Resin replacement operation platform, process and design method for internal cooling water system of phase modifier
By designing a resin replacement operation platform for the cooling water system in the camera, using concentric tube structure and various processes, efficient recycling and filling of ion exchanger resin is achieved, and the problems of low resin replacement efficiency and insufficient safety in the prior art are solved. Improves the filling efficiency and maintenance convenience of new resins.
Patent Information
- Application Number
- CN202411015078.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-15
AI Technical Summary
In the prior art, the replacement of ion exchanger resin requires cooperation among multiple people, which is time-consuming and labor-intensive, and the equipment is complex and inconvenient for maintenance, resulting in low replacement efficiency and insufficient safety.
A resin replacement operation platform for cooling water system in the camera was designed, including a water storage tank, a resin particle chamber and a particle recovery chamber. Through a two-position three-way solenoid reversing valve and concentric tube structure, it uses a large flow rate to flush and rotate the jet essence. The cleaning and jet rolling process achieves efficient recycling and filling of resin particles, reducing labor intensity and improving safety.
It improves the efficiency of filling new resin particles in the ion exchanger, reduces the labor intensity of staff, improves safety, and simplifies the maintenance process.
Smart Images

Figure CN118954701A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of resin replacement of a phase condenser station water system, and in particular relates to an operating platform, process and design method for replacing the resin of a phase condenser internal cooling water system. Background Art
[0002] Phase-shifting stations can provide emergency dynamic reactive power support for the power system, reduce the risk of continuous commutation failure in UHV DC, and help the rapid recovery of DC power and system stability; they can also significantly reduce the voltage fluctuation amplitude after a fault, which helps the rapid recovery of system voltage after a fault. Phase-shifting cooling water passes through the hollow conductor of the stator coil to take the heat generated by the stator coil loss out of the phase-shifting station. The water cooler takes away the heat absorbed by the cooling water from the stator coil. A filter is set in the system to remove impurities in the water. A bypass ion exchanger is used to soften the cooling water and control its conductivity. During normal operation, the ion exchanger resin needs to be replaced. The replacement cycle is generally 4-6 months, and each machine needs to replace 130L each time.
[0003] Ion exchangers are currently replaced manually, which requires multiple people to work together, is time-consuming and labor-intensive, and there are many valves in the pipes and accessories of the ion exchanger, which is inconvenient for operation and maintenance personnel to replace them. Therefore, it is necessary to develop an ion exchanger resin replacement system to solve the above problems, meet the needs of ion exchanger resin replacement, and improve replacement efficiency. Summary of the invention
[0004] The purpose of the present invention is to overcome the deficiencies of the prior art and to provide a phase shifter internal cooling water system resin replacement work platform, process and design method, improve the efficiency of new resin particle filling in the ion exchanger, reduce the labor intensity of the staff and improve safety.
[0005] The objective of the present invention is achieved as follows: a resin replacement work platform of a phase-shifting machine internal cooling water system comprises a water storage tank, a resin particle bin and a particle recovery bin, the water storage tank is connected to a water supply pipe, the water supply pipe is connected to a two-position three-way electromagnetic reversing valve, the two-position three-way electromagnetic reversing valve is connected to an inlet concentric tube, the inlet concentric tube is connected to the inlet of an ion exchanger, the outlet of the ion exchanger is connected to an outlet concentric tube, the outlet concentric tube is connected to a second transparent steel wire hose, the second transparent steel wire hose is connected to the particle recovery bin, the particle recovery bin is connected to a drain pipe; the resin particle bin is connected to the inlet concentric tube via a first transparent steel wire hose; the inlet concentric tube and the outlet concentric tube are concentric sleeves consisting of an outer tube and an inner tube.
[0006] The water supply pipe is provided with a booster pump and a pressure gauge, the second transparent steel wire hose is provided with a rotary valve, a flow meter and a water pump, and the particle recovery bin is provided with a filter screen.
[0007] The water storage tank is provided with a first switch, the resin particle bin is provided with a second switch, and the drainage pipe is provided with a third switch.
[0008] The resin replacement process of the cooling water system in the phase shifter utilizes the resin replacement operation platform of the cooling water system in the phase shifter, and comprises the following steps:
[0009] Step 1: Rough flushing with large flow rate
[0010] In the initial state, the inner tubes of the concentric tubes are respectively at the inlet and outlet of the ion exchanger and have not penetrated into the tank of the ion exchanger. The second switch of the resin particle bin is in the closed state, and new resin particles are quantitatively filled into the resin particle bin according to the volume of the ion exchanger.
