Water-cooling automatic quick-inserting device for crystallizer and bottom water tank of gas protection electroslag furnace
By designing the gas-friendly electric slag furnace crystallizer and the bottom water tank water cooling automatic quick insertion device, the safety accidents and operating efficiency problems of docking and disengagement of the cooling water port during the production process are solved, and the rapid and safe automatic docking or disengagement of the water cooling device is achieved, improving the improvement of the rapid and safe automatic docking or disengagement of the water cooling device. Overall operational efficiency.
Patent Information
- Application Number
- CN202411384246.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2024-11-15
AI Technical Summary
During the production process of gas-protective electric slag furnaces, on-site operators need to enter the pit to complete the docking and disengagement of the cooling water outlet, which poses a risk of safety accidents, and is cumbersome and time-consuming, affecting efficiency.
Design a gas-friendly electric slag furnace crystallizer and bottom water tank water cooling automatic quick insertion device. By guiding the crystallizer and bottom water tank positioning device, the quick insertion structure of the water cooling device is realized, and the connection is made with bolts and rubber joints is connected to simplify cooling. The docking and disengagement process of water pipes avoids manual entry into the pit.
It completely solved safety accidents in the production process of electric slag furnaces, improved operating efficiency, reduced labor intensity for workers, achieved rapid alignment and automatic docking or disengagement of cooling water outlets, and avoided accidents such as hypoxia and suffocation.
Smart Images

Figure CN118957285A_ABST
Abstract
Description
Technical Field
[0001] The embodiment of the present invention relates to an automatic quick-insertion device in the field of special smelting technology, and in particular to an automatic quick-insertion device for cooling a crystallizer of a gas-shielded electroslag furnace and a bottom water tank. Background Art
[0002] The crystallizer and the bottom water tank are important components of the gas-shielded electric slag furnace. The smelting, refining and ingot forming of metal materials from arcing to hot sealing are all completed in the space between the crystallizer and the bottom water tank. During the production process, on-site operators fix the bottom water tank and the crystallizer together with bolts on the work platform, and operate the crane to lift the crystallizer and the bottom water tank to the smelting station. After the lifting is completed, the workers enter the pit to complete the connection of the water pipes of the crystallizer and the bottom water tank cooling water. After the smelting is completed, the workers also enter the pit to complete the disconnection of the water pipes of the crystallizer and the bottom water tank cooling water. During production preparation, after the smelting is completed or in case of emergencies in the process, the crystallizer and the bottom water tank inlet and outlet cooling water inlet joints of the gas-shielded electric slag furnace are connected or disconnected by manual entry into the pit on site. The inert gas used in the gas-shielded electric slag furnace is colorless and odorless. If a leak occurs, it will accumulate in the limited space of the pit. Once someone enters, it will cause a major accident of death due to lack of oxygen and suffocation. Summary of the invention
[0003] The purpose of the implementation mode of the present invention is to provide an automatic quick-insertion device for the water cooling of the crystallizer and the bottom water tank of a gas-shielded electroslag furnace. During the production process of mold loading and demolding, it can not only solve the problem of on-site operators entering the pit to complete the docking and installation of the cooling water outlet during the entire process, and completely solve the safety accidents in the production process of the electroslag furnace, but also facilitate on-site operators to achieve rapid alignment, save time, and improve overall operating efficiency.
[0004] In order to achieve the above-mentioned purpose, the embodiment of the present invention designs a gas-protected electroslag furnace crystallizer and a bottom water tank water cooling quick plug-in device, comprising:
[0005] Crystallizer;
[0006] A bottom water tank is arranged at the bottom of the crystallizer;
[0007] A crystallizer and bottom water tank water cooling device, which is arranged on one side of the crystallizer and the bottom water tank;
[0008] An external water cooling device is arranged below the crystallizer and the bottom water tank cooling device, and the external water cooling device is fixed to the working platform;
[0009] A crystallizer and bottom water tank positioning device is provided around the crystallizer, below the bottom water tank and on the external water cooling device;
[0010] During the process of the crystallizer and the bottom water tank descending, under the guidance of the crystallizer and bottom water tank positioning device, the crystallizer and bottom water tank water cooling device are movably connected with the external water cooling device to form a quick-insert structure.
[0011] Furthermore, in the gas-shielded electric slag furnace crystallizer and bottom water tank water-cooled quick-insertion device of the present invention, the crystallizer and the bottom water tank are fixedly connected as a whole by bolts and placed on a bottom water tank bracket, the bottom water tank bracket is fixed to the smelting pit, and the bottom water tank is provided with a bottom water tank water inlet and a bottom water tank positioning block.
