Dam temperature prediction method based on finite element analysis and thermal parameter inversion
By introducing global optimal value guidance and cross-operation into the artificial bee colony algorithm, combined with finite element analysis, the local search problem in the inversion of thermal parameters of dam is solved, the accuracy and calculation efficiency of temperature prediction are improved, and the dam is realized refined temperature regulation.
Patent Information
- Application Number
- CN202410915746.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-25
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-06-25
AI Technical Summary
The prior art has problems such as poor local search capability and strong dependence on initial values in the thermal parameters in concrete dams, which are prone to falling into local optimal solutions, and have large calculation amounts and long iteration time, resulting in inaccurate temperature prediction.
Adding the guiding role and cross-operation of global optimal values in the artificial bee colony algorithm (ABC), improving the convergence speed and global optimization ability of the algorithm, combining finite element analysis and thermal parameter inversion, accurate thermal parameters can be obtained through iterative calculations value, predict dam temperature.
The accuracy of thermal parameter inversion is improved, the calculation error is reduced, the refined regulation of dam temperature is realized, and the convergence speed and global optimization ability of the ABC algorithm are enhanced.
Smart Images

Figure CN118940555A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of temperature control of water conservancy and hydropower concrete dams, and specifically relates to a dam temperature prediction method based on finite element analysis and thermal parameter inversion. Background Art
[0002] During the construction of concrete dams, due to the influence of factors such as its own hydration heat and external temperature, large temperature stress is easily generated in the dam body. When the tensile strength of concrete is not enough to resist the temperature stress, temperature cracks are very likely to occur. In order to accurately understand the temperature behavior of the dam in real time, it is not enough to rely on the current temperature data obtained by existing instruments. It is also necessary to predict the future trend of the dam temperature through software simulation to obtain an accurate concrete temperature field to analyze the stress state of the dam. However, the simulation calculation of the concrete temperature field is susceptible to a variety of uncertain factors, such as external temperature, internal water pipe cooling, and thermal parameters of concrete. The external temperature and cooling water pipe flow can be monitored on site, while the thermal parameter values need to be obtained through indoor tests. However, due to the limitations of indoor tests, there is a large error between the indoor experimental values and the actual values of thermal parameters. Therefore, it is necessary to comprehensively consider the influence of the external temperature and cooling water flow factors on site based on the measured data of the dam construction site and the intelligent optimization analysis method, and obtain the true thermal parameter values during the dam construction process through inversion calculation.
[0003] The inverse calculation process of the dam thermal parameters is essentially a process of multiple iterations using the optimization algorithm to call the temperature field simulation calculation program. The existing optimization algorithm method of calling the temperature field has poor local search ability and strong dependence on the initial value. In complex problems, it is easy to fall into the local optimum and cannot guarantee the search for the global optimal solution. There are also problems such as large amount of calculation and long iteration time.
[0004] The Artificial Bee Colony algorithm (ABC) is a bionic intelligent computing method that simulates bee colonies to find high-quality nectar sources. It was proposed by Turkish scholar Karaboga in 2005. It is produced by long-term observation of natural bee colonies, using the group intelligence of bee colonies to solve optimization problems and combining it with artificial intelligence technology. This algorithm belongs to the category of cluster thinking. Similar ones include fish swarm algorithm and ant colony algorithm. The artificial bee colony algorithm is essentially a generalized neighborhood search algorithm. It divides bee colonies into three types of bees: leading bees, following bees, and scout bees, as well as two basic behaviors: sharing nectar sources and giving up nectar sources. The location of each nectar source represents a feasible solution to the optimization problem, the amount of nectar in the nectar source represents the quality of the corresponding solution, and the speed at which bees search for nectar sources represents the speed of solving the corresponding optimization problem. Through the conversion of leading bees, following bees, and scout bees in different situations, with the help of heuristic strategies, it can not only effectively perform local search, but also has the ability to find global optimization.
[0005] Compared with other intelligent algorithms, the ABC algorithm has the advantages of fewer control parameters, simple and easy calculation, fast search speed, and fitness function as the main evolution basis. However, ABC still has problems such as slow convergence speed in the later stage and easy to fall into local optimal solution.
[0006] Therefore, the improved artificial bee colony algorithm is studied and applied to the inverse calculation of the dam thermal parameters to achieve accurate prediction of the dam temperature. Summary of the invention
[0007] The purpose of the present invention is to provide a dam temperature prediction method based on finite element analysis and thermal parameter inversion in view of the above problems, increase the guiding role of the current global optimal value in the search process of the ABC algorithm solution space to accelerate the convergence speed of the ABC algorithm, and increase the cross operation in the leading bee field search process to improve the global optimization ability; use the improved ABC algorithm to perform inversion calculation on the thermal parameters to reduce the error between the calculated thermal parameter values and the true values; and then predict the dam temperature based on the calculated thermal parameter values, so as to implement refined temperature control of the dam.
