Optimization method for water quality early warning monitoring point arrangement of water supply network

By building hydraulic model and delay simulation to calculate the water age value of the node, and combining the layered color marking method to determine the water quality monitoring point, the problem that the existing technology cannot effectively ensure the safety of citizens' water use, and the layout of water quality monitoring points in the water supply pipeline network is realized. Scientific and precise, providing effective water quality safety accident warning and regional determination.

CN118940446APending Publication Date: 2024-11-12FOSHAN CHANCHENG WATER SUPPLY CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410985568.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The layout of existing water supply pipeline monitoring points mainly focuses on the pressure and flow of the pipeline network, and cannot effectively ensure the safety of citizens' water use, and cannot timely identify and narrow the impact of water quality safety accidents.

Method used

By building a hydraulic model and delay simulation to calculate the water age value of the node, determine the water quality warning and monitoring location, use the layered color marking method and the node maximum water age value to mark different water age value ranges, select the downstream node as the water quality monitoring and early warning points, and combine it with Hydraulic model and actual data determine the monitoring point layout plan.

Benefits of technology

The scientific and precise layout of water quality monitoring points in the water supply pipeline network has been achieved, empirical and blind, and provides effective guarantees for civil water safety accident warnings and accident areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118940446A_ABST
    Figure CN118940446A_ABST
Patent Text Reader

Abstract

The invention discloses a water supply network water quality early warning monitoring point arrangement optimization method. The method comprises the steps that a hydraulic model is built based on actual design data of a water supply network; performing delay simulation on the hydraulic model and calculating a node water age value to obtain a maximum node water age value; and determining a water quality early warning monitoring position based on the node maximum water age value. By using the method, a water quality monitoring point distribution scheme can be formulated, and a water quality safety accident point investigation range can be determined. The method can be widely applied to the technical field of water quality early warning and monitoring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of water quality early warning monitoring, and in particular to a method for optimizing the arrangement of water quality early warning monitoring points in a water supply network. Background Art

[0002] The urban water supply network is one of the important infrastructures in the process of urban modernization. As the "main artery" of the urban system, the municipal water supply network is an important lifeline to ensure social production activities and the quality of life of citizens. Once an accident occurs in the municipal water supply network, it will have a serious impact on the production and life of the city.

[0003] The municipal water supply network needs to pay close attention to the water quality safety within the network. Whether the water quality of the network is guaranteed will directly affect the safety of citizens' water use and is directly related to the life and health of citizens. Therefore, it is necessary to set up water quality monitoring and early warning points in the municipal water supply network. The role of the water quality monitoring and early warning points is to monitor the water quality of upstream water, and combine the feedback data of other upstream monitoring points to timely determine the scope of water quality abnormalities, narrow the scope of water quality safety accidents in the network, and minimize the impact on citizens' water safety.

[0004] At present, the research on the layout of monitoring points in water supply pipelines focuses on pipeline pressure monitoring and flow monitoring, which mainly ensures sufficient water supply for citizens and production activities, but cannot guarantee the safety of citizens' water use. Summary of the invention

[0005] In order to solve the above technical problems, the purpose of the present invention is to provide an optimization method for the layout of water quality early warning monitoring points in a water supply network, which can formulate a water quality monitoring point layout plan and determine the scope of water quality safety accident point investigation.

[0006] The technical solution adopted by the present invention is: a method for optimizing the arrangement of water quality early warning monitoring points in a water supply network, comprising the following steps:

[0007] Build a hydraulic model based on the actual design data of the water supply network;

[0008] Conduct time-delay simulation on the hydraulic model and calculate the node water age value to obtain the maximum node water age value;

[0009] Determine the water quality early warning monitoring location based on the maximum water age value of the node.

[0010] Furthermore, the step of building a hydraulic model based on the actual design data of the water supply network specifically includes:

[0011] Based on the actual design data of the water supply network, obtain the network data;

[0012] The water supply network is simplified according to the network data to obtain the network topology model;

[0013] In the hydraulic modeling application software, a hydraulic model is constructed based on the pipe network topology model;

[0014] The design flow of each pipe section is input into the hydraulic model, and the actual water supply of each node and pipe section is simulated and calculated using the pipe section and node data.