[0012] Further, in the gas shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device of the present invention, the crystallizer and bottom water tank water cooling device include:
[0013] A crystallizer water inlet pipe and a crystallizer water outlet pipe, wherein the crystallizer water inlet pipe and the crystallizer water outlet pipe are arranged on the upper side of the crystallizer;
[0014] A first nozzle plate structure, wherein the crystallizer water inlet pipe and the crystallizer water outlet pipe are connected to the first nozzle plate structure via a rubber joint;
[0015] A bottom water tank water inlet pipe, wherein the first water inlet plate structure is provided with the bottom water tank water inlet pipe;
[0016] A bottom water tank outlet pipe is provided on one side of the bottom water tank inlet pipe and on the first water inlet plate structure; the bottom water tank inlet pipe and the bottom water tank outlet pipe are U-shaped structures, and the bottom water tank inlet pipe and the bottom water tank outlet pipe are connected through a hose;
[0017] A rubber joint, wherein flange surfaces at one end of the bottom water tank inlet pipe and the bottom water tank outlet pipe are fixed to the rubber joint by bolts.
[0018] Furthermore, in the gas-shielded electroslag furnace crystallizer and bottom water tank water-cooled quick-insertion device of the present invention, two identical sets of locking grooves are provided on both sides of the first water inlet plate structure, directly above the fastening screws provided on the second water inlet plate.
[0019] Furthermore, in the gas-shielded electroslag furnace crystallizer and bottom water tank water-cooling quick-insertion device of the present invention, a clamp is provided in the vertical direction between the other end of the bottom water tank water inlet pipe and the crystallizer water inlet pipe, and a clamp is provided in the vertical direction between the other end of the bottom water tank water outlet pipe and the crystallizer water outlet pipe.
[0020] Further, in the gas shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device of the present invention, the external water cooling device comprises:
[0021] A water pipe fixing plate structure is arranged below the first nozzle plate structure, and the water pipe fixing plate structure is welded to the working platform.
[0022] A second nozzle plate is fixed directly above the water pipe fixing plate structure;
[0023] A third nozzle plate, a transition pipe is fixed between the third nozzle plate and the second nozzle plate, a flange surface at one end of the transition pipe fixes the third nozzle plate to the water pipe fixing plate through bolts, and a flange surface at the other end of the transition pipe fixes the second nozzle plate through bolts;
[0024] Further, in the gas-shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device of the present invention, the water pipe fixing plate structure also includes a crystallizer external water inlet pipe, a crystallizer external water return pipe, a bottom water tank external water inlet pipe, and a bottom water tank external water return pipe;
[0025] The crystallizer external water inlet pipe, the crystallizer external water return pipe, the bottom water tank external water inlet pipe, and the bottom water tank external water return pipe are arranged below the water pipe fixing plate structure, and the third water inlet plate is respectively provided with two sets of fastening screws at symmetrical positions on the left and right sides.
[0026] Further, in the gas-shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device of the present invention, the first nozzle plate structure, the second nozzle plate, the third nozzle plate, the water pipe fixing plate structure and the crystallizer water inlet pipe, the rubber joint, the transition pipe, and the crystallizer external water inlet pipe distributed sequentially from top to bottom in the vertical direction are kept concentric;
[0027] The first nozzle plate structure, the second nozzle plate, the third nozzle plate, the water pipe fixing plate structure, and the crystallizer outlet pipe, the rubber joint, the transition pipe, and the crystallizer external water return pipe, which are sequentially distributed from top to bottom in the vertical direction, are kept concentric;
[0028] The first nozzle plate structure, the second nozzle plate, the third nozzle plate, the water pipe fixing plate structure and the bottom water tank inlet pipe, the rubber joint, the transition pipe, and the bottom water tank external water inlet pipe are arranged in sequence from top to bottom in the vertical direction and are kept concentric;
[0029] The first nozzle plate, the second nozzle plate, the third nozzle plate, and the water pipe fixing plate structure are kept concentric with the bottom water tank outlet pipe, the rubber joint, the transition pipe, and the bottom water tank external water return pipe which are distributed in sequence from top to bottom in the vertical direction.
[0030] Furthermore, in the gas-shielded electroslag furnace crystallizer and bottom water tank water-cooled quick-insert device of the present invention, the crystallizer water inlet pipe and the crystallizer water outlet pipe are S-shaped structures, one end of the crystallizer water inlet pipe and the crystallizer water outlet pipe are welded to the top of the side of the crystallizer, and the other end of the crystallizer water inlet pipe and the crystallizer water outlet pipe are fixedly connected to the rubber joint by bolts.