[0008] The technical solution of the present invention is a dam temperature prediction method based on finite element analysis and thermal parameter inversion, comprising the following steps:
[0009] Step 1: Establish the finite element model of each concrete pouring bin and set the initial conditions and boundary conditions;
[0010] Step 1-1: In the finite element software, establish a finite element model of the casting bin and mesh the finite element model; at the same time, assign values to the concrete material and unit properties;
[0011] Step 1-2: The initial conditions of the finite element model include the initial temperature of the concrete, which is obtained based on the measured data on site;
[0012] Step 1-3: Boundary conditions mainly include external environment temperature and water cooling of concrete;
[0013] Step 2: Determine the thermal parameters and their value ranges used for dam temperature prediction, and establish the objective function of thermal parameters;
[0014] Step 2-1: Determine the inverse thermal parameters and value range. The inverse thermal parameters include the concrete surface heat release coefficient, concrete temperature rise law parameters, and concrete final adiabatic temperature rise;
[0015] Step 2-2: Establish the objective function of thermal parameter inversion and transform the concrete thermal parameter inversion problem into an optimization problem;
[0016] Step 3: Randomly generate a set of initial thermal parameter values within the range of thermal parameter values, and substitute them into the finite element model for temperature simulation calculation to obtain the temperature value at the node in the concrete pouring bin, and substitute them into the objective function together with the actual temperature of the concrete at the node to calculate the objective function value;
[0017] Step 3-1: Simulate the pouring sequence, atmospheric temperature, pouring temperature, and hydration heat of concrete;
[0018] Step 3-2: Use the "unit generation" and "unit killing" functions of the finite element software to simulate the compartment concrete pouring; before the simulation of compartment concrete pouring, all dam body units are "killed"; during the simulation, the dam body units are activated in sequence according to the pouring progress;
[0019] Step 3-3: Apply the concrete heat generation rate in different time periods to the temperature field of the casting bin through the parametric programming language in the finite element software, and then calculate the temperature field of the concrete in the casting bin to obtain the calculated temperature of the concrete;
[0020] Step 4: Use the global artificial bee colony algorithm to iteratively invert the thermal parameters, and use the objective function to judge the quality of the obtained thermal parameter values;
[0021] Step 5: Repeat step 4 to obtain the value of the thermal parameters that meet the objective function value requirements, and compare the calculated temperature value with the actual temperature value of the concrete. Stop the iterative inversion after reaching the expected target;
[0022] Step 6: Based on the obtained thermal parameter values, predict the temperature of the dam concrete.
[0023] Preferably, in step 1-2, the bottom surface of the casting bin and the side surface of the transverse joint are used as adiabatic boundaries, and the top surface of the casting bin and the upstream and downstream surfaces are third-type temperature boundary conditions;
[0024] When concrete is in contact with air, it is assumed that the heat flux q passing through the concrete surface is proportional to the concrete surface temperature T and the air temperature T a The expression of the third type of heat transfer boundary condition is as follows:
[0025]
[0026] Where q is the heat flow; λ is the thermal conductivity; T a* is the comprehensive equivalent air temperature; β is the heat release coefficient of the concrete surface; T s is the daily average temperature of the concrete surface; n is the unit vector in the normal direction.
[0027] Preferably, in the steps 1-3, the calculation formula for the concrete temperature during cooling and water flow is as follows:
[0028] T(t)=T ωi +(T i -T ωi )f i (t)+θ0ψ i (t) (2)
[0029]
[0030] Where T(t) represents the average temperature of concrete; e is a natural constant; T ωi T is the cooling water temperature of the i-th gear; i is the concrete temperature when the i-1th level of water flow ends and the i-th level of water flow begins; φ i (t) is the water cooling function when the water is passed through the i-th gear; θ0 is the final adiabatic temperature rise; ψ i (t) is the water-cooling temperature rise function when the water is flowing through the i-th gear; p i is the water cooling parameter when the water is flowing in the i-th gear; t i is the time when the flow rate or water temperature changes; t is the cooling time; s, m1, and m2 are all coefficients to be determined;
[0031] The calculation formula of water cooling parameters is as follows:
[0032]
[0033] k=2.09-1.35ξ+0.320ξ 2 (7)
[0034] ξ=λL / c w ρ w q w (8)
[0035] The calculation formula for the equivalent thermal conductivity of non-metallic cooling water pipes is:
[0036]
[0037] Where D is the equivalent cooling column diameter; b is the equivalent cooling column radius; S1 and S2 are the horizontal and vertical spacing of the water pipe layout respectively; ρ w is the density of water, q w is the water flow rate, L is the length of the water pipe, c w is the specific heat of water, λ is the thermal conductivity of concrete; a' is the equivalent thermal conductivity, c is the outer radius of the water pipe, r0 is the inner radius of the water pipe, λ1 is the thermal conductivity of the water pipe; ξ represents the intermediate variable related to the specific heat of water, water density, water flow rate and water pipe length.
[0038] Preferably, in step 2-2, the expression of the objective function f(x) is:
[0039]
[0040] min f(x)x=(x1,x2,x3,…,x D )∈[L d ,U d ] (14)
[0041] Where x represents the feasible solution of the optimization problem, x * represents the optimal solution of the optimization problem, x is a D-dimensional vector, and D represents the number of parameters of the optimization problem; T ij '、T ij They represent the calculated value and measured value of concrete temperature at the jth position i at time; p represents the total number of measuring points, q is the total duration; L d , U d They represent the lower and upper bounds of the solution space respectively.
[0042] Preferably, in step 4, a global artificial bee colony algorithm based on crossover operation is used to iteratively invert the thermal parameters.
[0043] The global artificial bee colony algorithm based on crossover operation improves the search equation of the solution space as follows to solve the problem of slow convergence of the artificial bee colony algorithm:
[0044]
[0045] Where v id represents the velocity of the ith particle; x id represents the position of the i-th particle in the search space; represents the dth component in the global optimal solution vector; α is a random number in [-1,1]; β is a random number in [0,C], where C is a non-negative constant;
[0046] pass The item can balance the exploration and development capabilities of the artificial bee colony algorithm, but it reduces the global optimization ability. To address this problem, the crossover operation in the genetic algorithm is introduced to further improve the artificial bee colony algorithm.
