Deep coal seam mining far and near field hard rock stratum cooperative roof control strong mine earthquake prevention and treatment method

By combining surface hydraulic fracturing and underground deep-hole blasting, the problem of strong mine tremors caused by hard overburden in deep coal mining has been solved, achieving precise mine tremor control and risk reduction.

CN118933776APending Publication Date: 2024-11-12SHANDONG ENERGY GRP CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410816440.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During deep coal mining, hard overburden can easily form large-area overhang structures, leading to strong mine earthquakes that threaten the safety of underground miners and surface residents, and affect production efficiency and profitability.

Method used

The method combines surface hydraulic fracturing with downhole deep-hole blasting. By fracturing hard rock strata in the far field through vertical wells on the surface and pre-fracture hard rock strata in the near field through deep-hole blasting, penetrating fractures are formed, cutting the rock strata into regular block structures and avoiding large-area overhang fractures.

Benefits of technology

It effectively reduced the risk of strong mine earthquakes, improved positioning accuracy and construction precision, and achieved the goal of controlling strong mine earthquakes at their source.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933776A_ABST
    Figure CN118933776A_ABST
Patent Text Reader

Abstract

The invention discloses a deep coal seam mining far and near field hard rock stratum cooperative roof control strong mine earthquake prevention method, which comprises the following steps of: weakening a far field hard rock stratum before a working face is tunneled, and constructing a vertical well on the ground for fracturing so as to weaken the far field hard rock stratum above 100m of a coal seam roof; a single-point micro-seismic acquisition instrument and an underground deep hole roof detector are used for monitoring the rock stratum fracture development condition in the fracturing period; a deep hole blast hole is constructed in an underground roadway roof to weaken a near-field hard rock stratum within the range of 50-90 m of a coal seam roof, the explosive amount is determined according to the lithology of the roof and the hole depth, and the hole sealing length is not smaller than 1 / 3 of the hole depth; deep hole blasting is carried out on an underground roof, a blasting crack is communicated with a crack generated by fracturing of a ground vertical well to form a through crack, a hard rock stratum is cut into a regular blocky structure to weaken the hard roof, strong mine earthquakes induced by sudden fracture of a large-area suspended roof are avoided, and the strong mine earthquakes are treated from the source; therefore, the strong mine earthquake risk of the stope face can be greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of deep coal mining, and in particular relates to a method for preventing and controlling strong mine earthquakes by coordinated top control of hard rock strata in far and near fields during deep coal seam mining. Background Art

[0002] At present, the mining depth of most coal mines in the east, north and northeast of my country has exceeded 600m. As the mining depth gradually increases, hard overburden often develops above the coal seams in deep coal mines. During the coal seam mining process, the hard overburden is prone to form a large area of ​​suspended roof structure. Once it becomes unstable and breaks, the strong mine earthquake it induces will cause strong impact on the working face and strong vibration on the ground, which will seriously threaten the safety of underground miners and residents on the ground, and affect the production efficiency and benefits of mining.

[0003] In order to solve the problem of strong mining earthquakes encountered in deep coal seam mining, a method of coordinated roof control of hard rock formations in the far and near fields based on ground hydraulic fracturing and deep hole blasting in the well is proposed. This method is to implement segmented fracturing of hard rock formations in the far field through ground drilling, change the collapse step of hard rock formations in the far field, so as to reduce the energy release and the range of rock formation activity when the hard rock formations in the far field are broken; at the same time, combined with the deep hole blasting technology in the well, the hard rock formations in the near field of the working face are pre-cracked to reduce the initial collapse of the basic roof and the step of periodic pressure. Summary of the invention

[0004] To achieve the above object, the present invention proposes a method for preventing and controlling strong mining earthquakes by coordinating the top of hard rock strata in the far and near fields during deep coal seam mining, which is specifically implemented in the following steps:

[0005] Step 1: weaken the far-field hard rock formation before excavating the working face. Perform fracturing by constructing a vertical well on the ground to weaken the far-field hard rock formation above 100m above the coal seam roof. During the process, a single-point microseismic acquisition instrument and a deep hole roof geophone downhole are used to monitor the development of rock formation cracks during fracturing.

[0006] Step 2: During the mining of the working face, deep hole blasting holes are constructed on the roof of the underground tunnel to weaken the near-field hard rock formation within 50m to 90m of the coal seam roof. The amount of explosives is determined by the rock properties of the roof and the hole depth. The sealing length shall not be less than 1 / 3 of the hole depth.

