Method and device for determining regulation and control boundary of industrial park

By establishing a power regulation characteristic model and a safe operation coupling model of industrial parks, and using the ray sampling method, the problem of uncertainty in the regulation boundary of industrial parks is solved, and more accurate regulation boundary determination and safe operation of the power network are achieved.

CN118944053APending Publication Date: 2024-11-12YUNNAN POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410936435.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

It is difficult for the existing technology to accurately determine the regulatory boundaries of industrial parks, especially after the new energy units are connected to the grid, the topological complexity of industrial parks increases, resulting in uncertainty and accuracy of regulatory boundaries.

Method used

By establishing a power regulation characteristic model and a safe operation coupling model with high energy consumption load, the ray sampling method is used for optimization and solution, and the approximate regulation boundaries are determined to ensure the balance of current and safe operation of the power network in the industrial park.

Benefits of technology

It has achieved more accurate determination of the regulatory boundaries of industrial parks, expanded the search scope, reflected the limit situation in detail, and improved the certainty and accuracy of the regulatory boundaries.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944053A_ABST
    Figure CN118944053A_ABST
Patent Text Reader

Abstract

The invention discloses a method and a device for determining a regulation boundary of an industrial park. According to the method, an industrial park safe operation coupling constraint based on power flow balance of a power network is established, and an approximate regulation boundary is determined by optimally solving a safe operation coupling model based on a ray sampling method. Through a ray sampling method, the number of sampling points is increased, the search range can be effectively expanded, the overall regulation and control boundary of the industrial park under the limit condition can be reflected more finely, and finally the regulation and control boundary of the industrial park can be determined more accurately.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power system control, and in particular to a method and device for determining control boundaries of an industrial park. Background Art

[0002] With the grid connection of large-scale wind power and photovoltaic power generation units, the strong randomness and volatility of renewable energy power generation itself have put forward higher requirements for the flexible adjustment capabilities of new power systems. The current "source follows load" mode of the power system will be unsustainable in the future, so it is urgent to tap the flexible adjustment resources on the load side to enable them to participate in multi-type interactive control of the power grid.

[0003] Clear control boundaries are the basis for load-side resources to participate in grid control. As typical heat storage type high energy consumption loads, electrolytic aluminum and ore-fired furnace loads have good control characteristics, and short-term power control will not have a significant impact on production.

[0004] In the related technologies, since some new energy units are often installed inside industrial parks, the topological complexity of the industrial parks is increased, which leads to the uncertainty of the overall control boundary of the industrial parks. In addition, considering the flow balance constraints of the power network inside the industrial parks, these will increase the accuracy of the control boundary of the industrial parks. Summary of the invention

[0005] In view of this, the present application provides a method and device for determining the control boundary of an industrial park, so as to more accurately determine the control boundary of an industrial park.

[0006] In a first aspect, the present application provides an evaluation method for determining the regulatory boundary of an industrial park, comprising: Determine a power regulation characteristic model of high energy consumption loads within the industrial park, wherein the power regulation characteristic model has a regulation boundary constraint condition; Determine a safe operation coupling model of the industrial park according to the power regulation characteristic model, wherein the safe operation coupling model is embodied by a steady-state power flow equation; Based on the ray sampling method, the safe operation coupling model is solved by optimization to determine the approximate control boundary.

[0007] Optionally, the power regulation characteristic model includes an electrolytic aluminum load power characteristic model represented by the following formula: ; ; In the formula, P AL is the active power of electrolytic aluminum load, Q AL is the reactive power of electrolytic aluminum load, VAH is the high voltage bus voltage of the aluminum plant, k The transformation ratio of the on-load tap-changing transformer in the aluminum plant, V SR is the saturated reactor voltage drop, E AL is the equivalent potential of the electrolytic cell, Q AL is the reactive power of electrolytic aluminum load, Q k0 is the constant impedance characteristic coefficient, V 0 is the reference voltage, Q 0 is the constant power value; The power regulation characteristic model also includes a submerged arc furnace load power characteristic model represented by the following formula: ; In the formula, is the active power of the ore-arc furnace load, is the reactive power of the ore-arc furnace load, R line and is the short network equivalent resistance, X line is the short network equivalent reactance, R arc are the arc equivalent resistance, X arc is the arc equivalent reactance, V arc It is the low voltage side voltage of the main transformer of the electric arc furnace.

