Method, apparatus and computer program for transmitting NAS messages
By sending test control commands of the non-access layer NAS message container to the user equipment in the RRC non-connected state, the problem that the UE cannot receive the test control commands in the RRC non-connected state is solved, and more efficient testing and power are achieved manage.
Patent Information
- Application Number
- CN202410557098.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2023-05-12
- Filing Date
- 2024-05-07
- Publication Date
- 2024-11-12
AI Technical Summary
In the prior art, when the user equipment (UE) is in the RRC non-connected state, it is impossible to receive and send test control commands without switching back to the RRC connected state, resulting in increased test time and excessive power consumption.
By sending non-access layer NAS message containers in the system information block (SIB), and sending test control commands to the user equipment, including commands to activate, deactivate, close and open the test loop, ensure that the user equipment is also in the RRC non-connected state. Can receive and execute these commands to avoid sending NAS completion messages.
Reduces testing time, saves power on user equipment, and avoids unnecessary message exchange, improving testing efficiency and equipment energy efficiency.
Smart Images

Figure CN118945899A_ABST
Abstract
Description
Technical Field
[0001] Teachings in accordance with embodiments of the present invention generally relate to methods and apparatus for sending a layer 3 NAS message to a user equipment in an RRC non-connected state. Background Art
[0002] This section is intended to provide a background or context to the inventions described in the claims. The description herein may include concepts that could be pursued, but not necessarily concepts that have been previously conceived or pursued. Therefore, unless otherwise indicated herein, what is described in this section is not prior art to the description and claims in this application and is not admitted to be prior art by inclusion in this section.
[0003] Certain abbreviations used in the specification and / or drawings are defined as follows:
[0004] Abbreviation Description
[0005] 3GPP Third Generation Partnership Project
[0006] 5G NR Fifth Generation New Radio
[0007] 5GS 5G System
[0008] AT Access Type
[0009] BCH Broadcast Channel
[0010] Authorization configured by CG
[0011] CG-SDT SDT based on configured authorization
[0012] CORESET Control Resource Set
[0013] DL Downlink
[0014] DL-SCH Downlink Shared Channel
[0015] DUT Device Under Test
[0016] EMMI Electrical Human Machine Interface
[0017] FR2 Frequency Range 2
[0018] gNB gNodeB MIB Master Information Block MO-SDT Mobile Originated SDT NAS Non-Access Stratum PBCH Physical Broadcast Channel PCell Primary Cell PDCCH Physical Downlink Control Channel PDSCH Physical Downlink Shared Channel RA Random Access RAN4 Radio Access Network Working Group 4 RAN5 Radio Access Network Working Group 5 Rel-17 Release 17
[0019] RMSI Remaining Minimum SI RRC Radio Resource Control RRM Radio Resource Management RSRP Reference Signal Received Power SDT Small Data Transmission SI System Information SIB1 System Information Block 1SS System Simulator SSB Synchronization Signal Block TA Timing Advance TAC Timing Advance Command TE Test Equipment TMC Test Mode Control TS Technical Specification UE User Equipment UL Uplink UL-SDT Uplink SDT
[0020] V2X Vehicle to Everything
[0021] In order to support 5GS conformance testing, UE specific conformance test functions are required. They form part of the core requirements and therefore have a direct impact on the design of the UE. UE specific conformance test functions differ in the conformance test functions they are designed to support and are broadly divided into the following two groups:
[0022] Test loopback functionality: It requires establishing a loop between the UE and the system simulator (SS) to allow, for example, DL data packets sent by the SS to be sent back to the UL by the UE;
[0023] Generic Test Function: A command sent by the SS, for example, to trigger a specific UE behavior that may be a behavior determined by a 3GPP core specification requirement, or a behavior required to facilitate conformance testing and not part of any 3GPP core specification requirement, or to provide the UE with information required for conformance testing.
[0024] The use of any UE specific conformance test function is considered to put the UE into test mode. The duration of the test mode depends on the UE specific conformance test function and in most cases the test mode is defined by activation and deactivation commands. The UE specific conformance test function including any related procedures and the content of the Test Mode Control (TMC) messages for information exchange are defined in 3GPP TS 36.509 (Basic Release of LTE) and 38.509 (Extension for NR).
[0025] The UE-specific conformance test functionality provides access to isolated functions of the UE via the radio interface without the need to introduce new physical interfaces just for conformance testing.
[0026] According to the 3GPP specifications available at the time, there was no way to send these test control commands to a UE in a non-connected state (including RRC IDLE state and RRC INACTIVE state) if the UE did not initiate the SDT procedure. This means that in order to send each test mode command, the UE must go back to the RRC CONNECTED state. This requires an additional message exchange between the SS and the UE, which is unnecessary from a testing perspective. Summary of the invention
[0027] A simplified summary of the specification is disclosed below to provide a basic understanding of certain aspects of the specification. This content is not a comprehensive overview of the specification. It is neither intended to identify the key or important elements of the specification nor to indicate the scope of the specification. Its only purpose is to disclose some concepts of the specification in a simplified form as a preface to a more detailed description disclosed later.
[0028] According to a first exemplary embodiment, a method may include determining that a user equipment is in a radio resource control (RRC) non-connected state. The method may also include broadcasting a system information block (SIB) to a plurality of user equipments including the user equipment. The system information block (SIB) includes a non-access stratum (NAS) container for transmitting NAS messages to the user equipment.
[0029] In the method of the first exemplary embodiment, the RRC non-connected state includes an RRC inactive state or an RRC idle state.
[0030] In the method of the first exemplary embodiment, the system information block SIB is an existing SIB or a new SIB.
[0031] In the method of the first example embodiment, the NAS message indicates that the user equipment performs a specific action, and the method further comprises sending an indication to the user equipment indicating that the user equipment is not to send a NAS completion message after the specific action is completed.
[0032] In the method of the first example embodiment, the indication is sent as part of the SIB.
[0033] In the method of the first example embodiment, the NAS message is extended to include the indication.
[0034] In the method of the first exemplary embodiment, when the user equipment is in the RRC non-connected state, the user equipment is subjected to a consistency test procedure, and the NAS message is a test control command related to the consistency test procedure.
[0035] In the method of the first example embodiment, the test control command is one of:
[0036] - Command to activate test mode;
[0037] - Command to deactivate test mode;
[0038] - a command to close the user equipment test loop; or
[0039] - Command to open a test loop for user equipment.
