Hot dry rock reservoir transformation and heat energy extraction method under multi-field coupling effect
Through the combination of multi-field coupling and chemical stimulators, the deviation problem of dry hot rock reservoir transformation device under high pressure water flow reaction force is solved, and the efficiency of fixed-point fracturing and thermal energy extraction is improved, and the existing technology is solved. The problem of poor fracturing effect.
Patent Information
- Application Number
- CN202410993301.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-12
AI Technical Summary
The dry-hot rock reservoir transformation device is easily deviated under the reaction force of high-pressure water flow, resulting in weakening the fracturing effect on the rock formation and affecting the thermal energy extraction efficiency.
Using multi-field coupling method, the transformation device is fixed and transformed by electric telescopic rods, and the low-temperature and high-pressure water is fractured in fixed-point, combined with acidic or alkaline chemical stimulators to react with the rock formation, expand the cracks and increase the contact surface, and optimize using high-precision micro-seismic monitoring. well position and operation process.
Improve the stability and fracturing effect of the transformation device, increase the expansion length and contact surface of the crack, improve the thermal energy extraction efficiency, and reduce blockage and reflux through chemical stimulators and magnetic fluids, and improve the thermal energy recovery efficiency. .
Smart Images

Figure CN118935758A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of water-rock reaction and fluid penetration process in the development of hot dry rock geothermal resources, and specifically to a method for hot dry rock reservoir transformation and heat energy extraction under multi-field coupling. Background Art
[0002] Hot dry rock is a new geothermal energy source, which is usually buried thousands of meters deep and has a temperature greater than 180°C. It is a high-temperature rock with no fluid or only a small amount of underground fluid (dense and impermeable) inside. The composition of hot dry rock varies, mainly intermediate-acid intrusive rocks since the Mesozoic Era, or metamorphic rocks from the Mesozoic and Cenozoic Eras or massive sedimentary rocks of great thickness.
[0003] The transformation of hot dry rock reservoirs and the establishment of enhanced geothermal systems are key links in the development of geothermal resources. The main purpose is to improve the permeability and connectivity of the reservoirs, thereby enhancing the efficiency of geothermal energy extraction.
[0004] The energy storage method of hot dry rock is not to directly store its thermal energy itself, but to achieve it through the development and utilization of hot dry rock geothermal energy. At present, the transformation devices used for the transformation of hot dry rock reservoirs are mostly directly inserted into the rock formation through injection wells, without too many fixing measures. There may be a problem that the transformation device is offset under the reaction force of the rock formation by the high-pressure water flow, thereby weakening the fracturing effect of the high-pressure water flow on the rock formation. Therefore, it is necessary to propose a method for the transformation of hot dry rock reservoirs and heat energy extraction under multi-field coupling. Summary of the invention
[0005] In order to solve the problem that the above-mentioned transformation device is not fixed, resulting in the weakening of the high-pressure water flow fracturing effect on the rock formation, the purpose of the present invention is to propose a method for dry hot rock reservoir transformation and heat energy extraction under multi-field coupling, and the transformation device is limited by an electric telescopic rod so that low-temperature and high-pressure water can perform fixed-point fracturing on the rock formation, thereby achieving directional expansion of the cracks and increasing the expansion length and disturbance range of the cracks, increasing the contact area between the low-temperature and high-pressure water and the rock formation, so that the low-temperature and high-pressure water can bring out more heat energy, thereby improving the efficiency of heat energy extraction.
