Low-disturbance construction device and method for small-diameter vertical shaft in soft soil water-rich area

In the construction of small-diameter vertical shaft steel pipe pile enclosure in soft soil and water-rich areas, the adaptive steel pipe pile enclosure system and soil fluidized excavation system are used to solve the problems of insufficient construction accuracy and uneven support system. , achieving safe, reliable and efficient construction results, and reducing the impact of pressure-bearing water surges and environmental impacts.

CN118933793APending Publication Date: 2024-11-12SHANGHAI CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410941091.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In soft soil and water-rich areas, the construction accuracy of steel pipe piles with small diameter vertical shaft is insufficient, resulting in local air leakage problems of the annular ring beams, and the traditional support system is difficult to ensure the tight patch effect, which increases the safety risks and environmental impact of foundation pits.

Method used

Adaptive steel pipe pile enclosure system and soil fluidized excavation system, including flexible chain purlins, rigid double-piece combined ring beams, adaptive support units and soil fluidized treatment equipment, to realize steel pipe piles The adaptive tight patching and deformation adjustment of the enclosure ensures the safety, reliability and green and efficient construction through layer-by-layer mud excavation and installation of the adaptive ring beam support system.

Benefits of technology

It realizes safe, reliable and efficient construction of steel pipe pile enclosures in small-diameter vertical shaft, reduces the risk of pressure-bearing water surge and environmental impact, provides recycling and active adjustment and control capabilities for deformation, and improves the stability and efficiency of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933793A_ABST
    Figure CN118933793A_ABST
Patent Text Reader

Abstract

The invention relates to a low-disturbance construction device and method for a small-diameter vertical shaft in a soft soil water-rich area. The device comprises a low-disturbance recoverable steel pipe pile enclosure system, a self-adaptive annular supporting system and a soil body fluidization pumping and digging system. The low-disturbance recoverable steel pipe pile enclosure system is anchored through an end annular pipe grouting bag, and a wall-attached grouting hose is implanted in the pulling-out process of a steel pipe pile for follow-up compensation and reinforcement. According to the self-adaptive annular supporting system, flexible chain type enclosing purlins and steel pipe pile enclosures are arranged in a radiation mode and are tightly attached to each other, and rigid double-piece combined ring beams and the flexible chain type enclosing purlins are connected through scissor type telescopic connecting rods which are arranged in a radiation mode to provide annular support counter force. The steel jacket box clamping unit applies clamping force to the rigid double-piece combined ring beam to provide a tension pushing effect for the steel pipe pile enclosure; the soil body fluidization extraction and excavation system completes soil body slurrying through the soil body fluidization treatment equipment, the slurry extraction equipment achieves extraction and excavation of fluidization soil bodies, and the floating type annular manual operation platform provides operation spaces for supporting installation, slurry extraction and excavation and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of underground engineering, and particularly relates to a low-disturbance construction device and method for a small-diameter vertical shaft in a soft soil and water-rich area. Background Art

[0002] Resonance-free hydraulic vibratory hammer equipment Resonance-free hydraulic vibratory hammer generates high-frequency vibration through the vibratory hammer, avoiding the resonance frequency of the soil to liquefy the soil, so that the steel sheet piles sink into the soil, and the sound produced is only about 30 decibels, which is almost imperceptible during the day and will not affect the rest of the surrounding villagers even at night. It has green and efficient characteristics. In recent years, it has been widely used in projects such as steel pipe pile foundations in central urban areas and foundation pit steel pipe / sheet pile enclosures.

[0003] Due to the limitation of construction accuracy, there is a certain deviation in the position of the steel pipe pile during the driving process. When used as a retaining wall, it is difficult for each steel pipe pile to reach the line shape on the design drawing. The true roundness of the steel pipe pile enclosure cannot be guaranteed during the construction of the vertical shaft foundation pit. Traditionally, steel purlins are widely used. The regular steel line shape collides with the irregular steel pipe pile retaining wall line shape, resulting in uneven force on the support system, the risk of instability, and even certain difficulties in assembly and construction.