[0040] In the method of the first exemplary embodiment, the consistency test procedure is used to test the user equipment's verification of the last used timing advance value of the configured authorized small data transmission procedure.
[0041] According to a second exemplary embodiment, a network node may include a component for determining that a user equipment is in a radio resource control (RRC) non-connected state. The network node may also include a component for broadcasting a system information block (SIB) to a plurality of user equipments including the user equipment. The system information block (SIB) includes a non-access stratum (NAS) container for transmitting NAS messages to the user equipment.
[0042] In the network node of the second exemplary embodiment, the RRC non-connected state includes an RRC inactive state or an RRC idle state.
[0043] In the network node of the second exemplary embodiment, the system information block SIB is an existing SIB or a new SIB.
[0044] In the network node of the second exemplary embodiment, the NAS message indicates that the user equipment performs a specific action. The network node further includes means for sending an indication to the user equipment, the indication indicating that the user equipment does not send a NAS completion message after the specific action is completed.
[0045] In the network node of the second example embodiment, the indication is sent as part of the SIB.
[0046] In the network node of the second exemplary embodiment, the NAS message is extended to include the indication.
[0047] In the network node of the second exemplary embodiment, when the user equipment is in the RRC non-connected state, the user equipment is subjected to a consistency test procedure, and the NAS message is a test control command related to the consistency test procedure.
[0048] In the network node of the second exemplary embodiment, the test control command is one of the following:
[0049] - Command to activate test mode;
[0050] - Command to deactivate test mode;
[0051] - a command to close the user equipment test loop; or
[0052] - Command to open a test loop for user equipment.
[0053] In the network node of the second exemplary embodiment, the consistency test procedure is used to test the user equipment's verification of the last used timing advance value of the configured Granted Small Data Transmission procedure.
[0054] According to a third exemplary embodiment, a network node may include at least one processing circuit system or processor. The network node may also include at least one memory, the at least one memory including computer program code. The at least one memory and the computer program code may be configured to, together with the at least one processing circuit system or processor, enable the network node to at least determine that a user equipment is in a radio resource control RRC non-connected state. The network node may also be caused to broadcast a system information block SIB to a plurality of user equipments including the user equipment. The system information block SIB includes a non-access stratum NAS container for transmitting NAS messages to the user equipment.
[0055] In the network node of the third exemplary embodiment, the RRC non-connected state includes an RRC inactive state or an RRC idle state.
[0056] In the network node of the third exemplary embodiment, the system information block SIB is an existing SIB or a new SIB.
[0057] In the network node of the third exemplary embodiment, the NAS message indicates that the user equipment performs a specific action. The network node sends an indication to the user equipment, the indication indicating that the user equipment does not send a NAS completion message after the specific action is completed.
[0058] In the network node of the third example embodiment, the indication is sent as part of the SIB.
[0059] In the network node of the third exemplary embodiment, the NAS message is extended to include the indication.
[0060] In the network node of the third exemplary embodiment, when the user equipment is in the RRC non-connected state, the user equipment is subjected to a consistency test procedure, and the NAS message is a test control command related to the consistency test procedure.
[0061] In the network node of the third exemplary embodiment, the test control command is one of the following:
[0062] - Command to activate test mode;
[0063] - Command to deactivate test mode;
[0064] - a command to close the user equipment test loop; or
[0065] - Command to open a test loop for user equipment.
[0066] In the network node of the third exemplary embodiment, the consistency test procedure is used to test the user equipment's verification of the last used timing advance value of the configured authorized small data transmission procedure.
[0067] According to a fourth exemplary embodiment, a computer program product may be embodied on a non-transitory computer readable medium. The computer program product may be configured to control a processor to perform the method according to the first embodiment.
[0068] According to a fifth exemplary embodiment, a method may include transitioning to a radio resource control, RRC, non-connected state. The method may further include receiving a system information block, SIB, from a network node. The system information block, SIB, includes a non-access stratum, NAS, container for transmitting NAS messages to a user equipment.
[0069] In the method of the fifth exemplary embodiment, the RRC non-connected state includes an RRC inactive state or an RRC idle state,
[0070] In the method of the fifth exemplary embodiment, the SIB is an existing SIB or a new SIB.
[0071] In the method of the fifth example embodiment, the NAS message indicates that the user equipment performs a specific action. The method also includes receiving an indication from the network node, the indication indicating that the user equipment does not send a NAS completion message after the specific action is completed; and suppressing sending a NAS completion message to the network node after the specific action is completed based on the indication.
[0072] In the method of the fifth example embodiment, the indication is received as part of a SIB.
[0073] In the method of the fifth exemplary embodiment, the NAS message is extended to include the indication.
[0074] In the method of the fifth exemplary embodiment, when the user equipment is in the RRC non-connected state, the user equipment is subjected to a consistency test procedure, and the NAS message is a test control command related to the consistency test procedure.
[0075] In the method of the fifth example embodiment, the test control command is one of the following:
[0076] - Command to activate test mode;
[0077] - Command to deactivate test mode;
[0078] - a command to close the user equipment test loop; or
[0079] - Command to open a test loop for user equipment.
[0080] In the method of the fifth exemplary embodiment, the consistency test procedure is used to test the user equipment's verification of the last used timing advance value of the configured authorized small data transmission procedure.
[0081] According to a sixth exemplary embodiment, a user equipment (UE) may include a component for transitioning to a radio resource control (RRC) non-connected state. The UE may also include a component for receiving a system information block (SIB) from a network node. The system information block (SIB) includes a non-access stratum (NAS) container for transmitting NAS messages to the user equipment.
[0082] In the UE of the sixth exemplary embodiment, the RRC non-connected state includes an RRC inactive state or an RRC idle state.
[0083] In the UE of the sixth exemplary embodiment, the SIB is an existing SIB or a new SIB.
[0084] In the UE of the sixth example embodiment, the NAS message indicates that the user equipment performs a specific action, and the user equipment further includes a component for receiving an indication from the network node, the indication indicating that the user equipment does not send a NAS completion message after the specific action is completed; and a component for suppressing, based on the indication, sending a NAS completion message to the network node after the specific action is completed.
[0085] In the UE of the sixth exemplary embodiment, the indication is received as part of the SIB.
[0086] In the UE of the sixth exemplary embodiment, the NAS message is extended to include the indication.
