Differential settlement prevention structure for rigid structure of underpass airport runway section and backfilling method
By excavating steps on the periphery of the rigid structure of the airport runway section and setting up geogrids and steel mesh, combined with special backfill materials and layered filling technology, the differential settlement problem was solved, achieving a more uniform and stable backfill effect, and improving Foundation bearing capacity and construction quality.
Patent Information
- Application Number
- CN202411354002.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2024-11-15
AI Technical Summary
The existing technology cannot effectively control the differential settlement of airport runway sections, and the traditional backfill method cannot meet the requirements of modern engineering construction, resulting in uneven settlement of runway surfaces and non-tunnel areas, which has a great impact.
Adopt a rigid structure to prevent differential settlement structure of the underpass airport runway section, including expanding excavation steps outside the outer periphery of the rigid structure, and setting up a bidirectional geogrid and steel mesh on the roof panel, using mixed backfill materials and layered filling technology, combined with milling Press and compact to ensure uniformity and rigidity of backfill soil.
It effectively prevents uneven settlement of soil foundations on both sides of the backfill soil on the top of the tunnel, reduces the risk of differential settlement, improves the backfill effect and foundation bearing capacity, meets the design requirements, and ensures the stability and construction quality of the airport runway section.
Smart Images

Figure CN118958259A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of airport construction, and in particular to a rigid structure for preventing differential settlement of a section of an airport runway and a backfilling method. Background Art
[0002] With the expansion of airport construction in my country, the increase in population density and the improvement of channel facilities, Hohhot New Airport is the first high-speed rail channel in China to pass under the airport runway section. Currently, there is little research on the differential settlement structure of the airport runway section, and its settlement control is particularly important. There is no unified standard for airport runway foundation settlement control in China. The traditional backfill method cannot adapt to the current engineering construction requirements and has a great impact. The uneven settlement of the runway pavement and the non-tunnel area pavement has always been a major problem faced by runway construction. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a rigid structure for preventing differential settlement of the runway soil foundation on both sides of the tunnel top backfill and uneven settlement of the structural top plate soil itself, which can prevent the runway soil foundation on both sides of the tunnel top backfill from unevenly settling and the backfill method of the rigid structure for preventing differential settlement of the runway soil foundation on both sides of the tunnel top backfill and uneven settlement of the structural top plate soil itself.
[0004] A first aspect of the present invention provides a rigid structure for preventing differential settlement of a section of a runway under an airport, comprising a step, wherein the step is opened outward along the outer periphery of the rigid structure, the bottom surface of the step is flush with the top plate of the rigid structure, and the top surface of the step is flush with the roadbed, a bidirectional geogrid is arranged on the top plate of the rigid structure, a steel mesh is arranged on the upper surface of the bidirectional geogrid, and the bidirectional geogrid is uniformly arranged from the top plate of the rigid structure to the roadbed, concrete is sprayed on the excavated vertical surface of the step, and compacted backfill material is arranged between the bottom layer of the step and the rigid structure.
[0005] Optionally, the step expands outwards on both sides of the top plate by a distance equal to 10 m plus twice the backfill depth, the width and length of the step are both 2 m, the height is 1 m, and the outward slope is 2% to 4%.
[0006] Optionally, the concrete is C25 concrete with a spraying thickness of 50 mm.
[0007] Optionally, the backfill material includes lean concrete and lime soil, the lean concrete is laid on top of the lime soil, and the laying thickness of the lime soil is 30 cm. The lime soil adopts a lime soil ratio of 3:7, and the strength of the lean concrete is ≥3MPa.
[0008] Optionally, the size of the bidirectional geogrid is 5×5 cm, the diameter of the steel mesh is 6 mm, and the spacing is 10×10 cm;
[0009] The longitudinal and transverse tensile strength of the bidirectional geogrid is ≥50KN / m, the tensile strength when the longitudinal and transverse elongation is 2% is ≥17.5KN / m, the tensile strength when the longitudinal and transverse elongation is 5% is ≥35KN / m, the longitudinal nominal elongation is ≤15%, the transverse nominal elongation is ≤13%, the longitudinal and transverse overlap lengths should be ≥30cm, and the overlaps are fixed to the underlying soil layer with U-shaped iron nails, with an anchor spacing of 50cm. The U-shaped iron nails are made of φ8 steel bars, with a single foot height of ≥35cm and a width of 5 to 8cm.
