Steel beam cable-stayed bridge main beam assembling suspension equipment and using method

By using a mobile frame and suspension mechanism during the installation of the main beam of the steel beam cable-stayed bridge, and using components such as hydraulic telescopic rods and transmission guides to achieve accurate positioning of the main beam components, the problem of large installation errors of the main beam is solved and the elevation is increased Accuracy and structural stability.

CN118958142APending Publication Date: 2024-11-15NANJING YONGAN ENGINEERING TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411078950.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

During the installation of the main beam of the steel beam cable-stayed bridge, due to the large rise and fall of the suspension equipment and the transportation of bridge deck components, there are errors in the actual elevation and design elevation of the main beam, which is difficult to achieve accurate positioning, resulting in structural installation The overall error is relatively large.

Method used

Design a steel beam cable-stayed bridge main beam assembly suspension equipment including a mobile frame and a suspension mechanism. Through components such as hydraulic telescopic rods and transmission guides, the precise positioning and splicing of the main beam components can be achieved to ensure that the components to be installed and installed The components are always at the same level to reduce installation errors.

Benefits of technology

Through the installation of the suspension mechanism, the horizontal height of the main beam members can be kept consistent during the installation process, errors can be reduced, elevation accuracy can be improved, and the accuracy and stability of the main beam assembly can be ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958142A_ABST
    Figure CN118958142A_ABST
Patent Text Reader

Abstract

The invention relates to girder assembly suspension equipment for a girder cable-stayed bridge and a using method, the girder assembly suspension equipment comprises a moving frame, a suspension mechanism is arranged on the moving frame, the suspension mechanism comprises a plurality of fixing rods symmetrically mounted at the top of the moving frame, a fixing frame is mounted on one side of every two adjacent fixing rods, and a transmission guide rail is mounted at the bottom of each fixing frame; a plurality of first hydraulic telescopic rods are installed on the transmission guide rails, a first fixing plate is installed at the output ends of the first hydraulic telescopic rods, two first installation plates are installed at the bottom of the first fixing plate, and supporting frames are installed on the first installation plates. The main beam component can be positioned, the main beam component to be installed and the installed main beam component are located on the same horizontal height all the time, and therefore errors during installation are reduced, and certain elevation precision is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a main beam assembly suspension device for a steel beam cable-stayed bridge and a use method thereof. Background Art

[0002] A cable-stayed bridge is a highly statically indeterminate structure consisting of three basic components: a main tower, cable-stayed cables and a main beam. According to the different materials used in its construction, it can be divided into: concrete cable-stayed bridge, steel cable-stayed bridge, hybrid beam cable-stayed bridge and composite beam cable-stayed bridge. At present, the cantilever assembly method is mainly adopted for the superstructure construction of large-span steel beam cable-stayed bridges, and the corresponding bridge deck is installed and constructed after the steel beams are spliced.

[0003] To ensure the stability of the cable-stayed bridge, the installation elevation will be set when the main beam is installed. However, the suspension equipment installs and splices the main beam components one by one. Due to the large rise and fall of the suspension equipment and the impact of the transportation of the bridge deck components during the installation process, the equipment cannot accurately locate the installation height when suspending and assembling the main beam, resulting in an error between the actual elevation of the main beam after installation and the designed elevation. Since each steel component of the steel beam is very heavy, it is difficult to adjust once connected, which can easily lead to a large overall error after the structure is installed.

[0004] Therefore, it is urgent to improve to solve the above-mentioned problems. Summary of the invention

[0005] The purpose of the present invention is to provide a steel beam cable-stayed bridge main beam assembly suspension device and a use method. When assembling the main beam of the cable-stayed bridge, the main beam components can be positioned so that the main beam components to be installed and the installed main beam components are always at the same horizontal height, thereby reducing the error during installation and improving a certain elevation accuracy.

