Simulated moving bed online elution equipment and method

By simulating the replacement system and circulation system of the mobile bed online elution equipment, the online elution of the adsorption column is realized, which solves the problems of high cost and low efficiency caused by shutdown during the adsorption column elution process, and ensures the stable operation and supply of the equipment Reduced cargo pressure.

CN118949482APending Publication Date: 2024-11-15JIANGSU HANHUANG TECH CO LTD

Patent Information

Application Number
CN202411265169.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

Simulating the elution process of adsorption columns in mobile beds requires shutdown, resulting in high costs and reduced separation efficiency, affecting supply pressure.

Method used

Design a simulated mobile bed online elution device, adopting a replacement system and a circulation system, and replace the adsorption column in the isolation area by replacing the column to achieve online elution and avoid shutdown operations.

Benefits of technology

Without affecting the normal operation of the equipment, the adsorption and separation efficiency is ensured, reducing costs and supply pressure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118949482A_ABST
    Figure CN118949482A_ABST
Patent Text Reader

Abstract

The invention relates to simulated moving bed online elution equipment and a simulated moving bed online elution method. The simulated moving bed online elution equipment comprises an adsorption system, a replacement system, a raw material feeding system, a mobile phase feeding system, a circulating system, a raffinate system and an extract system, the adsorption system comprises a plurality of adsorption columns, and each functional area is provided with at least one adsorption column; the replacement system comprises a replacement column and a replacement pipeline assembly, the structure of the replacement column is the same as that of the adsorption column, and the column top and the column bottom of the replacement column are connected with the column top and the column bottom of each adsorption column through the replacement pipeline assembly; the replacement column can replace the adsorption column in the isolation area so as to elute the adsorption column in the isolation area. Therefore, after the adsorption column in the isolation area is replaced by the replacement column, the replacement column can be connected into the circulation loop, so that the whole equipment can normally operate, the adsorption column in the isolation area does not need to be shut down during elution, and the stable and uninterrupted operation of the equipment is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of separation equipment, and in particular to a simulated moving bed online elution equipment and method. Background Art

[0002] Simulated moving bed is a mass transfer device that uses the adsorption principle to perform liquid separation operations. It is a countercurrent continuous operation mode. By changing the material inlet and outlet positions of the fixed bed adsorption equipment, it produces an effect equivalent to the adsorbent moving continuously downward and the material moving continuously upward. As the main representative of continuous chromatography, simulated moving bed technology has the advantages of high production efficiency, low organic solvent consumption, large mass transfer driving force, and convenient automated continuous production. It is widely used in petrochemical, food industry, pharmaceutical and other fields.

[0003] Conventional simulated moving beds use adsorption beds for separation. Usually, the adsorption bed includes multiple adsorption columns, which form adsorption zones, purification zones, desorption zones, and isolation zones. Due to their own characteristics, the performance of some fillers in the adsorption columns drops sharply after a period of continuous use, and the columns need to be disassembled for elution, which takes two weeks. This will increase labor costs, lose some of the feed liquid, and the time spent will also affect the separation efficiency, which will invisibly increase costs and supply pressures. Summary of the invention

[0004] Based on this, it is necessary to provide a simulated moving bed online elution equipment and method to address the problem that the elution of the adsorption column in the current simulated moving bed requires equipment shutdown, resulting in high costs and affecting the separation efficiency. The equipment can elute the adsorption column without affecting the normal operation of the elution equipment, thereby ensuring the adsorption and separation efficiency of the equipment and reducing costs and supply pressure.

[0005] A simulated moving bed online elution device, comprising an adsorption system, a replacement system, a raw material feeding system, a mobile phase feeding system, a circulation system, a residual liquid extraction system and an extraction liquid system;

[0006] The adsorption system comprises a plurality of adsorption columns, which are divided into a plurality of functional zones, namely, an adsorption zone, a purification zone, a desorption zone and an isolation zone, and each functional zone has at least one adsorption column;

[0007] The replacement system includes a replacement column and a replacement pipeline assembly. The structure of the replacement column is the same as that of the adsorption column. The column top and column bottom of the replacement column are connected to the column top and column bottom of each adsorption column through the replacement pipeline assembly.

[0008] The circulation system comprises a circulation pipeline, a one-way valve and a circulation pump. Each of the adsorption columns is connected in series through the circulation pipeline to form a circulation loop. The circulation pump is arranged in the circulation pipeline. A one-way valve is arranged between adjacent adsorption columns. The raw material feeding system and the mobile phase feeding system are respectively connected to the top of each adsorption column. The residual liquid extraction system and the extracted liquid system are respectively connected to the bottom of each adsorption column.

[0009] The replacement column can replace the adsorption column in the isolation zone to elute the adsorption column in the isolation zone.

[0010] In one embodiment of the present application, the replacement pipe assembly includes a first replacement tube and a second replacement tube, one end of the first replacement tube is connected to the top of the replacement column, the other end of the first replacement tube is respectively connected to the top of each of the adsorption columns, one end of the second replacement tube is connected to the bottom of the replacement column, and the other end of the second replacement tube is respectively connected to the bottom of each of the adsorption columns.

[0011] In one embodiment of the present application, the first replacement pipe includes a first replacement main pipe and a plurality of first replacement branch pipes, and the second replacement pipe includes a second replacement main pipe and a plurality of second replacement branch pipes;

[0012] The top of each adsorption column is connected to a first replacement branch pipe, the bottom of each adsorption column is connected to a second replacement branch pipe, one end of the first replacement main pipe is connected to the top of the replacement column, and the other end is connected to each of the first replacement branches, one end of each of the second replacement main pipes is connected to the bottom of the replacement column, and the other end is connected to each of the second replacement branches.

[0013] In one embodiment of the present application, the replacement pipeline assembly further includes a plurality of input valves and a plurality of output valves, wherein one input valve is disposed at the top of each adsorption column, and one output valve is disposed at the bottom of each adsorption column;

[0014] The input valve is connected to the first replacement pipe, and the output valve is connected to the second replacement pipe.

[0015] In one embodiment of the present application, the input valve and the output valve are both three-way valves;

[0016] The input valve has a first inlet, a second inlet and a third inlet, the first inlet is connected to the adsorption column, the second inlet is connected to the raw material feeding system, the mobile phase feeding system and the circulation pipeline, and the third inlet is connected to the first replacement pipe; the input valve has a first outlet, a second outlet and a third outlet, the first outlet is connected to the adsorption column, the second outlet is connected to the residual liquid system, the extracted liquid system and the circulation pipeline, and the third outlet is connected to the second replacement pipe;

[0017] And / or, the input valve and the output valve are one of a ball valve, a regulating valve, a butterfly valve, a diaphragm valve and a plug valve, and are driven pneumatically or electrically.

[0018] In one embodiment of the present application, the number of the replacement columns is equal to the number of the adsorption columns in the isolation zone; each of the replacement columns replaces one of the adsorption columns in the isolation zone.

[0019] In one embodiment of the present application, the raw material feeding system includes a raw material feeding pipe, a plurality of raw material feeding valves and a first back pressure valve, a raw material feeding valve is arranged at the top of each adsorption column, the raw material feeding pipe connects the raw material barrel and each raw material feeding valve, and the first back pressure valve is arranged on the raw material feeding pipe;

[0020] And / or, the mobile phase feeding system comprises a mobile phase feeding pipe, a plurality of mobile phase feeding valves and a second back pressure valve, a mobile phase feeding valve is further arranged at the top of each adsorption column, the mobile phase feeding pipe is connected to the mobile phase cartridge and each of the mobile phase feeding valves, and the second back pressure valve is arranged on the mobile phase feeding pipe;

[0021] And / or, the residual liquid extraction system includes a residual liquid extraction discharge pipe, a third back pressure valve and a plurality of residual liquid extraction discharge valves, a residual liquid extraction discharge valve is arranged at the bottom of each adsorption column, the residual liquid extraction discharge pipe is connected to each of the residual liquid extraction discharge valves, and the third back pressure valve is arranged on the residual liquid extraction discharge pipe;

[0022] And / or, the extracted liquid system includes an extracted liquid discharge pipe, a fourth back pressure valve and multiple extracted liquid discharge valves, and an extracted liquid discharge valve is also arranged at the bottom of each adsorption column, the extracted liquid discharge pipe is connected to each of the extracted liquid discharge valves, and the fourth back pressure valve is arranged on the extracted liquid discharge pipe.