[0006] In order to achieve the above object, the technical solution of the present invention is as follows: a method for hot dry rock reservoir transformation and heat energy extraction under multi-field coupling, comprising the following steps:
[0007] Step 1, well drilling and target area optimization: select the drilling locations of injection wells and production wells at the selected site, and drill the injection wells and production wells by drilling rigs;
[0008] Step 2: rock formation fracturing: operate the pump assembly to inject low-temperature high-pressure water into the injection well through the transformation device, pressurizing the rock formation to generate cracks;
[0009] Step 3, chemical stimulation: placing a modification device into the injection well and fixing the modification device, operating the pump assembly to inject one or more of an acidic chemical stimulant or an alkaline chemical stimulant into the injection well through the modification device and waiting for 2 hours;
[0010] Step 4: Recovery monitoring: inject low-temperature high-pressure water into the injection well again, recover the rock formation heat energy brought out by the low-temperature high-pressure water belt through the production well, and use high-precision microseismic monitoring technology to monitor the direction and depth of rock formation cracks;
[0011] Step 5, re-drilling evaluation: After obtaining the direction and depth of the rock formation fractures, re-select and re-drill the injection wells and production wells based on the direction and depth information of the rock formation fractures, and repeat the operations of steps 2 to 4. Finally, the transformation effect of the rock formation is evaluated through the connectivity and permeability of the rock formation fractures at the bottom of each injection well, and the extraction efficiency is evaluated through the heat energy recovered from the production wells.
[0012] The principle of the basic scheme is: first select the drilling location of the injection well and the production well, and conduct drilling. After the drilling is completed, place the transformation device in the injection well. When the transformation device reaches the target depth, fix the transformation device, then turn on the pump assembly, inject low-temperature and high-pressure water into the injection well through the transformation device, impact the rock formation to produce cracks, and then inject acidic chemical stimulants or alkaline chemical stimulants into the injection well through the transformation device to fully react with the rock formation. 2 hours after the injection of acidic chemical stimulants or alkaline chemical stimulants, turn on the pump assembly again, and inject low-temperature and high-pressure water into the rock formation again. The low-temperature and high-pressure water is evaporated at the temperature inside the rock formation, and returns to the production well with the heat energy inside the rock formation. The heat energy brought by the low-temperature and high-pressure water is recovered through the production well, and the extension direction and length of the rock formation cracks are detected using high-precision microseismic technology to determine the range of disturbance. After obtaining the orientation and depth information of the rock formation fractures, the injection wells and production wells are re-sited and re-drilled according to the orientation and depth of the rock formation fractures, and the rock formation at the bottom of the re-drilled injection well is subjected to fracturing, chemical stimulation, heat energy recovery and fracture monitoring. Finally, the transformation effect of the rock formation is evaluated based on the connectivity and permeability of the rock formation fractures, and the heat energy extraction efficiency is evaluated based on the heat energy recovered by the production well.
[0013] The beneficial effects of the basic scheme are: 1. After the transformation device is fixed, the movement amplitude of the transformation device will be greatly reduced when low-temperature and high-pressure water is used to fractur the rock formation, thereby improving the stability of the device. At this time, the low-temperature and high-pressure water can perform point-by-point fracturing on the rock formation, thereby ensuring the fracturing effect on the rock formation.
[0014] 2. Wait for 2 hours after injecting one or more of the acidic chemical stimulants or alkaline chemical stimulants so that the acidic chemical stimulants or alkaline chemical stimulants can fully react with the rock formation, which can effectively reduce the occurrence of mineral blockage. At the same time, the flatness of the rock formation surface after the reaction is completed will be reduced, which is conducive to subsequent fracturing operations.
[0015] 3. The injection well and production well are re-drilled according to the fracture direction and fracture depth, so that when the rock formation at the bottom of the re-drilled injection well is fractured, it can be connected with the fracture of the rock formation at the bottom of the injection well drilled for the first time, thereby increasing the fracture contact surface, thereby increasing the contact surface between the low-temperature and high-pressure water and the rock formation, thereby increasing the heat energy brought out by the low-temperature and high-pressure water and improving the efficiency of heat energy extraction.
[0016] Furthermore, in step 2, when performing the rock fracturing operation, the injection operation needs to be repeated 3-5 times.