[0006] In order to achieve the above object, the main technical solutions adopted by the present invention include: A steel beam cable-stayed bridge main beam assembly suspension device, comprising a mobile frame, the mobile frame is provided with a suspension mechanism, the suspension mechanism comprises a plurality of fixed rods symmetrically installed on the top of the mobile frame, a fixed frame is installed on one side of two adjacent fixed rods, a transmission guide rail is installed at the bottom of the fixed frame, a plurality of first hydraulic telescopic rods are installed on the transmission guide rail, a first fixed plate is installed on the output end of the first hydraulic telescopic rod, two first mounting plates are installed at the bottom of the first fixed plate, a support frame is installed on the first mounting plate, a second hydraulic telescopic rod is installed on both sides of the support frame, two clamping plates connected to the second hydraulic telescopic rod are arranged inside the support frame, support plates are installed on both sides of the mobile frame, a plurality of third hydraulic telescopic rods are installed on the support plate, a second fixed plate is installed on the output end of the third hydraulic telescopic rod, a third fixed plate is installed on one side of the second fixed plate, two second mounting plates are installed on the top of the second fixed plate and the third fixed plate, and a plurality of rollers are installed on the second mounting plate.

[0007] Preferably, a plurality of slide grooves are provided on the first fixed plate, the second fixed plate and the third fixed plate, and the slide grooves are slidably connected to the first mounting plate and the second mounting plate, and fourth hydraulic telescopic rods are installed on both sides of the first fixed plate, the second fixed plate and the third fixed plate, the two support frames located on the first fixed plate are connected to the first mounting plate, and the fourth hydraulic telescopic rods located on the second fixed plate and the third fixed plate are connected to the second mounting plate.

[0008] Preferably, a plurality of fourth fixing plates are mounted on the surface of the second mounting plate, screw rods connected by threads are arranged on the fourth fixing plates, and two limiting blocks used in conjunction with the screw rods are mounted on the surface of the roller.

[0009] Preferably, a plurality of push rods are installed on one end of the fourth fixing plate, and the plurality of push rods are evenly distributed on the surface of one end of the fourth fixing plate.

[0010] Preferably, a plurality of positioning blocks are installed on the top of the second mounting plate, and a plurality of positioning plates engaging with the positioning blocks are installed on both sides of the roller.

[0011] Preferably, a rubber sleeve is provided on the roller.

[0012] Preferably, two first reinforcing rods are symmetrically installed between the plurality of fixing rods, and a plurality of second reinforcing rods are installed between the two first reinforcing rods.

[0013] Preferably, the first reinforcing rod and the second reinforcing rod are made of high tensile strength steel.

[0014] Preferably, a plurality of the second reinforcing rods are obliquely distributed between two of the first reinforcing rods, and a counterweight is provided on the movable frame.

[0015] Preferably, a method for using a steel beam cable-stayed bridge main beam assembly suspension device comprises the following steps: Step 1: The main beams on the cable-stayed bridge are spliced. After the first main beam is installed and fixed, the mobile frame is started to move the second fixed plate on the support plate to the bottom of the first main beam. The output end of the fourth hydraulic telescopic rod is started to push the second installation plate, driving multiple rollers to move to adjust its position to correspond to the main beam. Finally, the third hydraulic telescopic rod is started to drive the second fixed plate to rise until the multiple rollers on the second fixed plate are in contact with the bottom of the main beam. Step 2: Start the extension and push of the output end of the fourth hydraulic telescopic rod to push the first mounting plate to adjust the position of the clamping plate so that the position of the clamping plate corresponds to the position of the main beam, then start the first hydraulic telescopic rod to drive the first fixed plate to descend, so that the multiple clamping plates under the first fixed plate are all sleeved on the main beam, start the second hydraulic telescopic rod to drive the clamping plate to move, so that the multiple clamping plates clamp and fix the main beam, and finally start the first hydraulic telescopic rod to contract to lift the main beam; Step 3: Then start the transmission guide rail to move the main beam to the top of the third fixed plate, start the first hydraulic telescopic rod to move the main beam down to the third fixed plate, and the main beam is supported by multiple rollers on the third fixed plate. At the same time, the third fixed plate and the second fixed plate are on the same horizontal line, and the two main beams are also in a horizontal state, so the main beams can be spliced; Step 4: When splicing the third and subsequent main beams, start the mobile frame to drive the overall movement. At this time, the second fixed plate on the support plate relies on multiple rollers to fit the bottom of the spliced ​​main beam and move until the third fixed plate is moved to the splicing position and stops. Then repeat the operation of step 2 to lift the main beam to be spliced ​​for splicing.

