Photovoltaic MPPT (Maximum Power Point Tracking) control method based on improved grey wolf and incremental conductance method

By combining the improved Gray Wolf algorithm and conductance increment method, the difficulty of photovoltaic power generation systems tracking the maximum power point during environmental changes is solved, the power generation efficiency and accuracy are improved, and efficient power generation under local shadow conditions is achieved.

CN118939072APending Publication Date: 2024-11-12QUFU NORMAL UNIV

Patent Information

Application Number
CN202411186650.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Traditional photovoltaic power generation systems are difficult to stably track the maximum power point when environmental changes, resulting in low power generation efficiency and economic waste. The gray wolf algorithm responds slowly in the later stage of convergence, making it difficult to coordinate tracking accuracy and speed.

Method used

The improved gray wolf algorithm is combined with the conductance increment method, and the global search is embedded in the Levi walk strategy and nonlinear convergence factor by initializing the duty cycle and the number of iterations, and the global search is switched to the improved conductance increment method during local search. Optimize maximum power point tracking using step size correction.

Benefits of technology

It improves the power generation efficiency and tracking accuracy of the photovoltaic power generation system, avoids the influence of local shadows, enhances the algorithm's global search ability and local search speed, and ensures that the system works stably at the maximum power point.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118939072A_ABST
    Figure CN118939072A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of photovoltaic systems, in particular to a photovoltaic MPPT (Maximum Power Point Tracking) control method based on an improved grey wolf and an incremental conductance method, which comprises the following steps of: performing parameter initialization on a grey wolf algorithm based on a circuit structure of a photovoltaic array; carrying out search strategy improvement on a grey wolf algorithm, and carrying out global search on a grey wolf population by adopting an embedded Levy walk strategy and a nonlinear convergence factor; updating each gray wolf position and real-time fitness based on global search, and outputting a duty ratio signal corresponding to the alpha wolf position; controlling the output power of the photovoltaic array according to the duty ratio signal, judging whether the output power is smaller than a fluctuation threshold value or not, and if so, switching to an improved conductance increment method to perform local search of a photovoltaic maximum power point; and collecting the output power of the photovoltaic array, calculating to obtain a power change percentage, judging whether the power change percentage is greater than or equal to a set threshold, and if so, restarting the grey wolf algorithm to track and search the photovoltaic maximum power point. Therefore, the photovoltaic power generation system under the shielding of the local shadow can maintain high power generation efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of photovoltaic systems, and in particular to a photovoltaic MPPT control method based on an improved grey wolf and conductance increment method. Background Art

[0002] As photovoltaic power generation brings convenience to people, the problems it faces in practical applications, such as large environmental impact, low power generation efficiency and high cost, are gradually increasing. In actual photovoltaic power generation systems, the conditions that affect power generation efficiency mainly include ambient temperature and light intensity. Changes in these two conditions will have a serious impact on the power generation efficiency of photovoltaic power generation systems. The power output control of traditional photovoltaic power generation systems is mainly controlled by the voltage, current and proportional parameters of photovoltaic cells at the maximum power point to achieve maximum power output, such as constant voltage, conductivity increment, etc.

[0003] Taking the conductance increment method as an example, although it has good response speed and tracking accuracy, it is difficult to exert the performance of this method under partial shadows, and when the photovoltaic power generation system controlled by the conductance increment method is under uniform lighting conditions, the output power will fluctuate around the maximum power point, causing the system to remain in an oscillating state and unable to stably output the maximum power; and when the photovoltaic power generation system encounters changes in external conditions such as rainy days or strong winds during the power generation process, the current operating voltage is changed by adjusting the duty cycle due to erroneous predictions, resulting in the photovoltaic array being unable to find the operating voltage at the maximum power point, and thus causing the photovoltaic power generation system to continue to operate in a low-power state, resulting in output power loss and economic waste. The Gray Wolf Algorithm has good application prospects in photovoltaic power generation MPPT due to its strong global search capability, few parameters and strong robustness. However, the Gray Wolf Algorithm has the problem of slow response in the late stage of algorithm convergence when used alone. Under uniform lighting conditions, the Gray Wolf Algorithm can quickly and accurately track the maximum power point; when external conditions change, the Gray Wolf Algorithm will track the initial MPP point more accurately, but the more accurate tracking will lead to lengthy tracking time in the late stage of convergence, thereby reducing the power generation efficiency of the photovoltaic power generation system. Summary of the invention

