving bevel gear 2 is fixed to the outer side of the rotating shaft at the middle section.

[0008] Preferably, the two adjusting assemblies 2 include two sliding frames fixedly connected to one end of two adjacent connecting rods, the inner sides of the two sliding frames are rotatably connected with a two-way screw rod 2, the outer sides of the two two-way screw rods 2 are fixed with a driven bevel gear 3, and the outer sides of the two two-way screw rods 2 are symmetrically rotatably connected to two sliding rods through threads, the inner sides of the two sliding frames are located at the middle position and are rotatably connected with a rotating rod 2 passing through, a rotating block 2 is fixed to one end of the outer sides of the two rotating rods 2, and the other ends of the two rotating rods 2 are fixed with an active bevel gear 3 meshing with the two driven bevel gears 3, and one end of each of the multiple sliding rods is provided with a mounting assembly.

[0009] Preferably, the multiple mounting components include positioning cylinders fixed to one end of the multiple sliding rods, the inner sides of the multiple positioning cylinders are slidably connected with slides, one side of the multiple slides are fixed with positioning columns, the other ends of the multiple positioning columns are fixed with mounting plates, and the inner sides of the multiple mounting plates are evenly spaced with multiple positioning holes distributed in a circle.

[0010] Preferably, dampers and buffer springs are installed between the plurality of positioning cylinders and the slide plate.

[0011] Preferably, a slide groove is provided on the inner side of each of the two fixing frames, and two sliders are provided on the inner side of each of the two slide grooves for symmetrical sliding up and down movement, and the multiple sliders are respectively fixed on one side of the multiple connecting rods.

[0012] Preferably, guide grooves are provided on the inner sides of the two sliding frames, two guide blocks are symmetrically and slidably provided on the inner sides of the two guide grooves, and the plurality of guide blocks are respectively fixed on one side of the plurality of sliding rods.

[0013] Preferably, a rubber pad is provided on one side of each of the plurality of mounting plates.

[0014] The present invention provides a fast pre-fixed structure for installing a curtain wall of a building device through improvement, which has the following improvements and advantages compared with the prior art:

[0015] First, the present invention is provided with an adjustment component 1. When in operation, the rotating block 1 is rotated, and the cooperation between the active bevel gear 2 and the driven bevel gear 2 is utilized to drive the two active bevel gears 1 to rotate. The rotation of the two active bevel gears 1 drives the two driven bevel gears 1 to rotate, and then the two bidirectional screw rods 1 rotate. The rotation of the two bidirectional screw rods 1 drives multiple connecting rods to move away from or approach each other through threaded engagement, and finally completes the adjustment of the vertical distance between the two sliding frames and multiple installation components, thereby improving applicability.

[0016] Secondly: the present invention is provided with two adjustment components 2. When in operation, the two rotating blocks 2 are rotated respectively, and the cooperation between the two active bevel gears 3 and the driven bevel gear 3 is utilized to drive the two bidirectional screw rods 2 to rotate, and then the two adjacent sliding rods and the installation components are driven to move away from or approach each other through threaded engagement, thereby completing the adjustment of the horizontal distance and further improving the applicability.

[0017] Thirdly, the present invention installs dampers and buffer springs between a plurality of positioning cylinders and the slide plate, so that after the installation of the building curtain wall is completed, the vibration of the building curtain wall can be buffered, thereby ensuring the use effect of the building curtain wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0020] Figure 2 It is a schematic diagram of a local structure between a fixing frame and a fixing plate in the present invention;

[0021] Figure 3 It is a partial cross-sectional structural schematic diagram of an adjustment component in the present invention;

[0022] Figure 4 For the present invention Figure 3 The enlarged structural diagram at A in the middle;

[0023] Figure 5 It is a partial cross-sectional structural schematic diagram of one of the adjustment components 2 in the present invention;

[0024] Figure 6 It is a schematic diagram of a partial cross-sectional structure between one of the positioning cylinders and the mounting plate in the present invention.