[0031] Furthermore, in the gas shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device of the present invention, the crystallizer and bottom water tank positioning device further includes:
[0032] Lower furnace legs, four lower furnace legs are symmetrically distributed around the crystallizer and the bottom water tank, the lower furnace legs are fixed to the bottom water tank bracket by bolts, and four guide rails are arranged on the outer side of the lower furnace legs, and the guide rails are T-shaped structures;
[0033] A guide positioning block, wherein the guide positioning block is arranged at a position corresponding to the lower furnace leg below the crystallizer, and the guide positioning block further comprises a crystallizer guide fixing block, a Z-shaped guide connecting block, and a concave guide groove. The crystallizer guide fixing block is welded to the outer side surface below the crystallizer, and the two sides of the Z-shaped guide connecting block are connected to the crystallizer guide fixing block and the concave guide groove by bolts. The crystallizer and the bottom water tank slide up and down in the vertical direction of the guide rail through the guide positioning block, driving the first water inlet plate structure to separate and connect with the second water inlet plate, so as to realize the water-cooled quick plug-in of the crystallizer and the bottom water tank;
[0034] A bottom water tank positioning block, the bottom water tank positioning blocks are respectively located on two sides of the bottom water tank water inlet and welded to the bottom water tank, and a hole is opened in the middle of the bottom water tank positioning block;
[0035] A bottom water tank locating pin, wherein the bottom water tank locating pin is arranged on a bottom water tank bracket, and the bottom water tank locating pin is located directly below a bottom water tank locating block. After the crystallizer and the bottom water tank are hoisted and installed, the bottom water tank locating pin passes through a middle hole on the bottom water tank locating block;
[0036] A first sprue locating pin and a second sprue locating pin, wherein the first sprue locating pin and the second sprue locating pin are respectively fixed in front of and behind the center position of the third sprue plate;
[0037] A high temperature resistant sealing ring is respectively arranged between the crystallizer external water inlet pipe, the crystallizer external water return pipe, the bottom water tank external water inlet pipe, the bottom water tank external water return pipe of the second nozzle plate and the first nozzle plate structure;
[0038] A hanging ring is evenly distributed on the outer side of the upper end of the crystallizer.
[0039] Compared with the prior art, the embodiments of the present invention are as follows: a crystallizer and a bottom water tank water cooling device are arranged on one side of the crystallizer and the bottom water tank; an external water cooling device is arranged below the crystallizer and the bottom water tank water cooling device, and the external water cooling device is fixed to the working platform; a crystallizer and bottom water tank positioning device is arranged around the crystallizer, below the bottom water tank and on the external water cooling device; in the process of the crystallizer and the bottom water tank being lowered, under the guidance of the crystallizer and the bottom water tank positioning device, the crystallizer and the bottom water tank water cooling device are movably connected with the external water cooling device to form a quick-insertion structure; an automatic quick-insertion device for water cooling of the crystallizer and the bottom water tank of a gas-shielded electric slag furnace is provided, which, during the production process of mold loading and demolding, can not only solve the problem of on-site operators entering the pit to complete the docking and installation of the cooling water inlet during the entire process, completely solve the safety accidents in the production process of the electric slag furnace, but also facilitate the on-site operation of the workers to achieve quick The invention can quickly align the crystallizer and the bottom water tank together with bolts, save time and improve the overall operation efficiency. The invention solves the technical problems in the prior art that, in the production process, the on-site operating workers fix the bottom water tank and the crystallizer together with bolts on the work platform, and the workers operate the crane to lift the crystallizer and the bottom water tank to the smelting station. After the lifting is completed, the workers enter the pit to complete the connection of the water pipes of the cooling water of the crystallizer and the bottom water tank. After the smelting is completed, the workers also enter the pit to complete the disconnection of the water pipes of the cooling water of the crystallizer and the bottom water tank. When making preparations before production, after the smelting is completed or in case of emergencies during the process, the crystallizer and the bottom water tank inlet and outlet cooling water inlet joints of the gas-protected electric slag furnace are connected or disconnected by manual entry into the pit on site. The inert gas used in the gas-protected electric slag furnace is colorless and odorless. If a leak occurs, it will accumulate in the limited space of the pit. Once someone enters, it will cause a major accident of death due to lack of oxygen and suffocation. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 It is a front view of the connected state of the present invention;
[0041] Figure 2 It is a front view of the present invention in a separated state;
[0042] Figure 3 A top view of the structure of the present invention;
[0043] Figure 4 for Figure 2 Enlarged view of the middle I position;
[0044] Figure 5 for Figure 2 AA section view;
[0045] Figure 6 for Figure 3 BB cross-sectional view;
[0046] The reference numerals in the figures are as follows:
[0047] 1-crystallizer, 11-lifting ring, 12-guide positioning block, 121-crystallizer guide positioning block, 122-Z-type guide connecting block, 123-concave guide groove, 13-crystallizer water inlet pipe, 14-crystallizer water outlet pipe, 15-clamp, 2-bottom water tank, 21-bottom water tank water inlet, 211-hose, 22-bottom water tank positioning block, 3-bottom water tank bracket, 31-bottom water tank positioning pin, 4-lower furnace leg, 41-guide rail, 5-first water inlet;
[0048] 51-bottom water tank inlet pipe, 52-bottom water tank outlet pipe, 53-rubber joint, 54-fastening groove, 6-water pipe fixing plate, 61-second water inlet plate, 611-first water inlet positioning pin, 612 second water inlet positioning pin, 613-fastening screw, 614-high temperature resistant sealing ring, 62-third water inlet plate, 621-transition pipe, 63-crystallizer external water inlet pipe, 64-crystallizer external water return pipe, 65-bottom water tank external water inlet pipe, 66-bottom water tank external water return pipe. DETAILED DESCRIPTION
[0049] In order to make the purpose, technical scheme and advantages of the present invention clearer, the following will be described in detail with reference to the accompanying drawings. However, it will be appreciated by those skilled in the art that in the various embodiments of the present invention, many technical details are provided in order to enable the reader to better understand the present application. However, even without these technical details and various changes and modifications based on the following embodiments, the technical scheme claimed for protection in the claims of the present application can be implemented.
