Construction waste sorting and crushing device

By using automatic linkage scraper and electromagnet plate to absorb iron products in construction waste sorting and crushing devices, the problems of low sorting efficiency and iron filing residue in the existing technology are solved, and efficient crushing of construction waste and crushing and crushing are achieved. Iron product sorting.

CN118950145AInactive Publication Date: 2024-11-15SHANDONG WANLUO CONSTR ENG CO LTD

Patent Information

Application Number
CN202411121675.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing construction waste sorting and crushing devices are not convenient for rapid crushing of construction waste and sorting of iron products. The screening efficiency is low, and the iron filings and iron products that have not detached the surface of the electromagnet plate are not easy to scrape off, which affects the sorting effect.

Method used

A construction waste sorting and crushing device was designed to absorb iron products through electromagnet plates, and the iron filings and iron products on the surface of the electromagnet plate are removed by using an automatic linkage scraper mechanism, and the construction waste is crushed in combination with a crushing motor and a crushing gear. and sorting, the electromagnet plate is set to facilitate adsorption and removal of iron products.

Benefits of technology

The sorting effect and screening efficiency are improved, and the problems of residue residues and iron products not falling off are avoided, so that the device has better linkage and efficient sorting ability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118950145A_ABST
    Figure CN118950145A_ABST
Patent Text Reader

Abstract

The invention provides a construction waste sorting and crushing device, and relates to the technical field of construction waste treatment. A discharging opening is formed in the side end of the treatment box, an electrifying disc is composed of a conductor arc plate and an insulator arc plate, a second outer connector is fixed to the rear end of a material distributing shaft, and the outer end of an electromagnet plate is connected with the conductor arc plate and the second outer connector through circuits; iron products such as iron wires in construction waste are adsorbed through an electromagnet plate, other waste automatically falls to the bottom of the treatment box, and the device can scrape iron chips and iron products which are not separated from the surface of the electromagnet plate through a scraper plate in an automatic linkage mode, so that the sorting effect of the device is effectively improved, and the device has good linkage performance; the problems that construction waste is inconvenient to crush and iron products in the construction waste are inconvenient to quickly sort, the screening efficiency of the device needs to be improved, and scrap iron and iron products which are not separated from the surface of an electromagnet plate are not easy to scrape are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction waste treatment, and in particular to a construction waste sorting and crushing device. Background Art

[0002] After being crushed, the bricks, stones, concrete and other waste materials in the construction and demolition waste can be used for masonry mortar, plastering mortar, concrete cushion layer, etc., and can also be used to make building blocks, paving bricks, lattice bricks and other building materials. The iron products such as iron wire can be recycled and reused. Therefore, a construction waste sorting and crushing device is needed. As for the existing construction waste sorting and crushing device, the device is not convenient for crushing the construction waste and quickly sorting the iron products therein. The screening efficiency of the device needs to be improved. Moreover, when the iron products are adsorbed by the electromagnetic iron plate, the iron filings and iron products that have not been detached from the surface of the electromagnetic iron plate are not easy to be scraped off. Therefore, the sorting effect of the device needs to be improved. Summary of the invention

[0003] The disclosed embodiment relates to a construction waste sorting and crushing device, which absorbs iron products such as iron wire in the construction waste through an electromagnetic plate, and the remaining garbage automatically falls to the bottom of the processing box. The device can automatically link to scrape off the iron filings and iron products that have not detached from the surface of the electromagnetic plate through a scraper, which effectively improves the sorting effect of the device and makes the device have better linkage.

[0004] In a first aspect of the present disclosure, there is provided a construction waste sorting and crushing device, specifically comprising: a processing box; The side end of the processing box is provided with a discharge port, the top of the processing box is provided with a feed port, a crushing gear is installed on the feed port, a group of guide plates with an italic structure are fixedly connected to the inner sides of the feed port, a group of conductor balls are slidably installed on the front end of the processing box, and the conductor balls are connected to the first external joint through wires, a rotating shaft is rotatably installed on the rear end of the processing box, a group of driving screws are rotatably installed on the rear end of the processing box, a driving motor is also fixed on the rear end of the processing box, a group of moving plates are also threadedly installed on the rear end of the processing box, a first rack is fixedly installed on the top of the moving plate, and a gear is fixed on the moving plate. A limiting plate is provided, and a distribution bin is fixedly installed on the side end of the processing box, a mobile frame is slidably installed on the distribution bin, a scraper is fixed on the inner end of the mobile frame, and the inner end of the scraper is in contact with the right end surface of the processing box, and a group of distribution shafts are rotatably installed on the right end of the processing box, a group of electromagnet plates and a group of partitions are fixedly installed on the distribution shaft, and the electromagnet plates are arranged in a left-low and right-high style, and a power-on disk is fixed on the front end of the distribution shaft, and the power-on disk is composed of a conductor arc plate and an insulator arc plate, and a second external joint is fixed on the rear end of the distribution shaft, and the outer ends of the electromagnet plates are respectively connected to the conductor arc plate and the second external joint through lines.