[0087] In the UE of the sixth exemplary embodiment, when the user equipment is in the RRC non-connected state, the user equipment is subjected to a consistency test procedure, and the NAS message is a test control command related to the consistency test procedure.
[0088] In the UE of the sixth exemplary embodiment, the test control command is one of the following:
[0089] - Command to activate test mode;
[0090] - Command to deactivate test mode;
[0091] - a command to close the user equipment test loop; or
[0092] - Command to open a test loop for user equipment.
[0093] In the UE of the sixth exemplary embodiment, the consistency test procedure is used to test the user equipment's verification of the last used timing advance value of the configured authorized small data transmission procedure.
[0094] According to a seventh exemplary embodiment, a user equipment (UE) may include at least one processing circuit system or processor. The UE may also include at least one memory, and the at least one memory includes computer program code. The at least one memory and the computer program code may be configured to, together with the at least one processing circuit system or processor, cause the UE to at least transition to a radio resource control RRC non-connected state. The UE may also be caused to receive a system information block SIB from a network node. The system information block SIB includes a non-access stratum NAS container for transmitting NAS messages to the user equipment.
[0095] In the user equipment of the seventh exemplary embodiment, the RRC non-connected state includes an RRC inactive state or an RRC idle state.
[0096] In the user equipment of the seventh exemplary embodiment, the SIB is an existing SIB or a new SIB.
[0097] In the user equipment of the seventh exemplary embodiment, the NAS message indicates that the user equipment performs a specific action, and the user equipment further includes a component for receiving an indication from the network node, the indication indicating that the user equipment does not send a NAS completion message after the specific action is completed. The user equipment is also caused to suppress sending a NAS completion message to the network node after the specific action is completed based on the indication.
[0098] In the user equipment of the seventh exemplary embodiment, the indication is received as part of the SIB.
[0099] In the user equipment of the seventh exemplary embodiment, the NAS message is extended to include the indication.
[0100] In the user equipment of the seventh exemplary embodiment, when the user equipment is in the RRC non-connected state, the user equipment is subjected to a consistency test procedure, and the NAS message is a test control command related to the consistency test procedure.
[0101] In the user equipment of the seventh exemplary embodiment, the test control command is one of the following:
[0102] - Command to activate test mode;
[0103] - Command to deactivate test mode;
[0104] - a command to close the user equipment test loop; or
[0105] - Command to open a test loop for user equipment.
[0106] In the user equipment of the seventh exemplary embodiment, the consistency test procedure is used to test the user equipment's verification of the last used timing advance value of the configured authorized small data transmission procedure.
[0107] According to an eighth exemplary embodiment, a computer program product may be embodied on a non-transitory computer readable medium. The computer program product may be configured to control a processor to execute the method according to the fifth embodiment.
[0108] According to any of the example embodiments above, the network node may be a system simulator (SS). BRIEF DESCRIPTION OF THE DRAWINGS
[0109] The above and other aspects of embodiments of the present invention will become more apparent in the following detailed description when read in conjunction with the accompanying drawings, in which:
[0110] Figure 1 is a diagram illustrating an example of an over-the-air test (OTA TST) command for a test loop;
[0111] Figure 2 is a graph illustrating the variation of RSRP levels in active cells during a test;
[0112] Figure 3 is a diagram illustrating a procedure for activating UE test mode using NAS messages;
[0113] Figure 4 is a diagram illustrating a procedure for deactivating UE test mode using NAS messages;
[0114] Figure 5 is a diagram illustrating a procedure for closing a UE test loop using a NAS message;
[0115] Figure 6 is a diagram illustrating a procedure for opening a UE test loop using a NAS message;
[0116] Figure 7 illustrates a flow chart of a method according to certain embodiments;
[0117] Figure 8 illustrates a flow chart of a method according to certain embodiments;
[0118] Fig. 9 Two exemplary embodiments of instructing a UE to avoid sending a NAS Complete message are illustrated;
[0119] Fig.10 A UE capable of performing a method according to an example implementation is illustrated;
[0120] Fig.11 A network node capable of executing a method according to an example implementation is illustrated. DETAILED DESCRIPTION
[0121] As required, only exemplary embodiments of the present application are disclosed herein; however, it should be understood that the disclosed embodiments are merely examples of the present disclosure, and the present disclosure can be embodied in various and / or alternative forms. The specific process details disclosed herein should not be interpreted as limiting, but only as the basis for the claims and as a representative basis for teaching those skilled in the art to use the present disclosure in various ways in almost any appropriately detailed process.
[0122] The exemplary embodiments may be applicable to many different purposes and are not intended to be limited to the specific exemplary purposes described herein. Those skilled in the art will be able to adapt the exemplary embodiments of the present disclosure according to, for example, the intended use of the adapted embodiments. In addition, the examples and limitations related thereto introduced below are intended to be illustrative rather than exclusive. After reading the following description and studying the relevant drawings, other limitations of the related art will become apparent to those skilled in the art. The present invention will be more clearly understood through the following description of the product of the present invention.
[0123] Some embodiments of the present invention propose a method, apparatus and computer program for sending a dedicated NAS message container within a system information block (whether existing or new) in general, and for implementing conformance testing of Radio Access Network System (RANS) User Equipment (UE) in particular, and finding solutions to problems encountered during such testing.
[0124] In order to support 5GS conformance testing, UE specific conformance test functions are required. They form part of the core requirements and therefore have a direct impact on the design of the UE. UE specific conformance test functions differ in the conformance test functions they are designed to support and are broadly divided into the following two groups:
[0125] Test loopback functionality: it requires establishing a loopback between the UE and the system simulator (SS) to allow, for example, DL data packets sent by the SS to be sent back UL by the UE; and
[0126] Generic test functions: These consist of commands sent by the SS, for example, to trigger specific UE behavior, which may be behavior determined by 3GPP core specification requirements, or behavior required to facilitate conformance testing and is not part of any 3GPP core specification requirements, or to provide the UE with information required for conformance testing.
[0127] The use of any UE specific conformance test function is considered equivalent to placing the UE in test mode. The duration of the test mode depends on the UE specific conformance test function and in most cases will be defined by activation and deactivation commands. The UE specific conformance test function including any related procedures and the content of the Test Mode Control (TMC) messages for information exchange are defined in 3GPP TS 36.509 (Basic Release of LTE) and 38.509 (Extension for NR).