[0016] Step 5: When the roller is damaged, twist the screw to make it rotate and move by relying on the thread between it and the fourth fixed plate until one end of the screw is separated from the limit block, and then the roller can be removed from the second mounting plate, which is convenient for replacement when the roller is damaged.

[0017] The present invention has at least the following beneficial effects: After the first main beam component is installed through the setting of the suspension mechanism, the mobile frame is started to move to extend the second fixed plate on the support plate to the bottom of the first main beam component, and the third hydraulic telescopic rod is started to drive the second fixed plate to rise so that multiple rollers on its top are in contact with the first main beam component, and then the first hydraulic telescopic rod is started to drive the first fixed plate to descend and the two second hydraulic telescopic rods are started to make the clamping plate clamp the main beam component to be assembled, and the bead curtain component assembled by the transmission guide rail and the first hydraulic telescopic rod is placed on the third fixed plate. At the same horizontal position, the component to be assembled placed on the third fixed plate is consistent with the horizontal height of the main beam component installed on the second fixed plate, and then the two main beam components can be assembled, and when installing the subsequent main beam components, the second fixed plate is adjusted to the bottom of the newly installed main beam component by starting the mobile frame to move and cooperating with the rollers set on the second fixed plate, so as to position the subsequent main beam component installation, so that the main beam component to be installed and the installed main beam component are always at the same horizontal height, thereby reducing the error during installation and improving a certain elevation accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings: Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the structure of the first fixing plate of the present invention; Figure 3 For the present invention Figure 2 Enlarged view of point A in the middle; Figure 4 It is a schematic diagram of the structure of the second fixing plate and the third fixing plate of the present invention; Figure 5 It is a schematic diagram of the roller structure of the present invention; Figure 6 It is a schematic diagram of the limit block structure of the present invention; Figure 7 It is a schematic diagram of the structure of the first reinforcing rod and the second reinforcing rod of the present invention.

[0019] In the figure, 1, mobile frame; 2, suspension mechanism; 3, fixed rod; 4, fixed frame; 5, transmission guide rail; 6, first hydraulic telescopic rod; 7, first fixed plate; 8, first mounting plate; 9, support frame; 10, second hydraulic telescopic rod; 11, clamping plate; 12, support plate; 13, third hydraulic telescopic rod; 14, second fixed plate; 15, third fixed plate; 16, second mounting plate; 17, roller; 18, slide; 19, fourth hydraulic telescopic rod; 20, fourth fixed plate; 21, screw; 22, limit block; 23, push rod; 24, positioning block; 25, positioning plate; 26, rubber sleeve; 27, first reinforcing rod; 28, second reinforcing rod. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0021] like Figure 1-Figure 7 As shown, this embodiment provides an embodiment of a steel beam cable-stayed bridge main beam assembly suspension device and a method of use.

[0022] A steel beam cable-stayed bridge main beam assembly suspension device comprises a mobile frame 1, on which a suspension mechanism 2 is arranged, the suspension mechanism 2 comprises a plurality of fixed rods 3 symmetrically mounted on the top of the mobile frame 1, a fixed frame 4 is mounted on one side of two adjacent fixed rods 3, a transmission guide rail 5 is mounted on the bottom of the fixed frame 4, a plurality of first hydraulic telescopic rods 6 are mounted on the transmission guide rail 5, a first fixed plate 7 is mounted on the output end of the first hydraulic telescopic rod 6, two first mounting plates 8 are mounted on the bottom of the first fixed plate 7, a support frame 9 is mounted on the first mounting plate 8, and second hydraulic telescopic rods 10 are mounted on both sides of the support frame 9.