[0004] The use of prefabricated support systems such as steel purlins and steel supports makes it difficult to ensure the close fit between the retaining wall and the support system, like cast-in-place concrete supports. This makes the actual force mechanism of the entire retaining structure system far different from the design calculation results. The insufficient close fit of the ring beam leads to local defects in the force system, which increases the uncertainty of the system and greatly increases the safety risk of the foundation pit. At the same time, the redundant gap between the steel purlins and the steel pipe piles also provides space for the deformation of the soil behind the wall, which is particularly unfavorable for controlling the impact on the surrounding environment.

[0005] Therefore, how to provide a low-disturbance construction device for small-diameter vertical shafts in soft soil and water-rich areas to prevent safety risks such as pressurized water surges in soft soil and water-rich strata is a technical problem that technical personnel in this field urgently need to solve. Summary of the invention

[0006] The present invention provides a low-disturbance construction method for a small-diameter vertical shaft in a soft soil and water-rich area. Aiming at the problem that the construction accuracy of steel pipe pile enclosure for small-diameter vertical shaft leads to local hollowing of annular ring beams, an annular support system with an irregular configuration of an adaptive steel pipe pile enclosure wall is proposed, so that adaptive close fitting of existing gaps can be completed in the initial installation stage; in the subsequent construction process, active control capability can be further maintained according to enclosure deformation and support axial force conditions; through fluidization treatment of mud in the pit, layer-by-layer mud extraction, layer-by-layer installation of an adaptive ring beam support system, bottom plate backbuilding, lining assembly from bottom to top ring by ring, steel pipe pile recovery in-situ compensatory grouting, etc., safe, reliable, green and efficient, recyclable and deformation active adjustment and control solutions are provided for the construction of steel pipe pile enclosure for small-diameter vertical shafts in soft soil and water-rich areas.

[0007] In order to solve the above technical problems, the present invention includes the following technical solutions:

[0008] A low-disturbance construction device for small-diameter vertical shafts in soft soil and water-rich areas, comprising a low-disturbance recyclable steel pipe pile enclosure system, an adaptive annular support system, and a soil fluidization excavation system.

[0009] The low-disturbance recyclable steel pipe pile protection system includes steel pipe piles, wall-attached grouting hoses, and end ring pipe grouting bags. The grouting hoses are anchored in the soil through the grouting bags. After the steel pipe piles are pulled out, the compensatory grouting for soil loss is completed. The adaptive annular support system includes flexible chain purlins, rigid double-piece composite ring beams, adaptive support units, scissor-type telescopic connecting rods, and steel sleeve clamping units.

[0010] The flexible chain purlin is connected to the steel pipe pile enclosure by using radially arranged adaptive support units, and adaptive adjustment of the steel pipe pile enclosure structure is achieved by adjusting the spacing between the adaptive support unit and the two support rollers;

[0011] The rigid double-piece composite ring beam and the flexible chain-type purlin are connected by radially arranged scissor-type telescopic connecting rods, and a clamping force is applied to the rigid double-piece composite ring beam through a steel sleeve clamping unit, and the rigid double-piece composite ring beam provides tension for the flexible chain-type purlin through hoop stress;

[0012] The soil fluidization excavation system includes soil fluidization treatment equipment and slurry extraction equipment. By fluidizing the soil in the pit, the risks of foundation pit instability and pressurized water are reduced, and rapid excavation and rapid support are achieved by slurry extraction instead of excavation.

[0013] Furthermore, the flexible chain purlin is connected in multiple sections by bolts, and a set of adaptive support units is arranged between each section. The adaptive support unit is subjected to force by supporting rollers in close contact with the outer steel pipe piles. The distance between the two supporting rollers of the adaptive support unit is adjusted, and the supporting rollers roll with the arc surface of the steel pipe piles to adaptively find the initial close contact position.

