Method for determining mine control range of geological line image

By generating digital data and distance calculations of linear images, the ore control range is determined, which solves the problem that the ore control range of the break structure in traditional methods is not accurate enough, and the accuracy and reliability of the prediction of the ore-prospecting target area is improved, and more accurate is achieved. Prediction of deposit distribution.

CN118941938APending Publication Date: 2024-11-12甘肃省地质调查院
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410828484.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The traditional method of determining the range of ore control in fault structure is not accurate enough, which affects the accuracy and reliability of the research on the cause of ore deposits and the prediction of ore prospecting targets. Especially in the era of big data, innovative methods are needed to improve the accuracy of quantitative tectonic ore control in the range.

Method used

By generating digital data of linear images, the distance from the deposit to the linear image is calculated, the percentage of the deposits in different distances is counted, the trend chart is generated and the straight line is fitted, and the ore control range is determined to improve the accuracy of the prediction of the ore-prospecting target area.

Benefits of technology

It realizes more accurate determination of ore control scope, promotes information exchange and comparison of different regions, improves the accuracy and reliability of geologic research and the prediction of ore search targets, and significantly narrows the scope of ore search.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941938A_ABST
    Figure CN118941938A_ABST
Patent Text Reader

Abstract

The invention relates to a geological line image ore control range determination method, which comprises the following steps of: generating line image digital data, writing algorithm software of a distance from an ore deposit to a line image, calculating the distance from the ore deposit to the line image, obtaining an information statistical table, and generating a trend chart for counting the number of ore deposits contained in different distance ranges of the line image in a research area; and finally, determining the ore control range of the geological line image, thereby determining the accurate value of the ore control range, facilitating the development of the modeling processing of the geoscience research and the quantitative prediction of the ore prospecting target, and greatly improving the precision of the geoscience research and the prediction of the ore prospecting target.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of remote sensing technology, and in particular relates to a method for determining a geological line image ore-controlling range. Background Art

[0002] Regional geological line images (such as fault structures and remote sensing line images) are closely related to the distribution of regional mineral deposits. Geological theory believes that the formation of regional mineral deposits is mostly controlled by regional geological structures (fault structures). Therefore, some regional mineral deposits are mostly distributed within a certain range of specific fault structures, which is the range of fault structure control. Therefore, the accurate value of the fault structure control range directly affects the accuracy and effect of mineral deposit genesis research and prospecting target area prediction.

[0003] At present, the determination of the scope of mineral control by traditional fault structures is based solely on the experience of geologists. Obviously, this determination result is not conducive to the exchange of information or the comparison of different regions. Especially in today's "big data" era, innovative methods must be used to determine a more accurate and quantitative structural mineral control range, thereby improving the accuracy and reliability of geological research and prospecting target area prediction.

[0004] For example, the Chinese invention patent with application number CN202311584669.5 and titled "A prospecting prediction method and system based on multiple K-means cluster analysis" discloses a prospecting prediction method and system based on multiple K-means cluster analysis, which is used to solve the technical problems of errors and low efficiency in existing prospecting methods, and belongs to the field of prospecting prediction technology. The method includes: determining a favorable area in a coal-bearing basin; wherein the favorable area is used to define the prospecting range; identifying the results of gravity and magnetic multiple potential field processing based on K-means cluster analysis, and determining the key area in the favorable area; collecting information on changes in the content of mineralized and altered elements in the geological body, and determining the prospecting target area in the key area.

[0005] The Chinese invention patent with application number CN202310812501.9 and titled "A prospecting prediction method and system based on multiple K-means cluster analysis" discloses a method in the field of prospecting technology that uses existing gold exploration and mining data to assist in gold resource detection, including: S1, obtaining geological data of existing gold mines; S2, constructing a stratigraphic model; S3, constructing a fault model; S4, constructing a rock model; S5, constructing a grade model; S6, coupling the stratigraphic model, fault model, rock model and grade model, determining the mineralization factors and mineralization threshold based on the prospecting information method, and constructing a gold prediction model; S7, constructing mineralization factors and mineral reserve functions; S8, distributively obtaining mineralization factor data of the mineral area to be detected; S9, calculating the mineralization degree to determine the mineral area to be mined; S10, calculating the estimated gold reserves of the mineral area to be mined. The scheme adopts distributed monitoring in the first mineralization range to obtain a more accurate range of the mineral area to be mined, and estimate the estimated gold reserves of the mineral area to be mined.

