Single-track railway tunnel secondary lining construction trolley and construction method thereof

By designing structures such as door trellis and power walking mechanisms, the problem of low construction efficiency in the construction of the second lining of a single-line railway tunnel is solved, and efficient utilization of construction space and improvement of construction efficiency is achieved.

CN118933885APending Publication Date: 2024-11-12CHINA RAILWAY NO 5 ENGINEERING GROUP CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411190445.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the construction of the second-line concrete of the single-line railway tunnel, the equipment and vehicles occupied insufficient space, resulting in low construction efficiency and increased time and capital costs.

Method used

A single-line railway tunnel two-line construction trolley including door tray, power walking mechanism, diagonal brace and tie rod was designed. The trolley was widened and stabilized through cantilever beams, spiral jacks and detachable widening hydraulic cylinders. Support to ensure the utilization of construction space and the normal operation of equipment.

Benefits of technology

It effectively solves the problem of occupying construction space during second lining casting, reduces the impact on palm surface construction, improves construction efficiency, reduces costs, and realizes rapid construction of single-line tunnels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933885A_ABST
    Figure CN118933885A_ABST
Patent Text Reader

Abstract

The single-track railway tunnel secondary lining construction trolley comprises a door-shaped rack, power walking mechanisms, inclined struts and pull rods, the four power walking mechanisms are installed at the four corners of the door-shaped rack, every two power walking mechanisms are placed on two rails respectively, the two rails are fixedly connected into grooves in the two sides of a filling face, and the inclined struts are connected with the pull rods. A cantilever beam is arranged at the bottom of the n-shaped rack, a vertical strip-shaped hole is formed in the cantilever beam, a pull rod penetrates through the cantilever beam, the end, facing the side wall of the tunnel, of the pull rod is fixedly connected to the top of a pre-poured side wall, and the other end of the pull rod penetrates through the vertical strip-shaped hole and then is fixedly connected with a nut through an anchor plate. A plurality of inclined struts and pull rods are arranged on the two sides of the n-shaped rack in the length direction of the n-shaped rack. The problem that a transportation main road is occupied during secondary lining pouring can be solved, it is guaranteed that all procedures from the whole secondary lining pouring process to the tunnel face interval can be normally constructed, and the situation that a vehicle transportation channel is occupied due to secondary lining pouring is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel construction, and relates to a secondary lining construction trolley for a single-track railway tunnel and a construction method thereof. Background Art

[0002] Due to the small clearance size of the cross-section of a single-track railway tunnel, during the pouring of the secondary lining concrete, the reinforcement support system of the secondary lining trolley formwork, the concrete delivery pump, and the concrete transport vehicle often occupy the limited construction space, and the mechanical equipment and transport vehicles required for the construction between the heading face and the secondary lining trolley are separated outside the lining trolley and the heading face, which seriously affects the construction process between the secondary lining and the heading face, reduces the utilization rate of personnel and machinery, and increases time and financial costs. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a secondary lining construction trolley for a single-track railway tunnel and a construction method thereof, which can solve the problem of low construction efficiency caused by road occupation during secondary lining concrete construction.

[0004] The technical solution adopted by the present invention is: a single-track railway tunnel secondary lining construction trolley, including a portal frame, a power walking mechanism, a diagonal brace and a pull rod, four power walking mechanisms are installed at the four corners of the portal frame, the four power walking mechanisms are placed on two tracks in pairs, the two tracks are fixedly connected to the grooves on both sides of the filling surface, a cantilever beam is arranged at the bottom of the portal frame, the cantilever beam is provided with vertical strip holes, through which a pull rod passes, one end of the pull rod facing the tunnel side wall is fixedly connected to the top of the precast side wall, and the other end passes through the vertical strip hole and is fixedly connected by an anchor plate and a nut, one end of the diagonal brace abuts against the inner side of the groove, and the other end abuts against the template seam of the side mold, and multiple diagonal braces and pull rods are arranged on both sides of the portal frame along its length direction.

[0005] Furthermore, the outer end of the pull rod is fixedly connected with a fixed plate, the top of the side wall is fixedly connected with a temporary plate via temporary anchoring steel bars, and the fixed plate and the temporary plate are fixedly connected via bolts.

[0006] Furthermore, the above-mentioned door frame includes multiple door frames and bottom longitudinal beams. The two free ends of the bottom of the multiple door frames are fixedly connected to the two bottom longitudinal beams and are evenly arranged along the length direction of the bottom longitudinal beams. Multiple upper longitudinal beams are fixedly connected between two adjacent door frames. Each door frame includes a top crossbeam and a column. The bottom of the two ends of the top crossbeam is fixedly connected to two columns, and each column is an arc-shaped column.

[0007] Furthermore, an arch structure is installed above the above-mentioned top crossbeam, and the arch structure is a structure with variable transverse length, including a left-section top arch and a right-section top arch. A detachable widening hydraulic cylinder is hinged between the left-section top arch and the right-section top arch and the top crossbeam, and a detachable middle arch widening crossbeam is fixedly connected between the left-section top arch and the right-section top arch. The left-section top arch and the right-section top arch are against the middle section and two side sections of the top of the top crossbeam.

[0008] Furthermore, a screw jack is rested on the bottom of the above-mentioned bottom longitudinal beam, and the lower end of the screw jack rests on a door-shaped base. The door-shaped base spans the track and is placed in the groove. Multiple screw jacks are arranged evenly along the length direction of the two bottom longitudinal beams. Support sleeves are fixedly connected at both ends of the bottom longitudinal beam. Support columns are movable through the support sleeves. The lower end of the support column is fixedly connected to the power walking mechanism, and the upper end is fixedly connected to the cylinder rod end of the lifting hydraulic cylinder. The cylinder seat of the lifting hydraulic cylinder is fixedly connected to a support pier arranged on one side of the column.

[0009] Furthermore, each of the above-mentioned columns is larger at the top and smaller at the bottom, and the cross-section has a laterally gradually changing size.

