Production and manufacturing automatic routing method and system
By obtaining the car body information in real time and generating project numbers, building a storage channel mapping relationship, and automatically storing the car body with a preset shifter, solving the problem of insufficient storage flexibility in automobile production and improving production efficiency.
Patent Information
- Application Number
- CN202411057762.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-12
AI Technical Summary
In existing automobile production, the storage flexibility of painted car bodies is poor and cannot respond quickly to production needs, resulting in longer production time and reduced efficiency.
By obtaining body information in real time, a project number is generated, a mapping relationship between storage channels and project number is constructed, a preset shifter is used to automatically store the body, and the body is quickly dispatched according to user scheduling instructions.
It realizes rapid and automatic scheduling of the vehicle body, meets production needs, and improves production efficiency.
Smart Images

Figure CN118941211A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of automobile production, and in particular to an automatic production routing method and system. Background Art
[0002] With the advancement of science and technology and the rapid development of productivity, cars have become popular in people's daily lives and have become one of the indispensable means of transportation for people's daily travel, greatly facilitating people's lives.
[0003] Among them, existing cars must go through a series of production processes before they can be manufactured. Specifically, the car body needs to circulate between various factories during the actual production process, and the painting plant and the final assembly plant are two important factories, which are used to complete the car's spraying and the assembly of various parts of the car respectively, so as to produce a complete vehicle.
[0004] Furthermore, a body storage area is set between the existing paint plant and the final assembly plant, and the body storage area is composed of multiple storage channels. In the actual production process, when the painted bodies come off the line, most of the existing technologies will store the painted bodies in the order in which the painted bodies actually come off the line, and only after one storage channel is completed will it be replaced for storage in another storage channel. However, this storage method has poor flexibility and cannot quickly complete the transfer of painted bodies according to various actual production needs, thereby correspondingly increasing the production time of the car and correspondingly reducing production efficiency. Summary of the invention
[0005] Based on this, the purpose of the present invention is to provide an automatic manufacturing routing method and system to solve the problem that the prior art has poor storage flexibility for painted car bodies, resulting in the inability to quickly complete the transfer of painted car bodies according to various actual production needs.
[0006] The first aspect of the embodiment of the present invention proposes:
[0007] A production and manufacturing automatic routing method, wherein the method comprises:
[0008] Acquire vehicle body information corresponding to each production vehicle body in real time, and generate a project number corresponding to each production vehicle body according to each vehicle body information;
[0009] Real-time detection of a number of storage channels contained in the vehicle body storage area between the painting plant and the final assembly plant, and real-time construction of a mapping relationship between each of the project numbers and each of the storage channels;
[0010] The preset shape shifting machine stores each of the production bodies into a corresponding target storage channel according to the mapping relationship, wherein production bodies with the same project number are stored in the same storage channel;
[0011] When a scheduling instruction issued by a user is received in real time, the corresponding target production vehicle body is retrieved from each of the storage channels according to the scheduling instruction.
[0012] The beneficial effect of the present invention is that by acquiring the body information of each produced body, the production status of each produced body can be obtained accordingly, and based on this, the corresponding project number can be further generated. Furthermore, under the constructed mapping relationship, each produced body can be stored in the adapted target storage channel, and after receiving the scheduling instructions issued by the user, the scheduling of various types of produced bodies can be automatically and quickly completed, thereby meeting actual production needs and improving work efficiency.
[0013] Furthermore, the step of generating a project number corresponding to each production vehicle body according to each vehicle body information includes:
[0014] When the vehicle body information of the production vehicle body is acquired in real time, the vehicle body information is parsed and processed to detect the vehicle body model, vehicle type and production time respectively contained in the vehicle body information;
[0015] The vehicle body model, the vehicle category and the production time are fused to generate a project number corresponding to the production vehicle body, wherein the project number includes a specific numerical value.
[0016] Furthermore, the step of fusing the vehicle body model, the vehicle category and the production time to generate a project number corresponding to the production vehicle body includes:
[0017] When the vehicle body model, the vehicle category and the production time are respectively obtained, the vehicle body model, the vehicle category and the production time are combined and processed based on a preset rule to construct a corresponding production data chain in real time;
[0018] Detecting in real time the starting point and the ending point corresponding to the production data chain, and detecting in real time a number of target parameters included in the production data chain within the range of the starting point and the ending point;
[0019] A plurality of the target parameters are arranged and combined to generate corresponding project numbers of the production vehicle bodies, and the project numbers of each of the production vehicle bodies may be the same or different.