[0007] Step 3, deep hole blasting is performed on the underground roof in step 2 to generate blasting gaps, and the blasting gaps are connected with the fractures generated by the ground vertical well fracturing in step 1 to form through fractures, so as to cut the hard rock layer into a relatively regular block structure to weaken the hard roof, avoid sudden fracture of a large area of ​​suspended roof and induce strong mine tremors, and control the strong mine tremors from the source.

[0008] Furthermore, the step 1 is specifically implemented according to the following steps:

[0009] Step 1.1, determine the target rock layer for mine earthquake control based on the drilling column chart, drilling peek and key layer theory of the mining area;

[0010] Step 1.2, arrange 4 single-point microseismic collectors around the surface fracturing well, the installation interval between two adjacent single-point microseismic collectors is 200m, obtain high-frequency effective signals and avoid mutual interference, arrange 4 deep hole top plate geophones in each of the two lanes of the corresponding underground working face, the installation interval between two adjacent underground deep hole top plate geophones is 50m, the installation aperture of each underground deep hole top plate geophone is 75mm, the depth is 22m, and the angle between the borehole and the horizontal plane is>70°. After the deep hole top plate geophone is installed, connect the geophone to the communication cable and the communication cable to the portable high-precision collector to realize the synchronous and continuous collection of received vibration signals;

[0011] Step 1.3, constructing a vertical well on the ground, first constructing a well, after completion, casing, reinforcing the wellhead, then constructing the second and third wells, withdrawing the drill pipe after construction to the fracturing layer, installing perforating bullets, and shooting bullets to shoot 4 to 6 clusters of perforations in the rock formation, with a perforation angle of 360° / number of perforations;

[0012] Step 1.4, during the vertical well fracturing process, continuously injecting fracture proppant including at least fracturing fluid and fine sand to ensure the effect after fracturing.

[0013] The beneficial effects of the present invention are:

[0014] 1. The present invention designs ground vertical well drilling and underground roof blasting drilling according to the stratum structure within the mining area, accurately pre-splitting the target rock layer for mine earthquake control, and avoiding blind large-scale construction; and combined with ground and underground microseismic monitoring devices, it can effectively reduce the vertical error of microseismic events and improve positioning accuracy;

[0015] 2. The method for preventing and controlling strong mine tremors by coordinated roof control of hard rock strata in the far and near fields during deep coal seam mining of the present invention adopts pressure relief measures combining staged fracturing of ground horizontal wells with deep hole pre-splitting blasting of underground roof. The pressure relief range is wide and the effect is obvious. It can control strong mine tremors at the source and greatly reduce the risk of strong mine tremors occurring in the mining face. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0017] Figure 1 It is a schematic diagram of a method for coordinated top control of hard rock strata in the far and near fields for preventing and controlling strong mine earthquakes in deep coal seam mining in the system of the present invention;

[0018] Figure 2 It is a schematic diagram of the target position of ground fracturing in the drilling column diagram of the mining area in the system of the present invention;

[0019] Figure 3 A schematic diagram of the target position of ground fracturing in the system of the present invention;

[0020] Figure 4 It is a schematic diagram of the state of a fracturing well after cementing and perforating in the system of the present invention;

[0021] Figure 5 It is a schematic diagram of the downhole deep hole pre-splitting blasting drilling structure in the system of the present invention;

[0022] Figure 6 It is a schematic diagram of the arrangement of the ground single-point microseismic acquisition instrument in the system of the present invention;

[0023] Figure 7 This is a schematic diagram of the installation of the underground deep hole top plate detector in the system of the present invention.

[0024] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0027] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0028] The present invention provides a method for preventing and controlling strong mining earthquakes by coordinating the top control of hard rock strata in the far and near fields during deep coal seam mining. Figures 1 to 7 As shown, the specific implementation steps are as follows:

[0029] Step 1: Weaken the hard rock formation in the far field before excavating the working face. Fracturing is carried out by constructing vertical wells on the ground to weaken the hard rock formation in the far field above 100m of the coal seam roof. During the process, a single-point microseismic acquisition instrument and a deep hole roof detector are used to monitor the development of rock formation cracks during fracturing. The specific process is as follows:

[0030] Step 1.1, determine the target rock layer for mine earthquake control based on the borehole column chart, borehole peek and key layer theory of the mining area.

[0031] Step 1.2, arrange 4 single-point microseismic collectors around the ground fracturing well, with the installation interval of 200m between two adjacent single-point microseismic collectors, to obtain high-frequency effective signals and avoid mutual interference, arrange 4 deep hole top plate detectors in each of the two lanes of the corresponding underground working face, with the installation interval of 50m between two adjacent underground deep hole top plate detectors, the installation aperture of each underground deep hole top plate detector is 75mm, the depth is 22m, and the angle between the borehole and the horizontal plane is >70°. After the deep hole top plate detector is installed, the detector is connected to the communication cable and the communication cable is connected to the portable high-precision collector to realize the synchronous and continuous collection of the received vibration signal.