[0025] Reference numerals:

[0026] 1. Fixed frame; 2. Fixed plate; 201. Connecting block; 202. Mounting hole; 3. Connecting rod; 4. Adjusting assembly 1; 401. Bidirectional screw 1; 402. Driven bevel gear 1; 403. Slide; 404. Sliding block; 405. Connecting frame; 406. Rotating shaft; 407. Active bevel gear 1; 408. Rotating rod 1; 409. Rotating block 1; 410. Active bevel gear 2; 411. Driven bevel gear 2; 5. Sliding frame; 6. Slide rod; 7. Adjustment assembly 2; 701. Bidirectional screw rod 2; 702. Driven bevel gear 3; 703. Guide groove; 704. Guide block; 705. Rotating rod 2; 706. Rotating block 2; 707. Active bevel gear 3; 8. Installation assembly; 801. Positioning cylinder; 802. Slide plate; 803. Damper; 804. Buffer spring; 805. Positioning column; 806. Mounting plate; 807. Positioning hole; 808. Rubber pad. DETAILED DESCRIPTION

[0027] The present invention is described in detail below, and the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] The present invention provides a fast pre-fixed structure for curtain wall installation of a building device through improvement. The technical solution of the present invention is:

[0029] like Figures 1 to 6As shown, an embodiment of the present invention provides a fast pre-fixing structure for curtain wall installation of a building device, comprising two fixing frames 1, two connecting blocks 201 are symmetrically fixed on one side of the two fixing frames 1, one end of each of the two adjacent connecting blocks 201 is fixedly connected to a fixing plate 2, two mounting holes 202 are symmetrically provided on the inner sides of the two fixing plates 2, fixing bolts are passed through the inside of the multiple mounting holes 202, so that the fixing bolts are connected to the structure outside the building structure, so that the structure can be pre-installed conveniently, and further comprising: an adjusting component 1 4 and two adjusting components 2 7, the adjusting component 1 4 is arranged between the two fixing frames 1; the two adjusting components 2 7 are respectively arranged at At the upper and lower positions of the two fixed frames 1; the adjustment component 4 includes two bidirectional screw rods 401 rotatably connected to the inner sides of the two fixed frames 1, and a connecting frame 405 fixedly connected between the two fixed frames 1. The outer sides of the two bidirectional screw rods 401 are fixed with driven bevel gears 402, and the outer sides of the two bidirectional screw rods 401 are symmetrically rotatably connected to two connecting rods 3 through threads. The inner side of the connecting frame 405 is located in the middle position and is rotatably connected with a rotating rod 408. A rotating block 409 is fixed to one end of the outer side of the rotating rod 408. The outer side of the rotating block 409 is provided with irregular patterns for easy rotation. The other end of the rotating rod 408 is fixed There is a driving bevel gear 410, and a rotating shaft 406 is rotatably connected to the inner side of the connecting frame 405. Both ends of the outer side of the rotating shaft 406 are fixed with a driving bevel gear 407 meshing with two driven bevel gears 402, and a driven bevel gear 411 meshing with the driving bevel gear 410 is fixed at the middle position of the outer side of the rotating shaft 406. When the building curtain wall needs to be installed, the building curtain wall to be installed is placed on the front side of the two fixed frames 1, the structure is adjusted as a whole according to the size of the building curtain wall, the rotating block 409 is held and rotated, and then the driving bevel gear 410 rotates, and the driving bevel gear 410 rotates to drive the driven bevel gear 411 to mesh with the driving bevel gear 410. The meshed driven bevel gear 411 rotates, and then the rotating shaft 406 rotates. The rotation of the rotating shaft 406 drives the two active bevel gears 407 fixed at both ends to rotate synchronously. The two active bevel gears 407 rotate to drive the two meshed driven bevel gears 402 to rotate. The two driven bevel gears 402 are respectively fixed to the outside of the two bidirectional screw rods 401, and then the two bidirectional screw rods 401 rotate. The rotation of the two bidirectional screw rods 401 drives the multiple connecting rods 3 to move away from or approach each other through threaded engagement, and then the two sliding frames 5 move away from or relatively approach each other, thereby realizing the vertical adjustment of the two sliding frames 5 and the multiple mounting components 8.

