Industrial monitoring system and method based on gas data analysis

By combining gas diffusion analysis and probability evaluation models in the industrial monitoring system, the problem of low positioning efficiency and accuracy of gas leakage equipment is solved, and accurate positioning and safety warning of gas leakage equipment is achieved.

CN118936760AActive Publication Date: 2024-11-12ZHENGFAN TECH (HUZHOU) CO LTD

Patent Information

Application Number
CN202411433215.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-15
Publication Date
2024-11-12
Estimated Expiration
2044-10-15

AI Technical Summary

Technical Problem

The prior art cannot effectively integrate the operating data and gas transmission data of gas transmission equipment for accurate traceability analysis, resulting in low positioning efficiency and positioning accuracy of gas leakage equipment.

Method used

By obtaining industrial gas data from each monitoring node in the factory and operating data of gas transmission equipment, a gas diffusion analysis model is introduced for gas leakage range analysis, and combining the primary probability analysis and probability evaluation model of gas leakage, marking early warnings are marked to improve positioning accuracy.

Benefits of technology

Accurate positioning of gas leakage equipment is achieved, positioning efficiency and positioning accuracy are improved, and personnel and equipment are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118936760A_ABST
    Figure CN118936760A_ABST
Patent Text Reader

Abstract

The invention discloses an industrial monitoring system and method based on gas data analysis, and belongs to the field of general control systems.Operation data of gas transmission equipment in a first gas leakage range are obtained and imported into a gas leakage primary probability analysis strategy for gas leakage primary probability analysis; and substituting the obtained gas leakage primary probability analysis result and the gas transmission data of each gas transmission device into a gas leakage probability evaluation model to carry out gas leakage probability evaluation, and carrying out leakage device marking early warning according to the obtained gas leakage probability evaluation result. The industrial gas data of each monitoring node is accurately traced and analyzed, and meanwhile, the gas leakage equipment is accurately positioned by fusing the operation data of the gas transmission equipment and the gas transmission data, so that the positioning efficiency and the positioning accuracy of the gas leakage equipment are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the general field of control systems, and in particular to an industrial monitoring system and method based on gas data analysis. Background Art

[0002] GMS is the abbreviation of gas monitoring system. It monitors the safety of special gases used in the factory process, the related equipment and the detection status of the factory environment. When an accident occurs, it can shut down the related equipment in time and notify the on-site personnel to evacuate, so as to achieve the purpose of protecting personnel safety and equipment integrity. However, the existing technology cannot integrate the operation data of the gas transmission equipment and the gas transmission data to accurately trace the industrial gas data of each monitoring node, and thus cannot accurately locate the gas leakage equipment, which reduces the positioning efficiency and accuracy of the gas leakage equipment. Most of the existing technologies have the above problems.

[0003] For example, a Chinese patent with the authorization publication number CN104238475B involves a gas monitoring system based on a Zigbee network, including: a Zigbee wireless monitoring node for real-time monitoring of gas-related equipment, the Zigbee wireless monitoring node including a gas sensor module and a Zigbee terminal module; a Zigbee coordinator, which establishes a wireless communication connection with the Zigbee wireless monitoring node to aggregate the collected data uploaded by the Zigbee wireless monitoring node; a control host that is connected to the Zigbee coordinator in communication, including a data storage device, a fault alarm, a safety relay, and a microprocessor, and the microprocessor triggers the fault alarm to give an alarm and controls the safety relay to shut down the corresponding gas-related equipment when the gas concentration in the collected data exceeds the preset gas concentration threshold value after analysis. Compared with the prior art, the invention is based on a gas monitoring system of a Zigbee network, which makes full use of the self-organizing network characteristics of Zigbee and the self-diagnosis and redundant fault-tolerant functions of the safety relay, and combines the advantages of both to safely and reliably control the workshop equipment, thereby improving the safety of the workshop working environment;

[0004] The above patents all have the problems raised by this background technology. In order to solve the problems raised by this background technology, this application designs an industrial monitoring system and method based on gas data analysis. Summary of the invention

[0005] In view of the deficiencies of the prior art, the present invention proposes an industrial monitoring system and method based on gas data analysis.

[0006] To achieve the above object, the present invention provides the following technical solution: an industrial monitoring method based on gas data analysis, which comprises the following specific steps:

[0007] The gas data collection terminal obtains the industrial gas data of each monitoring node in the plant area, and obtains the operation data and gas transmission data of each gas transmission equipment;

[0008] Importing the industrial gas data of each monitoring node into the gas diffusion analysis model to perform gas diffusion analysis and obtain a first gas leakage range;

[0009] Obtaining the operation data of the gas transmission equipment within the first gas leakage range and importing it into the gas leakage primary probability analysis strategy to perform the gas leakage primary probability analysis;

[0010] Substituting the obtained gas leakage primary probability analysis results and the gas transmission data of each gas transmission equipment into the gas leakage probability assessment model to conduct gas leakage probability assessment;

[0011] Based on the obtained gas leakage probability assessment results, leakage equipment marking and warning are carried out.