[0023] In one embodiment of the present application, the simulated moving bed online elution device further includes a programmable valve group and an automatic control system, all valves form the programmable valve group, the automatic control system is control-connected to the programmable valve group, and the automatic control system can control the opening and closing states of each valve in the programmable valve group in manual and automatic operation modes;

[0024] Each valve in the program-controlled valve group is independently controlled, and the valves in the program-controlled valve group except the input valve and the output valve are all one of ball valves, needle valves, stop valves and butterfly valves, and are pneumatically or electrically controlled.

[0025] In one embodiment of the present application, the number of the plurality of adsorption columns is six, wherein the adsorption zone includes two adsorption columns, the purification zone includes two adsorption columns, the desorption zone includes one adsorption column, the isolation zone includes one adsorption column, and the replacement system includes one replacement column;

[0026] The replacement column can replace the adsorption column in the isolation zone, so that the adsorption column in the isolation zone can be eluted.

[0027] A simulated moving bed online elution method is applied to a simulated moving bed online elution device as described in any of the above technical features, and the simulated moving bed online elution method comprises at least the following steps;

[0028] The automatic control system controls the multiple adsorption columns in the adsorption system to cyclically perform adsorption, purification, desorption, and isolation operations;

[0029] After a preset time, when the adsorption column in the isolation zone needs to be eluted, the input valve and the output valve corresponding to the adsorption column are controlled to open, and the replacement column is connected through the replacement pipeline assembly;

[0030] The column bottom of the first adsorption column is connected to the column top of the replacement column through the circulation pipeline, the input valve and the replacement pipeline assembly, and the column bottom of the replacement column is connected to the column top of the second adsorption column through the replacement pipeline assembly, the output valve and the circulation pipeline;

[0031] Connecting the replacement column to a circulation loop, and replacing the adsorption column in the isolation zone for elution;

[0032] After the elution of the adsorption column is completed, the adsorption column is operated as the isolation zone, the input valve and the output valve are closed, and the adsorption column is connected to the circulation loop to replace the replacement column out of the circulation loop.

[0033] After adopting the above technical solution, this application has at least the following technical effects:

[0034] The simulated moving bed online elution device and method of the present application, in which the multiple adsorption columns of the adsorption system are divided into multiple functional areas, each functional area has at least one adsorption column, the replacement column of the replacement system is arranged side by side with the multiple adsorption columns, the replacement column is respectively connected to the column top and the column bottom of each adsorption column through the replacement pipeline assembly, the circulation pipeline of the circulation system connects each adsorption column and the replacement column in series to form a circulation loop, the circulation pump is arranged in the circulation pipeline, and the raw material feeding system and the mobile phase feeding system are respectively connected to the column top of each adsorption column. The replacement column can replace the adsorption column in the isolation zone, so that the replacement column can temporarily store materials, and at the same time, the adsorption column in the isolation zone can be eluted.

[0035] The simulated moving bed online elution equipment uses a replacement pipeline assembly in the replacement system to connect the replacement column with the top and bottom of each adsorption column. When the adsorption column in the isolation area needs to be eluted, the replacement column is connected to the circulation loop to replace the adsorption column in the isolation area. At this time, the adsorption column in the isolation area is not in the circulation loop, and the adsorption column can be eluted. In this way, after the adsorption column in the isolation area is replaced by the replacement column, the adsorption column in the isolation area does not need to be shut down for elution, which will not affect the normal operation of the entire equipment, so that the simulated moving bed online elution equipment can perform separation operations normally, ensure the adsorption separation efficiency, and reduce costs and supply pressures. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] FIG1 is a schematic structural diagram of a simulated moving bed online elution device according to an embodiment of the present application.

[0037] FIG. 2 is a schematic diagram showing a replacement of the simulated moving bed online elution device shown in FIG. 1 .

[0038] FIG. 3 is a partial schematic diagram of the first adsorption column in the simulated moving bed online elution device shown in FIG. 1 .

[0039] FIG. 4 is a flow chart of a simulated moving bed online elution method according to an embodiment of the present application.

[0040] Wherein: 100, simulated moving bed online elution equipment; 110, adsorption system; 101, adsorption column; 111, first adsorption column; 112, second adsorption column; 113, third adsorption column; 114, fourth adsorption column; 115, fifth adsorption column; 116, sixth adsorption column; 120, replacement system; 121, replacement column; 122, replacement pipeline assembly; 1221, first replacement main pipe; 1222, first replacement branch pipe; 1223, second replacement main pipe; 1224, second replacement branch pipe; 123, input valve; 1231, first inlet; 1232, second inlet; 1233, third inlet; 124, output valve; 1241, first outlet; 1242, first outlet; 1243, second outlet; 1244, second outlet; 1245, third outlet; 1246, third outlet; 1247, third outlet; 1248, third outlet; 1249, third outlet; 1250, third outlet; 1251, first outlet; 1252, first outlet; 1253, third outlet; 1254, third outlet; 1255, third outlet; 1256, third outlet; 1257, third outlet; 1258, third outlet; 1259, third outlet; 1260, third outlet; 1261, first outlet; 1262, first outlet; 1263, third outlet; 1264, third outlet; 1265, third outlet; 1266, third outlet; 1267, third outlet; 1268, third outlet; 1269, third outlet; 1270, third outlet; 1271, first outlet; 1272, first outlet; 1273, third outlet; 12 Second outlet; 1243, third outlet; 130, raw material feeding system; 131, raw material feeding pipe; 132, raw material feeding valve; 133, first back pressure valve; 134, raw material pump; 140, mobile phase feeding system; 141, mobile phase feeding pipe; 142, mobile phase feeding valve; 143, second back pressure valve; 144, mobile phase pump; 150, circulation system; 151, circulation pipeline; 152, circulation pump; 153, one-way valve; 160, residual liquid extraction system; 161, residual liquid extraction discharge pipe; 162, residual liquid extraction discharge valve; 163, third back pressure valve; 170, extracted liquid system; 171, extracted liquid extraction discharge pipe; 172, extracted liquid extraction valve; 173, fourth back pressure valve. DETAILED DESCRIPTION

[0041] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.

[0042] In the description of the present application, it should be understood that if the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. appear, the orientation or position relationship indicated by these terms is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application.

[0043] In addition, if the terms "first" or "second" appear, these terms are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, if the term "plurality" appears, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0044] In this application, unless otherwise clearly specified and limited, if the terms "installed", "connected", "connected", "fixed" and the like appear, these terms should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to the specific circumstances.

[0045] In the present application, unless otherwise clearly specified and limited, if there is a description that a first feature is "on" or "below" a second feature, etc., or the like, it may mean that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, the first feature being "above", "above" and "above" the second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. The first feature being "below", "below" and "below" the second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0046] It should be noted that if an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. If an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. If any, the terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used in this application are for illustrative purposes only and do not represent the only implementation method.

[0047] Referring to FIG. 1 , the present application provides a simulated moving bed online elution device 100. FIG. 1 is a schematic structural diagram of a simulated moving bed online elution device 100 of an embodiment of the present application. The simulated moving bed online elution device 100 is a mass transfer device that uses the adsorption principle to perform liquid separation operations. It operates in a countercurrent continuous manner, and by simultaneously and regularly changing the material inlet and outlet positions of the fixed bed adsorption device, it produces an effect equivalent to the continuous upward movement of the adsorbent and the continuous downward movement of the material, thereby achieving the purpose of adsorption separation.