[0020] Furthermore, the step of arranging and combining a plurality of the target parameters to generate a corresponding project number for the production vehicle body comprises:
[0021] When it is detected in real time that the similarity of the target parameters in the two production data chains is greater than a preset threshold, it is determined that the project numbers of the production car bodies corresponding to the two current production data chains are the same.
[0022] Furthermore, when a scheduling instruction issued by a user is received in real time, the step of retrieving a corresponding target production vehicle body in each storage channel according to the scheduling instruction includes:
[0023] When receiving a dispatch instruction sent by a user through a user terminal in real time, extracting dispatch information contained in the dispatch instruction in real time;
[0024] Identifying a target scheduling vehicle body corresponding to the user according to the scheduling information, wherein the target scheduling vehicle body is at least one;
[0025] The corresponding operation instructions are generated in real time according to the target scheduling vehicle body, and the operation instructions are sent to the preset shape shifting machine to complete the scheduling of the production vehicle body through the preset shape shifting machine.
[0026] Furthermore, the step of generating corresponding operation instructions in real time according to the target scheduling vehicle body includes:
[0027] When it is detected in real time that there are multiple target scheduling vehicles, a target ratio between the multiple target scheduling vehicles is calculated in real time;
[0028] The scheduling order between the multiple target scheduling vehicles is determined in real time according to the target ratio, and the operation instruction is correspondingly generated according to the target ratio and the scheduling order.
[0029] Furthermore, the step of sending the operation instruction to the preset shape shifting machine to complete the scheduling of the production of the vehicle body through the preset shape shifting machine includes:
[0030] When it is detected in real time that the preset mobile machine scheduling is completed, a corresponding scheduling report is generated in real time, and the scheduling report is sent to the user terminal of the user accordingly.
[0031] The second aspect of the embodiment of the present invention proposes:
[0032] A production and manufacturing automatic routing system, wherein the system comprises:
[0033] An acquisition module, used for acquiring the vehicle body information corresponding to each production vehicle body in real time, and generating a project number corresponding to each production vehicle body according to each vehicle body information;
[0034] A detection module, used to detect in real time a number of storage channels contained in the vehicle body storage area between the painting plant and the final assembly plant, and to construct in real time a mapping relationship between each of the project numbers and each of the storage channels;
[0035] A processing module, used for storing each of the production bodies into a corresponding target storage channel according to the mapping relationship through a preset shape shifting machine, wherein production bodies with the same project number are stored in the same storage channel;
[0036] The scheduling module is used to retrieve the corresponding target production vehicle body in each of the storage channels according to the scheduling instruction when the scheduling instruction issued by the user is received in real time.
[0037] Furthermore, the acquisition module is specifically used for:
[0038] When the vehicle body information of the production vehicle body is acquired in real time, the vehicle body information is parsed and processed to detect the vehicle body model, vehicle type and production time respectively contained in the vehicle body information;
[0039] The vehicle body model, the vehicle category and the production time are fused to generate a project number corresponding to the production vehicle body, wherein the project number includes a specific numerical value.
[0040] Furthermore, the acquisition module is specifically used for:
[0041] When the vehicle body model, the vehicle category and the production time are respectively obtained, the vehicle body model, the vehicle category and the production time are combined and processed based on a preset rule to construct a corresponding production data chain in real time;
[0042] Detecting in real time the starting point and the ending point corresponding to the production data chain, and detecting in real time a number of target parameters included in the production data chain within the range of the starting point and the ending point;
[0043] A plurality of the target parameters are arranged and combined to generate corresponding project numbers of the production vehicle bodies, and the project numbers of each of the production vehicle bodies may be the same or different.
[0044] Furthermore, the acquisition module is specifically used for:
[0045] When it is detected in real time that the similarity of the target parameters in the two production data chains is greater than a preset threshold, it is determined that the project numbers of the production car bodies corresponding to the two current production data chains are the same.
[0046] Furthermore, the scheduling module is specifically used for:
[0047] When receiving a dispatch instruction sent by a user through a user terminal in real time, extracting dispatch information contained in the dispatch instruction in real time;
[0048] Identifying a target scheduling vehicle body corresponding to the user according to the scheduling information, wherein the target scheduling vehicle body is at least one;
[0049] The corresponding operation instructions are generated in real time according to the target scheduling vehicle body, and the operation instructions are sent to the preset shape shifting machine to complete the scheduling of the production vehicle body through the preset shape shifting machine.