[0012] It should be specifically explained that, as a preferred technical solution of an industrial monitoring method based on gas data analysis, the specific steps of the gas data acquisition terminal acquiring industrial gas data of each monitoring node in the plant area and acquiring operation data and gas transmission data of each gas transmission equipment are as follows:

[0013] S11. Collecting industrial gas data of each monitoring node in the factory through a gas data collection terminal, wherein the industrial gas data is gas concentration data of various gases in the air of the node;

[0014] S12, obtaining the operating data of each gas transmission equipment in the factory, wherein the operating data includes the transmission pressure, temperature and humidity of the transmission gas;

[0015] S13. Obtain gas concentration data of various types of gases of various gas transmission equipment in the factory.

[0016] It should be specifically explained that, as a preferred technical solution of an industrial monitoring method based on gas data analysis, the step of importing the industrial gas data of each monitoring node into a gas diffusion analysis model for gas diffusion analysis to obtain a first gas leakage range includes the following specific steps:

[0017] S21. Obtain the industrial gas data of each monitoring node, obtain the gas concentration data of various gases in the node air, and simultaneously obtain the composition data of various components in the set air of the monitoring node, obtain the gas types whose gas concentration data of various gases in the node air differ from the composition data of various components in the set air by more than a safe range, set the obtained gas types as the first abnormal gas types, for example, if nitrogen dioxide exceeds the standard, set nitrogen dioxide as the first abnormal gas type, obtain the gas types in the gas transmitted by the gas transmission equipment in the plant area that can react with the gas in the set air to generate any one or more of the first abnormal gas types, set them as the second abnormal gas types, and determine the gas types according to the chemical reaction equation and the various gas types of the first abnormal gas type. The volume content corresponds to the content of each gas in the second abnormal gas type required to obtain the content of various gases in the first abnormal gas type, which is set as the reaction amount of each gas in the second abnormal gas type, and the reaction amount of each gas in the second abnormal gas type plus the remaining amount of each gas in the second abnormal gas type in the node air is obtained to obtain the total amount of each gas in the second abnormal gas type, which constitutes the total amount set of the first abnormal gas type. At the same time, the total amount of each gas in the node air that is in the gas type transmitted by the gas transmission equipment in the plant area and is not in the second abnormal gas type is obtained to constitute the total amount set of the second abnormal gas type. The union of the total amount set of the first abnormal gas type and the total amount set of the second abnormal gas type is obtained to obtain the total amount set of the abnormal gas type.

[0018] S22, obtaining the gas volume of each abnormal gas in the total amount set of abnormal gas types, and importing it into the node gas abnormal value calculation formula to calculate the gas abnormal value of each node, wherein the gas abnormal value calculation formula of the i-th node is: , where mi is the type of abnormal gas at the i-th node, aj is the proportion coefficient of the j-th abnormal gas, xij is the gas volume of the j-th abnormal gas at the i-th node that is greater than the maximum value of the normal range of the corresponding type, and xijm is the maximum value of the normal range of the corresponding type;

[0019] S23. Obtain the gas anomaly value corresponding to each node, obtain the node corresponding to the largest gas anomaly value, set it as the central node, obtain the corresponding node whose gas anomaly value differs from the central node by a set anomaly value gradient, set it as the abnormal node, connect the corresponding abnormal nodes to form a closed area, and set the corresponding closed area as the first gas leakage range.

[0020] The advantages of the above steps are: the content of each gas in the second abnormal gas type required to generate the various gas contents of the first abnormal gas type is obtained according to the chemical reaction equation and the various gas contents of the first abnormal gas type, thereby avoiding the monitoring error caused by the abnormal gas reaction, and at the same time, the maximum gas abnormal value is obtained corresponding to each node to form a closed area, and the scope of the leaking equipment is preliminarily detected;

[0021] It should be specifically explained that, as a preferred technical solution of an industrial monitoring method based on gas data analysis, the operation data of the gas transmission equipment within the first gas leakage range is obtained and imported into the gas leakage primary probability analysis strategy to perform the gas leakage primary probability analysis, which includes the following specific steps:

[0022] S31, acquiring all gas transmission equipment within the first gas leakage range, and acquiring operation data of the gas transmission equipment;