[0048] It is understandable that, due to their own characteristics, the performance of certain fillers in the adsorption column of the simulated moving bed drops sharply after a period of continuous use, and the column needs to be dismantled for elution, a process that takes two weeks. This will increase labor costs and lose part of the slurry, and the time consumed will also invisibly increase costs and supply pressures. To this end, the present application provides a new type of simulated moving bed online elution equipment 100, which can elute the adsorption column 101 without affecting the normal operation of the elution equipment, thereby ensuring the adsorption and separation efficiency of the equipment and reducing costs and supply pressures. The specific structure of the simulated moving bed online elution equipment 100 of one embodiment is introduced below.

[0049] Referring to FIG. 1 , in one embodiment, a simulated moving bed online elution device 100 includes an adsorption system 110, a replacement system 120, a raw material feeding system 130, a mobile phase feeding system 140, a circulation system 150, a residual liquid extraction system 160, and an extraction liquid system 170. The adsorption system 110 includes a plurality of adsorption columns 101, and the plurality of adsorption columns 101 are divided into a plurality of functional areas, namely, an adsorption area, a purification area, a desorption area, and an isolation area, and each functional area has at least one adsorption column 101. The replacement system 120 includes a replacement column 121 and a replacement pipeline assembly 122. The structure of the replacement column 121 is the same as that of the adsorption column 101, and the column top and column bottom of the replacement column 121 are connected to the column top and column bottom of each adsorption column 101 through the replacement pipeline assembly 122. The circulation system 150 includes a circulation pipeline 151, a one-way valve 153 and a circulation pump 152. Each adsorption column 101 is connected in series through the circulation pipeline 151 to form a circulation loop. The circulation pump 152 is arranged in the circulation pipeline 151. A one-way valve 153 is arranged between adjacent adsorption columns 101. The raw material feeding system 130 and the mobile phase feeding system 140 are respectively connected to the top of each adsorption column 101. The residual liquid extraction system 160 and the extraction liquid system 170 are respectively connected to the bottom of each adsorption column 101. The replacement column 121 can replace the adsorption column 101 in the isolation zone to elute the adsorption column 101 in the isolation zone.

[0050] The adsorption system 110 is the main adsorption bed of the simulated moving bed online elution device 100, and the adsorption, purification and desorption of the raw material are achieved through the adsorption system 110. The raw material feeding system 130 is connected to the mobile phase feeding system 140 and the adsorption system 110. The raw material feeding system 130 provides raw materials to the adsorption system 110, and the mobile phase feeding system 140 provides mobile phase to the adsorption system 110. The mobile phase can flow in the adsorption system 110 as a carrier of the raw materials. The raw material and the mobile phase are mixed as materials. The residual liquid system 160 is connected to the extracted liquid system 170 and the adsorption system 110. The adsorption system 110 completes the adsorption separation of the raw material to produce residual liquid and extracted liquid. The residual liquid is extracted by the residual liquid system 160, and the extracted liquid is extracted by the extracted liquid system 170.

[0051] Specifically, the adsorption system 110 includes a plurality of adsorption columns 101, through which the adsorption separation of the raw materials is achieved. The plurality of adsorption columns 101 are arranged side by side and connected through a circulation system 150 to form a circulation loop. The circulation system 150 includes a circulation pipeline 151 and a circulation pump 152. The circulation pipeline 151 connects the plurality of adsorption columns 101 in series end to end to form a circulation loop. The circulation pump 152 is arranged on the circulation pipeline 151 to provide power for the flow of the material in the circulation loop. Moreover, a one-way valve 153 is provided on the circulation pipeline 151 between two adjacent adsorption columns 101, and the one-way valve 153 is used to ensure the unidirectional flow of the material and prevent backflow. In other words, the present application adopts a circulation system 150 to connect the plurality of adsorption columns 101 in series to form a circulation loop for the flow of the material, so as to perform adsorption and separation operations on the raw materials.

[0052] Moreover, a plurality of adsorption columns 101 form a plurality of functional areas of the adsorption system 110, and the plurality of functional areas are respectively an adsorption area, a purification area, a desorption area and an isolation area. Each functional area has at least one adsorption column 101, and the corresponding functional area realizes the corresponding function through the adsorption column 101. For example, the adsorption column 101 in the adsorption area can perform an adsorption operation, the adsorption column 101 in the purification area can perform a purification operation, the adsorption column 101 in the desorption area can perform a desorption operation, and the adsorption column 101 in the isolation area can perform a temporary storage operation. When the circulation loop is running, the position of each functional area will change to produce the effect that the adsorbent moves continuously downward and the material moves continuously upward. The operating principle of the adsorption system 110 is prior art and will not be repeated here. Here, only the structure and principle of how the adsorption column 101 can be eluted without affecting the normal operation of the equipment after running for a period of time are explained.

[0053] In order to achieve the elution of the adsorption column 101 without stopping the equipment, the simulated moving bed online elution equipment 100 of the present application also includes a replacement system 120, and the adsorption column 101 is replaced by the replacement system 120. Specifically, the replacement system 120 includes a replacement column 121 and a replacement pipeline assembly 122. The replacement column 121 connects the column top and the column bottom of each adsorption column 101 through the replacement pipeline assembly 122. The structure of the replacement column 121 is the same as that of the adsorption column 101. When the replacement column 121 replaces the adsorption column 101, the adsorption separation operation can be performed. When the equipment is operating normally (the adsorption column 101 does not need to be eluted), the adsorption system 110 operates normally, and the replacement pipeline assembly 122 is disconnected from each adsorption column 101. When the adsorption column 101 is replaced, the replacement pipeline assembly 122 can be connected to the corresponding adsorption column 101 and disconnected from the remaining adsorption columns 101. The replacement of the adsorption column 101 in the isolation zone is achieved by replacing the column 121, and the adsorption separation function of the adsorption system 110 will not be affected.

[0054] After a certain adsorption column 101 is used continuously for a period of time, the adsorption performance decreases. When the adsorption column 101 runs to the isolation area, the top of the replacement column 121 is connected to the top of the adsorption column 101 in the isolation area through the replacement pipeline assembly 122, and the bottom of the replacement column 121 is connected to the bottom of the adsorption column 101 in the isolation area through the replacement pipeline assembly 122. At this time, the replacement column 121 is connected to the circulation loop, and the previous adsorption column 101, the raw material feeding system 130 and the mobile phase feeding system 140 can be connected to the replacement column 121 through the replacement pipeline assembly 122, and the bottom of the replacement column 121 can be connected to the top of the next adsorption column 101, the residual liquid extraction system 160, and the extracted liquid system 170 through the replacement pipeline assembly 122, that is, the remaining adsorption columns 101 and the replacement column 121 are connected to the circulation pipeline 151 through the replacement pipeline assembly 122 to form a circulation loop, and the separation operation can continue to be performed to ensure the stability and uninterrupted operation of the equipment.

[0055] At the same time, the adsorption column 101 in the isolation zone is replaced from the circulation loop. The adsorption column 101 does not participate in the separation operation. The adsorption column 101 can be disassembled and eluted. For example, the filler (such as resin, etc.) in the adsorption column 101 can be replaced or the filler in the adsorption column 101 can be cleaned, so that the filler in the adsorption column 101 can restore its own adsorption characteristics. After the elution of the adsorption column 101 is completed, the adsorption column 101 is installed back to its original position. When the adsorption column 101 runs to the isolation zone again, the adsorption column 101 is connected to the circulation loop to replace the replacement column 121 out of the circulation loop. When the performance of the remaining adsorption columns 101 decreases, the remaining adsorption columns 101 can be eluted in this way.