[0010] A second aspect of the present invention provides a method for backfilling a rigid structure for preventing differential settlement of a section under a runway of an airport, which is based on the rigid structure for preventing differential settlement of a section under a runway of an airport as described in any one of the above items, and includes the following steps:
[0011] S1. Clean the foundation pit and clean up the debris at the bottom of the foundation pit before backfilling;
[0012] S2. Remove the cushion layer and water-stabilizing layer within the runway area;
[0013] S3. Clean the gap between the side wall and the ground-connected wall, seal it with asphalt hemp, and backfill and compact it after it dries;
[0014] S4, excavating the steps;
[0015] S5. Before backfilling, lay a layer of the bidirectional geogrid, lay a layer of the steel mesh on the bidirectional geogrid, and then lay a layer of the bidirectional geogrid every 60 cm of backfill. The return length of the bidirectional geogrid is 2.5 m and the overlap length is 300 mm.
[0016] S6. Transport and lay out the raw soil. Use lime lines to make a grid. According to the thickness of the press and the amount of soil transported per truck, determine the unloading area of the truck to be 13.5×6m. The raw soil is transported to the site by a dump truck and flattened by a bulldozer. One truck of raw soil is poured into each 13.5×6m square.
[0017] S7, backfill material mixing, the backfill material includes cement, fly ash and sandy soil, with cement accounting for 3%, fly ash accounting for 3%, and its maximum dry density is 1.95g / m 3 The unconfined compressive strength is 2.2MP. Before mixing, the water content of the sandy soil is measured at the optimum water content of about 10% ± 2%. The cement and fly ash are mixed and transported to the construction site. After being mixed evenly by a road mixer, the dosage is measured. The backfill material is evenly spread at 25kg per square meter.
[0018] S8, Layered filling: fill the roadbed with soil in layers longitudinally across the full width of the cross section, using the same filler material for each layer and compacting it, with the thickness of each layer ≤30cm;
[0019] S9, paving and leveling, using a loader and a grader to spread the backfill material evenly according to a reasonable layer thickness;
[0020] S10, rolling and compacting, using a 23T roller to roll, first use the roller to roll statically once, the rolling speed is 1.5-1.7 km / h, the rolling order is rolling from both sides of the foundation pit to the center, the wheel tracks of the roller overlap ≥ 0.3m, the wheel tracks of the roller overlap 0.4-0.5m at the transverse joint, rolling slowly at first and then fast, rolling 3-5 times, the speed is 1.8-2.2 km / h, and finally use the roller to roll statically once, the speed is 2.5 km / h;
[0021] S11. Compactness test: the compaction degree of each backfill layer shall not be less than 95%, and the unconfined compressive strength shall not be less than 2.2MPa.
[0022] Optionally, the backfill material includes 3% cement, 3% fly ash and sandy soil, and the maximum dry density of the backfill material is 1.95g / m 3 , the unconfined compressive strength is 2.2MP.
[0023] Optionally, after the gap between the side wall and the ground-connected wall is sealed, a waterproof board is provided on the outside thereof.
[0024] Optionally, step S8 adopts the following method: 6% backfill material is used for backfilling within 1m from the top plate of the rigid structure, and the compaction degree is 95%. The remaining range is backfilled with original soil. The compaction degree is ≥96% when the backfill is 0-4m below the ground, and the compaction degree is ≥95% when the backfill is >4m below the ground. The remaining range of the runway section is backfilled with ordinary soil, and the backfill compaction degree is ≥93%.
[0025] Optionally, the step S11 adopts the following method: during the rolling process, the compaction degree is detected once by the sand filling method each time the rolling is carried out, and the compaction degree is calculated. After the compaction degree reaches the requirement, the compaction passes when the compaction degree is 94%, 95%, and 96% are recorded respectively. If the static rolling cannot reach the compaction degree of 95%, the virtual paving thickness is reduced to 24 cm, and compaction is restarted until the compaction requirement is met.