[0017] The principle and beneficial effect of the basic scheme are: multiple injection operations can further expand the disturbance range of rock formation fractures and increase the permeability of the rock formation.
[0018] Further, in step three, the transformation device includes a plurality of hoses, which are interconnected to form a hose transformation network, an ultrasonic sensor is provided at the bottom of the hose transformation network, through holes and valves corresponding to the through holes are provided on both sides of the interconnections between the hoses, and the hoses in the vertical direction are connected to a pump assembly, and an electric telescopic rod is provided on the surface of the hoses in the horizontal direction, and the electric telescopic rod signal is connected to a controller, and the ultrasonic sensor and the pump assembly are both connected to the controller signal. When the ultrasonic sensor senses that the distance to the bottom of the crack is about to contact the hose transformation network, it sends a distance input signal to the controller, and the controller sends a distance output signal to the electric telescopic rod. At this time, the electric telescopic rod operates to expand toward the rock walls on both sides of the crack to fix the hose transformation network in the crack.
[0019] The principle and beneficial effects of the basic scheme are: after the hose modification net enters the injection well, when the hose modification net is less than 10 cm away from the crack, the ultrasonic sensor sends a distance input signal to the controller, the staff stops the hose modification net from going deeper, and sends a distance output signal to the electric telescopic rod through the controller, and adjusts the electric telescopic rod according to the distance from the crack wall as needed, and then adjusts the position of the hose modification net, so that the hose modification net can fit the crack wall on one side, and the hose modification net can be fixed on the surface of the crack wall.
[0020] Furthermore, in step three, an acidic chemical irritant is injected into the hose modified net to form an acidic net, and an alkaline chemical irritant is injected into the hose modified net to form an alkaline net, wherein the acidic chemical irritant is a chelated acid and the alkaline chemical irritant is a chelated base.
[0021] The principle and beneficial effects of the basic solution are: the chelating agents in chelating acids and chelating bases have a strong chelating effect on Ca2+, Fe3+, and Mg2+, enabling Ca2+, Fe3+, and Mg2+ to combine with the chelating agents to form water-soluble chelates, thereby reducing the possibility of some metal ions combining with acids or bases to form precipitation and cause crack blockage.
[0022] Furthermore, in step three, during use of the modified device, the acidic net and the alkaline net are alternately arranged.
[0023] The principle and beneficial effect of the basic scheme are: the design of staggered arrangement of acidic nets and alkaline nets enables the acidic chemical stimulants to react with the alkaline chemical stimulants to generate water after the rock fractures on the acidic net side are connected with the rock fractures on the alkaline net side, thereby reducing the impact of the acidic chemical stimulants and alkaline chemical stimulants on the rock formation and the environment.
[0024] Furthermore, in step three, the valve is designed with multiple wing-shaped channels arranged inside.
[0025] The principle and beneficial effects of the basic scheme are as follows: when acidic chemical irritants, alkaline chemical irritants and low-temperature high-pressure water flow through the valve, they flow in one direction under the design of multiple wing-shaped channels of the valve, and when liquid flows back from the rock formation through the valve to the hose, the liquid will be blocked by the bends in the wing-shaped channels after entering the valve. After the liquid is blocked by the bends many times, the kinetic energy of the liquid gradually decreases, thereby reducing the situation of rock formation liquid flowing back through the valve.
[0026] Furthermore, in step three, an anti-corrosion coating is provided inside the pipe of the alkaline net.
[0027] The principle and beneficial effects of the basic solution are: the design of the anti-corrosion coating effectively alleviates the corrosion of the pipeline by alkaline chemical irritants and increases the service life of the pipeline.
[0028] Furthermore, in step three, slag, magnetic fluid and biodegradable plastic particles are added to the acidic chemical stimulant and the alkaline chemical stimulant.