[0008] Optionally, the constraint condition corresponding to the electrolytic aluminum load power characteristic model is expressed in the following formula: ; ; In the formula, V SR is the saturated reactor voltage drop, is the minimum voltage drop of the saturated reactor, is the maximum voltage drop of the saturated reactor, P AL is the active power of electrolytic aluminum load, Q AL is the reactive power of electrolytic aluminum load, is the minimum active power of electrolytic aluminum load, is the maximum active power of electrolytic aluminum load, is the minimum reactive power of electrolytic aluminum load, It is the maximum reactive power of electrolytic aluminum load.

[0009] Optionally, the constraint condition corresponding to the submerged arc furnace load power characteristic model is expressed in the following formula: ; ; In the formula, V arc The voltage on the low voltage side of the main transformer of the submerged arc furnace. The minimum voltage on the low voltage side of the main transformer of the submerged arc furnace. The maximum voltage on the low voltage side of the main transformer of the submerged arc furnace. is the active power of the ore-arc furnace load, is the minimum active power of the ore-fired furnace load, is the maximum active power of the ore-fired furnace load, is the reactive power of the ore-arc furnace load, is the minimum reactive power of the ore-fired furnace load, It is the maximum reactive power of the ore-arc furnace load.

[0010] Optionally, the safety operation coupling model is expressed in the following formula: ; In the formula, is the active power of the new energy unit, is the active power of high energy consumption load, is the reactive power of the new energy unit, Reactive power for high energy consumption loads, is the node voltage of the industrial park, A node in the power network of the industrial park i and nodes j The mutual conductance, A node in the power network of the industrial park i and nodes j The mutual acceptance of electricity.

[0011] Optionally, the constraint conditions of the safe operation coupling model include power flow thermal stability capacity constraints corresponding to the internal lines and tie lines of the industrial park expressed by the following formula: ; In the formula, P ij Indicates branch ij The meritorious trend, Q ij Indicates branch ij The reactive power flow, Indicates branch ij Thermal stability limit of tidal capacity; The constraints of the safe operation coupling model also include the capacity constraints of the new energy units expressed by the following formula: ; In the formula, P G Indicates the active power of new energy units. Q G Indicates the reactive power of new energy units. Indicates the capacity limit of the new energy unit; The constraints of the safe operation coupling model also include the voltage constraints of the nodes inside the industrial park expressed by the following formula: ; In the formula, is the node voltage of the industrial park, is the minimum voltage of the industrial park node, is the maximum voltage of the industrial park node; The constraints of the safety operation coupling model also include the output constraints of the new energy units expressed by the following formula: ; In the formula, P G Indicates the active power of new energy units. P G min Indicates the active power of new energy units. Q G min Indicates the reactive power of new energy units. Indicates the minimum power factor of the new energy unit. Indicates the maximum power factor of the new energy unit.

[0012] Optionally, determining an approximate control boundary based on a ray sampling method includes: Determine the linearized high-dimensional state space based on the constraints of the safe operation coupling model ,and , , P 0, Q 0, V is the node voltage amplitude,  is the node voltage phase angle, P w is the active power of the new energy unit, Q w Reactive power of new energy units, P d For the load active output, Q d is the reactive power output of the load, V SR is the saturated reactor voltage drop; Determine the vertex of the control boundary by solving the following formula; ; In the formula, represents the coordinate origin of the control boundary, r is the ray vector; α is the polar angle of the ray emission direction; Connect all vertices to obtain the approximate control boundary.

[0013] In a second aspect, the present application provides a device for determining a control boundary of a business park, including: A first determination module is used to determine a power regulation characteristic model of high energy consumption loads within the industrial park, wherein the power regulation characteristic model has a regulation boundary constraint condition; A second determination module is used to determine a safe operation coupling model of the industrial park according to the power regulation characteristic model, wherein the safe operation coupling model is embodied by a steady-state power flow equation; The third determination module is used to determine the approximate control boundary by optimizing the safe operation coupling model based on the ray sampling method.

[0014] In a third aspect, the present application provides an execution device, including a processor and a memory, wherein the processor is coupled to the memory; The memory is used to store programs; The processor is used to execute the program in the memory, so that the execution device executes the above method.

