Electric power facility and regional function system cooperative emergency disposal method and device, and medium
By building a risk assessment model and emergency response plan, the existing emergency response system has been solved, and the coordinated emergency response efficiency and system of the existing emergency response system has been insufficient in the cross-system coordinated response under heavy rain disasters has been realized. stability.
Patent Information
- Application Number
- CN202410900032.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-11-12
AI Technical Summary
The existing emergency response system lacks cross-system collaborative handling capabilities in heavy rain disasters, resulting in uneven resource allocation and inefficient response efficiency, and is unable to effectively coordinate the emergency response of power facilities and urban functional systems.
By obtaining real-time data and geographic information system data, combining historical disaster data and physical characteristic data, building a risk assessment model, conducting infrastructure risk assessment and vulnerability analysis, formulating an emergency response plan, and carrying out emergency response based on this plan.
It has achieved rapid assessment and effective response to the impact of disasters, shortened response time, improved emergency response efficiency, and ensured the safety and stability of power facilities and urban functional systems.
Smart Images

Figure CN118941408A_ABST
Abstract
Description
Technical Field
[0001] The present invention application relates to the field of emergency response technology, and specifically to a method, device and medium for coordinated emergency response of power facilities and regional functional systems. Background Art
[0002] Under extreme weather conditions such as heavy rain, urban infrastructure and transportation systems face huge challenges. Extreme natural disasters occur frequently around the world, resulting in many large-scale power outages and causing huge losses to the society and economy.
[0003] According to the latest assessment report from the International Panel on Climate Change (IPCC), the global climate change problem continues to worsen, causing an increase and intensification of extreme climate events. The risk of natural disasters including heavy rains and floods has increased significantly, posing major challenges to the power grid.
[0004] With the rapid development of cities and the rapid increase in power load, the safety of urban power grids has become increasingly prominent. The hardening of urban ground has also strengthened the role of surface runoff, leading to an increase in the risk of urban rainstorms and waterlogging. Rainstorm disasters have posed a huge threat to the huge power system, and ensuring the safety and stability of power supply will have a significant impact on the country's economic construction and people's lives.
[0005] In recent years, research on risk assessment and early warning methods of rainstorm disasters on power systems has achieved certain results.
[0006] Wang Xingfa et al. proposed a "Power Grid Natural Disaster Early Warning Index System", which divides the indicators into four main categories: natural disasters, power grid characteristics, emergency response capabilities and social effects. Chang Kang et al. proposed "The mechanism of rainstorm affecting power grid security and its online defense technology", suggesting that key rainfall indicators, including critical rainfall intensity, critical rainfall and critical effective rainfall, be extracted from different disaster levels as early warning standards. Xu Xiaochun et al. proposed "Research on the early warning method of power outage risk in distribution network based on multi-source information fusion", which combines meteorological disasters with the specific conditions of distribution network as early warning considerations. In order to solve the problem that the distribution network is difficult to effectively warn due to its wide distribution, Peng Chunliu et al. proposed "Development and application of low voltage monitoring and early warning system based on distribution network big data platform", developed a data integration framework, and realized the integrated management of power grid information and geographic information system (GIS). Xie Wusan et al. proposed "Risk assessment and early warning of urban waterlogging disaster based on Flood Area model", which used a two-dimensional non-steady flow hydrodynamic model (Flood Area) to simulate the flooding depth map, and combined with the vulnerability curve to simulate the urban waterlogging phenomenon. A. Stone-MacDonald proposed "Strategic bidding in electric power flow control on a network meteorological and istercast early warning system [J]. Rural Electrification", which combined meteorological data and power grid data to develop a power grid risk warning system. Tang Weijie et al. proposed "Development and implementation of intelligent meteorological information warning system for power industry", using GIS technology to integrate power grid, meteorological and geographic information to create a disaster monitoring and early warning system. Wei Jun et al. proposed "Development and application of Shijiazhuang urban waterlogging meteorological risk monitoring and early warning system", which analyzed the rainfall data collected by meteorological stations, drove the urban waterlogging hydrodynamic model, and constructed an urban waterlogging early warning system. R. Billington, K. E. Bollinger proposed "Transition system reliability evaluation in Markov processes" and R. Billington, G. Singh proposed "Application of a diverse and extended weather: modeling in transmission and distribution system reliability valuation", which quantified the line failure rate under disaster conditions through statistical models.Wang Zhaokun et al. proposed "Comprehensive Assessment of the Economic Impact of Power Losses and Power Outages under Flood Disasters", Li Yanbin, Han Ying, Zhang Rong et al. proposed "Model of the Impact of Meteorological Factors on Power Safety Accidents", and H. Liu, RA Davidson, DV Rosowsky proposed "Negative biological regression of electric power output in hurricanes" to reveal the impact of meteorological disasters such as floods on power grid equipment. In the field of artificial intelligence, Zhang Wen et al. proposed "Distribution Network Failure Risk Level Prediction Method Considering Weather Factor Correlation". Tang Haiguo et al. proposed "Active Distribution Network Failure Risk Intelligent Warning Considering Topology Transformation", which takes into account the changes in network topology and establishes a distribution network line failure risk warning model based on the extreme gradient boosting (XG Boost) algorithm. In "Research on Urban Waterlogging Risk Warning System under Extreme Rainstorm Threat", Cao Xuejian et al. proposed "Research on Urban Waterlogging Risk Warning System under Extreme Rainstorm Threat", researchers improved the accuracy of waterlogging forecasts by integrating multiple data sources such as rainfall and waterlogging observations. "A flash flood hazard assessment in northern France by cellular automatamodeling" provided by Johnny, VDWMarc, Daniel, D., etc. uses the cellular automata method to solve the problem of poor flash flood warning effect caused by the close distance between the runoff area and the risk area. "Research on a fully automated warning method of medium voltage grid based on medium voltage grid work" provided by X. Xie, J. Lu, P. Xian, etc. predicts the line state based on nonlinear state estimation and constructs a distribution network fault warning model. "Regional rainfall-induced landslide susceptibility mapping and a critical rainfall threshold. Geomorphology" provided by F. Huang, J. Chen, W. Liu, etc. uses a machine learning model to generate a landslide susceptibility map and combines it with a critical rainfall threshold to achieve early warning of landslide hazards.The article "A hybrid fuzzy and K-nearest neighbor approach for debris flow disaster prevention" by T.Su, T.Pan, Y.Chang et al. applied the K nearest neighbor algorithm (KNN) to establish a debris flow disaster warning model based on rock flow and rainfall history information. The article "Fault prediction of distribution networkwork based on support vector machine" by W.Huang, X.Lu, Y.Liu et al. screened and cleaned meteorological feature data through the Relief F algorithm, and combined with support vector machine (SVM) and particle swarm algorithm to build a distribution network fault prediction model. At the same time, the article "Intelligent warning of active distribution network fault risk considering topological transformation" by Tang Haiguo et al. also used the Bayesian neural network structure to implement meteorological disaster warning.