[0029] The principles and beneficial effects of the basic scheme are as follows: slag and biodegradable plastic particles can play a certain supporting role in the cracks in the rock formation. The biodegradable plastic particles will expand after being heated, which can further expand the cracks in the rock formation. After the operator energizes the pipeline, the magnetic fluid generates an electromagnetic field. At this time, the rock formation is heated under the action of the electromagnetic field, thereby intensifying the thermal motion of the water molecules injected into the rock formation, increasing the distance between the water molecules, making the water molecules more active, and more easily vaporized and returned to the production well, thereby increasing the efficiency of extracting thermal energy from the rock formation.
[0030] Furthermore, in step four, the heat energy recovered from the production well is stored by adsorption heat storage material.
[0031] The principles and beneficial effects of the basic solution are: the heat storage density of the adsorption heat storage material is high, which can reach 800-1000kJ / kg, and the adsorption heat storage material is non-toxic and pollution-free, and there is no heat loss in the heat storage process. While ensuring the heat storage capacity, it can also reduce pollution to the environment.
[0032] Furthermore, in step four, when performing high-precision microseismic monitoring, sound-absorbing cotton is used to isolate the instrument from the outside world.
[0033] The principle and beneficial effects of the basic scheme are as follows: when conducting high-precision microseismic monitoring, the generation of noise will cause the monitored data to contain non-seismic information, thereby affecting the accuracy of the monitoring data, reducing the signal-to-noise ratio of the seismic data, and making it difficult to identify and extract effective signals. The use of sound-absorbing cotton to isolate the instrument from the outside world can effectively reduce the generation of noise, thereby effectively reducing the possibility of excessive interference with seismic information and improving the accuracy of monitoring data. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 The figure is a flow chart of a method according to an embodiment of the present invention.
[0035] Figure 2 It is a front view schematic diagram of the hose transformation net in an embodiment of the present invention.
[0036] Figure 3 It is an axonometric schematic diagram of a drilling model in an embodiment of the present invention.
[0037] Figure 4 It is a front cross-sectional schematic diagram of the valve in the embodiment of the present invention. DETAILED DESCRIPTION
[0038] The following is further described in detail through specific implementation methods:
[0039] The reference numerals in the drawings of the specification include: hose modification net 1, hose 2, valve 3, electric telescopic rod 4, injection well 5, production well 6, hot dry rock 7, ultrasonic sensor 8.
[0040] Embodiment 1, basically as attached Figure 1-Figure 3 As shown: The method for reservoir transformation and heat energy extraction of hot dry rock 7 under multi-field coupling includes the following steps:
[0041] Step 1, well drilling and target area optimization: select the drilling positions of the injection well 5 and the production well 6 at the selected site, and drill the injection well 5 and the production well 6 by a drilling rig, the model of which includes but is not limited to a fully hydraulic coring rig;
[0042] Step 2: rock formation fracturing: operate the pump assembly to repeatedly inject low-temperature high-pressure water into the injection well 5 three times through the transformation device, continuously pressurize the rock formation to generate cracks, and gradually expand the cracks;
[0043] Step three, chemical stimulation: place the transformation device into the injection well 5 and fix the transformation device, operate the pump assembly to inject one or more of the acidic chemical stimulants or alkaline chemical stimulants into the injection well 5 through the transformation device and wait for 2 hours, wherein the acidic chemical stimulant adopts chelated acid, and the alkaline chemical stimulant adopts chelated base, and slag, magnetic fluid and biodegradable plastic particles are added to the acidic chemical stimulant and the alkaline chemical stimulant.
[0044] The transformation device includes a plurality of hoses 2, which are interconnected to form a hose transformation net 1. An ultrasonic sensor 8 is bonded to the bottom of the hose transformation net 1. The model of the ultrasonic sensor 8 includes but is not limited to hc-sr04. Valves 3 are connected on both sides of the interconnection between the hoses 2, and the hoses 2 in the vertical direction are connected to a pump assembly. An electric telescopic rod 4 is arranged on the surface of the hoses 2 in the horizontal direction. The electric telescopic rod 4 is connected to a controller by signal. The model of the controller includes but is not limited to NZ-3A. The ultrasonic sensor 8 and the pump assembly are both connected to the controller signal. When the ultrasonic sensor 8 senses that the distance at the bottom of the crack is about to contact the hose transformation net, a distance input signal is sent to the controller, and the controller sends a distance output signal to the electric telescopic rod. At this time, the electric telescopic rod operates to expand toward the rock walls on both sides of the crack to fix the hose transformation net in the crack.