[0023] S32, importing the obtained operation data of the gas transmission equipment into the abnormal value calculation formula of the gas transmission equipment to calculate the abnormal value of the gas transmission equipment, wherein the abnormal value calculation formula of the gas transmission equipment is: , where D is the type of operation data, bc is the proportion coefficient of the cth type of operation data, sc is the average data of the monitoring time of the cth type of operation data of the gas transmission equipment, scm is the median value of the safety range of the cth type of operation data of the gas transmission equipment, scmax is the maximum value of the safety range of the cth type of operation data of the gas transmission equipment, and scmin is the minimum value of the safety range of the cth type of operation data of the gas transmission equipment;

[0024] S33, obtaining the calculated gas transmission device abnormal values ​​of all gas transmission devices in the first gas leakage range, and substituting them into the gas leakage primary probability calculation formula to calculate the gas leakage primary probability, wherein the gas leakage primary probability calculation formula of the d-th gas transmission device is: , where k is the number of gas transmission devices in the first gas leakage range, and Psd is the abnormal value of the dth gas transmission device.

[0025] The advantages of the above steps are: by conducting a safety analysis on the operating data of the gas transmission equipment and a preliminary analysis on the operating conditions of the gas transmission equipment, the accuracy of monitoring the leakage equipment is improved.

[0026] It should be specifically explained that, as a preferred technical solution for an industrial monitoring method based on gas data analysis, the step of substituting the obtained primary probability analysis results of gas leakage and the gas transmission data of each gas transmission device into a gas leakage probability assessment model for assessment includes the following specific contents: S41, obtaining gas concentration data of abnormal gas types of each gas transmission device in a first gas leakage range, and simultaneously obtaining the gas concentration distribution average value of each abnormal gas type within the first gas leakage range, the gas concentration distribution average value of each abnormal gas type within the first gas leakage range is obtained by averaging the detection data of all nodes within the first gas leakage range;

[0027] S42, substituting the acquired gas concentration data of the abnormal gas type of each gas transmission device in the first gas leakage range and the gas concentration distribution average value of each abnormal gas type in the first gas leakage range into the gas leakage secondary probability calculation formula to calculate the gas leakage secondary probability of the gas transmission device, wherein the gas leakage secondary probability of the d-th gas transmission device is: , where pd is the number of abnormal gas types in the d-th gas transmission equipment, lvd is the gas concentration data of the v-th abnormal gas type in the d-th gas transmission equipment, and lvm is the gas concentration data corresponding to the v-th abnormal gas type in the first gas leakage range;

[0028] S43. Add the calculated secondary probability of gas leakage and the primary probability of gas leakage to obtain the gas leakage probability.

[0029] It should be specifically explained that, as a preferred technical solution for an industrial monitoring method based on gas data analysis, the specific content of marking and warning of leakage equipment based on the obtained gas leakage probability assessment results is: obtaining the gas transmission equipment corresponding to the largest gas leakage probability as the leaking gas transmission equipment mark, obtaining the corresponding position of the leaking gas transmission equipment, transmitting the leaking gas transmission equipment information and the corresponding position of the leaking gas transmission equipment to the administrator terminal and issuing a warning.

[0030] An industrial monitoring system based on gas data analysis, which is implemented based on the above-mentioned industrial monitoring method based on gas data analysis, and specifically includes a data acquisition module, a gas leakage primary probability analysis module, a gas leakage probability assessment module, a leakage equipment marking module and a gas leakage range analysis module, wherein the data acquisition module is used to obtain industrial gas data of each monitoring node in the factory area, and obtain operation data and gas transmission data of each gas transmission equipment;

[0031] The gas leakage range analysis module is used to import the industrial gas data of each monitoring node into the gas diffusion analysis model to perform gas diffusion analysis and obtain a first gas leakage range;

[0032] The gas leakage primary probability analysis module is used to obtain the operation data of the gas transmission equipment within the first gas leakage range and import it into the gas leakage primary probability analysis strategy to perform the gas leakage primary probability analysis;

[0033] The gas leakage probability assessment module is used to substitute the obtained gas leakage primary probability analysis results and the gas transmission data of each gas transmission device into the gas leakage probability assessment model to perform gas leakage probability assessment;

[0034] The leakage equipment marking module is used to issue a leakage equipment marking warning according to the obtained gas leakage probability assessment result.

[0035] An electronic device comprises: a processor and a memory, wherein the memory stores a computer program that can be called by the processor;

[0036] The processor executes the above-mentioned industrial monitoring method based on gas data analysis by calling the computer program stored in the memory.

[0037] A computer-readable storage medium stores instructions. When the instructions are executed on a computer, the computer is enabled to execute the above-mentioned industrial monitoring method based on gas data analysis.

