Festival and holiday traffic jam simulation and induction method and management and control system thereof

Through simulation engines and traffic induction algorithms, based on historical data, the traffic demand and congested section information of holidays are predicted, and the shortcomings of traditional congestion prediction methods are solved in abnormal situations, and the accurate prediction and induction of highway traffic flow during holidays is achieved, which is improved. Passage efficiency and control effect.

CN118942250APending Publication Date: 2024-11-12SHENZHEN URBAN TRANSPORT PLANNING CENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411127650.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Traditional congestion prediction methods have high dependence on pre-data, and poor ability to deduce the entire congestion process, especially in abnormal situations (such as holidays and road section construction) that the prediction effect is not good.

Method used

Use simulation engine to obtain the traffic prediction simulation request during holidays, calculate the simulation algorithm based on historical traffic data, obtain the traffic simulation evaluation index data, and induce congested sections through traffic induction algorithm, update the simulation evaluation index data, and realize the precise control of traffic flow .

Benefits of technology

Through online simulation technology, the traffic demand and congested section information of highways across the network during holidays is predicted in advance, and accurate traffic induction plans are provided to improve traffic efficiency and achieve precise control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118942250A_ABST
    Figure CN118942250A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of traffic operation and maintenance, in particular to a holiday traffic jam simulation and guidance method and system, and the method comprises the steps: carrying out the calculation based on historical traffic data through employing a simulation algorithm, and obtaining the traffic simulation evaluation index data corresponding to the holiday and festival date, the traffic simulation evaluation index data at least comprises congested road section data, and the congested road section data comprises at least one congested road section position and congested condition data at the position; and based on the congested road section data, adopting a traffic guidance algorithm to perform congestion guidance on the traffic condition at the congested road section position, and adopting a simulation algorithm to recalculate the updated traffic simulation evaluation index data. According to the method, the traffic travel volume of the whole network expressway is predicted in advance, especially for the congestion condition in festivals and holidays, scientific decision support is provided for traffic control of the expressway in festivals and holidays, and the traffic efficiency of the expressway is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of traffic operation and maintenance, and in particular to a holiday traffic congestion simulation and induction method and a control system thereof. Background Art

[0002] With the development and progress of the highway infrastructure construction industry, highways have gradually become an important means of travel for travelers. However, with the rapid growth of the number of motor vehicles, the demand for transportation is increasing. In addition, the journey on highways is long. During holidays, the large passenger flow on highways can easily lead to frequent congestion on highways. Therefore, it is necessary to combine traffic flow prediction with simulation technology to predict the congestion in holiday scenarios for large passenger flow scenarios. By predicting congestion before holidays, we can release congestion intelligence and guidance information in advance for sections prone to congestion, and combine them with holiday travel guides to improve the traffic efficiency of highways during holiday scenarios.

[0003] Since traditional congestion prediction is based on deep learning or machine learning, regular feature extraction operations are performed on congestion data to train the model and predict congested road section information. Therefore, the traditional congestion prediction is more effective under normal circumstances, that is, when there are no temporary emergency control events; however, under abnormal circumstances, such as road section control during holidays and road section construction, the effect of traditional congestion prediction is relatively poor.

[0004] In summary, the prior art has the following technical problems: (1) Congestion prediction methods are highly dependent on prior data.

[0005] (2) Traditional congestion forecasting has poor ability to deduce the entire congestion process.

[0006] (3) Traditional congestion prediction has poor prediction effect under abnormal conditions. Summary of the invention

[0007] In view of the problems existing in the above background technology, the present invention provides a holiday traffic congestion simulation and induction method and a control system thereof, and the specific technical solution is as follows: A holiday traffic congestion simulation and induction method comprises the following steps: The simulation engine obtains a holiday traffic forecast simulation request sent by the business end, where the holiday traffic forecast simulation request at least includes the holiday date; According to the holiday traffic forecast simulation request, the historical traffic data corresponding to the holiday date is loaded from the database. The historical traffic data includes the travel demand of all traffic areas in historical holidays by day and time, the highway network data of the entire network, and the road network path data; Based on historical traffic data, a simulation algorithm is used to calculate traffic simulation evaluation index data corresponding to the holiday date, where the traffic simulation evaluation index data at least includes congested road section data, and the congested road section data includes at least one congested road section location and congestion situation data at the location; Based on the congested road section data, a traffic induction algorithm is used to induce the traffic situation at the congested road section, and a simulation algorithm is used to recalculate the updated traffic simulation evaluation index data; The traffic simulation evaluation index data is compared with the updated traffic simulation evaluation index data, and the difference between the updated traffic simulation evaluation index data and the traffic simulation evaluation index data after traffic induction is obtained to check the effectiveness of traffic induction.

