Jump-layer garage and building

Through the combined structure of prefabricated hollow floor covers and covers, combined with spraying systems and smoke pipes, the problem of insufficient bearing capacity and bending resistance of prefabricated building structures is solved, and more efficient building speed and economic benefits are achieved. Improves the fire safety performance of the building.

CN118933415APending Publication Date: 2024-11-12QIZHI CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310529383.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-11
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Prefabricated cavity building structures have shortcomings in bearing capacity and bending resistance, especially in the horizontal components design of floor panels and roof panels. The solid panels are heavy and have poor mechanical properties, resulting in low load-bearing capacity of the building and difficult to meet modern buildings. Double requirements for speed and cost.

Method used

A combination structure of prefabricated cavity floor cover and cover plate is adopted to form a cavity structure through the design of frame, rib structure and bottom cover plate, and a prefabricated cavity building structure is used in part of the roof and middle plates, combining the spray system and wind The design of smoke pipes improves the fire and ventilation performance of the building, while using the combination of overlapping layers and rib beams to improve the bending resistance of the building.

Benefits of technology

It improves the load-bearing capacity and bending resistance of the building, reduces the building's own weight, simplifies the factory prefabrication and on-site assembly process, improves the building speed and economic benefits, and enhances the fire safety performance of the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933415A_ABST
    Figure CN118933415A_ABST
Patent Text Reader

Abstract

The invention provides a skip-layer garage. The skip-layer garage comprises a top plate; a bottom plate; at least one intermediate plate; at least one hollow area and an air and smoke pipeline; at least partial area of the top plate and / or the middle plate is mainly composed of an assembly type cavity building structure; the fabricated cavity building structure at least comprises a prefabricated cavity floor system and a cover plate, wherein the prefabricated cavity floor system comprises a frame body, a rib structure and a bottom sealing plate; the frame body is provided with an enclosed space, and the rib structure is arranged in the frame body and divides the enclosed space of the frame body into at least two space structures; the bottom sealing plate seals the lower end of at least part of the space structure, and enables the enclosed space of the frame body to form a cavity structure; the cover plate is arranged on the prefabricated cavity floor system and at least partially covers the space structure defined by the frame body and the rib structure; and / or at least partially sealing the space structure separated by the rib structure. The invention further provides a building.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a split-level garage and a building. Background Art

[0002] Buildings assembled on site from prefabricated components are called prefabricated buildings. Although prefabricated buildings have increased the speed of building construction, compared with traditional buildings, their cost is higher and there are certain difficulties in promotion. The bearing capacity of prefabricated cavity building structures has been lost, and there is an urgent need to improve the bearing capacity.

[0003] In traditional buildings, there are a large number of horizontal components such as floor panels and roof panels, which have a large load-bearing area. These horizontal components are generally made of solid panels, but solid panels are relatively thick and heavy, and they are completely competent for related functions based on the amount of materials used, and their mechanical properties are poor. Often, most of the bending resistance is consumed to resist the deadweight, and the net contribution to the building is only a small part. Therefore, improving the bearing capacity of the corresponding building components and reducing the deadweight, and facilitating factory prefabrication, transportation and on-site assembly are key breakthrough directions. Summary of the invention

[0004] In order to solve one of the above technical problems, the present invention provides a split-level garage and a building.

[0005] According to one aspect of the present disclosure, a split-level garage is provided, comprising:

[0006] A roof plate, the roof plate forming the top of the split-level garage;

[0007] A bottom plate, the bottom plate forming the bottom of the split-level garage, wherein the bottom plate comprises a bottom driving lane and a bottom parking space arranged on at least one side of the bottom driving lane;

[0008] at least one middle plate, the middle plate being disposed between the top plate and the bottom plate, the middle plate comprising a middle lane and a middle parking space disposed on at least one side of the middle lane;

[0009] at least one hollow area, through which the upper space and the lower space of the middle plate can be connected; and

[0010] An air and smoke duct, which is used to supply air into the garage or to discharge smoke in the garage to the outside of the garage;

[0011] Wherein, at least part of the area of ​​the top plate and / or the middle plate is mainly composed of an assembled cavity building structure; the assembled cavity building structure at least includes a prefabricated cavity floor and a cover plate, and the prefabricated cavity floor includes a frame, a rib structure and a bottom plate; the frame has an enclosed space, the rib structure is arranged in the frame, and divides the enclosed space of the frame into at least two space structures; the bottom plate closes the lower end of at least part of the space structure, and forms the enclosed space of the frame into a cavity structure; the cover plate is arranged on the prefabricated cavity floor, and at least partially covers the space enclosed by the frame and the rib structure. Space structure; and / or, at least partially covering the space structure separated by the rib structure; or, the prefabricated cavity building structure at least includes a prefabricated cavity floor and a laminated layer, the prefabricated cavity floor includes a frame, a rib structure and a bottom plate; the frame has an enclosed space, the rib structure is arranged in the frame, and the enclosed space of the frame is divided into at least two space structures; the bottom plate closes the lower end of at least part of the space structure, and makes the enclosed space of the frame form a cavity structure; the laminated layer is at least partially arranged on the prefabricated cavity floor, and the laminated layer is formed as a whole by cast-in-place concrete.

[0012] According to at least one embodiment of the present disclosure, the mezzanine garage further includes:

[0013] A sprinkler system capable of providing fire-fighting liquid to at least one of the air and smoke duct, the middle plate and the bottom plate.

[0014] According to at least one embodiment of the split-level garage disclosed herein, the sprinkler system includes a sprinkler pipe and a sprinkler head connected to the sprinkler pipe, the sprinkler pipe is fixed to the outer wall or to the middle plate around the hollow area, and the sprinkler head is configured to spray fire-fighting liquid toward the air and smoke duct, downward and / or obliquely downward.

[0015] According to at least one embodiment of the split-level garage disclosed herein, the spray system includes a spray pipe and a spray head, the spray pipe is arranged on a middle plate or a support column, the spray pipe is arranged along a first direction, and the spray pipe is connected to a spray branch pipe, the spray branch pipe is arranged along a second direction, and the spray head is arranged on the spray branch pipe, wherein the first direction is different from the second direction.

[0016] According to the split-level garage of at least one embodiment of the present disclosure, at least one of the nozzles is configured to spray fire-fighting liquid toward the air and smoke duct, downward, and / or obliquely downward.

[0017] According to the split-level garage of at least one embodiment of the present disclosure, when the hollow area is disposed adjacent to an outer wall of the split-level garage, at least a portion of the sprinkler system is fixed to the outer wall.

[0018] According to at least one embodiment of the split-level garage disclosed herein, the air and smoke duct is arranged on the top plate, and a sprinkler branch pipe is arranged above and / or below the air and smoke duct, and the sprinkler branch pipe is provided with a nozzle, at least part of which sprays fire-fighting liquid upward, downward and / or obliquely downward.

[0019] According to at least one embodiment of the split-level garage of the present disclosure, when the prefabricated cavity building structure includes a superimposed layer, the prefabricated cavity building structure further includes: a cover plate, which is arranged on the prefabricated cavity floor and at least partially covers the space structure enclosed by the frame and the rib structure; and / or at least partially covers the space structure separated by the rib structure.

[0020] According to at least one embodiment of the split-level garage of the present disclosure, no connectors are provided around the periphery of the prefabricated cavity floor, or connectors are provided around at least a portion of the periphery of the prefabricated cavity floor.

[0021] According to the split-level garage of at least one embodiment of the present disclosure, when connecting members are provided around the periphery of the prefabricated cavity floor, at least a portion of the connecting members is located inside the rib beam.

[0022] According to at least one embodiment of the split-level garage disclosed herein, two adjacent connecting members located inside the rib beam are connected to each other, or the connecting members are anchored inside the rib beam.

[0023] According to at least one embodiment of the split-level garage of the present disclosure, the assembled cavity building structure further includes:

[0024] The rib beam is arranged in or near the interval area between two adjacent prefabricated cavity floor slabs, and the rib beam is formed by cast-in-place concrete.

[0025] According to at least one embodiment of the split-level garage disclosed herein, when the prefabricated cavity building structure has an overlapping layer, the rib beam and the overlapping layer are integrally formed by cast-in-place concrete, and the rib beam is formed into a T-shaped rib beam; when the prefabricated cavity building structure does not have an overlapping layer, the top of the frame, the top of the rib structure, and the rib beam are connected as a whole with the cover plate by cast-in-place concrete.

[0026] According to at least one embodiment of the split-level garage of the present disclosure, when the prefabricated cavity building structure has a cover plate, a connection relationship can be formed between the rib beam and the cover plate while the rib beam is formed by cast-in-place concrete.

[0027] According to the split-level garage of at least one embodiment of the present disclosure, a reinforcing member is provided inside the rib beam.

[0028] According to the split-level garage of at least one embodiment of the present disclosure, the overlapping layer is at least partially located above the cover plate.

[0029] According to at least one embodiment of the split-level garage of the present disclosure, the rib beam includes a reinforcing member, at least a portion of the reinforcing member is located near the lower portion of the rib beam, and / or at least a portion of the reinforcing member is located at the overlapping layer.

[0030] According to the split-level garage of at least one embodiment of the present disclosure, the lower surface of the rib beam is flush with the lower surface of the prefabricated cavity floor or protrudes from the lower surface of the prefabricated cavity floor.

[0031] According to the split-level garage of at least one embodiment of the present disclosure, at least one recessed structure is formed on at least a portion of the outer peripheral surface of the frame of the prefabricated cavity floor.

[0032] According to at least one embodiment of the split-level garage of the present disclosure, when looking up at the prefabricated cavity floor, the shape of the upward concave space structure of the prefabricated cavity floor is one or more of square, rectangular, diamond, triangle, circle, arc, or polygon.

[0033] According to at least one embodiment of the split-level garage disclosed herein, the cover plate is independently prefabricated or can be replaced by a steel deck; and / or the cover plate is prefabricated integrally with the prefabricated cavity floor.

[0034] According to another aspect of the present disclosure, a building is provided, which includes the above-mentioned split-level garage. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] The accompanying drawings illustrate exemplary embodiments of the present disclosure and together with the description serve to explain the principles of the present disclosure. These drawings are included to provide a further understanding of the present disclosure and are incorporated in and constitute a part of this specification.

[0036] Figures 1 to 14 It is a schematic structural diagram of a split-level garage according to different embodiments of the present disclosure.

[0037] Fig.15 It is a schematic structural diagram of a prefabricated cavity floor according to one embodiment of the present disclosure.

[0038] Fig.16 yes Fig.15 sectional view of .

[0039] Fig.17 and Fig.18 It is a schematic structural diagram of a prefabricated cavity floor according to another embodiment of the present disclosure.

[0040] Fig.19 yes Fig.17 and Fig.18 sectional view of .

[0041] Fig. 20 and Fig.21 It is a schematic structural diagram of a prefabricated cavity floor according to another embodiment of the present disclosure.

[0042] Fig. 22 yes Fig. 20 and Fig.21 sectional view of .

[0043] Fig.23 It is a schematic structural diagram of a building according to one embodiment of the present disclosure.

[0044] Fig.24 It is a schematic cross-sectional structural diagram of an assembled cavity building structure according to one embodiment of the present disclosure.

[0045] Fig.25 It is a schematic structural diagram of a cover plate according to an embodiment of the present disclosure.

[0046] Fig.26 and Fig. 27 It is a schematic cross-sectional structural diagram of an assembled cavity building structure according to different embodiments of the present disclosure.