[0007] However, the research on the coordinated emergency response of power facilities and urban functional systems under heavy rain disasters is still in its early stages. In addition, the existing emergency response systems often focus on the protection of a single system and lack the ability to coordinate across systems, resulting in uneven resource allocation and low response efficiency. Therefore, it is necessary to further study the methods and devices for coordinated emergency response of power facilities and urban functional systems under heavy rain disasters. This will help the power industry better cope with the challenges brought by heavy rain disasters and ensure the safety and stability of power facilities and urban power grids. Summary of the invention
[0008] Existing emergency response systems often focus on the protection of a single system and lack the ability to coordinate across systems, resulting in uneven resource allocation and low response efficiency. This invention application proposes a method for coordinated emergency response between power facilities and regional functional systems, including:
[0009] Obtain real-time data on the region, real-time GIS data, and physical characteristics data of infrastructure;
[0010] Conduct risk assessment of infrastructure based on real-time data, real-time geographic information system data and physical property data combined with pre-built risk assessment models to obtain risk assessment results;
[0011] Formulate emergency response plans based on risk assessment results, physical property data, real-time data and the importance of infrastructure in power supply, and conduct emergency response based on the emergency response plans;
[0012] The risk assessment model is constructed based on historical disaster data, geographic information system data and physical property data using statistical analysis methods.
[0013] Optionally, the construction of the risk assessment model includes:
[0014] Access historical disaster data, geographic information system data, and physical characteristics of infrastructure;
[0015] constructing a risk assessment model using statistical analysis methods based on the historical disaster data, geographic information system data, and physical property data of infrastructure;
[0016] Wherein, the statistical analysis method includes: linear programming, genetic algorithm or machine learning algorithm.
[0017] Optionally, the risk assessment of the infrastructure is performed based on the real-time data and the physical property data in combination with a pre-built risk assessment model to obtain an assessment result, including:
[0018] Based on the pre-built risk assessment model, a vulnerability analysis is performed on the infrastructure units in the area to assess the extent of damage that the infrastructure units may suffer under heavy rain conditions, and obtain vulnerable infrastructure units;
[0019] Based on the pre-built risk assessment model, a vulnerability analysis is performed on the critical infrastructure to assess the degree of damage that the critical infrastructure may suffer under heavy rain conditions, and obtain critical infrastructure that is vulnerable to damage;
[0020] Wherein, the infrastructure includes: a plurality of infrastructure units;
[0021] The infrastructure unit includes: a plurality of key infrastructures;
[0022] The risk assessment results include: vulnerable infrastructure units and critical infrastructure.
[0023] Optionally, after obtaining the vulnerable critical infrastructure, the method further includes: marking the vulnerable critical facilities and infrastructure units on the GIS map according to the locations of the vulnerable critical infrastructure and infrastructure units.
[0024] Optionally, the emergency response plan is formulated based on the risk assessment results, physical property data, real-time data and the importance of the infrastructure in power supply, including:
[0025] Setting corresponding emergency plans based on the physical property data of vulnerable infrastructure units and critical infrastructure in the risk assessment results and the real-time data collected by sensors;
[0026] Setting the execution priority of the emergency plans corresponding to the vulnerable infrastructure units and the critical infrastructure based on their importance in power supply and the difficulty of repair;
[0027] The emergency response plan is constructed based on the emergency plans corresponding to each infrastructure unit and key infrastructure, as well as the execution priority.
[0028] Optionally, before setting a corresponding emergency plan based on the physical property data of vulnerable infrastructure units and critical infrastructure in the risk assessment results and the real-time data collected by sensors, the method further includes:
[0029] The real-time data collected by the sensor is cleaned to obtain cleaned data.
[0030] Optionally, before setting the execution priority of the emergency plans corresponding to the vulnerable infrastructure units and the critical infrastructure based on the importance and repair difficulty of the vulnerable infrastructure units and the critical infrastructure in power supply, the method further includes:
[0031] Classify the risk assessment results into risk levels;
[0032] Set up corresponding emergency response plans according to different risk levels;
[0033] The risk levels include: low risk, medium risk and high risk.
[0034] Optionally, it also includes: generating a multi-dimensional disaster impact report based on the assessment results;
[0035] Among them, the multi-dimensional disaster impact report includes: impact scope, severity, and recovery time.
[0036] In another aspect, the present invention further provides a device for coordinating emergency response of power facilities and regional functional systems, comprising:
[0037] Sensors to obtain real-time data about the area, real-time GIS data, and physical characteristics of infrastructure;
[0038] A system platform for conducting risk assessment on infrastructure based on real-time data, real-time geographic information system data and physical property data in combination with a pre-built risk assessment model to obtain risk assessment results; and formulating emergency response plans based on the risk assessment results, physical property data, real-time data and the importance of the infrastructure in power supply, and conducting emergency response based on the emergency response plans;
[0039] The risk assessment model is constructed based on historical disaster data, geographic information system data and physical property data using statistical analysis methods.