[0006] It can be seen that using exploration and telemetry data to analyze and build models to improve the accuracy and reliability of target area prediction in key areas is an effective method. This is also a key research direction in the current combination of remote sensing and information technology.

[0007] In view of this, it is necessary to propose an innovative method for determining the ore-controlling range of geological line images to improve the accuracy of prediction of prospecting targets in the ore-controlling range of fault structures. Summary of the invention

[0008] The purpose of the present invention is to provide a method for determining the ore-controlling range of geological line images, which can better reflect and predict the properties and characteristics of fault structures and improve the prediction accuracy of ore-prospecting target areas.

[0009] In order to solve the above technical problems, the present invention discloses a method for determining the ore-controlling range of geological line images, comprising the following steps:

[0010] S1. Generate linear image digital data:

[0011] Generate a plain text file of the linear image Mapgis: For the linear image on the geological map, firstly perform vectorization processing to form a Mapgis line file, which contains at least the number of each linear image, the number of nodes constituting the line segment, and the digital information of the graphic coordinates of each node in the line segment; use Mapgis software to export the plain text file of the Mapgis line file;

[0012] S2. Write the algorithm software of the distance from the ore deposit to the line image, and calculate the distance from the ore deposit to the line image:

[0013] S2.1. Assume that the graphic coordinates of the first deposit are (x0, y0); the coordinates of the first node of the first line image are (x1, y1), and the coordinates of the second node are (x2, y2);

[0014] S2.2. Calculate the distance from the first ore deposit to the straight line formed by the first and second nodes of the first line image using formula 1;

[0015] S2.3. Repeat the above process to calculate the distance from the first ore deposit to the straight line formed by all adjacent nodes in the first line image, and take the minimum value as the distance from the first ore deposit to the first line image;

[0016] S2.4. Repeat the above process to calculate the distances from all mineral deposits to all line images;

[0017] S2.5. Record the distances from all mineral deposits to all line images;

[0018] S3. Information statistics table: For the predicted mineral deposit types in the study area, the number of mineral deposits contained in the line image of the study area at different distances is counted, and the cumulative percentage of the number of mineral deposits contained in the line image at different distances is calculated.

[0019] S4. Generate a trend chart for the number of mineral deposits within different distance ranges of the line image of the study area: open the file in Excel software, hold down the "Ctrl" key and select the "Distance" and "Number of mineral deposits%" columns at the same time - open the insert function - select scatter plot - click "scatter plot with data markers only", and you can generate a cumulative percentage distribution trend chart of the number of mineral deposits within different distance ranges of the line image with different distance ranges as the horizontal axis and the percentage of mineral deposits as the vertical axis;

[0020] Formula 1 is the distance formula from the ore deposit to the adjacent node:

[0021] Among them, k: slope of the straight line; d: distance from the point to the straight line.

[0022] S5. Determination of the ore-controlling range of geological line images: Divide the projection points in the percentage distribution trend diagram of ore deposits in different distance ranges in S4 into three parts according to the trend direction: a sharp rise, a slowing trend and a flat trend. Fit straight lines are made for the parts with a sharp rise and a slow trend respectively, and the fitting straight lines pass through as many projection points as possible. Make a bisector of the angle between the two fitting straight lines through the intersection point, and determine the projection point closest to the bisector in the part with a slowing trend as the base point. The horizontal axis reading of this point is the ore-controlling range, and the vertical axis reading is the cumulative percentage of ore deposit distribution within the ore-controlling range.

[0023] Preferably, in S3, the line image with the smallest deposit belonging distance is not counted repeatedly, and the line image is not limited.

[0024] Preferably, in S3, one of the line images contains one or more mineral deposits with the smallest distance.

[0025] Preferably, the linear images at least include fault structures and remote sensing interpretation line images.

[0026] Preferably, in S1, the operation method for exporting the plain text file of the Mapgis line file using the Mapgis software is: open the Mapgis software - enter the graphics processing function - click file conversion - load the line file - click output - select click - click to output the Mapgis plain text format, and the plain text file of the Mapgis line file can be generated.

[0027] Preferably, the plain text file is a comma-delimited file in a notepad format.

[0028] Preferably, the database is at least used for quantitative modeling and prediction research on fault structures and prospecting targets of various mineral types.