[0038] Compared with the prior art, the present invention has the following beneficial effects:

[0039] The present invention obtains industrial gas data of each monitoring node in the factory area, obtains operating data and gas transmission data of each gas transmission equipment, imports the industrial gas data of each monitoring node into a gas diffusion analysis model to perform gas diffusion analysis, and obtains a first gas leakage range, obtains operating data of the gas transmission equipment within the first gas leakage range and imports it into a gas leakage primary probability analysis strategy to perform a gas leakage primary probability analysis, substitutes the obtained gas leakage primary probability analysis results and the gas transmission data of each gas transmission equipment into a gas leakage probability assessment model to perform a gas leakage probability assessment, performs leakage equipment marking and early warning according to the obtained gas leakage probability assessment results, accurately traces the industrial gas data of each monitoring node, and simultaneously integrates the operating data and gas transmission data of the gas transmission equipment to accurately locate the gas leakage equipment, thereby improving the positioning efficiency and positioning accuracy of the gas leakage equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 This is a schematic diagram of the overall process of an industrial monitoring method based on gas data analysis of the present invention;

[0041] Figure 2 This is a schematic diagram of step S3 of an industrial monitoring method based on gas data analysis of the present invention;

[0042] Figure 3 It is a schematic diagram of the overall framework of an industrial monitoring system based on gas data analysis of the present invention;

[0043] Figure 4 This is a schematic diagram of the information transmission framework of the present invention. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present application and its application or use.

[0045] Example 1 To solve the technical problem raised in the background technology: the prior art cannot integrate the operation data of the gas transmission equipment and the gas transmission data to accurately trace the industrial gas data of each monitoring node, and thus cannot accurately locate the gas leakage equipment, which reduces the positioning efficiency and positioning accuracy of the gas leakage equipment; the present invention provides a preferred embodiment: Figure 1-Figure 2 As shown, an industrial monitoring method based on gas data analysis includes the following specific steps:

[0046] S1. The gas data collection terminal obtains the industrial gas data of each monitoring node in the factory area, and the equipment data collection terminal obtains the operation data and gas transmission data of each gas transmission equipment;

[0047] In this embodiment, the specific steps for the gas data collection terminal to obtain the industrial gas data of each monitoring node in the plant area and the operation data and gas transmission data of each gas transmission equipment are as follows:

[0048] S11. Collecting industrial gas data of each monitoring node in the factory through a gas data collection terminal, wherein the industrial gas data is gas concentration data of various gases in the air of the node;

[0049] S12, obtaining the operating data of each gas transmission equipment in the factory, wherein the operating data includes the transmission pressure, temperature and humidity of the transmission gas;

[0050] S13, obtaining gas concentration data of various types of gases of various gas transmission equipment in the factory area;

[0051] S2. Importing the industrial gas data of each monitoring node into a gas diffusion analysis model to perform gas diffusion analysis to obtain a first gas leakage range;

[0052] In this embodiment, the industrial gas data of each monitoring node is imported into the gas diffusion analysis model to perform gas diffusion analysis, and obtaining the first gas leakage range includes the following specific steps:

[0053] S21. Obtain the industrial gas data of each monitoring node, obtain the gas concentration data of various gases in the node air, and simultaneously obtain the composition data of various components in the set air of the monitoring node, obtain the gas types whose gas concentration data of various gases in the node air differ from the composition data of various components in the set air by more than a safe range, set the obtained gas type as the first abnormal gas type. For example, if nitrogen dioxide exceeds the standard, set nitrogen dioxide as the first abnormal gas type, obtain the gas type in the gas transmitted by the plant gas transmission equipment that can react with the gas in the set air to generate any one or more of the first abnormal gas types, and set it as the second abnormal gas type. For example, the gas transmitted by the plant gas transmission equipment is nitric oxide, and nitric oxide reacts with oxygen in the air to generate nitrogen dioxide, so nitric oxide is set as the second abnormal gas type. Abnormal gas types, according to the chemical reaction equation and the corresponding contents of various gases of the first abnormal gas type, the contents of various gases in the second abnormal gas type required to generate the contents of various gases of the first abnormal gas type are obtained, and set as the reaction amount of each gas in the second abnormal gas type, and the reaction amount of each gas in the second abnormal gas type plus the remaining amount of each gas in the second abnormal gas type in the node air is obtained to obtain the total amount of each gas in the second abnormal gas type, forming a total amount set of the first abnormal gas type, and at the same time, the total amount of each gas in the node air that is in the gas type transmitted by the gas transmission equipment in the plant area and is not in the second abnormal gas type is obtained to form a total amount set of the second abnormal gas type, and the union of the total amount set of the first abnormal gas type and the total amount set of the second abnormal gas type is obtained to obtain the total amount set of the abnormal gas type;

[0054] The content of each gas in the second abnormal gas type required to generate the various gas contents of the first abnormal gas type is obtained according to the chemical reaction equation and the various gas contents of the first abnormal gas type, thereby avoiding monitoring errors caused by abnormal gas reactions;