[0040] Optionally, the system platform includes:
[0041] A risk assessment module is used to conduct risk assessment on infrastructure based on real-time data, real-time geographic information system data and physical property data combined with a pre-built risk assessment model to obtain risk assessment results;
[0042] Decision support tools for developing emergency response plans based on risk assessment results, physical property data, real-time data and the criticality of the infrastructure in power supply.
[0043] Optional, decision support tools specifically for:
[0044] Setting corresponding emergency plans based on the physical property data of vulnerable infrastructure units and critical infrastructure in the risk assessment results and the real-time data collected by sensors;
[0045] Setting the execution priority of the emergency plans corresponding to the vulnerable infrastructure units and the critical infrastructure based on their importance in power supply and the difficulty of repair;
[0046] The emergency response plan is constructed based on the emergency plans corresponding to each infrastructure unit and key infrastructure, as well as the execution priority.
[0047] Optionally, it also includes: a data cleaning module, which is used to clean the real-time data collected by the sensor to obtain cleaned data, and transmit the cleaned data to the decision support tool.
[0048] Optionally, the decision support tool further includes: a level classification module;
[0049] The grading module is used to grade the risk assessment results and set corresponding emergency response plans according to different risk levels;
[0050] The risk levels include: low risk, medium risk and high risk.
[0051] Optionally, it also includes a visualization platform connected to the risk assessment module;
[0052] The visualization platform is used to display the data analyzed and processed by the risk assessment module;
[0053] The analyzed and processed data include: risk assessment results, icons and marked maps.
[0054] Optionally, the device further comprises: a report generation module, configured to generate a multi-dimensional disaster impact report based on the assessment result;
[0055] Among them, the multi-dimensional disaster impact report includes: impact scope, severity, and recovery time.
[0056] In another aspect, the present application further provides a computing device, comprising: at least one processor and a memory;
[0057] The memory is used to store one or more programs;
[0058] When the one or more programs are executed by the at least one processor, a method for coordinated emergency response between power facilities and regional functional systems as described above is implemented.
[0059] On the other hand, the present application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed, implements a method for coordinated emergency response of power facilities and regional functional systems as described above.
[0060] Compared with the prior art, the beneficial effects of the present invention are:
[0061] The present invention application provides a method for coordinated emergency response of power facilities and regional functional systems, including: obtaining real-time data, real-time geographic information system data and physical property data of the region; conducting risk assessment on the infrastructure based on real-time data, real-time geographic information system data and physical property data combined with a pre-constructed risk assessment model to obtain risk assessment results; formulating an emergency response plan based on the risk assessment results, physical property data, real-time data and the importance of the infrastructure in power supply, and conducting emergency response based on the emergency response plan; wherein the risk assessment model is constructed based on historical disaster data, geographic information system data and physical property data using statistical analysis methods. The present invention can implement an assessment of the impact of disasters through analysis of real-time data, quickly identify disaster situations, formulate and implement effective response measures, thereby shortening response time and improving response efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] Figure 1 A flow chart of a method for coordinated emergency response between power facilities and regional functional systems applied for by the present invention;
[0063] Figure 2 This is a specific implementation block diagram of the method for coordinated emergency response between power facilities and regional functional systems applied for in the present invention. DETAILED DESCRIPTION
[0064] The present invention application proposes a method for coordinated emergency response of power facilities and regional functional systems, which can quickly collect key data when a rainstorm disaster occurs, including the status of power facilities, the operation of urban infrastructure, etc., and through data analysis technology, realize real-time assessment of the impact of the disaster.
[0065] Embodiment 1:
[0066] A method for coordinating emergency response between power facilities and regional functional systems, such as Figure 1 As shown, including:
[0067] Step 1: Obtain real-time data of the area, real-time GIS data, and physical characteristics data of the infrastructure;
[0068] Step 2: Conduct risk assessment on infrastructure based on real-time data, real-time geographic information system data and physical property data combined with a pre-built risk assessment model to obtain risk assessment results;
[0069] Step 3: Formulate an emergency response plan based on the risk assessment results, physical property data, real-time data, and the importance of the infrastructure in power supply, and conduct emergency response based on the emergency response plan;
[0070] The risk assessment model is constructed based on historical disaster data, geographic information system data and physical property data using statistical analysis methods.
[0071] The present invention applies to design a system platform for collaborative data analysis and processing between power facilities and urban functional systems. The platform integrates machine learning algorithms and can conduct in-depth analysis of real-time collected data to identify potential risks and damages. Through data fusion technology, the platform can integrate information from different sensors and monitoring systems to provide a comprehensive, multi-dimensional disaster impact assessment and provide a scientific basis for decision makers. The present invention is further introduced below:
[0072] Step 1: Obtain real-time data of the area, geographic information system data, and physical characteristics of the infrastructure, including:
[0073] Data collection and compilation:
[0074] Collect historical disaster data, including records of rainstorm events, infrastructure damage, and emergency response effectiveness.
[0075] Obtain Geographic Information System (GIS) data, which includes urban topography, landforms, hydrological features, and infrastructure layout and design parameters.
[0076] Organize the physical property data of infrastructure, including building structure, material strength, and drainage capacity.
[0077] Data collection and communication guarantee:
[0078] In order to monitor the status of urban infrastructure in real time, a series of high-precision data acquisition devices need to be deployed on it. These devices are installed on vulnerable infrastructure. At the same time, a reliable sensor network needs to be established to ensure stable data transmission under severe weather conditions such as rainstorms. In addition, a communication guarantee mechanism is designed to prevent data transmission interruptions and ensure the continuity and accuracy of information. The specific steps include:
[0079] ●Equipment selection and customization:
[0080] According to the type of urban infrastructure and monitoring requirements, select appropriate data acquisition equipment, including water level sensors, pressure sensors, flow meters, etc.