[0015] In the method disclosed in this application, a coupling constraint for safe operation of an industrial park based on power network flow balance is established, and a safe operation coupling model is solved by optimization based on a ray sampling method to determine an approximate control boundary. By using the ray sampling method, the number of sampling points is increased, which can effectively expand the search range, more finely reflect the overall control boundary of the industrial park under extreme conditions, and finally determine the control boundary of the industrial park more accurately. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The technical solution and other beneficial effects of the present application will be made apparent by describing in detail the specific implementation methods of the present application in conjunction with the accompanying drawings.

[0017] Figure 1 An operational flow chart of a method for determining an industrial park regulatory boundary provided by an exemplary embodiment is shown.

[0018] Figure 2 An exemplary topological structure diagram of an industrial park approximate real-time control boundary solution provided by an exemplary embodiment is shown.

[0019] Figure 3A comparison diagram of the determination method of the present application provided by an exemplary embodiment and the progressive vertex enumeration method of the related art is shown.

[0020] Figure 4 A block diagram of a device for determining an industrial park control boundary provided by an exemplary embodiment is shown.

[0021] Figure 5 A block diagram of the execution device provided by an exemplary embodiment is shown. DETAILED DESCRIPTION

[0022] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below. The terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments described here can be implemented in an order other than that illustrated or described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or modules is not necessarily limited to those steps or modules clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products or devices. The naming or numbering of steps in this application does not mean that the steps in the method flow must be executed in the time / logical sequence indicated by the naming or numbering. The process steps that have been named or numbered can change the execution order according to the technical purpose to be achieved, as long as the same or similar technical effects can be achieved. The division of units in this application is a logical division. There may be other division methods when it is implemented in actual applications. For example, multiple units can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, and the indirect coupling or communication connection between units can be electrical or other similar forms, which are not limited in this application. In addition, the units or sub-units described as separate components may or may not be physically separated, may or may not be physical units, or may be distributed in multiple circuit units, and some or all of the units may be selected according to actual needs to achieve the purpose of the present application.

[0023] Please refer to Figure 1 ,in Figure 1 A flowchart of a method for determining an industrial park control boundary provided by an exemplary embodiment is shown. The method is implemented through steps 102-106.

[0024] In step 102, a power regulation characteristic model of high energy consumption loads within the industrial park is determined, wherein the power regulation characteristic model has a regulation boundary constraint condition.

[0025] It is known to those skilled in the art that high energy consumption loads include but are not limited to electrolytic aluminum, ore-fired furnaces, etc.

[0026] According to the production process analysis of electrolytic aluminum load, the main electrical equipment for electrolytic aluminum is the electrolytic cell, which can be equivalent to an equivalent resistor. R AL and back EMF E AL Based on this, the specific process of active power regulation characteristics of electrolytic aluminum load can be obtained as follows: First, the equivalent circuit model of the electrolytic aluminum load is established, and it can be concluded that the DC bus voltage of the electrolytic aluminum load can be expressed as: (1) In formula (1), V d is the DC bus voltage of the electrolyzer, V AH is the high voltage bus voltage of the aluminum plant, k The transformation ratio of the on-load tap-changing transformer in the aluminum plant, V SR is the saturated reactor voltage drop, P AL is the electrolytic aluminum load power, I d is the DC current of the electrolytic cell, R AL is the equivalent resistance in series with the electrolytic cell, E AL is the equivalent potential of the electrolytic cell.

[0027] Based on formula (1), the active power model of the electrolytic aluminum load included in the power characteristic model of the electrolytic aluminum load can be obtained, that is, the coupling relationship between the active power of the electrolytic aluminum load and the high-voltage bus voltage and the saturated reactor voltage drop of the aluminum plant can be expressed as: (2) Considering P AL and V AH , V SRThe three-dimensional space graph of is approximately a plane within the electrolytic aluminum load control range, so the plane equation is used to replace its active power characteristics. and , retain the square term and add a constant term, and the active power model of the electrolytic aluminum load is obtained after linearization processing as follows: (3) Among them, the coefficient a , b and c The actual operation data of the aluminum plant can be used and obtained by least squares identification.