[0050] Furthermore, the scheduling module is specifically used for:
[0051] When it is detected in real time that there are multiple target scheduling vehicles, a target ratio between the multiple target scheduling vehicles is calculated in real time;
[0052] The scheduling order between the multiple target scheduling vehicles is determined in real time according to the target ratio, and the operation instruction is correspondingly generated according to the target ratio and the scheduling order.
[0053] Furthermore, the scheduling module is specifically used for:
[0054] When it is detected in real time that the preset mobile machine scheduling is completed, a corresponding scheduling report is generated in real time, and the scheduling report is sent to the user terminal of the user accordingly.
[0055] The third aspect of the embodiment of the present invention proposes:
[0056] A computer comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned automatic manufacturing routing method when executing the computer program.
[0057] The fourth aspect of the embodiments of the present invention proposes:
[0058] A readable storage medium stores a computer program, wherein when the program is executed by a processor, the automatic manufacturing routing method as described above is implemented.
[0059] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] Figure 1 A flowchart of a production and manufacturing automatic routing method provided by a first embodiment of the present invention;
[0061] Figure 2This is a structural block diagram of a production and manufacturing automatic routing system provided in a sixth embodiment of the present invention.
[0062] The following specific implementation manner will further illustrate the present invention in conjunction with the above-mentioned drawings. DETAILED DESCRIPTION
[0063] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. Several embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.
[0064] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.
[0065] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0066] See also Figure 1 , shown is the automatic manufacturing routing method provided by the first embodiment of the present invention. The automatic manufacturing routing method provided by this embodiment can automatically and quickly complete the scheduling of various production car bodies after receiving the scheduling instructions issued by the user, thereby meeting the actual production needs and improving work efficiency.
[0067] Specifically, this embodiment provides:
[0068] A production and manufacturing automatic routing method specifically comprises the following steps:
[0069] Step S10, acquiring vehicle body information corresponding to each production vehicle body in real time, and generating a project number corresponding to each production vehicle body according to each vehicle body information;
[0070] Step S20, detecting in real time a plurality of storage channels contained in the vehicle body storage area between the coating plant and the final assembly plant, and constructing in real time a mapping relationship between each of the project numbers and each of the storage channels;
[0071] Step S30, storing each of the production bodies into a corresponding target storage channel according to the mapping relationship by a preset shape shifting machine, wherein production bodies with the same project number are stored in the same storage channel;
[0072] Step S40, when a scheduling instruction issued by a user is received in real time, the corresponding target production vehicle body is retrieved from each of the storage channels according to the scheduling instruction.
[0073] Specifically, in this embodiment, it should be noted that in order to automatically and quickly complete the storage and transfer of various types of production car bodies, it is necessary to obtain the information corresponding to each production car body. In addition, it should be pointed out that the automatic production and manufacturing routing method provided by the present invention is implemented based on a server set in the background. Specifically, the server can automatically receive and process various types of information to improve work efficiency accordingly. Preferably, in the actual application process, when each production car body is manufactured, the current server will immediately obtain the car body information corresponding to the current production car body. In order to facilitate subsequent scheduling, the current server will further generate a project number corresponding to the current production car body in real time based on the current car body information, that is, the corresponding identity identification.
[0074] Furthermore, in order to facilitate the storage of each currently produced car body, it is also necessary to synchronously detect the corresponding storage channels contained in the car body storage area between the current existing paint shop and the final assembly plant. Based on this, it is necessary to construct a one-to-one correspondence between each current storage channel and each current project number in real time. On this basis, the existing transfer machine can automatically transfer each currently produced production car body to the corresponding target storage channel according to the mapping relationship constructed in real time, so as to automatically complete the storage of the production car body. Furthermore, in the subsequent production process, when the server receives the scheduling instruction issued by the user in real time, the current server can immediately automatically and quickly complete the scheduling of each current production car body according to the current scheduling instruction, thereby improving work efficiency.
[0075] Second embodiment
[0076] Furthermore, the step of generating a project number corresponding to each production vehicle body according to each vehicle body information includes:
[0077] When the vehicle body information of the production vehicle body is acquired in real time, the vehicle body information is parsed and processed to detect the vehicle body model, vehicle type and production time respectively contained in the vehicle body information;
[0078] The vehicle body model, the vehicle category and the production time are fused to generate a project number corresponding to the production vehicle body, wherein the project number includes a specific numerical value.