[0045] An acidic chemical irritant is injected into the hose modification net 1 to form an acidic net, and an alkaline chemical irritant is injected into the hose modification net 1 to form an alkaline net, and an anti-corrosion coating is provided inside the pipe of the alkaline net. In the process of using the modification device for the adjacent injection well 5, the acidic net and the alkaline net are arranged in an alternating manner;
[0046] Step 4, recovery monitoring: inject low-temperature high-pressure water into the injection well 5 again, recover the rock formation heat energy brought out by the low-temperature high-pressure water through the production well 6, store the heat energy through the adsorption heat storage material, the adsorption heat storage material is preferably but not limited to zeolite, and use high-precision microseismic monitoring technology to monitor the direction and depth of the rock formation cracks. When performing high-precision microseismic monitoring, sound-absorbing cotton is used to isolate the instrument from the outside world.
[0047] Step 5, re-drilling evaluation: After obtaining the direction and depth of the rock formation fractures, re-select and re-drill the injection well 5 and the production well 6 according to the direction and depth information of the rock formation fractures, and repeat the operations of steps 2 to 4. Finally, the transformation effect of the rock formation is evaluated through the connectivity and permeability of the rock formation fractures at the bottom of each injection well 5, and the extraction efficiency is evaluated through the heat energy recovered by the production well 6.
[0048] The specific implementation process is as follows: the construction personnel first determine the drilling positions of the first injection well 5 and the first production well 6, and operate the drilling machine to drill the first injection well 5 and the first production well 6. After the drilling operation is completed, the construction personnel put the acid net or alkaline net into the injection well 5. When the ultrasonic sensor 8 at the bottom of the acid net or alkaline net senses that the distance between the bottom of the crack and the bottom of the acid net or alkaline net is less than 10 cm, the ultrasonic sensor 8 sends a distance input signal to the controller. At this time, the construction personnel stop putting the acid net or alkaline net, and send a distance output signal to the electric telescopic rod 4 through the controller. The electric telescopic rod 4 expands toward the rock wall under the control of the distance output signal to fix the acid net or alkaline net in the crack. After fixing the acid net or alkaline net, the construction workers inject low-temperature and high-pressure water into the rock formation three times through the pump assembly to fractur the rock formation, causing cracks in the rock formation and further expanding the cracks in the rock formation. Then the construction workers inject acidic chemical stimulants or alkaline chemical stimulants into the rock formation through the pump assembly, and wait for 2 hours after the injection is completed to allow the acidic chemical stimulants or alkaline chemical stimulants to fully react with the rock formation.
[0049] After the acidic chemical stimulant or alkaline chemical stimulant fully reacts with the rock formation, the construction personnel inject low-temperature and high-pressure water into the injection well 5 again to collect thermal energy from the rock reservoir. The production well 6 will store the thermal energy collected by the low-temperature and high-pressure water through adsorption heat storage materials, and the adsorption heat storage material here is preferably zeolite.
[0050] After the data collection, the construction personnel used high-precision microseismic monitoring to monitor the depth and orientation of the rock formation cracks. During the monitoring period, the construction personnel used sound-absorbing cotton to isolate the instrument from the outside world. According to the monitoring results, the construction personnel re-selected the site and re-drilled the injection well 5 and the production well 6, and repeated the fracturing of the rock formation, the injection of acidic or alkaline chemical stimulants, the recovery of heat energy, and the monitoring of rock formation cracks. Finally, the transformation effect of the rock formation was evaluated based on the connectivity and permeability of the rock formation cracks, and the heat extraction efficiency was evaluated based on the heat recovery.