[0011] Open the first switch of the water storage tank, open the third switch, start the water pump, adjust the flow of the booster pump to the preset value, start the booster pump, and make the two-position three-way electromagnetic reversing valve in the open state of the inlet concentric tube outer pipe. At this time, a large flow of water flows into the ion exchanger continuously and steadily, and drives most of the old resin particles to flow out from the outlet. After the suction operation of the water pump, it is accelerated to be discharged into the particle recovery bin. Due to the effect of the filter screen, the old resin particles remain in the particle recovery bin, and the water flows into the drain pipe; at the same time, pay attention to observe the water level gauge, so that the water in the ion exchanger always submerges the highest position of the resin particles, that is, properly adjust the rotary valve so that the value at the flow meter is less than the flow of the booster pump, so that the input flow can be greater than the discharge flow; when a large amount of particles are not observed to flow out from the second transparent steel wire hose upstream of the water pump, the large flow rough flushing is completed;
[0012] Step 2: Rotary jet cleaning
[0013] The inner tubes of the concentric tubes at the inlet and outlet of the ion exchanger are extended to the bottom of the tank of the ion exchanger, so that the two-position three-way electromagnetic reversing valve is in the state of opening the inner tube pipeline; the rotating nozzle connected to the end of the inner tube of the inlet concentric tube emits a rotating jet to arouse the old resin particles settled at the bottom to make them in a suspended state, and the old resin particles are sucked to the particle recovery bin by the water pump. The old resin particles are separated by the filter screen and remain in the particle recovery bin, and the water flows into the drain pipe; when no resin particles are observed to flow out from the second transparent steel wire hose upstream of the water pump, the rotary jet fine cleaning is completed;
[0014] Step 3: Jet entrainment and resin particle filling
[0015] Pull out the inner tubes of the inlet concentric tube and the outlet concentric tube to the inlet and outlet of the ion exchanger, so that the two-position three-way electromagnetic reversing valve is in the open state of the outer pipe line, and open the second switch of the resin particle bin. At this time, the high-speed flowing water forms a negative pressure, and the resin particles in the resin particle bin are sucked into the water flow and sent into the ion exchanger; when it is observed that there are no resin particles in the resin particle bin, the new resin particles are filled, and the third switch and other components are closed.
[0016] The design method of the resin replacement operation platform of the phase shifter internal cooling water system comprises the following steps:
[0017] Step 11, calculating the minimum crushing strength of the resin particles and determining the water flow rate;
[0018] Step 12, calculate the design flow rate and pipeline pressure loss;
[0019] Step 13: Determine the inner diameter of the pipeline and the rated pressure of the booster pump.
[0020] The step 11 of calculating the minimum crushing strength of the resin particles and determining the water flow rate includes:
[0021] The minimum crushing strength of the resin pellets is calculated by the following formulas (1) and (2):
[0022] G=mg (1)
[0023]
[0024] After being pressurized by a high-pressure pump, the water flows out of the pump outlet at a certain speed. For continuous water flow, between two points inside and outside the pump outlet section, the Bernoulli equation shows that:
[0025]
[0026] Where P is the supply pressure of the pump; P0 is the atmospheric pressure; v i is the water flow velocity in the pump; v0 is the water flow velocity at the pump outlet; ρ is the density of water;
[0027] The water flow hits the surface of the solid target at a speed v. After a time Δt, the shock wave generated by the water flow hitting the target propagates to a certain cross section at a speed c, which causes the water flow velocity of the cross section to change to v1. The area of the water flow changes from the initial A to A+ΔA, the water flow pressure changes from the initial pressure P0 to P0+ΔP, and the density changes from ρ to ρ+Δρ. Then, within the time Δt, the change in momentum of the water flow is:
[0028] ΔM=(ρ+Δρ)(A+ΔA)cΔtv1-ρAcΔtv (4)
[0029] After ignoring the higher-order terms, we can get:
[0030] ΔM=ρAcΔt(v-v1) (5)
[0031] During the Δt time, the impulse caused by the water hammer pressure on the resin particles is:
[0032] I=[P0A-(P0+ΔP)(A+ΔA)]Δt=-(P0ΔA+ΔPA+ΔPΔA) (6)
[0033] Ignore the high-order term ΔPΔA. Considering that the water hammer pressure value ΔP is very large, ΔP>>P0, the P0ΔA term can be ignored. After sorting, we get:
[0034] I=-ΔPAΔt (7)
[0035] From the momentum theorem:
[0036] ρAcΔt(v-v1)=-ΔPAΔt (8)
[0037] The moment the front end of the water flow hits the surface of the resin particles, the water flow velocity immediately drops to 0. After rearranging the above formula, we can get:
[0038] P 水锤 =ρvc1 (9)
[0039] Where c1 is the shock wave velocity of water; v is the water flow velocity;
[0040] c1=c0+kv (10)
[0041] Where c0 is the speed of sound waves in water (1480 m / s); v is the water flow velocity.