[0081] Design customized sensors to adapt to different environmental conditions, including waterproof, dustproof, high and low temperature resistance, etc., to ensure that they can work stably in severe weather such as heavy rain.
[0082] ●Sensor deployment strategy:
[0083] Determine the deployment locations of sensors, giving priority to key areas and facilities that are vulnerable to heavy rain, including low-lying areas, drainage system entrances, and around power facilities.
[0084] Ensure that the layout of sensors can fully cover the monitoring area and avoid blind spots, while considering the convenience of maintenance and replacement.
[0085] ●Sensor network construction:
[0086] Design sensor network architecture, including the selection of wireless communication protocols (including LoRaWAN, NB-IoT, etc.) to accommodate different communication distances and environmental conditions.
[0087] Implement network optimization to ensure that signal strength and data transmission rate meet the requirements of real-time monitoring during disasters such as heavy rains.
[0088] ●Communication guarantee mechanism:
[0089] Develop data redundancy and retransmission mechanisms to automatically switch to backup paths when the main communication path is blocked due to disaster conditions such as heavy rain to ensure continuous data transmission.
[0090] Implement data encryption and authentication to ensure the security and integrity of data during transmission.
[0091] ●System testing and verification:
[0092] Test the sensor network in a real-world environment to verify its performance in adverse conditions such as heavy rain.
[0093] Stress test the communication assurance mechanism to ensure the stability and reliability of the system under extreme circumstances.
[0094] ●Maintenance and upgrade:
[0095] Establish a regular maintenance plan for sensors and communication equipment, including inspection, cleaning, battery replacement, etc.
[0096] Upgrade sensor networks and communication systems based on technological developments and user feedback,
[0097] To adapt to new monitoring needs and improve system performance.
[0098] Through the above steps, it can be ensured that during rainstorm disasters, the status information of infrastructure can be collected and transmitted in real time and accurately, providing key data support for emergency response.
[0099] Before introducing step 2, we first further introduce the construction of the risk assessment model:
[0100] Building a risk assessment model:
[0101] Using statistical analysis methods, combined with historical data and geographic information, a risk assessment model for urban infrastructure in rainstorm disasters is established.
[0102] Consider the physical characteristics of the infrastructure, including water resistance, impact resistance, maintenance status, etc., as well as its importance in the urban network.
[0103] Data preprocessing and storage:
[0104] Data preprocessing, including filtering and compression, is implemented on sensor nodes to reduce the amount of data and improve transmission efficiency.
[0105] Design distributed storage solutions to store data locally and in the cloud to ensure data persistence and accessibility.
[0106] Machine Learning Model Development:
[0107] Depending on the type of infrastructure and monitoring purpose, choose appropriate machine learning algorithms, including classification, regression, clustering, etc.
[0108] The model is trained using historical data to enable it to identify abnormal conditions and potential risks to infrastructure under heavy rain conditions.
[0109] Step 2: Conduct risk assessment on infrastructure based on real-time data, real-time GIS data and physical property data combined with pre-built risk assessment models to obtain risk assessment results, including:
[0110] Based on the pre-built risk assessment model, a vulnerability analysis is performed on the infrastructure units in the area to assess the extent of damage that the infrastructure units may suffer under heavy rain conditions, and obtain vulnerable infrastructure units;
[0111] Based on the pre-built risk assessment model, a vulnerability analysis is performed on the critical infrastructure to assess the degree of damage that the critical infrastructure may suffer under heavy rain conditions, and obtain critical infrastructure that is vulnerable to damage;
[0112] Wherein, the infrastructure includes: a plurality of infrastructure units;
[0113] The infrastructure unit includes: a plurality of key infrastructures;
[0114] The risk assessment results include: vulnerable infrastructure units and critical infrastructure.
[0115] Step 2 specifically includes:
[0116] Real-time data analysis:
[0117] Design real-time data processing processes to ensure that data received from the sensor network can be quickly input into the analysis system.
[0118] Realize real-time updating and adjustment of the model to adapt to environmental changes and the input of new data.
[0119] ●Risk assessment and prediction:
[0120] Use trained machine learning models to analyze real-time data to identify potential risks and possible damage to infrastructure.
[0121] Develop predictive models to predict changes in infrastructure status over a period of time in the future and provide early warning information to decision makers.
[0122] Disaster Impact Assessment:
[0123] Combine real-time analysis results and historical data to assess the impact of rainstorm disasters on infrastructure.
[0124] Generate multi-dimensional disaster impact reports, including impact scope, severity, recovery time, etc.
[0125] First, a comprehensive risk analysis of urban infrastructure is needed, including key systems such as water, electricity, gas, heat, and transportation. By comprehensively considering historical data, geographic information, and the physical characteristics of infrastructure, the vulnerability of each facility in a rainstorm disaster is assessed, and key points that are susceptible to damage are marked. This ensures that emergency response strategies can be optimized for high-risk areas and facilities. Specific steps include:
[0126] Vulnerability analysis:
[0127] Conduct a vulnerability analysis of each urban infrastructure unit to assess the extent of damage it may suffer under heavy rain conditions.
[0128] Identify key urban infrastructure, including power hubs, water treatment plants, and transportation arteries.
[0129] Damage to these facilities could have a significant impact on overall city functions.
[0130] The present invention also includes classifying risk levels:
[0131] ●Risk level classification:
[0132] Based on the results of vulnerability analysis, each urban infrastructure unit is assigned a risk level, including low risk, medium risk, and high risk.
[0133] For high-risk areas and facilities, conduct more in-depth assessments to consider possible chain reactions and secondary disasters.
[0134] ●Marking and prioritization:
[0135] Mark vulnerable key urban facilities and areas on the GIS map, and attach a detailed risk assessment report to each marked point.
[0136] Set emergency response priorities to ensure that, given limited resources, the most critical city infrastructure is protected and restored first.