[0050] The embodiment of the present invention relates to a gas shielded electroslag furnace crystallizer and a bottom water tank water cooling quick plug-in device, such as Figures 1 to 6 As shown, including:
[0051] The crystallizer 1 in this example; the crystallizer 1 and the bottom water tank 2 are important components of the gas-shielded electric slag furnace. The smelting, refining and ingot forming of the metal from arc starting to hot sealing are all completed in the space between the crystallizer and the bottom water tank.
[0052] A bottom water tank 2 is arranged at the bottom of the crystallizer 1;
[0053] A crystallizer and bottom water tank water cooling device 100 is provided on one side of the crystallizer 1 and the bottom water tank 2;
[0054] An external water cooling device 200 is provided below the crystallizer and the bottom water tank cooling device 100, and the external water cooling device 200 is fixed to the working platform;
[0055] A crystallizer and bottom water tank positioning device 300 is provided around the crystallizer 1, below the bottom water tank 2 and on the external water cooling device 200;
[0056] During the descent of the crystallizer 1 and the bottom water tank 2, under the guidance of the crystallizer and bottom water tank positioning device 300, the crystallizer 1 and the crystallizer and bottom water tank water cooling device 100 are movably connected with the external water cooling device 200 to form a quick-insert structure.
[0057] During the descent of the crystallizer 1, under the guidance of the crystallizer and bottom water tank positioning device 300, the crystallizer and bottom water tank water cooling device 100 are movably connected with the external water cooling device 200 to form a quick-insert structure. This embodiment provides a gas-shielded electroslag furnace crystallizer and bottom water tank water cooling automatic quick-insertion device. During the production process of mold loading and demolding, it can not only solve the problem of on-site operators entering the pit to complete the docking and installation of the cooling water outlet during the entire process, and completely solve the safety accidents in the production process of the electroslag furnace, but also facilitate the on-site operation of workers to achieve rapid alignment, save time, and improve the overall operating efficiency. Technical problems solve the problem that in the prior art, during the production process, on-site operators fix the bottom water tank and the crystallizer together with bolts on the work platform, and the workers operate the crane to lift the crystallizer and the bottom water tank to the smelting After the hoisting is completed, the workers enter the pit to connect the water pipes of the crystallizer and the bottom water tank cooling water. After the smelting is completed, the workers also enter the pit to disconnect the water pipes of the crystallizer and the bottom water tank cooling water. During the preparation before production, after the smelting is completed or in case of emergencies during the process, the crystallizer and the cooling water inlet and outlet joints of the bottom water tank of the gas-shielded electric slag furnace are connected or disconnected manually by entering the pit on site. The inert gas used in the gas-shielded electric slag furnace is colorless and odorless. If a leak occurs, it will accumulate in the limited space of the pit. Once someone enters, it will cause a major accident of suffocation and death due to lack of oxygen.
[0058] In order to achieve the above technical effects, the gas shielded electroslag furnace crystallizer and the bottom water tank water cooling quick plug device in this example are as follows Figures 1 to 6 As shown, the crystallizer 1 and the bottom water tank 2 are fixedly connected as a whole by bolts and placed on a bottom water tank bracket 3. The bottom water tank bracket 3 is fixed to the smelting pit. Four lower furnace legs 4 are symmetrically distributed around the crystallizer 1 and the bottom water tank 2. The lower furnace legs 4 are fixed to the bottom water tank bracket 3 by bolts. The bottom water tank 2 is provided with a bottom water tank water inlet 21 and a bottom water tank positioning block 22.