[0005] In at least some embodiments, a limiting column is fixedly installed on the connecting rod at the outer end of the conductor ball, a first elastic member is sleeved on the connecting rod at the outer end of the conductor ball, and the outer end of the first elastic member contacts the inner end surface of the upper support plate of the processing box.

[0006] In at least some embodiments, a group of support plates are fixedly installed at the front end of the processing box, a group of sliding holes are opened on the support plates, a connecting rod is fixedly installed at the outer end of the conductor ball, and the connecting rod at the outer end of the conductor ball is slidably installed on the connecting rod at the outer end of the conductor ball.

[0007] In at least some embodiments, two groups of support rods are fixedly installed on the outer end of the distribution bin, and two groups of connecting plates are fixedly installed on the outer end of the movable frame. A group of sliding holes are respectively opened on the connecting plates, and the sliding holes of the connecting plates at the outer end of the movable frame are respectively slidably installed on the support rods at the outer end of the distribution bin.

[0008] In at least some embodiments, a group of guide rods are fixedly installed at the rear end of the processing box, a group of sliding holes are opened at the left end of the movable plate, and the sliding holes opened at the left end of the movable plate are slidably installed on the guide rods at the rear end of the processing box.

[0009] In at least some embodiments, a connecting gear is fixedly mounted on the outer end of the rotating shaft, a second rack is fixedly mounted on the outer end of the movable frame, and the second rack at the outer end of the movable frame is meshed and transmission-connected with the connecting gear at the outer end of the rotating shaft.

[0010] In at least some embodiments, the outer end of the drive screw is fixedly mounted on the transmission shaft of the drive motor, a group of threaded holes are opened at the right end of the movable plate, and the threaded holes opened at the right end of the movable plate are threadedly mounted on the drive screw at the rear end of the processing box.

[0011] In at least some embodiments, a group of second elastic members are respectively sleeved and installed on the support rods at the outer ends of the sub-bins, and the top ends of the second elastic members are respectively in contact with the bottom surfaces of the connecting plates on the movable frame.

[0012] In at least some embodiments, a group of first incomplete gears are fixedly mounted on the rotating shaft, a group of second incomplete gears are fixedly mounted on the outer end of the material distribution shaft, and the first rack is meshed and transmission-connected with the first incomplete gears and the second incomplete gears respectively.

[0013] In at least some embodiments, there are two groups of crushing gears, which are meshed with each other and are rotatably mounted on the top of the processing box. A crushing motor is fixed to the outer end of the processing box, and the outer end of the crushing gear is fixed to the transmission shaft of the crushing motor.

[0014] The present invention provides a construction waste sorting and crushing device, which has the following beneficial effects: The present invention can automatically link up to scrape off the iron filings and iron products that have not detached from the surface of the electromagnet plate through a scraper, thereby effectively improving the sorting effect of the device, avoiding the problem of residual chips during sorting and the iron products sorted by the device not falling off, which affects the work efficiency, so that the device has better linkage and effectively improves the screening efficiency of the device.

[0015] In addition, the crushing motor drives two sets of crushing gears to rotate to crush the construction waste. The crushed construction waste falls onto the electromagnet plate of the distribution shaft, which is arranged in a left-low and right-high style. The electromagnet plate is energized to adsorb iron products such as iron wire in the construction waste, and the remaining garbage automatically falls to the bottom of the processing box. Under the action of the first elastic part on the connecting rod, the conductor ball contacts the conductor arc plate of the energized disk, and the driving motor drives the driving screw to rotate to drive the movable plate threadedly installed on the driving screw to move upward. The first rack and the second incomplete gear are meshed and connected to drive the distribution shaft to rotate clockwise until the electromagnet plate is placed vertically, the conductor ball contacts the insulator arc plate of the energized disk, and the magnetic force of the electromagnet plate disappears when it is disconnected, so that the iron products adsorbed on the electromagnet plate automatically fall into the distribution bin, making the device convenient for crushing and sorting construction waste, and effectively improving the screening efficiency of the device.