[0028] The reactive power model of the electrolytic aluminum load included in the electrolytic aluminum load power characteristic model can be composed of a constant impedance and a constant power model, as shown below: (4) in, Q AL is the reactive power of electrolytic aluminum load, Q k0 is the constant impedance characteristic coefficient, V 0 is the reference voltage, Q 0 is the constant power value. , the reactive power model of electrolytic aluminum load can be obtained after linear processing as follows: (5) The constraints corresponding to the electrolytic aluminum load power characteristic model include the saturated reactor voltage control range constraints and the load power upper and lower limit constraints, as shown below: (6) (7) According to the operation characteristics of the submerged arc furnace during the steel smelting process, the power regulation characteristic model also includes a submerged arc furnace load power characteristic model, and the submerged arc furnace load power characteristic model is in the following form: (8) In formula (8), is the active power of the ore-arc furnace load, is the reactive power of the ore-arc furnace load, R line and X line are the short network equivalent resistance and equivalent reactance respectively; R arc and X arc are the arc equivalent resistance and equivalent reactance respectively, V arc It is the low voltage side voltage of the main transformer of the electric arc furnace.

[0029] The load power of the submerged arc furnace is regulated by adjusting the voltage with fixed impedance. As an independent variable, the above-mentioned submerged arc furnace load power characteristic model can be linearized into the following form: (9).

[0030] The constraints corresponding to the load power characteristic model of the ore-fired furnace include the voltage control range constraint on the low-voltage side of the main transformer and the upper and lower limit constraints of the load power, as shown below: (10) (11) In formula (10) and (11), V arc The voltage on the low voltage side of the main transformer of the submerged arc furnace. The minimum voltage on the low voltage side of the main transformer of the submerged arc furnace. The maximum voltage on the low voltage side of the main transformer of the submerged arc furnace. is the active power of the ore-arc furnace load, is the minimum active power of the ore-fired furnace load, is the maximum active power of the ore-fired furnace load, is the reactive power of the ore-arc furnace load, is the minimum reactive power of the ore-fired furnace load, It is the maximum reactive power of the ore-arc furnace load.

[0031] In step 104, a safe operation coupling model of the industrial park is determined according to the power regulation characteristic model, and the safe operation coupling model is embodied by a steady-state power flow equation.

[0032] There is a certain power network structure inside the industrial park. The high-energy-consuming loads, conventional loads, and new energy units inside the park are connected together through the power network, forming a safe operation coupling model of the industrial park.

[0033] In general form, the steady-state power flow equation (nonlinear form) of the industrial park power network is as follows: (12) In formula (12), is the active power of the new energy unit, is the active power of high energy consumption load, is the reactive power of the new energy unit, Reactive power for high energy consumption loads, is the node voltage of the industrial park, A node in the power network of the industrial park i and nodes j The mutual conductance, A node in the power network of the industrial park i and nodes j The mutual acceptance of electricity.

[0034] Considering that the actual grid line impedance is small and the phase angle difference between adjacent buses is also small, the first-order Taylor series of the sine function and the second-order Taylor series expansion of the cosine function are taken, the branch loss is ignored, and the voltage square is taken as the independent variable, that is, U = V 2 , the linear steady-state power flow equation can be obtained as follows: (13) The node voltage constraint, which is one of the constraints for the safe operation of the coupled model industrial park, is as follows: (14) In formula (14), is the node voltage of the industrial park, is the minimum voltage of the industrial park node, It is the maximum voltage of the industrial park node.

[0035] It is worth noting that the node voltage has a coupling relationship with the control range of the high-voltage AC bus voltage of the electrolytic aluminum load and the low-voltage side voltage of the main transformer of the blast furnace load.

[0036] As one of the constraints for the safe operation of the coupled model industrial park, the power flow thermal stability capacity constraints for the internal lines and interconnection lines of the industrial park are as follows: (15) in, P ij , Q ij and Respectively represent branches ij Thermal stability limits of active power flow, reactive power flow and power flow capacity.

[0037] The linearization method for the power flow thermal stability capacity constraint conditions corresponding to the internal lines and interconnection lines of the industrial park can be: using the inscribed positive N The polygon approaches the circular area infinitely, and the inscribed regular N Edges can be used N A linear inequality is expressed as: (16).

[0038] The capacity constraint of the new energy units, which is one of the constraints for the safe operation of the coupled model industrial park, is as follows: (17); In the formula,P G Indicates the active power of new energy units. Q G Indicates the reactive power of new energy units. Indicates the capacity limit of the new energy unit.

[0039] The linearization of the capacity constraints of new energy units can be similar to the linearization of the power flow thermal stability capacity constraints, that is, the linearization of the capacity constraints of new energy units is as follows: (18) in, P G , Q G and S G They respectively represent the active power, reactive power output and capacity limit of the new energy units.