[0051] When acidic chemical stimulants or alkaline chemical stimulants are injected into rock cracks, the slag and degradable plastic particles inside the acidic chemical stimulants or alkaline chemical stimulants will support the cracks. Under the impact of low-temperature and high-pressure water, the cracks can be further expanded. Compared with other non-degradable substances, the harm of degradable plastic particles to the environment will also be reduced.
[0052] When construction workers energize the magnetic fluid in the acidic chemical irritant or alkaline chemical irritant in the pipeline, the magnetic fluid will generate an electromagnetic field to heat the rock formation. At this time, the degradable plastic particles will expand after being heated, further increasing the width of the cracks. At the same time, the contact area between the low-temperature and high-pressure water and the rock formation will also be larger, which can better improve the efficiency of heat energy extraction.
[0053] After storing thermal energy, the adsorption heat storage material can release or convert thermal energy according to different situations. For example, when combined with a solar power generation system, when there is insufficient sunlight, the adsorption heat storage material will release thermal energy to generate thermal energy.
[0054] Example 2
[0055] The difference from the above embodiment is that basically Figure 4 As shown: the valves 3 on both sides of the acidic net and the alkaline net are designed with multiple wing-shaped channels inside. The acidic chemical irritant, alkaline chemical irritant and low-temperature high-pressure water can directly reach the rock formation when flowing from the hose 2 through the valve 3 to the rock formation. When the liquid flowing from the rock formation to the hose 2 passes through the valve 3, due to the design of the wing-shaped channel, the liquid will be blocked by the bend in the wing-shaped channel after entering the valve 3. After the liquid is blocked by the bend many times, the kinetic energy of the liquid gradually decreases, thereby reducing the situation of the rock formation liquid flowing back through the valve 2.
[0056] When the acidic chemical stimulant or the alkaline chemical stimulant is injected into the rock formation, the acidic chemical stimulant or the alkaline chemical stimulant will react with the rock formation to increase the disturbance range of the fracture, thereby facilitating the subsequent recovery of heat energy.
[0057] For example, when an acidic chemical stimulant is injected, the acidic chemical stimulant will react with the aluminosilicate in the rock formation. Here, the acidic chemical stimulant is hydrochloric acid, and the reaction mechanism is as follows:
[0058] M v Al w Si x O y (OH) z +yH + →wAl 3+ +vM m+ +xH 4 SiO 4 ↓+(y+z-4x)H 2 O
[0059] Among them, v, w, x, y, and z all represent stoichiometric coefficients, and M represents metal ions in common silicates, such as K, Na, and Ca.
[0060] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0061] The above is only an embodiment of the present invention. The common sense such as the known specific structure and characteristics in the scheme is not described in detail here. The ordinary technicians in the relevant field know all the common technical knowledge in the technical field of the invention before the application date or priority date, can obtain all the existing technologies in the field, and have the ability to apply the conventional experimental means before that date. The ordinary technicians in the relevant field can improve and implement this scheme in combination with their own abilities under the enlightenment given by this application. Some typical known structures or known methods should not become obstacles for ordinary technicians in the relevant field to implement this application. It should be pointed out that for those skilled in the art, without departing from the structure of the present invention, several deformations and improvements can be made, which should also be regarded as the protection scope of the present invention, which will not affect the effect of the implementation of the present invention and the practicality of the patent. The protection scope required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. A method for transforming hot dry rock reservoirs and extracting heat energy under multi-field coupling, characterized in that: The following steps are involved: Step 1, well drilling and target area optimization: select the drilling locations of injection wells and production wells at the selected site, and drill the injection wells and production wells by drilling rigs; Step 2: rock formation fracturing: operate the pump assembly to inject low-temperature high-pressure water into the injection well through the transformation device, pressurizing the rock formation to generate cracks; Step 3, chemical stimulation: placing a modification device into the injection well and fixing the modification device, operating the pump assembly to inject one or more of an acidic chemical stimulant or an alkaline chemical stimulant into the injection well through the modification device and waiting for 2 hours; Step 4: Recovery monitoring: inject low-temperature high-pressure water into the injection well again, recover the rock formation heat energy brought out by the low-temperature high-pressure water belt through the production well, and use high-precision microseismic monitoring technology to monitor the expansion length and disturbance range of rock formation cracks; Step 5, re-drilling evaluation: After obtaining the direction and depth of the rock formation fractures, re-select and re-drill the injection wells and production wells based on the direction and depth information of the rock formation fractures, and repeat the operations of steps 2 to 4. Finally, the transformation effect of the rock formation is evaluated through the connectivity and permeability of the rock formation fractures at the bottom of each injection well, and the extraction efficiency is evaluated through the heat energy recovered from the production wells.