[0042] The step 12 of calculating the design flow rate and pipeline pressure loss includes:
[0043] The design flow rate of the ion exchanger tank is calculated by the following formula:
[0044] V=Qt (11)Wherein, V is the volume of the tank; Q is the flow rate of the pump; t is the working time of the pump;
[0045] The pressure loss in the pipeline mainly includes hydraulic loss along the way and local hydraulic loss, so the total pressure loss is:
[0046] h w =h f +∑h j (12)
[0047]
[0048] Where λ is the resistance coefficient along the way; ζ jis the local resistance coefficient of a local device; d1 is the inner diameter of the pipeline; v is the velocity of the water flow in the pipeline; l i is the length of the pipeline; g is the acceleration due to gravity;
[0049] In the calculation, the local resistance coefficient is converted into equivalent pipeline length, and then formula (13) can be converted into:
[0050]
[0051] Where L is the total length of the pipeline, L = l + ∑l e ,∑l e The sum of the equivalent pipeline lengths of the local resistance coefficients.
[0052] The step 13 of determining the inner diameter of the pipeline and the rated pressure of the booster pump includes:
[0053] The cross-sectional area through which the fluid passes is determined by the following formula:
[0054] Q=vS (15)
[0055] In the formula, v is the water velocity, Q is the flow rate of the pump, and S is the cross-sectional area of the fluid. Since there are inner and outer pipe structures upstream of the tank inlet, and the inner and outer pipes between the booster pump and the tank inlet work independently, both the inner and outer pipes should meet the requirements of the cross-sectional area of the fluid. It is calculated by formulas (16) and (17):
[0056]
[0057] Where, d i is the inner diameter of the inner tube; D o is the inner diameter of the outer tube;
[0058] The stagnation pressure of water flow can be calculated by formula (18):
[0059]
[0060] P2=ρgΔh (19)
[0061] Where P1 is the stagnation pressure of water flow, P2 is the elevation pressure generated by the height difference between the booster pump and the tank inlet, and Δh is the height difference between the booster pump and the tank inlet;
[0062] Booster pump power N b It can be calculated by the following formula:
[0063]
[0064] Where N b is the rated power of the booster pump; P n Q is the rated pressure of the booster pump; n is the booster pump flow rate.
[0065] Beneficial effects of the present invention: the resin replacement work platform of the cold water system in the phase shifter of the present invention, the water storage tank is connected to the two-position three-way electromagnetic reversing valve through a water supply pipe, the two-position three-way electromagnetic reversing valve is connected to the inlet of the ion exchanger through an inlet concentric tube, the outlet of the ion exchanger is connected to the outlet concentric tube, the outlet concentric tube is connected to the particle recovery bin through a second transparent steel wire hose, and the particle recovery bin is connected to a drain pipe; the resin particle bin is connected to the inlet concentric tube through a first transparent steel wire hose, the inlet concentric tube and the outlet concentric tube are concentric sleeves composed of an outer tube and an inner tube; the resin replacement work platform of the cold water system in the phase shifter of the present invention drives most of the old resin particles to be discharged from the ion exchanger by a high-speed jet, and then restores the fluidity of the residual resin particles on the side wall and bottom of the ion exchanger by a rotating pressurized jet, and is pumped out by a water pump and pumped to the particle recovery bin. The old resin particles in the ion exchanger are recovered by closing the bin, and finally the high-speed jet takes away the air in the resin particle bin, forming a negative pressure to make the new resin particles be sucked into the pipeline, and the resin particles and water mixture are transported to the ion exchanger to realize the filling of the new resin particles in the ion exchanger; the design method of the resin replacement operation platform of the cold water system in the phase shifter, through step 11, calculates the minimum crushing strength of the resin particles and determines the water flow rate; step 12, calculates the design flow rate and pipeline pressure loss; step 13, determines the inner diameter of the pipeline and the rated pressure of the booster pump, and can determine the various process and equipment parameters in the resin replacement operation platform of the cold water system in the phase shifter; the phase shifter internal cold water system resin replacement operation platform, process and design method of the present invention improve the efficiency of filling new resin particles in the ion exchanger, reduce the labor intensity of the staff, and improve safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0066] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0067] Figure 1 This is a schematic diagram of the resin replacement work platform in the phase regulator's internal cooling water system.