[0010] Furthermore, the top arch of the left section and the top arch of the right section both include a bottom crossbeam, a lower sliding longitudinal beam, an outer short column and an inner high column. A plurality of bottom crossbeams are used, which are evenly spaced along the length direction of the vehicle, and the left bottom is fixedly connected to the lower sliding longitudinal beam. A sliding plate is provided at the bottom of the lower sliding longitudinal beam, and both ends of the sliding plate are tilted upward. The sliding plate abuts against the top of the left section of the top crossbeam. The end of the lower sliding longitudinal beam is hinged to one end of the widening hydraulic cylinder, and the left and right sides above each bottom crossbeam are respectively detachably fixedly connected There are outer short columns and inner high columns, which are detachably fixedly connected to the bottom of the single-sided top mold, and the single-sided top mold is fixedly connected to the outer end of the bottom cross beam near the inner side of the lower end, and the two ends of the middle arch widened cross beam are detachably fixedly connected to the inner ends of the two bottom cross beams, and the upper surface of the middle arch widened cross beam is detachably fixedly connected to the bottom of the two upper sliding longitudinal beams, and the upper surfaces of the two upper sliding longitudinal beams are fixedly connected to the top widened top mold through two rows of middle columns, and the two upper sliding longitudinal beams are placed in the middle section of the top cross beam.

[0011] Furthermore, the above-mentioned construction method of a single-track railway tunnel secondary lining construction trolley comprises the following specific steps: Step 1: Assemble the trolley. First install the power travel mechanism and the bottom longitudinal beam. After installation, place them stably on the track. Then install the front and rear door frames on the two bottom longitudinal beams and use the auxiliary fixing mechanism to temporarily fix them. After fixing, install the middle door frame and the upper longitudinal beam. Step 2: Install the second lining template to the set position and fix it; Step 3: Set diagonal braces on both sides of the trolley bottom mold. The diagonal braces use screw jacks. The top of the screw jack is connected to the side mold and is located at the template seam of the side mold. The bottom of the screw jack is gathered to the edge of the filling surface and rests against it.

[0012] Furthermore, the above-mentioned screw jacks have an inclination angle of 30°, and the screw jacks are arranged at intervals of 1.5m, with a total of seven arranged along the length direction of the trolley.

[0013] Furthermore, when the second lining construction trolley needs to be widened, the two widening hydraulic cylinders that need to be installed on one side are installed between the top arch of the left section and the top arch of the right section and the top cross beam, the bolts between the two symmetrical bottom cross beams at the bottom of the top arch of the left section and the top arch of the right section are loosened, and then the bolts between the left top mold connected to the top arch of the left section and the right top mold connected to the top of the top arch of the right section are loosened, and the front and rear two pairs of widening hydraulic cylinders are controlled to open, and under the tension of the widening hydraulic cylinders, the top arch of the left section and the top arch of the right section are moved outward respectively. When the set position is reached, the hydraulic cylinders are loosened, and an intermediate arch widening beam is installed between every two bottom cross beams to connect the two bottom cross beams into one, and a top widening top mold is installed to fix the top inner ends of the two top molds, and the fixed connection between the upper sliding longitudinal beam on the left and the bottom cross beam on the left, as well as the intermediate fixed connection with the upper sliding longitudinal beam are loosened. The top of the column is fixedly connected to the top formwork on the left, and it is moved to the right. After moving to the set position, the upper sliding longitudinal beam is fixedly connected to the middle arch widening beam, the middle column is fixedly connected to the top widening top formwork, and an inner high column is fixed between the bottom beam on the left and the corresponding top formwork. Then, the fixed connection between the upper sliding longitudinal beam on the right and the bottom beam on the right, as well as the fixed connection between the top of the middle column fixedly connected to the upper sliding longitudinal beam and the top formwork on the right are loosened, and it is moved to the left. After moving to the set position, the upper sliding longitudinal beam is fixedly connected to the middle arch widening beam, the middle column is fixedly connected to the top widening top formwork, and an inner high column is fixed between the bottom beam on the side and the corresponding top formwork. After widening all parts of the arch structure, a widened arch structure is formed, and the side formwork is widened with the hydraulic jack of the side formwork to complete the entire trolley widening setting and the widening of the second lining trolley formwork of the single tunnel.