[0047]
[0048] Where v id ' represents the speed of the i-th particle after the introduction of the crossover operation; cr represents the crossover operator; rand is a random number in [0,1]; when cr takes a smaller value, the development ability of the improved artificial bee colony algorithm is enhanced, conversely, when cr takes a larger value, the exploration ability of the improved artificial bee colony algorithm is enhanced; corresponding to different optimization problems, cr can take different values to enable the algorithm to achieve the best optimization ability, thereby improving the adaptability of the algorithm to different optimization problems.
[0049] Compared with the prior art, the beneficial effects of the present invention include:
[0050] 1) Based on the consideration of the influence of cooling water and external ambient temperature, the present invention applies the ABC algorithm to the inverse calculation of concrete thermal parameters according to the temperature measurement data of the optical fiber buried in the concrete bin, thereby reducing the error between the calculated thermal parameter value and the actual thermal parameter value of the concrete during the construction period.
[0051] 2) The inversion results are of great significance for clarifying the relationship between temperature changes and thermal parameters. The dam temperature is then predicted based on the calculated thermal parameter values, which improves the accuracy of dam temperature prediction and is conducive to the implementation of refined real-time temperature control of the dam.
[0052] 3) In view of the weak development capability of the ABC algorithm, the present invention increases the convergence speed of the ABC algorithm and improves the global optimization capability of the ABC algorithm by increasing the guiding role of the current global optimal value in the search process of the ABC algorithm solution space and adding crossover operations in the search process of the leading bee field. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0054] Figure 1 Schematic diagram of a distributed optical fiber temperature measurement system according to an embodiment of the present invention.
[0055] Figure 2 Schematic diagram of a thermal parameter inversion framework according to an embodiment of the present invention.
[0056] Figure 3 This is a typical layout diagram of distributed optical fibers in a concrete pouring bin according to an embodiment of the present invention.
[0057] Figure 4 This is a distributed optical fiber plan layout diagram of the 021 concrete pouring bin according to an embodiment of the present invention.
[0058] Figure 5 This is a finite element model of a concrete pouring bin according to an embodiment of the present invention.
[0059] Figure 6 The present invention is a flowchart of the concrete pouring bin temperature simulation pre-processing according to an embodiment of the present invention.
[0060] Figure 7 This is a curve diagram of water temperature variation in a concrete pouring bin according to an embodiment of the present invention.
[0061] Figure 8 This is a curve diagram of water flow rate variation in a concrete pouring bin according to an embodiment of the present invention.
[0062] Fig. 9This is a curve diagram of the ambient temperature change of the concrete pouring bin in an embodiment of the present invention.
[0063] Fig.10 This is a curve diagram of the objective function of the ABC algorithm according to an embodiment of the present invention changing with the number of iterations.
[0064] Fig.11 This is a graph showing how the objective function of different numbers of nectar sources changes with the number of iterations in an embodiment of the present invention.
[0065] Fig.12 This is a comparison chart of the predicted temperature value and the measured temperature value of the 021 concrete pouring bin in an embodiment of the present invention.
[0066] Fig.13 This is a comparison chart of the predicted value and the measured value of the temperature of the 022 concrete pouring bin in an embodiment of the present invention.
[0067] Fig.14 It is a schematic diagram of the component crossover operation of the CGABC algorithm according to an embodiment of the present invention. DETAILED DESCRIPTION
[0068] Example Taking the Baihetan concrete hyperbolic arch dam at the junction of Sichuan and Yunnan as an example, the dam is the second cascade hydropower station in the cascade development of the lower reaches of the Jinsha River, and is divided into 31 dam sections. The dam is located in the subtropical monsoon area. The average temperature in the dam site area is 21.9℃ for many years, with large extreme temperature differences and obvious day-night temperature differences. The extreme maximum temperature is 42.7℃, which occurs in September, and the extreme minimum temperature is 2.1℃, which occurs in December. The average water temperature is 17.4℃, and the average wind speed is 1.9m / s.
[0069] The concrete grades used in the embodiment are mainly C30, C35, and C40. In order to analyze the temperature variation law of C40 concrete in the Baihetan project under the influence of the external pouring environment, the embodiment selects the 27# dam section 020-022 pouring bin, which is three continuous pouring bins from bottom to top, and uses the improved artificial bee colony algorithm to perform concrete thermal parameter inversion.
[0070] In the embodiment, the optical fiber laid in each section of the dam is used to measure the concrete temperature data. The optical fiber of each section of the dam adopts an "L" type layout scheme. The starting point and end point of the optical fiber layout line in the casting chamber are 3 to 5 meters away from the cross joint surface template and 3 meters away from the upstream and downstream surface templates. Figures 3-4 As shown. The average temperature of the fiber along the river in each casting bin is taken as the measured temperature value of the center point. At the same time, thermometers are arranged at typical measuring points for mutual verification.