[0030] Further, in order to facilitate the adjustment of the horizontal distance between the multiple mounting components 8, the two adjusting components 2 7 include two sliding frames 5 fixedly connected to one end of two adjacent connecting rods 3, the inner sides of the two sliding frames 5 are rotatably connected with a two-way screw rod 2 701, the outer sides of the two two-way screw rods 2 701 are fixed with a driven bevel gear 3 702, and the outer sides of the two two-way screw rods 2 701 are symmetrically rotatably connected to two sliding rods 6 through threads, the inner sides of the two sliding frames 5 are both rotatably connected with a rotating rod 2 705 at the middle position, the outer ends of the two rotating rods 2 705 are fixed with a rotating block 2 706, and the other ends of the two rotating rods 2 705 are fixed with a rotating block 2 706 connected to the two driven bevel gears 3 70 2. The active bevel gear three 707 is meshed with each other, and one end of the multiple slide bars 6 is provided with a mounting assembly 8, which respectively hold the two rotating blocks 2 706 to rotate, drive the two rotating rods 2 705 fixed thereto to rotate, and then the two active bevel gears 3 707 rotate, and the two active bevel gears 3 707 rotate to drive the two driven bevel gears 3 702 meshed therewith to rotate, and the two driven bevel gears 3 702 are respectively fixed to the outside of the two two-way screw rods 2 701, so that the two two-way screw rods 2 701 rotate, and the rotation of the two two-way screw rods 2 701 drives the multiple slide bars 6 to move away from or approach each other through threaded engagement, and finally realizes the horizontal adjustment of the multiple slide bars 6 and the multiple mounting assemblies 8.

[0031] Furthermore, in order to ensure the installation of the building curtain wall, multiple installation components 8 include positioning cylinders 801 fixed to one end of multiple sliding rods 6, the inner sides of the multiple positioning cylinders 801 are slidably connected with slides 802, one side of the multiple slides 802 is fixed with positioning columns 805, the other ends of the multiple positioning columns 805 are fixed with mounting plates 806, and the inner sides of the multiple mounting plates 806 are evenly spaced with multiple circularly distributed positioning holes 807, so that the pre-installed holes of the building curtain wall correspond to the multiple positioning holes 807, and the building curtain wall is connected to the multiple mounting plates 806 using connecting bolts to complete the installation of the building curtain wall.

[0032] Furthermore, in order to reduce the impact of wind and building structure vibration on the building curtain wall during installation and use, dampers 803 and buffer springs 804 are installed between multiple positioning cylinders 801 and slide plates 802. The vibration is transmitted to the building curtain wall, so that the multiple mounting plates 806 drive the multiple positioning columns 805 to move, and the multiple positioning columns 805 slide on the inner walls of the multiple positioning cylinders 801 through the multiple slide plates 802. The installed multiple dampers 803 and buffer springs 804 can buffer the movement of the multiple slide plates 802, and then buffer the vibration of the building curtain wall, thereby ensuring the use effect of the building curtain wall.

[0033] Furthermore, in order to ensure the vertical movement of the multiple connecting rods 3, a slide groove 403 is provided on the inner side of the two fixed frames 1, and two sliders 404 are symmetrically slidably provided on the inner side of the two slide grooves 403. The multiple sliders 404 are respectively fixed on one side of the multiple connecting rods 3 to play a guiding role.