[0014] Beneficial effects of the present invention: Compared with the prior art, the secondary lining trolley of the single tunnel of the present invention is more severe in the case of a flat cross-section with a single tunnel height and width ratio of about 1.4, and then after disassembling the bottom transverse support beam, an inclined brace and a pull rod are installed to free up the walking space at the bottom of the secondary lining trolley, solving the problem of occupying the main transportation road during the pouring of the secondary lining, so as to ensure that during the whole process of the pouring of the secondary lining, each process from the secondary lining to the heading face can be constructed normally, and the tunnel construction period is not affected by the occupation of the vehicle transportation channel by the pouring of the secondary lining, which solves the problem of lining concrete pouring. The process does not affect the construction of the face, and the goal of rapid construction of a single-line tunnel is achieved. With the conventional secondary lining pouring process, it takes an average of 15 hours to occupy the road (support, pipeline installation, delivery pump in place, and 3 hours to achieve pouring conditions; concrete pouring for an average of 10 hours; support, pipeline removal and delivery pump leaving the site for 2 hours). Within 15 hours of occupying the road, after process planning, the face is supported (frame, anchor, mesh) and the next blast hole is constructed, which can eliminate the impact of occupying the road for at least 5 hours. Each pouring of a bin of secondary lining will affect the construction of the face for 10 hours. After adopting this process, the impact can be reduced by 10 hours. Calculated based on the average construction of 8 bins / month for a single-mouth secondary lining, the impact on the construction of the face can be reduced by 80 hours per month, equivalent to 3.3 days; 15m of Class III surrounding rock, 9m of Class IV surrounding rock, and 6m of Class V surrounding rock can be completed each month, which will greatly improve per capita production efficiency and reduce losses. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a three-dimensional schematic diagram of the secondary lining construction trolley for a single-track railway tunnel; Figure 2 This is a schematic diagram of the front view of the secondary lining construction trolley for a single-track railway tunnel; Figure 3 for Figure 2 A schematic diagram of the enlarged structure of the middle part A; Figure 4 This is a schematic diagram of the vault structure; Figure 5 This is a left-side structural diagram of a secondary lining construction trolley for a single-track railway tunnel; Figure 6 for Figure 5 Schematic diagram of the structure of the middle BB section; Figure 7 for Figure 2 Schematic diagram of the CC cross-section structure; Figure 8 for Figure 7 Schematic diagram of the structure of the middle DD section; Fig. 9 for Figure 7 Schematic diagram of the EE cross-section structure; Fig.10 for Fig. 9 Partial schematic diagram of the middle vault structure; Fig.11This is a schematic diagram of the front structure of the trolley before widening; Fig.12 This is a schematic diagram of the vault structure before widening; Fig.13 It is a schematic diagram of the three-dimensional structure of the door frame; Fig.14 It is a schematic diagram of the three-dimensional structure of the column; Fig.15 It is a schematic diagram of the rear view structure of the column; Fig.16 for Fig.15 Schematic diagram of the AA section structure; Fig.17 It is a schematic diagram of the structure of the column from the right side; Fig.18 for Fig.17 Schematic diagram of the structure of the middle BB section; Fig.19 This is the stress state analysis diagram of the bottom longitudinal beam of the second lining trolley. In the figure, F1 is the concrete extrusion force and vibration pushing force; F2 is the deadweight of the side form; Fig. 20 This is the support additional force state analysis diagram; in the figure, F 1-1 Additional force of bottom diagonal support; F 2-1 Horizontal external pull additional force; Fig.21 It is a construction flow chart; Fig. 22 This is a front view structural diagram of the auxiliary assembly suspension device for the secondary lining trolley frame of a single-track tunnel; Fig.23 This is a front view structural diagram of the auxiliary assembly suspension device for the secondary lining trolley frame of a single-track tunnel (after the installation of the traveling trolley); Fig.24 This is a schematic diagram of the right view installation structure of the auxiliary assembly suspension device for the secondary lining trolley frame of a single-track tunnel. DETAILED DESCRIPTION

[0016] The invention is further described below in conjunction with the accompanying drawings and specific embodiments.

[0017] Example 1: Figure 1 to Figure 24As shown, a secondary lining construction trolley for a single-track railway tunnel comprises a portal frame 1, a power travel mechanism 2, a diagonal brace 3 and a tie rod 4. Four power travel mechanisms 2 are installed at the four corners of the portal frame 1. The four power travel mechanisms 2 are placed on two tracks 5 in pairs. The two tracks 5 are fixedly connected in grooves 7 on both sides of a filling surface 6. A cantilever beam 8 is arranged at the bottom of the portal frame 1. The cantilever beam 8 is provided with a vertical strip hole 9, through which a tie rod 4 passes. One end of the tie rod 4 is fixedly connected to the top of a precast side wall 10 toward the tunnel side wall, and the other end passes through the vertical strip hole 9 and is fixedly connected by an anchor plate 11 and a nut 12. One end of the diagonal brace 3 abuts against the inner side of the groove 7, and the other end abuts against the template seam of the side mold 13. A plurality of diagonal braces 3 and tie rods 4 are arranged on both sides of the portal frame 1 along its length direction.

[0018] In order to achieve reuse, the outer end of the pull rod 4 is fixedly connected to a fixed plate 14, the top of the side wall 10 is fixedly connected to a temporary plate 22 through a temporary anchoring steel bar 15, and the fixed plate 14 and the temporary plate 22 are fixedly connected by bolts. This structure is easy to install, the connection is stable and reliable, and it can be reused after disassembly.

[0019] In order to improve the stability of the door frame, the door frame 1 includes multiple door frames 101 and bottom longitudinal beams 102. The two free ends at the bottom of the multiple door frames 101 are fixedly connected to the two bottom longitudinal beams 102 and are evenly arranged along the length direction of the bottom longitudinal beams 102. Multiple upper longitudinal beams 103 are fixedly connected between two adjacent door frames 101. Each door frame 101 includes a top crossbeam 104 and a column 105. Two columns 105 are fixedly connected at the bottom of both ends of the top crossbeam 104. Each column 105 is an arc column. The arc column is provided to increase the passing space under the door frame while improving the rigidity and strength, thereby increasing the width of vehicle passing. Each column 105 includes a side plate 124, an inner arc plate 125 and an outer arc plate 126. Two side plates 124 are symmetrically fixedly connected between the inner arc plate 125 and the outer arc plate 126 to form a wide top and narrow bottom. Empty tube structure, the upper and lower ends of the empty tube structure are respectively fixedly connected with an upper closed flange plate 127 and a lower closed flange plate 128, and a reinforcement plate 129 is fixedly connected between the two side plates 124. The outer arc plate 126 is provided with an opening 130 for inserting a hydraulic jack for supporting the side mold. The hydraulic jack is movably inserted into the opening and hinged with the column 105. A reinforcement sub-plate 131 is arranged on the outside of the hinge hole to facilitate the installation of the hydraulic jack, and the hinge is located inside to improve the support stability. The radius of the outer arc plate 126 is 12012000mm, and the inner arc plate 126 includes an arc segment plate 132 and a straight segment plate 133 from top to bottom. The two columns 105 of adjacent door frames 101 are fixedly connected by a fork-type scissors support 122, which can provide stability for the door frame. Cantilever beams 123 are installed at the front and rear ends of the door frame 1. The cantilever beams are convenient for installing ladders and operating platforms.