[0071] like Figure 1 As shown in FIG. 1 , the dam temperature prediction method based on finite element analysis and thermal parameter inversion includes the following steps:
[0072] Step 1: Establish a finite element model for the concrete pouring bin and set up initial conditions and boundary conditions;
[0073] Step 1-1: Create a solid model of the casting bin in the CAD software, extract the coordinate values from the CAD model, import it into the ANSYS software, create a finite element model of the casting bin, and mesh the finite element model. At the same time, assign values to the concrete material and unit attributes. In the ANSYS software, select solid70, which supports life and death units, as the concrete unit.
[0074] Step 1-2: The initial condition mainly refers to the initial temperature of the concrete, which is obtained from the measured data on site. In the embodiment, the bottom surface of the casting bin and the side surface of the transverse joint are used as adiabatic boundaries, and the top surface of the casting bin and the upstream and downstream surfaces are the third type of temperature boundary conditions.
[0075] When concrete is in contact with air, it is assumed that the heat flux q passing through the concrete surface is proportional to the concrete surface temperature T and the air temperature T a The difference is proportional to the third type of heat transfer boundary condition expression:
[0076]
[0077] In formula (1), q is the heat flow; λ is the thermal conductivity; T a* is the comprehensive equivalent air temperature; β is the heat release coefficient of the concrete surface, unit is kJ / (m 2 ·h·℃); T s is the daily average temperature of the concrete surface; n is the unit vector in the normal direction.
[0078] Step 1-3: External conditions mainly include external environment temperature and water cooling of concrete. In the first stage of water cooling, multi-stage water flow is usually adopted, and the water temperature and water flow rate will change accordingly.
[0079] The calculation formula for the average temperature of concrete when cooling water is considered is as follows:
[0080] T(t)=T ωi +(T i -T ωi )φ i (t)+θ0ψ i (t) (2)
[0081]
[0082]
[0083] Where e is a natural constant in mathematics, T ωi is the water temperature of the i-th level; T iis the concrete temperature when the i-1th level of water flow ends and the i-th level of water flow begins; φ i (t) is the water cooling function when the water is passed through the i-th gear; θ0 is the final adiabatic temperature rise; ψ i (t) is the water-cooling temperature rise function when the water is flowing through the i-th gear; p i is the water cooling parameter when the water is flowing in the i-th gear; t is the cooling time; t i is the moment when the flow rate or water temperature changes. When the flow rate or water temperature changes, t must start from 0; s, m1, and m2 are all coefficients to be determined.
[0084] The calculation formula of water cooling parameters is as follows:
[0085]
[0086] k=2.09-1.35ξ+0.320ξ 2 (7)
[0087] ξ=λL / c w ρ w q w (8)
[0088] The calculation formula for the equivalent thermal conductivity of non-metallic cooling water pipes is:
[0089]
[0090] In formulas (5) to (8), k, a', and D are constants; D is the equivalent cooling column diameter; b is the equivalent cooling column radius; S1 and S2 are the horizontal and vertical spacings of the water pipes, respectively; ρ w is the density of water, q w is the water flow rate, L is the length of the water pipe, c w is the specific heat of water, λ is the thermal conductivity of concrete; a′ is the equivalent thermal conductivity, which can be obtained by substituting the known equivalent cooling column radius b, water pipe outer radius c, water pipe inner radius r0, concrete thermal conductivity λ, and water pipe thermal conductivity l1 into formula (9).
[0091] In the embodiment, the finite element model of the 27# dam section 020-022 casting bins of the arch dam was established by ANSYS finite element software. The concrete grade of the three continuous casting bins was C40 and the gradation was the same. Each casting bin was divided into 6 0.5m thick layers, and the bin thickness was 3m. The finite element model of the casting bin was meshed by hexahedral eight-node isoparametric units, with a total of 74976 units and 83655 nodes. Figure 5 As shown. The density of C40 concrete is 2601kg / m 3 , specific heat c is 0.851 kJ / (kg·℃), thermal conductivity α is 0.0078 m 2 / d.
[0092] The side of the horizontal joint of the casting bin is used as the adiabatic boundary, the top surface and the upstream and downstream surfaces of the casting bin are the third type of temperature boundary conditions, the time of cooling water flow, water temperature and flow rate adopt the time water flow scheme, and the external ambient temperature adopts the measured 0.5d average temperature. In order to eliminate the influence of the 019 casting bin on the concrete temperature of the 020 casting bin, the measured temperature of the 020 casting bin concrete is not involved in the inversion calculation. According to the pouring sequence from bottom to top in actual construction, the life and death units in the thermal analysis process of ANSYS software are used, that is, all units are "killed" before the calculation starts. When pouring, only the 020 casting bin unit is activated in the 020 casting bin, and only the 020 and 021 casting bin units are activated in the 021 casting bin. When pouring, all units of the three casting bins are activated in the 022 casting bin. The temperature load loading time step is 0.5d, and the total time is 30d.
[0093] The temperature simulation pre-processing flow chart of ANSYS software is as follows Figure 6 The water pipe cooling effect is simulated and calculated using the equivalent heat conduction method. The actual cooling water temperature, water flow rate and external ambient temperature information of the water pipe are shown in Figure 1. Figure 7 , 8 , as shown in Figure 9.
[0094] Step 2: Determine the thermal parameters to be inverted and their value ranges;
[0095] Step 2-1: Take the concrete surface heat release coefficient β, concrete temperature rise law parameter n, and concrete final adiabatic temperature rise θ0 as the parameters to be inverted. Considering that the hydration heat of cement is an important factor affecting the temperature stress of concrete, and in fact, the adiabatic temperature rise θ of concrete is used in the temperature field calculation, the calculation of adiabatic temperature rise requires the use of thermal parameters of concrete.