[0034] Furthermore, in order to ensure the horizontal movement of the multiple sliding rods 6, guide grooves 703 are provided on the inner sides of the two sliding frames 5, and two guide blocks 704 are symmetrically slidably provided on the inner sides of the two guide grooves 703. The multiple guide blocks 704 are respectively fixed on one side of the multiple sliding rods 6 to play a guiding role.

[0035] Furthermore, a rubber pad 808 is provided on one side of the plurality of mounting plates 806, which effectively reduces the wear caused by friction between one side and one side of the plurality of mounting plates 806 after the building curtain wall is installed.

[0036] Specific implementation steps: During operation, use fixing bolts to pass through the multiple installation holes 202 so that the fixing bolts are connected to the structure outside the building structure, which can facilitate the pre-installation of the structure. When the building curtain wall needs to be installed, the building curtain wall to be installed is placed on the front of the two fixing frames 1, and the structure is adjusted as a whole according to the size of the building curtain wall. Hold the rotating block 1 409 to rotate, and then the active bevel gear 2 410 rotates, and the active bevel gear 2 410 rotates to drive the driven bevel gear 2 411 meshed with it to rotate, and then the rotating shaft 406 rotates, and the rotating shaft 406 rotates to drive The two active bevel gears 407 fixed at both ends thereof rotate synchronously, and the two active bevel gears 407 rotate to drive the two driven bevel gears 402 meshing therewith to rotate, and the two driven bevel gears 402 are respectively fixed to the outsides of the two bidirectional screw rods 401, so that the two bidirectional screw rods 401 rotate, and the two bidirectional screw rods 401 rotate to drive the multiple connecting rods 3 to move away from or approach each other through threaded engagement, so that the two sliding frames 5 move away from or approach each other relatively, thereby realizing the vertical adjustment of the two sliding frames 5 and the multiple mounting components 8, and respectively holding the two rotating blocks 706 to rotate, The two rotating rods 2 705 fixed thereto are driven to rotate, and then the two active bevel gears 3 707 are rotated. The rotation of the two active bevel gears 3 707 drives the two driven bevel gears 3 702 meshing therewith to rotate. The two driven bevel gears 3 702 are respectively fixed to the outsides of the two bidirectional screw rods 2 701, so that the two bidirectional screw rods 2 701 rotate. The rotation of the two bidirectional screw rods 2 701 drives the multiple sliding rods 6 to move away from or approach each other through threaded engagement, and finally realizes the horizontal adjustment of the multiple sliding rods 6 and the multiple installation components 8. After the adjustment is completed, the pre-installed holes of the building curtain wall are aligned with the multiple positioning holes 807. Correspondingly, connecting bolts are used to connect the building curtain wall and multiple mounting plates 806 to complete the installation of the building curtain wall. At the same time, when the building curtain wall is installed and used, it is affected by wind force and vibration of the building structure, and the vibration is transmitted to the building curtain wall, so that the multiple mounting plates 806 drive the multiple positioning columns 805 to move, and the multiple positioning columns 805 slide on the inner walls of the multiple positioning cylinders 801 through the multiple slides 802. The installed multiple dampers 803 and buffer springs 804 can buffer the movement of the multiple slides 802, and then buffer the vibration of the building curtain wall, thereby ensuring the use effect of the building curtain wall.