[0029] The method for determining the ore-controlling range of geological line images of the present invention has the following beneficial effects:

[0030] 1. The division points of the three parts of the percentage trend of the number of mineral deposits at different distances in the remote sensing line image of the study area are used as its ore-control range, which is consistent with the geological fact that the genesis of regional mineral deposits is controlled by specific structures (the mineral deposits are distributed within a certain range of specific structures).

[0031] 2. The accurate value of the mining control range of the line image is conducive to the exchange of information and comparison of different areas.

[0032] 3. The accurate determination of the ore-control range of line images is conducive to the modeling and processing of geological research and quantitative prediction of prospecting targets, thereby greatly improving the accuracy of geological research and prediction of prospecting targets. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 This is a statistical table of the number of Au deposits in different distance ranges of remote sensing line images in some areas of the western Qinling Mountains in Gansu Province.

[0034] Figure 2 This is a distribution trend chart of the percentage of mineral deposits in different distance ranges.

[0035] Figure 3 This is a statistical table of prediction results of Au prospecting targets using remote sensing line images in the western Qinling area of ​​Gansu Province. DETAILED DESCRIPTION

[0036] The present invention is further described in detail below through examples so that those skilled in the art can implement the invention with reference to the description.

[0037] It should be understood that the terms such as “having”, “including” and “comprising” used herein do not exclude the existence or addition of one or more other elements or combinations thereof.

[0038] A method for determining the ore-controlling range of a geological line image (fault or remote sensing interpretation line image) comprises the following steps:

[0039] S1. Generate linear image digital data:

[0040] Generate a Mapgis plain text file of a line image: For the line image on the geological map, first perform vectorization processing to form a Mapgis line file (*.WL), which contains at least the number of each line image, the number of nodes that make up the line segment, and the digital information of the graphic coordinates of each node in the line segment; use Mapgis software to export the plain text file (*.wal) of the Mapgis line file. The specific method is: open Mapgis software - enter the graphic processing function - click file conversion - load line file - click output - select click - click output Mapgis plain text format, and the plain text file of the Mapgis line file can be generated (in this embodiment, the wal format is a comma-delimited file in Notepad format).

[0041] S2. Write the algorithm software of the distance from the ore deposit to the line image, and calculate the distance from the ore deposit to the line image:

[0042] S2.1. Assume that the graphic coordinates of the first deposit are (x0, y0); the coordinates of the first node of the first line image are (x1, y1), and the coordinates of the second node are (x2, y2);

[0043] S2.2. Calculate the distance from the first ore deposit to the straight line formed by the first and second nodes of the first line image using formula 1;

[0044] S2.3. Repeat the above process to calculate the distance from the first ore deposit to the straight line formed by all adjacent nodes in the first line image, and take the minimum value as the distance (vertical distance) from the first ore deposit to the first line image;

[0045] S2.4. Repeat the above process to calculate the distances from all mineral deposits to all line images;

[0046] S2.5. Record the distances from all mineral deposits to all line images;

[0047] S3. Information statistics table: For the predicted mineral deposit types in the study area, count the number of mineral deposits contained in different distance ranges of the line image of the study area (the mineral deposits belong to the line image with the smallest distance, and they shall not be counted repeatedly, and there is no limit on line images; that is, one line image can contain multiple mineral deposits with the smallest distance), and calculate the cumulative percentage of the number of mineral deposits contained in different distance ranges of the line image (recorded in Excel format (*.xlsx) file).

[0048] S4. Generate a trend chart for the number of mineral deposits contained in different distance ranges of the line image of the study area: open the file (statistical table (*.xlsx) file) in the "Excel software", hold down the "Ctrl" key and select the "Distance" and "Number of mineral deposits %" columns at the same time - open the insert function - select scatter plot - click "scatter plot with data markers only", and you can generate a cumulative percentage distribution trend chart of the number of mineral deposits in different distance ranges of the line image with different distance ranges as the horizontal axis and the percentage of the number of mineral deposits as the vertical axis;

[0049] Formula 1 is the distance formula from the ore deposit to the adjacent node:

[0050] Among them, k: slope of the straight line; d: distance from the point to the straight line.