[0096] The adiabatic temperature rise expression of concrete is usually expressed in hyperbolic form, which is as follows:
[0097]
[0098] Where θ(τ) represents the adiabatic temperature rise function of concrete, and τ represents the age of concrete.
[0099] Although the hyperbolic formula is highly consistent with the test data, it is inconvenient to calculate. Therefore, Zhu Bofang proposed a combined exponential formula for calculating the adiabatic temperature rise of concrete:
[0100]
[0101] The relationship between the parameters of formula (11) is as follows:
[0102]
[0103] Wherein θ0 is the final adiabatic temperature rise of concrete, τ is the age of concrete, s, m1, and m2 are three coefficients to be determined, and the value of s in the embodiment is 0.60.
[0104] In the embodiment, a combined exponential formula is selected as the expression of the adiabatic temperature rise of concrete. Furthermore, it is considered that the main thermal parameters of concrete are the equivalent surface heat release coefficient β, the temperature rise law parameter n, the final adiabatic temperature rise θ0, the thermal conductivity λ, the thermal conductivity α, the density ρ and the specific heat c of concrete. Among them, the density ρ, the specific heat c and the thermal conductivity α of concrete can obtain relatively accurate results through indoor tests; the thermal conductivity λ can be determined according to the formula α=λ / cρ. After the concrete is poured, the surface needs to be covered with a thermal insulation blanket and maintained with running water, and the transverse joints are directly exposed to the air, so the equivalent surface heat release coefficient β needs to be inverted.
[0105] Therefore, the present invention selects three thermal parameters, namely, the final adiabatic temperature rise θ0, the temperature rise law parameter n, and the equivalent surface heat release coefficient β, as the parameters to be inverted.
[0106] Referring to the concrete design value of the area and the indoor experimental value of Yangtze River Scientific Research Institute, the range of thermal parameters to be inverted is: θ0∈[18,30], n∈[1.2,6], β∈[100,1200].
[0107] Step 2-2: Establish the objective function;
[0108] In order to minimize the difference between the temperature value of the typical node calculated by the thermal parameters inverted by the artificial bee colony algorithm and the actual temperature value of the node, that is, when x * =[θ0 * ,n * ,β * ], f(x * )=minf(x), and establish the following objective function expression (13), thereby transforming the inversion problem of concrete thermal parameters into the optimization problem of finding the f(x) function.
[0109]
[0110] min f(x)x=(x1,x2,x3,…,x D )∈[L d ,U d ] (14)
[0111] Where f(x) is the objective function of the intelligent optimization problem; x is the feasible solution of the optimization problem, and x * is the optimal solution to the optimization problem, each solution is a D-dimensional vector; D is the number of parameters of the intelligent optimization problem; T′ ij 、T ijThey represent the calculated value and measured value of concrete temperature at the jth position at time i, respectively; p is the total number of measuring points, and q is the total duration. d , U d are the lower and upper bounds of the solution space respectively.
[0112] Step 3: Substitute a set of thermal parameter values randomly selected within the value range into ANSYS for temperature simulation calculation to obtain the temperature calculation value T′ of each node at different times in the concrete pouring bin ij Then, the actual temperature and calculated temperature of the concrete are substituted into the objective function (13) to obtain the objective function value.
[0113] Step 3-1: The main task of the concrete temperature solution process is to simulate the concrete pouring sequence, atmospheric temperature, pouring temperature, hydration heat, etc. However, since ANSYS software cannot directly apply the hydration heat of concrete, the hydration heat must be converted into the heat generation rate HGEN, that is, the heat generation per unit volume of concrete per unit time, which can be obtained by deriving the cement hydration heat formula. After calculating the heat generation rate, the heat generation rate is applied to the unit and the temperature field is calculated.
[0114] The calculation formula of heat generation rate is:
[0115]
[0116] Where HGEN is the heat generation rate of concrete hydration; Q is the heat generated in concrete; p is the density of concrete, unit Kg / m 3 ; c is the specific heat of concrete, unit is kJ / (kg·℃).
[0117] According to formula (15), the heat generation rate of concrete can be determined by the given adiabatic temperature rise expression.
[0118] Step 3-2: Since the concrete pouring bin is not poured all at once, but needs to be poured in separate bins, the "unit life and death" function in ANSYS is used to implement this process. Before calculation, all dam body units are "killed". During calculation, the dam body units can be activated in sequence according to the pouring progress.
[0119] Step 3-3: Apply the concrete heat generation rate at different time periods to the temperature field through the parametric programming language (ANSYS Parametric Design Language, APDL) in the ANSYS software, and then calculate the temperature field of the concrete in the pouring bin to obtain the calculated temperature T′ of the concrete ij '.
[0120] Step 4: Iterate the thermal parameters that need to be inverted through the improved global artificial bee colony algorithm, repeat the process of step 4, and rely on the optimization ability of the improved global artificial bee colony algorithm to obtain the values of the thermal parameters that meet the objective function value requirements.
[0121] The standard process of the artificial bee colony algorithm ABC is as follows:
[0122] 1) Initialization phase;
[0123] The value range of the parameter to be inverted is taken as the solution space, and SN nectar sources are randomly generated in the solution space. Each nectar source x i (x i1 ,x i2 ,…,x iD ) T The position of (i=1,2,…,SN) is a potential solution. Each nectar source only arranges one leading bee to collect nectar at the same time, where the number of leading bees = the number of following bees = SN / 2. The initial position of the nectar source i=1,2,…,SN is randomly generated according to the following formula:
[0124] x id =L d +rand(0,1)(U d -L d ) (16)
[0125] In the formula, rand(0,1) represents a random number between 0 and 1.