[0037] The above description enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A fast pre-fixing structure for curtain wall installation of a building device, comprising two fixing frames (1), two connecting blocks (201) are symmetrically fixed on one side of the two fixing frames (1), one end of two adjacent connecting blocks (201) is fixedly connected to a fixing plate (2), and two mounting holes (202) are symmetrically opened on the inner sides of the two fixing plates (2), characterized in that: Also includes: An adjustment component (4), wherein the adjustment component (4) is arranged between the two fixed frames (1); Two adjustment components (7), the two adjustment components (7) are respectively arranged at upper and lower positions of the two fixed frames (1); The adjustment component (4) comprises two bidirectional screw rods (401) rotatably connected to the inner sides of the two fixed frames (1), and a connecting frame (405) fixedly connected between the two fixed frames (1). The outer sides of the two bidirectional screw rods (401) are fixed with a driven bevel gear (402), and the outer sides of the two bidirectional screw rods (401) are symmetrically rotatably connected to two connecting rods (3) through threads. The inner side of the connecting frame (405) is located at the middle section and is rotatably connected with a rotating rod (408). The rotating rod (408) is fixedly connected to the inner side of the two bidirectional screw rods (401). A rotating block 1 (409) is fixed to one end of the outside of the rotating rod 1 (408), and a driving bevel gear 2 (410) is fixed to the other end of the rotating rod 1 (408), and a rotating shaft (406) is rotatably connected to the inner side of the connecting frame (405), and a driving bevel gear 1 (407) meshing with two driven bevel gears 1 (402) is fixed to both ends of the outside of the rotating shaft (406), and a driven bevel gear 2 (411) meshing with the driving bevel gear 2 (410) is fixed to the outside of the rotating shaft (406) at the middle position.

2. A fast pre-fixed structure for curtain wall installation of a building device according to claim 1, characterized in that: The two adjustment components (7) include two sliding frames (5) fixedly connected to one end of two adjacent connecting rods (3), the inner sides of the two sliding frames (5) are both rotatably connected with a two-way screw rod (701), the outer sides of the two two-way screw rods (701) are both fixed with a driven bevel gear (702), and the outer sides of the two two-way screw rods (701) are both symmetrically rotatably connected with two sliding rods (6) through threads, the inner sides of the two sliding frames (5) are both rotatably connected with a rotating rod (705) at the middle position, the outer ends of the two rotating rods (705) are both fixed with a rotating block (706), and the other ends of the two rotating rods (705) are both fixed with an active bevel gear (707) meshing with the two driven bevel gears (702), and one end of each of the plurality of sliding rods (6) is provided with a mounting component (8).

3. A fast pre-fixed structure for curtain wall installation of a building device according to claim 2, characterized in that: The plurality of mounting assemblies (8) include a positioning cylinder (801) fixed to one end of the plurality of slide bars (6); the inner sides of the plurality of positioning cylinders (801) are slidably connected with slide plates (802); one side of the plurality of slide plates (802) is fixed with a positioning column (805); the other ends of the plurality of positioning columns (805) are fixed with a mounting plate (806); and the inner sides of the plurality of mounting plates (806) are provided with a plurality of positioning holes (807) distributed in a circular pattern at even intervals.

4. A fast pre-fixed structure for curtain wall installation of a building device according to claim 3, characterized in that: A damper (803) and a buffer spring (804) are installed between the plurality of positioning cylinders (801) and the slide plate (802).

5. The rapid pre-fixing structure for curtain wall installation of a building device according to claim 1, characterized in that: The inner sides of the two fixed frames (1) are each provided with a slide groove (403), and the inner sides of the two slide grooves (403) are each provided with two sliding blocks (404) that slide symmetrically up and down, and the plurality of sliding blocks (404) are respectively fixed to one side of the plurality of connecting rods (3).

6. A fast pre-fixed structure for curtain wall installation of a building device according to claim 2, characterized in that: The inner sides of the two sliding frames (5) are each provided with a guide groove (703), and the inner sides of the two guiding grooves (703) are each provided with two guide blocks (704) symmetrically and slidably, and the plurality of guide blocks (704) are respectively fixed on one side of the plurality of sliding rods (6).

7. A fast pre-fixed structure for curtain wall installation of a building device according to claim 3, characterized in that: A rubber pad (808) is provided on one side of each of the plurality of mounting plates (806).

Citation Information

Patent Citations

  • Novel building environment-friendly curtain wall

    CN215406760U

  • Fixing support

    CN219654017U

  • An assembled curtain wall

    CN221030870U

  • Jack for adjusting verticality of steel-framed column

    JP2003343088A