[0137] Step 3: Develop an emergency response plan based on the risk assessment results, physical property data, real-time data, and the importance of the infrastructure in power supply, and conduct emergency response based on the emergency response plan, including:
[0138] Setting corresponding emergency plans based on the physical property data of vulnerable infrastructure units and critical infrastructure in the risk assessment results and the real-time data collected by sensors;
[0139] Setting the execution priority of the emergency plans corresponding to the vulnerable infrastructure units and the critical infrastructure based on their importance in power supply and the difficulty of repair;
[0140] Construct emergency response plans based on the emergency plans of each infrastructure unit and key infrastructure, as well as implementation priorities;
[0141] and implement emergency response plans.
[0142] Step 3 specifically includes:
[0143] ● Plan formulation and optimization:
[0144] Based on the risk assessment results, formulate or optimize emergency plans and clarify response measures under different risk levels.
[0145] Develop special protection measures for critical facilities and areas, including strengthening structures, improving drainage capabilities, and establishing backup systems.
[0146] ●Continuous monitoring and updating:
[0147] Implement continuous monitoring and collect new data, including climate change, urban development, infrastructure maintenance, etc.
[0148] Regularly update risk assessment models and emergency plans to ensure they reflect the latest risk conditions and response strategies.
[0149] Through the above steps, a scientific and systematic method can be provided for risk assessment and labeling of urban infrastructure, laying a solid foundation for emergency response to rainstorm disasters.
[0150] The present invention also includes: data preprocessing:
[0151] The raw data collected from the sensor network (including meteorological information such as rainfall, wind speed, temperature, humidity, hydrological data such as river water level, flow, reservoir water storage, groundwater level, real-time operating status of power facilities such as substations, transmission lines, distribution facilities, and the distribution and availability of emergency generators, backup power supplies, rescue teams, and rescue materials, etc.) are cleaned to remove noise and outliers and ensure data quality.
[0152] Standardize the data to make it suitable for subsequent analysis models, including normalization, feature extraction, etc.
[0153] ● Development of decision support tools:
[0154] Develop decision support tools to convert analysis results into visual charts and reports to help decision makers complete emergency response through the coordination of power facilities and urban functional systems during rainstorm disasters.
[0155] Provide recommendations based on analysis results, including resource allocation, emergency measures, long-term improvement strategies, etc.
[0156] ●System optimization and iteration:
[0157] Gather feedback from decision makers and emergency response teams to evaluate the usefulness and effectiveness of the analytical system.
[0158] The analysis model and data fusion technology are optimized based on the feedback to improve the accuracy and response speed of the system to disasters such as heavy rains.
[0159] Through the above steps, the data analysis and processing system platform can provide scientific and accurate decision-making support for the emergency response of urban infrastructure in rainstorm disasters, effectively reduce disaster risks and ensure urban safety.
[0160] The purpose of the present invention application is:
[0161] (1) Improving emergency response efficiency: This invention application aims to develop an integrated emergency response device that can quickly collect key data when a rainstorm disaster occurs, including the status of power facilities, the operation of urban infrastructure, etc., and use data analysis technology to achieve real-time assessment of the impact of the disaster. In this way, the emergency response team can quickly understand the disaster situation, formulate and implement effective response measures, thereby shortening the response time and improving the handling efficiency.
[0162] (2) Enhance system resilience: The purpose of this application is to ensure the stability of power facilities and urban infrastructure under heavy rain disasters. This includes designing and implementing a series of preventive measures, including improving the waterproofing capacity of facilities, establishing backup power systems, etc., as well as quickly restoring power supply and infrastructure functions after a disaster occurs to reduce the impact on the normal operation of the city.
[0163] (3) Optimizing resource allocation: This invention is dedicated to achieving optimal resource allocation through an intelligent decision support system. This means that when a disaster occurs, the system can automatically determine the priority of resource allocation based on real-time data and analysis results, ensuring that key areas and facilities receive timely support and recovery while avoiding resource waste.
[0164] (4) Data collection and communication technology: In order to maintain the continuity and accuracy of data under adverse weather conditions, this invention application will develop water-resistant and impact-resistant sensors and communication equipment. These devices can work stably in heavy rains and continuously provide real-time information on the status of power facilities and urban infrastructure, providing reliable data support for emergency response.
[0165] (5) Cross-system information sharing and collaboration: This invention application emphasizes information sharing and collaborative work between different urban infrastructure systems. By establishing a unified communication platform to achieve interconnection between power, water, gas, transportation and other systems, when disasters occur, the various systems can support each other and respond together, thereby improving the emergency response capabilities of the entire urban system.
[0166] (6) Promoting technological innovation:
[0167] This invention application has promoted the application of technologies such as the Internet of Things, big data, and artificial intelligence in the field of emergency management, and promoted the innovation and development of related technologies. The water-resistant and impact-resistant design of the equipment and the research and development of the communication guarantee mechanism provide a technical basis for responding to similar disasters in the future.
[0168] (7) Reduce disaster losses:
[0169] Through effective prevention, preparation, response and recovery measures, this invention application helps to minimize the impact of rainstorm disasters on the city's economy, society and environment. Rapid restoration of key infrastructure helps to shorten post-disaster recovery time and reduce the impact of disasters on residents' lives.
[0170] Embodiment 2:
[0171] Figure 2 The figure shows the technical framework of the method for coordinating emergency response between power facilities and regional functional systems. This embodiment takes a city as an example to introduce this application in detail:
[0172] This method mainly focuses on the coordinated emergency response of power facilities and urban functional systems in rainstorm disaster events. Through a comprehensive risk analysis of urban infrastructure, vulnerable facilities are evaluated and marked. Deploy high-precision data acquisition equipment and establish a sensor network to ensure stable data transmission in severe weather. Integrate machine learning algorithms to achieve real-time data analysis, predict risks, and integrate multi-source information for disaster impact assessment. Automatically generate emergency response plans, including resource allocation, personnel deployment, and facility repair priorities. Create interactive maps and dashboards to display infrastructure status and emergency response progress in real time, and support multi-platform access. This method and device for coordinated emergency response between power facilities and urban functional systems under rainstorm disasters provides an effective means of coordinated emergency management between power facilities and urban functional systems, which helps to respond to rainstorm disasters in advance and ensure the safe, stable and reliable operation of the power system.