[0040] As one of the constraints for the safe operation of the coupled model industrial park, the output constraint of the new energy unit includes the upper and lower limit constraints of the active and reactive power of the new energy unit and the power factor constraint of the unit, as follows: (19) In formula (19), P G Indicates the active power of new energy units. P G min Indicates the active power of new energy units. Q G min Indicates the reactive power of new energy units. Indicates the minimum power factor of the new energy unit. Indicates the maximum power factor of the new energy unit.

[0041] In order to further deepen the understanding of the specific execution process of this step 104, please refer to Figure 2 The industrial park power grid topology shown in the figure verifies the effectiveness of the above method. The industrial park and the large power grid are connected by a tie line, and the power reference direction of the tie line is from the large power grid to the industrial park power grid. Table 1 shows the grid structure and impedance parameters of the industrial park power grid, and Table 2 shows the rated power of the park's high-energy load and the parameters of the installed capacity of new energy. The industrial park grid voltage level is 230kV, and the transmission power and load power involved are all per unit values, the reference voltage is 230kV, and the reference capacity is 100MVA.

[0042] Table 1 Industrial park grid impedance parameters .

[0043] Table 2 Industrial Park Power Load Parameters .

[0044] In step 106, based on the ray sampling method, the safe operation coupling model is optimized to determine the approximate control boundary.

[0045] like Figure 3 As shown, the basic principle of the ray sampling method is as follows: emitting rays through the coordinate origin r , at the ray polar angle α Take the range [0,2π] and find the ray that satisfies the high-dimensional state space constraints. r The above process can be understood as r The circle with the modulus length as radius and the coordinate origin as center and the control boundary exists in the form of ( r cos α , r sin α ), solve r The maximum modulus length.

[0046] In a preferred specific example, determining the approximate control boundary based on the ray sampling method includes: Step 1061: Determine the linearized high-dimensional state space according to the constraints of the safe operation coupling model ,and , , P 0, Q 0, V is the node voltage amplitude, P w is the active power of the new energy unit, Q w Reactive power of new energy units, P d For the load active output, Q d is the reactive power output of the load, V SR is the saturated reactor voltage drop; Step 1062: Determine the vertex of the control boundary by solving the following formula; (20) In the formula, Represents the coordinate origin of the control boundary (it can be the power transmission value of the industrial park and the large power grid connection line, or it can be 0), r is the ray vector; α is the polar angle of the ray emission direction.

[0047] Here, the plane coordinate expression of the objective function of formula (20) is as follows: (twenty three).

[0048] For the previous article , given the polar angle α back, x The following constraints are met: (twenty four).

[0049] Step 1063: Connect all vertices to obtain the approximate control boundary.

[0050] In actual operation, α Take [0,2 π ] uniformly sample within the range and repeatedly solve equation (20). When the number of sampling points reaches a certain value, the control boundary of the industrial park can be obtained. This area is composed of multiple straight lines and can be characterized by a group of linear inequalities.

[0051] refer to Figure 3 As can be seen from the figure, the ray emission solution method and the progressive vertex enumeration method of the present application are used to solve the control boundary of the industrial park in the high-dimensional linearized state space. The solution results are as follows: Figure 3 According to the analysis of the results, the control boundary finally obtained by the method of the present application is composed of 100 sampling points, which can effectively cover the control boundary of the industrial park under extreme conditions. Compared with the asymptotic vertex enumeration method, it has more advantages in solution accuracy.

[0052] Please refer to Figure 4 , which shows a block diagram of the device for determining the industrial park control boundary provided by the present application. The device 200 includes: A first determination module 202 is used to determine a power regulation characteristic model of high energy consumption loads within the industrial park, wherein the power regulation characteristic model has a regulation boundary constraint condition; A second determination module 204 is used to determine a safe operation coupling model of the industrial park according to the power regulation characteristic model, wherein the safe operation coupling model is embodied by a steady-state power flow equation; The third determination module 206 is used to determine the approximate control boundary by optimizing and solving the safe operation coupling model based on the ray sampling method.

[0053] Since the above methods have been discussed in detail, the specific implementation of the above modules will not be repeated here.

[0054] Next, an execution device provided by an embodiment of the present application is introduced. Figure 5 , Figure 5This is a schematic diagram of a structure of an execution device provided in an embodiment of the present application. The execution device 300 can be specifically manifested as an autonomous driving vehicle, a mobile phone, a tablet, a laptop computer, a desktop computer, a monitoring data processing device, etc., which is not limited here. Figure 1 The functions of the execution device in the corresponding embodiment. Specifically, the execution device 300 includes: a receiver 301, a transmitter 302, a processor 303 and a memory 304 (wherein the number of the processor 303 in the execution device 300 can be one or more, Figure 5 In the example of FIG. 3 , the processor 303 may include an application processor 3031 and a communication processor 3032. In some embodiments of the present application, the receiver 301, the transmitter 302, the processor 303 and the memory 304 may be connected via a bus or other means.