[0026] Compared with the prior art, the technical solution provided by the embodiment of the present invention has the following beneficial effects:
[0027] The embodiment of the present invention provides a rigid structure for preventing differential settlement of a section of a runway under an airport and a backfilling method. The structure excavates steps in a reverse direction by expanding the periphery of the rigid structure so that the bottom of the steps is flush with the top plate of the rigid structure and the top of the steps is flush with the roadbed, thereby expanding the range of backfilling and increasing the backfilling area. The backfilling is flexible and the rigid structure is rigid. When there is a difference in settlement between the rigid structure and the soil on both sides of the rigid structure, cracks will appear. The flexible backfilling can reduce the reflected cracks reflected above the backfill soil, and at the same time reduce the density difference between the backfill soil on the top of the rigid structure and the backfill soil outside the rigid structure, thereby ensuring the stability of the working surface and reducing settlement. In order to reduce the risk of backfill, before backfilling, the rigidity of the backfill soil is increased by setting bidirectional geogrid and steel mesh on the top plate of the rigid structure. After that, a layer of bidirectional geogrid is laid for each backfill layer. The bidirectional geogrid provides a greater constraint on the backfill soil and reduces the vertical stress and shear stress in the backfill soil, thereby preventing the soil above the top plate of the rigid structure from settling unevenly and effectively controlling the differential settlement. Concrete is sprayed on the excavated facade of the step to protect the facade of the step and enhance the stability of the step structure. Compacted backfill material is set between the bottom layer of the step and the rigid structure to prevent uneven settlement of the soil around the rigid structure.
[0028] The backfill method provided in the embodiment of the present invention utilizes original soil, i.e. sandy soil, cement and fly ash as backfill materials, wherein cement accounts for 3% and fly ash accounts for 3%. Compared with traditional materials, it has less pollution, and determines its maximum dry density and unconfined compressive strength, meets the support capacity and operation requirements, meets the protection of differential settlement between the runway pavement and the non-tunnel area pavement, reduces the risk of settlement, and effectively tests the main structure backfill materials by adjusting the layered paving thickness and the number of rolling times and comparing them, so that the backfill effect, foundation bearing capacity and post-construction settlement can meet the design requirements. This backfill method ensures the overall backfill quality of the top plate of the main structure of the airport runway section, and effectively improves the quality of earthwork construction before large-area filling construction, which is beneficial to treating foundations with large pavement loads such as airport runways. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.
[0030] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0031] Figure 1This is a schematic diagram of the layout of an airport runway according to an embodiment of the present invention;
[0032] Figure 2 This is a schematic diagram of layered filling according to an embodiment of the present invention;
[0033] Figure 3 This is a schematic diagram of step excavation according to an embodiment of the present invention;
[0034] Figure 4 This is a flow chart of a method for backfilling a rigid structure under an airport runway to prevent differential settlement according to an embodiment of the present invention.
[0035] Among them, 1. steps; 2. rigid structure; 3. roadbed; 4. bidirectional geogrid; 5. concrete; 6. lean concrete; 7. gray soil; 8. ground-anchored wall; 9. waterproof board; 10. tunnel; 11. backfill material backfill area; 12. runway; 13. original soil backfill area. DETAILED DESCRIPTION
[0036] In order to more clearly understand the above-mentioned objectives, features and advantages of the present invention, the scheme of the present invention will be further described below. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict.
[0037] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein; it is obvious that the embodiments in the specification are only part of the embodiments of the present invention, rather than all of the embodiments.
[0038] Reference Figures 1 to 3 As shown, the first aspect of this embodiment provides a rigid structure for preventing differential settlement of a section of a runway under an airport, including a step 1, which is opened along the outer periphery of a rigid structure 2, and whose bottom surface is flush with the top plate of the rigid structure 2, and whose top surface is flush with the roadbed 3. A bidirectional geogrid 4 is arranged on the top plate of the rigid structure 2, and a steel mesh is arranged on the upper surface of the bidirectional geogrid 4, and the bidirectional geogrid 4 is evenly arranged along the direction from the top plate of the rigid structure 2 to the roadbed 3. Concrete 5 is sprayed on the excavated vertical surface of the step 1, and compacted backfill material is arranged between the bottom layer of the step 1 and the rigid structure 2.