[0055] S22, obtaining the gas volume of each abnormal gas in the total amount set of abnormal gas types, and importing it into the node gas abnormal value calculation formula to calculate the gas abnormal value of each node, wherein the gas abnormal value calculation formula of the i-th node is: , where mi is the type of abnormal gas at the i-th node, aj is the proportion coefficient of the j-th abnormal gas, xij is the gas volume of the j-th abnormal gas at the i-th node that is greater than the maximum value of the normal range of the corresponding type, and xijm is the maximum value of the normal range of the corresponding type;

[0056] S23, obtaining gas abnormality values ​​corresponding to each node, obtaining the node corresponding to the largest gas abnormality value, setting it as the central node, obtaining the corresponding node whose gas abnormality value differs from the central node by a set abnormality value gradient, setting it as the abnormal node, connecting the corresponding abnormal nodes to form a closed area, and setting the corresponding closed area as the first gas leakage range;

[0057] S3, obtaining the operation data of the gas transmission equipment within the first gas leakage range and importing it into the gas leakage primary probability analysis strategy to perform a gas leakage primary probability analysis;

[0058] In this embodiment, obtaining the operation data of the gas transmission equipment within the first gas leakage range and importing it into the gas leakage primary probability analysis strategy to perform the gas leakage primary probability analysis includes the following specific steps:

[0059] S31, acquiring all gas transmission equipment within the first gas leakage range, and acquiring operation data of the gas transmission equipment;

[0060] S32, importing the obtained operation data of the gas transmission equipment into the abnormal value calculation formula of the gas transmission equipment to calculate the abnormal value of the gas transmission equipment, wherein the abnormal value calculation formula of the gas transmission equipment is: , where D is the type of operation data, bc is the proportion coefficient of the cth type of operation data, sc is the average data of the monitoring time of the cth type of operation data of the gas transmission equipment, scm is the median value of the safety range of the cth type of operation data of the gas transmission equipment, scmax is the maximum value of the safety range of the cth type of operation data of the gas transmission equipment, and scmin is the minimum value of the safety range of the cth type of operation data of the gas transmission equipment;

[0061] S33, obtaining the calculated gas transmission device abnormal values ​​of all gas transmission devices in the first gas leakage range, and substituting them into the gas leakage primary probability calculation formula to calculate the gas leakage primary probability, wherein the gas leakage primary probability calculation formula of the d-th gas transmission device is: , where k is the number of gas transmission equipment in the first gas leakage range, and Psd is the abnormal value of the dth gas transmission equipment; by conducting a safety analysis on the operating data of the gas transmission equipment and a preliminary analysis on the operating conditions of the gas transmission equipment, the accuracy of monitoring the leakage equipment is improved;

[0062] S4, substituting the obtained gas leakage primary probability analysis results and the gas transmission data of each gas transmission device into the gas leakage probability assessment model to perform gas leakage probability assessment;

[0063] In this embodiment, substituting the obtained gas leakage primary probability analysis results and the gas transmission data of each gas transmission device into the gas leakage probability assessment model for assessment includes the following specific contents: S41, obtaining the gas concentration data of the abnormal gas type of each gas transmission device in the first gas leakage range, and at the same time obtaining the gas concentration distribution average value of each abnormal gas type in the first gas leakage range, the gas concentration distribution average value of each abnormal gas type in the first gas leakage range is obtained by averaging the detection data of all nodes in the first gas leakage range;

[0064] S42, substituting the acquired gas concentration data of the abnormal gas type of each gas transmission device in the first gas leakage range and the gas concentration distribution average value of each abnormal gas type in the first gas leakage range into the gas leakage secondary probability calculation formula to calculate the gas leakage secondary probability of the gas transmission device, wherein the gas leakage secondary probability of the d-th gas transmission device is: , where pd is the number of abnormal gas types in the d-th gas transmission equipment, lvd is the gas concentration data of the v-th abnormal gas type in the d-th gas transmission equipment, and lvm is the gas concentration data corresponding to the v-th abnormal gas type in the first gas leakage range;

[0065] S43, adding the calculated secondary probability of gas leakage and the primary probability of gas leakage to obtain the gas leakage probability;

[0066] S5. Mark and warn the leaking equipment based on the obtained gas leakage probability assessment results;

[0067] In this embodiment, the specific contents of the leakage equipment marking warning according to the obtained gas leakage probability assessment result are as follows: obtaining the gas transmission equipment corresponding to the maximum gas leakage probability as the leaking gas transmission equipment mark, obtaining the corresponding position of the leaking gas transmission equipment, transmitting the leaking gas transmission equipment information and the corresponding position of the leaking gas transmission equipment to the administrator terminal and issuing a warning;

[0068] In this embodiment, the values ​​of the proportion coefficient of the cth type of operating data and the proportion coefficient of the jth abnormal gas are obtained by technical personnel in this field based on experience, and the preferred value-taking method is: obtain 5000 sets of historical industrial gas data of each monitoring node, the operating data of each gas transmission equipment and the gas transmission data, obtain the judgment result of the specific location of the leakage, and obtain the leaking gas transmission equipment through the industrial gas data of each monitoring node, the operating data of each gas transmission equipment and the gas transmission data gas leakage probability, import the calculated leaking gas transmission equipment and the specific location judgment result of the leakage into the fitting software, and output the values ​​of the proportion coefficient of the cth type of operating data and the proportion coefficient of the jth abnormal gas that meet the highest judgment accuracy.