[0056] After the replacement column 121 is used to replace the adsorption column 101 in the isolation area, the replacement column 121 can be connected to the circulation loop so that the entire device can operate normally, and will not be shut down due to the disassembly and elution of the adsorption column 101 in the isolation area, ensuring the stability and uninterrupted operation of the equipment, and the raw materials and the mobile phase can flow normally in the circulation loop, and each adsorption column 101 can adsorb and separate the material to obtain the residual liquid and the extracted liquid. In this way, the disassembly and elution of the column will not take up time, and the separation efficiency of the entire device can be guaranteed to meet the use requirements.

[0057] The simulated moving bed online elution equipment 100 of the above embodiment uses the replacement pipeline assembly 122 in the replacement system 120 to connect the replacement column 121 with the column top and column bottom of each adsorption column 101. When the adsorption column 101 in the isolation area needs to be eluted, the replacement column 121 is connected to the circulation loop to replace the adsorption column 101 in the isolation area. At this time, the adsorption column 101 in the isolation area is not in the circulation loop, and the adsorption column 101 can be eluted. In this way, after the adsorption column 101 in the isolation area is replaced by the replacement column 121, the adsorption column 101 in the isolation area does not need to be shut down for elution, and the normal operation of the entire equipment will not be affected, so that the simulated moving bed online elution equipment 100 can perform separation operations normally, ensure the adsorption separation efficiency, and reduce costs and supply pressures.

[0058] Referring to FIG. 1 , in one embodiment, the circulation pipeline 151 includes a first circulation pipeline 151 and a second circulation pipeline 151. The column bottoms and column tops of adjacent adsorption columns 101 are connected in series through the second circulation pipeline 151. The first circulation pipeline 151 connects the column bottom of the tail adsorption column 101 and the column top of the first adsorption column 101 in series. Each second circulation pipeline 151 is provided with a one-way valve 153, and a circulation pump 152 is provided in the first circulation pipeline 151. In this way, each adsorption column 101 is connected in series through the first circulation pipeline 151 and the second circulation pipeline 151 to form a circulation loop.

[0059] Referring to FIG. 1 , in one embodiment, the raw material feeding system 130 includes a raw material feeding pipe 131, a plurality of raw material feeding valves 132 and a first back pressure valve 133. A raw material feeding valve 132 is provided at the top of each adsorption column 101. The raw material feeding pipe 131 connects the raw material barrel and each raw material feeding valve 132. The first back pressure valve 133 is provided at the raw material feeding pipe 131. The raw material feeding valve 132 is provided at the top of each adsorption column 101. The raw material feeding pipe 131 is a pipeline for conveying raw materials. One end of the raw material feeding pipe 131 is connected to the raw material barrel, and the other end of the raw material feeding pipe 131 is respectively connected to each raw material feeding valve 132. When the raw material feeding valve 132 is opened, the raw material feeding pipe 131 can convey the raw material to the corresponding adsorption column 101 through the corresponding raw material feeding valve 132. When the raw material feeding valve 132 is closed, the raw material cannot be conveyed through the raw material feeding valve 132. The first back pressure valve 133 is disposed in the raw material feed pipe 131 to provide power for the delivery of the raw material so as to control the flow of the raw material in the raw material feed pipe 131. Optionally, the raw material feed system 130 further includes a raw material pump 134, which is disposed in the raw material feed pipe 131.

[0060] Referring to FIG. 1 , in one embodiment, the mobile phase feeding system 140 includes a mobile phase feeding pipe 141, a plurality of mobile phase feeding valves 142 and a second back pressure valve 143. A mobile phase feeding valve 142 is also provided at the top of each adsorption column 101. The mobile phase feeding pipe 141 is connected to the mobile phase barrel and each mobile phase feeding valve 142, and the second back pressure valve 143 is provided at the mobile phase feeding pipe 141. The mobile phase feeding valve 142 is provided at the top of each adsorption column 101. The mobile phase feeding pipe 141 is a pipeline for conveying the mobile phase. One end of the mobile phase feeding pipe 141 is connected to the mobile phase barrel (solvent barrel), and the other end of the mobile phase feeding pipe 141 is respectively connected to each mobile phase feeding valve 142. When the mobile phase feeding valve 142 is opened, the mobile phase feeding pipe 141 can convey the mobile phase to the corresponding adsorption column 101 through the corresponding mobile phase feeding valve 142. When the mobile phase feed valve 142 is closed, the mobile phase cannot be delivered through the mobile phase feed valve 142. The second back pressure valve 143 is provided in the mobile phase feed pipe 141 to provide power for the delivery of the mobile phase to control the flow of the mobile phase in the mobile phase feed pipe 141. Optionally, the mobile phase feed system 140 further includes a mobile phase pump 144, which is provided in the mobile phase feed pipe 141.

[0061] Referring to FIG. 1 , in one embodiment, the residual liquid extraction system 160 includes a residual liquid extraction discharge pipe 161, a third back pressure valve 163 and a plurality of residual liquid extraction discharge valves 162. A residual liquid extraction discharge valve 162 is provided at the bottom of each adsorption column 101. The residual liquid extraction discharge pipe 161 is connected to each residual liquid extraction discharge valve 162. The third back pressure valve 163 is provided on the residual liquid extraction discharge pipe 161. The residual liquid extraction discharge valve 162 is provided at the bottom of each adsorption column 101. The residual liquid extraction discharge pipe 161 is a pipeline for the flow of residual liquid. One end of the residual liquid extraction discharge pipe 161 is connected to each residual liquid extraction discharge valve 162, and the other end of the residual liquid extraction discharge pipe 161 is connected to a corresponding storage container. When the residual liquid extraction discharge valve 162 is opened, the residual liquid of the corresponding adsorption column 101 can enter the residual liquid extraction discharge pipe 161 through the residual liquid extraction discharge valve 162. The third back pressure valve 163 is disposed on the residual liquid discharge pipe 161 to provide power for extracting the residual liquid so as to control the flow of the residual liquid in the residual liquid discharge pipe 161 .

[0062] Referring to FIG. 1 , in one embodiment, the extracted liquid system 170 includes an extracted liquid discharge pipe 171, a fourth back pressure valve 173 and a plurality of extracted liquid discharge valves 172. An extracted liquid discharge valve 172 is also provided at the bottom of each adsorption column 101. The extracted liquid discharge pipe 171 is connected to each extracted liquid discharge valve 172, and the fourth back pressure valve 173 is provided on the extracted liquid discharge pipe 171. The extracted liquid discharge valves 172 are provided at the bottom of each adsorption column 101, respectively. The extracted liquid discharge pipe 171 is a pipeline for the flow of the extracted liquid. One end of the extracted liquid discharge pipe 171 is connected to each extracted liquid discharge valve 172, respectively, and the other end of the extracted liquid discharge pipe 171 is connected to a corresponding storage container. When the extracted liquid discharge valve 172 is opened, the extracted liquid of the corresponding adsorption column 101 can enter the extracted liquid discharge pipe 171 through the extracted liquid discharge valve 172. The fourth back pressure valve 173 is disposed on the extracted liquid discharge pipe 171 to provide power for extracting the extracted liquid so as to control the flow of the extracted liquid in the extracted liquid discharge pipe 171 .

[0063] Referring to FIG. 1 , in one embodiment, the number of replacement columns 121 is equal to the number of adsorption columns 101 in the isolation zone, and each replacement column 121 replaces one adsorption column 101 in the isolation zone. It can be understood that the replacement column 121 replaces the adsorption column 101 in the isolation zone. If there are several adsorption columns 101 in the isolation zone, several replacement columns 121 are generally provided. In this way, the replacement column 121 can accurately replace each adsorption column 101 in the isolation zone to elute each adsorption column 101 in the isolation zone, while ensuring the stable and uninterrupted operation of the entire device.