[0047] Figures 28 to 30 It is a partial structural schematic diagram of a building according to different embodiments of the present disclosure.

[0048] Figure 31 to Figure 33 It is a partial structural schematic diagram of a building according to different embodiments of the present disclosure.

[0049] Fig.34 and Fig.35 It is a partial structural schematic diagram of a building according to different embodiments of the present disclosure. DETAILED DESCRIPTION

[0050] The present disclosure is further described in detail below in conjunction with the accompanying drawings and implementations. It is understood that the specific implementations described herein are only used to explain the relevant content, rather than to limit the present disclosure. It should also be noted that, for ease of description, only the parts related to the present disclosure are shown in the accompanying drawings.

[0051] It should be noted that, in the absence of conflict, the embodiments and features of the embodiments in the present disclosure can be combined with each other. The technical solution of the present disclosure will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0052] Unless otherwise specified, the exemplary embodiments / embodiments shown will be understood as providing exemplary features of various details of some ways in which the technical concept of the present disclosure can be implemented in practice. Therefore, unless otherwise specified, the features of the various embodiments / embodiments can be combined, separated, interchanged and / or rearranged without departing from the technical concept of the present disclosure.

[0053] The use of cross-hatching and / or shading in the accompanying drawings is generally used to make the boundaries between adjacent components clear. As such, unless otherwise specified, the presence or absence of cross-hatching or shading does not convey or indicate any preference or requirement for the specific materials, material properties, dimensions, proportions, commonalities between the components shown, and / or any other characteristics, attributes, properties, etc. of the components. In addition, in the accompanying drawings, the sizes and relative sizes of the components may be exaggerated for clarity and / or descriptive purposes. When the exemplary embodiments can be implemented differently, the specific process sequence can be performed in a different order than described. For example, two successively described processes can be performed substantially simultaneously or in an order opposite to the described order. In addition, the same figure numbers represent the same components.

[0054] When a component is referred to as being "on" or "over," "connected to," or "coupled to" another component, the component may be directly on, directly connected to, or directly coupled to the other component, or intervening components may be present. However, when a component is referred to as being "directly on," "directly connected to," or "directly coupled to" another component, there are no intervening components. For this purpose, the term "connected" may refer to a physical connection, an electrical connection, etc., with or without intervening components.

[0055] For descriptive purposes, the present disclosure may use spatially relative terms such as "under," "beneath," "under," "down," "over," "upper," "above," "higher," and "side (e.g., as in "sidewall")," to describe the relationship of one component to another (other) component as shown in the accompanying drawings. The spatially relative terms are intended to encompass different orientations of the device in use, operation, and / or manufacture in addition to the orientation depicted in the accompanying drawings. For example, if the device in the accompanying drawings is turned over, components described as "under" or "beneath" other components or features would subsequently be positioned "over" the other components or features. Thus, the exemplary term "under" can encompass both the "above" and "below" orientations. Furthermore, the device may be otherwise oriented (e.g., rotated 90 degrees or at other orientations), and the spatially relative descriptors used herein should be interpreted accordingly.

[0056] The terms used here are for the purpose of describing specific embodiments, and are not intended to be restrictive. As used here, unless the context clearly indicates otherwise, the singular forms "one (kind, person)" and "said (the)" are also intended to include plural forms. In addition, when the terms "comprise" and / or "include" and their variations are used in this specification, it is explained that there are stated features, integral bodies, steps, operations, parts, assemblies and / or their groups, but it is not excluded that there are or add one or more other features, integral bodies, steps, operations, parts, assemblies and / or their groups. It should also be noted that, as used here, the terms "substantially", "approximately" and other similar terms are used as approximate terms and not as degree terms, so that they are used to explain the inherent deviations of the measured values, calculated values ​​and / or the values ​​provided that will be recognized by those of ordinary skill in the art.

[0057] Figure 1 It is a structural schematic diagram of a split-level garage according to an embodiment of the present disclosure.

[0058] like Figure 1 As shown, the split-level garage of the present disclosure may include components such as a top plate 110, a bottom plate 120, at least one middle plate 130, and an outer wall 150. Those skilled in the art should know that Figure 1 Just part of the garage.

[0059] The top plate 110 and the bottom plate 120 are spaced apart by a preset distance, and the preset distance may be determined according to the number of the intermediate plates 130, for example, Figure 1 As shown, when the intermediate plate 130 is a single layer, the distance between the top plate 110 and the bottom plate 120 can be 5-6m; accordingly, although the present disclosure does not show this through the drawings, when the intermediate plate 130 is a double layer, at this time, the distance between the two intermediate plates 130 is about 2-3m, and accordingly, the distance between the top plate 110 and the bottom plate 120 can be set to 7-9m.

[0060] The roof 110 is formed as the top of the mezzanine garage 100. When the mezzanine garage 100 is formed as an underground parking garage, a covering layer may be provided above the roof 110; when the mezzanine garage 100 is formed as an above-ground parking garage, the roof 110 is formed as the uppermost part of the mezzanine garage 100. More preferably, structures such as lighting and ventilation holes may be provided on the roof 110, and the lighting and ventilation holes may be formed above the hollow area 180, for example, directly above or obliquely above the hollow area 180. Of course, the mezzanine garage 100 may also be formed as a semi-underground and semi-above-ground garage.

[0061] A gas circulation duct is provided in the covering soil layer, and the air and smoke duct 400 can be connected to the gas circulation duct so that air enters the air and smoke duct 400 through the gas circulation duct, or the smoke in the split-level garage 100 enters the air and smoke duct 400 and is discharged through the gas circulation duct.

[0062] Specifically, the wind and smoke duct 400 can be connected to the fan, and correspondingly, the fan is connected to the gas circulation duct, that is, the gas circulation duct is connected to the wind and smoke duct 400 through the fan, so that the smoke in the mezzanine garage 100 can be discharged to the outside of the mezzanine garage 100 through the fan, or the fresh air outside the mezzanine garage 100 can be transported to the inside of the mezzanine garage 100 through the fan.

[0063] Those skilled in the art should know that when the split-level garage of the present disclosure is formed as a ground parking garage, the roof 110 may not be included.

[0064] The bottom plate 120 forms the bottom of the split-level garage 100, and a parking space is arranged on the bottom plate 120, for example, the space between the bottom plate 120 and the middle plate 130 adjacent to the bottom plate 120 forms the above-mentioned parking space, and at least one bottom driving lane is arranged in the parking space, the bottom driving lane is used for vehicle passage, and the bottom parking space is arranged on at least one side of the bottom driving lane so that a vehicle can be parked in the bottom parking space.

[0065] In the present disclosure, the bottom plate 120 may be formed by pouring concrete, and the bottom parking spaces and bottom driving lanes may be formed by marking on the bottom plate 120 according to actual projects.

[0066] The middle plate 130 is disposed between the top plate 110 and the bottom plate 120. In the present disclosure, the middle plate 130 may be provided as at least one in the vertical direction. For example, when the number of the middle plate 130 is one, a split-level garage 100 having two parking floors is formed. When the number of the middle plates 130 is two, a split-level garage 100 having three parking floors is formed. Of course, the middle plates 130 may also be provided as three, four, five, etc.

[0067] That is, when the number of the intermediate plates 130 of the present disclosure is two or more, the intermediate plates 130 are arranged in the height direction.

[0068] Each intermediate plate 130 includes: at least one intermediate driving lane, the intermediate driving lane is used for vehicle traffic, and an intermediate parking space, the intermediate parking space is arranged on at least one side of the intermediate driving lane, and vehicles can also be parked in the intermediate parking space.

[0069] In the present disclosure, when the intermediate plates 130 are provided in at least two, these intermediate plates 130 can be provided in parallel; for example, these intermediate plates 130 are all provided in a certain horizontal plane; more preferably, the intermediate plates 130 can be parallel to the top plate 110 and the bottom plate 120, that is, the top plate 110, the bottom plate 120 and the intermediate plates 130 are all provided in a certain horizontal plane.

[0070] Of course, the middle plate 130, the top plate 110 and the bottom plate 120 may not be arranged parallel to each other, and those skilled in the art may selectively arrange them according to the specific circumstances of the project.

[0071] In the present disclosure, when there is one intermediate plate 130 , the distance between the intermediate plate 130 and the bottom plate 120 is the same as the distance between the intermediate plate 130 and the top plate 110 or the difference is within a preset range, so that the two parking floors have approximately the same floor height.

[0072] On the other hand, when the number of the intermediate plates 130 is at least two, the distance between the intermediate plates 130 and the bottom plate 120, the distance between two adjacent intermediate plates 130, and the distance between the intermediate plates 130 and the top plate 110 are the same or approximately the same (i.e., the difference is within a preset range), so that these parking floors have approximately the same floor height.

[0073] In the present disclosure, the bottom plate 120 and the top plate 110 are supported by the support column 140, that is, the support column 140 is disposed between the bottom plate 120 and the top plate 110. As an implementation form, the support column 140 can be disposed in sections, for example, the support column 140 can be disposed between the bottom plate 120 and the middle plate 130 to support the middle plate 130; correspondingly, the support column 140 can also be disposed between the middle plate 130 and the top plate 110 to support the top plate 110.

[0074] Preferably, the support columns 140 at different heights may be arranged on the same vertical line, so that force can be directly transmitted between the support columns 140 .

[0075] The outer wall 150 is arranged between the top plate 110 and the bottom plate 120, and at least partially surrounds the middle plate 130. That is, when the outer wall 150 is formed into an annular structure, the outer wall 150 can enclose a closed space together with the top plate 110 and the bottom plate 120, or, when the outer wall 150 has an opening, the outer wall 150 can enclose a space with an opening together with the top plate 110 and the bottom plate 120, wherein a vehicle can enter the split-level garage from the outside through the opening.

[0076] In the present disclosure, the mezzanine garage may further include an in-and-out lane, which is directly or indirectly connected to the bottom plate 120 or the middle plate 130 so that vehicles can enter the mezzanine garage through the in-and-out lane.

[0077] The split-level garage disclosed in the present invention includes at least one hollow area 180, which is located near the middle plate 130, and allows the upper space and the lower space of the middle plate 130 to be connected through the hollow area 180; more specifically, the hollow area 180 is located on the side of the middle plate 130 in the horizontal direction.

[0078] In one embodiment, there may be more than two intermediate plates 130, and the two intermediate plates 130 may be at the same horizontal height, or there may be a certain height difference in the vertical direction. In this case, there may be a certain interval between the two intermediate plates 130 in the horizontal direction, and the above-mentioned hollow area 180 is formed by the interval.

[0079] In another embodiment, a hollow area 180 is formed between the middle plate 130 and the outer wall 150 , that is, the middle plate 130 is not directly connected to the outer wall 150 in a partial area, so that a hollow area 180 is formed between the middle plate 130 and the outer wall 150 .

[0080] Figure 1 Only two hollow areas 180 are shown, but for those skilled in the art, in the entire split-level garage, the number of the hollow areas 180 can be set to multiple according to the area size of the garage.

[0081] In the present disclosure, the fire protection space above the hollow area 180 and the fire protection space below the hollow area 180 are connected through the hollow area 180 to form a cross-layer fire protection partition or fire protection unit.

[0082] The split-level garage disclosed herein also includes a transverse closing device 200, which is used to selectively close at least part of the hollow area 180; when a fire occurs and / or smoke is generated inside the split-level garage: the hollow area is closed by the transverse closing device 200, so that the fireproof space above the hollow area 180 and the fireproof space below the hollow area 180 are in different fireproof partitions or fireproof units.