[0020] In order to adapt to the lining width of different secondary linings of a single tunnel, an arch structure is installed above the top crossbeam 104. The arch structure is a structure with variable transverse length, including a left-section top arch 106 and a right-section top arch 107. A detachable widening hydraulic cylinder 108 is hinged between the left-section top arch 106 and the right-section top arch 107 and the top crossbeam 104. A detachable intermediate arch widening crossbeam 109 is fixedly connected between the left-section top arch 106 and the right-section top arch 107. 107 is against the middle section and both side sections of the top of the top crossbeam 104. When in use, the widening hydraulic cylinder is installed, and the central joints of the left and right sections of all the arch structures are loosened to control the widening hydraulic cylinder to open the left and right halves of the arch structure. After reaching the set width, the middle arch widening crossbeam is installed to complete the widening operation, and the widening hydraulic cylinder and the bottom template are removed. The support is opened by controlling the length of the hydraulic cylinder. The widened second lining trolley can adapt to the use of the new widened template, which is more convenient to adapt to the processing of different variable cross-sections in a single tunnel, and the cost is greatly reduced.

[0021] In order to facilitate the support stability of the trolley during walking and use, a screw jack 16 is abutted against the bottom of the above-mentioned bottom longitudinal beam 102, and the lower end of the screw jack 16 abuts against a door-shaped base 17. The door-shaped base 17 spans the track 5 and is placed in the groove 6. A plurality of screw jacks 16 are arranged, which are evenly arranged along the length direction of the two bottom longitudinal beams 102. Support sleeves 18 are fixedly connected at both ends of the bottom longitudinal beam 102. A support column 19 is movable through the support sleeve 18. The lower end of the support column 19 is fixedly connected to the power walking mechanism 2, and the upper end is fixedly connected to the cylinder rod end of the lifting hydraulic cylinder 20. The cylinder seat of the lifting hydraulic cylinder 20 is fixedly connected to the support pier 21 set on one side of the column 105. This structure is convenient for walking and stable support during use.

[0022] In order to achieve stable support, each column 105 is larger at the top and smaller at the bottom, and the cross section has a laterally gradually changing size, which has good load-bearing stability, especially for the narrow structure of a single tunnel (the load-bearing problem when the ratio of the highest height to the widest width is between 1.2-1.5).

[0023] In order to facilitate assembly, the top arch 106 of the left section and the top arch 107 of the right section both include a bottom crossbeam 110, a lower sliding longitudinal beam 111, an outer short column 112 and an inner high column 113. A plurality of bottom crossbeams 110 are used, which are evenly arranged along the length direction of the vehicle, and the left bottom is fixedly connected to the lower sliding longitudinal beam 111. A sliding plate 114 is provided at the bottom of the lower sliding longitudinal beam 111. The two ends of the sliding plate 114 are upwardly tilted, and the front and rear sides are provided with downwardly bent limiting side plates to form a slide groove structure. Through the slide groove structure, directional stability can be achieved during movement. Slide, the sliding plate 114 is against the top of the left section of the top crossbeam 104, and the end of the sliding longitudinal beam 111 is hinged to one end of the widening hydraulic cylinder 108. The left and right sides above each bottom crossbeam 110 are respectively detachably fixedly connected with an outer short column 112 and an inner high column 113. The outer short column 112 and the inner high column 113 are detachably fixedly connected to the bottom of the single-sided top mold 115. The single-sided top mold 115 is fixedly connected to the outer end of the bottom crossbeam 110 near the inner side of the lower end. The two ends of the middle arch widening crossbeam 109 are detachably fixedly connected to the inner ends of the two bottom crossbeams 110. The upper surface of the widened cross beam 109 is detachably fixedly connected to the bottom of the two upper sliding longitudinal beams 116. The upper surfaces of the two upper sliding longitudinal beams 116 are fixedly connected to the top widened top mold 119 through two rows of middle columns 118. The two upper sliding longitudinal beams 116 are placed on the middle section of the top cross beam 104. The top of the middle section of the two top cross beams 104 at the front end and the rear end of the door frame 1 is fixedly connected with a limit door frame 117. The upper sliding longitudinal beam 116 is located at the upper and lower parts of each top cross beam 104. Two upper and lower symmetrical sliding plates 120 are arranged. The sliding plate 120 and the sliding plate The first 114 has the same structural shape, and the second sliding plate 120 can respectively abut against the upper end surface of the middle part of the top crossbeam 104 and the bottom surface of the crossbeam of the limiting door frame 117. The limiting door frame 117 is set to play a horizontal and vertical limiting protection role. The side columns on both sides of the limiting door frame 117 are horizontally spirally connected with a detachable pushing screw 121. The inner end of the pushing screw 121 abuts against the upper sliding longitudinal beam 116. Through the two pushing screws 121 set at the front and rear of the trolley, the single upper sliding longitudinal beam 116 can be pushed toward the center, and then slide onto the middle arch widened crossbeam, which is convenient for movement.

[0024] Before widening Figure 11-12As shown, the bottom left side of the bottom cross beam 110 of the left section top arch 106 and the right section top arch 107 is detachably fixedly connected to the lower sliding longitudinal beam 111, and the upper right side is detachably fixedly connected to the upper sliding longitudinal beam 116. The lower sliding longitudinal beam 111 is placed on the upper surfaces of both sides of the four top cross beams 104, and is provided with a sliding plate 114 for auxiliary sliding. The sliding plate 114 rests on the upper surfaces of the two side sections of the top cross beam 104, and the sliding plate 2 120 at the lower end of the upper sliding longitudinal beam 116 rests on the top of the middle section of the top cross beam 104, and is connected to two symmetrical top molds 115 through two middle columns 118 above.