[0064] Exemplarily, as shown in FIG1 , the number of replacement columns 121 is one, and the number of adsorption columns 101 in the isolation zone is one. When eluting the adsorption column 101 in the isolation zone, the replacement column 121 can accurately replace one adsorption column 101 in the isolation zone. Of course, in other embodiments of the present application, the number of replacement columns 121 is at least two, and the number of replacement columns 121 is equal to the number of adsorption columns 101 in the isolation zone. When eluting each adsorption column 101 in the isolation zone, each replacement column 121 replaces the adsorption column 101 in the isolation zone one by one. It is worth noting that the replacement principle of having one replacement column 121 and having at least two replacement columns 121 is substantially the same, and the present application only takes the example of having one replacement column 121 for illustration.

[0065] Referring to Figures 1 to 3, in a specific example of the present application, the number of the multiple adsorption columns 101 is six, wherein the adsorption zone includes two adsorption columns 101, the purification zone includes two adsorption columns 101, the desorption zone includes one adsorption column 101, the isolation zone includes one adsorption column 101, and the replacement system 120 includes a replacement column 121, and the replacement column 121 can replace the adsorption column 101 in the isolation zone, so that the adsorption column 101 in the isolation zone can be eluted. Figure 2 is a schematic diagram of replacing the simulated moving bed online elution device 100 shown in Figure 1, and Figure 3 is a partial schematic diagram of the first adsorption column 111 in the simulated moving bed online elution device 100 shown in Figure 1.

[0066] In Fig. 1, six adsorption columns 101 are arranged side by side, namely the first adsorption column 111, the second adsorption column 112, the third adsorption column 113, the fourth adsorption column 114, the fifth adsorption column 115, and the sixth adsorption column 116, and the replacement column 121 is located on the side of the sixth adsorption column 116 away from the fifth adsorption column 115. The top of each adsorption column 101 is provided with a raw material feed valve 132V11, V21, V31, V41, V51, V61, and the top of each adsorption column 101 is provided with a mobile phase feed valve 142V12, V22, V32, V42, V52, V62. Two adjacent adsorption columns 101 are provided with a one-way valve 153V13, V23, V33, V43, V53. A residual liquid discharge valve 162V14, V24, V34, V44, V54, V64 is provided at the bottom of each adsorption column 101, and an extracted liquid discharge valve 172V15, V25, V35, V45, V55, V65 is provided at the bottom of each adsorption column 101.

[0067] The raw material feed pipe 131 in the raw material feed system 130 is connected to the raw material feed valve 132V11, V21, V31, V41, V51, V61 of each adsorption column 101, and the mobile phase feed pipe 141 in the mobile phase feed system 140 is connected to the mobile phase feed valve 142V12, V22, V32, V42, V52, V62 of each adsorption column 101. The residual liquid discharge pipe 161 in the residual liquid system 160 is connected to the residual liquid discharge valve 162V14, V24, V34, V44, V54, V64 of each adsorption column 101, and the extracted liquid discharge pipe 171 in the extracted liquid system 170 is connected to the extracted liquid discharge valve 172V15, V25, V35, V45, V55, V65 of each adsorption column 101.

[0068] In this embodiment, when the equipment is running, two adsorption columns 101 in the adsorption zone, two adsorption columns 101 in the purification zone, one adsorption column 101 in the desorption zone, and one adsorption column 101 in the isolation zone move in sequence. When the adsorption performance of the first adsorption column 111 decreases, and when the entire equipment runs to the point where the first adsorption column 111 is an isolation zone, the replacement column 121 connects the top and bottom of the first adsorption column 111 through the replacement pipeline assembly 122 to replace the first adsorption column 111 and connect it to the circulation loop. At this time, the replacement column 121, the second adsorption column 112, the third adsorption column 113, the fourth adsorption column 114, the fifth adsorption column 115, and the sixth adsorption column 116 form a circulation loop. While the entire equipment is running continuously, the first adsorption column 111 can be disassembled and eluted, as shown in FIG2 , where the replacement of the replacement column 121 is illustrated along the arrow direction in FIG2 .

[0069] It is worth noting that the principle of replacing the second adsorption column 112, the third adsorption column 113, the fourth adsorption column 114, the fifth adsorption column 115 and the sixth adsorption column 116 is substantially the same as the principle of replacing the first replacement column 121, and will not be repeated here. Of course, in other embodiments of the present application, the number of adsorption columns 101 can also be other, and the number of adsorption columns 101 in the adsorption zone, purification zone, desorption zone and isolation zone can be set according to the use requirements, and the principle is substantially the same as the principle of six adsorption columns 101, and will not be repeated here.

[0070] Referring to Figures 1 and 2, in one embodiment, the replacement pipe assembly 122 includes a first replacement tube and a second replacement tube, one end of the first replacement tube is connected to the top of the replacement column 121, and the other end of the first replacement tube is respectively connected to the top of each adsorption column 101, one end of the second replacement tube is connected to the bottom of the replacement column 121, and the other end of the second replacement tube is respectively connected to the bottom of each adsorption column 101.

[0071] The first replacement tube and the second replacement tube are connected to each adsorption column 101 at the top and bottom of the replacement column 121. The first replacement tube is located at the top of the replacement column 121, one end of which is connected to the top of the replacement column 121, and the other end of which is connected to the top of each adsorption column 101. The second replacement tube is located at the bottom of the replacement column 121, one end of which is connected to the bottom of the replacement column 121, and the other end of which is connected to the bottom of each adsorption column 101.

[0072] When the adsorption performance of the first adsorption column 111 decreases, and when the entire device runs to the point where the first adsorption column 111 is an isolation zone, the raw material feeding system 130, the mobile phase feeding system 140, and the bottom of the sixth adsorption column 116 are connected to the top of the replacement column 121 through the first replacement tube, and the bottom of the replacement column 121 is connected to the residual liquid extraction system 160, the extraction liquid system 170, and the top of the second adsorption column 112 through the second replacement tube. In this way, the replacement column 121 can be connected to the circulation loop to replace the first adsorption column 111.

[0073] 1 to 3, in one embodiment, the replacement pipeline assembly 122 further includes a plurality of input valves 123 and a plurality of output valves 124, wherein an input valve 123 is disposed at the top of each adsorption column 101, and an output valve 124 is disposed at the bottom of each adsorption column 101. The input valve 123 is connected to the first replacement pipe, and the output valve 124 is connected to the second replacement pipe.

[0074] An input valve 123 is provided at the top of each adsorption column 101, and an output valve 124 is provided at the bottom of each adsorption column 101. The first replacement pipe connects the input valve 123 and the top of the replacement column 121, and the second replacement pipe connects the output valve 124 and the bottom of the replacement column 121. In this embodiment, there are six input valves 123, namely P11, P21, P31, P41, P51, and P61, which are correspondingly provided at the tops of the six adsorption columns 101, and there are six output valves 124, namely P12, P22, P32, P42, P52, and P62, which are correspondingly provided at the bottoms of the six adsorption columns 101. The replacement column 121 is connected to the input valves 123P11, P21, P31, P41, P51, P61 through a first replacement tube, and is connected to the output valves 124P12, P22, P32, P42, P52, P62 through a second replacement tube.

[0075] When the adsorption performance of the first adsorption column 111 decreases, and when the entire device runs to the isolation zone of the first adsorption column 111, the entire device continues to run while opening the input valve 123P11 and the output valve 124P12 corresponding to the first adsorption column 111. At this time, the raw material feeding system 130, the mobile phase feeding system 140 and the column bottom of the sixth adsorption column 116 are connected to the column top of the replacement column 121 through the input valve 123P11 through the first replacement pipe, and the column bottom of the replacement column 121 is connected to the residual liquid system 160, the extraction liquid system 170 and the column top of the second adsorption column 112 through the second replacement pipe through the output valve 124P12. In this way, the replacement column 121 can be connected to the circulation loop to replace the first adsorption column 111. At this time, the first adsorption column 111 can be disassembled for elution. After the elution of the first adsorption column 111 is completed, the first adsorption column 111 is installed in place. When the equipment runs again to the isolation area where the first adsorption column 111 is located, the input valve 123P11 and the output valve 124P12 corresponding to the first adsorption column 111 are closed to connect the first adsorption column 111 to the circulation loop.