[0004] In order to solve the problem that the traditional photovoltaic maximum power point tracking control strategy has power oscillation under uniform lighting conditions, and is unable to track the maximum power point when external conditions suddenly change, resulting in power waste, and the existing photovoltaic maximum power point tracking control method has the contradiction between slow response and difficulty in coordinating tracking accuracy and speed.

[0005] The present invention provides a photovoltaic MPPT control method based on an improved gray wolf and conductance increment method, which is applied to a photovoltaic power generation system. The photovoltaic power generation system includes a photovoltaic array and an MPPT controller. The MPPT controller is used to control the output power of the photovoltaic array through a duty cycle signal. The method includes:

[0006] S1. Initialize the parameters of the gray wolf algorithm based on the circuit structure of the photovoltaic array, including initializing the duty cycle, population size and number of iterations; use the duty cycle as the position parameter of each gray wolf in the gray wolf population; use the output power of the photovoltaic array as the fitness of the gray wolf individual;

[0007] S2. Improve the search strategy of the gray wolf algorithm and use the embedded Levy walk strategy and nonlinear convergence factor to perform a global search of the gray wolf population;

[0008] S3, based on global search, update the position and real-time fitness of each gray wolf, select the top three gray wolves with the highest fitness and set them as α wolf, β wolf and δ wolf in turn, and output the duty cycle signal corresponding to the position of α wolf;

[0009] S4, controlling the output power of the photovoltaic array according to the duty cycle signal, judging whether the output power fluctuation value is less than the fluctuation threshold, if so, switching to the improved conductivity increment method to perform a local search for the photovoltaic maximum power point to determine the maximum output power;

[0010] S5. Collect the output power of the photovoltaic array, calculate the power change percentage with the maximum output power, and determine whether the power change percentage is greater than or equal to the set threshold. If so, restart the gray wolf algorithm to track and search for the photovoltaic maximum power point.

[0011] In S3, the position and real-time fitness of each gray wolf are updated based on global search. The specific method is:

[0012] S3.1. Calculate the initial fitness of each gray wolf position and sort them, and set the gray wolves with the top three initial fitness as α wolf, β wolf and δ wolf in turn; and determine the positions of the top three gray wolves;

[0013] S3.2. Based on the positions and position proportions of the first three alpha wolves, calculate the positions of other individual gray wolves;

[0014] S3.3. Calculate the fitness of the individual gray wolves in the population based on the updated positions of the gray wolves, and select the top three gray wolves to become the new α wolf, β wolf, and δ wolf based on the updated fitness ranking;

[0015] S3.4, judging whether the duty cycle error is less than a preset threshold value or judging whether the number of iterations reaches the maximum number of iterations according to the duty cycle corresponding to the new α wolf position;

[0016] If yes, the iteration is terminated and the duty cycle signal corresponding to the α wolf position is output; if no, the process returns to S2 and iterates again.

[0017] In a specific implementation, the calculation formula for the positions of the first three gray wolves in S3.1 is:

[0018] D α =|C1·X α -X|,

[0019] D β =|C2·X β -X|,

[0020] D δ =|C3·X δ -X|,

[0021] X1=X α -A1·(D α ),

[0022] X2=X β -A2·(D β ),

[0023] X3=X δ -A3·(D δ ),

[0024]

[0025] Among them, D is the distance between the gray wolf and the prey, X (i+1) and X p Represent the position parameters of the gray wolf and prey respectively; i is the current iteration number; A and C are coefficient vectors;

[0026] A=2a·r1-a,

[0027] C = 2·r2,

[0028]

[0029] Among them, r1 and r2 are random values ​​between 0 and 1; a is the convergence factor, e is the base of the natural logarithm, t and t max is the current and maximum number of iterations.