[0039] Specifically, by excavating the step 1 in the reverse direction outwardly around the rigid structure 2, the bottom of the step 1 is flush with the top plate of the rigid structure 2, and the top of the step 1 is flush with the roadbed 3, thereby expanding the range of backfill and increasing the backfill area. The backfill is flexible, and the rigid structure 2 is rigid. When there is a difference in soil settlement above the rigid structure 2 and on both sides of the rigid structure 2, cracks will appear. Flexible backfill can reduce the reflected cracks reflected above the backfill soil, and at the same time reduce the density difference between the backfill soil on the top of the rigid structure 2 and the backfill soil outside the rigid structure 2, thereby ensuring the stability of the working surface and reducing the risk of settlement. Before backfilling, the rigid structure 2 is used to make the backfill soil more stable. A bidirectional geogrid 4 and a steel mesh are set on the top plate to increase the rigidity of the backfill soil. After that, a layer of bidirectional geogrid 4 is laid for each backfill layer. The bidirectional geogrid 4 provides a greater restraint effect on the backfill soil, while reducing the vertical stress and shear stress in the backfill soil, thereby preventing the soil above the top plate of the rigid structure 2 from undergoing uneven settlement, effectively controlling the differential settlement, and protecting the facade of the step 1 by spraying concrete 5 on the excavated facade of the step 1, thereby enhancing the stability of the step 1 structure, and preventing uneven settlement of the soil around the rigid structure 2 by arranging compacted backfill material between the bottom layer of the step 1 and the rigid structure 2.
[0040] Further, see Figure 2 As shown, step 1 expands outwards to both sides of the top plate by 10m plus twice the backfill depth, the width and length of step 1 are both 2m, the height is 1m, and the outward slope is 2% to 4%.
[0041] Reference Figure 3 As shown, concrete 5 is C25 concrete with a spraying thickness of 50 mm.
[0042] Continue to refer to Figure 2 As shown, the backfill material includes lean concrete 6 and ash soil 7. The lean concrete 6 is laid on top of the ash soil 7, and the laying thickness of the ash soil 7 is 30 cm. The ash soil 7 is made of ash soil mixed and compacted in a ratio of lime to soil of 3:7. The strength of the lean concrete 6 is ≥3MPa.
[0043] In some embodiments, the size of the bidirectional geogrid 4 is 5×5cm, the diameter of the steel mesh is 6mm, the spacing is 10×10cm, the longitudinal and transverse tensile strength of the bidirectional geogrid 4 is ≥50KN / m, the tensile strength when the longitudinal and transverse elongation is 2% is ≥17.5KN / m, the tensile strength when the longitudinal and transverse elongation is 5% is ≥35KN / m, the longitudinal nominal elongation is ≤15%, the transverse nominal elongation is ≤13%, the longitudinal and transverse overlap lengths should be ≥30cm, and the overlaps are fixed to the underlying soil layer with U-shaped iron nails, the anchor spacing is 50cm, the U-shaped iron nails are made of φ8 steel bars, the single foot height is ≥35cm, and the width is 5~8cm.
[0044] Reference Figure 4 As shown, the second aspect of this embodiment provides a method for backfilling a rigid structure under a section of an airport runway to prevent differential settlement, which is based on the above-mentioned rigid structure for preventing differential settlement of a section of an airport runway, and includes the following steps:
[0045] S1. Clean the foundation pit. Before backfilling, clean the debris at the bottom of the foundation pit. Use a 260 excavator to clean it. After cleaning, store the eroded soil in a designated place. Silt, silt, miscellaneous fill soil and humus soil with an organic matter content of more than 5% dug out on site cannot be used as backfill soil. Check and maintain the mechanical equipment. If the backfill base is uneven or has a concave problem, repair and level it;
[0046] S2. Remove the cushion layer and water-stabilizing layer within the scope of runway 12. The ground-connected wall above the top plate of tunnel 10 in section 12 of runway will be removed by static cutting instead of vibrating crushing equipment to reduce the impact on the completed main structure. After the top plate is backfilled in layers, the cushion layer and water-stabilizing layer will be restored according to the original drawings of section 12 of runway;
[0047] S3, clean the gap between the side wall and the ground-connected wall 8, seal it with asphalt hemp, and set a waterproof board 9 on the outside to prevent water leakage in the gap in the future. After drying, backfill and compact the filler. First, backfill 30cm thick 3:7 lime soil 7 and compact it, and then backfill with lean concrete 6 until it is flush with the top of the rigid structure 2;
[0048] S4, excavate step 1, expand the top plate of rigid structure 2 outwards by ≥10m on both sides before backfilling, add twice the backfill depth, the width and length of step 1 are both 2m, the height is 1m, and the outward slope is 2% to 4%, and spray 50mm thick C25 concrete on the excavated facade of step 1;
[0049] S5. Before backfilling, lay a layer of bidirectional geogrid 4, lay a layer of steel mesh on the top of the bidirectional geogrid 4, and then lay a layer of bidirectional geogrid 4 every 60 cm of backfill. The folding length of the bidirectional geogrid 4 is 2.5 m, and the overlap length is 300 mm.