[0126] At the same time, the maximum number of mining times is initialized to facilitate the escape from the local optimal solution later.
[0127] 2) Leading bee stage;
[0128] The leader bee searches in the neighborhood of nectar source i according to formula (17) and generates a new nectar source location v i , calculate the fitness value of the new nectar source according to formula (18) i ), using greedy selection method and fitness(x i ) for comparison, if v i The function value is better than x i , the location information of the new nectar source is retained.
[0129]
[0130] In formulas (16)-(18), d is a random integer in [1,D], indicating that i (x i1 ,x i2 ,…,x iD ) TThe random one-dimensional disturbance in is generated; a is the acceleration coefficient, which is usually taken as 1; is a random number in [-1,1], representing the disturbance amplitude; j≠i and j∈{1,2,…,SN}, representing selecting a nectar source different from nectar source i in the neighborhood. As the search gets closer to the optimal solution, the scope of the neighborhood will gradually decrease; x i represents the location of nectar source i; fitness(x i ) is the fitness value of nectar source i; f(x i ) is the function value of nectar source i.
[0131] 3) Follow the bee stage
[0132] The following bee calculates the following probability p through equation (18): i , and the roulette method is used to select the honey source, that is, a random number r is randomly generated in [0,1]. If r<p i , the follower bee selects nectar source i and performs the same steps as the previous leading bee, that is, turns to equation (16) to generate a new nectar source in the neighborhood and performs greedy selection; if r>p i , then proceed to the next step.
[0133]
[0134] 4) Scouting Bee Stage
[0135] It is determined whether the objective function requirement is reached within the maximum number of iterations. If it is reached, the loop ends and the optimal solution is output; otherwise, the nectar source is abandoned, and the leading bee that collects nectar at the nectar source is transformed into a scout bee, and the formula (16) is returned to randomly generate a new nectar source to replace the nectar source, and the loop continues until the optimal solution is generated. The optimal solution at this time is the optimal value of the inversion parameter.
[0136] The global artificial bee colony algorithm (Global Artificial Bee Colony algorithm, GABC) of the embodiment is as follows:
[0137] In the algorithm cycle from step 1) to step 4), there is no guidance for the memory of the current global optimal value, only a random component x i , which leads to insufficient development capability of ABC algorithm and slow convergence speed. To solve this problem, the present invention uses the global optimal solution (gbest) in particle swarm algorithm to improve the search equation (17) in standard artificial bee colony algorithm.
[0138]
[0139] In formula (20) is the dth component of the global optimal solution vector of the algorithm; α is a random number in [-1,1]; β is a random number in [0,C], where C is a non-negative constant. When C is 0, equation (20) is equal to equation (17). The algorithm performance analysis test with different values of C shows that the algorithm performance is better when C is 1.5, and the global optimization ability of the algorithm is enhanced.
[0140] Compared with formula (17), formula (20) is The item can balance the exploration and development capabilities of the ABC algorithm, but it reduces the global optimization capability to a certain extent. To address this problem, the present invention introduces the crossover operation in the genetic algorithm, further improves the GABC algorithm, and proposes a global artificial bee colony algorithm (Cross-GlobalArtificial Bee Colony algorithm, CGABC) based on the crossover operation.
[0141] The crossover operation is to exchange the partial code values of two parents bit by bit to obtain a new individual. In the algorithm, each component first generates a uniform random number rand between 0 and 1. If rand < the set value cr, the target component is accepted, otherwise the current component is retained, such as Fig.14 shown.
[0142] The present invention combines the GABC algorithm with the two-term crossover in the genetic algorithm, and improves the algorithm's global optimization ability by allowing the leader bee to perform a crossover operation with the current global optimal value after searching the neighborhood, that is, adding formula (21) after formula (20):
[0143]
[0144] In formula (21), cr is the crossover operator set in the algorithm, which generally takes a value of 0.3 to 0.6; rand is a uniform random number between [0, 1]. When cr takes a smaller value, the development ability of the algorithm is enhanced. Conversely, when cr takes a larger value, the exploration ability of the algorithm is enhanced.
[0145] Corresponding to different optimization problems, cr can take different values to enable the algorithm to achieve the best optimization ability, thereby improving the adaptability of the algorithm to different optimization problems.
[0146] Fig.10 The objective function comparison values of the standard ABC algorithm and the CGABC algorithm of the embodiment at the same number of iterations in the inversion calculation of thermal parameters of C40 concrete are given. It can be seen that the objective function values of the two algorithms gradually decrease with the increase of the number of iterations, but the CGABC algorithm converges faster than the ABC algorithm. At the same number of iterations, most of the objective function values are smaller than the ABC algorithm, that is, the inversion calculation results are better, indicating that the CGABC algorithm has better performance in the inversion of thermal parameters.
[0147] Fig.11 The performance of the improved CGABC algorithm in the inversion calculation of thermal parameters of C40 concrete at different colony sizes is given. The maximum number of iterations maxCycle=200, the maximum number of mining times limit=100, and the dimension D=3 are set. By selecting different numbers of artificial bee colony nectar sources SN for parameter inversion calculation, the variation of the objective function value with the number of iterations is obtained when the number of nectar sources is 20, 40, and 60 respectively.