[0059] In order to achieve the above technical effects, the gas shielded electroslag furnace crystallizer and the bottom water tank water cooling quick plug device in this example are as follows Figures 1 to 6 As shown, the crystallizer and bottom water tank water cooling device 100 also includes:
[0060] The crystallizer and bottom water tank water cooling device (100) comprises:
[0061] A crystallizer water inlet pipe 13 and a crystallizer water outlet pipe 14, wherein the crystallizer water inlet pipe 13 and the crystallizer water outlet pipe 14 are arranged on the upper side of the crystallizer 1;
[0062] The crystallizer water inlet pipe 13 and the crystallizer water outlet pipe 14 are connected to the first water inlet plate structure 5 through a rubber joint 53;
[0063] The first water inlet plate structure 5 is provided with a bottom water tank water inlet pipe 51;
[0064] On one side of the bottom water tank inlet pipe 51, a bottom water tank outlet pipe 52 is provided on the first water inlet plate structure 5. The bottom water tank inlet pipe 51 and the bottom water tank outlet pipe 52 are U-shaped structures, and the bottom water tank inlet pipe 51 and the bottom water tank outlet pipe 52 are connected through a hose 211;
[0065] One end flange surface of the bottom water tank inlet pipe 51 and the bottom water tank outlet pipe 52 is fixed to the rubber joint 53 by bolts.
[0066] The first water inlet plate structure 5 and the water pipe fixing plate structure 6 are components of the gas-shielded electroslag furnace crystallizer and bottom water tank water-cooled quick-insertion device in this example.
[0067] In order to achieve the above technical effects, the gas shielded electroslag furnace crystallizer and the bottom water tank water cooling quick plug device in this example are as follows Figures 1 to 6 As shown,
[0068] Two identical sets of locking grooves 54 are provided on both sides of the first nozzle plate structure 5 and are located directly above the fastening screws 613 provided on the second nozzle plate 61 .
[0069] In order to achieve the above technical effects, the gas shielded electroslag furnace crystallizer and the bottom water tank water cooling quick plug device in this example are as follows Figures 1 to 6 As shown,
[0070] A clamp 15 is provided at the other end of the bottom water tank inlet pipe 51 and the crystallizer inlet pipe 13 in a vertical direction, and a clamp 15 is provided at the other end of the bottom water tank outlet pipe 52 and the crystallizer outlet pipe 14 in a vertical direction.
[0071] In order to achieve the above technical effects, the gas shielded electroslag furnace crystallizer and the bottom water tank water cooling quick plug device in this example are as follows Figures 1 to 6 As shown, the external water cooling device 200 includes:
[0072] A water pipe fixing plate structure 6 is arranged below the first water inlet plate structure 5, and the water pipe fixing plate structure 6 is welded to the working platform.
[0073] The second nozzle plate 62 is fixed directly above the water pipe fixing plate structure 6;
[0074] A transition pipe 621 is fixed between the third nozzle plate 62 and the second nozzle plate 61. A flange surface at one end of the transition pipe 621 fixes the third nozzle plate 62 to the water pipe fixing plate 6 through bolts, and a flange surface at the other end of the transition pipe 621 fixes the second nozzle plate 61 through bolts.
[0075] In order to achieve the above technical effects, the gas shielded electroslag furnace crystallizer and the bottom water tank water cooling quick plug device in this example are as follows Figures 1 to 6 As shown, the water pipe fixing plate structure 6 also includes:
[0076] Crystallizer external water inlet pipe 63, crystallizer external water return pipe 64, bottom water tank external water inlet pipe 65, bottom water tank external water return pipe 66;
[0077] A crystallizer external water inlet pipe 63, a crystallizer external water return pipe 64, a bottom water tank external water inlet pipe 65, and a bottom water tank external water return pipe 66 are arranged below the water pipe fixing plate structure 6, and two groups of fastening screws 613 are respectively arranged at symmetrical positions on the left and right sides of the third water inlet plate 62.
[0078] In order to achieve the above technical effects, the gas shielded electroslag furnace crystallizer and the bottom water tank water cooling quick plug device in this example are as follows Figures 1 to 6 As shown, the crystallizer water inlet pipe 13 and the crystallizer water outlet pipe 14 are S-shaped structures, one end of the crystallizer water inlet pipe 13 and the crystallizer water outlet pipe 14 are welded above the side of the crystallizer 1, and the other end of the crystallizer water inlet pipe 13 and the crystallizer water outlet pipe 14 are fixedly connected to the rubber joint 53 by bolts. The rubber joint 53 mainly plays a role of shock absorption.
[0079] In order to achieve the above technical effects, the gas shielded electroslag furnace crystallizer and the bottom water tank water cooling quick plug device in this example are as follows Figures 1 to 6 As shown, the crystallizer and bottom water tank positioning device 300 further includes:
[0080] Four lower furnace legs 4 are symmetrically arranged around the crystallizer 1 and the bottom water tank 2. The lower furnace legs 4 are fixed to the bottom water tank bracket 3 by bolts. Four guide rails 41 are arranged on the outer side of the lower furnace legs 4. The guide rails 41 are T-shaped structures.