[0016] In addition, when the material distribution shaft rotates clockwise to the required position, the movable plate continues to move upward, the first rack and the second incomplete gear are not meshed, the first rack is meshed with the first incomplete gear and is connected to drive the rotating shaft to rotate, and the second rack at the outer end of the movable frame is meshed with the connecting gear at the outer end of the rotating shaft and is connected to the movable frame and the scraper thereon automatically move downward, so that the device can automatically link to scrape off the iron filings and iron products that have not detached from the surface of the electromagnet plate through the scraper, effectively improving the sorting effect of the device and making the device have better linkage. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the drawings of the embodiment are briefly introduced below.

[0018] The drawings described below are only related to some embodiments of the present invention, but are not intended to limit the present invention.

[0019] In the attached picture: Figure 1 It is a front axial schematic diagram of the construction waste sorting and crushing device of the present invention.

[0020] Figure 2 It is a rear axial schematic diagram of the construction waste sorting and crushing device of the present invention.

[0021] Figure 3 It is an internal schematic diagram of the construction waste sorting and crushing device of the present invention.

[0022] Figure 4 The invention discloses a schematic diagram of the installation of a power-on disk of a construction waste sorting and crushing device.

[0023] Figure 5 It is a schematic diagram of disassembly and assembly of a mobile frame of the construction waste sorting and crushing device of the present invention.

[0024] Figure 6 It is a schematic diagram of the installation of the rotating shaft of the construction waste sorting and crushing device of the present invention.

[0025] Figure 7 It is a schematic diagram of the inner side of the rotating shaft of the construction waste sorting and crushing device of the present invention.

[0026] Reference numerals list 1. Processing box; 101. Discharging port; 102. Feeding port; 1021. Guide plate; 103. Crushing motor; 1031. Crushing gear; 104. Support plate; 105. Conductor ball; 1051. Connecting rod; 1052. First external joint; 1053. First elastic member; 106. Rotating shaft; 1061. Connecting gear; 1062. First incomplete gear; 107. Guide rod; 108. Driving screw; 1081. Driving motor; 109, moving plate; 1091, first rack; 1092, limit plate; 2, material distribution bin; 201, support rod; 2011, second elastic member; 3, moving frame; 301, connecting plate; 302, second rack; 303, scraper; 4, material distribution shaft; 401, electromagnet plate; 402, partition; 403, power-on disk; 4031, conductor arc plate; 4032, insulator arc plate; 404, second incomplete gear; 405, second external connector. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] Example 1: Please refer to Figures 1 to 7 As shown: The present invention provides a construction waste sorting and crushing device, comprising a processing box 1; A discharge port 101 is provided at the side end of the processing box 1, a feed port 102 is provided at the top of the processing box 1, a crushing gear 1031 is installed on the feed port 102, a group of guide plates 1021 with an italic structure are fixedly connected to both sides of the inside of the feed port 102, a group of conductor balls 105 are slidably installed at the front end of the processing box 1, and a first external joint 1052 is connected to the conductor balls 105 through a wire, a rotating shaft 106 is rotatably installed at the rear end of the processing box 1, a group of driving screws 108 are rotatably installed at the rear end of the processing box 1, a driving motor 1081 is also fixed at the rear end of the processing box 1, and a group of moving plates 109 are also threadedly installed at the rear end of the processing box 1, a first rack 1091 is fixedly installed on the top of the moving plate 109, and a first gear 1091 is fixed on the moving plate 109. There is a limiting plate 1092, and a distribution bin 2 is fixedly installed on the side end of the processing box 1, and a movable frame 3 is slidably installed on the distribution bin 2. A scraper 303 is fixed on the inner end of the movable frame 3, and the inner end of the scraper 303 contacts the right end surface of the processing box 1. A group of distribution shafts 4 are also rotatably installed on the right end of the processing box 1, and a group of electromagnet plates 401 and a group of partitions 402 are fixedly installed on the distribution shaft 4. The electromagnet plates 401 are arranged in a left-low and right-high style. A power-on disk 403 is fixed at the front end of the distribution shaft 4, and the power-on disk 403 is composed of a conductor arc plate 4031 and an insulator arc plate 4032. A second external connector 405 is fixed at the rear end of the distribution shaft 4, and the outer ends of the electromagnet plates 401 are respectively connected to the conductor arc plate 4031 and the second external connector 405 through lines.