[0128] The UE-specific conformance test functionality provides access to isolated functions of the UE via the radio interface without the need to introduce new physical interfaces just for conformance testing.
[0129] Depending on the supported conformance test functions, UE specific conformance test functions may include:
[0130] A single DL message (e.g. a test function intended to provide the UE with the information required for conformance testing);
[0131] 2 message exchanges of the request / confirmation type, a DL message followed by a UL message, (e.g. intended to request the UE to perform an action that requires confirmation that the request was received and that an action was taken).
[0132] Before a specific target UE behavior can be assumed, two or more UE-specific conformance test functions may need to be performed in a specific sequence. An example is the activation of the UE test mode and the closing of the UE test loop function. The former needs to be performed first at a specific moment in time in order to establish a specific type of test bearer that terminates in a specific UE protocol layer. This is followed by the latter, performed at a different point in time, which will indicate that the UE starts to loop back received packets.
[0133] When testing a device, it is best to test the device as a black box, and the most common use case is to connect the device to a network simulator via the air interface only. However, this is not possible in all use cases. For example, when testing data transmission, it is important that the network simulator controls what the device sends. An example is UL data, where it is uncertain what source within the device can send a specific test data set.
[0134] For this case, a specific Over-the-Air Test Command (OTA TST Command) is used. The Test Command has its own protocol discriminator / protocol endpoint that runs in parallel with other protocols at Layer 3 level (such as RRC, MM, etc.). The Test Command is specified in TS 38.509 / TS 36.509.
[0135] Figure 1The diagram shows that a set of commands is used for the loopback of data, which means that the network simulator sends data towards the device, and the device is configured to send the same frame in the uplink. The mapping between downlink and uplink, and at which protocol layers can be configured.
[0136] Small Data Transfer (SDT) is a feature introduced in 3GPP Rel 17 for 5G NR where small data packets can be sent when the UE is in RRC INACTIVE state. This feature is intended as a power saving feature as the UE can stay in RRC INACTIVE state for longer periods of time. There are two main different implementations of SDT, one where the UE sends small transport blocks as part of the Random Access (RA) procedure in RRC INACTIVE state and the other where the configured Grant (CG) resources are allocated to the UE for transmission when in RRC INACTIVE state. The last type of SDT transmission is referred to in this article as CG-SDT.
[0137] In order for CG-SDT to work properly, the UE has a mechanism for maintaining synchronization in the UL. When in the RRCCONNECTED state, the gNB can adjust the UL transmission through the timing advance (TA) command TAC. However, when the UE changes to the RRCINACTIVE state, the gNB has no components for maintaining this message exchange and keeping the UL transmission synchronized with the UL resources. Therefore, a TA verification mechanism is defined as part of the RAN2 and RAN4 CG-SDT work (clause 5.5 of 3GPP TS 38.133), which is responsible for detecting whether the UE has changed. This is done by detecting changes in the received signal level and defining a range in the received level, where levels outside this range will indicate excessive changes in the propagation delay, which is the basis of the timing advance used between the network and the UE.
[0138] TA verification works as follows: two RSRP values are collected, RSRP1 is collected after the time the UE receives the TAC, and RSRP2 is collected when TA verification is performed to transmit at the CG-SDT opportunity.
[0139] When the UE is still in the RRC CONNECTED state and the UE receives a reference TAC command at time T1, it shall perform an RSRP measurement RSRP1 at time T1'. The measurement RSRP1 is considered valid for the purpose of CG-SDT only when |T1 - T1'| < W1, where W1 is the time window within which the first RSRP value should be collected. When the UE receives an RRC release with a suspended configuration message from the gNB, the UE enters the RRC INACTIVE state and, if the message includes an SDT configuration, the UE can then use the SDT resources for UL-SDT thereafter. For the UE to transmit on the CG-SDT resources, it must measure RSRP2 at time T2' so that it can make a decision to transmit on the CG-SDT at time T2, where T2 - W2 < T2' < T2 and W2 is the window within which the RSRP2 measurement must be performed. In addition, RAN4 has determined that T3 - T2 <= 640 ms, where T3 is the transmission time on the CG-SDT resources and T2 is defined as above. If the UE has valid RSRP1 and RSRP2 measurements (performed within W1 and W2 respectively) and if |RSRP1 - RSRP2| < cg-SDT-RSRP-Change threshold, the UE can transmit at the CG-SDT opportunity. If so, the UE shall consider the timing advance to be valid for the network to be able to receive the uplink transmission from the UE on the CG-SDT resources.
[0140] After the UE meets these requirements, it should be able to transmit with a small UL timing error at the CG-SDT opportunity. As described in clause 7.1.2 of 3GPP TS 38.133, this transmission also has requirements for timing accuracy.
[0141] Current RAN5 test procedure
[0142] For TA verification of CG-SDT in FR2, the test procedure currently adopted by RAN5 is given in section 7.2.1 of 3GPP TS 38.533 and is reproduced below. As specified in TS 38.331, this test applies to all types of NR UEs from release 17 onwards that support the transmission of data and / or signaling via CG-SDT in the RRC inactive state through the allowed radio bearers.
[0143] Of the attached drawings Figure 2 shows the change in the RSRP level in the active cell during the test. The test procedure involves a single cell (cell 1) which is configured as the PCell in FR2 and which consists of 5 consecutive time periods with durations T1 to T5 respectively.
[0144] For greater clarity, the RSRP variation for TA verification of CG-SDT is described below:
[0145] Time point TA is the starting point of the test. Before time point TA, the UE should be fully synchronized and registered to PCell (cell 1).
[0146] The time point TB is a duration of T1 after TA, that is, TB=TA+T1.
[0147] The time point TC is the time when the "UE test loop mode B" command (configured with "T_delay_modeB" timer) and the RRC release message with CG-SDT configuration of "Subtest 1" are received at the UE, and is the W1 duration after TB, where W1 = max(480ms, 8*SMTC periodicity)), that is, TC = TB + max(480ms, 8*SMTC periodicity).
[0148] The time point TD is W1 duration after TC or T2 duration after TB, that is, TD=TC+max(480ms, 8*SMTC periodicity))=TB+T2.
[0149] The time point TE is a duration of T3 after TD, that is, TE=TD+T3.
[0150] The time point TF is the time when the "T_delay_modeB" timer that triggers UL data to reach the UE lower layer expires, and is W2 duration after the time point TE, that is, TF=TC+T_delay_modeB=TE+W2 (usually, TE<=TF<=TE+max(480ms,8*SMTC periodicity))).