[0025] Widening construction process: install the two widening hydraulic cylinders that need to be installed on one side (one pair is required on the front and rear sides of the trolley) between the top arch 106 of the left section and the top arch 107 of the right section and the top crossbeam 104, loosen the bolts between the two symmetrical bottom crossbeams at the bottom of the top arch of the left section and the top arch of the right section, and then loosen the bolts between the top mold on the left side connected to the top arch of the left section and the top mold on the right side connected to the top arch of the right section, control the front and rear pairs of widening hydraulic cylinders to open, and under the tension of the widening hydraulic cylinders The top arch of the left section and the top arch of the right section are moved outward respectively. When they reach the set position, the hydraulic cylinder is released, and an intermediate arch widening beam 109 is installed between every two bottom beams 110 to connect the two bottom beams 110 into one. A top widening top mold 119 is installed to fix the top inner ends of the two top molds together, and the fixed connection between the upper sliding longitudinal beam 116 on the left and the bottom beam on the left, as well as the top of the intermediate column 118 fixedly connected to the upper sliding longitudinal beam 116 and the left The upper sliding longitudinal beam 116 is fixedly connected to the middle arch widening cross beam 109, the middle column 118 is fixedly connected to the top widening top mold 119, and the inner high column 113 is fixed between the bottom cross beam 110 on the left and the corresponding top mold. Then, the fixed connection between the upper sliding longitudinal beam 116 on the right and the bottom cross beam on the right, and the top of the middle column 118 fixedly connected to the upper sliding longitudinal beam 116 and the top mold on the right are loosened. The upper sliding longitudinal beam 116 is fixedly connected to the middle arch widening cross beam 109, the middle column 118 is fixedly connected to the top widening top form 119, and the inner high column 113 is installed and fixed between the bottom cross beam 110 on the side and the corresponding top form. After widening all parts of the arch structure, a widened arch is formed, and the side form is widened with the hydraulic jack of the side form, completing the entire trolley widening setting and the widening of the second lining trolley formwork of the single tunnel.

[0026] Embodiment 2: A construction method of a single-track railway tunnel secondary lining construction trolley, the method comprising the following specific steps: Step 1: Assemble the trolley. First install the power travel mechanism and the bottom longitudinal beam. After installation, place them stably on the track. Then install the front and rear door frames on the two bottom longitudinal beams and use the auxiliary fixing mechanism to temporarily fix them. After fixing, install the middle door frame and the upper longitudinal beam. Step 2: Install the second lining template to the set position and fix it; Step 3: Set diagonal braces on both sides of the trolley bottom mold. The diagonal braces use screw jacks. The top of the screw jack is connected to the side mold and is located at the template seam of the side mold. The bottom of the screw jack is gathered to the edge of the filling surface and rests against it.

[0027] Furthermore, the above-mentioned screw jacks have an inclination angle of 30°, and the screw jacks are arranged at intervals of 1.5m, with a total of seven arranged along the length direction of the trolley.

[0028] Auxiliary assembly suspension device used when assembling the trolley, such as Figure 22-24As shown, the auxiliary assembly suspension device includes a portal frame suspension wire rope 2301, an upper longitudinal beam suspension wire rope 2302, a sliding longitudinal beam suspension wire rope 2303 and a plurality of electric winches 2304. The portal frame suspension wire rope 2301 is tied at one end to the middle of the top side of the portal frame, and the other end is connected to the first electric winch 2304 after passing through the first fixed pulley 2305. The first fixed pulley 2305 is connected to the middle of the top side of the tunnel. The first electric winch 2304 is highly installed on the ground. Four upper longitudinal beam suspension wire ropes 2302 are symmetrically arranged in the tunnel. One end of the two upper longitudinal beam suspension wire ropes 2302 on one side is tied to the two upper longitudinal beams, and the other end is passed through the second fixed pulley 2306, the third fixed pulley 2307 and the fourth fixed pulley 2308 respectively. The fixed pulley 2308 is connected to the second electric winch 2304, the second fixed pulley 2306 and the third fixed pulley 2307 are respectively connected to the tunnel wall above the inner upper longitudinal beam and the outer upper longitudinal beam, the fourth fixed pulley 2308 is connected to the tunnel wall above the outer side of the trolley (left or right side), the second winch 2304 is installed on the tunnel floor and is located outside the bottom longitudinal beam, the sliding longitudinal beam suspension wire rope 2303 uses two wires on one side, the two ends are longitudinally tied to the two ends of the sliding longitudinal beam, and the other end is connected to the third electric winch 2304 after passing through the fifth fixed pulley 2309 and the sixth fixed pulley 2310, the fifth fixed pulley 2309 and the sixth fixed pulley 2310 are longitudinally fixedly connected to the top of the tunnel side, which can slide the sliding longitudinal beam. It is hoisted to the top of the portal frame for installation, and also includes two auxiliary crossbeams 2311 and the seventh fixed pulley 2312 that assist in fixing and connecting the front and rear ends of the two bottom longitudinal beams. The seventh fixed pulley 2312 and the first fixed pulley 2305 are installed in the middle of the top side of the tunnel in front and back. The portal frame suspension wire rope 2301 passes around the seventh fixed pulley 2312 and is connected to the first electric winder. The two auxiliary crossbeams can connect the spiral jack mounting holes at the bottom of the two ends of the bottom longitudinal beams connected to the four walking mechanisms to form the entire bottom walking mechanism assembly, which can stably walk on the track or be locked with iron shoes 2315, so as to facilitate the installation of the portal frame and the arch structure. The seventh fixed pulley 2312 can realize the remote suspension of the portal frame and lift it into the air, and then move the walking mechanism assembly. To the corresponding position, after removing the auxiliary walking wheel, put down the door frame and install it to the corresponding position, it also includes an auxiliary walking wheel 2313 that is detachably fixed to the bottom of the two columns of the door frame. The auxiliary walking wheel is installed to facilitate suspension and dragging. It also includes an eighth fixed pulley 2314. The eighth fixed pulley 2314 is installed on the top of the tunnel in a longitudinally consistent manner with the fifth fixed pulley 2309 and the sixth fixed pulley 2310, and is located in front of the walking mechanism assembly. The sliding longitudinal beam suspension wire rope 2303 bypasses the eighth fixed pulley 2314 and is connected to the third electric winch 2304, and then the sliding longitudinal beam suspension wire rope 2303 bypasses a section of the fixed pulley away from the sliding longitudinal beam, which can avoid interference between the sliding longitudinal beam suspension wire rope 2303 and the suspended sliding longitudinal beam.The auxiliary support block 2316 is located behind the walking mechanism assembly, and has a sloped surface on the upper side. Two of them are used to support the two upright posts of the inclined door frame, so as to facilitate the initial suspension of the door frame.