[0051] S5. Determination of the ore-controlling range of geological line images: divide the projection points in the percentage distribution trend diagram of ore deposits in different distance ranges in S4 into three parts according to the trend direction: a sharp rise, a slowing trend and a flat trend. Fit straight lines are made for the parts with a sharp rise and a slow trend respectively, and the fitting straight lines pass through as many projection points as possible. Make a bisector of the angle between the two fitting straight lines through the intersection point, and determine the projection point closest to the bisector in the part with a slowing trend as the base point. The horizontal axis reading of this point (the vertical distance from the point to the line image) is the ore-controlling range, and the vertical axis reading is the cumulative percentage of ore deposit distribution within the ore-controlling range.

[0052] The database is at least used for quantitative modeling and prediction research on fault structures and prospecting targets of various mineral types.

[0053] In this embodiment, taking the number and percentage of Au deposits in different distances of remote sensing line images in the western Qinling area of ​​Gansu Province as an example, the specific method is:

[0054] 1. Count the number of mineral deposits within the different distance ranges of the line image of the study area, and calculate the percentage of the number of mineral deposits within the different distance ranges of the line image (see Figure 1 ).

[0055] 2. Open in Excel Figure 1(*.xlsx) file, hold down the "Ctrl" key and select the "Distance" and "Number of deposits %" columns at the same time - open the insert function - select scatter plot - click "scatter plot with data markers only". You can generate a distribution trend chart of the percentage of deposits in different distance ranges with different distance ranges as the horizontal axis (unit Km) and the percentage of deposits as the vertical axis (unit %) (see Figure 2 ).

[0056] 3. Determination of the ore-controlling range of geological line images (fracture structures, remote sensing line images): Figure 2 The projection points in the trend chart of the percentage of the number of Au deposits within different distances from the remote sensing line image of the study area are divided into three parts according to the trend direction: a sharp rise, a slowing trend and a flat trend. Fitting straight lines are made for the parts with a sharp rise and a slow trend respectively, and the fitting straight lines pass through as many projection points as possible. The bisector of the angle between the two fitting straight lines is made through the intersection of the two fitting straight lines, and the projection point closest to the bisector in the part with a slowing trend is determined as the base point. The horizontal axis reading of this point (1.5Km) is the ore-control range, and the vertical axis reading (85.28%) is the percentage of ore deposit distribution within the ore-control range. That is, the ore-control range of the remote sensing line image of the study area is determined to be 1.5Km, which includes 85.28% of the known Au deposits in the region.

[0057] 4. Application effect: Taking the project "Quantitative Prediction Research on Comprehensive Information Prospecting Target Areas for Au Minerals in the Western Qinling Mountains of Gansu Province" undertaken in 2023 as an example, this paper briefly introduces the application effect of the remote sensing line image control range in the quantitative prediction research on regional Au mineral prospecting target areas.

[0058] Model construction: The total area of ​​the study area is 79588.3km2. 2009 remote sensing interpretation line images are "research units". 197 Au deposits (points) have been discovered. The above algorithm (software) and diagrams determine that the line image controls the ore range of 1.5km, and 191 "controlling line images" (accounting for 9.5% of the total) are determined. The control range of the control line images controls 168 Au deposits (accounting for 85.28% of the total number of deposits). The 191 control line images are known "ore-bearing units". Based on this, the "series of quantitative optimization models for Au ore prospecting targets in remote sensing line image information in the West Qinling area of ​​Gansu Province" are constructed. In this model, a total of 247 predicted "prospecting units" were identified (it is believed that the ore-controlling range of these remote sensing line images is a favorable location for finding Au ore), and the 247 prospecting units were divided into four levels according to the "golden section rule" (specifically in this embodiment, the number of the next level of prospecting units is 1.618 times the number of the previous level) (see Figure 3 ).

[0059] Prediction effect analysis: The series of models selected 247 prospecting units, accounting for 12.29% of the total number of research units (greatly narrowing the scope of prospecting). Among the predicted prospecting units, the proportion of known mineralized units is as high as 69.64%, which is 7.32 times higher than the average value of mineralized units (the reliability of the prediction results is extremely high). The predicted prospecting units include 172 known mineralized units, accounting for as high as 90.05% (the model represents the mineralization characteristics of Au deposits, which account for 90.05% of the total number of deposits, and the model prediction effect is extremely ideal).

[0060] This prospecting target prediction study integrated the results of remote sensing line images, strata, igneous rocks, aeromagnetic and geochemical data to predict prospecting targets, and delineated the regional comprehensive information Au prospecting target areas. In that year, 19 predicted target areas were selected for field survey and inspection, and Au mineralization clues were found in 7 target areas (the probability of discovering mineralization was as high as 36.8%). Four of the target areas were selected for preliminary soil or stream sediment measurements, and three target areas were determined to be mineral-induced anomalies. The prediction results provided a favorable basis for the establishment of a general prospecting project next year.