[0173] The best embodiment of the present invention is applied to the coordinated emergency response of power facilities and urban functional systems under rainstorm disasters. The specific steps and key points of this embodiment will be described in detail below.
[0174] 1) Infrastructure risk assessment and labeling:
[0175] The present invention application first conducts a comprehensive risk analysis of urban infrastructure, including key systems such as water, electricity, gas, heat, and transportation. By comprehensively considering historical data, geographic information, and the physical characteristics of infrastructure, the vulnerability of each facility in a rainstorm disaster is assessed, and key points that are susceptible to damage are marked. This step ensures that the emergency response strategy can be optimized specifically for high-risk areas and facilities.
[0176] 2) Data collection and communication guarantee:
[0177] In order to monitor the status of infrastructure in real time, the present invention deploys a series of high-precision data acquisition devices, which are installed on vulnerable infrastructure. At the same time, a reliable sensor network is established to ensure stable data transmission under adverse weather conditions. In addition, a communication guarantee mechanism is designed to prevent data transmission interruptions and ensure the continuity and accuracy of information.
[0178] 3) Data analysis and integration:
[0179] This invention application designs an advanced data analysis and processing system platform that integrates machine learning algorithms and can conduct in-depth analysis of real-time collected data to identify potential risks and damages. Through data fusion technology, the platform can integrate information from different sensors and monitoring systems to provide a comprehensive, multi-dimensional disaster impact assessment and provide scientific basis for decision makers.
[0180] 4) Intelligent decision support system:
[0181] Based on the results of data analysis, the present invention application builds an intelligent decision support system. The system includes an intelligent decision support module that can automatically generate a detailed emergency response plan, including the optimal allocation of resources, the reasonable deployment of personnel, and the priority of facility repair. The system provides a user-friendly interface that enables the emergency response team to quickly understand the analysis results and efficiently execute decisions.
[0182] 5) Visual display platform:
[0183] In order to improve the transparency and efficiency of emergency response, this invention application builds a visual display platform in the decision support system. The platform displays the status of urban infrastructure and the progress of emergency response in real time through interactive maps and dashboards. The platform supports multi-platform access, and can provide clear and intuitive information display whether on mobile devices or on the large screen of the command center, helping decision makers and emergency response teams make decisions quickly.
[0184] Embodiment 3:
[0185] In another aspect, the present invention further provides a device for coordinating emergency response of power facilities and regional functional systems, comprising:
[0186] Sensors to obtain real-time data about the area, real-time GIS data, and physical characteristics of infrastructure;
[0187] A system platform for conducting risk assessment on infrastructure based on real-time data, real-time geographic information system data and physical property data in combination with a pre-built risk assessment model to obtain risk assessment results; and formulating emergency response plans based on the risk assessment results, physical property data, real-time data and the importance of the infrastructure in power supply, and conducting emergency response based on the emergency response plans;
[0188] The risk assessment model is constructed based on historical disaster data, geographic information system data and physical property data using statistical analysis methods.
[0189] Optionally, the system platform includes:
[0190] A risk assessment module is used to conduct risk assessment on infrastructure based on real-time data, real-time geographic information system data and physical property data combined with a pre-built risk assessment model to obtain risk assessment results;
[0191] Decision support tools for developing emergency response plans based on risk assessment results, physical property data, real-time data and the criticality of the infrastructure in power supply.
[0192] Optional, decision support tools specifically for:
[0193] Setting corresponding emergency plans based on the physical property data of each infrastructure and key infrastructure in the vulnerable infrastructure unit in the risk assessment results and the real-time data collected by sensors;
[0194] Setting the execution priority of the emergency plans corresponding to the vulnerable infrastructure units and the critical infrastructure based on their importance in power supply and the difficulty of repair;
[0195] The emergency response plan is constructed based on the emergency plans corresponding to each infrastructure unit and key infrastructure, as well as the execution priority.
[0196] Optionally, it also includes: a data cleaning module, which is used to clean the real-time data collected by the sensor to obtain cleaned data, and transmit the cleaned data to the decision support tool.
[0197] Optionally, the decision support tool further includes: a level classification module;
[0198] The grading module is used to grade the risk assessment results and set corresponding emergency response plans according to different risk levels;
[0199] The risk levels include: low risk, medium risk and high risk.
[0200] Optionally, it also includes a visualization platform connected to the risk assessment module;
[0201] The visualization platform is used to display the data analyzed and processed by the risk assessment module;
[0202] The analyzed and processed data include: risk assessment results, icons and marked maps.
[0203] Optionally, the device further comprises: a report generation module, configured to generate a multi-dimensional disaster impact report based on the assessment result;
[0204] Among them, the multi-dimensional disaster impact report includes: impact scope, severity, and recovery time.
[0205] 1. Intelligent decision support system:
[0206] Based on the results of data analysis, an intelligent decision support system for rainstorm disasters is constructed. The system contains an intelligent decision support module that can automatically generate a detailed emergency response plan for rainstorm disasters, including the optimal allocation of resources, the reasonable deployment of personnel, and the priority of facility repair. The system provides a user-friendly interface that enables the emergency response team to quickly understand the analysis results and make decisions efficiently. Create interactive maps and dashboards to display the status of urban infrastructure and the progress of emergency response in real time. The specific steps include:
[0207] ●Decision support module design:
[0208] Design an intelligent decision support module that can process real-time data and prediction results from the data analysis system that collaborates with power facilities and urban functional systems.
[0209] The module should have logical reasoning capabilities and be able to automatically generate emergency response strategies based on input data.
[0210] ● Resource optimization algorithm development:
[0211] Develop resource optimization algorithms for rainstorm disaster scenarios, including linear programming, genetic algorithms, etc., to determine the best allocation plan under limited resources.