[0081] The guide positioning block 12 is arranged below the crystallizer 1 and at a position corresponding to the lower furnace leg 4. The guide positioning block 12 also includes a crystallizer guide fixing block 121, a Z-shaped guide connecting block 122, and a concave guide groove 123. The crystallizer guide fixing block 121 is welded to the outer side surface below the crystallizer 1. The two sides of the Z-shaped guide connecting block 122 are connected to the crystallizer guide fixing block 121 and the concave guide groove 123 by bolts. The crystallizer 1 and the bottom water tank 2 slide up and down in the vertical direction of the guide rail 41 through the guide positioning block 12, driving the first water inlet plate structure 5 to separate and connect with the second water inlet plate 61, so as to realize the water-cooled quick plug-in of the crystallizer 1 and the bottom water tank 2;
[0082] The bottom water tank positioning blocks 22 are respectively located on the two sides of the bottom water tank water inlet 21 and are welded to the bottom water tank 2, and a hole is opened in the middle of the bottom water tank positioning blocks 22;
[0083] The bottom water tank positioning pin 31 is arranged on the bottom water tank bracket 3, and the bottom water tank positioning pin 31 is located directly below the bottom water tank positioning block 22. After the crystallizer 1 and the bottom water tank 2 are hoisted and installed, the bottom water tank positioning pin 31 passes through the middle hole on the bottom water tank positioning block 22;
[0084] The first sprue locating pin 611 and the second sprue locating pin 612 are respectively fixed in front and behind the center position of the third sprue plate 62;
[0085] A high temperature resistant sealing ring 614 is respectively provided between the crystallizer external water inlet pipe 63, the crystallizer external water return pipe 64, the bottom water tank external water inlet pipe 65, the bottom water tank external water return pipe 66 of the second nozzle plate 61 and the first nozzle plate structure 5;
[0086] Two suspension rings 15 are evenly distributed on the outer side of the upper end of the crystallizer 1 .
[0087] The clamp 15 is used to fix the crystallizer water outlet pipe 14 and the crystallizer water inlet pipe 13. Through the clamp 15, when the water pump is started and shut down, the influence of the change of water pressure on the pipeline vibration is offset, the water pipe is protected, and the service life is prolonged.
[0088] The third water inlet plate 62 is provided with two sets of fastening screws 613 at symmetrical positions on the left and right sides. Through the two sets of locking screws 613 and high temperature resistant sealing rings 614, after the crystallizer and the bottom water tank are hoisted, the sealing between the first water inlet plate 5 and the second water inlet plate 6 is further strengthened to avoid water leakage in and out of the crystallizer and the bottom water tank, which affects the smelting effect. Through the positioning pin, it is convenient for workers to quickly align on-site operations, save time, and improve the overall operation efficiency. The crystallizer 1 and the bottom water tank 2 are quickly plugged in for water cooling; the crystallizer 1 and the bottom water tank 2 are automatically and quickly connected or disconnected for water cooling. This automatic connection or disconnection method at the working platform can not only avoid major accidents such as anoxia and suffocation caused by people entering the pit, but also reduce the labor intensity of workers.
[0089] Two lifting rings 15 are evenly distributed on the outer side of the upper end of the crystallizer 1. The lifting rings 15 are used to lift the entire crystallizer 1.
[0090] The gas-shielded electroslag furnace crystallizer and the bottom water tank water-cooled automatic quick-insertion device in this embodiment, on the one hand, the external water of the crystallizer and the bottom water tank includes the crystallizer external water inlet pipe 63, the crystallizer external water return pipe 64, the bottom water tank external water inlet pipe 65, and the bottom water tank external water return pipe 66 which are fixed on the working platform through the water pipe fixing plate 6, and on the other hand, the crystallizer and the bottom water tank are connected to the crystallizer inlet pipe 13, the crystallizer outlet pipe 14, the bottom water tank inlet pipe 51, and the bottom water tank outlet pipe 52 through the first water inlet plate 5. When the crystallizer and the bottom water tank are hoisted to the work station, the crystallizer and the bottom water tank slide up and down in the vertical direction of the guide rail 41 through the guide positioning block 12, driving the first water inlet plate 5 to separate and connect with the second water inlet plate 61, so as to realize the rapid docking or disconnection of the cooling water of the crystallizer 1 and the bottom water tank 2. This automatic docking or disconnection method at the working platform can not only avoid major accidents such as hypoxia and suffocation caused by people entering the pit, but also reduce the labor intensity of workers.
[0091] The gas-shielded electroslag furnace crystallizer and the bottom water tank water-cooled automatic quick-insertion device in this embodiment are provided with a first water inlet locating pin 611 and a second water inlet locating pin 612 on the second water inlet plate. At the same time, the locating pin 31 on the bottom water tank is located at the bottom water tank locating block 22, which is convenient for workers to quickly align during on-site operation, save time, and improve overall operating efficiency.