[0151] The time point TG is the time when the UE sends using CG-SDT.
[0152] The time point TH is the time when the second "UE test loop mode B" command (reconfiguring the "T_delay_modeB" timer) and the second RRC release message with the CG-SDT configuration of "Subtest 2" are received at the UE, and is the FFS in RAN4.
[0153] The time point TI is a duration of T4 after TE and a duration of W1 after TH, ie, TI=TE+T4=TH+W1.
[0154] The time point TJ is the time when the "T_delay_modeB" timer configured in the second "UE test loop mode B" command expires, which triggers the UL data to reach the UE lower layer, that is, TJ=TH+T_delay_modeB.
[0155] The time point TK is the end point of the first iteration of the test and is a duration of T5 after TI, ie, TK=TI+T5.
[0156] The actual steps of the process are as follows:
[0157] According to clause 4.5 of TS 38.508-1
[14] , ensure that the UE is in RRC_CONNECTED state with common procedure parameters Connectivity NR, Connected without release ON and Test Mode ON (test loop mode B).
[0158] Set these parameters according to Table 7.2.1.1.5-1 of TS 38.533.
[0159] The test starts at time TA, at which the SS sets the transmit power to P0.
[0160] At time point TB, SS changes the power level from P0 to P1.
[0161] At time point TC, the SS sends a Close UE Test Loop message with CG-SDT configuration (with a non-zero value of the T_delay_mode B timer) and a RRCRelease message to the UE, and the UE enters the RRC_INACTIVE state.
[0162] At time point TD, SS changes the power level from P1 to P0.
[0163] At time TE, SS changes the power level from P0 to P2.
[0164] At time point TF, the T_delay_mode B timer expires, which triggers the UL data to reach the UE lower layer.
[0165] At time point TG, UE uses CG-SDT to send.
[0166] Check 1: Subtest "1" passes if the UE transmits with CG-SDT within 640ms+Z after TF, ie if TF<=TG<=640ms+Z.
[0167] The SS sends an open UE test loop message to the UE.
[0168] The UE sends a message of opening the UE test loop completion to the SS.
[0169] At time point TH, the SS sends a Close UE Test Loop message (with a non-zero value for the T_delay_modeB timer) and a second RRC Release message with CG-SDT configuration to the UE, and the UE remains in the RRC_INACTIVE state.
[0170] At time point TI, SS changes the power level from P2 to P3.
[0171] At time point TJ, the T_delay_modeB timer expires, which triggers the UL data to arrive at the UE lower layer.
[0172] Check 2: Subtest "2" passes if the UE does not transmit using CG-SDT between TJ and TK.
[0173] The SS sends an open UE test loop message to the UE.
[0174] The UE sends a message of opening the UE test loop completion to the SS.
[0175] Verdict: If both subtests "1" and "2" pass, the test passes. If any subtest fails, the test fails.
[0176] The test ends at time TK.
[0177] As far as the prior art is concerned, it is a standard procedure during the consistency test of RAN5 user equipment that the system simulator (SS) sends certain test control commands to the UE in the downlink, such as activate UE test loop, close UE test loop, open UE test loop and deactivate UE test loop commands, and the UE then sends a confirmation / completion message in the uplink, such as activate UE test loop complete, close UE test loop complete, open UE test loop complete, deactivate UE test loop complete.
[0178] System Information (SI) consists of MIB and several SIBs, which are divided into minimum SI and other SI:
[0179] The minimum SI includes the basic information required for initial access and the information used to obtain any other SI. The minimum SI consists of the following:
[0180] The MIB contains cell barring status information and basic physical layer information of the cell required to receive additional system information, such as CORESET#0 configuration. The MIB is broadcast periodically on the BCH.
[0181] SIB1 defines the scheduling of other system information blocks and contains information required for initial access. SIB1 is also called the Remaining Minimum SI (RMSI) and is broadcast periodically on the DL-SCH or sent in a dedicated manner on the DL-SCH to UEs in RRC_CONNECTED.
[0182] The Master Information Block (MIB) on the PBCH provides the UE with parameters (e.g., CORESET#0 configuration) for monitoring the PDCCH for scheduling the PDSCH carrying System Information Block 1 (SIB1). The PBCH may also indicate that there is no associated SIB1, in which case the UE may point to another frequency from which it may search for the SSB associated with SIB1, and the frequency range in which the UE may assume that there is no SSB associated with SIB1. The indicated frequency range is restricted to within a contiguous spectrum allocation of the same operator in which the SSB is detected.
[0183] Various test modes and test commands are defined in 3GPP TS 36.509 and 3GPP TS 38.509. A test loop typically requires that the PDUs to be looped back be sent in the downlink by the system tester. One of the defined test loop modes is called "UE test loop mode B" and allows a timer (integer seconds) to be set so that the UE loops back data in the UL after the timer expires. This allows a delay in the loopback functionality, which is useful for basic SDT testing, because when the SDT procedure is initiated, the UE is not in RRC CONNECTED mode to receive the loopback data.
[0184] In the current 3GPP RAN5 specification TS 38.509, according to clause 4.4 of 3GPP TS24.301, test control messages (i.e., activate test mode, deactivate test mode, close UE test loop, and open UE test loop) are integrity protected and encrypted. In addition, the following method is defined in TS 38.509 to send test control messages to the DUT.
[0185] Activate test mode
[0186] Figure 3 The Activate UE Test Mode procedure using NAS messages for all scenarios is shown. The SS uses the Activate UE Test Mode procedure to put the UE into test mode. The SS can activate the UE test mode when the UE is in NR connected state or when the UE capable of NR sidelink communication is in out-of-coverage state. When the UE is in connected state, the SS requests the UE to activate UE test mode by sending an Activate Test Mode message.
[0187] Deactivate test mode
[0188] Figure 4 The Deactivate UE Test Mode procedure using NAS messages for all scenarios is shown. The purpose of this procedure is to deactivate the UE test mode and return the UE to normal operation. The SS can deactivate the UE test mode when the UE is in NR connected state, or when the UE capable of NR sidelink communication is in out-of-coverage state, and when the UE test mode is active. The SS requests the UE to deactivate the UE test mode by sending a Deactivate Test Mode message.