[0030] In S3.2, the positions of other gray wolves are calculated based on the positions and position proportions of the first three alpha wolves. The specific operations are as follows:

[0031] By improving the proportional weight based on the step length Euclidean distance, the proportion of the three alpha wolves in the search process is changed, and the positions of other gray wolves are determined according to the improved positions of the three alpha wolves. The calculation formula is:

[0032]

[0033] Among them, X is the position parameter of the gray wolf individual; W1, W2, W3 represent the proportion of α, β, γ in the alpha wolf respectively, and X(t+1) is the next iterative update position of the gray wolf.

[0034] In the step S4, it is determined whether the output power fluctuation value is less than the fluctuation threshold value, and the formula is:

[0035]

[0036] Among them, U i (t) and U j (t) represents the voltage value corresponding to the alpha wolf in the same iteration, t is the current iteration number, N is the population size, and the fluctuation threshold is 0.5.

[0037] In order to make the photovoltaic power generation system work at the maximum power point, the improved conductance increment method performs a local search for the photovoltaic maximum power point, measures and collects the output voltage and output current of the photovoltaic array, and determines the voltage change dU of the adjacent working points of the photovoltaic array based on the output voltage;

[0038] If dU=0, a local search is performed by determining the current change dI of the adjacent working points of the PV array;

[0039] When the voltage change dU = 0, if the current change dI = 0 at this time, the local search tracks the maximum power point and terminates, indicating that the photovoltaic power generation system is operating at the photovoltaic maximum power point;

[0040] If dI>0 at this time, the local search fails to track the maximum power point, and the step size correction amount is reduced to conduct the local search again;

[0041] If dI < 0 at this time, the local search fails to track the maximum power point, and the step correction amount is increased to conduct the local search again;

[0042] If dU≠0, the conductance increment dI / dU and the instantaneous conductance I / U are calculated and compared for local search;

[0043] When the voltage change dU≠0, if the conductance increment is equal to the instantaneous conductance, that is, dI / dU=-I / U, the local search tracks the maximum power point and terminates, indicating that the photovoltaic power generation system is operating at the photovoltaic maximum power point;

[0044] If the conductance increment is greater than the instantaneous conductance, that is, dI / dU>-I / U, the local search fails to track the maximum power point, and the step size correction amount is reduced to conduct the local search again;

[0045] If the conductance increment is less than the instantaneous conductance, that is, dI / dU<-I / U, the local search fails to track the maximum power point, and the step size correction is increased and the local search is repeated.

[0046] The step size and compensation coefficient of the conductivity increment method are:

[0047]

[0048] Where d(k) is the variable step size coefficient, σ is the step size correction, k is the step size variable, P is the output power, and U is the output voltage.

[0049] In S5, the Grey Wolf Algorithm is restarted to track and search for the maximum power point of photovoltaic power generation, and the restart determination condition is:

[0050]

[0051] Where ΔP is the percentage of power change, P t is the current sampling power, P m is the maximum power, ΔP t To set the threshold.

[0052] Beneficial effects: The present invention is a photovoltaic MPPT control method based on the improved gray wolf and conductance increment methods. The improved gray wolf algorithm with strong global search capability is applied in the early stage of the search, and the improved conductance increment method with strong local search capability is switched to in the late stage of the search, which offsets the adverse effects of local shadow occlusion, so that the photovoltaic power generation system under local shadow occlusion maintains a high power generation efficiency.