[0083] That is to say, when the loft garage of the present disclosure is in use, under normal conditions, the transverse closing device 200 cannot close the hollow area 180, so the existence of the hollow area 180 can make the loft garage more beautiful and facilitate the arrangement of pipelines in the loft garage. On the other hand, when a fire occurs, the hollow area 180 can be closed by the transverse closing device 200, so that the space above and below the hollow area 180 is not connected, and accordingly different fire partitions or fire units are formed above and below the hollow area 180.

[0084] In the present disclosure, selectively closing the hollow area 180 means that the transverse closing device 200 can be formed as a movable device, so that when a fire occurs, the transverse closing device 200 can close the hollow area 180, so that the fireproof space above the hollow area 180 and the fireproof space below the hollow area 180 are in different fireproof partitions or fireproof units. In this case, when a fire occurs, the hollow area 180 can be closed by the transverse closing device 200 to prevent the fire from spreading to other fireproof partitions or fireproof units.

[0085] Accordingly, when no fire occurs, the transverse closing device 200 leaves at least part of the hollow area 180 unclosed, and connects the fireproof space above the hollow area 180 and the fireproof space below the hollow area 180 through the hollow area 180 .

[0086] In other words, whether or not to set the transverse closing device 200 determines how to divide the fire partitions or fire units. When the transverse closing device 200 is present, as long as the transverse closing device 200 can close the hollow area 180, even if the transverse closing device 200 is not in the state of closing the hollow area 180, the fire space above the hollow area 180 and the fire space below the hollow area 180 belong to different fire partitions or fire units, thereby reducing the number of vertical partition devices (capable of separating each parking space into different fire partitions or fire units) set in each parking space and reducing the construction cost of the split-level garage.

[0087] In the present disclosure, the transverse closing device 200 is disposed on the middle plate 130 or the outer wall 150 near the hollow area 180 , thereby enabling the transverse closing device 200 to close the hollow area 180 .

[0088] Preferably, the transverse closing device 200 is selected from at least one of a transverse rolling curtain, a transverse folding curtain, a transverse rolling curtain, a gravity fire curtain, a slope gravity fire curtain, and a fireproof transverse cover. That is, for the same hollow area 180, one of the transverse rolling curtain, the transverse folding curtain, the transverse rolling curtain, the gravity fire curtain, the slope gravity fire curtain, and the fireproof transverse cover can be selected, or multiple of the transverse rolling curtain, the transverse folding curtain, the transverse rolling curtain, the gravity fire curtain, the slope gravity fire curtain, and the fireproof transverse cover can be selected.

[0089] Figure 2 It is a structural schematic diagram of a split-level garage according to another embodiment of the present disclosure.

[0090] like Figure 2 As shown, the structure of the split-level garage is Figure 1 The horizontal closing device 200 is substantially the same, except that the horizontal closing device 200 is realized by a sloped gravity fire curtain, so that when there is no fire or smoke, the sloped gravity fire curtain is stored to one side of the hollow area, so that the hollow area is in an open state. When a fire or smoke occurs, the sloped gravity fire curtain is released, thereby closing the hollow area 180.

[0091] In this disclosure, Figure 1 As shown, part of the hollow area 180 can also be closed by a vertical closing device 500. For example, the device closing the hollow area 180 can be all horizontal closing devices 200, all vertical closing devices 500, or part horizontal closing devices 200 and part vertical closing devices 500.

[0092] by Figure 1 For example, the split-level garage includes two hollow areas 180 , one of the two hollow areas 180 is closed by a horizontal closing device 200 , and the other is closed by a vertical closing device 500 .

[0093] The vertical enclosing device 500 is used to selectively at least partially surround a portion of the hollow area 180 in the hollow area 180; and a smoke storage gallery 510 is formed by the vertical enclosing device 500, that is, the smoke storage gallery 510 is a space enclosed by the vertical enclosing device, and the space is connected to the hollow area 180. When a fire occurs in the mezzanine garage 100 and smoke is generated, at least part of the smoke flows to the smoke storage gallery 510 and is discharged to the outside of the mezzanine garage 100 through the smoke duct 400 connected to the smoke storage gallery 510.

[0094] That is to say, when smoke is generated inside the split-level garage: the hollow area 180 is closed by the horizontal closing device 200, so that the fire protection space above the hollow area 180 and the fire protection space below the hollow area 180 are in different fire protection zones or fire protection units; and a smoke storage gallery 510 is formed by the vertical closing device 500, at least part of the smoke flows to the smoke storage gallery 510, and is discharged to the outside of the split-level garage through the wind and smoke duct 400 connected to the smoke storage gallery 510.

[0095] That is to say, on the one hand, the fireproof space above and below the middle plate 130 where the hollow area 180 is located are made to belong to different fireproof partitions or fireproof units through the vertical closing device 500, and the fireproof partitions of each layer in the split-level garage 100 are similar / same as the fireproof partitions of the flat layer. On the other hand, there is an opening area in the enclosed space of the vertical closing device 500, so that the fireproof space above and below the middle plate 130 where the hollow area 180 is located are connected through the opening area of ​​the enclosed space of the vertical closing device 500, so that the fireproof space above and below the middle plate 130 where the hollow area 180 is located belong to the same fireproof partition or fireproof unit, thereby forming a cross-layer fireproof partition or fireproof unit inside the split-level garage 100.

[0096] In other words, through the vertical closing device 500, the smoke storage gallery 510 and the fire protection space connected to the smoke storage gallery 510 belong to the same fire protection partition or fire protection unit.

[0097] When the transverse closing device 200 and the vertical closing device 500 disclosed in the present invention are in use, only the transverse closing device 200 or only the vertical closing device 500 may be provided for the same hollow area 180; those skilled in the art should know that, for the same hollow area 180, the transverse closing device 200 and the vertical closing device 500 may also be provided at the same time, and in this case, the transverse closing device 200 can close a part of the hollow area 180, and correspondingly, the vertical closing device 500 can close (surround) a part of the hollow area 180, thereby, through the combination of the transverse closing device 200 and the vertical closing device 500, the entire hollow area 180 can be closed.

[0098] On the other hand, when there is an opening area in the enclosed space of the vertical enclosure device 500, the fireproof space and / or smoke storage corridor outside the enclosed space of the vertical enclosure device 500 is connected through the opening area of ​​the enclosed space of the vertical enclosure device 500, so that the fireproof space above the hollow area 180 and the fireproof space below and the hollow area 180 belong to the same fire partition or fire protection unit.

[0099] In the present disclosure, when the hollow area 180 is located in the middle of the middle plate 130, the hollow area 180 can be completely arranged around the hollow area 180 so that the vertical closing device 500 can close the hollow area 180; on the other hand, when the hollow area 180 is close to the outer wall 150, the vertical closing device 500 partially surrounds the hollow area 180, and a smoke storage corridor 510 is formed between the vertical closing device 500 and the outer wall 150; at this time, both ends of the vertical closing device 500 in the circumferential direction are in contact with the outer wall 150.

[0100] Therefore, when a fire occurs in the mezzanine garage 100, the hollow area 180 can be closed by the vertical closing device 500 to prevent the fire from spreading to other fire partitions or fire units.

[0101] Accordingly, when no fire occurs and when there is an open area in the vertical closing device 500, at least part of the hollow area 180 is not closed, and the fire protection space above the hollow area 180 and the fire protection space below the hollow area 180 are connected through the hollow area 180, thereby making the fire protection space above the hollow area 180, the fire protection space below the hollow area 180 and the hollow area belong to the same fire partition or fire protection unit.

[0102] Therefore, through the setting of the vertical closing device 500, the setting method of the fire partition of the split-level garage 100 is changed. As long as there is no open area in the vertical closing device 500, that is, the vertical closing device 500 can close the hollow area, even if the vertical closing device 500 is not in a state of closing the hollow area 180, the fire space above the middle plate 130 where the hollow area 180 is located and the fire space below the middle plate 130 where the hollow area 180 is located also belong to different fire partitions or fire units.

[0103] In the present disclosure, the opening area of ​​the vertical enclosing device 500 can be formed on the side of the vertical enclosing device 500, or on the top or bottom of the vertical enclosing device 500. Those skilled in the art should know that as long as the fireproof space above the hollow area 180 of the middle plate 130 can be connected with the fireproof space below.

[0104] In the present disclosure, the vertical closing device 500 is selected from at least one of a vertical roller shutter, a vertical fire curtain, a vertical fire panel, a vertical fire door, a vertical fire wall, a vertical fire glass, a vertical water curtain, a vertical roller curtain, a vertical elastic curtain, a vertical folding curtain, a vertical side-sliding curtain, a gravity-type side-sliding curtain and a substrate wrapped with a layer of fireproof material, thereby enabling the vertical closing device 500 to separate the fireproof space and prevent the spread of fire in case of fire.

[0105] That is to say, the vertical closing device 500 can be a fixed device, such as a vertical fire door, a vertical fire panel, a vertical fire wall, a vertical fire glass, etc. It can also be a movable device, such as a vertical rolling curtain, a vertical fire curtain, a vertical water curtain, a vertical roller curtain, a vertical elastic curtain, a vertical folding curtain, a vertical side-moving curtain, a gravity side-moving curtain, and a substrate wrapped with a fireproof material layer.

[0106] Figure 3 It is a schematic structural diagram of a split-level garage according to at least one embodiment of the present disclosure.

[0107] An upward flip beam is arranged above the middle plate 130, and the vertical closing device 500 includes two groups, wherein the lower end of one group of vertical closing devices 500 is arranged on the middle plate, and the upper end thereof extends upward and is closed by the top plate 110; the upper end of the other group of vertical closing devices 500 is connected to the middle plate 130, and the lower end thereof extends downward and is closed by the bottom plate 120.

[0108] That is to say, in the present disclosure, at least part of the vertical enclosing device 500 extends upward and downward from the hollow area 180, and the space enclosed by the vertical enclosing device 500 is formed into an independent fire partition or fire unit; for example, the upper end of the vertical enclosing device 500 can be in contact with the lower surface of the top plate 110 and be enclosed by the top plate 110, and the lower end of the vertical enclosing device 500 can be in contact with the upper surface of the bottom wall and be enclosed by the bottom plate 120, thereby forming the interior of the vertical enclosing device 500 into a closed smoke storage corridor, and thereby forming the space enclosed by the vertical enclosing device 500 into an independent fire partition or fire unit.

[0109] The smoke and wind duct 400 can be fixed to the top plate 110, or fixed to the vertical sealing device 500. The smoke and wind duct 400 is located in the space enclosed by the vertical sealing device 500. The smoke and wind duct 400 is connected to a smoke and wind branch pipe 410, which passes through the vertical sealing device 500 and communicates with the external space of the space enclosed by the vertical sealing device 500. Moreover, the smoke and wind branch pipe 410 also passes through the middle plate 130 and communicates with the outside of the space enclosed by the vertical sealing device 500. Part of the vertical sealing device 500 is formed as a wall or a column, and the smoke and wind branch pipe 410 passes through the wall or the column. Part of the vertical sealing device 500 is formed as a curtain, which is released when a fire occurs and retracted when no fire occurs.

[0110] Figure 4 It is a schematic structural diagram of a split-level garage according to at least one embodiment of the present disclosure.