[0069] In this embodiment, the advantages of this embodiment over the prior art are as follows: industrial gas data of each monitoring node in the factory area is obtained, operation data and gas transmission data of each gas transmission equipment are obtained, the industrial gas data of each monitoring node is imported into the gas diffusion analysis model for gas diffusion analysis, and a first gas leakage range is obtained, and the operation data of the gas transmission equipment within the first gas leakage range is imported into the gas leakage primary probability analysis strategy for gas leakage primary probability analysis, and the obtained gas leakage primary probability analysis results and the gas transmission data of each gas transmission equipment are substituted into the gas leakage probability assessment model for gas leakage probability assessment, leakage equipment is marked and warned according to the obtained gas leakage probability assessment results, and the industrial gas data of each monitoring node is accurately traced and analyzed, and the operation data and gas transmission data of the gas transmission equipment are integrated to accurately locate the gas leakage equipment, thereby improving the positioning efficiency and positioning accuracy of the gas leakage equipment. Figure 4 As shown, the gas data collection terminal of the monitoring node obtains industrial gas data, and the equipment data collection terminal collects the operating data and gas transmission data of each gas transmission equipment. The server accurately traces and analyzes the industrial gas data of each monitoring node, and at the same time integrates the operating data and gas transmission data of the gas transmission equipment to accurately locate the gas leakage equipment, and displays the leakage equipment mark positioning results on the administrator terminal and issues an alert.

[0070] Example 2 like Figure 3 As shown, an industrial monitoring system based on gas data analysis is implemented based on the above-mentioned industrial monitoring method based on gas data analysis, which specifically includes a data acquisition module, a gas leakage primary probability analysis module, a gas leakage probability assessment module, a leakage equipment marking module and a gas leakage range analysis module, wherein the data acquisition module is used to obtain industrial gas data of each monitoring node in the factory area, and obtain the operation data and gas transmission data of each gas transmission equipment;

[0071] A gas leakage range analysis module, used for importing the industrial gas data of each monitoring node into the gas diffusion analysis model to perform gas diffusion analysis and obtain a first gas leakage range;

[0072] A gas leakage primary probability analysis module, used for acquiring operation data of gas transmission equipment within the first gas leakage range and importing it into the gas leakage primary probability analysis strategy to perform gas leakage primary probability analysis;

[0073] A gas leakage probability assessment module is used to substitute the obtained gas leakage primary probability analysis results and the gas transmission data of each gas transmission device into the gas leakage probability assessment model to perform gas leakage probability assessment;

[0074] A leakage equipment marking module is used to issue a leakage equipment marking warning based on the obtained gas leakage probability assessment result;

[0075] It also includes a control module for controlling the operation of a data acquisition module, a gas leakage primary probability analysis module, a gas leakage probability assessment module, a leakage equipment marking module and a gas leakage range analysis module.

[0076] Example 3 This embodiment provides an electronic device, including: a processor and a memory, wherein the memory stores a computer program that can be called by the processor;

[0077] The processor executes the above-mentioned industrial monitoring method based on gas data analysis by calling the computer program stored in the memory.

[0078] The electronic device may have relatively large differences due to different configurations or performances, and may include one or more processors and one or more memories, wherein the memory stores at least one computer program, and the computer program is loaded and executed by the processor to implement an industrial monitoring method based on gas data analysis provided by the above method embodiment. The electronic device may also include other components for implementing the functions of the device, for example, the electronic device may also have components such as a wired or wireless network interface and an input / output interface to input and output data. This embodiment will not be described in detail here.

[0079] Example 4 This embodiment provides a computer-readable storage medium having a rewritable computer program stored thereon;

[0080] When the computer program runs on a computer device, the computer device is enabled to execute the above-mentioned industrial monitoring method based on gas data analysis.

[0081] For example, the computer readable storage medium can be a read-only memory, a random access memory, a read-only CD-ROM, a magnetic tape, a floppy disk, an optical data storage device, and the like.

[0082] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When a computer instruction or computer program is loaded or executed on a computer, a process or function according to an embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network or other programmable device. Computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center through a wired network or / and a wireless network. The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (for example, a floppy disk, a hard disk, a tape), an optical medium (for example, a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.