[0023] Two clamping plates 11 connected to the second hydraulic telescopic rod 10 are arranged inside the support frame 9, support plates 12 are installed on both sides of the mobile frame 1, a plurality of third hydraulic telescopic rods 13 are installed on the support plate 12, a second fixed plate 14 is installed on the output end of the third hydraulic telescopic rod 13, a third fixed plate 15 is installed on one side of the second fixed plate 14, two second mounting plates 16 are installed on the top of the second fixed plate 14 and the third fixed plate 15, and a plurality of rollers 17 are installed on the second mounting plate 16.

[0024] Through the setting of the suspension mechanism 2, after the first main beam component is installed, the mobile frame 1 is started to move and extend the second fixed plate 14 on the support plate 12 to the bottom of the first main beam component, and the third hydraulic telescopic rod 13 is started to drive the second fixed plate 14 to rise so that the multiple rollers 17 on the top are in contact with the first main beam component, and then the first hydraulic telescopic rod 6 is started to drive the first fixed plate 7 to descend and the two second hydraulic telescopic rods 10 are started to make the clamping plate 11 clamp the main beam component to be assembled, and the bead curtain component assembled on the transmission guide rail 5 and the first hydraulic telescopic rod 6 is placed on the third fixed plate 15.

[0025] Since the heights of the second fixing plate 14 and the third fixing plate 15 are at the same level, the components to be assembled placed on the third fixing plate 15 are at the same level as the main beam components installed on the second fixing plate 14, and then the two main beam components can be assembled. When installing subsequent main beam components, the second fixing plate 14 is adjusted to the bottom of the newly installed main beam component by starting the movement of the mobile frame 1 and cooperating with the roller 17 provided on the second fixing plate 14, so as to position the subsequent main beam component installation, so that the main beam component to be installed and the installed main beam component are always at the same level, thereby reducing the error during installation and improving a certain elevation accuracy.

[0026] In this embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown, a plurality of slide grooves 18 are provided on the first fixed plate 7, the second fixed plate 14 and the third fixed plate 15, and the slide grooves 18 are slidably connected to the first mounting plate 8 and the second mounting plate 16. Fourth hydraulic telescopic rods 19 are installed on both sides of the first fixed plate 7, the second fixed plate 14 and the third fixed plate 15, the two support frames 9 located on the first fixed plate 7 are connected to the first mounting plate 8, the fourth hydraulic telescopic rod 19 located on the second fixed plate 14 and the third fixed plate 15 is connected to the second mounting plate 16, and a plurality of fourth fixed plates 20 are installed on the surface of the second mounting plate 16, and the fourth fixed plate 20 is provided with screws 21 connected by threads.

[0027] Two limit blocks 22 used in conjunction with the screw rod 21 are installed on the surface of the roller 17, a plurality of push rods 23 are installed on one end of the fourth fixed plate 20, and the plurality of push rods 23 are evenly distributed on the surface of one end of the fourth fixed plate 20, a plurality of positioning blocks 24 are installed on the top of the second mounting plate 16, and a plurality of positioning plates 25 engaged with the positioning blocks 24 are installed on both sides of the roller 17. Through the arrangement of the slide slot 18 and the fourth hydraulic telescopic rod 19, the position of the support frame 9 slidably mounted on the first mounting plate 8 and the second mounting plate 16 can be adjusted under the telescopic push of the output end of the fourth hydraulic telescopic rod 19, thereby adjusting the positions of the plurality of support frames 9 and the plurality of rollers 17, so that they can adapt to the use of main beam components of different widths.

[0028] By setting the fourth fixing plate 20, the screw rod 21 and the limit block 22, the roller 17 is installed on the second mounting plate 16 after one end of the screw rod 21 is connected to the limit block 22. After one end of the screw rod 21 is separated from the limit block 22, the roller 17 can be removed from the second mounting plate 16, which is convenient for replacing the roller 17 when it is damaged. By setting the push rod 23, it is convenient to push the screw rod 21 to rotate. By setting the positioning block 24 and the positioning plate 25, it can play a positioning role when replacing and installing multiple rollers 17, and it is easy to install the roller 17.