[0148] Step 5: Bring back the thermal parameters obtained by inversion for inverse analysis;
[0149] In the embodiment, when the number of honey sources is 40, the thermal parameters of C40 concrete obtained by inversion are: θ0 = 24 °C, n = 2.86, β = 489.2 kJ / (m 2 ·d·℃), as shown in Table 1, and substituted it into the temperature field of 021 and 022 casting bins of 27# dam section for simulation calculation, and the calculated temperature values of concrete at different ages were obtained. The calculated temperature and measured temperature change trends of 021 casting bin and 022 casting bin were compared as shown in Fig.12 , 13 As shown. Fig.12 and Fig.13 It can be seen that the measured values of concrete temperature in casting bins 021 and 022 are in good agreement with the calculated values, and the change trends are consistent. The difference in individual time points of casting bin 022 is due to the unstable cooling water flow rate during the actual construction process.
[0150] Table 1 Thermal parameter inversion value table
[0151]
[0152] Step 6: Based on the obtained thermal parameter values, predict the temperature of the dam concrete.
[0153] In order to verify that the CGABC algorithm of the present invention has a stronger optimization capability than the ABC and GABC algorithms before improvement, in the embodiment, five commonly used performance test functions, namely Rastrigin, Sphere, Rosenbrock, Ackely and Schaffer, are selected to perform optimization performance tests on the three algorithms of ABC, GABC and CGABC respectively, wherein the Sphere function is a unimodal function, and the other four test functions are multimodal functions, and the theoretical optimal values of all test functions are 0. The expressions and search ranges of these five performance test functions are shown in Table 2.
[0154] Table 2 Performance test function table
[0155]
[0156] In the performance comparison test, the number of nectar sources = 50, the number of leading bees = the number of follower bees = 25, the maximum number of iterations = 5000, the maximum number of mining times = 300, the dimension D of the Rosenbrock function = 2, the dimension D of the Sphere, Rastrigin, Ackely, and Schaffer functions are all 30, and the optimization performance is better when the crossover operator in the CGABC algorithm is 0.5. All test functions are repeatedly run 10 times with each algorithm under the above-mentioned set parameters. The algorithm programs are all written in Matlab language to obtain the mean value mean and standard deviation SD of each function.
[0157] The performance comparison of the standard artificial bee colony algorithm ABC, the improved global artificial bee colony algorithm GABC and the global artificial bee colony algorithm CGABC based on crossover operation on 5 different test functions is shown in Table 3. From the test results in Table 3, it can be seen that the CGABC algorithm has a stronger optimization ability under the same set conditions than the ABC and GABC algorithms. The CGABC algorithm accelerates the convergence speed of the algorithm by introducing the global optimal solution gbest in the steps of the ABC algorithm, and combines it with the crossover operation to significantly improve the search breadth and depth of the algorithm.
[0158] Table 3 Comparison of three artificial bee colony algorithms
[0159]
[0160] In summary, it is shown that the artificial bee colony algorithm can be applied to the inversion of dam thermal parameters, and the inversion results have high reliability, thus laying the foundation for the subsequent real-time control of dam concrete temperature.
Claims
1. Dam temperature prediction method based on finite element analysis and thermal parameter inversion, It is characterized in that The following steps are involved: Step 1: Establish the finite element model of each concrete pouring bin and set the initial conditions and boundary conditions; Step 1-1: In the finite element software, establish a finite element model of the casting bin and mesh the finite element model; at the same time, assign values to the concrete material and unit properties; Step 1-2: The initial conditions of the finite element model include the initial temperature of the concrete, which is obtained based on the measured data on site; Step 1-3: Boundary conditions mainly include external environment temperature and water cooling of concrete; Step 2: Determine the thermal parameters and their value ranges used for dam temperature prediction, and establish the objective function of thermal parameters; Step 2-1: Determine the inverse thermal parameters and value range. The inverse thermal parameters include the concrete surface heat release coefficient, concrete temperature rise law parameters, and concrete final adiabatic temperature rise; Step 2-2: Establish the objective function of thermal parameter inversion and transform the concrete thermal parameter inversion problem into an optimization problem; Step 3: Randomly generate a set of initial thermal parameter values within the range of thermal parameter values, and substitute them into the finite element model for temperature simulation calculation to obtain the temperature value at the node in the concrete pouring bin, and substitute them into the objective function together with the actual temperature of the concrete at the node to calculate the objective function value; Step 4: Use the global artificial bee colony algorithm to iteratively invert the thermal parameters, and use the objective function to judge the quality of the obtained thermal parameter values; Step 5: Repeat step 4 to obtain the value of the thermal parameters that meet the objective function value requirements, and compare the calculated temperature value with the actual temperature value of the concrete. Stop the iterative inversion after reaching the expected target; Step 6: Based on the obtained thermal parameter values, predict the temperature of the dam concrete.
2. The dam temperature prediction method according to claim 1, It is characterized in that In the step 1-2, the bottom surface of the casting bin and the side surface of the transverse joint are used as adiabatic boundaries, and the top surface of the casting bin and the upstream and downstream surfaces are the third type of temperature boundary conditions; When concrete is in contact with air, it is assumed that the heat flux q passing through the concrete surface is proportional to the concrete surface temperature T and the air temperature T a The expression of the third type of heat transfer boundary condition is as follows: Where q is the heat flow; λ is the thermal conductivity; T a * is the comprehensive equivalent air temperature; b is the heat release coefficient of the concrete surface; T s is the daily average temperature of the concrete surface; n is the unit vector in the normal direction.