[0068] Figure 2 This is the process flow chart for replacing the resin in the water system of the phase-shifting station.
[0069] Figure 3 This is a schematic diagram of the high-flow rough flushing in the resin replacement process of the phase-shifting station water system.
[0070] Figure 4 Schematic diagram of rotary jet fine cleaning in the resin replacement process of the phase-shifting station water system.
[0071] Figure 5 Schematic diagram of the jet entrainment and filling of resin particles in the resin replacement process of the phase-shifting station water system. DETAILED DESCRIPTION
[0072] The present invention will be further described below in conjunction with the accompanying drawings.
[0073] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0074] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0075] It should be noted that all directional indications in the embodiments of the present invention (such as up-down-left-right-front-back...) are only used to explain the relative position relationship - movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly. The connection can be a direct connection or an indirect connection.
[0076] like Figure 1-5 As shown, the resin replacement operation platform of the phase-shifting machine internal cooling water system of the present invention comprises a water storage tank, a resin particle bin and a particle recovery bin, the water storage tank is connected to a water supply pipe, the water supply pipe is connected to a two-position three-way electromagnetic reversing valve, the two-position three-way electromagnetic reversing valve is connected to an inlet concentric tube, the inlet concentric tube is connected to the inlet of an ion exchanger, the outlet of the ion exchanger is connected to an outlet concentric tube, the outlet concentric tube is connected to a second transparent steel wire hose, the second transparent steel wire hose is connected to the particle recovery bin, and the particle recovery bin is connected to a drain pipe; the resin particle bin is connected to the inlet concentric tube through a first transparent steel wire hose; the inlet concentric tube and the outlet concentric tube are concentric sleeves composed of an outer tube and an inner tube.
[0077] The water supply pipe is provided with a booster pump and a pressure gauge, the second transparent steel wire hose is provided with a rotary valve, a flow meter and a water pump, and the particle recovery bin is provided with a filter screen.
[0078] The water storage tank is provided with a first switch, the resin particle bin is provided with a second switch, and the drainage pipe is provided with a third switch.
[0079] The resin replacement work platform for the phase shifter's internal cooling water system can be integrated on a special tire-type movable frame. It consists of a motor, water tank, booster pump, water pump, control valve group, pipe fittings, valves, high-pressure hose, hard pipe, wire hose, nozzle, container, spare parts box, etc., which is easy to move, install and use.
[0080] The resin replacement process of the cooling water system in the phase shifter utilizes the resin replacement operation platform of the cooling water system in the phase shifter, and comprises the following steps:
[0081] Step 1: Rough flushing with large flow rate
[0082] In the initial state, the inner tubes of the concentric tubes are respectively at the inlet and outlet of the ion exchanger and have not penetrated into the tank of the ion exchanger. The second switch of the resin particle bin is in the closed state, and new resin particles are quantitatively filled into the resin particle bin according to the volume of the ion exchanger.
[0083] Open the first switch of the water storage tank, open the third switch, start the water pump, adjust the flow of the booster pump to the preset value, start the booster pump, and make the two-position three-way electromagnetic reversing valve in the open state of the inlet concentric tube outer pipe. At this time, a large flow of water flows into the ion exchanger continuously and steadily, and drives most of the old resin particles to flow out from the outlet. After the suction operation of the water pump, it is accelerated to be discharged into the particle recovery bin. Due to the effect of the filter screen, the old resin particles remain in the particle recovery bin, and the water flows into the drain pipe; at the same time, pay attention to observe the water level gauge, so that the water in the ion exchanger always submerges the highest position of the resin particles, that is, properly adjust the rotary valve so that the value at the flow meter is less than the flow of the booster pump, so that the input flow can be greater than the discharge flow; when a large amount of particles are not observed to flow out from the second transparent steel wire hose upstream of the water pump, the large flow rough flushing is completed;
[0084] Step 2: Rotary jet cleaning
[0085] The inner tubes of the concentric tubes at the inlet and outlet of the ion exchanger are extended to the bottom of the tank of the ion exchanger, so that the two-position three-way electromagnetic reversing valve is in the state of opening the inner tube pipeline; the rotating nozzle connected to the end of the inner tube of the inlet concentric tube emits a rotating jet to arouse the old resin particles settled at the bottom to make them in a suspended state, and the old resin particles are sucked to the particle recovery bin by the water pump. The old resin particles are separated by the filter screen and remain in the particle recovery bin, and the water flows into the drain pipe; when no resin particles are observed to flow out from the second transparent steel wire hose upstream of the water pump, the rotary jet fine cleaning is completed;
[0086] Step 3: Jet entrainment and resin particle filling
[0087] Pull out the inner tubes of the inlet concentric tube and the outlet concentric tube to the inlet and outlet of the ion exchanger, so that the two-position three-way electromagnetic reversing valve is in the open state of the outer pipe line, and open the second switch of the resin particle bin. At this time, the high-speed flowing water forms a negative pressure, and the resin particles in the resin particle bin are sucked into the water flow and sent into the ion exchanger; when it is observed that there are no resin particles in the resin particle bin, the new resin particles are filled, and the third switch and other components are closed.