[0029] In this embodiment, Figure 1 , Figure 5 , Figure 6 and Figure 7 As shown, a rubber sleeve 26 is sleeved on the roller 17, two first reinforcing rods 27 are symmetrically installed between the multiple fixed rods 3, and multiple second reinforcing rods 28 are installed between the two first reinforcing rods 27. The first reinforcing rods 27 and the second reinforcing rods 28 are made of high-tensile strength steel, and the multiple second reinforcing rods 28 are obliquely distributed between the two first reinforcing rods 27. A counterweight is provided on the mobile frame 1. The rubber sleeve 26 can protect the surface of the main beam component to prevent the roller 17 from causing wear to it. The first reinforcing rods 27 and the second reinforcing rods 28 can increase the support strength of the multiple fixed rods 3 to prevent bending and fracture.

[0030] In this embodiment, if Figure 1-Figure 7 As shown, the present embodiment provides a method for using a steel beam cable-stayed bridge main beam assembly suspension device, and the working process is as follows: Step 1: The main beams on the cable-stayed bridge are spliced. After the first main beam is installed and fixed, the mobile frame 1 is started to move the second fixed plate 14 on the support plate 12 to the bottom of the first main beam, and the output end of the fourth hydraulic telescopic rod 19 is started to push the second mounting plate 16, driving multiple rollers 17 to move to adjust their positions to correspond to the main beam. Finally, the third hydraulic telescopic rod 13 is started to drive the second fixed plate 14 to rise until the multiple rollers 17 on the second fixed plate 14 are in contact with the bottom of the main beam.

[0031] Step 2, start the telescopic push of the output end of the fourth hydraulic telescopic rod 19, push the first mounting plate 8 to adjust the position of the splint 11, so that the position of the splint 11 corresponds to the position of the main beam, and then start the first hydraulic telescopic rod 6 to drive the first fixed plate 7 to descend, so that the multiple splints 11 under the first fixed plate 7 are all mounted on the main beam, start the second hydraulic telescopic rod 10 to drive the splint 11 to move, so that the multiple splints 11 clamp and fix the main beam, and finally start the first hydraulic telescopic rod 6 to contract to lift the main beam.

[0032] Step 3, then start the transmission guide rail 5 to move the main beam to the top of the third fixed plate 15, start the first hydraulic telescopic rod 6 to move the main beam from the bottom to the third fixed plate 15, and the main beam is supported by multiple rollers 17 on the third fixed plate 15. At the same time, the third fixed plate 15 and the second fixed plate 14 are on the same horizontal line, and the two main beams are also in a horizontal state, so the main beams can be spliced.

[0033] Step 4: When splicing the third and subsequent main beams, start the mobile frame 1 to drive the overall movement. At this time, the second fixed plate 14 on the support plate 12 relies on multiple rollers 17 to fit the bottom of the spliced ​​main beam and move until the third fixed plate 15 is moved to the splicing position and then stops. Then repeat the operation of step 2 to lift the main beam to be spliced ​​for splicing.

[0034] Step 5: When the roller 17 is damaged, twist the screw 21 to make it rotate and move by relying on the thread between it and the fourth fixed plate 20 until one end of the screw 21 is separated from the limit block 22, and then the roller 17 can be removed from the second mounting plate 16, so as to facilitate replacement when the roller 17 is damaged.