[0008] In a preferred implementation, the traffic simulation evaluation index data corresponding to the holiday date is calculated using a simulation algorithm based on historical traffic data, including: The simulation is performed based on the preset time period length as a time slice granularity to evaluate the effectiveness of the plan. After multiple rounds of comparison, the optimal plan is selected.

[0009] In a preferred implementation, the induction method further includes: storing the obtained traffic simulation evaluation index data in a database, and sending a general congestion induction completion message to the service end.

[0010] In a preferred implementation, the traffic simulation evaluation index data can be sent to the business end in the form of a Kafka message.

[0011] In a preferred implementation, the method further includes: The simulation engine obtains the reference date and current holiday information sent by the business end, and obtains the prediction request format of the current holiday after data processing; The prediction engine obtains the prediction request and reference date sent by the RPC, compares the obtained prediction request and reference date with the default reference date, and chooses whether to update the prediction model depending on whether the two are different; According to the prediction model, the current holidays are predicted to obtain the traffic demand of the entire network's high-speed OD during the current holidays.

[0012] In a preferred implementation, the method further includes: Based on the traffic conditions at the congested road section, the future time-sharing travel demand OD matrix and vehicle path are obtained according to the traffic induction algorithm, and the induction plan is determined in combination with the location of the induction screen.

[0013] A holiday traffic congestion simulation and induction control system, using a holiday traffic congestion simulation and induction method, including: A holiday simulation module, which uses a simulation algorithm to calculate traffic simulation evaluation index data corresponding to holiday dates based on historical traffic data, wherein the traffic simulation evaluation index data at least includes congested road section data, and the congested road section data includes at least one congested road section location and congestion situation data at the location; The holiday congestion induction module uses a traffic induction algorithm to induce traffic conditions at the location of the congested road section based on the congested road section data, and uses a simulation algorithm to recalculate and update the traffic simulation evaluation index data; The holiday prediction module predicts the traffic demand of the entire highway network OD based on the reference date and current holiday information.

[0014] In a preferred implementation, the holiday prediction module can determine whether the module needs to be executed based on whether the traffic demand of the highway OD in the entire network needs to be updated during the current holiday.

[0015] In a preferred implementation, the holiday prediction module, the holiday simulation module, and the holiday congestion induction module all include a prediction engine, a business end, a simulation engine, and a database.

[0016] In a preferred implementation, the processing of the fault condition by the simulation engine specifically includes the following steps: S1: The business end initiates a holiday assessment scenario task request or starts the simulation engine program / restarts the container where the simulation engine is located through RPC; S2: The simulation engine program detects whether there is a holiday scenario evaluation task running in the current program; S3: If there is a holiday scenario assessment task in the current program, the RPC returns the scenario ID of the running holiday scenario task. At this point, the holiday assessment scenario is completed. S4: If there is no holiday scenario evaluation task in the current program, determine whether the simulation engine is restarted; S5: If the simulation engine is restarted, then for the scenario task maintained by the database, the last running status of the simulation engine is queried, and then it is determined whether the holiday prediction module is needed; if the simulation engine is not restarted, it is directly determined whether the holiday prediction module is needed; S6: If a holiday prediction module is required, determine whether the holiday prediction module scenario task is created. If not, recreate the holiday prediction module scenario task, and then run the holiday prediction scenario on a daily basis for the current holiday. S7: If the holiday prediction for all days of the current holiday has been completed according to the prediction module scenario tasks, then the holiday prediction module for the current holiday is completed; S8: If the holiday prediction module is not needed, determine whether the holiday simulation module scenario task is created. If not, recreate the holiday simulation module scenario task, and then run the holiday simulation module scenario task according to the time slice; S9: When all days of all holidays have completed the holiday simulation module scenario according to the time slice, the holiday simulation module of the current holiday is completed; S10: Determine whether the holiday congestion induction module scenario task is created. If not, it is necessary to recreate the holiday congestion induction module scenario task, and then traverse each congestion point one by one to determine whether the holiday congestion induction module scenario task is created. If not, it is necessary to recreate the holiday congestion induction module scenario task; S11: Run the holiday induction module scenario tasks at each congestion point; S12: The holiday induction module is completed, the holiday congestion induction module is completed, and the holiday assessment scenario task is completed.