[0014] Furthermore, the rigid double-piece composite ring beam comprises an upper composite ring beam and a lower composite ring beam which are vertically arranged and connected by springs, and the upper and lower ends of the rigid double-piece composite ring beam are respectively connected to the steel casing clamping unit by jacks.

[0015] The present invention also provides a low-disturbance construction method for a small-diameter vertical shaft in a soft soil and water-rich area, the method comprising the following steps:

[0016] Step S1, providing a small-diameter vertical shaft low-disturbance construction device for the soft soil and water-rich area for standby;

[0017] Step S2, using a resonance-free hydraulic vibration hammer to carry out small-diameter steel pipe pile shaft enclosure construction;

[0018] Step S3, using a slot milling device to perform deep slurry treatment on the soil in the shaft pit;

[0019] Step S4, start the slurry extraction equipment to extract a layer of slurry, the floating annular artificial work platform descends to a preset height along with the liquid level, installs a positioning bracket, and arranges an adaptive annular support system on the positioning bracket;

[0020] Step S5, repeating step S4, pumping slurry layer by layer and arranging the adaptive annular support system to the bottom of the pit to complete the bottom plate pouring;

[0021] Step S6, dismantling the adaptive annular support system layer by layer from bottom to top, and installing the lining ring by ring at the corresponding position; and

[0022] Step S7, anchoring the pre-installed bladder grouting pipes one by one through the bladder grouting ring pipe for grouting the bottom bladder bag. During the process of removing the steel pipe pile, the formation grouting hose is implanted by the anchoring effect of the bottom bladder bag, and the formation grouting hose is subsequently supplemented with in-situ grouting.

[0023] Furthermore, in step S7, the steel pipe pile removal and supplementary grouting are both carried out symmetrically and at intervals to ensure the balance and stability of the shaft structure.

[0024] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0025] The present invention provides a low-disturbance construction device for small-diameter vertical shafts in soft soil and water-rich areas, and a double-wheeled adaptive support unit, which can complete the adaptive close fit of the existing gap between the steel pipe pile enclosure and the annular support system in the initial installation stage; the flexible chain purlin, rigid double-piece composite ring beam, and scissor telescopic connecting rod of the present invention can also further maintain active control capabilities for local emptying, loosening and other support hazards according to the enclosure deformation and support axial force through the expansion mechanism during the excavation construction process, providing a number of advantageous solutions for the construction of steel pipe pile enclosures for small-diameter vertical shafts, such as safe and reliable, efficient construction, reciprocating utilization, and active adjustment and control of axial force. The low-disturbance construction method for small-diameter vertical shafts proposed by the present invention provides a number of advantages for the construction of steel pipe pile enclosures for small-diameter vertical shafts in soft soil and water-rich areas, such as safe and reliable, green and efficient, recyclable utilization, and active adjustment and control of deformation, through fluidization treatment of mud in the pit, layer-by-layer mud extraction, layer-by-layer adaptive ring beam support system installation, bottom plate backbuilding, and bottom-up assembly of lining ring by ring, and in-situ compensation grouting of steel pipe pile recovery, etc. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is one of the structural schematic diagrams of a low-disturbance construction device for a small-diameter vertical shaft in a soft soil and water-rich area according to an embodiment of the present invention;

[0027] Figure 2 It is a structural schematic diagram of an adaptive annular support system in a low-disturbance construction device for a small-diameter vertical shaft in a soft soil and water-rich area according to an embodiment of the present invention;

[0028] Figures 3 to 9 It is a construction flow chart of steps S1 to S7 in a low-disturbance construction method for a small-diameter vertical shaft in a soft soil and water-rich area in one embodiment of the present invention;

[0029] Fig.10 This is the second structural schematic diagram of a low-disturbance construction device for a small-diameter vertical shaft in a soft soil and water-rich area according to an embodiment of the present invention.