[0035] In summary, in this embodiment, according to a steel beam cable-stayed bridge main beam assembly suspension device and a method of use of this embodiment, by setting the slide slot 18 and the fourth hydraulic telescopic rod 19, under the telescopic push of the output end of the fourth hydraulic telescopic rod 19, the position of the support frame 9 slidably mounted on the first mounting plate 8 and the second mounting plate 16 can be adjusted, thereby adjusting the positions of multiple support frames 9 and multiple rollers 17, so that they can adapt to the use of main beam components of different widths. By setting the fourth fixing plate 20, the screw rod 21 and the limit block 22, one end of the screw rod 21 is connected to the limit block 22, and the roller 17 is installed on the second mounting plate 16. After one end of the screw rod 21 is separated from the limit block 22, the roller 17 can be removed from the second mounting plate 16, which is convenient for replacing the roller 17 when it is damaged. The setting of the push rod 23 facilitates the screw rod 21 to be pushed and rotated. The setting of the positioning block 24 and the positioning plate 25 can play a positioning role when multiple rollers 17 are replaced and installed, and the roller 17 is easy to install. The setting of the rubber sleeve 26 can protect the surface of the main beam component to prevent the roller 17 from causing wear on it. The setting of the first reinforcing rod 27 and the second reinforcing rod 28 can increase the supporting strength of multiple fixing rods 3 to prevent bending and breakage.

[0036] For example, certain words are used in the specification and claims to refer to specific components. Those skilled in the art should understand that hardware manufacturers may use different terms to refer to the same component. This specification and claims do not use differences in names as a way to distinguish components, but use differences in the functions of components as the criteria for distinction. For example, "including" mentioned throughout the specification and claims is an open term, so it should be interpreted as "including but not limited to". "Approximately" means that within an acceptable error range, those skilled in the art can solve technical problems within a certain error range and basically achieve technical effects.

[0037] It should be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a product or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such product or system. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the product or system including the elements.

[0038] The above description shows and describes several preferred embodiments of the present invention, but as mentioned above, it should be understood that the present invention is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the invention concept described herein through the above teachings or the technology or knowledge of the relevant field. Changes and variations made by those skilled in the art do not depart from the spirit and scope of the present invention, and should be within the scope of protection of the claims attached to the present invention.

Claims

1. A steel beam cable-stayed bridge main beam assembly suspension device, comprising a mobile frame (1), characterized in that: The mobile frame (1) is provided with a suspension mechanism (2), the suspension mechanism (2) comprising a plurality of fixed rods (3) symmetrically mounted on the top of the mobile frame (1), a fixed frame (4) being mounted on one side of two adjacent fixed rods (3), a transmission guide rail (5) being mounted on the bottom of the fixed frame (4), a plurality of first hydraulic telescopic rods (6) being mounted on the transmission guide rail (5), a first fixed plate (7) being mounted on the output end of each of the first hydraulic telescopic rods (6), two first mounting plates (8) being mounted on the bottom of the first fixed plate (7), a support frame (9) being mounted on the first mounting plate (8), and second hydraulic The movable frame (1) is provided with a hydraulic telescopic rod (10), two clamping plates (11) connected to the second hydraulic telescopic rod (10) are arranged inside the support frame (9), support plates (12) are installed on both sides of the movable frame (1), a plurality of third hydraulic telescopic rods (13) are installed on the support plates (12), a second fixing plate (14) is installed on the output end of the third hydraulic telescopic rod (13), a third fixing plate (15) is installed on one side of the second fixing plate (14), two second mounting plates (16) are installed on the top of the second fixing plate (14) and the third fixing plate (15), and a plurality of rollers (17) are installed on the second mounting plate (16).

2. The main beam assembly suspension equipment for a steel beam cable-stayed bridge according to claim 1, characterized in that: The first fixed plate (7), the second fixed plate (14) and the third fixed plate (15) are each provided with a plurality of slide grooves (18), and the slide grooves (18) are all slidably connected to the first mounting plate (8) and the second mounting plate (16). Fourth hydraulic telescopic rods (19) are each installed on both sides of the first fixed plate (7), the second fixed plate (14) and the third fixed plate (15), and the two support frames (9) located on the first fixed plate (7) are connected to the first mounting plate (8), and the fourth hydraulic telescopic rods (19) located on the second fixed plate (14) and the third fixed plate (15) are connected to the second mounting plate (16).

3. The main beam assembly suspension equipment for a steel beam cable-stayed bridge according to claim 1, characterized in that: A plurality of fourth fixing plates (20) are mounted on the surface of the second mounting plate (16), a screw rod (21) connected by threads is provided on the fourth fixing plate (20), and two limit blocks (22) used in conjunction with the screw rod (21) are mounted on the surface of the roller (17).