[0079] Furthermore, the step of fusing the vehicle body model, the vehicle category and the production time to generate a project number corresponding to the production vehicle body includes:
[0080] When the vehicle body model, the vehicle category and the production time are respectively obtained, the vehicle body model, the vehicle category and the production time are combined and processed based on a preset rule to construct a corresponding production data chain in real time;
[0081] Detecting in real time the starting point and the ending point corresponding to the production data chain, and detecting in real time a number of target parameters included in the production data chain within the range of the starting point and the ending point;
[0082] A plurality of the target parameters are arranged and combined to generate corresponding project numbers of the production vehicle bodies, and the project numbers of each of the production vehicle bodies may be the same or different.
[0083] Furthermore, the step of arranging and combining a plurality of the target parameters to generate a corresponding project number for the production vehicle body comprises:
[0084] When it is detected in real time that the similarity of the target parameters in the two production data chains is greater than a preset threshold, it is determined that the project numbers of the production car bodies corresponding to the two current production data chains are the same.
[0085] Furthermore, when a scheduling instruction issued by a user is received in real time, the step of retrieving a corresponding target production vehicle body in each storage channel according to the scheduling instruction includes:
[0086] When receiving a dispatch instruction sent by a user through a user terminal in real time, extracting dispatch information contained in the dispatch instruction in real time;
[0087] Identifying a target scheduling vehicle body corresponding to the user according to the scheduling information, wherein the target scheduling vehicle body is at least one;
[0088] The corresponding operation instructions are generated in real time according to the target scheduling vehicle body, and the operation instructions are sent to the preset shape shifting machine to complete the scheduling of the production vehicle body through the preset shape shifting machine.
[0089] Furthermore, the step of generating corresponding operation instructions in real time according to the target scheduling vehicle body includes:
[0090] When it is detected in real time that there are multiple target scheduling vehicles, a target ratio between the multiple target scheduling vehicles is calculated in real time;
[0091] The scheduling order between the multiple target scheduling vehicles is determined in real time according to the target ratio, and the operation instruction is correspondingly generated according to the target ratio and the scheduling order.
[0092] Furthermore, the step of sending the operation instruction to the preset shape shifting machine to complete the scheduling of the production of the vehicle body through the preset shape shifting machine includes:
[0093] When it is detected in real time that the preset mobile machine scheduling is completed, a corresponding scheduling report is generated in real time, and the scheduling report is sent to the user terminal of the user accordingly.
[0094] In addition, in this embodiment, it should be noted that after the required vehicle body information is obtained in real time through the above steps, in order to objectively and accurately generate a project number that is compatible with the current vehicle body information, preferably, the present invention will extract the vehicle body model, vehicle category and production time corresponding to the current production vehicle body in real time from the current vehicle body information according to the characteristics of the existing automobile body. Further, the present invention will fuse the vehicle body model, vehicle category and production time of each current production vehicle body according to the rule of "production time-vehicle category-body model", and correspondingly construct the required production data chain. Further, in order to objectively and accurately determine whether the project number corresponding to each current production vehicle body is the same, the present invention will further identify the starting point and the end point of the current production data chain. Specifically, within the range of the current starting point and the end point, several target parameters contained in the current production data chain are further detected. Preferably, the several target parameters include numbers and letters. Based on this, the current several target parameters can be immediately arranged and combined to generate the project number corresponding to the current production vehicle body. Among them, it should be pointed out that after the present invention obtains the production data chain corresponding to each production car body in real time, it will further determine in real time whether the similarity of the target parameters between each two production data chains is greater than the preset threshold. Specifically, if so, it can directly indicate that the project numbers of the production car bodies corresponding to the current two production data chains are the same; correspondingly, if not, it can directly indicate that the project numbers of the production car bodies corresponding to the current two production data chains are different.
[0095] Furthermore, in the actual use process, after the above-mentioned server receives the scheduling instruction sent by the user through the user terminal in real time, in order to be able to objectively and accurately complete the scheduling of the production body, it will further detect the scheduling information carried in the current scheduling instruction, and at the same time, it can determine the target scheduling body that meets the current user's needs according to the current scheduling information. It should be pointed out that when it is detected in real time that there is only one target scheduling body required by the user, the corresponding scheduling can be completed directly through the above-mentioned shape-shifting machine. Correspondingly, when it is detected in real time that there are multiple target scheduling bodies required by the user, it is necessary to detect the number of each target scheduling body at this time, and then determine the corresponding target ratio, and further determine the scheduling order between each target scheduling body in real time according to the size of the ratio between each other, and can further generate the above-mentioned operation instruction in real time according to the current target ratio and scheduling order. On this basis, the current operation instruction is sent to the pre-set shape-shifting machine, and the corresponding scheduling task can be automatically completed through the shape-shifting machine. At the same time, the corresponding scheduling report is generated synchronously and sent to the user terminal of the current user, thereby improving work efficiency.