[0017] In a preferred implementation, the method for determining whether the simulation engine needs to be restarted in step S5 is: determining whether a scenario task exists in the database. If the scenario task does not exist in the database, it means that the simulation engine is started for the first time. If the scenario task exists in the database, it means that the container where the currently running simulation engine is located has restarted.

[0018] Beneficial effects of the present invention: The algorithm engine based on online simulation technology of the present invention predicts the traffic demand of the entire network highway OD during the current holidays in advance on the eve of holidays, and then uses it as the input data of the simulation engine in combination with basic data such as the entire network highway network and the entire network highway path to simulate and deduce the holidays, and obtains the congested section information of the entire network highway during the holidays, including the queue length and congestion duration of the congested section, so as to predict the congestion information during the holidays in advance.

[0019] The algorithm engine based on online simulation technology of the present invention uses traffic induction technology to perform traffic induction on congested sections according to the congested sections of the entire network of highways during holidays obtained by prediction and simulation, and obtains a congestion evacuation plan for the entire network of highways using traffic induction; then combined with simulation deduction technology, the traffic induction plans are compared in the form of traffic evaluation indicators to achieve precise control. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the process of the control method in the present invention.

[0021] Figure 2 This is a timing diagram of the holiday prediction module process in the present invention.

[0022] Figure 3 This is a timing diagram of the holiday simulation module process in the present invention.

[0023] Figure 4 This is a timing diagram of the holiday congestion induction module process in the present invention.

[0024] Figure 5 It is a schematic diagram of the process management after the holiday simulation task management in the present invention.

[0025] Figure 6 It is a schematic diagram of the process of holiday induction in the present invention. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiment is only one embodiment of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] like Figures 1 to 5 As shown, a holiday traffic congestion simulation and induction method comprises the following steps: The simulation engine obtains a holiday traffic forecast simulation request sent by the business end, where the holiday traffic forecast simulation request at least includes the holiday date; According to the holiday traffic forecast simulation request, the historical traffic data corresponding to the holiday date is loaded from the database. The historical traffic data includes the travel demand of all traffic areas in historical holidays by day and time, the highway network data of the entire network, and the road network path data; Based on historical traffic data, a simulation algorithm is used to calculate traffic simulation evaluation index data corresponding to the holiday date, where the traffic simulation evaluation index data at least includes congested road section data, and the congested road section data includes at least one congested road section location and congestion situation data at the location; Based on the congested road section data, a traffic induction algorithm is used to induce the traffic conditions at the congested road section, and a simulation algorithm is used to recalculate the updated traffic simulation evaluation index data; The traffic simulation evaluation index data is compared with the updated traffic simulation evaluation index data, and the difference between the updated traffic simulation evaluation index data and the traffic simulation evaluation index data after traffic induction is obtained to check the effectiveness of traffic induction.

[0028] In a preferred implementation, the traffic simulation evaluation index data corresponding to the holiday date is calculated using a simulation algorithm based on historical traffic data, including: The simulation is performed based on the preset time period length as a time slice granularity to evaluate the effectiveness of the plan. After multiple rounds of comparison, the optimal plan is selected.

[0029] Based on the traffic simulation evaluation index data after simulation, the actual implementation effect of the plan can be fed back, and optimization data feedback can be provided for the simulation engine and induction algorithm, which will help to further upgrade the algorithm and form a closed-loop feedback to form a self-iterative optimization system for congestion simulation and control.

[0030] Specifically, congestion mileage and congestion index are selected as evaluation indicators; 1) Congested mileage refers to the spatial proportion of a road section in a state of severe congestion during the statistical period.