[0189] Close the UE test loop
[0190] Figure 5 The Close UE Test Loop procedure using NAS messages for all scenarios is shown. When in NR mode, or when in NR sidelink out of coverage state, the SS uses the Close UE Test Loop procedure to start the UE test loop function in the UE. The SS requests the UE to close the UE test loop by sending a Close UE Test Loop message.
[0191] Open the UE test loop
[0192] Figure 6 The UE test loop opening procedure using NAS message is shown. The SS uses the UE test loop opening procedure to deactivate the UE test loop function in the UE. The SS requests the UE to open all closed test loops by sending the UE test loop opening message.
[0193] According to the current 3GPP specification standards, when the UE is in the radio resource control (RRC) connected state, the downlink test control command is sent as a security-protected NAS layer 3 message. Therefore, when using the over-the-air (OTA) interface, any downlink test control command can only be sent from the SS to the UE in the RRC connected state. In addition, the uplink confirmation / completion message for the received downlink over-the-air (OTA) test control command can currently only be sent via a NAS layer 3 message in the RRC connected state. Unless the UE initiates the SDT process, there is currently no component or method that can send a downlink test control command to a UE in the RRC non-connected state. This presents a problem that the present invention is intended to overcome.
[0194] The non-connected state means that the UE is not in a connected state, that is, the UE may be in an inactive state or an idle state.
[0195] In RAN5 UE conformance testing, some common steps in the standard test process are that the system simulator (SS) sends certain test control commands to the UE in the downlink (e.g., activate UE test loop, close UE test loop, open UE test loop, and deactivate UE test loop commands), and the UE sends completion messages in the uplink (e.g., activate UE test loop complete, close UE test loop complete, open UE test loop complete, deactivate UE test loop complete). According to the current 3GPP specifications, these commands are sent as security-protected NAS layer 3 messages when the UE is in RRC connected state.
[0196] Currently, RAN4 and RAN5 are discussing the test process for testing the Rel-17 SDT features, where there are two sub-tests in the CG-SDTRRM test case, as described below.
[0197] Subtest 1: Time point TA to TG, where the correct UE behavior is to successfully perform MO-SDT (UL) at time point TG.
[0198] Subtest 2: Time point TG to TK, where the correct UE behavior is to not perform MO-SDT(UL) at time point TK.
[0199] Reference again Figure 2 , in the test, at time point TC or before, the UE receives an activate test mode command and a close UE test mode command in the RRC CONNECTED state. At time point TC, the UE receives an RRC release message, after which it enters the RRC INACTIVE state and remains in the INACTIVE state for the remainder of the test. After time point TG, the SS sends an open UE test loop command to the UE, and then the UE sends an open UE test loop complete command to the SS. Thereafter, the SS sends a close UE test loop command to the UE to configure another value for the T_delay_modeB timer, and then the UE sends a close UE test loop complete command to the SS. After time point TK, the SS sends an open UE test loop command to the UE, and then the UE sends an open UE test loop complete command to the SS. Then, a deactivate UE test loop command needs to be sent to the UE, and the UE needs to send a deactivate UE test loop complete command to the SS.
[0200] According to the current 3GPP specifications, there is no method by which these test control commands can be sent to a UE in the RRC non-connected state if the UE has not initiated the SDT procedure. This means that in order to send each test mode command, the UE must be brought back to the RRC CONNECTED state if it is not already in the CONNECTED state. However, this will involve an additional message exchange between the SS and the UE, which is unnecessary from a testing perspective.
[0201] The purpose of the present disclosure is to perform downlink signaling when not in RRC connected mode, more specifically for the purpose of device testing. Embodiments of the present disclosure may also be used in communication systems generally. Signaling should not require nor trigger RRC connected mode, as the whole purpose of device testing is to keep the device in the RRC non-connected state, for example to test the device to maintain timing.
[0202] The non-connected state means that the UE is not in a connected state and may be in an inactive or idle state.
[0203] Figure 7 A flow chart of a method according to some embodiments of the invention is illustrated. Figure 7 The method shown in includes: at 710, a network node determines that a user equipment is in a radio resource control RRC non-connected state. The method may also include: at 720, broadcasting a system information block SIB to multiple user equipments including the user equipment. The SIB includes a non-access stratum NAS container for transmitting NAS messages to the user equipment.
[0204] Figure 8 A flow chart of a method according to some embodiments of the invention is illustrated. Figure 8 The method shown in includes: at 810, transitioning by the user equipment to a radio resource control RRC non-connected state. When the UE receives an RRC release with a suspend configuration message from the gNB, the UE enters the RRC INACTIVE state. The method may also include: at 820, receiving a system information block SIB from a network node. The SIB includes a non-access stratum NAS container for transmitting NAS messages to the user equipment.
[0205] The test mode command in the layer 3 NAS message can be sent to the UE in the downlink even if the UE is in the RRC non-connected state. Therefore, there is no need for the UE to move back to the RRC CONNECTED state, which will reduce the test time.
[0206] According to an exemplary embodiment of the present invention, the NAS message may be a test mode command. The test mode command may be used for consistency testing of a 5GS user equipment.
[0207] Specifically, in order to achieve this, exemplary embodiments of the present disclosure provide at least two alternative routes as described below:
[0208] Route 1: Send a NAS message containing a test control message as an additional information element in an existing SI message (eg, SIB1).
[0209] Route 2: Send a NAS message containing a test control message in a newly defined SIB, which is purely defined as a NAS message container.
[0210] In an example embodiment, when the UE is in the RRC non-connected state, the network node indicates at least by sending a NAS message to the UE to avoid sending an uplink complete message for a received downlink NAS message.
[0211] The network node sends a NAS message instructing the user equipment to perform a specific action. The instruction includes indicating that the user equipment does not send a NAS completion message after the specific action is completed.
[0212] The network node instructs the UE through a bit within the NAS message or through a new IE (Information Element) in the SIB to avoid sending an uplink complete message for a downlink NAS message.
[0213] The indication by the network node is sent together with the NAS message via broadcast or multicast signaling.The NAS message is sent to a plurality of user equipments including the user equipment as part of a system information block broadcast by the network.
[0214] The NAS message can be used to send a test mode command or a non-test mode command. In other words, no matter whether the NAS command contains a test control command or not, any NAS message can be sent in the RRC non-connected state.
[0215] The instructions from the network node may be provided to the UE in either of the following two ways:
[0216] Option 1: Instruct the UE to avoid using bits within the new octet in the Test Control message to send an Uplink Complete message for a downlink NAS message.