[0053] In order to solve the problem of low search accuracy caused by the contradiction between the iterative process and the convergence factor search process of the traditional gray wolf algorithm, a search strategy that introduces a nonlinear convergence factor and embeds Levy walk is proposed; at the same time, in order to solve the problem that the traditional gray wolf algorithm does not reflect the importance of the alpha wolf, the present invention changes the proportion of the alpha wolf by improving the proportional weight based on the step-length Euclidean distance during the search process. The above improvements improve the global search capability of the algorithm, avoid falling into the local optimal trap, greatly improve the tracking accuracy, and improve the performance of the gray wolf algorithm in photovoltaic power generation systems, making the algorithm more effective in optimizing the output power of the system;

[0054] The present invention combines the improved conductivity increment method in the later stage of iteration, and takes advantage of its fast tracking response. By setting the switching condition, after the initial maximum power point has been found in the later stage of iteration convergence, the local accurate search of the maximum power point is performed. This not only improves the global search accuracy in the early stage of the iteration process, but also significantly improves the local search speed in the later stage of iteration. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1It is a flow chart of the photovoltaic MPPT control method based on the improved grey wolf and conductance increment method;

[0056] Figure 2 This is the structural diagram of the photovoltaic power generation system. DETAILED DESCRIPTION

[0057] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings.

[0058] like Figure 2 The photovoltaic power generation system shown in the figure includes a photovoltaic array, an MPPT controller, a drive circuit and a Boost circuit. The MPPT controller calculates the real-time output power by sampling the real-time output voltage and output current of the photovoltaic array, thereby outputting a PWM control signal of a duty cycle. The PWM control signal is enhanced by the drive circuit, and the IGBT switch tube is effectively driven to realize the control of the duty cycle of the IGBT switch tube. The duty cycle signal output by the MPPT controller controls the operation of the photovoltaic array, so that the photovoltaic power generation system can stably operate at the maximum power point.

[0059] See also Figure 1 This embodiment provides a photovoltaic MPPT control method based on the improved grey wolf and conductance increment method, which is applied to the above photovoltaic power generation system to achieve the tracking of the maximum power point of the photovoltaic power generation system. The specific implementation steps are as follows:

[0060] Step 1: Initialize the parameters of the gray wolf algorithm based on the circuit structure of the photovoltaic array, including initializing the duty cycle, population size and number of iterations; use the duty cycle as the position parameter of each gray wolf in the gray wolf population; use the output power of the photovoltaic array as the fitness of the gray wolf individual;

[0061] The duty cycle is the conduction time of the IGBT switch controlled by the MPPT controller, which is equivalent to the working voltage of the photovoltaic array, that is, the duty cycle corresponding to the position parameter of the gray wolf in the gray wolf algorithm replaces the working voltage of the photovoltaic array.

[0062] Step 2: Improve the search strategy of the gray wolf algorithm and use the embedded Levy walk strategy and nonlinear convergence factor to perform a global search of the gray wolf population;

[0063] Improve the Gray Wolf Algorithm by embedding the Levy Walk strategy. Use the high probability and large stride characteristics of the Levy Walk strategy to improve the Gray Wolf Algorithm, improve the global search capability of the Gray Wolf Algorithm, and prevent the local optimization of the Gray Wolf Algorithm in the early stage of the search.

[0064] A nonlinear convergence factor is introduced to avoid the global search and local search being fixed in proportion, and to force the convergence factor to switch when reaching 1 / 2 of the iterative search cycle. The nonlinear convergence factor is:

[0065]

[0066] Among them, a is the convergence factor, e is the base of natural logarithm, t, t max is the current and maximum number of iterations.

[0067] Step 3: Based on the global search, update the position and real-time fitness of each gray wolf, select the top three gray wolves with the highest fitness and set them as α wolf, β wolf and δ wolf in turn, and output the duty cycle signal corresponding to the position of α wolf;

[0068] S3.1. Calculate the initial fitness of each gray wolf position and sort them, and set the gray wolves with the top three initial fitness as α wolf, β wolf and δ wolf in turn; and determine the positions of the top three gray wolves;

[0069] The calculation formula for the positions of the first three gray wolves is:

[0070] D α =|C1·X α -X|,

[0071] D β =|C2·X β -X|,

[0072] D δ =|C3·X δ -X|,

[0073] X1=X α -A1·(D α ),

[0074] X2=X β -A2·(D β ),

[0075] X3=X δ -A3·(D δ ),

[0076]

[0077] Among them, D is the distance between the gray wolf and the prey, X (i+1) and X p Represent the position parameters of the gray wolf and prey respectively; t is the current iteration number; A and C are coefficient vectors;