[0076] 1 and 2, in one embodiment, the first replacement pipe includes a first replacement main pipe 1221 and a plurality of first replacement branch pipes 1222, and the second replacement pipe includes a second replacement main pipe 1223 and a plurality of second replacement branch pipes 1224. The top of each adsorption column 101 is connected to a first replacement branch pipe 1222, and the bottom of each adsorption column 101 is connected to a second replacement branch pipe 1224. One end of the first replacement main pipe 1221 is connected to the top of the replacement column 121, and the other end is connected to each first replacement branch pipe 1222. One end of each second replacement main pipe 1223 is connected to the bottom of the replacement column 121, and the other end is connected to each second replacement branch pipe 1224.

[0077] The plurality of first replacement branch pipes 1222 are arranged in parallel, one end of the plurality of first replacement branch pipes 1222 is respectively connected to the first replacement main pipe 1221, the other end of the plurality of first replacement branch pipes 1222 is respectively connected to the input valve 123 at the top of each adsorption column 101, and the first replacement main pipe 1221 is also connected to the top of the replacement column 121. The plurality of second replacement branch pipes 1224 are arranged in parallel, one end of the plurality of second replacement branch pipes 1224 is respectively connected to the second replacement main pipe 1223, the other end of the plurality of second replacement branch pipes 1224 is respectively connected to the output valve 124 at the bottom of each adsorption column 101, and the second replacement main pipe 1223 is also connected to the bottom of the adsorption column 101.

[0078] When the adsorption performance of the first adsorption column 111 decreases, and when the entire device runs to the isolation zone of the first adsorption column 111, the entire device continues to run while opening the input valve 123P11 and the output valve 124P12 corresponding to the first adsorption column 111. At this time, the raw material feeding system 130, the mobile phase feeding system 140 and the column bottom of the sixth adsorption column 116 are connected to the column top of the replacement column 121 through the input valve 123P11, the first replacement branch pipe 1222 and the first replacement main pipe 1221, and the column bottom of the replacement column 121 is connected to the residual liquid system 160, the extraction liquid system 170 and the column top of the second adsorption column 112 through the second replacement main pipe 1223 and the second replacement branch pipe 1224 through the output valve 124P12. In this way, the replacement column 121 can be connected to the circulation loop to replace the first adsorption column 111.

[0079] Referring to Fig. 1 and Fig. 2, in one embodiment, both the input valve 123 and the output valve 124 are three-way valves. The three-way valve, which is the input valve 123, is disposed at the top of the adsorption column 101 through a branch pipe, and the output valve 124, which is the three-way valve, is disposed at the bottom of the adsorption column 101 through a branch pipe. Moreover, the input valve 123, which is the three-way valve, can also be connected to the first replacement branch pipe 1222, the raw material feed valve 132 and the mobile phase feed valve 142, so as to connect the first replacement branch pipe 1222, the raw material feed valve 132 and the mobile phase feed valve 142 to the top of the adsorption column 101, and the output valve 124, which is the three-way valve, can also be connected to the second replacement branch pipe 1224, the residual liquid discharge valve 162 and the extracted liquid discharge valve 172, so as to connect the second replacement branch pipe 1224, the residual liquid discharge valve 162 and the extracted liquid discharge to the bottom of the adsorption column 101.

[0080] Optionally, the input valve 123 and the output valve 124 may also be valves of separate channels. In this case, the raw material feed valve 132, the mobile phase feed valve 142 and the input valve 123 are independently set at the top of the adsorption column 101 (such as through separate branches), and the opening and closing of the corresponding pipelines are independently controlled. The residual liquid discharge valve 162, the extracted liquid discharge valve 172 and the output valve 124 are independently set at the bottom of the adsorption column 101 (such as through separate branches), and the opening and closing of the corresponding pipelines are independently controlled. Of course, in other embodiments of the present application, the input valve 123 and the output valve 124 may also be multi-way valves or a combination of valves of separate channels and multi-way valves, as long as the opening and closing control of the corresponding pipelines can be achieved.

[0081] Referring to Figures 1 and 2, in one embodiment, the input valve 123 has a first inlet 1231, a second inlet 1232 and a third inlet 1233, the first inlet 1231 is connected to the adsorption column 101, the second inlet 1232 is connected to the raw material feeding system 130, the mobile phase feeding system 140 and the circulation pipeline 151, and the third inlet 1233 is connected to the first replacement tube; the input valve 123 has a first outlet 1241, a second outlet 1242 and a third outlet 1243, the first outlet 1241 is connected to the adsorption column 101, the second outlet 1242 is connected to the residual liquid system 160, the extracted liquid system 170 and the circulation pipeline 151, and the third outlet 1243 is connected to the second replacement tube.

[0082] The second inlet 1232 of each input valve 123 is connected to the raw material feed valve 132, the mobile phase feed valve 142, and the circulation pipeline 151 connected to the column bottom of the previous adsorption column 101, and the second outlet 1242 of each output valve 124 is connected to the residual liquid discharge valve 162, the extracted liquid discharge valve 172, and the circulation pipeline 151 connected to the column top of the next adsorption column 101. The third inlet 1233 of each input valve 123 is connected to the first replacement branch pipe 1222, and the third outlet 1243 of each output valve 124 is connected to the second replacement branch pipe 1224. Moreover, when the equipment is operating normally, the first inlet 1231 of the input valve 123 is connected to the second inlet 1232 and the third inlet 1233 is closed, and the first outlet 1241 of the output valve 124 is connected to the second outlet 1242 and the third outlet 1243 is closed; when the adsorption column 101 in the isolation area needs to be replaced, the first inlet 1231 of the corresponding input valve 123 is closed and the second inlet 1232 is connected to the third inlet 1233, and the first outlet 1241 of the corresponding output valve 124 is closed and the second outlet 1242 is connected to the third outlet 1243.

[0083] Specifically, when the equipment is operating normally, the first inlet 1231 of the input valve 123 is connected to the second inlet 1232 and the third inlet 1233 is closed. The circulation pipeline 151 can transport materials to the adsorption column 101 through the first inlet 1231 and the second inlet 1232. If the raw material feed valve 132 and the mobile phase feed valve 142 are opened, the raw material and the mobile phase can be output to the adsorption column 101 through the first inlet 1231 and the second inlet 1232. The first outlet 1241 and the second outlet 1242 of the output valve 124 are connected and the third outlet 1243 is closed. The adsorption column 101 can output materials to the circulation pipeline 151 through the first outlet 1241 and the second outlet 1242. If one of the residual liquid discharge valve 162 and the extracted liquid discharge valve 172 is opened, the residual liquid can be output to the residual liquid discharge pipe 161 through the first outlet 1241 and the second outlet 1242, and the extracted liquid can be output to the extracted liquid discharge pipe 171 through the first outlet 1241 and the second outlet 1242.

[0084] When the adsorption performance of the first adsorption column 111 decreases, and when the entire device runs to the point where the first adsorption column 111 is in the isolation zone, the entire device continues to run while closing the first inlet 1231 of the input valve 123P11 and the first outlet 1241 of the output valve 124P12 corresponding to the first adsorption column 111, and opening the second inlet 1232 and the third inlet 1233 of the input valve 123P11 and the second outlet 1242 and the third outlet 1241 of the output valve 124P12 corresponding to the first adsorption column 111. The third outlet 1243, at this time, the raw material feeding system 130, the mobile phase feeding system 140 and the column bottom of the sixth adsorption column 116 are connected to the column top of the replacement column 121 through the input valve 123P11, the first replacement branch pipe 1222 and the first replacement main pipe 1221, and the column bottom of the replacement column 121 is connected to the residual liquid system 160, the extracted liquid system 170 and the column top of the second adsorption column 112 through the second replacement main pipe 1223 and the second replacement branch pipe 1224 through the output valve 124P12.