[0217] Option 2: Instruct the UE to avoid sending the uplink complete message for the downlink NAS message using a new IE in the SIB through which the downlink test control command is sent in the non-connected state.
[0218] The following is about the Fig. 9In a more detailed description of the solution provided by the present invention, when the UE is in the RRC non-connected state, the SS indicates that the UE avoids sending an uplink complete message for the received downlink test control command. Therefore, there is no need for the UE to change back to the RRC CONNECTED state, which will reduce the test time.
[0219] As mentioned above, the present invention proposes two routes or embodiments, by sending a Layer 3 test control message to the UE in the RRC non-connected state, the network node instructs the UE through a bit in the test control command or through a new IE in the SIB to avoid sending an uplink completion message for the downlink NAS message.
[0220] When the first route is adopted, the NAS message is extended to include the indication. In one example, the NAS message containing the test control command can be extended to include more than one octet, any one of which can be used to instruct the UE to avoid sending an UL completion message for the received DL when the UE is in an RRC non-connected state. When the first route is used, the NAS message containing the test control command can be sent via a new information element added to an existing SI message.
[0221] The following example shows a scenario where the Open UE Test Loop command is extended by one octet, where bit 1 is used to instruct the UE to avoid sending an UL Complete message (Open UE Test Loop Complete in this case) when the UE is in RRC INACTIVE state. In addition, as described above, other test control commands (e.g., Activate Test Mode, Deactivate Test Mode, Close UE Test Loop, etc.) also need to be similarly enhanced.
[0222] Example
[0223] Proposed extension of the Open UE Test Loop command according to example embodiments -
[0224] This message is sent only in the direction SS to UE.
[0225]
[0226] The message types are:
[0227] 8 7 6 5 4 3 2 1 Bit number 1 0 0 0 0 0 1 0 Octet 1
[0228] And UL confirmed that:
[0229] 8 7 6 5 4 3 2 1 Bit number 0 0 0 0 0 0 0 X1 Octet 1
[0230] Wherein X1=1 indicates that there is no need to send a UL completion message.
[0231] According to a second aspect, the network node sends a NAS message containing a test control message via a new IE in any existing SIB or a newly defined SIB, which is purely defined as a NAS message container. The UE is instructed to avoid sending an uplink complete message for the downlink test control command using the new IE in the existing SIB or the newly defined SIB through which the downlink test control command is sent in RRC non-connected state.
[0232] Use the new IE in the existing SIB, for example, the SIB1 message is as follows:
[0233]
[0234]
[0235]
[0236]
[0237]
[0238]
[0239]
[0240] In the second option, the new SIB2x contains a dedicated NAS message container, which can be used to send, for example, a downlink conformance test control command to a UE in an RRC non-connected state. The following is an example of a SIB2x information element according to some of all embodiments:
[0241]
[0242] In the above two examples of Option 2 (SIB1 and SIB2x), the newly introduced field 'Dedicated-Acknowledgement-Needed ENUMERATED{True,False}'
[0243] Will be set to "False" by the network node to indicate that the UE does not require an UL Complete message. Therefore, the UE will avoid sending an UL Complete message while remaining in the RRC Non-Connected state.
[0244] When using embodiments of the present invention, the upper layers will not know how the message is received. Instead, it has been determined that the test command requires a completion message, so the NAS entity only needs to execute as specified. Therefore, this new information makes it possible that the NAS entity does not need to know the transmission method.
[0245] According to the embodiments described herein, the UE avoids sending an uplink completion message, which will reduce the message exchange between the UE and the network node during the test, thereby reducing the test time. In addition, the method does not require the UE to switch back to the RRC CONNECTED state, so it can also save battery power.
[0246] It is necessary to ensure that the UE reads this newly defined SIB2x in test mode. One way to do this is to define that when in test mode the UE will always read SIB2x.
[0247] Now refer to Fig.10 describing in more detail a possible mobile communication device for sending and resending information blocks towards stations of the system, Fig.10 A schematic partial cross-sectional view of a communication device 100 is shown. Such a communication device is generally referred to as a user equipment (UE) or terminal. A suitable mobile communication device can be provided by any device capable of sending and receiving radio signals. Non-limiting examples include a mobile station (MS), such as a mobile phone or a so-called "smart phone", a computer equipped with a wireless interface card or other wireless interface facilities, a personal data assistant (PDA) equipped with wireless communication capabilities, or any combination of these, etc. For example, a mobile communication device can provide data communications for carrying communications such as voice, e-mail, text messages, multimedia, etc. Therefore, many services can be supplied and provided to users via their communication devices. Non-limiting examples of these services include two-way or multi-way calls, data communications or multimedia services, or simply access to a data communication network system (such as the Internet). Broadcast or multicast data can also be provided to users. Non-limiting examples of content include downloads, television and radio programs, videos, advertisements, various alarms and other information. The mobile device 100 can receive signals via an appropriate device for receiving through the air interface 207, and can send signals via an appropriate device for sending radio signals. In Fig.10 In the mobile device, the transceiver arrangement is schematically represented by a block 106. The transceiver arrangement 106 may be provided, for example, by a radio part and an associated antenna arrangement. The antenna arrangement may be arranged internally or externally to the mobile device.
[0248] Multiple-input / multiple-output (MIMO) antenna systems may be provided for wireless communication devices. Such MIMO arrangements are known. MIMO systems use multiple antennas and advanced digital signal processing at the transmitter and receiver to improve link quality and capacity. Fig.10 Although not shown, multiple antennas may be provided, for example at a base station and a mobile station, and Fig.10The transceiver device 106 may provide multiple antenna ports. In the presence of more antenna elements, more data can be received and / or sent. A station may include an array of multiple antennas. Signaling and muting patterns may be associated with the Tx antenna number or port number of the MIMO arrangement.
[0249] The mobile device is also typically equipped with at least one processing circuit system (or processor or microprocessor) 101, at least one memory 102 and other possible components 103 for software and hardware-assisted execution of the tasks it is designed to perform, including controlling access to and communicating with access systems and other communication devices. Data processing, storage and other related network nodes can be provided in appropriate circuit boards and / or chipsets. This feature is represented by reference numeral 104. The user can control the operation of the mobile device with the help of a suitable user interface, such as a keypad 105, voice commands, a touch-sensitive screen or touchpad, a combination thereof, etc. A display 108, a speaker and a microphone may also be provided. In addition, the mobile communication device may include appropriate connectors (wired or wireless) to other devices and / or for connecting external accessories (e.g., a hands-free device) to it.