[0088] The design method of the resin replacement operation platform of the phase shifter internal cooling water system comprises the following steps:
[0089] Step 11, calculating the minimum crushing strength of the resin particles and determining the water flow rate;
[0090] Step 12, calculate the design flow rate and pipeline pressure loss;
[0091] Step 13: Determine the inner diameter of the pipeline and the rated pressure of the booster pump.
[0092] The step 11 of calculating the minimum crushing strength of the resin particles and determining the water flow rate includes:
[0093] The minimum crushing strength of the resin pellets is calculated by the following formulas (1) and (2):
[0094] G=mg (1)
[0095]
[0096] To ensure the integrity of the resin particles, the pressure intensity generated by the water flow must be less than the minimum crushing strength of the resin particles. After being pressurized by the high-pressure pump, the water flows out of the pump outlet at a certain speed. For continuous water flow, between two points inside and outside the pump outlet section, the Bernoulli equation shows that:
[0097]
[0098] Where P is the supply pressure of the pump; P0 is the atmospheric pressure; v i is the water flow velocity in the pump; v0 is the water flow velocity at the pump outlet; ρ is the density of water;
[0099] When water flows through the pipeline to impact the resin in the tank, the entire impact process can be divided into two different stages, namely the water hammer pressure stage and the stagnation pressure stage. In the initial stage, the water flow impacts the resin particles in a compressible manner, generating shock waves on the contact surface. When the water is compressed, the high-pressure impact will cause the water flow to act on the resin particles like a "water hammer", and water hammer pressure will be generated in the area where the water flow and the resin particles are in contact. The water hammer pressure lasts for a very short time, generally in the order of nanoseconds; in the second stage, after the water hammer pressure stage, a stable impact water flow will be formed. At this time, the pressure in the center of the water flow will gradually oscillate and decrease, forming a stable Bernoulli stagnation pressure. Subsequently, the water flow continues to impact the resin particles at the same speed, and the dynamic pressure in the center of the jet will stabilize at the Bernoulli stagnation pressure.
[0100] The water flow hits the surface of the solid target at a speed v. After a time Δt, the shock wave generated by the water flow hitting the target propagates to a certain cross section at a speed c, which causes the water flow velocity of the cross section to change to v1. The area of the water flow changes from the initial A to A+ΔA, the water flow pressure changes from the initial pressure P0 to P0+ΔP, and the density changes from ρ to ρ+Δρ. Then, within the time Δt, the change in momentum of the water flow is:
[0101] ΔM=(ρ+Δρ)(A+ΔA)cΔtv1-ρAcΔtv (4)
[0102] After ignoring the higher-order terms, we can get:
[0103] ΔM=ρAcΔt(v-v1) (5)
[0104] During the Δt time, the impulse caused by the water hammer pressure on the resin particles is:
[0105] I=[P0A-(P0+ΔP)(A+ΔA)]Δt=-(P0ΔA+ΔPA+ΔPΔA) (6)
[0106] Ignore the high-order term ΔPΔA. Considering that the water hammer pressure value ΔP is very large, ΔP>>P0, the P0ΔA term can be ignored. After sorting, we get:
[0107] I=-ΔPAΔt (7)
[0108] From the momentum theorem:
[0109] ρAcΔt(v-v1)=-ΔPAΔt (8)
[0110] The moment the front end of the water flow hits the surface of the resin particles, the water flow velocity immediately drops to 0. After rearranging the above formula, we can get:
[0111] P 水锤 =ρvc1 (9)
[0112] Where c1 is the shock wave velocity of water; v is the water flow velocity; P 水锤 <P 树 ;
[0113] c1=c0+kv (10)
[0114] In the formula, c0 is the speed of sound waves in water (1480m / s); v is the water velocity. k is a coefficient. When the water velocity is less than 1000m / s, k takes the value of 2.