[0029] When in use, two auxiliary cross beams 2311 are connected to the bottom of two bottom longitudinal beams 102 to form a walking mechanism assembly (including a power walking mechanism 2). The walking mechanism assembly is located on the track 5, the first fixed pulley 2305 is located at the front top of the walking mechanism assembly, the seventh fixed pulley 2312 is located at the rear top of the walking mechanism assembly, the eighth fixed pulley 2314 is located in front of the walking mechanism assembly, the fifth fixed pulley 2309 and the sixth fixed pulley 2310 are arranged in two rows, respectively located on the upper left and right sides of the walking mechanism assembly, the second fixed pulley 2306 and the third fixed pulley 2307 are arranged in two groups, respectively located on the upper left and right sides of the walking mechanism assembly, and symmetrically arranged. After the auxiliary walking wheels 2313 are installed on the two uprights 105 of the first door frame 101, the door frame is used. The suspension wire rope is tied to the top of the door frame 101, and the first electric winch 2304 is controlled to lift it to a suspended position, and the auxiliary walking wheel 2313 is removed. The walking mechanism assembly is controlled to move toward one side of the suspended door frame 101. When it moves to the first door frame 101 installation position on the front side, it stops and is locked (the auxiliary iron shoe 2315 is locked). The winch 2304 and the two columns 105 of the door frame 101 are controlled to be lowered (the column position is manually controlled). The two positioning pins set at the bottom of the two columns 105 are inserted into the bottom longitudinal beam 101 to achieve positioning, and the columns 105 and the bottom longitudinal beam 102 are locked with bolts. The tied door frame suspension wire rope 2301 is removed, and the locking state of the walking mechanism assembly is released. The walking mechanism assembly is controlled to move to the side of the suspended door frame 101. The walking mechanism assembly returns to the initial position, and the second door frame 101 continues to be suspended. The installation process of the second door frame 101 adopts the installation process of the first door frame 101. After the installation of the second door frame 101 is completed, it is moved to the installation position of the upper longitudinal beam 103 between the first door frame 101 and the second door frame 101. The upper longitudinal beam suspension wire rope 2302 is tied to the corresponding upper longitudinal beam 103 for suspension. After being suspended on the top crossbeam 104 of the door frame 101, the rotation direction is manually controlled to lower it to the installation position, and it is locked with the two door frames 101 with bolts. After the installation of the upper longitudinal beam 103 between the first door frame 101 and the second door frame 101 is completed, the third door frame 101 is installed, and The upper longitudinal beam 103 between the third gantry frame 101 and the second gantry frame 101 is installed, and the process is repeated in sequence. After the installation of the last gantry frame 101 and the upper longitudinal beam 103 is completed, and after the installation of the two adjacent gantry frames 101 is completed, the fork-type scissors support 122 is fixedly connected between the two adjacent gantry frames 101, and the walking mechanism assembly returns to the starting position, and the sliding longitudinal beam (upper sliding beam or lower sliding beam) is tied to the sliding longitudinal beam suspension wire rope 2303 at both ends, and the third electric winch 2304 is controlled to suspend it above the top crossbeam 104, and it is manually moved to the top crossbeam 104, and the lifting of the sliding beam is repeated to complete the installation of all sliding longitudinal beams (installation of the lower sliding longitudinal beam and the upper sliding longitudinal beam), and the main frame structure assembly of the walking gantry is completed.An operating platform is built on the top crossbeam 104 to assemble the parts of the vault structure, and the parts of the vault structure can be suspended by the upper longitudinal beam suspension wire rope 2302.

[0030] Embodiment 3: A specific construction method of a single-track railway tunnel secondary lining construction trolley, the method comprising the following steps: Step 1: Prepare for the delivery and acceptance of materials required for the trolley formwork reinforcement system, conduct quality inspection of the pumping pipeline, test run the on-board pump, and conduct system training and learning preparation for operators.

[0031] Step 2: Measure the layout and positioning of the lining trolley, measure the clearance size of the initial support section, and ensure that the section size meets the design requirements. Measure the embedded position of the fixed-point transverse temporary tie rod anchor steel bars.

[0032] Step 3: Installation of temporary anchor steel bars. According to the measurement points, use a handheld electric drill to drill temporary anchor steel bar holes at the top of the small side wall. The depth is 20 cm and the drill hole diameter is 22 mm. Install φ22 threaded steel temporary anchor steel bars, bury them 20 cm into the concrete, and leave 20 cm exposed.

[0033] Step 4: Install the external pulling device. Connect the 5mm steel plate with the temporary anchor steel bar through the reserved holes in the bottom formwork of the trolley. Use φ25 high-quality rolled threaded steel to bolt the horizontal external pull rod anchor plate at the bottom of the second lining trolley longitudinal beam to the 5mm steel plate at the end of the temporary anchor steel bar. The longitudinal spacing is 1.5m and is distributed at the bottom of the longitudinal beams on both sides of the trolley.

[0034] Step 5: Strengthen the trolley and formwork. Screw jacks are set on both sides of the bottom formwork of the trolley with a longitudinal spacing of 1.5m. The length is adjusted according to the effective clearance size. The top of the screw jack is connected to the side touch and is located at the template seam. The bottom is gathered to the edge of the filling surface. The purpose of reinforcing the bottom formwork is achieved by rotating the screw jack. The screw jacks configured on the bottom longitudinal beams on both sides of the trolley are adjusted. The bottom of the screw jack is tightly attached to the walking rails. Relying on the gravity of the trolley and the friction between the rails and the screw jacks, the purpose of braking the lining trolley is achieved.