3. The dam temperature prediction method according to claim 2, It is characterized in that In the steps 1-3, the calculation formula for the concrete temperature during cooling and water flow is as follows: T(t)=T wi +(T i -T wi )φ i (t)+θ 0 ψ i (t) (2) Where T(t) represents the average temperature of concrete; e is a natural constant; T ωi T is the cooling water temperature of the i-th gear; i is the concrete temperature when the i-1th level of water flow ends and the i-th level of water flow begins; φ i (t) is the water cooling function when the water is flowing in the i-th gear; θ 0 is the final adiabatic temperature rise; ψ i (t) is the water-cooling temperature rise function when the water is flowing through the i-th gear; p i is the water cooling parameter when the water is flowing in the i-th gear; t i is the time when the flow rate or water temperature changes; t is the cooling time; s, m 1 、m 2 All are coefficients to be determined; The calculation formula of water cooling parameters is as follows: k=2.09-1.35ξ+0.320ξ 2 (7) ξ=λL / c w r w q w (8) The calculation formula for the equivalent thermal conductivity of non-metallic cooling water pipes is: Where D is the equivalent cooling column diameter; b is the equivalent cooling column radius; S 1 , S 2 are the horizontal and vertical spacing of the water pipes respectively; r w is the density of water, q w is the water flow rate, L is the length of the water pipe, c w is the specific heat of water, l is the thermal conductivity of concrete; a' is the equivalent thermal conductivity, c is the outer radius of the water pipe, r 0 is the inner radius of the water pipe, l 1 is the thermal conductivity of the water pipe; x represents the intermediate variable related to the specific heat of water, water density, water flow rate and water pipe length.
4. The dam temperature prediction method according to claim 3, It is characterized in that In step 2-2, the expression of the objective function f(x) is: min f(x)x=(x 1 ,x 2 ,x 3 ,…,x D )∈[L d ,U d ] (14) Where x represents the feasible solution of the optimization problem, x * represents the optimal solution of the optimization problem, x is a D-dimensional vector, and D represents the number of parameters of the optimization problem; T′ ij 、T ij They represent the calculated value and measured value of concrete temperature at the jth position at time i, respectively; p represents the total number of measuring points, q is the total duration; L d , U d They represent the lower and upper bounds of the solution space respectively.
5. The dam temperature prediction method according to claim 4, It is characterized in that Step 3 includes the following sub-steps: Step 3-1: Simulate the pouring sequence, atmospheric temperature, pouring temperature, and hydration heat of concrete; Step 3-2: Use the "unit generation" and "unit killing" functions of the finite element software to simulate the compartment concrete pouring; before the simulation of compartment concrete pouring, all dam body units are "killed"; during the simulation, the dam body units are activated in sequence according to the pouring progress; Step 3-3: Apply the concrete heat generation rate in different time periods to the temperature field of the casting bin through the parametric programming language in the finite element software, and then calculate the temperature field of the concrete in the casting bin to obtain the calculated temperature of the concrete.
6. The dam temperature prediction method according to claim 5, It is characterized in that In step 3-1, the hydration heat is converted into a heat generation rate, which is the heat generation per unit volume of concrete per unit time, and is obtained by deriving the cement hydration heat formula; after the heat generation rate is calculated, the heat generation rate is applied to the unit and the temperature field is calculated; The heat generation rate is calculated as follows: Where HGEN is the heat generation rate of concrete hydration; Q is the heat generated in concrete; p is the density of concrete; c is the specific heat of concrete; θ(t) represents the adiabatic temperature rise of concrete; θ′(t) represents the derivative of the adiabatic temperature rise function of concrete; τ represents the age of concrete; According to formula (15), the heat generation rate of concrete is determined by the adiabatic temperature rise expression.
7. The dam temperature prediction method according to claim 6, It is characterized in that In step 4, a global artificial bee colony algorithm based on crossover operation is used to iteratively invert the thermal parameters. The global artificial bee colony algorithm based on crossover operation improves the search equation of the solution space as follows to solve the problem of slow convergence of the artificial bee colony algorithm: Where v id represents the velocity of the ith particle; x id represents the position of the i-th particle in the search space; represents the dth component in the global optimal solution vector; α is a random number in [-1,1]; β is a random number in [0,C], where C is a non-negative constant; Formula (20) is obtained by The item can balance the exploration and development capabilities of the artificial bee colony algorithm, but it reduces the global optimization ability. To address this problem, the crossover operation in the genetic algorithm is introduced to further improve the artificial bee colony algorithm. Where v id ' represents the velocity of the ith particle after the crossover operation is introduced; cr represents the crossover operator; rand is a random number in [0,1]; When cr takes a smaller value, the development ability of the improved artificial bee colony algorithm is enhanced. Conversely, when cr takes a larger value, the exploration ability of the improved artificial bee colony algorithm is enhanced. Corresponding to different optimization problems, cr can take different values to enable the algorithm to achieve the best optimization ability, thereby improving the adaptability of the algorithm to different optimization problems.
Citation Information
Patent Citations
Temperature field prediction method for concrete dam body
CN111274729A
Construction method of arch dam orifice simulation calculation model considering solar radiant heat
CN113177338A
Cited By
Bridge concrete strength detection method based on pigeon inspired algorithm and inversion theory
CN119670487A