[0031] In the statistical period [T, T+ ], the congestion mileage of road section i is:

[0032] in, Indicates whether sub-path j of road section i is severely congested, with a value of [1-yes, 0-no], is the length of road segment j.

[0033] 2) Congestion Index: A dimensionless value reflecting the traffic condition of a road section or region, ranging from 0 to 10, calculated by the travel time ratio TTI. The road condition is divided into 5 levels according to the TTI value range, as follows: ① Smooth: Travel time ratio (TTI) is [1, 1.3), and urban traffic operation index is [0, 2); ②Basically smooth: travel time ratio (TTI) is [1.3, 1.6), and urban traffic operation index is [2, 4); ③ Mild congestion: travel time ratio (TTI) is [1.6, 1.9), urban traffic operation index is [4, 6); ④ Moderate congestion: travel time ratio (TTI) is [1.9, 2.2), urban traffic operation index is 6, 8); ⑤ Severe congestion: travel time ratio (TTI) is [2.2, ), the urban traffic operation index is [8, ).

[0034] The travel time ratio (TTI) indicates the ratio of the actual driving time of a vehicle on a road section to the driving time of the vehicle on the road section at free flow speed. The larger the travel time ratio, the worse the traffic conditions, that is, the more congested it is.

[0035] In the statistical period [T, T+ ], the travel time ratio (TTI) of section i is:

[0036] In the formula, is the average speed of section i, is the free flow speed of section i, is the length of road section i.

[0037] In a preferred implementation, the induction method further includes: storing the obtained traffic simulation evaluation index data in a database, and sending a general congestion induction completion message to the service end.

[0038] In a preferred implementation, the traffic simulation evaluation index data can be sent to the business end in the form of a Kafka message.

[0039] In a preferred implementation, the method further includes: The simulation engine obtains the reference date and current holiday information sent by the business end, and obtains the prediction request format of the current holiday after data processing; The prediction engine obtains the prediction request and reference date sent by the RPC, compares the obtained prediction request and reference date with the default reference date, and chooses whether to update the prediction model depending on whether the two are different; According to the prediction model, the current holidays are predicted to obtain the traffic demand of the entire network's high-speed OD during the current holidays.

[0040] In a preferred implementation, the method further includes: Based on the traffic conditions at the location of the congested road section, the future time-sharing travel demand OD matrix and vehicle path are obtained according to the traffic induction algorithm, and the induction plan is determined in combination with the location of the induction screen.

[0041] Specifically, when facing platform users, based on the road guidance screen, according to the location of the traffic guidance screen, the platform can push the enabled guidance screen number and detour information to the guidance screen based on the local redistribution process of the predicted traffic flow state.

[0042] For individual users: Not based on the road guidance screen, it is assumed that in the future information can be sent to individual mobile terminals in real time. Managers can set the guidance starting point based on the vehicle tracing analysis of the accident section. After the platform calculates the guidance path, it can send the information to the affected users.

[0043] The guidance method of the present invention takes into account the information receiving capabilities of individual users such as mobile phones and in-vehicle apps. Therefore, on sections without real guidance screens, a virtual guidance screen can be set up in combination with the analyzed traffic flow with the same starting and ending points passing through the congested section, and a guidance plan can be given using an induction algorithm.

[0044] The method for screening vehicle routes is as follows: based on the specified vehicle data, the system screens vehicles that may be induced according to three principles, and vehicles that may be induced include at least affected vehicles; after the screening is completed, the destination with the most induced vehicles is selected for vehicle induction.

[0045] Specifically, the three principles include: Principle 1: The vehicle’s route passes through congested sections; Principle 2: There is at least one turning node on the route from the current section of the vehicle to the congested section, so there is room for other path selection and execution; Principle 3: There is a driving route from the current point to the destination that does not pass through congested sections.