[0050] S6. Transport and lay out the raw soil. Use lime lines to make a grid. According to the thickness of the press and the amount of soil transported per truck, determine the unloading area of the truck to be 13.5×6m. The raw soil is transported to the site by a dump truck and flattened by a bulldozer. One truck of raw soil is poured into each 13.5×6m square.
[0051] S7. Mix the backfill materials. The backfill materials include 3% cement, 3% fly ash and sandy soil. The maximum dry density of the backfill materials is 1.95g / m 3The unconfined compressive strength is 2.2MP. Before mixing, the water content of sandy soil is measured to be around the optimum water content of 10%±2%. If it is not satisfied, it is ensured that the water content meets the requirements by drying or watering. The backfill material is mixed off-site, and the cement parameter is mixed at a mass ratio of 6.5% to 7%. Ensure that the cement dosage is ≥6% after the actual mixing is completed. The cement and fly ash are mixed and transported to the construction site. After being mixed evenly by a road mixer, the dosage is measured, and the backfill material is evenly spread at 25kg per square meter.
[0052] S8, Layered filling: fill the entire width of the roadbed 3 cross section with longitudinal layers, use the same filler for each layer, and compact it. The thickness of each layer is ≤30cm. Figure 2 As shown, specifically, 6% backfill material is used to backfill the area 1m away from the top plate of the rigid structure 2, that is, Figure 2 The backfill area 11 shown in the figure has a compaction degree of 95%. When the backfill material is compacted, the integrity is enhanced. At the same time, laying a bidirectional geogrid 4 on this layer increases the integrity and reduces the uneven settlement of the top of the rigid structure 2 and the backfill soil on both sides. The rest of the area is backfilled with original soil, that is, Figure 2 The original soil backfill area 13 shown in the figure has a compaction degree of ≥96% when the backfill is 0 to 4 m below the ground surface, and a compaction degree of ≥95% when the backfill is >4 m below the ground surface. The rest of the runway section 12 is backfilled with ordinary soil, and the backfill compaction degree is ≥93%;
[0053] S9, paving and leveling, using a loader and a grader to spread the backfill material evenly according to a reasonable layer thickness;
[0054] S10. Rolling and compaction. Rolling is done with a 23T roller. First, use the roller to roll statically once. The rolling speed is 1.5-1.7 km / h. The rolling order is from both sides of the foundation pit to the center. The wheel tracks of the roller overlap ≥0.3m. When making transverse joints, the wheel tracks of the roller overlap 0.4-0.5m to achieve the purpose of stabilizing pressure. At the same time, the roller should start and brake slowly. Roll the road slowly first and then quickly. Roll 3-5 times at a speed of 1.8-2.2 km / h. Finally, use the roller to roll statically once at a speed of 2.5 km / h to achieve the purpose of smooth surface and eliminate obvious wheel tracks. The entire compaction width is not less than the designed width. The compaction surface has no leakage and no dead angle. In accordance with the principle of "light first and heavy later, slow first and fast later, both sides first and the middle later", each round overlaps by one third, and turning around is strictly prohibited to achieve no leakage and no dead angle, and ensure uniform rolling until the specified compaction degree is reached;
[0055] S11. Compactness test: the compactness of each backfill layer shall not be less than 95%, and the unconfined compressive strength shall not be less than 2.2MPa. Specifically, after the backfill is completed, the backfill part shall be tested for compactness as required. The test requirement is every 1000m 2Three points were tested and the compaction degree was 95%. During the rolling process, the compaction degree was tested once with the sand filling method after each rolling and the compaction degree was calculated. After the compaction degree reached the requirement, the number of compaction passes when the compaction degree was 94%, 95% and 96% were recorded respectively. If the static rolling could not reach the compaction degree of 95%, the virtual paving thickness would be reduced to 24cm and compaction would be restarted until the compaction requirement was met.