[0035] Step 6: Debug and confirm the pumping pipe and vehicle-mounted pump. Prepare the pumping pipe according to the distance between the shunting tunnel and the lining trolley. The shunting tunnel and concrete pumping station are set at a spacing of 120m. The concrete pumping distance is controlled at 10-60m. The pumping pipe is installed near the edge of the channel. The vehicle-mounted pump is placed in the concrete pumping station and tested with pipeline lubricant. If there is any fault, it should be repaired in time.

[0036] Step 7: Concrete preparation. Before concrete preparation, check whether the raw materials meet the specifications, measure the water content of sand and gravel, and prepare the construction mix according to the length of the on-site pumping pipeline. Before leaving the station, the laboratory technician checks the slump of the concrete. According to the length of the pumping pipe, the slump should be 160mm to 200mm to prevent concrete from blocking the pipe. After the concrete arrives at the site, measure the slump again. If it does not meet the requirements, return it to the factory for processing.

[0037] Step 8: Concrete pouring. The concrete pouring is strictly organized according to the principle of feeding window by window and left-right symmetry. The vertical layering should not be greater than 50cm. It should be vibrated and compacted in time. After pouring to the elevation of three windows, the concrete should be leveled, vibrated and the windows closed to pour the vault concrete.

[0038] Step 9: Cut off the tie rod and polish the appearance. During the concrete curing period, the remaining steel plate after the template external pulling device is cut manually and polished with a grinder to ensure a flawless appearance.

[0039] Using a vehicle-mounted pump instead of a ground pump can solve the problems of long traction time of the ground pump, low pumping pressure, and low pumping efficiency. The vehicle-mounted pump is suitable for construction on multiple working surfaces and is flexible to deploy. It can also be used as a backup equipment when the concrete cannot be continuously operated due to a pump failure, and can solve the equipment failure problem in a relatively short time.

[0040] During the construction process, traffic controllers are deployed to direct and coordinate the construction vehicles on the face and the concrete pouring vehicles to prevent traffic jams that affect the pouring speed and quality. The present invention is suitable for the secondary lining concrete construction of small-section tunnels, and the construction process features are as follows: (1) Low cost, strong applicability and operability.

[0041] (2) The trolley formwork reinforcement system is easy to operate and saves space.

[0042] (3) Space is exchanged for time, enabling parallel operation of the tunnel face and secondary lining of small-section tunnels.

[0043] The method of the present invention is easy to operate, highly efficient, low-cost and of guaranteed quality. Taking the construction practice of the second lining of Baoshan Tunnel on the Dali-Ruili Railway without occupying the road as an example, the conventional second lining pouring process requires an average of 15 hours of road occupation (support, pipeline installation, delivery pump in place, and reaching pouring conditions for 3 hours; concrete pouring for an average of 10 hours; support, pipeline removal and delivery pump leaving the site for 2 hours). Within 15 hours of road occupation, after process planning, the face is supported (frame, anchor rod, mesh) and the next blast hole is constructed, which can eliminate the impact of road occupation for at least 5 hours. Each pouring of one bin of the second lining will affect the construction of the face for 10 hours. After adopting this process, the impact can be reduced by 10 hours.

[0044] Based on the average construction of 8 warehouses per month for a single secondary lining, the impact on the face construction can be reduced by 80 hours per month, equivalent to 3.3 days. An additional 15m of Class III surrounding rock, 9m of Class IV surrounding rock, and 6m of Class V surrounding rock can be completed each month, which will greatly improve per capita production efficiency and reduce losses.

[0045] The method of the present invention generates a total direct economic benefit of 6.18 million yuan, with significant economic benefits.

[0046] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A single-track railway tunnel secondary lining construction trolley, characterized in that: The invention comprises a gate frame (1), a power travel mechanism (2), a diagonal brace (3) and a pull rod (4). Four power travel mechanisms (2) are installed at the four corners of the gate frame (1). The four power travel mechanisms (2) are placed on two rails (5) in pairs. The two rails (5) are fixedly connected in grooves (7) on both sides of a filling surface (6). A cantilever beam (8) is arranged at the bottom of the gate frame (1). The cantilever beam (8) is provided with a vertical strip hole (9) through which a pull rod (4) passes. One end of the pull rod (4) facing the tunnel side wall is fixedly connected to the top of a precast side wall (10), and the other end passes through the vertical strip hole (9) and is fixedly connected through an anchor plate (11) and a nut (12). One end of the diagonal brace (3) abuts against the inner side of the groove (7), and the other end abuts against the template seam of the side mold (13). A plurality of diagonal braces (3) and pull rods (4) are arranged on both sides of the gate frame (1) along its length direction.

2. A single-track railway tunnel secondary lining construction trolley according to claim 1, characterized in that: The outer end of the pull rod (4) is fixedly connected to a fixed plate (14), the top of the side wall (10) is fixedly connected to a temporary plate (15) via a temporary anchoring steel bar (15), and the fixed plate (14) and the temporary plate (15) are fixedly connected via bolts.

3. The single-track railway tunnel secondary lining construction trolley according to claim 1, characterized in that: The door frame (1) comprises a plurality of door frames (101) and bottom longitudinal beams (102). The bottom two free ends of the plurality of door frames (101) are fixedly connected to two bottom longitudinal beams (102) and are evenly arranged along the length direction of the bottom longitudinal beams (102). A plurality of upper longitudinal beams (103) are fixedly connected between two adjacent door frames (101). Each door frame (101) comprises a top cross beam (104) and a column (105). The bottoms of both ends of the top cross beam (104) are fixedly connected to two columns (105), and each column (105) is an arc column.

4. A single-track railway tunnel secondary lining construction trolley according to claim 3, characterized in that: A vault structure is installed above the top crossbeam (104). The vault structure is a structure with variable transverse length. The vault structure comprises a left-section top vault (106) and a right-section top vault (107). The top crossbeam (104) is a bilaterally symmetrical arched structure. A detachable widening hydraulic cylinder (108) is hingedly connected between the left-section top vault (106) and the right-section top vault (107) and the top crossbeam. A detachable middle vault widening crossbeam (109) is fixedly connected between the left-section top vault (106) and the right-section top vault (107). The left-section top vault (106) and the right-section top vault (107) are abutted against the middle section and the upper side sections of the top of the top crossbeam (104).