[0085] In this way, the replacement column 121 can be connected to the circulation loop to replace the first adsorption column 111. At this time, the first adsorption column 111 can be disassembled for elution. After the elution of the first adsorption column 111 is completed, the first adsorption column 111 is installed in place, and when the equipment runs again to the isolation area of ​​the first adsorption column 111, the third inlet 1233 of the input valve 123P11 corresponding to the first adsorption column 111 and the third outlet 1243 of the output valve 124P12 are closed, and the first inlet 1231 and the second inlet 1232 of the input valve 123P11 corresponding to the first adsorption column 111 and the first outlet 1241 and the second outlet 1242 of the output valve 124P12 are opened to connect the first adsorption column 111 to the circulation loop.

[0086] Referring to FIG. 1 and FIG. 2 , in one embodiment, the input valve 123 and the output valve 124 are one of a ball valve, a regulating valve, a butterfly valve, a diaphragm valve and a plug valve, and are driven pneumatically or electrically. When the input valve 123 is a three-way valve, the input valve 123 can be any one of a ball valve, a regulating valve, a butterfly valve, a diaphragm valve and a plug valve to achieve three-channel control. Moreover, the input valve 123 and the output valve 124 can be driven by pneumatic or electric control to achieve the opening and closing control of the input valve 123 and the output valve 124.

[0087] Referring to Figures 1 and 2, in one embodiment, the simulated moving bed online elution equipment 100 also includes a programmable valve group and an automatic control system. All valves form a programmable valve group. The automatic control system is control-connected to the programmable valve group. The automatic control system can control the opening and closing states of each valve in the programmable valve group in manual and automatic operation modes. Each valve in the programmable valve group is independently controlled, and the valves in the programmable valve group except the input valve 123 and the output valve 124 are one of ball valves, needle valves, stop valves and butterfly valves, and are pneumatically or electrically controlled.

[0088] All valves in the present application form a program-controlled valve group, that is, the raw material feed valve 132, the mobile phase feed valve 142, the input valve 123, the one-way valve 153, the residual liquid discharge valve 162, the extracted liquid discharge valve 172, the output valve 124 and the back pressure valve form a program-controlled valve group, each valve in the program-controlled valve group is independently controlled and electrically connected or communicated with the automatic control system, and the automatic control system can control the opening and closing state of each valve in the automatic operation mode. Moreover, each valve also has a manual operation mode, and the automatic control system can also control the opening and closing state of each valve by manual operation.

[0089] Meanwhile, the valves other than the input valve 123 and the output valve 124 in the program-controlled valve, namely the raw material feed valve 132, the mobile phase feed valve 142, the one-way valve 153, the residual liquid discharge valve 162, the extracted liquid discharge valve 172 and the back pressure valve can be any one of a ball valve, a needle valve, a stop valve and a butterfly valve to realize the opening and closing control of a single channel. Moreover, the valves other than the input valve 123 and the output valve 124 in the program-controlled valve, namely the raw material feed valve 132, the mobile phase feed valve 142, the one-way valve 153, the residual liquid discharge valve 162, the extracted liquid discharge valve 172 and the back pressure valve can be controlled and driven by pneumatic or electric means to realize the opening and closing control of each valve.

[0090] The simulated moving bed online elution equipment 100 of the present application, when the adsorption performance of the adsorption column 101 decreases after running for a period of time, the replacement pipeline assembly 122 in the replacement system 120 is used to connect the replacement column 121 with the column top and column bottom of each adsorption column 101. When it is necessary to elute the adsorption column 101 in the isolation area, the replacement column 121 is connected to the circulation loop to replace the adsorption column 101 in the isolation area. At this time, the adsorption column 101 in the isolation area is not in the circulation loop, and the adsorption column 101 can be eluted. In this way, after the adsorption column 101 in the isolation area is replaced by the replacement column 121, the adsorption column 101 in the isolation area does not need to be shut down for elution, and the normal operation of the entire equipment will not be affected, so that the simulated moving bed online elution equipment 100 can perform separation operations normally, ensure the adsorption separation efficiency, and reduce costs and supply pressures.

[0091] When the adsorption performance of the first adsorption column 111 decreases, and when the entire device runs to the isolation zone of the first adsorption column 111, the entire device continues to run, and the input valve 123P11 and the output valve 124P12 corresponding to the first adsorption column 111 are opened. At this time, the raw material feeding system 130, the mobile phase feeding system 140 and the column bottom of the sixth adsorption column 116 are connected to the column top of the replacement column 121 through the input valve 123P11 through the first replacement pipe, and the column bottom of the replacement column 121 is connected to the residual liquid system 160, the extraction liquid system 170 and the column top of the second adsorption column 112 through the second replacement pipe through the output valve 124P12. In this way, the replacement column 121 can be connected to the circulation loop to replace the first adsorption column 111. In the present application, the replacement column 121 is connected to the top and bottom of each replacement column 121 through the input valve 123 and the output valve 124. By opening and closing the corresponding input valve 123 and the output valve 124, the adsorption column 101 can be accurately replaced to ensure the stability and uninterrupted operation of the entire equipment.

[0092] See Figure 4, which is a flow chart of a simulated moving bed online elution method according to an embodiment of the present application. The present application also provides a simulated moving bed online elution method, which is applied to the simulated moving bed online elution device 100 of any of the above embodiments, and the simulated moving bed online elution method comprises at least the following steps:

[0093] The automatic control system controls the multiple adsorption columns 101 in the adsorption system 110 to cyclically perform adsorption, purification, desorption, and isolation operations;

[0094] After a preset time, when the adsorption column 101 in the isolation zone needs to be eluted, the input valve 123 and the output valve 124 corresponding to the adsorption column 101 are controlled to open, and the replacement column 121 is connected through the replacement pipeline assembly 122;

[0095] The column bottom of the previous adsorption column 101 is connected to the column top of the replacement column 121 through the circulation pipeline 151, the input valve 123 and the replacement pipeline assembly 122, and the column bottom of the replacement column 121 is connected to the column top of the next adsorption column 101 through the replacement pipeline assembly 122, the output valve 124 and the circulation pipeline 151;

[0096] The replacement column 121 is connected to the circulation loop, and the adsorption column 101 in the isolation area is replaced for elution;

[0097] After the elution of the adsorption column 101 is completed, the adsorption column 101 is operated as an isolation zone, the input valve 123 and the output valve 124 are closed, and the adsorption column 101 is connected to the circulation loop to replace the replacement column 121 out of the circulation loop.

[0098] When the equipment is running, the automatic control system controls the two adsorption columns 101 in the adsorption area, the two adsorption columns 101 in the purification area, the one adsorption column 101 in the desorption area, and the one adsorption column 101 in the isolation area to move in sequence to cyclically perform adsorption, purification, desorption, and isolation operations. After a period of time, the adsorption performance of the adsorption column 101 decreases, and when the adsorption column 101 needs to be eluted, when the entire equipment runs to the isolation area where the adsorption column 101 is located, the automatic control system controls the input valve 123 and the output valve 124 corresponding to the adsorption column 101 to open, and the column bottom of the previous adsorption column 101 is connected to the column top of the replacement column 121 through the circulation pipeline 151, the input valve 123, and the replacement pipeline assembly 122, and the column bottom of the replacement column 121 is inserted into the column top of the next adsorption column 101 through the replacement pipeline assembly 122, the output valve 124, and the circulation pipeline 151.

[0099] At this time, the replacement column 121 replaces the adsorption column 101 and is connected to the circulation loop. The adsorption column 101 is replaced from the circulation loop, and the remaining adsorption columns 101 and the replacement column 121 form a circulation loop. The adsorption column 101 can be disassembled and eluted while the entire device is running continuously. After the elution of the adsorption column 101 is completed, the adsorption column 101 is installed in place. When the device runs again to the isolation area where the adsorption column 101 is, the input valve 123 and the output valve 124 corresponding to the adsorption column 101 are closed to connect the adsorption column 101 to the circulation loop, and at the same time replace the replacement column 121 out of the circulation loop. In this way, each adsorption column 101 can be disassembled and eluted to ensure the performance of each adsorption column 101.