[0015] Further, the step of performing delayed simulation on the hydraulic model and calculating the node water age value to obtain the node maximum water age value specifically includes:

[0016] Input the water supply data of the pipe network in different time periods under actual working conditions into the hydraulic model, and set the simulation time length for delayed simulation;

[0017] Calculate the water age value of each node under the condition of water volume change under the time-delay simulation condition, and obtain the maximum water age value of the node.

[0018] Further, the step of determining the water quality early warning monitoring location based on the maximum water age value of the node specifically includes:

[0019] Set the standard time for water quality early warning monitoring, and set the number of monitoring points based on the standard time for water quality early warning monitoring;

[0020] Nodes with different water age value ranges are marked based on the hierarchical color marking method and the maximum water age value of the node to obtain the same water age value range;

[0021] If there is a water quality connection between the nodes, select the downstream nodes within the same water age value range as water quality monitoring and early warning points;

[0022] If there is no water quality connection between nodes, the water quality early warning monitoring location shall be determined according to the distribution of water age values ​​in each pipe network area where there is no water quality connection.

[0023] Furthermore, the calculation expression of the node water age value is as follows:

[0024]

[0025] Among them, T i represents the water age value of node i; represents the water volume of the nth water pipe path of node i; represents the time it takes for the water source to reach node i along the nth water pipe path from node i; N represents the number of water pipe paths; LU i Represents the set of all upstream water supply paths of node i.

[0026] Furthermore, the simplification principle of the pipe network topology model is as follows:

[0027] Keep the pipe sections with larger diameter and larger flow rate, and delete the pipe sections with smaller diameter;

[0028] Nodes that are geographically close are merged into one node;

[0029] Parallel pipe sections with close distances are merged into a single pipe section, and small-diameter passing pipe sections between main pipe sections are deleted.

[0030] Furthermore, the pipe network data includes pipe section flow, pipe diameter, pipe section length, pipe network node location coordinates, water supply pump station location coordinates, node basic water demand, and concentrated flow size.

[0031] The beneficial effects of the method of the present invention are as follows: the present invention realizes hydraulic simulation of the layout of the actual water supply network, performs delayed simulation in the hydraulic modeling application software based on actual working conditions, determines the water consumption and maximum water age value of the main nodes in the network, and determines the nodes within different water age value ranges through color marking. The scope of water quality monitoring and early warning of regional downstream nodes can be intuitively seen in the hydraulic model diagram. By combining the node water age and hydraulic model, the layout plan of water quality monitoring and early warning is determined based on actual data, avoiding the empiricism and blindness of the previous method of determining water quality monitoring points, and providing an effective basis and guarantee for the early warning of water safety accidents for citizens and the determination of accident occurrence areas. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a flow chart of steps of a method for optimizing the arrangement of water quality early warning monitoring points in a water supply network according to the present invention;

[0033] Figure 2 It is a schematic diagram of a pipe network topology model of an optimization method for arranging water quality early warning monitoring points in a water supply pipe network according to the present invention;

[0034] Figure 3 It is a schematic diagram of water quality early warning monitoring locations of a method for optimizing the arrangement of water quality early warning monitoring points in a water supply network according to the present invention;

[0035] Figure 4 The present invention is a relationship diagram between the number of monitoring points and the monitoring standard time in an optimization method for arranging water quality early warning monitoring points in a water supply network. DETAILED DESCRIPTION

[0036] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The step numbers in the following embodiments are only provided for the convenience of explanation and description, and the order between the steps is not limited in any way. The execution order of each step in the embodiment can be adaptively adjusted according to the understanding of those skilled in the art.

[0037] Reference Figure 1 The present invention provides a method for optimizing the arrangement of water quality early warning monitoring points in a water supply network, the method comprising the following steps:

[0038] S1. Build a hydraulic model based on the actual design data of the water supply network;

[0039] S1.1. Based on the actual design data of the water supply network, obtain the network data;

[0040] Specifically, the pipe network data includes pipe section flow, pipe diameter, pipe section length, pipe network node location coordinates, water supply pump station location coordinates, node basic water demand, concentrated flow, node elevation, important concentrated water use point locations and water demand in the pipe network, etc.