[0111] like Figure 4As shown, the middle plate 130 is provided with an overhanging plate 160, the upper end of the vertical closing device 500 is closed by a transverse partition device 600, and both sides (e.g., the upper side and the lower side) of the transverse partition device 600 are provided with a wind and smoke duct 400. The lower end of the vertical closing device 500 is provided on the overhanging plate 160.

[0112] Figure 5 It is a schematic structural diagram of a split-level garage according to at least one embodiment of the present disclosure.

[0113] like Figure 5 As shown, an overhanging plate 160 is provided on the middle plate 130, and the lower end of the vertical closing device 500 is provided on the overhanging plate 160 and extends upward from the overhanging plate 160; the upper end of the vertical closing device 500 is closed by a transverse partition device 600, thereby, the smoke storage corridor 510 formed by the vertical closing device 500 opens downward, and the smoke storage corridor 510 is connected to the hollow area 180, and both sides (for example, the upper side and the lower side) of the transverse partition device 600 are provided with wind and smoke ducts 400.

[0114] In the present disclosure, the above-mentioned air and smoke duct 400 can also be set on one side of the transverse partition device 600, and connected with the other side of the transverse partition device 600 through an air and smoke branch pipe passing through the transverse partition device 600, so that the smoke on both sides of the transverse partition device 600 can be discharged simultaneously or air can be supplied to both sides of the transverse partition device 600 through the same air and smoke duct 400.

[0115] Figure 6 It is a schematic structural diagram of a split-level garage according to at least one embodiment of the present disclosure.

[0116] like Figure 6 As shown, when the vertical enclosing device 500 is located near the outer wall 150, the two ends of the circumferential direction of the vertical enclosing device 500 are connected to the inner wall surface of the outer wall 150. Moreover, in the vertical direction, the upper end of the vertical enclosing device 500 is connected to the lower surface of the top plate 110 or is located near the lower surface of the top plate 110, and the lower end of the vertical enclosing device 500 is connected to the middle plate 130 or is located near the middle plate 130. More preferably, the lower end of the vertical enclosing device 500 is connected to the outer cantilever plate 160 provided on the middle plate 130, or is located near the outer cantilever plate 160.

[0117] In the present disclosure, a smoke and wind duct 400 is provided on the lower surface of the top plate 110, and the smoke and wind duct 400 is connected to a smoke and wind branch pipe 410. The smoke and wind branch pipe 410 passes through the vertical enclosed device 500 and is connected to the space on the other side of the vertical enclosed device 500, so that the smoke on both sides of the vertical enclosed device 500 is discharged or air is supplied to both sides of the vertical enclosed device 500 through the smoke and wind duct 400.

[0118] Figure 7 It is a schematic structural diagram of a split-level garage according to at least one embodiment of the present disclosure.

[0119] like Figure 7 As shown, when the vertical enclosing device 500 is located in the middle of the split-level garage, the vertical enclosing device 500 is arranged around the hollow area. That is, in the direction from top to bottom, the vertical enclosing device 500 is formed into a ring.

[0120] Moreover, in the vertical direction, the upper end of the vertical closing device 500 is connected to the lower surface of the top plate 110 or is located near the lower surface of the top plate 110, and the lower end of the vertical closing device 500 is connected to the middle plate 130 or is located near the middle plate 130. More preferably, the lower end of the vertical closing device 500 is connected to the outer cantilever plate 160 provided on the middle plate 130 or is located near the outer cantilever plate 160.

[0121] In the present disclosure, a smoke and wind duct 400 is provided on the lower surface of the top plate 110, and the smoke and wind duct 400 is connected to a smoke and wind branch pipe 410. The smoke and wind branch pipe 410 passes through the vertical enclosed device 500 and is connected to the space on the other side of the vertical enclosed device 500, so that the smoke on both sides of the vertical enclosed device 500 is discharged or air is supplied to both sides of the vertical enclosed device 500 through the smoke and wind duct 400.

[0122] Generally speaking, the wind and smoke duct 400 can be arranged above the hollow area, or arranged in the hollow area, or arranged below the hollow area. Of course, the wind and smoke duct 400 can also be arranged in the middle plate 130 near the hollow area. Specifically, the wind and smoke duct 400 is located near the top plate above the hollow area 180, or located in the middle plate near the hollow area 180, or the wind and smoke duct 400 is arranged in the horizontal partition device 600. On the other hand, the wind and smoke duct 400 can also be arranged in an area outside the hollow area.

[0123] The machine room is arranged near the hollow area 180 so as to conveniently connect the machine room to the air and smoke duct 400. In the present disclosure, the machine room may include an air supply machine room and a smoke exhaust machine room. Of course, the fan in the machine room may also have both air supply and smoke exhaust functions.

[0124] In the present disclosure, the outside of the air and smoke duct 400 can be wrapped with fireproof material. Therefore, through the provision of the fireproof material, when a fire occurs, the working time of the air and smoke duct 400 can be extended as much as possible, and the smoke in the split-level garage can be discharged as much as possible.

[0125] On the other hand, the air and smoke duct 400 is also connected to an air and smoke branch pipe 410, so that different fire partitions or fire protection units can be connected through the other end of the air and smoke branch pipe 410, that is, air supply and smoke exhaust in multiple fire partitions and / or fire protection units can be achieved through one air and smoke duct 400.

[0126] The fireproof space above the hollow area 180, the hollow area 180 and the smoke storage gallery belong to the same fire partition or fire unit; or, the fireproof space below the hollow area 180, the hollow area 180 and the smoke storage gallery belong to the same fire partition or fire unit.

[0127] In the present disclosure, a charging device may be provided in the fire protection unit so as to charge the electric vehicle parked in the parking space through the charging device.

[0128] Therefore, in the present disclosure, by setting the transverse closing device 200, the hollow area 180 can be closed when a fire occurs, and the cross-layer space, that is, the fireproof space above the hollow area and the fireproof space below the hollow area, is closed to form independent fire partitions and fireproof units of the lower layer and the lower layer, so that smoke and fire spread in their respective layers and will not affect other layers, and the fire problem is solved more efficiently. The hollow area is open at ordinary times, which makes the garage space more spacious and transparent, makes the garage more beautiful, does not affect the ground landscape, and greatly saves investment.

[0129] Figures 8 to 14 It is a schematic structural diagram of a split-level garage according to different embodiments of the present disclosure.

[0130] Specifically, Figure 8 As shown, the two wind and smoke ducts 400 are provided, and the two wind and smoke ducts 400 are arranged side by side in the horizontal direction, and the wind and smoke duct 400 located on the right side is connected to the wind and smoke branch pipe 410. That is, one end of the wind and smoke branch pipe 410 is connected to the wind and smoke duct 400, and the other end of the wind and smoke branch pipe 410 can pass through the middle plate 130 and communicate with the fire partition / smoke partition below the middle plate 130.

[0131] In reference Figure 8The mezzanine garage of the present invention further includes a sprinkler system 700, at least a portion of which is disposed below the transverse closing device 200 or near the edges or corners of the hollow area 180. When a fire occurs and / or smoke is generated inside the mezzanine garage, the sprinkler system 700 can provide fire-fighting liquid to at least one of the transverse closing device 200, the middle plate 130 and the bottom plate 120.

[0132] In the present disclosure, it is considered that the top plate 110, the bottom plate 120 and the middle plate 130 are made of materials such as reinforced concrete, but the transverse closing device 200 is generally made of iron materials. Therefore, compared with components such as the top plate 110, the bottom plate 120 and the middle plate 130, the transverse closing device 200 is more easily damaged in a fire. Therefore, part of the sprinkler system 700 in the present disclosure can be arranged below the transverse closing device 200, so that the fire-fighting liquid (such as water, etc.) provided by the sprinkler system 700 can be provided to the transverse closing device 200, thereby effectively protecting the transverse closing device 200 from damage; moreover, the fire-fighting liquid provided to the transverse closing device 200 can also be splashed or flow to positions such as the middle plate 130 and the bottom plate 120, thereby also being able to extinguish the fire points generated on the middle plate 130 and the bottom plate 120.

[0133] On the other hand, Figure 8 As shown, there is also a sprinkler system 700 in the mezzanine garage for providing fire-fighting liquid to the roof 110 , that is, a plurality of sprinkler systems 700 can be arranged inside the same mezzanine garage 100 .

[0134] In a preferred embodiment, Figure 8 As shown, the sprinkler system 700 may include a sprinkler pipe 710 and a nozzle 720; in one embodiment, when the hollow area is arranged adjacent to the outer wall 150 of the split-level garage, the sprinkler pipe 710 may be fixed to the outer wall 150, and the extension direction of the sprinkler pipe 710 is consistent with the length direction of the hollow area 180, wherein the nozzle 720 is arranged to spray fire-fighting liquid toward the transverse closure device 200, thereby, on the one hand, at least a portion of the sprinkler system 700 can be fixed to the outer wall 150, and on the other hand, the transverse closure device 200 can be effectively protected by the orientation setting of the nozzle 720.

[0135] In another embodiment, the spray system 700 can be fixed at a position such as the middle plate 130 or the support column 140; in a preferred embodiment, a support beam 170 is provided below the top plate 110 and / or below the middle plate 130, and the spray pipe 710 of the spray system 700 is arranged along the direction of the support beam 170 and is located near the support beam 170, thereby enabling the spray pipe 710 to be easily arranged in the split-level garage.

[0136] That is to say, at this time, the support beam 170 is arranged along the first direction, and the spray pipe 710 is also arranged along the first direction. More preferably, the spray pipe 710 is connected to a spray branch pipe 730, and the spray branch pipe 730 is arranged along the second direction, wherein the sprinkler 720 is arranged on the sprinkler branch pipe 730; wherein the second direction is different from the first direction, and more preferably, the second direction is perpendicular to the first direction, thereby enabling the location and number of sprinklers in the entire split-level garage to meet fire protection regulations through the arrangement of the sprinkler branch pipe 730.

[0137] In the present disclosure, the orientation of the spray head 720 is set so that the spray head 720 can spray firefighting liquid toward the transverse sealing device 200 .

[0138] In one embodiment, at least a portion of the spray branch pipe 730 extends into the hollow area and is located below the transverse sealing device 200; Fig. 9 As shown, the spray branch pipe 730 is in a broken line shape. At this time, part of the spray branch pipe 730 can be arranged close to the horizontal sealing device 200; however, those skilled in the art should know that Fig.10 As shown, the spray branch pipe 730 may also be in a straight line, thereby making the water flow in the spray branch pipe 730 smoother.

[0139] More preferably, if Fig.10 As shown, the transverse closing device 200 can be arranged on the outer cantilever plate 160. Of course, the transverse closing device 200 can also be directly arranged on the middle plate 130. In this case, the middle plate 130 may not be provided with the outer cantilever plate 160.

[0140] like Fig.11 As shown, the sprinkler system 700 can also be fixed to the middle plate 130; in one embodiment, the sprinkler pipe 710 of the sprinkler system 700 can be fixed to the middle plate 130 around the hollow area 180, so that at least part of the sprinkler system 700 can be located below the transverse closure device 200. At this time, at least one of the sprinkler heads 720 of the sprinkler system 700 can spray fire-fighting liquid toward the transverse closure device 200, downward and / or obliquely downward.

[0141] like Fig.12 As shown, in a preferred embodiment, the sprinkler system 700 can be located directly below the transverse sealing device 200. At this time, the nozzle of the sprinkler system 700 can spray the fire-fighting liquid upward.