[0046] like Figure 6 As shown, the induction process is as follows: (1) Mark the congested section as L0: Mark the congested section as L0, and set the number of lanes affected by the congestion and the estimated duration of the congestion; (2) Simulation of congestion scenarios: Simulation evaluates congestion conditions and outputs evaluation indicators, congestion mileage and congestion index; (3) Set the road section L1 associated with the guidance screen: According to the real guidance screen or virtual guidance screen, mark the road section L1 with the guidance screen; (4) Program reading files: load the highway network data, network path data and the vehicle simulation trajectory file output in step (2), and read the congested section L0 information in step (1) and the section L1 information where the induction screen is placed in step (3); (5) Preliminary screening of inducible vehicles: Traverse all vehicles and screen out all vehicles that meet the conditions according to principle 1 (the vehicle's path passes through the congested section L0, and at the time of induction, the vehicle has not yet reached the induction screen section L1); (6) Inducible vehicle destination screening: The destinations of the vehicles screened in step (5) are screened out, and the destinations are aggregated and sorted according to the same destinations, and the destinations are sorted according to the number of vehicles [D 1, D2, …], that is, the number of vehicles going to destination D1 > the number of vehicles going to destination D2; (7) Determine the inducible vehicles: After the inducing information is released, if the vehicle can be induced, it must meet one condition: there are other roads ahead. Therefore, according to Principle 2 (there is at least one turning node on the route from the vehicle's current point to the congested section, and there is room for other path selection and execution) and Principle 3 (there is a driving route from the vehicle's current point to its destination that does not pass through the congested section), first screen D 1,That is, start with the destination with the most vehicles. If the above two principles are met, the vehicle with destination D1 is determined to be a decoyable vehicle. If the destination D1 does not meet the above two principles, D2 is checked in order, and so on; (8) Determine the set of inducible paths [L3, L4, L5]: According to the principle of minimum travel time ratio, select the three paths with the smallest travel time ratio between the section L1 where the induction screen is placed and the destination D1 as the set of inducible paths. If there are less than three paths, 1-2 paths are also acceptable. (9) Simulation of induced scenarios: Three simulations are performed respectively, simulating the three paths of the induced path set [L3, L4, L5]. Assuming that all induced vehicles follow the induced paths, the vehicle operation is simulated, and the congestion situation in each scenario is output respectively, and the evaluation indicators, congestion mileage and congestion index are output; (10) Compare the simulation evaluation results and select the optimal path: Compare the evaluation indicators of the congestion scenario (without induction) and the three induction paths in steps (2) and (9), and select the path with the smallest congestion mileage and the best congestion index after induction as the optimal induction path; (11) Output induction path.

[0047] A holiday traffic congestion simulation and induction control system, using a holiday traffic congestion simulation and induction method, including: A holiday simulation module, which uses a simulation algorithm to calculate traffic simulation evaluation index data corresponding to holiday dates based on historical traffic data, wherein the traffic simulation evaluation index data at least includes congested road section data, and the congested road section data includes at least one congested road section location and congestion situation data at the location; The holiday congestion induction module uses a traffic induction algorithm to induce traffic conditions at the location of the congested road section based on the congested road section data, and uses a simulation algorithm to recalculate and update the traffic simulation evaluation index data; The holiday prediction module predicts the traffic demand of the entire highway network OD based on the reference date and current holiday information.

[0048] In a preferred implementation, the holiday prediction module can determine whether the module needs to be executed based on whether the traffic demand of the highway OD of the entire network needs to be updated during the current holiday; In a preferred implementation, the holiday prediction module, the holiday simulation module, and the holiday congestion induction module all include a prediction engine, a business end, a simulation engine, and a database.

[0049] In a preferred implementation, the processing of the fault condition by the simulation engine specifically includes the following steps: S1: The business end initiates a holiday assessment scenario task request or starts the simulation engine program / restarts the container where the simulation engine is located through RPC; S2: The simulation engine program detects whether there is a holiday scenario evaluation task running in the current program; S3: If there is a holiday scenario assessment task in the current program, the RPC returns the scenario ID of the running holiday scenario task. At this point, the holiday assessment scenario is completed. S4: If there is no holiday scenario evaluation task in the current program, determine whether the simulation engine is restarted; S5: If the simulation engine is restarted, then for the scenario task maintained by the database, the last running status of the simulation engine is queried, and then it is determined whether the holiday prediction module is needed; if the simulation engine is not restarted, it is directly determined whether the holiday prediction module is needed; S6: If a holiday prediction module is required, determine whether the holiday prediction module scenario task is created. If not, recreate the holiday prediction module scenario task, and then run the holiday prediction scenario on a daily basis for the current holiday. S7: If the holiday prediction for all days of the current holiday has been completed according to the prediction module scenario tasks, then the holiday prediction module for the current holiday is completed; S8: If the holiday prediction module is not needed, determine whether the holiday simulation module scenario task is created. If not, recreate the holiday simulation module scenario task, and then run the holiday simulation module scenario task according to the time slice; S9: When all days of all holidays have completed the holiday simulation module scenario according to the time slice, the holiday simulation module of the current holiday is completed; S10: Determine whether the holiday congestion induction module scenario task is created. If not, it is necessary to recreate the holiday congestion induction module scenario task, and then traverse each congestion point one by one to determine whether the holiday congestion induction module scenario task is created. If not, it is necessary to recreate the holiday congestion induction module scenario task; S11: Run the holiday induction module scenario tasks at each congestion point; S12: The holiday induction module is completed, the holiday congestion induction module is completed, and the holiday assessment scenario task is completed.