[0056] The backfill material provided in this implementation utilizes original soil, i.e. sandy soil, cement and fly ash as backfill materials, of which cement accounts for 3% and fly ash accounts for 3%. Compared with traditional materials, it has less pollution, and its maximum dry density and unconfined compressive strength are determined to meet the supporting capacity and operational requirements, meet the protection of the differential settlement of runway 12 pavement and the non-tunnel area pavement, and reduce the risk of settlement.
[0057] This backfill method expands the backfill range by excavating steps 1 outwardly on the periphery of the rigid structure 2, and lays bidirectional geogrids 4 and steel mesh at intervals above the top plate of the rigid structure 2, effectively controlling differential settlement, adjusting the layered paving thickness and the number of rolling times, and comparing and effectively testing the main structure backfill materials, so that the backfill effect, foundation bearing capacity and post-construction settlement can meet the design requirements. This backfill method ensures the overall backfill quality of the top plate of the main structure of section 12 of the airport runway, and effectively improves the quality of earthwork construction before large-scale filling construction, which is beneficial to treating foundations with large pavement loads such as airport runway 12.
[0058] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0059] The above description is only a specific embodiment of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments described herein, but should conform to the widest scope consistent with the principles and novel features invented herein.
Claims
1. A rigid structure to prevent differential settlement under an airport runway. It is characterized in that The invention comprises a step (1), wherein the step (1) is opened along the outer periphery of a rigid structure (2), the bottom surface of the step (1) is flush with the top plate of the rigid structure (2), and the top surface of the step (1) is flush with the roadbed (3), a bidirectional geogrid (4) is arranged on the top plate of the rigid structure (2), a steel mesh is arranged on the upper surface of the bidirectional geogrid (4), and the bidirectional geogrid (4) is evenly arranged in the direction from the top plate of the rigid structure (2) to the roadbed (3), concrete (5) is sprayed on the excavated vertical surface of the step (1), and compacted backfill is arranged between the bottom layer of the step (1) and the rigid structure (2).
2. The rigid structure for preventing differential settlement of a section of a runway under an airport according to claim 1, It is characterized in that The step (1) expands outwards on both sides of the top plate to a depth equal to 10m plus twice the backfill depth, the width and length of the step (1) are both 2m, the height is 1m, and the outward slope is 2% to 4%.
3. The rigid structure for preventing differential settlement of a section of a runway under an airport according to claim 1, It is characterized in that The concrete (5) is C25 concrete with a spraying thickness of 50 mm.
4. The rigid structure for preventing differential settlement of a section of a runway under an airport according to claim 1, It is characterized in that The backfill material comprises lean concrete (6) and lime soil (7); the lean concrete (6) is laid on top of the lime soil (7); the laying thickness of the lime soil (7) is 30 cm; the lime soil (7) is 3:7 lime soil; and the strength of the lean concrete (6) is ≥3 MPa.
5. The rigid structure for preventing differential settlement of a section of a runway under an airport according to claim 1, It is characterized in that The size of the bidirectional geogrid (4) is 5×5 cm, the diameter of the steel mesh is 6 mm, and the spacing is 10×10 cm; The longitudinal and transverse tensile strength of the bidirectional geogrid (4) is ≥50KN / m, the tensile strength when the longitudinal and transverse elongation is 2% is ≥17.5KN / m, the tensile strength when the longitudinal and transverse elongation is 5% is ≥35KN / m, the longitudinal nominal elongation is ≤15%, the transverse nominal elongation is ≤13%, the longitudinal and transverse overlap length should be ≥30cm, and the overlap is fixed to the underlying soil layer with U-shaped iron nails, the anchoring spacing is 50cm, and the U-shaped iron nails are Made of steel bars, single leg height ≥35cm, width 5-8cm.