[0055] The memory 304 may include a read-only memory and a random access memory, and provides instructions and data to the processor 303. A portion of the memory 304 may also include a non-volatile random access memory (NVRAM). The memory 304 stores processor and operation instructions, executable modules or data structures, or subsets thereof, or extended sets thereof, wherein the operation instructions may include various operation instructions for implementing various operations.

[0056] The processor 303 controls the operation of the execution device. In a specific application, the various components of the execution device are coupled together through a bus system, wherein the bus system includes not only a data bus but also a power bus, a control bus, and a status signal bus, etc. However, for the sake of clarity, various buses are referred to as bus systems in the figure.

[0057] The method disclosed in the above embodiment of the present application can be applied to the processor 303, or implemented by the processor 303. The processor 303 can be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit or software instructions in the processor 303. The above processor 303 can be a general processor, a digital signal processor (digital signal processing, DSP), a microprocessor or a microcontroller, and can further include an application specific integrated circuit (application specific integrated circuit, ASIC), a field programmable gate array (field-programmable gate array, FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The processor 303 can implement or execute the various methods, steps and logic block diagrams disclosed in the embodiments of the present application. The general processor can be a microprocessor or the processor can also be any conventional processor, etc. The steps of the method disclosed in the embodiment of the present application can be directly embodied as a hardware decoding processor to execute, or it can be executed by a combination of hardware and software modules in the decoding processor. The software module may be located in a storage medium mature in the art, such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory, or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory 304, and the processor 303 reads the information in the memory 304 and completes the steps of the above method in combination with its hardware.

[0058] The receiver 301 can be used to receive input digital or character information and generate signal input related to the relevant settings and function control of the execution device. The transmitter 302 can be used to output digital or character information through the first interface; the transmitter 302 can also be used to send instructions to the disk group through the first interface to modify the data in the disk group; the transmitter 302 can also include a display device such as a display screen.

[0059] In the embodiment of the present application, the processor 303 is used to execute Figure 1 The specific manner in which the application processor 3031 in the processor 303 performs the above steps is the same as that in the present application. Figure 1 The corresponding method embodiments are based on the same concept, and the technical effects they bring are the same as those in this application. Figure 1 The corresponding method embodiments are the same. For specific contents, please refer to the description in the method embodiments shown above in this application, which will not be repeated here.

[0060] The above is only a preferred specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed in the present application should be covered within the protection scope of the present application.

Claims

1. A method for determining the control boundary of an industrial park, characterized in that: include: Determine a power regulation characteristic model of high energy consumption loads within the industrial park, wherein the power regulation characteristic model has a regulation boundary constraint condition; Determine a safe operation coupling model of the industrial park according to the power regulation characteristic model, wherein the safe operation coupling model is embodied by a steady-state power flow equation; Based on the ray sampling method, the safe operation coupling model is solved by optimization to determine the approximate control boundary.

2. The method according to claim 1, characterized in that: The power regulation characteristic model includes an electrolytic aluminum load power characteristic model represented by the following formula: ; ; In the formula, P AL is the active power of electrolytic aluminum load, Q AL is the reactive power of electrolytic aluminum load, V AH is the high voltage bus voltage of the aluminum plant, k The transformation ratio of the on-load tap-changing transformer in the aluminum plant, V SR is the saturated reactor voltage drop, E AL is the equivalent potential of the electrolytic cell, Q AL is the reactive power of electrolytic aluminum load, Q k0 is the constant impedance characteristic coefficient, V 0 is the reference voltage, Q 0 is the constant power value; The power regulation characteristic model also includes a submerged arc furnace load power characteristic model represented by the following formula: ; In the formula, is the active power of the ore-arc furnace load, is the reactive power of the ore-arc furnace load, R line and is the short network equivalent resistance, X line is the short network equivalent reactance, R arc are the arc equivalent resistance, X arc is the arc equivalent reactance, V arc It is the low voltage side voltage of the main transformer of the electric arc furnace.