5. The single-track railway tunnel secondary lining construction trolley according to claim 3, characterized in that: The bottom of the bottom longitudinal beam (102) is supported by a screw jack (16), and the lower end of the screw jack (16) is supported on a gate-shaped base (17). The gate-shaped base (17) spans the track (5) and is placed in the groove (6). A plurality of screw jacks (16) are provided and are evenly arranged along the length direction of the two bottom longitudinal beams (102). The two ends of the bottom longitudinal beam (102) are fixedly connected with support sleeves (18), and a support column (19) is movably passed through the support sleeve (18). The lower end of the support column (19) is fixedly connected to the power walking mechanism (2), and the upper end is fixedly connected to the cylinder rod end of the lifting hydraulic cylinder (20). The cylinder seat of the lifting hydraulic cylinder (20) is fixedly connected to a support pier (21) provided on one side of the column (105).

6. The single-track railway tunnel secondary lining construction trolley according to claim 3, characterized in that: Each upright post (105) is larger at the top and smaller at the bottom, and has a cross-section with a gradually changing size in the transverse direction.

7. A single-track railway tunnel secondary lining construction trolley according to claim 4, characterized in that: The left section top arch (106) and the right section top arch (107) both include a bottom crossbeam (110), a lower sliding longitudinal beam (111), an outer short column (112) and an inner high column (113). A plurality of bottom crossbeams (110) are used and are evenly spaced along the length direction of the vehicle. The left bottom is fixedly connected to the lower sliding longitudinal beam (111). A sliding plate (114) is provided at the bottom of the lower sliding longitudinal beam (111). Both ends of the sliding plate (114) are tilted upward. The sliding plate (114) abuts against the top of the left section of the top crossbeam (104). The end of the lower sliding longitudinal beam (111) is hinged to one end of a widening hydraulic cylinder (108). The left and right sides above each bottom crossbeam (110) are respectively detachably fixedly connected to an outer short column (112). The columns (112) and the inner high columns (113), the outer short columns (112) and the inner high columns (113) are detachably fixedly connected to the bottom of the single-sided top mold (115); the inner side of the single-sided top mold (115) is fixedly connected to the outer end of the bottom cross beam (110) near the lower end; the two ends of the middle arch widening cross beam (109) are detachably fixedly connected to the inner ends of the two bottom cross beams (110); the upper surface of the middle arch widening cross beam (109) is detachably fixedly connected to the bottom of the two upper sliding longitudinal beams (116); the upper surfaces of the two upper sliding longitudinal beams (116) are fixedly connected to the top widening top mold (119) through two rows of middle columns (118); and the two upper sliding longitudinal beams (116) are placed on the middle section of the top cross beam (104).

8. The construction method of a single-track railway tunnel secondary lining construction trolley according to claim 1, characterized in that: The method comprises the following specific steps: Step 1: Assemble the trolley. First install the power travel mechanism and the bottom longitudinal beam. After installation, place them stably on the track. Then install the front and rear door frames on the two bottom longitudinal beams and use the auxiliary fixing mechanism to temporarily fix them. After fixing, install the middle door frame and the upper longitudinal beam. Step 2: Install the second lining template to the set position and fix it; Step 3: Set diagonal braces on both sides of the trolley bottom mold. The diagonal braces use screw jacks. The top of the screw jack is connected to the side mold and is located at the template seam of the side mold. The bottom of the screw jack is gathered to the edge of the filling surface and rests against it.

9. The construction method of a single-track railway tunnel secondary lining construction trolley according to claim 7, characterized in that: The screw jack has an inclination angle of 30° and is set at a spacing of 1.5m, with a total of seven screw jacks set along the length of the trolley.

10. The construction method of a single-track railway tunnel secondary lining construction trolley according to claim 7, characterized in that: When the secondary lining construction trolley needs to be widened, install the two widening hydraulic cylinders that need to be installed on one side between the top arch of the left section and the top arch of the right section and the top beam, loosen the bolts between the two symmetrical bottom beams at the bottom of the top arch of the left section and the top arch of the right section, and then loosen the bolts between the left top formwork connected to the top arch of the left section and the right top formwork connected to the top of the top arch of the right section, control the front and rear pairs of widening hydraulic cylinders to open, and under the tension of the widening hydraulic cylinders, move the top arch of the left section and the top arch of the right section outward respectively. When the set position is reached, release the hydraulic cylinders, install an intermediate arch widening beam between every two bottom beams to connect the two bottom beams into one, install a top widening top formwork to fix the top inner ends of the two top forms, loosen the fixed connection between the upper sliding longitudinal beam on the left and the bottom beam on the left, and the intermediate column fixedly connected to the upper sliding longitudinal beam. The top is fixedly connected with the top formwork on the left, and it is moved to the right. After moving to the set position, the upper sliding longitudinal beam is fixedly connected with the middle arch widening beam, the middle column is fixedly connected with the top widening top formwork, and an inner high column is fixed between the bottom beam on the left and the corresponding top formwork. Then, the fixed connection between the upper sliding longitudinal beam on the right and the bottom beam on the right, as well as the fixed connection between the top of the middle column fixedly connected to the upper sliding longitudinal beam and the top formwork on the right are loosened, and it is moved to the left. After moving to the set position, the upper sliding longitudinal beam is fixedly connected with the middle arch widening beam, the middle column is fixedly connected with the top widening top formwork, and an inner high column is fixed between the bottom beam on the side and the corresponding top formwork. After widening all parts of the arch structure, a widened arch structure is formed, and the side formwork is widened with the hydraulic jack of the side formwork to complete the entire trolley widening setting and the widening of the second lining trolley formwork of the single tunnel.