[0212] The algorithm should consider factors such as resource availability, transportation time, and cost-effectiveness to ensure the efficiency and economy of resource allocation under disaster conditions such as heavy rain.
[0213] ● Staff deployment strategy formulation:
[0214] Using machine learning technology, we analyze the city’s historical emergency response data and determine the best mode for the deployment of emergency personnel through big data analysis.
[0215] Design a personnel dispatch system to ensure that key urban areas and infrastructure have sufficient professional technicians for maintenance and repair.
[0216] ●Facility repair priority assessment:
[0217] Assess the priority of facility repair based on the importance, extent of damage and difficulty of repair of urban infrastructure.
[0218] Develop a decision tree or rules engine to automatically generate repair plans and timelines for each piece of city infrastructure.
[0219] ●Emergency Response Plan Generation:
[0220] Generate a detailed emergency response plan that combines resource allocation, emergency personnel deployment, and facility restoration priorities.
[0221] The plan should include specific action steps, responsibilities, timelines, and expected goals.
[0222] User interface design:
[0223] Design an intuitive, easy-to-use user interface that enables emergency response teams to quickly navigate and understand emergency response plans.
[0224] The interface should support interactive operations, including dragging and dropping resources, adjusting personnel deployment, etc., to facilitate real-time adjustment of plans.
[0225] ●Real-time feedback and adjustment:
[0226] Realize real-time communication between the system and the on-site emergency response team and collect on-site feedback information.
[0227] Based on on-site feedback, the intelligent decision support module can automatically adjust the emergency response plan.
[0228] Ensure adaptability and flexibility of the plan.
[0229] ●System testing and optimization:
[0230] Test intelligent decision support systems in simulated environments and actual emergency response scenarios to evaluate their performance and accuracy.
[0231] Collect user feedback, iteratively optimize the system, and improve the quality and efficiency of decision support.
[0232] Through the above steps, the intelligent decision support system can provide emergency response teams with a powerful tool to help them make quick and effective decisions in rainstorm disasters, thereby minimizing disaster losses.
[0233] (II) Visualization display platform:
[0234] In order to improve the transparency and efficiency of emergency response, a visual display platform was built in the decision support system. The platform displays the status of urban infrastructure and the progress of emergency response in real time through interactive maps and dashboards. The platform supports multi-platform access, whether on mobile devices or on the large screen of the command center, it can provide clear and intuitive information display to help decision makers and emergency response teams make decisions quickly. The specific contents include:
[0235] ●Requirements analysis and design:
[0236] Analyze the information needs of decision makers and emergency response teams, and determine the core functions and display content of the visualization platform.
[0237] Design the platform's interface layout and interaction process to ensure that users can quickly obtain key information and perform effective operations.
[0238] Data integration and processing:
[0239] Integrate real-time data from data analysis systems, including infrastructure status, resource allocation, personnel deployment, etc.
[0240] Process and format data for presentation in the form of charts, maps, etc. on visualization platforms.
[0241] ●Interactive map development:
[0242] Develop interactive map capabilities to allow users to intuitively view the distribution and status of infrastructure through maps.
[0243] Implement marking and layer functions on the map, including highlighting damaged areas, showing resource allocation paths, etc.
[0244] ●Dashboard building:
[0245] Design and implement dashboards to display key performance indicators (KPIs), including response time, remediation progress, resource usage, etc.
[0246] Use charts and graphs (including bar charts, line charts, pie charts, etc.) to visually display data.
[0247] Easy for users to understand.
[0248] ●Multi-platform adaptation:
[0249] Ensure that the visualization platform can adapt to different devices and operating systems, including PCs, tablets, smartphones, etc.
[0250] Develop responsive designs so that the platform looks good on different screen sizes and resolutions.
[0251] ●Testing and optimization:
[0252] Test the visualization platform in simulated and actual emergency response scenarios and collect user feedback.
[0253] Based on the test results and user feedback, the platform is optimized to improve its usability and ease of use.
[0254] ●Training and support:
[0255] Provide user training to ensure decision makers and emergency response teams are proficient in using the visualization platform.
[0256] Establish technical support channels to provide users with continuous technical support and problem answers.
[0257] Through the above steps, the visualization display platform can provide strong information support for emergency response, helping decision makers and emergency response teams make quick and accurate decisions in rainstorm disasters.
[0258] Embodiment 4:
[0259] Based on the same invention application concept, the present invention application also provides a computer device, which includes a processor and a memory, wherein the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits, or a processor.
[0260] (Application Specific Integrated Circuit, ASIC), off-the-shelf programmable gate array (Field-Programmable Gate Array, FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc., which are the computing core and control core of the terminal, and are suitable for implementing one or more instructions, specifically suitable for loading and executing one or more instructions in a computer storage medium to implement corresponding method flows or corresponding functions, so as to realize the steps of the collaborative emergency response method of power facilities and regional functional systems in the above-mentioned embodiment.
[0261] Embodiment 5:
[0262] Based on the same invention application concept, the present invention application also provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a computer device for storing programs and data. It can be understood that the computer-readable storage medium here can include both built-in storage media in a computer device and, of course, extended storage media supported by the computer device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by a processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the steps of the collaborative emergency response method of power facilities and regional functional systems in the above-mentioned embodiment.
[0263] Those skilled in the art will appreciate that the embodiments of the present invention application can be provided as methods, systems, or computer program products. Therefore, the present invention application can adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present invention application can adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.
[0264] The present invention application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present invention application. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of the processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0265] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0266] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0267] The above are merely embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are included in the scope of the claims of the present invention to be approved.