2. The method for hot dry rock reservoir transformation and heat energy extraction under multi-field coupling according to claim 1 is characterized in that: In step two, the transformation device includes a plurality of hoses, which are interconnected to form a hose transformation network, an ultrasonic sensor is provided at the bottom of the hose transformation network, through holes and valves corresponding to the through holes are provided on both sides of the interconnections between the hoses, and the hoses in the vertical direction are connected to a pump assembly, and an electric telescopic rod is provided on the surface of the hoses in the horizontal direction, and the electric telescopic rod signal is connected to a controller, and the ultrasonic sensor and the pump assembly are both connected to the controller signal. When the ultrasonic sensor senses that the distance to the bottom of the crack is about to contact the hose transformation network, a distance input signal is sent to the controller, and the controller sends a distance output signal to the electric telescopic rod. At this time, the electric telescopic rod operates to expand toward the rock walls on both sides of the crack to fix the hose transformation network in the crack.
3. The method for hot dry rock reservoir transformation and heat energy extraction under multi-field coupling according to claim 2 is characterized in that: In step 2, when performing the rock fracturing operation, the injection operation is repeated 3-5 times.
4. The method for hot dry rock reservoir transformation and heat energy extraction under multi-field coupling according to claim 3 is characterized in that: In step three, an acidic chemical irritant is injected into the hose modified net to form an acidic net, and an alkaline chemical irritant is injected into the hose modified net to form an alkaline net, wherein the acidic chemical irritant is a chelated acid and the alkaline chemical irritant is a chelated base.
5. The method for hot dry rock reservoir transformation and heat energy extraction under multi-field coupling according to claim 4 is characterized in that: In step three, when using the transformation device on the adjacent injection wells, an alternating arrangement of acidic and alkaline nets is adopted.
6. The method for hot dry rock reservoir transformation and heat energy extraction under multi-field coupling according to claim 5 is characterized in that: In step three, the valve is designed with multiple wing-shaped channels arranged inside.
7. The method for hot dry rock reservoir transformation and heat energy extraction under multi-field coupling according to claim 6 is characterized in that: In step three, the inside of the pipe of the alkaline net is provided with an anti-corrosion coating.
8. The method for hot dry rock reservoir transformation and heat energy extraction under multi-field coupling according to claim 7 is characterized in that: In step three, slag, magnetic fluid and biodegradable plastic particles are added into both the acidic chemical stimulant and the alkaline chemical stimulant.
9. The method for hot dry rock reservoir transformation and heat energy extraction under multi-field coupling according to claim 8, characterized in that: In step 4, the heat energy recovered from the production well is stored by adsorption heat storage material.
10. The method for hot dry rock reservoir transformation and heat energy extraction under multi-field coupling according to claim 9, characterized in that: In step 4, when conducting high-precision microseismic monitoring, sound-absorbing cotton is used to isolate the instrument from the outside world.