[0096] See also Figure 2 , the third embodiment of the present invention provides:
[0097] A production and manufacturing automatic routing system, wherein the system comprises:
[0098] An acquisition module, used for acquiring the vehicle body information corresponding to each production vehicle body in real time, and generating a project number corresponding to each production vehicle body according to each vehicle body information;
[0099] A detection module, used to detect in real time a number of storage channels contained in the vehicle body storage area between the painting plant and the final assembly plant, and to construct in real time a mapping relationship between each of the project numbers and each of the storage channels;
[0100] A processing module, used for storing each of the production bodies into a corresponding target storage channel according to the mapping relationship through a preset shape shifting machine, wherein production bodies with the same project number are stored in the same storage channel;
[0101] The scheduling module is used to retrieve the corresponding target production vehicle body in each of the storage channels according to the scheduling instruction when the scheduling instruction issued by the user is received in real time.
[0102] Furthermore, the acquisition module is specifically used for:
[0103] When the vehicle body information of the production vehicle body is acquired in real time, the vehicle body information is parsed and processed to detect the vehicle body model, vehicle type and production time respectively contained in the vehicle body information;
[0104] The vehicle body model, the vehicle category and the production time are fused to generate a project number corresponding to the production vehicle body, wherein the project number includes a specific numerical value.
[0105] Furthermore, the acquisition module is specifically used for:
[0106] When the vehicle body model, the vehicle category and the production time are respectively obtained, the vehicle body model, the vehicle category and the production time are combined and processed based on a preset rule to construct a corresponding production data chain in real time;
[0107] Detecting in real time the starting point and the ending point corresponding to the production data chain, and detecting in real time a number of target parameters included in the production data chain within the range of the starting point and the ending point;
[0108] A plurality of the target parameters are arranged and combined to generate corresponding project numbers of the production vehicle bodies, and the project numbers of each of the production vehicle bodies may be the same or different.
[0109] Furthermore, the acquisition module is specifically used for:
[0110] When it is detected in real time that the similarity of the target parameters in the two production data chains is greater than a preset threshold, it is determined that the project numbers of the production car bodies corresponding to the two current production data chains are the same.
[0111] Furthermore, the scheduling module is specifically used for:
[0112] When receiving a dispatch instruction sent by a user through a user terminal in real time, extracting dispatch information contained in the dispatch instruction in real time;
[0113] Identifying a target scheduling vehicle body corresponding to the user according to the scheduling information, wherein the target scheduling vehicle body is at least one;
[0114] The corresponding operation instructions are generated in real time according to the target scheduling vehicle body, and the operation instructions are sent to the preset shape shifting machine to complete the scheduling of the production vehicle body through the preset shape shifting machine.
[0115] Furthermore, the scheduling module is specifically used for:
[0116] When it is detected in real time that there are multiple target scheduling vehicles, a target ratio between the multiple target scheduling vehicles is calculated in real time;
[0117] The scheduling order between the multiple target scheduling vehicles is determined in real time according to the target ratio, and the operation instruction is correspondingly generated according to the target ratio and the scheduling order.
[0118] Furthermore, the scheduling module is specifically used for:
[0119] When it is detected in real time that the preset mobile machine scheduling is completed, a corresponding scheduling report is generated in real time, and the scheduling report is sent to the user terminal of the user accordingly.
[0120] A fourth embodiment of the present invention provides a computer, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the automatic manufacturing routing method as described above when executing the computer program.
[0121] A fifth embodiment of the present invention provides a readable storage medium having a computer program stored thereon, wherein when the program is executed by a processor, the automatic manufacturing routing method as described above is implemented.
[0122] In summary, the automatic manufacturing routing method and system provided by the above embodiments of the present invention can automatically and quickly complete the scheduling of various production vehicle bodies after receiving the scheduling instructions issued by the user, thereby meeting actual production needs and improving work efficiency.
[0123] It should be noted that the above modules can be functional modules or program modules, and can be implemented by software or hardware. For modules implemented by hardware, the above modules can be located in the same processor; or the above modules can be located in different processors in any combination.
[0124] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.
[0125] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.
[0126] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0127] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0128] The above-described embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the attached claims.