[0029] In the embodiments of the present disclosure, Figures 2 to 7As shown, there are two groups of crushing gears 1031, and the two groups of crushing gears 1031 are meshed and rotatably installed on the top of the processing box 1. A crushing motor 103 is fixed to the outer end of the processing box 1, and the outer end of the crushing gear 1031 is fixed to the transmission shaft of the crushing motor 103. A group of guide rods 107 are fixedly installed at the rear end of the processing box 1. A group of sliding holes are opened at the left end of the moving plate 109, and the sliding holes opened at the left end of the moving plate 109 are slidably installed on the guide rods 107 at the rear end of the processing box 1. The outer end of the driving screw 108 is fixedly installed on the transmission shaft of the driving motor 1081. A group of threaded holes are opened at the right end of the moving plate 109, and the threaded holes opened at the right end of the moving plate 109 are threadedly installed on the driving screw 108 at the rear end of the processing box 1. A group of support plates are fixedly installed at the front end of the processing box 1 104, a group of sliding holes are opened on the support plate 104, a connecting rod 1051 is fixedly installed on the outer end of the conductor ball 105, and the connecting rod 1051 on the outer end of the conductor ball 105 is slidably installed on the connecting rod 1051 on the outer end of the conductor ball 105, a limiting column is fixedly installed on the connecting rod 1051 on the outer end of the conductor ball 105, a first elastic member 1053 is sleeved and installed on the connecting rod 1051 on the outer end of the conductor ball 105, and the outer end of the first elastic member 1053 is in contact with the inner end surface of the support plate 104 on the processing box 1, a group of first incomplete gears 1062 are also fixedly installed on the rotating shaft 106, a group of second incomplete gears 404 are fixedly installed on the outer end of the material distribution shaft 4, and the first rack 1091 is respectively meshed and transmission-connected with the first incomplete gear 1062 and the second incomplete gear 404;Specifically, the crushing motor 103 drives the two sets of crushing gears 1031 to rotate to crush the construction waste. The crushed construction waste falls onto the electromagnet plate 401 of the material distribution shaft 4. The electromagnet plate 401 is set as a left-low and right-high type. The electromagnet plate 401 is energized to adsorb iron products such as iron wire in the construction waste, and the remaining garbage automatically falls to the bottom of the processing box 1. The connecting rod 1051 at the outer end of the conductor ball 105 is slidably installed on the connecting rod 1051 at the outer end of the conductor ball 105. Under the action of the first elastic member 1053 on the connecting rod 1051, the conductor ball 105 contacts the conductor arc plate 4031 of the power disk 403, and the sliding hole opened at the left end of the movable plate 109 is slidably installed on the guide rod 1 at the rear end of the processing box 1 07, the threaded hole opened at the right end of the moving plate 109 is threadedly installed on the driving screw 108 at the rear end of the processing box 1, and the driving motor 1081 drives the driving screw 108 to rotate, so as to drive the moving plate 109 threadedly installed on the driving screw 108 to move upward, and the first rack 1091 and the second incomplete gear 404 are meshed and connected to drive the material distribution shaft 4 to rotate clockwise until the electromagnetic plate 401 is placed vertically, the conductor ball 105 contacts the insulator arc plate 4032 of the power-on disk 403, and the electromagnetic plate 401 is disconnected and the magnetic force disappears, so that the iron products adsorbed on the electromagnetic plate 401 automatically fall into the material distribution bin 2, so that the device is convenient for crushing and sorting construction waste, and the screening efficiency of the device is effectively improved. ;