[0030] In the figure:

[0031] 1-Flexible chain purlin, 2-Rigid double-piece composite ring beam, 3-Adaptive support unit, 4-Scissor-type telescopic connecting rod, 5-Steel box clamping unit, 6-Support roller, 7-Support connecting rod, 8-Jack, 9-Spring, 10-Steel pipe pile, 11-Resonance-free hydraulic vibrating hammer, 12-Milling equipment, 13-Adaptive annular support system, 14-Slurry extraction equipment, 15-Positioning bracket, 16-Floating annular manual work platform, 17-Base plate, 18-Liner, 19-Bag grouting pipe, 20-Bag grouting ring pipe, 21-Bottom sealing bag, 22-Formation grouting hose. DETAILED DESCRIPTION

[0032] The following is a further detailed description of a low-disturbance construction device and method for a small-diameter vertical shaft in a soft soil and water-rich area provided by the present invention in conjunction with the accompanying drawings and specific embodiments. According to the following description, the advantages and features of the present invention will become clearer. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. For the convenience of description, the "upper" and "lower" described below are consistent with the upper and lower directions of the accompanying drawings, but this cannot be a limitation of the technical solution of the present invention.

[0033] Principle: With the increase of high-rise buildings and the higher requirements of construction, the depth of foundation pit projects is getting deeper and deeper. However, in the construction of ultra-deep foundation pits, dangerous situations such as sudden surges of pressurized water are very likely to occur; and ultra-deep precipitation measures will have a greater impact on the surrounding environment of the foundation pit; on the other hand, since the daily precipitation of ultra-deep precipitation is much greater than that of shallow precipitation, it will cause irreversible waste of groundwater resources.

[0034] The mud in the pit is fluidized through milling machines and other equipment. The bending deformation of the steel pipe pile retaining wall is extremely low under the nearly balanced effect of the lateral pressure of the fluidized mud and the lateral pressure of water and soil behind the wall. At the same time, underwater excavation also greatly reduces the occurrence of dangerous situations such as sudden surges of pressurized water, reduces the impact of precipitation measures on the environment around the foundation pit, and reduces the waste of groundwater resources.

[0035] Direct recovery of steel pipe piles can easily lead to excessive disturbance of the stratum, thus affecting the displacement of the shaft structure and the deformation of the surrounding strata.

[0036] By pre-setting a stratum grouting hose on the inner wall of the steel pipe pile and setting a bag grouting ring at the bottom of the steel pipe pile, the bottom bag expands to produce an anchoring effect during the steel pipe pile recovery process, so that the preset grouting hose is implanted into the in-situ stratum during the steel pipe pile lifting process, and the subsequent grouting is used to compensate for the stratum loss in time, thereby ensuring low-disturbance construction during the steel pipe pile recovery process.

[0037] Embodiment 1

[0038] Combine the following Figures 1 to 10 , and detailed description of the structural composition of the small-diameter vertical shaft low-disturbance construction device in soft soil and water-rich areas.

[0039] A low-disturbance construction device for small-diameter vertical shafts in soft soil and water-rich areas, comprising a low-disturbance recyclable steel pipe pile enclosure system, an adaptive annular support system, and a soil fluidization excavation system.

[0040] The low-disturbance recyclable steel pipe pile protection system includes steel pipe piles, wall-attached grouting hoses, and end ring-tube grouting bags. The grouting hoses are anchored in the soil through the grouting bags. After the steel pipe piles are pulled out, compensatory grouting for soil loss is completed.