Claims
1. A method for coordinated emergency response of power facilities and regional functional systems, characterized in that: include: Obtain real-time data on the region, real-time GIS data, and physical characteristics data of infrastructure; Conduct risk assessment of infrastructure based on real-time data, real-time geographic information system data and physical property data combined with pre-built risk assessment models to obtain risk assessment results; Formulate emergency response plans based on risk assessment results, physical property data, real-time data and the importance of infrastructure in power supply, and conduct emergency response based on the emergency response plans; The risk assessment model is constructed based on historical disaster data, geographic information system data and physical property data using statistical analysis methods.
2. The method according to claim 1, characterized in that The construction of the risk assessment model includes: Access historical disaster data, geographic information system data, and physical property data of infrastructure; constructing a risk assessment model using statistical analysis methods based on the historical disaster data, geographic information system data, and physical property data of infrastructure; Wherein, the statistical analysis method includes: linear programming, genetic algorithm or machine learning algorithm.
3. The method according to claim 1, characterized in that The risk assessment of infrastructure is performed based on real-time data, real-time geographic information system data and physical property data in combination with a pre-built risk assessment model to obtain risk assessment results, including: Based on the pre-built risk assessment model, a vulnerability analysis is performed on the infrastructure units in the area to assess the extent of damage that the infrastructure units may suffer under heavy rain conditions, and obtain vulnerable infrastructure units; Based on the pre-built risk assessment model, a vulnerability analysis is performed on the critical infrastructure of the region, the degree of damage that the critical infrastructure of the region may suffer under heavy rain conditions is assessed, and the critical infrastructure that is vulnerable to damage is obtained; Wherein, the infrastructure includes: a plurality of infrastructure units; The infrastructure unit includes: a plurality of key infrastructures; The risk assessment results include: vulnerable infrastructure units and critical infrastructure.
4. The method according to claim 3, characterized in that After obtaining the vulnerable infrastructure units and critical infrastructure, the method further includes: marking the vulnerable critical infrastructure and infrastructure units on the GIS map according to the locations of the vulnerable critical infrastructure and infrastructure units.
5. The method according to claim 1, characterized in that The emergency response plan is formulated based on risk assessment results, physical property data, real-time data and the importance of infrastructure in power supply, including: Setting emergency plans corresponding to the infrastructure units and the critical infrastructure based on the physical property data of the vulnerable infrastructure units in the risk assessment results and the real-time data collected by sensors; Setting the execution priority of the emergency plans corresponding to the vulnerable infrastructure units and the critical infrastructure based on their importance in power supply and the difficulty of repair; The emergency response plan is constructed based on the emergency plans corresponding to each infrastructure unit and key infrastructure, as well as the execution priority.
6. The method according to claim 5, characterized in that Before setting the emergency plans corresponding to the infrastructure units and the critical infrastructure based on the physical property data of the vulnerable infrastructure units and the critical infrastructure in the risk assessment results and the real-time data collected by sensors, the method further includes: The real-time data collected by the sensor is cleaned to obtain cleaned data.
7. The method according to claim 5, characterized in that Before setting the execution priority of the emergency plans corresponding to the vulnerable infrastructure units and the critical infrastructure based on the importance and repair difficulty of the vulnerable infrastructure units and the critical infrastructure in power supply, the method further includes: Classify the risk assessment results into risk levels; Set up corresponding emergency response plans according to different risk levels; The risk levels include: low risk, medium risk and high risk.
8. The method according to claim 1, characterized in that Also includes: Generate a multi-dimensional disaster impact report based on the assessment results; Among them, the multi-dimensional disaster impact report includes: impact scope, severity, and recovery time.
9. A device for coordinating emergency response between power facilities and regional functional systems, characterized in that: include: Sensors to obtain real-time data about the area, real-time GIS data, and physical characteristics of infrastructure; A system platform for conducting risk assessment of infrastructure based on real-time data, real-time geographic information system data and physical property data combined with pre-built risk assessment models to obtain risk assessment results; Formulate emergency response plans based on risk assessment results, physical property data, real-time data and the importance of infrastructure in power supply, and conduct emergency response based on the emergency response plans; The risk assessment model is constructed based on historical disaster data, geographic information system data and physical property data using statistical analysis methods.
10. The device according to claim 9, characterized in that The system platform comprises: A risk assessment module is used to conduct risk assessment on infrastructure based on real-time data, real-time geographic information system data and physical property data combined with a pre-built risk assessment model to obtain assessment results; Decision support tools for developing emergency response plans based on risk assessment results, physical property data, real-time data and the criticality of the infrastructure in power supply.
11. The device according to claim 10, characterized in that The decision support tool is specifically used for: Setting emergency plans corresponding to the infrastructure units and the critical infrastructure based on the physical property data of the vulnerable infrastructure units and the critical infrastructure in the risk assessment results and the real-time data collected by sensors; Setting the execution priority of the emergency plans corresponding to the vulnerable infrastructure units and the critical infrastructure based on their importance in power supply and the difficulty of repair; Construct emergency response plans based on the emergency response plans of infrastructure units and critical infrastructure, as well as implementation priorities; Wherein, the infrastructure includes: a plurality of infrastructure units; The infrastructure unit includes: multiple key infrastructures.
12. The device according to claim 9, characterized in that Also included is a visualization platform connected to the risk assessment module; The visualization platform is used to display the data analyzed and processed by the risk assessment module; The analyzed and processed data include: risk assessment results, icons and marked maps.
13. A computer device, characterized in that: include: at least one processor and memory; The memory is used to store one or more programs; When the one or more programs are executed by the at least one processor, a method for coordinated emergency response of power facilities and regional functional systems as described in any one of claims 1 to 8 is implemented.
14. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the computer program is executed, a method for coordinated emergency response of power facilities and regional functional systems as described in any one of claims 1 to 8 is implemented.
Citation Information
Cited By
Electric power intelligent GIS system based on Internet of Things
CN119583307A
Power network dynamic toughness evaluation method and device, equipment and storage medium
CN119994896A
Power Grid Dynamic Resilience Assessment Method, Device, Equipment, and Storage Medium
CN119994896B
Urban infrastructure risk assessment method for rainstorm disaster chain
CN120317659A