[0078] A=2a·r1-a,

[0079] C = 2·r2,

[0080] Among them, r1 and r2 are random values ​​between 0 and 1, and a is the above-mentioned convergence factor. A changes with a in the interval [-a, a], and performs different searches through comparison and judgment. When |A|<1, the wolf pack approaches the prey and shows strong local search ability. When |A|>1, the wolf pack stays away from the prey and shows strong global search ability. |C| is a random value in the range of [0,2], which provides a random weight for the prey, and avoids local optimization during the search process by randomly enhancing (|C|>1) or weakening (|C|<1) the influence of the search distance on the prey.

[0081] At the same time, the update formula of the position parameter of the α wolf in the Levy walk strategy is:

[0082]

[0083] Among them, u and v obey the normal distribution and take the following values:

[0084]

[0085] In the global search process, the greedy strategy is considered to screen out the gray wolves with poor positions in the iteration process, and retain the gray wolves with good positions in each iteration process. The optimal solution is obtained based on the output of multiple iterations. The optimal solution is as follows:

[0086]

[0087] S3.2. Based on the positions and position proportions of the top three alpha wolves, the positions of other individual gray wolves are calculated. In order to solve the problem that the existing algorithm only considers the positions of excellent individual gray wolves but not the proportion of the positions of excellent individual gray wolves, which leads to long search time and reduced accuracy, the proportion of the three alpha wolves in the search process is changed by improving the proportional weight based on the step length Euclidean distance. The positions of other individual gray wolves are determined according to the improved positions of the three alpha wolves. The calculation formula is:

[0088]

[0089] Among them, X is the position parameter of the gray wolf individual; W1, W2, W3 represent the proportion of α, β, γ in the alpha wolf respectively, and X(t+1) is the next iterative update position of the gray wolf.

[0090] S3.3. Calculate the fitness of the individual gray wolves in the population based on the updated positions of the gray wolves, and select the top three gray wolves as the new α wolf, β wolf, and δ wolf based on the updated fitness ranking;

[0091] S3.4, judging whether the duty cycle error is less than a preset threshold value or judging whether the number of iterations reaches the maximum number of iterations according to the duty cycle corresponding to the new α wolf position;

[0092] If yes, the iteration is terminated, and the duty cycle signal corresponding to the α wolf position is output, and the MPPT controller controls the photovoltaic power generation system to operate at the current operating voltage; if no, return to step 2 and iterate again.

[0093] The duty cycle error is determined according to the duty cycle corresponding to the new α wolf position, and the duty cycle error is the absolute value of the difference between the duty cycle corresponding to the α wolf position and the optimal duty cycle, wherein the optimal duty cycle is obtained by experimentally simulating the power output characteristic curve of the same type of battery, and the optimal operating voltage and optimal duty cycle are obtained based on the optimal light intensity and temperature under experimental adjustment. The judgment formula is:

[0094] |d t -d alpha |<Δd,

[0095] t>t max ,

[0096] Among them, d t is the current duty cycle, d alpha For the best duty cycle, Δd is 1%; t, t max is the current and maximum iterations.

[0097] Step 4: Control the output power of the photovoltaic array according to the duty cycle signal, and determine whether the output power fluctuation value is less than the fluctuation threshold. If so, switch to the improved conductivity increment method to perform a local search for the photovoltaic maximum power point to determine the maximum output power;

[0098] The formula for judging whether the output power fluctuation value is less than the fluctuation threshold is:

[0099]

[0100] Among them, U i (t) and U j (t) represents the voltage value corresponding to the alpha wolf in the same iteration, t is the current iteration number, N is the population size, and the fluctuation threshold is 0.5, which is the optimal value obtained after simulation experiment verification.

[0101] When the output power fluctuation value is less than the fluctuation threshold, the global search of the Grey Wolf Algorithm terminates the output of the maximum power of the current photovoltaic array and switches to the improved conductivity increment method to perform a local search for the photovoltaic maximum power point;

[0102] When the output power fluctuation value is greater than the fluctuation threshold, the global search of the Grey Wolf Algorithm continues.