[0050] In a preferred implementation, the method for determining whether the simulation engine needs to be restarted in step S5 is: determining whether a scenario task exists in the database. If the scenario task does not exist in the database, it means that the simulation engine is started for the first time. If the scenario task exists in the database, it means that the container where the currently running simulation engine is located has restarted.

[0051] The algorithm engine based on online simulation technology of the present invention predicts the traffic demand of the entire network highway OD during the current holidays in advance on the eve of holidays, and then uses it as the input data of the simulation engine in combination with basic data such as the entire network highway network and the entire network highway path to simulate and deduce the holidays, and obtains the congested section information of the entire network highway during the holidays, including the queue length and congestion duration of the congested section, so as to predict the congestion information during the holidays in advance.

[0052] The algorithm engine based on online simulation technology of the present invention uses traffic induction technology to perform traffic induction on congested sections according to the congested sections of the entire network of highways during holidays obtained by prediction and simulation, and obtains a congestion evacuation plan for the entire network of highways using traffic induction; then combined with simulation deduction technology, the traffic induction plans are compared in the form of traffic evaluation indicators to achieve precise control.

[0053] The above is only a preferred embodiment of the present invention, and its description is relatively specific and detailed, but it cannot be understood as limiting the scope of the invention patent. It should be pointed out that several improvements and modifications can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.

Claims

1. A holiday traffic congestion simulation and induction method, characterized in that: The following steps are involved: The simulation engine obtains a holiday traffic forecast simulation request sent by the service end, wherein the holiday traffic forecast simulation request at least includes a holiday date; Loading historical traffic data corresponding to the holiday date from a database according to the holiday traffic forecast simulation request, the historical traffic data including travel demand by day and time for all traffic zones during historical holidays, full-network highway network data, and road network path data; Based on the historical traffic data, a simulation algorithm is used to calculate traffic simulation evaluation index data corresponding to the holiday date, wherein the traffic simulation evaluation index data at least includes congested road section data, and the congested road section data includes at least one congested road section location and congestion situation data at the location; Based on the congested road section data, a traffic induction algorithm is used to induce the traffic situation at the congested road section, and a simulation algorithm is used to recalculate the updated traffic simulation evaluation index data; The traffic simulation evaluation index data is compared with the updated traffic simulation evaluation index data to obtain the difference between the updated traffic simulation evaluation index data after traffic induction and the traffic simulation evaluation index data, so as to check the effectiveness of traffic induction.

2. The holiday traffic congestion simulation and induction method according to claim 1 is characterized in that: Traffic simulation evaluation index data corresponding to the holiday date is calculated based on the historical traffic data using a simulation algorithm, including: The simulation is performed based on the preset time period length as a time slice granularity to evaluate the effectiveness of the plan. After multiple rounds of comparison, the optimal plan is selected.

3. The holiday traffic congestion simulation and induction method according to claim 1, characterized in that: The induction method further includes: storing the obtained traffic simulation evaluation index data in a database, and sending a general congestion induction completion message to the service end.

4. The holiday traffic congestion simulation and induction method according to claim 1, characterized in that: The traffic simulation evaluation index data can be sent to the business end in the form of Kafka messages.