Claims

1. An industrial monitoring method based on gas data analysis, characterized in that: It includes the following specific steps: The gas data collection terminal obtains the industrial gas data of each monitoring node in the plant area, and obtains the operation data and gas transmission data of each gas transmission equipment; Importing the industrial gas data of each monitoring node into the gas diffusion analysis model to perform gas diffusion analysis and obtain a first gas leakage range; Obtaining the operation data of the gas transmission equipment within the first gas leakage range and importing it into the gas leakage primary probability analysis strategy to perform the gas leakage primary probability analysis; Substituting the obtained gas leakage primary probability analysis results and the gas transmission data of each gas transmission equipment into the gas leakage probability assessment model to perform gas leakage probability assessment; Based on the obtained gas leakage probability assessment results, leakage equipment marking and warning are carried out.

2. An industrial monitoring method based on gas data analysis as claimed in claim 1, characterized in that: The step of importing the industrial gas data of each monitoring node into the gas diffusion analysis model to perform gas diffusion analysis and obtain the first gas leakage range comprises the following specific steps: Obtain the industrial gas data of each monitoring node, obtain the gas concentration data of various gases in the node air, and simultaneously obtain the composition data of various components in the set air of the monitoring node, obtain the gas types whose gas concentration data of various gases in the node air differ from the composition data of various components in the set air by more than the safety range, set the obtained gas types as the first abnormal gas types, obtain the gas types in the gas transmitted by the gas transmission equipment in the plant area that can react with the gas in the set air to generate any one or more of the first abnormal gas types, set them as the second abnormal gas types, and obtain the generation of the first abnormal gas according to the chemical reaction equation and the corresponding gas contents of various gases in the first abnormal gas type. The content of each gas in the second abnormal gas type required for the content of various gases in the type is set as the reaction amount of each gas in the second abnormal gas type, and the reaction amount of each gas in the second abnormal gas type plus the remaining amount of each gas in the second abnormal gas type in the node air is obtained to obtain the total amount of each gas in the second abnormal gas type, which constitutes the total amount set of the first abnormal gas type. At the same time, the total amount of each gas in the node air that is in the gas type transmitted by the factory gas transmission equipment and is not in the second abnormal gas type is obtained to constitute the total amount set of the second abnormal gas type. The union of the first abnormal gas type total amount set and the second abnormal gas type total amount set is obtained to obtain the total amount set of abnormal gas types.

3. An industrial monitoring method based on gas data analysis as claimed in claim 2, characterized in that: The step of importing the industrial gas data of each monitoring node into the gas diffusion analysis model to perform gas diffusion analysis and obtain the first gas leakage range further includes the following specific steps: obtaining the gas volume of each abnormal gas in the node in the total amount set of abnormal gas types, and importing the gas abnormal value calculation formula of the node to calculate the gas abnormal value of each node, wherein the gas abnormal value calculation formula of the i-th node is: , where mi is the type of abnormal gas at the i-th node, aj is the proportion coefficient of the j-th abnormal gas, xij is the gas volume of the j-th abnormal gas at the i-th node that is greater than the maximum value of the normal range of the corresponding type, and xijm is the maximum value of the normal range of the corresponding type; Obtain the gas anomaly value corresponding to each node, obtain the node corresponding to the largest gas anomaly value, set it as the central node, obtain the corresponding node whose gas anomaly value differs from the central node by a set anomaly value gradient, set it as the abnormal node, connect the corresponding abnormal nodes to form a closed area, and set the corresponding closed area as the first gas leakage range.

4. An industrial monitoring method based on gas data analysis as claimed in claim 3, characterized in that: The method of obtaining the operation data of the gas transmission equipment within the first gas leakage range and importing it into the gas leakage primary probability analysis strategy to perform the gas leakage primary probability analysis includes the following specific steps: Acquire all gas transmission equipment within the first gas leakage range, and acquire operation data of the gas transmission equipment; The obtained operation data of the gas transmission equipment is imported into the abnormal value calculation formula of the gas transmission equipment to calculate the abnormal value of the gas transmission equipment, wherein the abnormal value calculation formula of the gas transmission equipment is: , where D is the type of operation data, bc is the proportion coefficient of the cth type of operation data, sc is the average data of the monitoring time of the cth type of operation data of the gas transmission equipment, scm is the median value of the safety range of the cth type of operation data of the gas transmission equipment, scmax is the maximum value of the safety range of the cth type of operation data of the gas transmission equipment, and scmin is the minimum value of the safety range of the cth type of operation data of the gas transmission equipment; Obtain the calculated gas transmission device abnormal values ​​of all gas transmission devices in the first gas leakage range, and substitute them into the gas leakage primary probability calculation formula to calculate the gas leakage primary probability, wherein the gas leakage primary probability calculation formula of the d-th gas transmission device is: , where k is the number of gas transmission devices in the first gas leakage range, and Psd is the abnormal value of the dth gas transmission device.