6. A method for backfilling a rigid structure to prevent differential settlement of a section under an airport runway, based on the rigid structure to prevent differential settlement of a section under an airport runway as described in any one of claims 1 to 5 above, It is characterized in that The following steps are involved: S1. Clean the foundation pit and clean up the debris at the bottom of the foundation pit before backfilling; S2, removing the cushion layer and water-stabilizing layer within the runway (12); S3, cleaning the gap between the side wall and the ground-connected wall (8), sealing it with asphalt hemp caulking, and backfilling and compacting it after it dries; S4, excavating the step (1); S5. Before backfilling, a layer of the bidirectional geogrid (4) is laid, and a layer of the steel mesh is laid on top of the bidirectional geogrid (4). Thereafter, a layer of the bidirectional geogrid (4) is laid every 60 cm of backfill. The return length of the bidirectional geogrid (4) is 2.5 m, and the overlap length is 300 mm. S6. Transport and lay out the raw soil. Use lime lines to make a grid. According to the thickness of the press and the amount of soil transported per truck, determine the unloading area of the truck to be 13.5×6m. The raw soil is transported to the site by a dump truck and flattened by a bulldozer. One truck of raw soil is poured into each 13.5×6m square. S7, backfill material mixing, the backfill material includes cement, fly ash and sandy soil, with cement accounting for 3%, fly ash accounting for 3%, and its maximum dry density is 1.95g / m 3 The unconfined compressive strength is 2.2MP. Before mixing, the water content of the sandy soil is measured at the optimum water content of about 10% ± 2%. The cement and fly ash are mixed and transported to the construction site. After being mixed evenly by a road mixer, the dosage is measured. The backfill material is evenly spread at 25kg per square meter. S8, filling in layers, filling in layers longitudinally over the full width of the cross section of the roadbed (3), using the same filler material for each layer and compacting it, with the thickness of each layer being ≤30 cm; S9, paving and leveling, using a loader and a grader to spread the backfill material evenly according to a reasonable layer thickness; S10, rolling and compacting, using a 23T roller to roll, first use the roller to roll statically once, the rolling speed is 1.5-1.7 km / h, the rolling order is rolling from both sides of the foundation pit to the center, the wheel tracks of the roller overlap ≥ 0.3m, the wheel tracks of the roller overlap 0.4-0.5m at the transverse joint, rolling slowly at first and then fast, rolling 3-5 times, the speed is 1.8-2.2 km / h, and finally use the roller to roll statically once, the speed is 2.5 km / h; S11. Compactness test: the compaction degree of each backfill layer shall not be less than 95%, and the unconfined compressive strength shall not be less than 2.2MPa.
7. The method for backfilling a rigid structure under an airport runway to prevent differential settlement according to claim 6, It is characterized in that The backfill material includes 3% cement, 3% fly ash and sandy soil, and the maximum dry density of the backfill material is 1.95g / m 3 , the unconfined compressive strength is 2.2MP.
8. The method for backfilling a rigid structure under an airport runway to prevent differential settlement according to claim 6, It is characterized in that After the gap between the side wall and the ground-connected wall (8) is sealed, a waterproof plate (9) is arranged on the outside thereof.
9. The method for backfilling a rigid structure under an airport runway to prevent differential settlement according to claim 6, It is characterized in that The step S8 adopts the following method: 6% backfill material is used for backfilling within a range of 1m from the top plate of the rigid structure (2), and the compaction degree is 95%. The remaining range is backfilled with original soil. The compaction degree is ≥96% when the backfill is 0-4m below the ground surface, and the compaction degree is ≥95% when the backfill is >4m below the ground surface. The remaining range of the runway (12) section is backfilled with ordinary soil, and the backfill compaction degree is ≥93%.
10. The method for backfilling a rigid structure under an airport runway to prevent differential settlement according to claim 6, It is characterized in that The step S11 adopts the following method: during the rolling process, the compaction degree is detected once by the sand filling method each time the rolling is carried out, and the compaction degree is calculated. After the compaction degree reaches the requirement, the compaction passes when the compaction degree is 94%, 95%, and 96% are recorded respectively. If the static rolling cannot reach the compaction degree of 95%, the virtual paving thickness is reduced to 24 cm, and compaction is restarted until the compaction requirement is met.