[0142] like Fig.13 As shown, in the present disclosure, the top plate 110 and / or the middle plate 130 are supported by a beam structure, wherein the beam structure is formed as an upturned beam, thereby making it more convenient to arrange pipelines in the split-level garage 100.

[0143] like Fig.14 As shown, a fireproof board may be provided below the air and smoke duct 400, so that when a fire occurs, the fireproof board can greatly prolong the damage time of the air and smoke duct 400, and enable the air and smoke duct 400 to work for the longest time when a fire occurs. Of course, in the present disclosure, components such as fireproof boards may not be provided.

[0144] Reference again Figure 8 Referring to the accompanying drawings, in the present disclosure, the fire-fighting liquid sprayed by the sprinkler system 700 can be applied to the air and smoke duct 400, so that the damage time of the air and smoke duct 400 can be greatly prolonged through the fire-fighting liquid sprayed by the sprinkler system 700, and the air and smoke duct 400 can work for the maximum time when a fire occurs.

[0145] In one embodiment, the air and smoke duct 400 is arranged on the top plate 110, and a sprinkler branch pipe 730 is arranged above and / or below the air and smoke duct 400, and the sprinkler branch pipe 730 is provided with a nozzle 720, and at least part of the nozzle 720 sprays fire-fighting liquid upward, downward and / or obliquely downward.

[0146] For example, when the sprinkler branch pipe 730 located above the air and smoke duct 400 sprays fire-fighting liquid upward, the fire-fighting liquid will be sprayed onto the top plate 110, thereby effectively reducing the degree of damage to the top plate 110 in a fire; further, after the fire-fighting liquid is splashed by the top plate 110, it will fall on the air and smoke duct 400, thereby effectively protecting the air and smoke duct 400.

[0147] On the other hand, when the sprinkler branch pipe 730 located below the air and smoke duct 400 sprays the fire-fighting liquid upward, the fire-fighting liquid will be sprayed onto the top plate 110 , thereby being able to directly protect the air and smoke duct 400 .

[0148] In the present disclosure, at least a portion of the top plate 110 and / or the middle plate 130 is mainly composed of a prefabricated cavity building structure.

[0149] Fig.15 is a schematic structural diagram of a prefabricated cavity floor 1000 according to an embodiment of the present disclosure. Fig.16 yes Fig.15 sectional view of .

[0150] like Fig.15 and Fig.16 As shown, the prefabricated cavity floor 1000 includes a frame 1001 , a rib structure 1002 and a bottom cover plate 1007 .

[0151] Among them, the frame 1001 can be prefabricated with reinforced concrete. Accordingly, the interior of the frame 1001 can be configured with stress-bearing steel bars and structural steel bars (hereinafter, the stress-bearing steel bars and structural steel bars are collectively referred to as skeleton structure), and the stress-bearing steel bars can be divided into prestressed and non-prestressed types.

[0152] The interior of the frame 1001 is formed as an enclosed space, that is, the frame 1001 has an enclosed space. In one embodiment, Fig.15 As shown, the enclosed space of the frame 1001 can be formed into a rectangular shape. In this case, the frame 1001 can also be formed into a rectangular structure with two sets of opposite sides. Of course, the frame 1001 can also be enclosed into other shapes such as a triangle, or an irregular shape, etc.

[0153] The frame 1001 may have a certain thickness, which may be the height of the rib structure 1002 of the prefabricated cavity floor. In a specific embodiment, the thickness of the frame 1001 may be about 0.5 meters.

[0154] The rib structure 1002 is arranged in the enclosed space of the frame 1001, wherein the rib structure 1002 is arranged to be at least one. In a specific embodiment, the rib structure 1002 can be arranged to be multiple, and these rib structures 1002 are parallel to each other. Of course, the rib structures 1002 can also be arranged to be non-parallel structures, and the arrangement of these rib structures 1002 can be arranged according to the shape of the enclosed space of the frame 1001, as long as adjacent rib structures 1002, or adjacent rib structures 1002 and the frame 1001, are enclosed to form a space structure.

[0155] Although Fig.15 The prefabricated cavity floor 1000 is shown to have a plurality of vertical rib structures and does not include a transverse rib structure; however, in the present disclosure, the number of the vertical rib structure may be one. Fig.15 Not shown in the figure, the prefabricated cavity floor 1000 of the present disclosure may include an implementation form including only one transverse rib structure and not including a vertical rib structure.

[0156] The bottom cover plate 1007 at least partially closes the lower end of at least part of the space structure. In one embodiment, the bottom cover plate 1007 is formed as an integral structure and can close the lower ends of all the space structures. Of course, the bottom cover plate 1007 of the present disclosure can completely close the lower ends of some of the space structures, and can partially close the lower ends of some of the space structures. Thus, by setting the bottom cover plate 1007, the enclosed space of the frame 1001 can be formed into a cavity structure (or a groove structure).

[0157] In the present disclosure, the frame 1001, the rib structure 1002 and the bottom cover plate 1007 can be prefabricated as a whole by pouring concrete, or can be formed as separate components and assembled together.

[0158] Although Fig.15 The prefabricated cavity floor 1000 is shown to have a plurality of vertical rib structures and does not include a transverse rib structure; however, in the present disclosure, the number of the vertical rib structure may be one. Fig.15 Not shown in the figure, the prefabricated cavity floor 1000 of the present disclosure may include an implementation form including only one transverse rib structure and not including a vertical rib structure.

[0159] Fig.17 and Fig.18 It is a schematic structural diagram of a prefabricated cavity floor according to another embodiment of the present disclosure. Fig.19 yes Fig.17 and Fig.18 sectional view of . Fig. 20 and Fig.21 It is a schematic structural diagram of a prefabricated cavity floor according to another embodiment of the present disclosure. Fig. 22 yes Fig. 20 and Fig.21 sectional view of .

[0160] like Figures 17 to 22 As shown, the rib structure 1002 includes a transverse rib structure (a first direction rib structure) and a vertical rib structure (a second direction rib structure). In terms of quantity, the transverse rib structure can be set to one or more, and correspondingly, the vertical rib structure can also be set to one or more. Correspondingly, these vertical rib structures can be set in parallel, and correspondingly, they can also be set non-parallel. The transverse rib structure can intersect with at least part of the vertical rib structure, so that the internal space of the frame 1001 is divided into a plurality of space structures by the transverse rib structure and the vertical rib structure. In a preferred embodiment, the shapes of these space structures can be the same or different, and the areas can also be the same or different.

[0161] Fig.17 and Fig.18 An embodiment is shown in which only one transverse rib structure is present, Fig. 20and Fig.21 An embodiment with two transverse rib structures is shown. In the present disclosure, the number of the transverse rib structures is not limited thereto.

[0162] The periphery of the prefabricated cavity floor 1000 is not provided with a connecting piece 1003, or Figures 15 to 22 As shown, at least a portion of the periphery of the prefabricated cavity floor 1000 is provided with a connector 1003. In a specific embodiment, the connector 1003 may be a steel structure, such as a steel bar, etc. Part of the connector 1003 is located inside the frame 1001 and / or the rib structure 1002, for example, it may be connected to the stress-bearing steel bar or structural steel bar of the frame 1001 and / or the rib structure 1002, and the other end extends out of the frame 1001 to form a free end.

[0163] Along the height direction of the prefabricated cavity floor 1000, the connecting members 1003 can be arranged in at least one row, that is, the connecting members in a row can be located on the same plane or close to the same plane, for example, on the same horizontal plane; in a preferred embodiment, the connecting members 1003 can be arranged in two rows, wherein one row of connecting members 1003 is located at or near the lower end of the frame 1001, and the other row of connecting members 1003 is located at or near the upper end of the frame 1001.

[0164] Of course, the connectors 1003 of the present disclosure may also be provided in two or more numbers along the height direction of the prefabricated cavity floor 1000. For example, a row of connectors 1003 may also be provided at the middle position of the frame 1001.

[0165] At least a portion of the outer peripheral surface of the frame 1001 of the prefabricated cavity floor 1000 is formed with at least one recessed structure 1004. In the present disclosure, the recessed structure 1004 can be formed as an annular structure or a discontinuous structure, that is, formed as an annular recessed structure or formed as a discontinuous recess. Moreover, the number of the recessed structures 1004 can be set according to the height of the frame 1001. In a preferred embodiment, the recessed structures 1004 are set to two in the height direction, and accordingly, the two recessed structures 1004 form three convex structures.

[0166] At least one end of the rib structure 1002 is connected to the side wall of the frame 1001. In a preferred embodiment, the two ends of the rib structure 1002 are respectively connected to two opposite side walls of the frame 1001. In the present disclosure, the connection position of the rib structure 1002 and the frame 1001 is not limited, and it can be connected to different positions on the inner surface of the frame 1001.

[0167] That is to say, the space structure is formed by the rib structure 1002. Accordingly, the rib structure 1002 can be orthogonal, oblique or arc-shaped, and the top view shape of the space structure is one or more of square, rectangular, diamond, triangle, circle, arc, or polygon.

[0168] In a preferred embodiment, the cross-section of the rib structure 1002 may be unequal width or equal width, wherein the unequal width means that the rib structure 1002 is smaller at the top and larger at the bottom, or larger at the top and smaller at the bottom.

[0169] Fig.23 It is a schematic structural diagram of a building according to one embodiment of the present disclosure.

[0170] like Fig.23 As shown, the assembled cavity building structure includes the above-mentioned prefabricated cavity floor 1000 and the following structures such as the rib beam 2000 and the composite layer 3000.

[0171] Of course, if the connection strength between the prefabricated cavity floor 1000 and the rib beam 2000 is sufficient, the laminated layer 3000 may not be provided.

[0172] The rib beam 2000 is arranged in the interval area or vicinity between two adjacent prefabricated cavity floor slabs 1000. In the process of manufacturing the assembled cavity building structure, the adjacent prefabricated cavity floor slabs 1000 are spaced at a predetermined distance, or a predetermined width, so that a predetermined space is formed between the prefabricated cavity floor slabs 1000. At this time, pouring concrete in the predetermined space can form the rib beam 2000. At this time, the rib beam 2000 can form a mechanical connection with the outer peripheral surface of the frame 1001 of the prefabricated cavity floor slab 1000, so that the assembled cavity building structure has better mechanical properties.

[0173] On the other hand, since the prefabricated cavity floor 1000 has a recessed structure 1004 , the rib beam 2000 formed by casting has a protruding structure inserted into the recessed structure 1004 , thereby providing better connection strength between the prefabricated cavity floor 1000 and the rib beam 2000 .

[0174] In the present disclosure, when the periphery of the prefabricated cavity floor 1000 is provided with a connector 1003, at least part of the connector 1003 is located inside the rib beam 2000, so that the connector 1003 of the prefabricated cavity floor 1000 can serve as at least part of the force-bearing steel bars or structural steel bars of the rib beam 2000. Of course, the connector 1003 can be connected to each other at the position of the rib beam 2000, for example, the connector 1003 extending from two rib structures 1002 along the long direction is connected at the rib beam, so that the rib structures on both sides of the rib beam are substantially connected and extended, and can be continuously stressed. Correspondingly, the same is true for the long direction of the frame, and the overall prefabricated cavity floor structure system has a superior structural system with bidirectional force and greater bearing capacity.