5. The holiday traffic congestion simulation and induction method according to claim 1, characterized in that: The method further comprises: The simulation engine obtains the reference date and current holiday information sent by the business end, and obtains the prediction request format of the current holiday after data processing; The prediction engine obtains the prediction request and reference date sent by the RPC, compares the obtained prediction request and reference date with the default reference date, and chooses whether to update the prediction model depending on whether the two are different; According to the prediction model, the current holidays are predicted to obtain the traffic demand of the entire network's high-speed OD during the current holidays.

6. The holiday traffic congestion simulation and induction method according to claim 1, characterized in that: The method further comprises: Based on the traffic conditions at the location of the congested road section, the future time-sharing travel demand OD matrix and vehicle path are obtained according to the traffic induction algorithm, and the induction plan is determined in combination with the location of the induction screen.

7. A holiday traffic congestion simulation and induction control system, using the holiday traffic congestion simulation and induction method according to any one of claims 1 to 6, characterized in that: include: A holiday simulation module, which uses a simulation algorithm to calculate traffic simulation evaluation index data corresponding to the holiday date based on the historical traffic data, wherein the traffic simulation evaluation index data at least includes congested road section data, and the congested road section data includes at least one congested road section location and congestion situation data at the location; A holiday congestion induction module, which uses a traffic induction algorithm to perform congestion induction on the traffic conditions at the location of the congested road section based on the congested road section data, and uses a simulation algorithm to recalculate and update traffic simulation evaluation index data; The holiday prediction module predicts the traffic demand of the entire highway network OD based on the reference date and current holiday information.

8. The holiday traffic congestion simulation and induction control system according to claim 7, characterized in that: The holiday prediction module can determine whether the module needs to be executed based on whether the traffic demand of the entire network highway OD during the current holiday needs to be updated.

9. The holiday traffic congestion simulation and induction control system according to claim 7, characterized in that: The holiday prediction module, holiday simulation module and holiday congestion induction module all include a prediction engine, a business terminal, a simulation engine and a database.

10. The holiday traffic congestion simulation and induction control system according to claim 9, characterized in that: The processing of the fault condition by the simulation engine specifically comprises the following steps: S1: The business end initiates a holiday assessment scenario task request or starts the simulation engine program / restarts the container where the simulation engine is located through RPC; S2: The simulation engine program detects whether there is a holiday scenario evaluation task running in the current program; S3: If there is a holiday scenario assessment task in the current program, the RPC returns the scenario ID of the running holiday scenario task. At this point, the holiday assessment scenario is completed. S4: If there is no holiday scenario evaluation task in the current program, determine whether the simulation engine is restarted; S5: If the simulation engine is restarted, then for the scenario task maintained by the database, the last running status of the simulation engine is queried, and then it is determined whether the holiday prediction module is needed; if the simulation engine is not restarted, it is directly determined whether the holiday prediction module is needed; S6: If a holiday prediction module is required, determine whether the holiday prediction module scenario task is created. If not, recreate the holiday prediction module scenario task, and then run the holiday prediction scenario on a daily basis for the current holiday. S7: If the holiday prediction for all days of the current holiday has been completed according to the prediction module scenario tasks, then the holiday prediction module for the current holiday is completed; S8: If the holiday prediction module is not needed, determine whether the holiday simulation module scenario task is created. If not, recreate the holiday simulation module scenario task, and then run the holiday simulation module scenario task according to the time slice; S9: When all days of all holidays have completed the holiday simulation module scenario according to the time slice, the holiday simulation module of the current holiday is completed; S10: Determine whether the holiday congestion induction module scenario task is created. If not, it is necessary to recreate the holiday congestion induction module scenario task, and then traverse each congestion point one by one to determine whether the holiday congestion induction module scenario task is created. If not, it is necessary to recreate the holiday congestion induction module scenario task; S11: Run the holiday induction module scenario tasks at each congestion point; S12: The holiday induction module is completed, the holiday congestion induction module is completed, and the holiday assessment scenario task is completed.

11. The holiday traffic congestion simulation and induction control system according to claim 10, characterized in that: The method for determining whether the simulation engine needs to be restarted in step S5 is: determining whether the scenario task in the database exists. If the scenario task does not exist in the database, it means that the simulation engine is started for the first time. If the scenario task exists in the database, it means that the container where the currently running simulation engine is located has restarted.