[0092] The gas shielded electroslag furnace crystallizer and the bottom water tank water cooling automatic quick plug device in this embodiment, the T-shaped guide rail 41 and the guide positioning block 22 are novel docking methods, avoiding the existing slide rail design, the crystallizer and the bottom water tank are hoisted and operated smoothly, and the interface docking is convenient.
[0093] The gas-shielded electroslag furnace crystallizer and the bottom water tank water-cooled automatic quick-insertion device in this embodiment has a compact structure, is easy to use, and is simple to operate.
[0094] Those skilled in the art will appreciate that the above-mentioned embodiments are specific examples for implementing the present invention, and in actual applications, various changes may be made thereto in form and detail without departing from the spirit and scope of the present invention.
Claims
1. A quick-insertion device for water cooling of a gas-shielded electroslag furnace crystallizer and a bottom water tank, characterized in that: include: Crystallizer (1); A bottom water tank (2), wherein the bottom water tank (2) is arranged at the bottom of the crystallizer (1); A crystallizer and bottom water tank water cooling device (100), wherein the crystallizer and bottom water tank water cooling device (100) is arranged on one side of the crystallizer (1) and the bottom water tank (2); An external water cooling device (200), the external water cooling device (200) being arranged below the crystallizer and the bottom water tank cooling device (100), and the external water cooling device (200) being fixed to a working platform; A crystallizer and bottom water tank positioning device (300), wherein the crystallizer and bottom water tank positioning device (300) is arranged around the crystallizer (1), below the bottom water tank (2), and on the external water cooling device (200); During the process of the crystallizer (1) and the bottom water tank (2) descending, under the guidance of the crystallizer and bottom water tank positioning device (300), the crystallizer and bottom water tank water cooling device (100) is movably connected with the external water cooling device (200) to form a quick-plug structure.
2. The gas shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device according to claim 1 is characterized in that: The crystallizer (1) and the bottom water tank (2) are fixedly connected by bolts and placed on a bottom water tank bracket (3); the bottom water tank bracket (3) is fixed to a smelting pit; and the bottom water tank (2) is provided with a bottom water tank water inlet (21) and a bottom water tank positioning block (22).
3. The gas shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device according to claim 1 is characterized in that: The crystallizer and bottom water tank water cooling device (100) comprises: A crystallizer water inlet pipe (13) and a crystallizer water outlet pipe (14), wherein the crystallizer water inlet pipe (13) and the crystallizer water outlet pipe (14) are arranged on the upper side of the crystallizer (1); A first sprue plate structure (5), wherein the crystallizer water inlet pipe (13) and the crystallizer water outlet pipe (14) are connected to the first sprue plate structure (5) via a rubber joint (53); A bottom water tank water inlet pipe (51), wherein the first water inlet plate structure (5) is provided with the bottom water tank water inlet pipe (51); A bottom water tank outlet pipe (52), which is arranged on one side of the bottom water tank inlet pipe (51) and on the first water inlet plate structure (5); the bottom water tank inlet pipe (51) and the bottom water tank outlet pipe (52) are U-shaped structures, and the bottom water tank inlet pipe (51) and the bottom water tank outlet pipe (52) are connected via a hose (211); A rubber joint (53), one end flange surface of the bottom water tank water inlet pipe (51) and the bottom water tank water outlet pipe (52) are fixed to the rubber joint (53) by bolts.
4. The gas shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device according to claim 3 is characterized in that: Two identical sets of locking grooves (54) are provided on both sides of the first nozzle plate structure (5) directly above the fastening screws (613) provided on the second nozzle plate (61).
5. The gas shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device according to claim 3 is characterized in that: A clamp (15) is provided at the other end of the bottom water tank water inlet pipe (51) and the crystallizer water inlet pipe (13) in a vertical direction, and a clamp (15) is provided at the other end of the bottom water tank water outlet pipe (52) and the crystallizer water outlet pipe (14) in a vertical direction.
6. The gas shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device according to claim 1 is characterized in that: The external water cooling device (200) comprises: A water pipe fixing plate structure (6) is arranged below the first water inlet plate structure (5), and the water pipe fixing plate structure (6) is welded to the working platform. A second water inlet plate (62) is fixed directly above the water pipe fixing plate structure (6); A third water inlet plate (61) is provided, and a transition pipe (621) is fixed between the third water inlet plate (62) and the second water inlet plate (61); a flange surface at one end of the transition pipe (621) is used to fix the third water inlet plate (62) to the water pipe fixing plate (6) by bolts, and a flange surface at the other end of the transition pipe (621) is used to fix the second water inlet plate (61) by bolts.