[0175] For example, the connecting pieces 1003 of adjacent prefabricated cavity floor slabs 1000 can be directly connected, or connected through the reinforcing member 2001 arranged inside the rib beam 2000, wherein the reinforcing member 2001 can be a steel bar arranged along the length direction of the rib beam 2000, and the end of the connecting piece 1003 can be formed with a hook, and the hook can be hooked on the reinforcing member 2001, or mechanically connected to each other, or welded, etc., so that the connecting pieces 1003 of adjacent prefabricated cavity floor slabs 1000 can be more closely connected to each other. At the same time, the reinforcing member 2001 can also be formed as the skeleton of the rib beam 2000, and the rib beam has a strong moment resistance, a greater bearing capacity and a higher strength. Therefore, the prefabricated cavity floor structure system with the rib beam can also have a greater bearing capacity and a higher strength as a whole.

[0176] The rib beam structure or the stronger T-shaped rib beam structure (that is, the rib beam 2000 and the composite layer 3000 together form a T-shaped section with better mechanical properties) has the function of enhancing the overall bearing capacity of the prefabricated cavity floor structure system. At the same time, it can also allow the rib structures between the prefabricated cavity floors to be connected to form a full-length force transmission structure, and work together with the rib beams in the other direction to form a more superior two-way prefabricated cavity floor structure system, in which the composite layer 3000 can also be called a flange.

[0177] In other words, compared to the situation where there is no reinforcing member between the prefabricated cavity floor and the prefabricated panels, that is, the situation where the intervals between the prefabricated panels have no bearing capacity, a key point of the present invention is to cast the post-cast rib beams and reinforcing members as an important structure that can bear about half of the load, and to form a T-shaped rib beam with a greater bearing capacity, which forms a whole with the prefabricated cavity floor and can jointly bear nearly double the load.

[0178] In a specific embodiment, the reinforcing member 2001 may be a plurality of steel bars, and the plurality of steel bars may be arranged in a plurality of rows in the vertical direction, and each row of steel bars may include a plurality of steel bars. In a preferred embodiment, each row of steel bars may be connected to or anchored into another rib beam corresponding to another rib beam in the extension direction, or anchored in a wall, column or beam at the end, thereby facilitating the connection between the connector 1003 and the reinforcing member 2001. More preferably, when a row of steel bars of the reinforcing member 2001 includes a plurality of steel bars, the connector 1003 is connected to the steel bar farthest from the reinforcing member 2001, so that the connector 1003 can have the maximum anchoring length in the rib beam 2000, thereby improving the reliability of the anchoring connection, and also improving the connection strength between the prefabricated cavity floor 1000 and the rib beam 2000.

[0179] In a preferred embodiment, the rib beam 2000 further includes a tying member 2002, which can connect the reinforcing members 2001 to each other and keep the reinforcing members 2001 in a reasonable position before pouring concrete.

[0180] In the present disclosure, the reinforcing member 2001 and the tying member 2002 can be formed in the form of a steel mesh or a steel cage.

[0181] After the rib beam 2000 is formed, the lower surface of the rib beam 2000 is flush with the lower surface of the prefabricated cavity floor 1000. In other embodiments, the lower surface of the rib beam 2000 may also be higher or lower than the lower surface of the prefabricated cavity floor 1000, as long as the connection strength between the rib beam 2000 and the prefabricated cavity floor 1000 is sufficient.

[0182] Fig.24 It is a schematic cross-sectional structural diagram of an assembled cavity building structure according to one embodiment of the present disclosure.

[0183] like Fig.24 As shown, a cover plate 4000 is arranged above the prefabricated cavity floor 1000 of the assembled cavity building structure, and a laminated layer 3000 is at least arranged on the cover plate 4000. The laminated layer 3000 and the rib beam 2000 are integrally formed by cast-in-place concrete. Accordingly, when pouring concrete, the cover plate 4000, the laminated layer 3000 and the rib beam 2000 form an integral force-bearing structure.

[0184] Although Fig.24It is not shown in the figure, but the prefabricated cavity building structure of the present invention may only include the superimposed layer 3000, and the cover plate 4000 is not arranged under the superimposed layer 3000. In this case, when pouring the superimposed layer 3000, a template may be arranged inside the prefabricated cavity floor 1000, so that the superimposed layer 3000 and the rib beam 2000 are formed into an integral force-bearing structure by pouring concrete.

[0185] In the present disclosure, the composite layer 3000 can connect the prefabricated cavity floor 1000 and the cover plate 4000, the cover plate and the rib structure, or the cover plate and the rib beam, beam, wall or column into an integral structure, which can bear the force together.

[0186] Accordingly, in the present disclosure, the lower surface of the cover plate 4000 is spaced apart from the upper surface of the bottom plate 1007, thereby forming a cavity structure between the cover plate 4000 and the bottom plate 1007; on the other hand, when the prefabricated cavity building structure does not include the bottom plate 1007, the lower surface of the stacking layer is spaced apart from the bottom plate 1007, thereby forming a cavity structure between the stacking layer and the bottom plate.

[0187] Fig.25 It is a schematic structural diagram of a cover plate according to an embodiment of the present disclosure.

[0188] In this disclosure, Fig.24 and Fig.25 As shown, the prefabricated cavity building structure further includes a cover plate 4000 , which is disposed on the prefabricated cavity floor 1000 and at least partially covers the space structure enclosed by the frame 1001 and the rib structure 1002 , and / or the rib structure 1002 .

[0189] That is, the shape of the cover plate 4000 can be formed to be the same as, slightly smaller than, or slightly larger than the shape of the space structure, so that each cover plate 4000 can enclose at least one space structure. Of course, the area of ​​the cover plate 4000 can also be set to be large enough, so that each cover plate 4000 can cover at least two space structures.

[0190] In a preferred embodiment, the cover plate 4000 can completely cover the area enclosed by the frame 1001. Generally speaking, the cover plate 4000 is not arranged across different prefabricated cavity floors 1000, because rib beams 2000 need to be formed at the locations where the prefabricated cavity floors 1000 are connected.

[0191] More preferably, when the prefabricated cavity building structure includes a cover plate 4000, the superimposed layer 3000 may not be provided; that is, it is sufficient to cover the upper end of the prefabricated cavity floor 1000, and connect and anchor the rib beams and / or rib structures and the top of the frame to the cover plate with steel bars, and then fill and pour concrete to form a whole; accordingly, when the superimposed layer 3000 is provided on the prefabricated cavity floor 1000, the superimposed layer 3000 is formed at least on the prefabricated cavity floor 1000 by cast-in-place concrete.

[0192] In other words, the cover plate 4000 can be integrally connected with the rib structure, beams, walls, columns, etc. by setting steel bars and / or post-cast concrete, and can bear the force together as a whole.

[0193] Regarding the specific structure of the cover plate 4000, Fig.25 As shown, the cover plate 4000 includes a base 4001, which can be made of reinforced concrete, and the shape of the base 4001 can be adapted to the shape of the space structure, for example, formed into a square or other shape. Preferably, the area of ​​the base 4001 is slightly larger than the area of ​​the space structure, so that the base 4001 can be stably placed on the prefabricated cavity floor 1000.

[0194] In a preferred embodiment, the base 4001 may be formed to cover two or more space structures. In this case, the shape of the base 4001 may be formed to cover these space structures.

[0195] In some implementation forms, the connection part 4002 may not be provided around the base 4001. However, preferably, the connection part 4002 is provided around the base 4001, wherein the connection part 4002 may be formed by steel bars, in which case a portion of the connection part 4002 is located inside the base 4001, and the other end of the connection part 4002 is located outside the base 4001 and formed as a free end.

[0196] In the present disclosure, the connection parts 4002 can be formed in a row, that is, they are arranged as one in the thickness (height) direction of the base 4001, and these connection parts 4002 can be located in a certain plane or on a certain horizontal plane.

[0197] In the present disclosure, when a connection portion 4002 is provided around the cover plate 4000 and the cover plate 4000 is disposed on the prefabricated cavity floor 1000 , at least part of the connection portion 4002 is located inside the rib beam 2000 , thereby the connection portion 4002 of the cover plate 4000 can be anchored on the rib beam 2000 . Of course, the connecting parts 4002 can be connected to each other at the position of the rib beam 2000. For example, the connecting parts 4002 of adjacent cover plates 4000 can be directly connected or overlapped, or connected or overlapped through the reinforcing member 2001 arranged inside the rib beam 2000, wherein the reinforcing member 2001 can be a steel bar arranged along the length direction of the rib beam 2000, and the end of the connecting part 4002 can be formed with a hook, and the hook can be hooked on the reinforcing member 2001, so that the connecting parts 4002 of adjacent cover plates 4000 can be more reliably connected to each other. At the same time, the reinforcing member 2001 can also form a skeleton of the rib beam 2000, and make the rib beam have higher strength or bearing capacity.

[0198] In a specific embodiment, the steel bars of the reinforcing member 2001 can also correspond to the position of the connecting portion 4002 of the cover plate 4000, thereby facilitating the connection between the connecting portion 4002 and the reinforcing member 2001. More preferably, when a row of reinforcing members 2001 includes multiple steel bars, the connecting portion 4002 is connected to the steel bar farthest from the reinforcing member 2001, so that the connecting portion 4002 can have the maximum length in the rib beam 2000, thereby improving the anchoring reliability of the connecting portion 4002.

[0199] That is to say, the partial connection part 4002 of the cover plate 4000 is connected to the rib beam 2000, and the partial connection part 4002 of the cover plate 4000 can be located above the frame 1001 or the rib structure 1002. When the composite layer 3000 is formed by pouring concrete, the connection part 4002 can be located inside the composite layer 3000.

[0200] In a preferred embodiment, Fig.16 , Fig.19 and Fig. 22 As shown, the upper ends of the frame 1001 and the rib structure 1002 are provided with connecting steel bars 1005, and as shown in FIG. Fig.24 As shown, the connection portion 4002 can be connected or anchored to the connection steel bar 1005, so that the cover plate 4000 can be formed as a whole with the prefabricated cavity floor 1000 after being superimposed with cast-in-place concrete.

[0201] More preferably, an extended steel bar 3001 is further provided above the frame 1001 and the rib structure 1002. For example, the extended steel bar 3001 can be provided in plurality and fixed to the connecting steel bar 1005 of the frame 1001 and / or the rib structure 1002. At this time, these extended steel bars 3001 can be provided along the direction of the frame 1001 and / or the rib structure 1002, thereby improving the strength of the laminated layer 3000.

[0202] In the present disclosure, the cover plate is prefabricated independently or can be replaced by a steel bearing plate. There is a gap between the cover plate and the bottom plate of the present disclosure, so that a cavity is formed inside the assembled cavity building structure, thereby reducing the deadweight of the assembled cavity building structure through the cavity and improving the bearing capacity of the assembled cavity building structure. Correspondingly, when the assembled cavity building structure does not include a cover plate but only includes a laminated layer, there is also a gap between the laminated layer and the bottom plate, and a cavity is also formed inside the assembled cavity building structure.

[0203] The assembled cavity building structure disclosed in the present invention can be used for the floor or roof structure of an above-ground building or an underground building, or for the parking layer or roof structure of a motor vehicle garage or a non-motor vehicle garage.

[0204] Therefore, the prefabricated cavity building structure disclosed in the present invention can greatly improve the construction speed of buildings such as underground garages, and the prefabricated cavity building structure has a low deadweight. Therefore, it can save building materials while bearing a large bending moment, thereby reducing the construction cost and achieving energy conservation and emission reduction.

[0205] When the assembled hollow building structure disclosed in the present invention is in use, the rib beam 2000 can be supported by components such as support columns and support beams, thereby further improving the mechanical properties of the assembled hollow building structure.