[0115] The step 12 of calculating the design flow rate and pipeline pressure loss includes:
[0116] The design flow rate of the ion exchanger tank is calculated by the following formula:
[0117] V=Qt (11)Wherein, V is the volume of the tank; Q is the flow rate of the pump; t is the working time of the pump;
[0118] The pressure loss in the pipeline mainly includes hydraulic loss along the way and local hydraulic loss, so the total pressure loss is:
[0119] h w =h f +∑h j (12)
[0120]
[0121] Where λ is the resistance coefficient along the way; ζ j is the local resistance coefficient of a local device; d1 is the inner diameter of the pipeline; v is the velocity of the water flow in the pipeline; l i is the length of the pipeline; g is the acceleration due to gravity;
[0122] In the calculation, the local resistance coefficient is converted into equivalent pipeline length, and then formula (13) can be converted into:
[0123]
[0124] Where L is the total length of the pipeline, L = l + ∑l e ,∑l e The sum of the equivalent pipeline lengths of the local resistance coefficients.
[0125] From formula (14), it can be seen that the pipeline diameter has the greatest impact on the pressure loss in the pipeline, followed by the flow rate Q and the pipeline length L. The range of flow rate Q has been determined, and from formula (14), it can be seen that h w It is inversely proportional to the fifth power of the pipeline diameter, directly proportional to the total length of the pipeline, and directly proportional to the square of the flow velocity. This shows that the total pressure loss decreases with the increase of the pipeline diameter, increases with the increase of the pipeline length, and increases with the increase of the flow velocity.
[0126] The step 13 of determining the inner diameter of the pipeline and the rated pressure of the booster pump includes:
[0127] The cross-sectional area through which the fluid passes is determined by the following formula:
[0128] Q=vS (15)
[0129] In the formula, v is the water velocity, Q is the flow rate of the pump, and S is the cross-sectional area of the fluid. Since there are inner and outer pipe structures upstream of the tank inlet, and the inner and outer pipes between the booster pump and the tank inlet work independently, both the inner and outer pipes should meet the requirements of the cross-sectional area of the fluid. It is calculated by formulas (16) and (17):
[0130]
[0131] Where, d i is the inner diameter of the inner tube; D o is the inner diameter of the outer tube;
[0132] There are tees, elbows, nozzles, etc. in the whole system. These local devices will have a certain pressure loss. The local resistance coefficient of the tee is about 1.5, the local resistance coefficient of the elbow is about 0.54, and the local resistance coefficient of the nozzle is about 0.43. By substituting the correlation coefficient into equations (12)-(14), the pressure loss of this design can be preliminarily estimated.
[0133] The stagnation pressure of water flow can be calculated by formula (18):
[0134]
[0135] P2=ρgΔh (19)
[0136] Where P1 is the stagnation pressure of water flow, P2 is the elevation pressure generated by the height difference between the booster pump and the tank inlet, and Δh is the height difference between the booster pump and the tank inlet;
[0137] The rated pressure of the selected booster pump should be greater than the pressure loss, the water stagnation pressure P1, and the pressure generated by the height difference between the booster pump and the tank inlet. The flow rate of the water pump should be close to or less than the flow rate of the booster pump to prevent the water from being drained and leaving a large amount of residual resin particles at the bottom of the tank.
[0138] Booster pump power N b It can be calculated by the following formula:
[0139]
[0140] Where N b is the rated power of the booster pump; P n Q is the rated pressure of the booster pump; nis the booster pump flow rate; the booster pump matching drive motor power Ny≥1.1×N b It will work.
[0141] In summary, the resin replacement operation platform of the cold water system in the phase shifter of the present invention has a water storage tank connected to a two-position three-way electromagnetic reversing valve through a water supply pipe, the two-position three-way electromagnetic reversing valve is connected to the inlet of the ion exchanger through an inlet concentric tube, the outlet of the ion exchanger is connected to the outlet concentric tube, the outlet concentric tube is connected to the particle recovery bin through a second transparent steel wire hose, and the particle recovery bin is connected to a drain pipe; the resin particle bin is connected to the inlet concentric tube through a first transparent steel wire hose, and the inlet concentric tube and the outlet concentric tube are concentric sleeves composed of an outer tube and an inner tube; the resin replacement operation platform of the cold water system in the phase shifter of the present invention drives most of the old resin particles to be discharged from the ion exchanger through a high-speed jet, and then restores the fluidity of the residual resin particles on the side wall and bottom of the ion exchanger through a rotating pressurized jet, and is pumped out by a water pump and pumped to the particle recovery bin, The old resin particles in the ion exchanger are recovered, and finally the high-speed jet takes away the air in the resin particle bin, forming a negative pressure to make the new resin particles be sucked into the pipeline, and the resin particles and water mixture are transported to the ion exchanger to realize the filling of the new resin particles in the ion exchanger; the design method of the resin replacement operation platform of the cold water system in the phase shifter is through step 11, calculating the minimum crushing strength of the resin particles and determining the water flow rate; step 12, calculating the design flow rate and pipeline pressure loss; step 13, determining the inner diameter of the pipeline and the rated pressure of the booster pump, and various process and equipment parameters in the resin replacement operation platform of the cold water system in the phase shifter can be determined; the resin replacement operation platform, process and design method of the cold water system in the phase shifter of the present invention improve the efficiency of filling new resin particles in the ion exchanger, reduce the labor intensity of the staff, and improve safety.