[0032] Step 1.3, constructing a vertical well on the ground, first constructing a well, and then casing and reinforcing the wellhead, and then constructing the second and third wells, after construction to the fracturing layer, withdrawing the drill pipe, installing the perforating bullet, and shooting 4 to 6 clusters of perforations in the rock formation, and the perforation angle is 360° / number of perforations.

[0033] Step 1.4, during the vertical well fracturing process, continuously injecting fracture proppant including at least fracturing fluid and fine sand to ensure the effect after fracturing.

[0034] Step 2: During the mining process, deep blasting holes are constructed on the roof of the underground tunnel to weaken the near-field hard rock formation within 50m to 90m of the coal seam roof. The amount of explosives depends on the rock properties of the roof and the hole depth, and the sealing length shall not be less than 1 / 3 of the hole depth.

[0035] Step 3, deep hole blasting is performed on the underground roof in step 2 to generate blasting gaps, and the blasting gaps are connected with the fractures generated by the ground vertical well fracturing in step 1 to form through fractures, so as to cut the hard rock layer into a relatively regular block structure to weaken the hard roof, avoid sudden fracture of a large area of ​​suspended roof and induce strong mine tremors, and control the strong mine tremors from the source.

[0036] In the far-field hard rock formations, ground vertical well segmented fracturing measures are adopted, and in the near-field hard rock formations, deep hole pre-splitting blasting measures are adopted in the underground roof, so as to realize a coordinated roof control system covering the far-field and near-field hard rock formations to prevent and control strong mining earthquakes.

[0037] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. A method for preventing and controlling strong mining earthquakes by coordinating the top control of hard rock strata in the far and near fields during deep coal seam mining, characterized in that: Please follow the steps below to implement: Step 1: weaken the far-field hard rock formation before excavating the working face. Perform fracturing by constructing a vertical well on the ground to weaken the far-field hard rock formation above 100m above the coal seam roof. During the process, a single-point microseismic acquisition instrument and a deep hole roof geophone downhole are used to monitor the development of rock formation cracks during fracturing. Step 2: During the mining of the working face, deep hole blasting holes are constructed on the roof of the underground tunnel to weaken the near-field hard rock formation within 50m to 90m of the coal seam roof. The amount of explosives is determined by the rock properties of the roof and the hole depth. The sealing length shall not be less than 1 / 3 of the hole depth. Step 3, deep hole blasting is performed on the underground roof in step 2 to generate blasting gaps, and the blasting gaps are connected with the fractures generated by the ground vertical well fracturing in step 1 to form through fractures, so as to cut the hard rock layer into a relatively regular block structure to weaken the hard roof, avoid sudden fracture of a large area of ​​suspended roof and induce strong mine tremors, and control the strong mine tremors from the source.

2. The method for preventing and controlling strong mining earthquakes by coordinating the top control of hard rock strata in the far and near fields during deep coal seam mining according to claim 1, characterized in that: The step 1 is specifically implemented according to the following steps: Step 1.1, determine the target rock layer for mine earthquake control based on the drilling column chart, drilling peek and key layer theory of the mining area; Step 1.2, arrange 4 single-point microseismic collectors around the surface fracturing well, the installation interval between two adjacent single-point microseismic collectors is 200m, obtain high-frequency effective signals and avoid mutual interference, arrange 4 deep hole top plate geophones in each of the two lanes of the corresponding underground working face, the installation interval between two adjacent underground deep hole top plate geophones is 50m, the installation aperture of each underground deep hole top plate geophone is 75mm, the depth is 22m, and the angle between the borehole and the horizontal plane is>70°. After the deep hole top plate geophone is installed, connect the geophone to the communication cable and the communication cable to the portable high-precision collector to realize the synchronous and continuous collection of received vibration signals; Step 1.3, constructing a vertical well on the ground, first constructing a well, after completion, casing, reinforcing the wellhead, then constructing the second and third wells, withdrawing the drill pipe after construction to the fracturing layer, installing perforating bullets, and shooting bullets to shoot 4 to 6 clusters of perforations in the rock formation, with a perforation angle of 360° / number of perforations; Step 1.4, during the vertical well fracturing process, continuously injecting fracture proppant including at least fracturing fluid and fine sand to ensure the effect after fracturing.

Citation Information

Cited By

  • Hard rock composite weakening method for deep coal seam mining

    CN122707834A