[0206] Fig.26 and Fig. 27 It is a schematic cross-sectional structural diagram of an assembled cavity building structure according to different embodiments of the present disclosure.

[0207] like Fig.26 As shown, the assembled cavity building structure may not include the laminated concrete layer on the top of the cover plate, and the cover plate intervals are connected as a whole by cast-in-place reinforced concrete. Accordingly, the connecting portion 4002 of the cover plate 4000 may be at least partially located inside the rib beam 2000, so that the cover plate 4000 and the rib beam 2000 form an integral force-bearing structure; and Fig.26 In the embodiment, the lower surface of the rib beam 2000 is flush or substantially flush with the lower surface of the prefabricated cavity floor 1000 .

[0208] That is to say, when there is no overlapping layer in the prefabricated cavity building structure, the top of the frame, the top of the rib structure and the rib beam are formed into a whole by cast-in-place concrete. Accordingly, at least part of the connecting portion 4002 of the cover plate 4000 is located in the whole, and the top of the frame, the top of the rib structure, the rib beam and the cover plate are connected into a whole.

[0209] In the present disclosure, the connection position between two adjacent cover plates 4000 can be located above the rib structure 1002 of the prefabricated cavity floor 1000. At this time, the area between the two cover plates 4000 can be poured with concrete and formed into a connection area. The connecting portion 4002 of the cover plate 4000 and the connecting steel bar 1005 of the prefabricated cavity floor 1000 are at least partially located in the connection area, and the connecting portion 4002 can be anchored or connected to the connecting steel bar 1005, so that an integral force-bearing structure is formed between the cover plate 4000 and the prefabricated cavity floor 1000.

[0210] Moreover, at least a portion of the rib beam 2000 is formed above the rib structure 1002 adjacent thereto, so that the rib beam 2000 is formed into a T-shaped rib beam, and thus the prefabricated cavity floor 1000, the T-shaped rib beam and the cover plate 4000 form an integral force-bearing structure.

[0211] Furthermore, if Fig. 27 As shown, the assembled cavity building structure may not include the laminated concrete layer on the top of the cover plate, and the cover plate intervals are connected as a whole by cast-in-place reinforced concrete. Moreover, the lower surface of the rib beam 2000 extends beyond the lower surface of the prefabricated cavity floor 1000, so that the rib beam 2000 has a higher strength, and accordingly the assembled cavity building structure also has a higher strength.

[0212] Under the conditions of equal material consumption and equal area, compared with solid slabs, prefabricated cavity floor slabs can greatly increase the moment of inertia of the section, thereby greatly improving the bending resistance, and can achieve a larger span or stronger bearing capacity, realize factory production, speed up construction, save a large amount of concrete in the cavity, and greatly reduce the deadweight of the structure. Therefore, prefabricated cavity floor slabs assembled into floor and roof structures can greatly improve the effective bearing capacity, greatly reduce the deadweight of the building, and greatly reduce the construction cost. They can also be industrially produced on a large scale and quickly assembled on site, greatly saving construction time.

[0213] The T-shaped rib beam is designed to greatly increase the bearing capacity. It utilizes the distance between dense-rib floor slabs and specifically configures the force-bearing, structural and bending-resistant steel bars, so that the rib beams, cover plates or composite cover plates are connected and cast into a whole, forming a T-shaped section with a large moment of inertia and very superior mechanical properties. It greatly helps to improve the bearing capacity of the entire floor slab and resist bending moments together with the prefabricated cavity floor slab.

[0214] In the present disclosure, when there is a laminated layer, the rib beam is integrally cast with the laminated layer, and the rib beam is formed into a T-shaped rib beam. More preferably, the rib beam is connected with the laminated layer and the cover plate by integral cast-in-place concrete to form a laminated plate, that is, the upper flange of the rib beam, thus forming a T-shaped rib beam with greatly improved mechanical properties. The T-shaped rib beam is equipped with stress-bearing steel bars, which can share a large amount of force.

[0215] When there is no overlapping layer, the cast-in-place concrete in the connection area between the rib beam and the cover plate forms a T-shaped rib beam with greatly improved mechanical properties. The T-shaped rib beam is equipped with load-bearing steel bars, which can share a large amount of force.

[0216] In the present disclosure, a bottom plate may be provided at the lower portion of the rib beam formed by the cast-in-place concrete, thereby eliminating the need to provide an additional bottom formwork when casting the concrete rib beam.

[0217] In another embodiment, the rib beam can also be formed into an I-shaped section, so that the frame of the prefabricated cavity floor can be at least partially located inside the rib beam, that is, in the recess of the rib beam, thereby increasing the cross-sectional height of the rib beam and forming a structural system with superior mechanical properties.

[0218] Fig.34 and Fig.35 It is a partial structural schematic diagram of a building according to different embodiments of the present disclosure, that is, a longitudinal cross-sectional view of a rib structure.

[0219] According to another aspect of the present disclosure, a building is provided, the building comprising the above-mentioned prefabricated cavity building structure.

[0220] like Fig.23 , Fig.34 and Fig.35 As shown, the building also includes components such as side walls or side beams 8000 and supporting beams 9000.

[0221] That is to say, in the building, its outer contour may be a side wall or a side beam. Specifically, when the building is an underground building, the outer contour is a side wall; when the building is an above-ground building, the outer contour is a side wall or a side beam.

[0222] Wherein, at least a portion of the side wall or side beam 8000 is used to form the outer boundary of the building, wherein the side wall or side beam 8000 is connected to the prefabricated cavity floor of the prefabricated cavity building structure.

[0223] Moreover, the supporting beam 9000 is located in the area enclosed by the side wall or the side beam 8000, and the end of the supporting beam 9000 is arranged on the side wall or the side beam 8000, and the supporting beam 9000 is connected to the prefabricated cavity floor of the assembled cavity building structure.

[0224] For example, see Fig.23 In the upper left corner, the supporting beam 9000 can be arranged horizontally and formed as a horizontal supporting beam, and the supporting beam 9000 can be arranged vertically and formed as a vertical supporting beam. At this time, the horizontal supporting beam and the vertical supporting beam are enclosed to form a filling space.

[0225] The prefabricated cavity building structure can at least partially cover the filling space. In a preferred embodiment, Fig.23 As shown, the prefabricated cavity building structure of the filling space in the upper left corner includes three prefabricated cavity floors 1000 and two rib beams 2000. The three prefabricated cavity floors 1000 are arranged in parallel, and a rib beam is arranged between two adjacent prefabricated cavity floors 1000.

[0226] Of course, the number of prefabricated cavity floor panels 1000 of each prefabricated cavity building structure may also be other values, such as Fig.23 The assembled cavity building structure shown in the middle part includes two prefabricated cavity floor slabs 1000 and a rib beam 2000 . At this time, the rib beam 2000 is located between the two prefabricated cavity floor slabs 1000 .

[0227] The supporting beam 9000 is located between the prefabricated cavity floor slabs of two adjacent assembled cavity building structures. Fig.23 As shown, the vertically arranged supporting beam 9000 is located between two transversely arranged prefabricated cavity building structures, and correspondingly, the transversely arranged supporting beam is located between two vertically arranged prefabricated cavity building structures.

[0228] The connection relationship between the assembled cavity building structure and the side walls or side beams 8000 and the supporting beams 9000 will be described below in conjunction with the accompanying drawings.

[0229] Figures 28 to 30 It is a partial structural schematic diagram of a building according to different embodiments of the present disclosure.

[0230] like Figures 28 to 30 As shown, the side wall 8000 includes a wall portion 8001 and a casting portion 8002; when constructing the building, the wall portion 8001 is first formed by pouring concrete, and the height of the wall portion 8001 is limited to a reasonable height, such as 2 meters to 3 meters. An assembled cavity building structure is arranged on the wall portion 8001, and at least part of the assembled cavity building structure is located on the wall portion 8001. For example, in actual use, the frame 1001 of the assembled cavity building structure is erected on the wall portion 8001, so that the position of the frame 1001 can be initially fixed.

[0231] On the other hand, a support ear structure may also be provided on the wall portion 8001, and in this case, the frame 1001 of the assembled cavity building structure can be erected on the support ear structure.

[0232] After the prefabricated cavity floor 1000 of the assembled cavity building structure is set, the connecting piece 1003 of the prefabricated cavity floor 1000 is set above the wall part 8001. After the casting part 8002 is obtained by pouring concrete, the connecting piece 1003 of the prefabricated cavity floor 1000 is located inside the casting part 8002.

[0233] Moreover, the connection part 4002 of the cover plate 4000 is also located in the casting part 8002, and the connection piece 1003 of the prefabricated cavity floor 1000 and the connection part 4002 of the cover plate 4000 can be anchored in the casting part 8002, and the casting part 8002 and the prefabricated cavity floor 1000 and the cover plate 4000 have higher connection strength and anchoring reliability.

[0234] In one embodiment, the extended steel bar 3001 of the laminated layer 3000 can also be located in the casting part 8002, and the extended steel bar 3001 can be formed into a bent structure, which is adapted to the shape of the casting part 8002, thereby enabling the laminated layer 3000 and the casting part 8002 to have higher connection strength and anchoring reliability.

[0235] That is, when the building includes a side wall, the casting part 8002 is formed as a wall cast in situ together with the superimposed layer.

[0236] When the building includes edge beams 8000, refer to Figures 28 to 30 , the component indicated by reference numeral 8001 may be a lower prefabricated edge beam, and the component indicated by 8002 is an edge beam cast in situ with the composite layer as a whole; in another case, the component indicated by reference numeral 8001 may be a supporting column, masonry or space structure, and the component indicated by 8002 is an edge beam cast in situ with the composite layer as a whole.

[0237] Figure 31 to Figure 33 It is a partial structural schematic diagram of a building according to different embodiments of the present disclosure.

[0238] like Fig.31 and Fig.33 As shown, at least part of the connection piece 1003 of the prefabricated cavity floor 1000 is located inside the supporting beam 9000 .

[0239] Thus, the connector 1003 of the prefabricated cavity floor 1000 can be connected or anchored to the supporting beam 9000. Of course, the connector 1003 can be connected or anchored to each other at the position of the supporting beam 9000, for example, the connectors 1003 of the prefabricated cavity floor 1000 of adjacent assembled cavity building structures can be directly connected or anchored, or connected or anchored through the skeleton member provided inside the supporting beam 9000, wherein the skeleton member can be a steel bar provided along the length direction of the supporting beam 9000 (or in a direction perpendicular or substantially perpendicular to the connector 1003), and the end of the connector 1003 can be formed with a hook, and the hook can be hooked on the skeleton member, so that the connectors 1003 of adjacent prefabricated cavity floor 1000 can be connected or anchored to each other, and at the same time, the skeleton member can also form the skeleton of the supporting beam 9000, and make the rib beam have higher strength and bearing capacity.

[0240] In a specific embodiment, the skeleton member may be a plurality of steel bars, and the plurality of steel bars may be arranged in a plurality of rows in the vertical direction, and each row of steel bars may include a plurality of steel bars. In a preferred embodiment, each row of steel bars may also be arranged corresponding to the position of the connector 1003 of the prefabricated cavity floor 1000, thereby facilitating the connection of the connector 1003 with the skeleton member. More preferably, when a row of steel bars of the skeleton member includes a plurality of steel bars, the connector 1003 is connected to the steel bar farthest from the connector 1003, so that the connector 1003 can have the maximum length in the supporting beam 9000, thereby improving the reliability of anchoring, and also improving the connection strength between the prefabricated cavity floor 1000 and the supporting beam 9000.