[0041] S1.2. Simplify the water supply network according to the network data to obtain a network topology model;

[0042] Specifically, the pipe network topology model can refer to Figure 2 , the simplification principles are as follows:

[0043] Keep the pipe sections with larger diameter and larger flow rate, and delete the pipe sections with smaller diameter;

[0044] Nodes that are geographically close are merged into one node;

[0045] Parallel pipe sections with close distances are merged into a single pipe section, and small-diameter passing pipe sections between main pipe sections are deleted.

[0046] S1.3. In the hydraulic modeling application software, a hydraulic model is constructed according to the pipe network topology model;

[0047] S1.4. Input the design flow of each pipe section into the hydraulic model, and use the pipe section and node data to simulate and calculate the actual water supply of each node and pipe section to ensure that the simulated actual node water supply can meet the designed node water demand.

[0048] S2, perform time-delay simulation on the hydraulic model and calculate the node water age value to obtain the maximum node water age value;

[0049] S2.1. Input the water supply data of the pipe network in different time periods under actual working conditions into the hydraulic model, and set the simulation time length for delayed simulation;

[0050] Specifically, before the daily water supply reaches its peak, the water stays in the pipe network for a long time. Therefore, when the water supply reaches its peak, the node water age value will reach a higher value in a single day. Water quality monitoring of the high water age value time period of the same node is more conducive to judging and warning the water quality safety in the pipe network. Based on the time-varying water supply of the water supply plant (in the absence of specific data, the maximum time-varying coefficient is 1.6, that is, the maximum water supply in a single day is 1.6 times the average water supply for the whole day); the time-delay simulation also needs to meet the flow requirements of each node.

[0051] S2.2. Calculate the water age value of each node under the condition of water volume change under the time-delay simulation condition, and obtain the maximum water age value of the node.

[0052] Specifically, the pollution degree of water coming from different nodes is compared by calculating the node water age. It is generally believed that the water age value can reflect the residence time of the water at the node in the pipe network. The water at a certain node may come from a weighted mixture of multiple pipe sections. Then the water age value of the node is equal to the weighted average of the residence time of the water flow in different water supply paths. In the water supply network, the main parameter affecting the node water age value is the water flow velocity of the pipe section.

[0053] The calculation expression of the node water age value is as follows:

[0054]

[0055] Among them, T i represents the water age value of node i; represents the water volume of the nth water pipe path of node i; represents the time it takes for the water source to reach node i along the nth water pipe path from node i; N represents the number of water pipe paths; LU i Represents the set of all upstream water supply paths of node i.

[0056] By carrying out time-delay simulation in the hydraulic model, it is possible to calculate the changes in the water age value of each node within a single day and obtain the maximum water age value of each node.

[0057] S3, determine the water quality early warning monitoring location based on the maximum water age value of the node;

[0058] S3.1. Set the standard time for water quality early warning monitoring and the number of monitoring points based on the standard time for water quality early warning monitoring

[0059] Specifically, the monitoring standard time T is determined, that is, when a water quality safety accident occurs in the pipe network, the nearest node downstream of the water quality safety accident can monitor the abnormal water quality within T time, so as to determine the location range of the water quality safety accident. In addition, the number of monitoring points is related to the size of the monitoring standard time. Figure 4 In a specific embodiment of the present invention, when the monitoring standard time is set to 1.5 hours, that is, the approximate location of the water quality safety accident is determined within 1.5 hours, 11 water quality monitoring points need to be set in the water supply network; when the monitoring standard time is set to 5 hours, 6 water quality monitoring points need to be set in the water supply network. Generally speaking, the higher the monitoring standard time requirement, the more water quality monitoring points are arranged in the network.

[0060] S3.2, marking nodes with different water age value ranges based on the hierarchical color marking method and the maximum water age value of the node to obtain the same water age value range;

[0061] Specifically, the distribution range of the maximum water age values ​​of the nodes is delineated in the hydraulic modeling application software, and the distribution range of the maximum water age values ​​of the nodes is marked with different colors to obtain the same water age value range.

[0062] S3.3. If there is a water quality connection between the nodes, select the downstream nodes within the same water age value range as water quality monitoring and early warning points.