7. The gas shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device according to claim 6 is characterized in that: The water pipe fixing plate structure (6) further comprises a crystallizer external water inlet pipe (63), a crystallizer external water return pipe (64), a bottom water tank external water inlet pipe (65), and a bottom water tank external water return pipe (66); The crystallizer external water inlet pipe (63), the crystallizer external water return pipe (64), the bottom water tank external water inlet pipe (65), and the bottom water tank external water return pipe (66) are arranged below the water pipe fixing plate structure (6), and the third water inlet plate (62) is respectively provided with two groups of fastening screws (613) at symmetrical positions on the left and right sides.
8. The gas shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device according to claim 1 is characterized in that: The first nozzle plate structure (5), the second nozzle plate (61), the third nozzle plate (62), the water pipe fixing plate structure (6), and the crystallizer water inlet pipe (13), the rubber joint (53), the transition pipe (621), and the crystallizer external water inlet pipe (63) are kept concentric with each other and are arranged in sequence from top to bottom in the vertical direction; The first nozzle plate structure (5), the second nozzle plate (61), the third nozzle plate (62), the water pipe fixing plate structure (6), and the crystallizer water outlet pipe (14), the rubber joint (53), the transition pipe (621), and the crystallizer external water return pipe (64) are kept concentric with each other and are arranged in sequence from top to bottom in the vertical direction; The first nozzle plate structure (5), the second nozzle plate (61), the third nozzle plate (62), the water pipe fixing plate structure (6), and the bottom water tank inlet pipe (51), the rubber joint (53), the transition pipe (621), and the bottom water tank external water inlet pipe (65) are kept concentric with each other and are arranged in sequence from top to bottom in the vertical direction; The first water inlet plate (5), the second water inlet plate (61), the third water inlet plate (62), the water pipe fixing plate structure (6), and the bottom water tank outlet pipe (52), the rubber joint (53), the transition pipe (621), and the bottom water tank external water return pipe (66) are arranged in sequence from top to bottom in the vertical direction and are kept concentric.
9. The gas shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device according to claim 3, characterized in that: The crystallizer water inlet pipe (13) and the crystallizer water outlet pipe (14) are of S-shaped structure, one end of the crystallizer water inlet pipe (13) and the crystallizer water outlet pipe (14) are welded above the side of the crystallizer (1), and the other end of the crystallizer water inlet pipe (13) and the crystallizer water outlet pipe (14) are fixedly connected to the rubber joint (53) by bolts.
10. The gas shielded electroslag furnace crystallizer and bottom water tank water cooling quick plug-in device according to claim 1, characterized in that: The crystallizer and bottom water tank positioning device (300) further comprises: Lower furnace legs (4), four lower furnace legs (4) are symmetrically distributed around the crystallizer (1) and the bottom water tank (2), the lower furnace legs (4) are fixed to the bottom water tank bracket (3) by bolts, and four guide rails (41) are arranged on the outer side of the lower furnace legs (4), and the guide rails (41) are T-shaped structures; A guide positioning block (12), the guide positioning block (12) being arranged below the crystallizer (1) and at a position corresponding to the lower furnace leg (4), the guide positioning block (12) further comprising a crystallizer guide fixing block (121), a Z-shaped guide connecting block (122), and a concave guide groove (123), the crystallizer guide fixing block (121) being welded to the outer side surface below the crystallizer 1, the two sides of the Z-shaped guide connecting block (122) being connected to the crystallizer guide fixing block (121) and the concave guide groove (123) by bolts, the crystallizer (1) and the bottom water tank (2) sliding up and down in the vertical direction of the guide rail (41) through the guide positioning block (12), driving the first water inlet plate structure (5) and the second water inlet plate (61) to separate and connect, thereby realizing water-cooled quick plug-in of the crystallizer (1) and the bottom water tank (2); A bottom water tank positioning block (22), the bottom water tank positioning blocks (22) are respectively located on two sides of the bottom water tank water inlet (21) and are welded to the bottom water tank (2), and a hole is opened in the middle of the bottom water tank positioning block (22); A bottom water tank positioning pin (31), the bottom water tank positioning pin (31) is arranged on the bottom water tank bracket (3), the bottom water tank positioning pin (31) is located directly below the bottom water tank positioning block (22), and after the crystallizer (1) and the bottom water tank (2) are hoisted and installed, the bottom water tank positioning pin (31) passes through the middle hole on the bottom water tank positioning block 22; A first sprue locating pin (611) and a second sprue locating pin (612), wherein the first sprue locating pin (611) and the second sprue locating pin (612) are respectively fixed in front of and behind the center of the third sprue plate (62); A high temperature resistant sealing ring (614) is respectively provided between the crystallizer external water inlet pipe (63), the crystallizer external water return pipe (64), the bottom water tank external water inlet pipe (65), the bottom water tank external water return pipe (66) of the second nozzle plate (61) and the first nozzle plate structure (5); Two hanging rings (15) are evenly distributed on the outer side of the upper end of the crystallizer (1).