[0103] In order to solve the problem of oscillation of maximum power point tracking under uniform conditions caused by the fixed step size of the traditional conductance increment method, as well as the problem of small search range and local optimization after misjudgment under local shadow conditions, the improved conductance increment method introduces the current coefficient to correct the compensation formula, and ranks the current coefficients by evaluation indicators, and selects the best correction coefficient through experimental evaluation. The step size and compensation coefficient of the conductance increment method are:

[0104]

[0105] In the formula, d(k) is the variable step size coefficient, σ is the step size correction; k is the step size variable, k1, k2 and k3 are three different step sizes; P is the output power, and U is the output voltage;

[0106] In this embodiment, the evaluation results of different variable step-size coefficients calculated by the TOPSIS decision method are as follows:

[0107] d(k1)=0.4655, d(k2)=0.5489, d(k3)=0.5229,

[0108] After sorting the evaluation results of the above different variable step size coefficients, it can be found that the variable step size coefficient with the best effect is d(k2), so it is selected as the variable step size coefficient of the conductance increment method.

[0109] The improved conductance increment method performs local search for the photovoltaic maximum power point by measuring and collecting the output voltage and output current of the photovoltaic array, and determining the voltage change dU of adjacent working points of the photovoltaic array based on the output voltage;

[0110] If dU=0, a local search is performed by determining the current change dI of the adjacent working points of the PV array;

[0111] If dU≠0, the conductance increment dI / dU and the instantaneous conductance I / U are calculated and compared to perform a local search.

[0112] The local search is performed by determining the current change dI of the adjacent working points of the photovoltaic array, specifically:

[0113] When the voltage change dU = 0, if the current change dI = 0 at this time, the local search tracks the maximum power point and terminates, indicating that the photovoltaic power generation system is operating at the photovoltaic maximum power point;

[0114] If dI>0 at this time, the local search fails to track the maximum power point, and the step size correction amount σ is reduced to conduct the local search again;

[0115] If dI<0 at this time, the local search has not tracked the maximum power point, and the step size correction σ is increased to perform the local search again.

[0116] The calculation compares the conductance increment dI / dU and the instantaneous conductance I / U to perform a local search, specifically:

[0117] When the voltage change dU≠0, if the conductance increment is equal to the instantaneous conductance, that is, dI / dU=-I / U, the local search tracks the maximum power point and terminates, indicating that the photovoltaic power generation system is operating at the photovoltaic maximum power point;

[0118] If the conductance increment is greater than the instantaneous conductance, that is, dI / dU>-I / U, the local search fails to track the maximum power point, and the step size correction σ is reduced to conduct the local search again;

[0119] If the conductance increment is less than the instantaneous conductance, that is, dI / dU<-I / U, the local search fails to track the maximum power point, and the step correction σ is increased to perform the local search again.

[0120] When the above conditions are met during the search process of the improved conductivity increment method, the local search is terminated, and the output voltage, output current and duty cycle signal of the photovoltaic array are output, so that the output power of the photovoltaic power generation system reaches the maximum value. In the early stage of the algorithm search, when it is far away from the maximum power point, the step size is increased to improve the search efficiency, and in the later stage of the search, when it is close to the maximum power point, the step size is reduced to avoid falling into the local optimum.

[0121] Step 5: Collect the output power of the photovoltaic array, calculate the power change percentage with the maximum output power, and determine whether the power change percentage is greater than or equal to the set threshold. If so, restart the gray wolf algorithm to track and search for the photovoltaic maximum power point;

[0122] The restart judgment conditions of the Grey Wolf algorithm caused by external changes are set to determine whether the change of external conditions causes the change of the output power of the photovoltaic array, and whether the amplitude of the power change causes the restart of the improved Grey Wolf optimization algorithm to re-find a new global maximum power point.

[0123] The restart determination condition is set as:

[0124]

[0125] Where ΔP is the percentage of power change, P t is the current sampling power, P m is the maximum power, ΔP t To set the threshold, ΔP t =0.04.