[0142] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0143] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.
Claims
1. The resin replacement operation platform of the phase-shifting internal cooling water system is characterized by: It includes a water storage tank, a resin particle bin and a particle recovery bin, the water storage tank is connected to a water supply pipe, the water supply pipe is connected to a two-position three-way electromagnetic reversing valve, the two-position three-way electromagnetic reversing valve is connected to an inlet concentric tube, the inlet concentric tube is connected to the inlet of an ion exchanger, the outlet of the ion exchanger is connected to an outlet concentric tube, the outlet concentric tube is connected to a second transparent steel wire hose, the second transparent steel wire hose is connected to the particle recovery bin, and the particle recovery bin is connected to a drain pipe; the resin particle bin is connected to the inlet concentric tube through a first transparent steel wire hose; the inlet concentric tube and the outlet concentric tube are concentric sleeves composed of an outer tube and an inner tube.
2. The resin replacement operation platform for the phase condenser internal cooling water system according to claim 1, characterized in that: The water supply pipe is provided with a booster pump and a pressure gauge, the second transparent steel wire hose is provided with a rotary valve, a flow meter and a water pump, and the particle recovery bin is provided with a filter screen.
3. The resin replacement operation platform for the phase condenser internal cooling water system according to claim 1, characterized in that: The water storage tank is provided with a first switch, the resin particle bin is provided with a second switch, and the drainage pipe is provided with a third switch.
4. A process for replacing the resin in the cooling water system of a phase condenser, which utilizes the resin replacement operation platform for the cooling water system of a phase condenser as claimed in claim 1, characterized in that: The following steps are involved: Step 1: Rough flushing with large flow rate Open the first switch of the water storage tank, open the third switch, start the water pump, adjust the flow of the booster pump to the preset value, start the booster pump, and make the two-position three-way electromagnetic reversing valve in the open state of the inlet concentric tube outer pipe. At this time, a large flow of water continuously and steadily flows into the ion exchanger, and drives most of the old resin particles to flow out from the outlet. After the suction operation of the water pump, it is accelerated to be discharged into the particle recovery bin. Due to the effect of the filter screen, the old resin particles remain in the particle recovery bin, and the water flows into the drain pipe; when a large amount of particles are not observed to flow out from the second transparent steel wire hose upstream of the water pump, the large flow rough flushing is completed; Step 2: Rotary jet cleaning The inner tubes of the concentric tubes at the inlet and outlet of the ion exchanger are extended to the bottom of the tank of the ion exchanger, so that the two-position three-way electromagnetic reversing valve is in the state of opening the inner tube pipeline; the rotating nozzle connected to the end of the inner tube of the inlet concentric tube emits a rotating jet to arouse the old resin particles settled at the bottom to make them in a suspended state, and the old resin particles are sucked into the particle recovery bin by the water pump; when no resin particles are observed to flow out from the second transparent steel wire hose upstream of the water pump, the rotating jet fine cleaning is completed; Step 3: Jet entrainment and resin particle filling Pull out the inner tubes of the inlet concentric tube and the outlet concentric tube to the inlet and outlet of the ion exchanger, so that the two-position three-way electromagnetic reversing valve is in the open state of the outer pipe line, and open the second switch of the resin particle bin. At this time, the high-speed flowing water forms a negative pressure, and the resin particles in the resin particle bin are sucked into the water flow and sent into the ion exchanger; when it is observed that there are no resin particles in the resin particle bin, the new resin particles are filled, and the third switch and other components are closed.
5. The design method of the resin replacement work platform of the phase condenser internal cooling water system as claimed in claim 1, characterized in that: The following steps are involved: Step 11, calculating the minimum crushing strength of the resin particles and determining the water flow rate; Step 12, calculate the design flow rate and pipeline pressure loss; Step 13: Determine the inner diameter of the pipeline and the rated pressure of the booster pump.