Claims
1. A production and manufacturing automatic routing method, characterized in that: The method comprises: Acquire vehicle body information corresponding to each production vehicle body in real time, and generate a project number corresponding to each production vehicle body according to each vehicle body information; Real-time detection of a number of storage channels contained in the vehicle body storage area between the painting plant and the final assembly plant, and real-time construction of a mapping relationship between each of the project numbers and each of the storage channels; The preset shape shifting machine stores each of the production bodies into a corresponding target storage channel according to the mapping relationship, wherein production bodies with the same project number are stored in the same storage channel; When a scheduling instruction issued by a user is received in real time, the corresponding target production vehicle body is retrieved from each storage channel according to the scheduling instruction.
2. The automatic manufacturing routing method according to claim 1, characterized in that: The step of generating a project number corresponding to each production vehicle body according to each vehicle body information comprises: When the vehicle body information of the production vehicle body is acquired in real time, the vehicle body information is parsed and processed to detect the vehicle body model, vehicle type and production time respectively contained in the vehicle body information; The vehicle body model, the vehicle category and the production time are integrated to generate a project number corresponding to the production vehicle body, wherein the project number includes a specific numerical value.
3. The automatic manufacturing routing method according to claim 2, characterized in that: The step of fusing the vehicle body model, the vehicle category and the production time to generate an item number corresponding to the production vehicle body includes: When the vehicle body model, the vehicle category and the production time are respectively obtained, the vehicle body model, the vehicle category and the production time are combined and processed based on a preset rule to construct a corresponding production data chain in real time; Detecting in real time the starting point and the ending point corresponding to the production data chain, and detecting in real time a number of target parameters included in the production data chain within the range of the starting point and the ending point; A plurality of the target parameters are arranged and combined to generate corresponding project numbers of the production vehicle bodies, and the project numbers of each of the production vehicle bodies may be the same or different.
4. The automatic manufacturing routing method according to claim 3, characterized in that: The step of arranging and combining a plurality of the target parameters to generate a corresponding project number for the production vehicle body comprises: When it is detected in real time that the similarity of the target parameters in the two production data chains is greater than a preset threshold, it is determined that the project numbers of the production car bodies corresponding to the two current production data chains are the same.
5. The automatic manufacturing routing method according to claim 1, characterized in that: When a scheduling instruction issued by a user is received in real time, the step of retrieving a corresponding target production vehicle body from each storage channel according to the scheduling instruction includes: When receiving a dispatch instruction sent by a user through a user terminal in real time, extracting dispatch information contained in the dispatch instruction in real time; Identifying a target scheduling vehicle body corresponding to the user according to the scheduling information, wherein the target scheduling vehicle body is at least one; The corresponding operation instructions are generated in real time according to the target scheduling vehicle body, and the operation instructions are sent to the preset shape shifting machine to complete the scheduling of the production vehicle body through the preset shape shifting machine.
6. The automatic manufacturing routing method according to claim 5, characterized in that: The step of generating corresponding operation instructions in real time according to the target scheduling vehicle body comprises: When it is detected in real time that there are multiple target scheduling vehicles, a target ratio between the multiple target scheduling vehicles is calculated in real time; The scheduling order between the multiple target scheduling vehicles is determined in real time according to the target ratio, and the operation instruction is correspondingly generated according to the target ratio and the scheduling order.
7. The automatic manufacturing routing method according to claim 6, characterized in that: The step of sending the operation instruction to the preset shape shifting machine to complete the scheduling of the production of the vehicle body through the preset shape shifting machine includes: When it is detected in real time that the preset mobile machine scheduling is completed, a corresponding scheduling report is generated in real time, and the scheduling report is sent to the user terminal of the user accordingly.
8. A manufacturing automatic routing system, characterized in that: The system comprises: An acquisition module, used for acquiring the vehicle body information corresponding to each production vehicle body in real time, and generating a project number corresponding to each production vehicle body according to each vehicle body information; A detection module, used to detect in real time a number of storage channels contained in the vehicle body storage area between the painting plant and the final assembly plant, and to construct in real time a mapping relationship between each of the project numbers and each of the storage channels; A processing module, used for storing each of the production bodies into a corresponding target storage channel according to the mapping relationship through a preset shape shifting machine, wherein production bodies with the same project number are stored in the same storage channel; The scheduling module is used to retrieve the corresponding target production vehicle body in each of the storage channels according to the scheduling instruction when the scheduling instruction issued by the user is received in real time.
9. A computer comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the automatic manufacturing routing method according to any one of claims 1 to 7 is implemented.
10. A readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the automatic manufacturing routing method as described in any one of claims 1 to 7 is implemented.