[0100] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0101] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.

Claims

1. A simulated moving bed online elution device, characterized in that: It includes adsorption system, replacement system, raw material feeding system, mobile phase feeding system, circulation system, residual liquid extraction system and extracted liquid system; The adsorption system comprises a plurality of adsorption columns, which are divided into a plurality of functional zones, namely, an adsorption zone, a purification zone, a desorption zone and an isolation zone, and each functional zone has at least one adsorption column; The replacement system includes a replacement column and a replacement pipeline assembly. The structure of the replacement column is the same as that of the adsorption column. The column top and column bottom of the replacement column are connected to the column top and column bottom of each adsorption column through the replacement pipeline assembly. The circulation system comprises a circulation pipeline, a one-way valve and a circulation pump. Each of the adsorption columns is connected in series through the circulation pipeline to form a circulation loop. The circulation pump is arranged in the circulation pipeline. A one-way valve is arranged between adjacent adsorption columns. The raw material feeding system and the mobile phase feeding system are respectively connected to the top of each adsorption column. The residual liquid extraction system and the extracted liquid system are respectively connected to the bottom of each adsorption column. The replacement column can replace the adsorption column in the isolation zone to elute the adsorption column in the isolation zone.

2. The simulated moving bed online elution equipment according to claim 1, characterized in that: The replacement pipeline assembly includes a first replacement tube and a second replacement tube, one end of the first replacement tube is connected to the top of the replacement column, the other end of the first replacement tube is respectively connected to the top of each adsorption column, one end of the second replacement tube is connected to the bottom of the replacement column, and the other end of the second replacement tube is respectively connected to the bottom of each adsorption column.

3. The simulated moving bed online elution equipment according to claim 2, characterized in that: The first replacement pipe includes a first replacement main pipe and a plurality of first replacement branch pipes, and the second replacement pipe includes a second replacement main pipe and a plurality of second replacement branch pipes; The top of each adsorption column is connected to a first replacement branch pipe, the bottom of each adsorption column is connected to a second replacement branch pipe, one end of the first replacement main pipe is connected to the top of the replacement column, and the other end is connected to each of the first replacement branches, one end of each of the second replacement main pipes is connected to the bottom of the replacement column, and the other end is connected to each of the second replacement branches.

4. The simulated moving bed online elution equipment according to claim 2, characterized in that: The replacement pipeline assembly further includes a plurality of input valves and a plurality of output valves, wherein the top of each adsorption column is provided with an input valve, and the bottom of each adsorption column is provided with an output valve; The input valve is connected to the first replacement pipe, and the output valve is connected to the second replacement pipe.

5. The simulated moving bed online elution equipment according to claim 4, characterized in that: The input valve and the output valve are both three-way valves; The input valve has a first inlet, a second inlet and a third inlet, the first inlet is connected to the adsorption column, the second inlet is connected to the raw material feeding system, the mobile phase feeding system and the circulation pipeline, and the third inlet is connected to the first replacement pipe; the input valve has a first outlet, a second outlet and a third outlet, the first outlet is connected to the adsorption column, the second outlet is connected to the residual liquid system, the extracted liquid system and the circulation pipeline, and the third outlet is connected to the second replacement pipe; And / or, the input valve and the output valve are one of a ball valve, a regulating valve, a butterfly valve, a diaphragm valve and a plug valve, and are driven pneumatically or electrically.

6. The simulated moving bed online elution device according to any one of claims 1 to 5, characterized in that: The number of the replacement columns is equal to the number of the adsorption columns in the isolation zone; each of the replacement columns replaces one of the adsorption columns in the isolation zone.

7. The simulated moving bed online elution device according to any one of claims 1 to 5, characterized in that: The raw material feeding system comprises a raw material feeding pipe, a plurality of raw material feeding valves and a first back pressure valve, a raw material feeding valve is arranged on the top of each adsorption column, the raw material feeding pipe connects the raw material barrel and each raw material feeding valve, and the first back pressure valve is arranged on the raw material feeding pipe; And / or, the mobile phase feeding system comprises a mobile phase feeding pipe, a plurality of mobile phase feeding valves and a second back pressure valve, a mobile phase feeding valve is further arranged at the top of each adsorption column, the mobile phase feeding pipe is connected to the mobile phase cartridge and each of the mobile phase feeding valves, and the second back pressure valve is arranged on the mobile phase feeding pipe; And / or, the residual liquid extraction system includes a residual liquid extraction discharge pipe, a third back pressure valve and a plurality of residual liquid extraction discharge valves, a residual liquid extraction discharge valve is arranged at the bottom of each adsorption column, the residual liquid extraction discharge pipe is connected to each of the residual liquid extraction discharge valves, and the third back pressure valve is arranged on the residual liquid extraction discharge pipe; And / or, the extracted liquid system includes an extracted liquid discharge pipe, a fourth back pressure valve and multiple extracted liquid discharge valves, and an extracted liquid discharge valve is also arranged at the bottom of each adsorption column, the extracted liquid discharge pipe is connected to each of the extracted liquid discharge valves, and the fourth back pressure valve is arranged on the extracted liquid discharge pipe.

8. The simulated moving bed online elution device according to any one of claims 1 to 5, characterized in that: The simulated moving bed online elution device also includes a programmable valve group and an automatic control system. All valves form the programmable valve group. The automatic control system is control-connected to the programmable valve group. The automatic control system can control the opening and closing states of each valve in the programmable valve group in manual and automatic operation modes. Each valve in the program-controlled valve group is independently controlled, and the valves in the program-controlled valve group except the input valve and the output valve are all one of ball valves, needle valves, stop valves and butterfly valves, and are pneumatically or electrically controlled.

9. The simulated moving bed online elution device according to any one of claims 1 to 5, characterized in that: The number of the plurality of adsorption columns is six, wherein the adsorption zone includes two adsorption columns, the purification zone includes two adsorption columns, the desorption zone includes one adsorption column, the isolation zone includes one adsorption column, and the replacement system includes one replacement column; The replacement column can replace the adsorption column in the isolation zone, so that the adsorption column in the isolation zone can be eluted.

10. A simulated moving bed online elution method, characterized in that: Applied to the simulated moving bed online elution device according to any one of claims 1 to 9, the simulated moving bed online elution method comprises at least the following steps; The automatic control system controls the multiple adsorption columns in the adsorption system to cyclically perform adsorption, purification, desorption, and isolation operations; After a preset time, when the adsorption column in the isolation zone needs to be eluted, the input valve and the output valve corresponding to the adsorption column are controlled to open, and the replacement column is connected through the replacement pipeline assembly; The column bottom of the first adsorption column is connected to the column top of the replacement column through the circulation pipeline, the input valve and the replacement pipeline assembly, and the column bottom of the replacement column is connected to the column top of the second adsorption column through the replacement pipeline assembly, the output valve and the circulation pipeline; Connecting the replacement column to a circulation loop, and replacing the adsorption column in the isolation zone for elution; After the elution of the adsorption column is completed, the adsorption column is operated as the isolation zone, the input valve and the output valve are closed, and the adsorption column is connected to the circulation loop to replace the replacement column out of the circulation loop.

Citation Information

Patent Citations

  • Method for separation with simulated moving bed

    CA3097021A1

  • Method for regenerating online depth of chromatographic column of simulated moving bed

    CN106237654A

  • Efficient simulated moving bed equipment and efficient simulated moving bed technology

    CN109432822A

  • Temperature control system applicable to simulated moving bed and temperature control method of simulated moving bed

    CN109432823A

  • Method for simultaneously separating gasoline and diesel components by simulated moving bed

    CN114736706A

Cited By

  • Sequential simulated moving bed chromatographic separation system and independent backwashing method thereof

    CN120586446A