[0061] It can be seen that the precise determination of the mineral control range of line images, combined with the quantitative prediction of mineral exploration target areas based on big data, has greatly improved the accuracy of quantitative prediction of mineral exploration target areas.

[0062] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes. They can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the embodiments shown and described herein.

Claims

1. A method for determining the ore-controlling range of geological line images, It is characterized in that The steps include: S1. Generate linear image digital data: Generate a plain text file of the linear image Mapgis: For the linear image on the geological map, firstly perform vectorization processing to form a Mapgis line file, which contains at least the number of each linear image, the number of nodes constituting the line segment, and the digital information of the graphic coordinates of each node in the line segment; use Mapgis software to export the plain text file of the Mapgis line file; S2. Write the algorithm software of the distance from the ore deposit to the line image, and calculate the distance from the ore deposit to the line image: S2.

1. Assume that the graphic coordinates of the first deposit are (x 0 ,y 0 ); the coordinates of the first node of the first line image are (x 1 ,y 1 ), the coordinates of the second node are (x 2 ,y 2 ); S2.

2. Calculate the distance from the first ore deposit to the straight line formed by the first and second nodes of the first line image using formula 1; S2.

3. Repeat the above process to calculate the distance from the first ore deposit to the straight line formed by all adjacent nodes in the first line image, and take the minimum value as the distance from the first ore deposit to the first line image; S2.

4. Repeat the above process to calculate the distances from all mineral deposits to all line images; S2.

5. Record the distances from all mineral deposits to all line images; S3. Information statistics table: For the predicted mineral deposit types in the study area, the number of mineral deposits contained in the line image of the study area at different distances is counted, and the cumulative percentage of the number of mineral deposits contained in the line image at different distances is calculated. S4. Generate a trend chart for the number of mineral deposits within different distance ranges of the line image of the study area: open the file in Excel software, hold down the "Ctrl" key and select the "Distance" and "Number of mineral deposits%" columns at the same time - open the insert function - select scatter plot - click "scatter plot with data markers only", and you can generate a cumulative percentage distribution trend chart of the number of mineral deposits within different distance ranges of the line image with different distance ranges as the horizontal axis and the percentage of mineral deposits as the vertical axis; Formula 1 is the distance formula from the ore deposit to the adjacent node: Among them, k: slope of the straight line; d: distance from the point to the straight line. S5. Determination of the ore-controlling range of geological line images: Divide the projection points in the percentage distribution trend diagram of ore deposits in different distance ranges in S4 into three parts according to the trend direction: a sharp rise, a slowing trend and a flat trend. Fit straight lines are made for the parts with a sharp rise and a slow trend respectively, and the fitting straight lines pass through as many projection points as possible. Make a bisector of the angle between the two fitting straight lines through the intersection point, and determine the projection point closest to the bisector in the part with a slowing trend as the base point. The horizontal axis reading of this point is the ore-controlling range, and the vertical axis reading is the cumulative percentage of ore deposit distribution within the ore-controlling range.

2. The method for determining the ore-controlling range of geological line images according to claim 1, Features: In S3, the line image with the smallest deposit belonging distance is not counted repeatedly, and the line image is not limited.

3. The method for determining the ore-controlling range of geological line images according to claim 2, Features: In S3, one of the line images contains one or more mineral deposits with the smallest distance.

4. The method for determining the ore-controlling range of geological line images according to claim 1, Features: The linear images at least include fault structures and remote sensing interpretation line images.

5. The method for determining the ore-controlling range of geological line images according to claim 1, It is characterized in that In S1, the operation method for using Mapgis software to export the plain text file of Mapgis line file is as follows: open Mapgis software - enter the graphics processing function - click file conversion - load line file - click output - select click - click output Mapgis plain text format to generate the plain text file of Mapgis line file.

6. The method for determining the ore-controlling range of geological line images according to claim 5, It is characterized in that The plain text file is a comma-delimited file in a notepad format.

7. The method for determining the ore-controlling range of geological line images according to claim 1, It is characterized in that The database is at least used for quantitative modeling and prediction research on fault structures and prospecting targets of various mineral types.