4. The main beam assembly suspension equipment for a steel beam cable-stayed bridge according to claim 3 is characterized by: A plurality of push rods (23) are mounted on one end of the fourth fixing plate (20), and the plurality of push rods (23) are evenly distributed on the surface of one end of the fourth fixing plate (20).

5. The main beam assembly and suspension equipment for a steel beam cable-stayed bridge according to claim 1 is characterized by: A plurality of positioning blocks (24) are mounted on the top of the second mounting plate (16), and a plurality of positioning plates (25) that engage with the positioning blocks (24) are mounted on both sides of the roller (17).

6. The main beam assembly suspension equipment for a steel beam cable-stayed bridge according to claim 1, characterized in that: The roller (17) is sleeved with a rubber sleeve (26).

7. The main beam assembly and suspension equipment for a steel beam cable-stayed bridge according to claim 1, characterized in that: Two first reinforcing rods (27) are symmetrically mounted between the plurality of fixing rods (3), and a plurality of second reinforcing rods (28) are mounted between the two first reinforcing rods (27).

8. The main beam assembly and suspension equipment for a steel beam cable-stayed bridge according to claim 7, characterized in that: The first reinforcing rod (27) and the second reinforcing rod (28) are made of high tensile strength steel.

9. The main beam assembly and suspension equipment for a steel beam cable-stayed bridge according to claim 8, characterized in that: A plurality of the second reinforcing rods (28) are distributed obliquely between the two first reinforcing rods (27), and a counterweight is provided on the mobile frame (1).

10. The method for using the steel beam cable-stayed bridge main beam assembly suspension device according to claim 1, characterized in that: The following steps are involved: Step 1: The main beams on the cable-stayed bridge are spliced. After the first main beam is installed and fixed, the moving frame (1) is started to move the second fixing plate (14) on the support plate (12) to the bottom of the first main beam. The output end of the fourth hydraulic telescopic rod (19) is started to push the second mounting plate (16) to drive the plurality of rollers (17) to move to adjust their positions to correspond to the main beam. Finally, the third hydraulic telescopic rod (13) is started to drive the second fixing plate (14) to rise until the plurality of rollers (17) on the second fixing plate (14) are in contact with the bottom of the main beam. Step 2: Start the telescopic push of the output end of the fourth hydraulic telescopic rod (19), push the first mounting plate (8) to adjust the position of the clamping plate (11), so that the position of the clamping plate (11) corresponds to the position of the main beam, then start the first hydraulic telescopic rod (6) to drive the first fixed plate (7) to descend, so that the multiple clamping plates (11) below the first fixed plate (7) are all sleeved on the main beam, start the second hydraulic telescopic rod (10) to drive the clamping plate (11) to move, so that the multiple clamping plates (11) clamp and fix the main beam, and finally start the first hydraulic telescopic rod (6) to retract to lift the main beam; Step 3: Then start the transmission guide rail (5) to move the main beam to the top of the third fixed plate (15), start the first hydraulic telescopic rod (6) to move the main beam from the bottom to the third fixed plate (15), and support the main beam with a plurality of rollers (17) on the third fixed plate (15). At the same time, the third fixed plate (15) and the second fixed plate (14) are on the same horizontal line, and the two main beams are also in a horizontal state, so the main beams can be spliced; Step 4: When splicing the third and subsequent main beams, start the moving frame (1) to drive the overall movement. At this time, the second fixing plate (14) on the support plate (12) moves on the bottom of the spliced ​​main beam by means of a plurality of rollers (17) until the third fixing plate (15) is moved to the splicing position and then stops. Then repeat the operation of step 2 to lift the main beam to be spliced ​​for splicing. Step 5: When the roller (17) is damaged, twist the screw (21) to rotate and move it by relying on the thread between it and the fourth fixing plate (20) until one end of the screw (21) is separated from the limit block (22), and then the roller (17) can be removed from the second mounting plate (16), so that it is easy to replace the roller (17) when it is damaged.