[0041] The adaptive annular support system includes a flexible chain purlin 1, a rigid double-piece composite ring beam 2, an adaptive support unit 3, a scissor-type telescopic link 4, and a steel box clamping unit 5; the flexible chain purlin 1 is connected to the steel pipe pile 10 enclosure by a radially arranged adaptive support unit 3, and the adaptive adjustment of the steel pipe pile 10 enclosure structure is achieved by adjusting the spacing between the two support rollers 6 of the adaptive support unit 3; the rigid double-piece composite ring beam 2 and the flexible chain purlin 1 are connected by a radially arranged scissor-type telescopic link 4, and the steel box clamping unit 5 applies a clamping force to the rigid double-piece composite ring beam 2. The rigid double-piece composite ring beam 2 is the force-bearing core of the entire adaptive annular support system, and provides tension to the flexible chain purlin 1 through the hoop stress. The soil fluidization excavation system includes soil fluidization treatment equipment and slurry extraction equipment. By fluidizing the soil in the pit, the risk of foundation pit instability and pressurized water is reduced, and rapid excavation and rapid support are achieved by slurry extraction instead of excavation.

[0042] In this embodiment, more preferably, the rigid double-piece composite ring beam 2 includes an upper composite ring beam and a lower composite ring beam which are vertically arranged and connected by a spring 9, and the upper and lower ends of the rigid double-piece composite ring beam are respectively connected to the steel casing clamping unit by jacks.

[0043] Specifically, the initial installation adjustment: the flexible chain purlin 1 is connected to multiple sections by bolts, a set of adaptive support units 3 is arranged between each section, the flexible chain purlin 1 is connected to the support roller 6 by a support link 7, the adaptive support unit 3 is closely attached to the outer steel pipe pile 10 through the support roller 6, the distance between the adaptive support unit 3 and the two support rollers 6 is adjusted, the support roller 6 and the arc surface of the steel pipe pile 10 roll, and adaptively find the initial close fitting position.

[0044] Subsequent servo adjustment: When it is found that the local support force is under stress or overstressed during the shaft excavation process, the support force can be loaded or released through the steel box clamping unit 5 arranged on the rigid double-piece composite ring beam 2. The upper and lower jacks 8 in the steel box clamping unit 5 are used for jacking, and the rigid double-piece composite ring beam 2 is squeezed and contracted, driving the spacing of the scissor-type telescopic connecting rods 4 to decrease, thereby generating a jacking effect on the flexible chain-type purlin 1, and finally transmitted to each steel pipe pile 10 enclosure through the adaptive support unit 3; the upper and lower jacks 8 in the steel box clamping unit 5 are retracted, and the rigid double-piece composite ring beam 2 is acted on by the return spring 9, driving the spacing of the scissor-type telescopic connecting rods 4 to expand, thereby generating a recovery effect on the flexible chain-type purlin 1, and finally the support force of the adaptive support unit 3 for the steel pipe pile enclosure is reduced.

[0045] Please continue to refer to Figures 1 to 10 This embodiment also provides a low-disturbance construction method for a small-diameter vertical shaft in a soft soil and water-rich area, the method comprising the following steps:

[0046] Step S1, providing a small-diameter vertical shaft low-disturbance construction device for the soft soil and water-rich area for standby;

[0047] Step S2, using a resonance-free hydraulic vibration hammer 11 to perform small-diameter vertical shaft enclosure construction of a steel pipe pile 10;

[0048] Step S3, using the slot milling equipment 12 to perform deep slurry treatment on the soil in the shaft pit;

[0049] Step S4, start the slurry extraction device 14 to extract a layer of slurry, the floating annular artificial work platform 16 descends to a preset height along with the liquid level, installs the positioning bracket 15, and arranges the adaptive annular support system 13 on the positioning bracket 15;

[0050] Step S5, repeating step S4, pumping slurry layer by layer and arranging the adaptive annular support system 13 to the bottom of the pit to complete the pouring of the bottom plate 17;

[0051] Step S6, dismantling the adaptive annular support system 13 layer by layer from bottom to top, and installing the lining 18 ring by ring at the corresponding position; and

[0052] Step S7, grouting the pre-installed bag grouting pipes 19 one by one through the bag grouting ring tube 20 to the bottom bag 21 to form an anchoring effect. During the removal of the steel pipe pile, the formation grouting hose 20 is implanted by the anchoring effect of the bottom bag, and the formation grouting hose 20 is subsequently supplemented with in-situ grouting.