[0126] When the percentage of power change caused by changes in external conditions exceeds the set threshold, the gray wolf algorithm is restarted to search for the global maximum power point; if the percentage of power change caused by changes in external conditions does not exceed the set threshold, there is no need to restart, and the duty cycle signal corresponding to the α wolf position at this time continues to be output to control the photovoltaic power generation system to operate at the maximum power point.

Claims

1. A photovoltaic MPPT control method based on improved grey wolf and conductance increment method, applied to a photovoltaic power generation system, wherein the photovoltaic power generation system comprises a photovoltaic array and an MPPT controller, wherein the MPPT controller is used to control the output power of the photovoltaic array through a duty cycle signal, and is characterized in that: Including: S1. Initialize the parameters of the grey wolf algorithm based on the circuit structure of the photovoltaic array, including initializing the duty cycle, population size, and number of iterations; Use the duty cycle as the position parameter of each grey wolf in the grey wolf population; Use the output power of the photovoltaic array as the fitness of the grey wolf individual; S2. Improve the search strategy of the grey wolf algorithm, and adopt the embedded Lévy walk strategy and non-linear convergence factor for the global search of the grey wolf population; S3. Update the positions and real-time fitness of each grey wolf based on the global search, select the grey wolves with the top three fitness values as the α-wolf, β-wolf, and δ-wolf in turn, and output the duty cycle signal corresponding to the position of the α-wolf; S4. Control the output power of the photovoltaic array according to the duty cycle signal, judge whether the output power fluctuation value is less than the fluctuation threshold. If it is less, switch to the improved conductance increment method for local search of the photovoltaic maximum power point to determine the maximum output power; S5. Collect the output power of the photovoltaic array, calculate the power change percentage with the maximum output power, judge whether the power change percentage is greater than or equal to the set threshold. If it is greater than or equal, restart the grey wolf algorithm for tracking search of the photovoltaic maximum power point.

2. The photovoltaic MPPT control method based on the improved grey wolf and conductance increment method according to claim 1 is characterized in that: In S3, updating the positions and real-time fitness of each grey wolf based on the global search, the specific method is: S3.

1. Calculate and sort the initial fitness of each grey wolf position, and set the grey wolves with the top three initial fitness values as the α-wolf, β-wolf, and δ-wolf in turn; and determine the positions of the top three grey wolves; S3.

2. Calculate the positions of other grey wolf individuals based on the positions and position ratios of the top three leading wolves; S3.

3. Calculate the fitness of the grey wolf individuals in the population according to the updated grey wolf positions, and sort based on the updated fitness, and select the top three grey wolves to become the new α-wolf, β-wolf, and δ-wolf; S3.

4. Judge whether the duty cycle error is less than the preset threshold according to the duty cycle corresponding to the position of the new α-wolf, or judge whether the number of iterations reaches the maximum number of iterations; If so, terminate the iteration and output the duty cycle signal corresponding to the position of the α-wolf; if not, return to S2 and perform the iteration again.

3. According to the photovoltaic MPPT control method based on the improved grey wolf and conductance increment method described in claim 2, It is characterized in that The calculation formula for the positions of the top three grey wolves in S3.1 is: D α =|C1·X α -X|, D β =|C2·X β -X|, D δ =|C3·X δ -X|, X1 = Xα - A1·(Dα), X2 = Xβ - A2·(Dβ), X3=X δ -A3·(D δ ), Among them, D is the distance between the gray wolf and the prey, X (i+1) and X p Represent the position parameters of the gray wolf and prey respectively; i is the current iteration number; A and C are coefficient vectors; A = 2a·r1 - a, C=2·r2, Among them, r1 and r2 are random values ​​between 0 and 1; a is the convergence factor, e is the base of the natural logarithm, t and t max is the current and maximum number of iterations.