6. The design method of the resin replacement work platform of the phase condenser internal cooling water system as claimed in claim 5, characterized in that: The step 11 of calculating the minimum crushing strength of the resin particles and determining the water flow rate includes: The minimum crushing strength of the resin pellets is calculated by the following formulas (1) and (2): G=mg (1) After being pressurized by a high-pressure pump, the water flows out of the pump outlet at a certain speed. For continuous water flow, between two points inside and outside the pump outlet section, the Bernoulli equation shows that: Where P is the supply pressure of the pump; P0 is the atmospheric pressure; v i is the water flow velocity in the pump; v0 is the water flow velocity at the pump outlet; ρ is the density of water; The water flow hits the surface of the solid target at a speed v. After a time Δt, the shock wave generated by the water flow hitting the target propagates to a certain cross section at a speed c, which causes the water flow velocity of the cross section to change to v1. The area of the water flow changes from the initial A to A+ΔA, the water flow pressure changes from the initial pressure P0 to P0+ΔP, and the density changes from ρ to ρ+Δρ. Then, within the time Δt, the change in momentum of the water flow is: ΔM=(ρ+Δρ)(A+ΔA)cΔtv1-ρAcΔtv (4) After ignoring the higher-order terms, we can get: ΔM=ρAcΔt(v-v1) (5) During the Δt time, the impulse caused by the water hammer pressure on the resin particles is: I=[P0A-(P0+ΔP)(A+ΔA)]Δt=-(P0ΔA+ΔPA+ΔPΔA) (6) Ignore the high-order term ΔPΔA. Considering that the water hammer pressure value ΔP is very large, ΔP>>P0, the P0ΔA term can be ignored. After sorting, we get: I=-ΔPAΔt (7) From the momentum theorem: ρAcΔt(v-v1)=-ΔPAΔt (8) The moment the front end of the water flow hits the surface of the resin particles, the water flow velocity immediately drops to 0. After rearranging the above formula, we can get: P 水锤 =ρvc1 (9) In the formula, c1 is the shock wave velocity of water; v is the water flow velocity; c1=c0+kv (10) In the formula, c0 is the speed of sound waves in water (1480 m / s); v is the water flow velocity.
7. The design method of the resin replacement work platform of the phase condenser internal cooling water system as claimed in claim 5, characterized in that: The step 12 of calculating the design flow rate and pipeline pressure loss includes: The design flow rate of the ion exchanger tank is calculated by the following formula: V=Qt (11)Wherein, V is the volume of the tank; Q is the flow rate of the pump; t is the working time of the pump; The pressure loss in the pipeline mainly includes hydraulic loss along the way and local hydraulic loss, so the total pressure loss is: h w =h f +∑h j (12) Where λ is the resistance coefficient along the way; ζ j is the local resistance coefficient of a local device; d1 is the inner diameter of the pipeline; v is the velocity of the water flow in the pipeline; l i is the length of the pipeline; g is the acceleration due to gravity; In the calculation, the local resistance coefficient is converted into equivalent pipeline length, and then formula (13) can be converted into: Where L is the total length of the pipeline, L = l + ∑l e ,∑l e The sum of the equivalent pipeline lengths of the local resistance coefficients.
8. The design method of the resin replacement work platform of the phase condenser internal cooling water system as claimed in claim 5, characterized in that: The step 13 of determining the inner diameter of the pipeline and the rated pressure of the booster pump includes: The cross-sectional area through which the fluid passes is determined by the following formula: Q=vS (15) In the formula, v is the water velocity, Q is the flow rate of the pump, and S is the cross-sectional area of the fluid. Since there are inner and outer pipe structures upstream of the tank inlet, and the inner and outer pipes between the booster pump and the tank inlet work independently, both the inner and outer pipes should meet the requirements of the cross-sectional area of the fluid. It is calculated by formulas (16) and (17): Where, d i is the inner diameter of the inner tube; D o is the inner diameter of the outer tube; The stagnation pressure of water flow can be calculated by formula (18): P2=ρgΔh (19) Where P1 is the stagnation pressure of water flow, P2 is the elevation pressure generated by the height difference between the booster pump and the tank inlet, and Δh is the height difference between the booster pump and the tank inlet; Booster pump power N b It can be calculated by the following formula: Where N b is the rated power of the booster pump; P n Q is the rated pressure of the booster pump; n is the booster pump flow rate.
Citation Information
Patent Citations
Water jet sand storage pool cleaning and separating recycling device
CN106965099A
Thermal network dynamic simulation method and device
CN111222213A
Caliber calculation method for water hammer of air valve of pipeline water delivery system
CN111985060A
Converter station water system resin replacement device based on negative pressure jet flow and application method thereof
CN113979511A
Resin replacing tool for ion exchanger
CN218689554U