[0241] Similarly, in the present disclosure, the connection portion 4002 of the cover plate 4000 can be anchored to the supporting beam 9000. Of course, the connection portion 4002 can be connected or anchored to each other at the position of the supporting beam 9000, for example, the connection portions 4002 of adjacent cover plates 4000 can be directly connected or anchored, or connected through a skeleton member provided inside the supporting beam 9000, wherein the skeleton member can be a steel bar provided along the length direction of the supporting beam 9000 (or in a direction perpendicular to or approximately perpendicular to the connection portion 4002), and the end of the connection portion 4002 can be formed with a hook, and the hook can be hooked on the skeleton member, so that the connection portions 4002 of adjacent cover plates 4000 can be connected to each other or reliably anchored, and at the same time, the skeleton member can also form the skeleton of the supporting beam 9000, and make the rib beam have higher strength and bearing capacity.

[0242] In a specific embodiment, the steel bars of the frame member can also correspond to the position of the connection part 4002 of the cover plate 4000, thereby facilitating the connection between the connection part 4002 and the frame member. More preferably, when a row of steel bars of the frame member includes multiple steel bars, the connection part 4002 is connected to the steel bar farthest from it, so that the connection part 4002 can have the maximum length in the supporting beam 9000, thereby improving the strength and anchoring reliability of the supporting beam 9000, and also improving the connection strength between the cover plate 4000 and the supporting beam 9000.

[0243] The supporting beam 9000 is provided with a support ear structure, and the assembled cavity building structure is supported by the support ear structure. Moreover, the supporting beam 9000 can be supported by a supporting column, so that the building can have a stronger bending resistance.

[0244] The supporting beam 9000 can be an integral cast-in-place concrete type, a composite reinforced concrete beam type, or a whole section prefabricated assembly type.

[0245] In the present disclosure, when the area of ​​the space structure is 0.8-2.5 square meters, that is, when the space structure is formed into a square with a side length of about 0.9-1.5m, the prefabricated cavity floor is formed into a dense rib prefabricated cavity floor; correspondingly, when the area of ​​the space structure is 56-64 square meters, that is, when the space structure is formed into a square with a side length of 7-8m, the prefabricated cavity floor is formed into a primary and secondary beam floor. That is, the cross-sectional area of ​​the rib structure 1002 is large, and it can be called a beam at this time.

[0246] Although not shown in the figure in the present disclosure, the cover plate 4000 of the present disclosure can be integrally formed with the prefabricated cavity floor 1000, for example, integrally prefabricated by concrete pouring. In this case, the cover plate 4000 can also be called an upper sealing plate, which can be formed as a whole and close the upper end of the space structure; preferably, the cover plate 4000 can close the upper end of the space structure, or close the upper end of the frame 110.

[0247] In this embodiment, only the rib beam 2000 is provided between two adjacent prefabricated cavity floor slabs 1000 .

[0248] Usually, prefabricated cavity floor is mainly affected by its own deadweight and live load. Under the action of these gravity, compressive stress is generated in the upper part of the prefabricated cavity floor and tensile stress is generated in the lower part, and the two form a resistance moment. Concrete is a brittle material, which is suitable for compression but not for tension. Therefore, the tension in the lower part needs to be borne by the steel bars, and the pressure in the upper part is borne by the concrete. Then the concrete in the lower part becomes a burden (burden), that is, it becomes an unnecessary deadweight load.

[0249] When the assembled cavity building structure disclosed in the present invention is used, it not only saves a lot of concrete and deadweight through the cavity, but also saves a lot of redundant concrete in the lower part through the arrangement of T-shaped rib beams, the T-shaped cross section just meets this mechanical characteristic.

[0250] When there is a superimposed layer in the prefabricated cavity building structure disclosed in the present invention, the T-shaped rib beam and the superimposed layer work together. There is a T-shaped rib beam and a prefabricated cavity floor slab with a superimposed layer in the same width. The load is a constant value. The T-shaped rib beam and the prefabricated cavity floor slab with a superimposed layer in the same width have basically the same bending resistance in the local area. It can also be said that there are two bending resistance structures in the same width, and the bearing capacity is greatly increased when they are combined into a whole and work together.

[0251] When considering the overall effect of the superimposed layer: the prefabricated components will deform in advance because they replace the formwork. After pouring the superimposed layer, the stiffness and bearing capacity of the same full-size cast-in-place structure can no longer be achieved, and there is a certain degree of loss, while the cast-in-place structure has no loss. In other words, the prefabricated cavity floor with a superimposed layer has a bearing capacity loss, while the bearing capacity of the post-cast T-shaped rib beam is not lost, which enhances the overall bearing capacity.

[0252] Based on the above analysis, the prefabricated cavity building structure disclosed in the present invention is a collaborative structure. The T-shaped rib beam is the main structural member and plays an important role. Its mechanical contribution is very large. In addition, the T-shaped rib beam can also connect or anchor the steel bars of the prefabricated cavity floor slabs on both sides to form a more superior two-way force-bearing structure.

[0253] In the description of this specification, the description with reference to the terms "one embodiment / method", "some embodiments / methods", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment / method or example are included in at least one embodiment / method or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment / method or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments / methods or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments / methods or examples described in this specification and the features of the different embodiments / methods or examples, unless they are contradictory.

[0254] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0255] Those skilled in the art should understand that the above embodiments are only for the purpose of clearly illustrating the present disclosure, and are not intended to limit the scope of the present disclosure. For those skilled in the art, other changes or modifications may be made based on the above disclosure, and these changes or modifications are still within the scope of the present disclosure.

Claims

1. A split-level garage, characterized in that: include: A roof plate, the roof plate forming the top of the split-level garage; A bottom plate, the bottom plate forming the bottom of the split-level garage, wherein the bottom plate comprises a bottom driving lane and a bottom parking space arranged on at least one side of the bottom driving lane; at least one middle plate, the middle plate being disposed between the top plate and the bottom plate, the middle plate comprising a middle lane and a middle parking space disposed on at least one side of the middle lane; at least one hollow area, through which the upper space and the lower space of the middle plate can be connected; and An air and smoke duct, which is used to supply air into the garage or to discharge smoke in the garage to the outside of the garage; Wherein, at least part of the area of ​​the top plate and / or the middle plate is mainly composed of an assembled cavity building structure; the assembled cavity building structure at least includes a prefabricated cavity floor and a cover plate, and the prefabricated cavity floor includes a frame, a rib structure and a bottom plate; the frame has an enclosed space, the rib structure is arranged in the frame, and divides the enclosed space of the frame into at least two space structures; the bottom plate closes the lower end of at least part of the space structure, and forms the enclosed space of the frame into a cavity structure; the cover plate is arranged on the prefabricated cavity floor, and at least partially covers the space enclosed by the frame and the rib structure. Space structure; and / or, at least partially covering the space structure separated by the rib structure; or, the prefabricated cavity building structure at least includes a prefabricated cavity floor and a laminated layer, the prefabricated cavity floor includes a frame, a rib structure and a bottom plate; the frame has an enclosed space, the rib structure is arranged in the frame, and the enclosed space of the frame is divided into at least two space structures; the bottom plate closes the lower end of at least part of the space structure, and makes the enclosed space of the frame form a cavity structure; the laminated layer is at least partially arranged on the prefabricated cavity floor, and the laminated layer is formed as a whole by cast-in-place concrete.

2. The split-level garage according to claim 1, characterized in that: Also includes: A sprinkler system capable of providing fire-fighting liquid to at least one of the air and smoke duct, the middle plate and the bottom plate.

3. The split-level garage according to claim 2, characterized in that: The sprinkler system includes a sprinkler pipe and a sprinkler head connected to the sprinkler pipe. The sprinkler pipe is fixed to the outer wall or to the middle plate around the hollow area. The sprinkler head is configured to spray fire-fighting liquid toward the air and smoke duct, downward and / or obliquely downward.

4. The split-level garage as claimed in claim 2, characterized in that: The spray system includes a spray pipe and a spray head, wherein the spray pipe is arranged on an intermediate plate or a support column, wherein the spray pipe is arranged along a first direction, and the spray pipe is connected to a spray branch pipe, wherein the spray branch pipe is arranged along a second direction, and the spray head is arranged on the spray branch pipe, wherein the first direction is different from the second direction.

5. The split-level garage as claimed in claim 4, characterized in that: At least one of the nozzles is configured to spray fire-fighting liquid toward the air and smoke duct, downward, and / or obliquely downward.

6. The split-level garage as claimed in claim 2, characterized in that: When the hollow area is arranged adjacent to the outer wall of the split-level garage, at least a portion of the sprinkler system is fixed to the outer wall.

7. The split-level garage as claimed in claim 4, characterized in that: The air and smoke duct is arranged on the top plate, and a sprinkler branch is arranged above and / or below the air and smoke duct, and the sprinkler branch is provided with a nozzle, at least part of which sprays fire-fighting liquid upward, downward and / or obliquely downward.

8. The split-level garage according to claim 1, characterized in that: When the prefabricated cavity building structure includes a laminated layer, the prefabricated cavity building structure further includes: a cover plate, which is arranged on the prefabricated cavity floor and at least partially covers the space structure enclosed by the frame and the rib structure; and / or at least partially covers the space structure separated by the rib structure.

9. The split-level garage according to any one of claims 1 to 8, characterized in that: The periphery of the prefabricated cavity floor is not provided with connecting pieces, or at least part of the periphery of the prefabricated cavity floor is provided with connecting pieces; Optionally, when a connection piece is provided around the periphery of the prefabricated cavity floor, at least a portion of the connection piece is located inside the rib beam; Optionally, two adjacent connecting members located inside the rib beam are connected to each other, or the connecting members are anchored inside the rib beam; Optionally, the assembled cavity building structure further includes: A rib beam, wherein the rib beam is arranged in or near a spacing area between two adjacent prefabricated cavity floor slabs, and the rib beam is formed by cast-in-place concrete; Optionally, when the prefabricated cavity building structure has a superimposed layer, the rib beam and the superimposed layer are integrally formed by cast-in-place concrete, and the rib beam is formed into a T-shaped rib beam; when the prefabricated cavity building structure does not have a superimposed layer, the top of the frame, the top of the rib structure and the rib beam are connected to the cover plate as a whole by cast-in-place concrete; Optionally, when the prefabricated cavity building structure has a cover plate, a connection relationship can be formed between the rib beam and the cover plate while the rib beam is formed by cast-in-place concrete; Optionally, a reinforcing member is provided inside the rib beam; Optionally, the laminate layer is at least partially located above the cover plate; Optionally, the rib beam comprises a reinforcing member, at least part of which is located near the lower part of the rib beam, and / or at least part of which is located in the laminated layer; Optionally, the lower surface of the rib beam is flush with the lower surface of the prefabricated cavity floor or protrudes from the lower surface of the prefabricated cavity floor; Optionally, at least a portion of the outer peripheral surface of the frame of the prefabricated cavity floor is formed with at least one concave structure; Optionally, from the perspective of looking up at the prefabricated cavity floor, the shape of the upward concave space structure of the prefabricated cavity floor is one or more of square, rectangle, diamond, triangle, circle, arc, or polygon; Optionally, the cover plate is prefabricated independently or can be replaced by a steel decking plate; and / or, the cover plate is prefabricated integrally with the prefabricated cavity floor.

10. A building, characterized in that: A split-level garage comprising the split-level garage described in any one of claims 1 to 9.