[0030] Embodiment 2: Based on Embodiment 1, wherein Figures 5 to 7As shown, two groups of support rods 201 are fixedly installed on the outer end of the distribution bin 2, and two groups of connecting plates 301 are fixedly installed on the outer end of the moving frame 3. A group of sliding holes are respectively opened on the connecting plates 301, and the sliding holes of the connecting plates 301 at the outer end of the moving frame 3 are respectively slidably installed on the support rods 201 at the outer end of the distribution bin 2, and a group of second elastic members 2011 are respectively sleeved and installed on the support rods 201 at the outer end of the distribution bin 2, and the top ends of the second elastic members 2011 are respectively in contact with the bottom surfaces of the connecting plates 301 on the moving frame 3, a connecting gear 1061 is fixedly installed on the outer end of the rotating shaft 106, and a second rack 302 is fixedly installed on the outer end of the moving frame 3, and the second rack 302 at the outer end of the moving frame 3 is meshed and transmission-connected with the connecting gear 1061 at the outer end of the rotating shaft 106; specifically, the sliding holes of the connecting plates 301 at the outer end of the moving frame 3 are respectively slidably installed on the distribution bin 2 On the support rod 201 at the outer end of the silo 2, the second rack 302 at the outer end of the mobile frame 3 is meshed and connected with the connecting gear 1061 at the outer end of the rotating shaft 106. When the material distribution shaft 4 rotates clockwise to the desired position, the mobile plate 109 continues to move upward, the first rack 1091 and the second incomplete gear 404 are not meshed, the first rack 1091 is meshed and connected with the first incomplete gear 1062 to drive the rotating shaft 106 to rotate, and the second rack 302 at the outer end of the mobile frame 3 is meshed and connected with the connecting gear 1061 at the outer end of the rotating shaft 106, so that the mobile frame 3 and the scraper 303 thereon automatically move downward, so that the device can automatically link the scraper 303 to scrape off the iron filings and iron products that have not detached from the surface of the electromagnet plate 401, effectively improving the sorting effect of the device, so that the device has better linkage.

[0031] Specific usage and function of this embodiment: In the present invention, the crushing motor 103 drives two sets of crushing gears 1031 to rotate to crush the construction waste. The crushed construction waste falls onto the electromagnet plate 401 of the material distribution shaft 4, and the electromagnet plate 401 is set as a left-low and right-high type. The electromagnet plate 401 is energized to adsorb iron products such as iron wire in the construction waste, and the remaining garbage automatically falls to the bottom of the processing box 1, and under the action of the first elastic member 1053 on the connecting rod 1051, the conductor ball 105 contacts the conductor arc plate 4031 of the power-on disk 403, and the driving motor 1081 drives the driving screw 108 to rotate, so as to drive the moving plate 109 threadedly mounted on the driving screw 108 to move upward, so as to drive the material distribution shaft 4 to rotate clockwise, until the electromagnet The plate 401 is placed vertically, the conductor ball 105 is in contact with the insulator arc plate 4032 of the energized disk 403, and the magnetic force of the electromagnetic plate 401 is disconnected and disappears, so that the iron products adsorbed on the electromagnetic plate 401 automatically fall into the distribution bin 2, so that the device is convenient for crushing and sorting construction waste. When the distribution shaft 4 rotates clockwise to the required position, the movable plate 109 continues to move upward, the first rack 1091 and the second incomplete gear 404 are not engaged, and the first rack 1091 is engaged with the first incomplete gear 1062 to drive the rotating shaft 106 to rotate, so that the movable frame 3 and the scraper 303 thereon automatically move downward, so that the device can automatically link the scraper 303 to scrape off the iron filings and iron products that have not detached from the surface of the electromagnetic plate 401.

Claims

1. A construction waste sorting and crushing device, comprising a processing box (1); The side end of the processing box (1) is provided with a discharge port (101), which is characterized in that: A feed port (102) is provided on the top of the processing box (1), a crushing gear (1031) is installed on the feed port (102), a group of guide plates (1021) with an italic structure are fixedly connected to the two sides of the inside of the feed port (102), a group of conductor balls (105) are slidably installed on the front end of the processing box (1), and the conductor balls (105) are connected to a first external joint (1052) via a wire, a rotating shaft (106) is rotatably installed on the rear end of the processing box (1), a group of driving screws (108) are rotatably installed on the rear end of the processing box (1), a driving motor (1081) is also fixed on the rear end of the processing box (1), a group of moving plates (109) are also threadedly installed on the rear end of the processing box (1), a first rack (1091) is fixedly installed on the top of the moving plate (109), and a limit plate (1092) is also fixed on the moving plate (109). A material distribution bin (2) is fixedly mounted on the side end of the processing box (1), a movable frame (3) is slidably mounted on the material distribution bin (2), a scraper (303) is fixedly mounted on the inner end of the movable frame (3), and the inner end of the scraper (303) contacts the right end surface of the processing box (1), and a group of material distribution shafts (4) are rotatably mounted on the right end of the processing box (1), a group of electromagnet plates (401) and a group of partition plates (402) are fixedly mounted on the material distribution shaft (4), the electromagnet plates (401) are arranged in a left-low and right-high type, a power-on disk (403) is fixedly mounted on the front end of the material distribution shaft (4), and the power-on disk (403) is composed of a conductor arc plate (4031) and an insulator arc plate (4032), a second external connector (405) is fixedly mounted on the rear end of the material distribution shaft (4), and the outer ends of the electromagnet plates (401) are respectively connected to the conductor arc plate (4031) and the second external connector (405) through lines.