[0063] Specifically, refer to Figure 3 In the pipe network topology model, the color range is marked based on the maximum water age value and the monitoring standard time, avoiding the calculation process of the node water age matrix; with the help of the pipe network topology model diagram, the location and number of the downstream node in the same color range can be intuitively determined, as well as the pipe network range that can be monitored and warned with the node as the water quality monitoring and early warning point. When a water quality safety accident occurs at a certain point in the pipe section within the same water age value range, the polluted water will pass through the downstream monitoring point within the range within T time, and combined with whether the water quality is abnormal at the upstream monitoring point, the approximate range of the water quality safety accident location can be determined within T time.

[0064] S3.4. If there is no water quality connection between nodes, the water quality early warning monitoring location shall be determined according to the distribution of water age values ​​in each pipe network area where there is no water quality connection.

[0065] The above is a specific description of the preferred implementation of the present invention, but the invention is not limited to the embodiments. Those skilled in the art may make various equivalent modifications or substitutions without violating the spirit of the present invention. These equivalent modifications or substitutions are all included in the scope defined by the claims of this application.

Claims

1. A method for optimizing the layout of water quality early warning monitoring points in a water supply network, characterized in that: The following steps are involved: Build a hydraulic model based on the actual design data of the water supply network; Conduct time-delay simulation on the hydraulic model and calculate the node water age value to obtain the maximum node water age value; Determine the water quality early warning monitoring location based on the maximum water age value of the node.

2. The method for optimizing the arrangement of water quality early warning monitoring points in a water supply network according to claim 1, characterized in that: The step of building a hydraulic model based on the actual design data of the water supply network specifically includes: Based on the actual design data of the water supply network, obtain the network data; The water supply network is simplified according to the network data to obtain the network topology model; In the hydraulic modeling application software, a hydraulic model is constructed based on the pipe network topology model; The design flow of each pipe section is input into the hydraulic model, and the actual water supply of each node and pipe section is simulated and calculated using the pipe section and node data.

3. The method for optimizing the arrangement of water quality early warning monitoring points in a water supply network according to claim 1, characterized in that: The step of performing delayed simulation on the hydraulic model and calculating the node water age value to obtain the node maximum water age value specifically includes: Input the water supply data of the pipe network in different time periods under actual working conditions into the hydraulic model, and set the simulation time length for delayed simulation; Calculate the water age value of each node under the condition of water volume change under the time-delay simulation condition, and obtain the maximum water age value of the node.

4. The method for optimizing the arrangement of water quality early warning monitoring points in a water supply network according to claim 1, characterized in that: The step of determining the water quality early warning monitoring location based on the maximum water age value of the node specifically includes: Set the standard time for water quality early warning monitoring, and set the number of monitoring points based on the standard time for water quality early warning monitoring; Nodes with different water age value ranges are marked based on the hierarchical color marking method and the maximum water age value of the node to obtain the same water age value range; If there is a water quality connection between the nodes, select the downstream nodes within the same water age value range as water quality monitoring and early warning points; If there is no water quality connection between nodes, the water quality early warning monitoring location shall be determined according to the distribution of water age values ​​in each pipe network area where there is no water quality connection.

5. The method for optimizing the arrangement of water quality early warning monitoring points in a water supply network according to claim 1, characterized in that: The calculation expression of the node water age value is as follows: N∈LU i Among them, T i represents the water age value of node i; represents the water volume of the nth water pipe path of node i; represents the time it takes for the water source to reach node i along the nth water pipe path from node i; N represents the number of water pipe paths; LU i Represents the set of all upstream water supply paths of node i.

6. The method for optimizing the arrangement of water quality early warning monitoring points in a water supply network according to claim 2, characterized in that: The simplified principles of the pipe network topology model are as follows: Keep the pipe sections with larger diameter and larger flow rate, and delete the pipe sections with smaller diameter; Nodes that are geographically close are merged into one node; Parallel pipe sections with close distances are merged into a single pipe section, and small-diameter passing pipe sections between main pipe sections are deleted.

7. The method for optimizing the arrangement of water quality early warning monitoring points in a water supply network according to claim 2, characterized in that: The pipe network data includes pipe section flow, pipe diameter, pipe section length, pipe network node location coordinates, water supply pump station location coordinates, node basic water demand, and concentrated flow size.

Citation Information

Cited By

  • Water supply network optimization scheduling method considering water age nonlinear target

    CN122088989A