3. The method according to claim 1, characterized in that The constraint conditions corresponding to the electrolytic aluminum load power characteristic model are expressed in the following formula: ; ; In the formula, V SR is the saturated reactor voltage drop, is the minimum voltage drop of the saturated reactor, is the maximum voltage drop of the saturated reactor, P AL is the active power of electrolytic aluminum load, Q AL is the reactive power of electrolytic aluminum load, is the minimum active power of electrolytic aluminum load, is the maximum active power of electrolytic aluminum load, is the minimum reactive power of electrolytic aluminum load, It is the maximum reactive power of electrolytic aluminum load.

4. The method according to claim 1, characterized in that The constraint conditions corresponding to the load power characteristic model of the submerged arc furnace are expressed in the following formula: ; ; In the formula, V arc The voltage on the low voltage side of the main transformer of the submerged arc furnace. The minimum voltage on the low voltage side of the main transformer of the submerged arc furnace. The maximum voltage on the low voltage side of the main transformer of the submerged arc furnace. is the active power of the ore-arc furnace load, is the minimum active power of the ore-fired furnace load, is the maximum active power of the ore-fired furnace load, is the reactive power of the ore-arc furnace load, is the minimum reactive power of the ore-fired furnace load, It is the maximum reactive power of the ore-arc furnace load.

5. The method according to claim 1, characterized in that The safety operation coupling model is expressed in the following formula: ; In the formula, is the active power of the new energy unit, is the active power of high energy consumption load, is the reactive power of the new energy unit, Reactive power for high energy consumption loads, is the node voltage of the industrial park, A node in the power network of the industrial park i and nodes j The mutual conductance, A node in the power network of the industrial park i and nodes j The mutual acceptance of electricity.

6. The method according to claim 1, characterized in that The constraints of the safe operation coupling model include the power flow thermal stability capacity constraints corresponding to the internal lines and tie lines of the industrial park expressed by the following formula: ; In the formula, P ij Indicates branch ij The meritorious trend, Q ij Indicates branch ij The reactive power flow, Indicates branch ij Thermal stability limit of tidal capacity; The constraints of the safe operation coupling model also include the capacity constraints of the new energy units expressed by the following formula: ; In the formula, P G Indicates the active power of new energy units. Q G Indicates the reactive power of new energy units. Indicates the capacity limit of the new energy unit; The constraints of the safe operation coupling model also include the voltage constraints of the nodes inside the industrial park expressed by the following formula: ; In the formula, is the node voltage of the industrial park, is the minimum voltage of the industrial park node, is the maximum voltage of the industrial park node; The constraints of the safety operation coupling model also include the output constraints of the new energy units expressed by the following formula: ; In the formula, P G Indicates the active power of new energy units. P G min Indicates the active power of new energy units. Q G min Indicates the reactive power of new energy units. Indicates the minimum power factor of the new energy unit. Indicates the maximum power factor of the new energy unit.

7. The method according to claim 1, characterized in that Determine the approximate control boundary based on the ray sampling method, including: Determine the linearized high-dimensional state space based on the constraints of the safe operation coupling model ,and , , P 0, Q 0, V is the node voltage amplitude, is the node voltage phase angle, P w is the active power of the new energy unit, Q w Reactive power of new energy units, P d For the load active output, Q d is the reactive power output of the load, V SR is the saturated reactor voltage drop; Determine the vertex of the control boundary by solving the following formula; ; In the formula, represents the coordinate origin of the control boundary, r is the ray vector; α is the polar angle of the ray emission direction; Connect all vertices to obtain the approximate control boundary.

8. A device for determining the control boundary of an industrial park, characterized in that: include: A first determination module is used to determine a power regulation characteristic model of high energy consumption loads within the industrial park, wherein the power regulation characteristic model has a regulation boundary constraint condition; A second determination module is used to determine a safe operation coupling model of the industrial park according to the power regulation characteristic model, wherein the safe operation coupling model is embodied by a steady-state power flow equation; The third determination module is used to determine the approximate control boundary by optimizing the safe operation coupling model based on the ray sampling method.

9. A computer-readable storage medium, characterized in that: The invention comprises a program, which, when being executed on a computer, causes the computer to execute the method according to any one of claims 1 to 7.

10. An execution device, characterized in that: comprising a processor and a memory, wherein the processor is coupled to the memory; The memory is used to store programs; The processor is configured to execute the program in the memory so that the execution device executes the method according to any one of claims 1 to 7.