5. An industrial monitoring method based on gas data analysis as claimed in claim 4, characterized in that: Substituting the obtained gas leakage primary probability analysis results and the gas transmission data of each gas transmission device into the gas leakage probability assessment model for assessment includes the following specific contents: obtaining the gas concentration data of the abnormal gas type of each gas transmission device in the first gas leakage range, and simultaneously obtaining the gas concentration distribution average value of each abnormal gas type in the first gas leakage range, the gas concentration distribution average value of each abnormal gas type in the first gas leakage range is obtained by averaging the detection data of all nodes in the first gas leakage range; Substitute the acquired gas concentration data of the abnormal gas types of each gas transmission device in the first gas leakage range and the average gas concentration distribution of each abnormal gas type in the first gas leakage range into the gas leakage secondary probability calculation formula to calculate the gas leakage secondary probability of the gas transmission device, wherein the gas leakage secondary probability of the d-th gas transmission device is: , where pd is the number of abnormal gas types in the d-th gas transmission equipment, lvd is the gas concentration data of the v-th abnormal gas type in the d-th gas transmission equipment, and lvm is the gas concentration data corresponding to the v-th abnormal gas type in the first gas leakage range; The calculated gas leakage secondary probability and gas leakage primary probability are added together to obtain the gas leakage probability.

6. An industrial monitoring method based on gas data analysis as claimed in claim 5, characterized in that: The specific content of the leakage equipment marking and warning based on the obtained gas leakage probability assessment results is: obtaining the gas transmission equipment corresponding to the maximum gas leakage probability as the leaking gas transmission equipment mark, obtaining the corresponding position of the leaking gas transmission equipment, transmitting the leaking gas transmission equipment information and the corresponding position of the leaking gas transmission equipment to the administrator terminal and issuing a warning.

7. An industrial monitoring method based on gas data analysis as claimed in claim 6, characterized in that: The specific steps for the gas data collection terminal to obtain industrial gas data of each monitoring node in the plant area and the operation data and gas transmission data of each gas transmission equipment are as follows: The industrial gas data of each monitoring node in the factory is collected through the gas data collection terminal, where the industrial gas data is the gas concentration data of various gases in the air of the node; Obtaining the operating data of each gas transmission equipment in the plant, wherein the operating data includes the transmission pressure, temperature and humidity of the transmission gas; Obtain gas concentration data of various types of gases from various gas transmission equipment in the factory.

8. An industrial monitoring system based on gas data analysis, which is implemented based on the industrial monitoring method based on gas data analysis according to any one of claims 1 to 7, characterized in that: It specifically includes a data acquisition module, a gas leakage primary probability analysis module, a gas leakage probability assessment module, a leakage equipment marking module and a gas leakage range analysis module, wherein the data acquisition module is used to obtain industrial gas data of each monitoring node in the plant area, and obtain the operation data and gas transmission data of each gas transmission equipment; The gas leakage range analysis module is used to import the industrial gas data of each monitoring node into the gas diffusion analysis model to perform gas diffusion analysis and obtain a first gas leakage range; The gas leakage primary probability analysis module is used to obtain the operation data of the gas transmission equipment within the first gas leakage range and import it into the gas leakage primary probability analysis strategy to perform the gas leakage primary probability analysis; The gas leakage probability assessment module is used to substitute the obtained gas leakage primary probability analysis results and the gas transmission data of each gas transmission device into the gas leakage probability assessment model to perform gas leakage probability assessment; The leakage equipment marking module is used to issue a leakage equipment marking warning according to the obtained gas leakage probability assessment result.

9. An electronic device, comprising: A processor and a memory, wherein the memory stores a computer program that can be called by the processor; It is characterized in that the processor executes the industrial monitoring method based on gas data analysis as described in any one of claims 1 to 7 by calling the computer program stored in the memory.

10. A computer-readable storage medium, characterized in that: Instructions are stored, and when the instructions are executed on a computer, the computer is caused to execute an industrial monitoring method based on gas data analysis as described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Method for sorting leakage probabilities of suspected leakage points of gas pipe networks

    CN107194599A

  • Intelligent chemical monitoring and early warning platform based on big data

    CN112216071A

  • Infrared SF6 gas leakage online monitoring system and method

    CN115855859A

  • Gas leakage detection method and device, equipment and storage medium

    CN117405303A

  • Combustible gas leakage detection method and system and computer equipment

    CN117490005A

Cited By

  • Industrial gas production monitoring system based on data processing

    CN120467444A