[0053] Furthermore, in step S7, the steel pipe pile removal and supplementary grouting are both carried out symmetrically and at intervals to ensure the balance and stability of the shaft structure.

[0054] The above examples are preferred embodiments of the present invention, but the embodiments of the present invention are not limited to the above embodiments. The above embodiments only express several embodiments of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for those of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A low-disturbance construction device for small-diameter vertical shafts in soft soil and water-rich areas, characterized in that: include: The low-disturbance recyclable steel pipe pile protection system includes a steel pipe pile, a wall-attached grouting hose, and an end ring grouting bag. The grouting hose is anchored in the soil through the grouting bag. After the steel pipe pile is pulled out, the compensation grouting for soil loss is completed. The adaptive annular support system comprises a flexible chain purlin, a rigid double-piece composite ring beam, an adaptive support unit, a scissor-type telescopic link, and a steel box clamping unit; the flexible chain purlin is connected to the steel pipe pile enclosure by a radially arranged adaptive support unit, and the adaptive adjustment of the steel pipe pile enclosure structure is achieved by adjusting the spacing between the two support rollers of the adaptive support unit; the rigid double-piece composite ring beam and the flexible chain purlin are connected by a radially arranged scissor-type telescopic link, and a clamping force is applied to the rigid double-piece composite ring beam by the steel box clamping unit, and the rigid double-piece composite ring beam provides tension for the flexible chain purlin through hoop stress, and The soil fluidization excavation system includes soil fluidization treatment equipment and slurry extraction equipment. The fluidization treatment of the soil in the pit reduces the risk of foundation pit instability and pressurized water, and rapid excavation and rapid support are achieved by slurry extraction instead of excavation.

2. The low-disturbance construction device for small-diameter vertical shafts in soft soil and water-rich areas according to claim 1 is characterized in that: The flexible chain purlin is connected in multiple sections by bolts, and a set of adaptive support units is arranged between each section. The adaptive support unit is subjected to force by closely fitting with the outer steel pipe piles through support rollers. The distance between the adaptive support unit and the two support rollers is adjusted, and the support rollers roll with the arc surface of the steel pipe piles to adaptively find the initial close fitting position.

3. The low-disturbance construction device for small-diameter vertical shafts in soft soil and water-rich areas according to claim 1 is characterized in that: The rigid double-piece composite ring beam comprises an upper composite ring beam and a lower composite ring beam which are arranged vertically and connected by springs. The upper and lower ends of the rigid double-piece composite ring beam are respectively connected to the steel casing clamping unit by jacks.

4. The low-disturbance construction method for small-diameter vertical shafts in soft soil and water-rich areas according to any one of claims 1 to 3, characterized in that: The steps include: Step S1, providing a small-diameter vertical shaft low-disturbance construction device for the soft soil and water-rich area for standby; Step S2, using a resonance-free hydraulic vibration hammer to carry out small-diameter steel pipe pile shaft enclosure construction; Step S3, using a slot milling device to perform deep slurry treatment on the soil in the shaft pit; Step S4, start the slurry extraction equipment to extract a layer of slurry, the floating annular artificial work platform descends to a preset height along with the liquid level, installs a positioning bracket, and arranges an adaptive annular support system on the positioning bracket; Step S5, repeating step S4, pumping slurry layer by layer and arranging the adaptive annular support system to the bottom of the pit to complete the bottom plate pouring; Step S6, dismantling the adaptive annular support system layer by layer from bottom to top, and installing the lining ring by ring at the corresponding position; and Step S7, grouting the bottom sealing bags one by one to form an anchoring effect. During the process of removing the steel pipe piles, the formation grouting hose is implanted by the anchoring effect of the bag, and the formation grouting hose is subsequently supplemented with in-situ grouting.

5. The method according to claim 4, characterized in that In step S7, the steel pipe piles are removed and the additional grouting is performed symmetrically and at intervals to ensure that the shaft structure is balanced and stable.