4. The photovoltaic MPPT control method based on the improved grey wolf and conductance increment method according to claim 2 is characterized in that: In S3.2, calculating the positions of other grey wolf individuals based on the positions and position ratios of the top three leading wolves, the specific operation is: Change the ratios of the three leading wolves in the search process by improving the proportional weights based on the step length Euclidean distance, and determine the positions of other grey wolf individuals according to the updated positions of the three leading wolves. The calculation formula is: Among them, X is the position parameter of the grey wolf individual; W1, W2, W3 represent the proportions of α, β, γ among the leading wolves respectively, and X(t + 1) is the next iteration update position of the grey wolf.

5. The photovoltaic MPPT control method based on the improved grey wolf and conductance increment method according to claim 1 is characterized in that: In S4, judging whether the output power fluctuation value is less than the fluctuation threshold, the formula is: Among them, U i (t) and U j (t) represents the voltage value corresponding to the alpha wolf in the same iteration, t is the current iteration number, N is the population size, and the fluctuation threshold is 0.

5.

6. The photovoltaic MPPT control method based on the improved grey wolf and conductance increment method according to claim 5 is characterized in that: The improved conductance increment method performs local search for the photovoltaic maximum power point by measuring and collecting the output voltage and output current of the photovoltaic array, and determining the voltage change dU of adjacent working points of the photovoltaic array based on the output voltage; If dU=0, a local search is performed by determining the current change dI of the adjacent working points of the PV array; When the voltage change dU = 0, if the current change dI = 0 at this time, the local search tracks the maximum power point and terminates, indicating that the photovoltaic power generation system is operating at the photovoltaic maximum power point; If dI>0 at this time, the local search fails to track the maximum power point, and the step size correction amount is reduced to conduct the local search again; If dI < 0 at this time, the local search fails to track the maximum power point, and the step correction amount is increased to conduct the local search again; If dU≠0, the conductance increment dI / dU and the instantaneous conductance I / U are calculated and compared for local search; When the voltage change dU≠0, if the conductance increment is equal to the instantaneous conductance, that is, dI / dU=-I / U, the local search tracks the maximum power point and terminates, indicating that the photovoltaic power generation system is operating at the photovoltaic maximum power point; If the conductance increment is greater than the instantaneous conductance, that is, dI / dU>-I / U, the local search fails to track the maximum power point, and the step size correction amount is reduced to conduct the local search again; If the conductance increment is less than the instantaneous conductance, that is, dI / dU<-I / U, the local search fails to track the maximum power point, and the step size correction is increased and the local search is repeated.

7. The photovoltaic MPPT control method based on the improved grey wolf and conductance increment method according to claim 6 is characterized in that: The step size and compensation coefficient of the conductivity increment method are: Where d(k) is the variable step size coefficient, σ is the step size correction, k is the step size variable, P is the output power, and U is the output voltage.

8. The photovoltaic MPPT control method based on the improved grey wolf and conductance increment method according to claim 1 is characterized in that: In S5, the Grey Wolf Algorithm is restarted to track and search for the maximum power point of photovoltaic power generation, and the restart determination condition is: Where ΔP is the percentage of power change, P t is the current sampling power, P m is the maximum power, ΔP t To set the threshold.

Citation Information

Patent Citations

  • Tracking method for maximum power point in photovoltaic grid-connected inverter

    CN103488239A

  • Grey wolf algorithm hybrid optimization method based on reverse learning strategy

    CN116341605A

  • Photovoltaic maximum power point tracking control method based on WPA-INC

    CN118226919A

  • INC-based light storage coupling hydrogen production system control method and system

    CN118331384A

  • Solar cell generation system tracking maximum power point according to determining partial shade of solar cell array

    KR101065862B1

Cited By

  • MPPT (Maximum Power Point Tracking) control method of offshore floating type photovoltaic power generation system

    CN120030026A

  • Maximum power point tracking control software combined with grey wolf algorithm

    CN120143928A

  • Improved grey wolf MPPT (maximum power point tracking) control method and device of photovoltaic array suitable for charging of energy storage power station

    CN120181508A

  • Accurate active standby control method and system for network-forming type photovoltaic field station

    CN122394117A

  • Method and system for precise active reserve control of grid-connected photovoltaic power station

    CN122394117B