2. A construction waste sorting and crushing device according to claim 1, characterized in that: The crushing gears (1031) are provided in two groups, and the two groups of crushing gears (1031) are meshed with each other and are respectively rotatably mounted on the top of the processing box (1). A crushing motor (103) is fixed to the outer end of the processing box (1), and the outer end of the crushing gear (1031) is fixed to the transmission shaft of the crushing motor (103).

3. The construction waste sorting and crushing device according to claim 1, characterized in that: A group of guide rods (107) are fixedly mounted at the rear end of the processing box (1), a group of sliding holes are opened at the left end of the movable plate (109), and the sliding holes opened at the left end of the movable plate (109) are slidably mounted on the guide rods (107) at the rear end of the processing box (1).

4. The construction waste sorting and crushing device according to claim 1, characterized in that: The outer end of the driving screw (108) is fixedly mounted on the transmission shaft of the driving motor (1081), and a group of threaded holes are opened at the right end of the movable plate (109), and the threaded holes opened at the right end of the movable plate (109) are threadedly mounted on the driving screw (108) at the rear end of the processing box (1).

5. The construction waste sorting and crushing device according to claim 1, characterized in that: A group of support plates (104) are fixedly mounted on the front end of the processing box (1), a group of sliding holes are opened on the support plates (104), a connecting rod (1051) is fixedly mounted on the outer end of the conductor ball (105), and the connecting rod (1051) at the outer end of the conductor ball (105) is slidably mounted on the connecting rod (1051) at the outer end of the conductor ball (105).

6. The construction waste sorting and crushing device according to claim 1, characterized in that: A limiting column is fixedly mounted on the connecting rod (1051) at the outer end of the conductor ball (105), a first elastic member (1053) is sleeved and mounted on the connecting rod (1051) at the outer end of the conductor ball (105), and the outer end of the first elastic member (1053) is in contact with the inner end surface of the upper support plate (104) of the processing box (1).

7. The construction waste sorting and crushing device according to claim 1, characterized in that: A set of first incomplete gears (1062) is fixedly mounted on the rotating shaft (106), a set of second incomplete gears (404) is fixedly mounted on the outer end of the material distribution shaft (4), and the first rack (1091) is respectively meshed and transmission-connected with the first incomplete gears (1062) and the second incomplete gears (404).

8. The construction waste sorting and crushing device according to claim 1, characterized in that: Two groups of support rods (201) are fixedly mounted on the outer end of the material distribution bin (2), and two groups of connecting plates (301) are fixedly mounted on the outer end of the moving frame (3). A group of sliding holes are respectively opened on the connecting plates (301), and the sliding holes of the connecting plates (301) at the outer end of the moving frame (3) are respectively slidably mounted on the support rods (201) at the outer end of the material distribution bin (2).

9. The construction waste sorting and crushing device according to claim 1, characterized in that: A group of second elastic members (2011) are respectively sleeved and installed on the support rods (201) at the outer ends of the material distribution bins (2), and the top ends of the second elastic members (2011) are respectively in contact with the bottom surfaces of the connecting plates (301) on the movable frame (3).

10. The construction waste sorting and crushing device according to claim 1, characterized in that: A connecting gear (1061) is fixedly mounted on the outer end of the rotating shaft (106), a second rack (302) is fixedly mounted on the outer end of the moving frame (3), and the second rack (302) at the outer end of the moving frame (3) is meshed and transmission-connected with the connecting gear (1061) at the outer end of the rotating shaft (106).

Citation Information

Patent Citations

  • Solid waste treatment device

    CN112058861A

  • Preparation method of energy-saving and environment-friendly artificial graphite negative electrode material

    CN114950661A

  • Combined manufacturing equipment for automatic light-changing welding mask

    CN116673739A

  • Medical waste treatment device with disinfection function

    CN212884109U

  • Environment-friendly building waste recovery device

    CN212943139U

Cited By

  • Quantitative recovery device for garbage sorting

    CN224271500U