[0250] Fig.11 An example of a network node is shown. The network node 200 may be configured to provide control functionality. For this purpose, the network node 200 includes at least one memory 201, at least one processing circuit system (or processor or microprocessor) 202, 203 and an input / output interface 204. The network node 200 may be configured to execute appropriate software code to provide control functionality.
[0251] The network node may be provided in a base station. In this case, the network node may be coupled to a receiver and a transmitter via an interface. The receiver and / or the transmitter may be part of a base station. That is, the apparatus may include a component for receiving and a component for sending / sending.
[0252] The network node may alternatively or additionally be provided elsewhere in the system, for example in an S-GW.The network node may be a system simulator (SS) utilized in the conformance test.
[0253] although Fig.11 One memory 201 and two processors 202 and 203 are shown, but any number of these components may be provided. Multiple functions may be performed in a single processor, or separate functions may be performed by separate processors. For example, a single processor may be used to make multiple determinations, or separate determinations may be made by separate processors.
[0254] A communication device can access a communication system based on various access technologies, such as code division multiple access (CDMA) or wideband CDMA (WCDMA). Other examples include time division multiple access (TDMA), frequency division multiple access (FDMA) and its various schemes, such as interleaved frequency division multiple access (IFDMA), single carrier frequency division multiple access (SC-FDMA), and orthogonal frequency division multiple access (OFDMA) space division multiple access (SDMA).
[0255] Compared with the existing methods, the present invention has advantages because it can easily perform the transmission of (multiple) test control commands embedded in the layer 3 NAS message when the UE remains in the RRC INACTIVE / IDLE state. The proposed method does not require the UE to switch back to the RRC CONNECTED state, nor does it require an external AT interface. Therefore, significant resource and power utilization can be saved.
[0256] In general, various embodiments may be implemented in hardware or dedicated circuits, software, logic, or any combination thereof. For example, some aspects may be implemented in hardware, while other aspects may be implemented in firmware or software, which may be executed by a controller, microprocessor, or other computing device, although the invention is not limited thereto. Although various aspects of the invention may be illustrated and described as block diagrams, flow charts, or using some other illustrations, it should be understood that, as non-limiting examples, the blocks, devices, systems, techniques, or methods described herein may be implemented in hardware, software, firmware, dedicated circuits or logic, general purpose hardware or controllers or other computing devices, or some combination thereof.
[0257] Some embodiments of the present invention may be practiced in various components such as integrated circuit modules. In general, the design of integrated circuits is generally a highly automated process. Complex and powerful software tools are available for converting logic level designs into semiconductor circuit designs that are ready to be etched and formed on semiconductor substrates.
[0258] The term NAS message container includes NAS message, NAS container, test control message, and has been used interchangeably.
[0259] The word "exemplary" herein means "serving as an example, instance, or illustration." Any embodiment described herein as "exemplary" is not necessarily to be construed as preferred or advantageous over other embodiments. All embodiments described in this detailed description are exemplary embodiments provided to enable persons skilled in the art to make or use the invention, without limiting the scope of the invention which is defined by the claims.
[0260] The foregoing description has provided by way of exemplary and non-limiting examples a complete and informative description of the best method and apparatus presently contemplated by the inventors for carrying out the invention. However, various modifications and adaptations may become apparent to those skilled in the relevant arts in view of the foregoing description when read in conjunction with the accompanying drawings and the appended claims. Nevertheless, all such and similar modifications of the teachings of the present invention will still fall within the scope of the present invention.
[0261] It should be noted that the terms "connected," "coupled," or any variations thereof, refer to any direct or indirect connection or coupling between two or more elements, and may encompass the presence of one or more intermediate elements between two elements being "connected" or "coupled" together. The coupling or connection between elements may be physical, logical, or a combination thereof. As used herein, as several non-limiting and non-exhaustive examples, two elements may be considered to be "connected" or "coupled" together using one or more wires, cables, and / or printed electrical connections, and by using electromagnetic energy, such as electromagnetic energy with wavelengths in the radio frequency region, microwave region, and optical (visible and invisible) region.
[0262] Furthermore, some of the features of the preferred embodiments of this invention may be used to advantage without the corresponding use of other features.Thus, the foregoing description should be considered as merely illustrative of the principles of the invention, and not in limitation thereof.
Claims
1. A user equipment, comprising: at least one processing circuit system, and at least one memory for storing instructions to be executed by the processing circuit system, wherein the at least one memory and the instructions are configured to, together with the at least one processing circuit system, cause the user device to at least: Transition to the Radio Resource Control (RRC) non-connected state; receiving a system information block SIB from a network node, The SIB includes: a non-access stratum NAS container for transmitting a NAS message to the user equipment.
2. The user equipment according to claim 1, wherein the RRC non-connected state comprises: RRC inactive state, or RRC idle state.
3. The user equipment according to claim 1 or 2, wherein the SIB is an existing SIB or a new SIB.
4. The user equipment according to claim 1 or 2, wherein the NAS message instructs the user equipment to perform a specific action, And wherein the at least one memory and the instructions are further configured to, together with the at least one processing circuit system, cause the user device to: receiving an indication from the network node, the indication indicating that the user equipment is not to send a NAS completion message after the specific action is completed; and and refraining from sending the NAS completion message to the network node after the particular action is completed based on the indication.
5. The user equipment of claim 4, wherein the indication is received as part of the SIB. The user equipment according to claim 5 , wherein the NAS message is extended to include the indication.
7. The user equipment according to claim 1 or 2, wherein when the user equipment is in the RRC non-connected state, the user equipment is subjected to a consistency test procedure, and wherein the NAS message is a test control command related to the consistency test procedure.
8. The user equipment according to claim 7, wherein the test control command is one of the following: - Command to activate test mode; - Command to deactivate test mode; - a command to close the user equipment test loop; or - Command to open a test loop for user equipment.
9. The user equipment according to claim 7, wherein the consistency test procedure is used to test the user equipment's verification of a last used timing advance value of the configured authorized small data transmission procedure.
10. A method for communication, the method comprising: Transition to the Radio Resource Control (RRC) non-connected state; receiving a system information block SIB from a network node, The SIB includes: a non-access stratum NAS container for transmitting a NAS message to the user equipment.