Side slope three-dimensional blanket soil dressing spray-seeding greening construction method
Through the construction method of three-dimensional carpets on slopes, combined with the roots of three-dimensional carpets and grass shrub plants, the problems of vegetation restoration and soil erosion of exposed slopes are solved, and the stability and ecological restoration of slopes are achieved, which is suitable for multiple engineering application.
Patent Information
- Application Number
- CN202411126554.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-15
AI Technical Summary
The prior art is difficult to achieve long-term greening and ecological restoration on exposed slopes, especially for poor soil quality and rock slopes, vegetation recovery is difficult and there is a risk of soil erosion.
The construction method of the three-dimensional blanket on the slope is adopted, including removing debris, laying nets, spraying the base substrate and surface layer, covering non-woven fabrics, fertilizing and maintenance, and combining the root system of the three-dimensional blanket and grass shrub plants to enhance the Slope stability and vegetation fixation.
Effectively cure slopes, promote plant growth, enhance root fixation, resist rainwater erosion, improve slope stability and ecological environment quality, and is suitable for different slopes and hard slopes to achieve ecological balance and environmental protection.
Smart Images

Figure CN118958321A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a greening construction method, in particular to a slope three-dimensional blanket soil spraying greening construction method, belonging to the technical field of slope maintenance and planting. Background Art
[0002] With the rapid development of highway construction, a large number of exposed slopes have been formed during mountain excavation. The large area of exposed slopes is inconsistent with the surrounding environment and is not beautiful. At the same time, the exposed slopes also pose a risk of soil erosion and cannot meet the requirements of ecological protection.
[0003] For soil slopes, engineering practice generally adopts wet seeding, three-dimensional net grass planting and other technologies to plant vegetation, consolidate soil and protect slopes. For slopes with poor soil conditions and rock slopes, due to the lack of a foundation for plant growth, mortar-laid stone engineering protection measures are often adopted, which not only fails to restore the damaged vegetation, but also affects the overall ecological environment and landscape of the slope. Therefore, how to ensure the stability of the slope and achieve long-term greening has become the focus and difficulty of slope ecological restoration. Summary of the invention
[0004] In order to solve the deficiencies of the prior art, the object of the present invention is to provide a slope three-dimensional blanket soil spraying greening construction method.
[0005] In order to achieve the above object, the present invention adopts the following technical solution:
[0006] The slope three-dimensional blanket soil spraying greening construction method is characterized by comprising the following steps:
[0007] S1. Clear away debris and level the slope to prepare the working surface;
[0008] S2. Lay the net on the working surface and fix it, keeping the gap between the net and the working surface at 8 to 10 cm;
[0009] S3, moisten the working surface, mix the matrix and the foreign soil, and spray it as the bottom matrix; the matrix includes organic matter, compound fertilizer, water retaining agent, and cooked soil, and the amount is:
[0010]
[0011] S4, laying the three-dimensional blanket and fixing it;
[0012] S5. After the bottom matrix is stable, the matrix and seeds are mixed evenly as the surface layer, sprayed with water, and then covered with non-woven fabric; the thickness of the surface layer is 2 to 3 cm;
[0013] S6. Fertilization and maintenance.
[0014] In the above step S1, if the slope is unstable, prestressed anchor rods and cables are used for reinforcement.
[0015] When laying the net in the above step S2, the net is unrolled from top to bottom, and the edges of two adjacent net rolls are required to overlap by at least 8 to 15 cm, and the overlap is not less than 10 cm; the fixing tool includes an anchor rod.
[0016] The covering thickness of the guest soil in the above step S3 is determined by the soil quality of the slope: 4-6 cm guest soil is suitable for weathered rock slopes with red clay or weathered sand; 6-8 cm guest soil is suitable for soft rock slopes with soil and stone; 8-10 cm guest soil is suitable for hard rock slopes; 10-12 cm guest soil is suitable for plate-like stone slopes.
[0017] The amount of water used in the above step S5 is such that the matrix and seeds adhere to the slope and do not slip off.
[0018] In the above step S5, the non-woven fabric is evenly covered from top to bottom, or fixed with at least one of iron nails, bamboo nails, and anchor rods; the non-woven fabric is 12g / m 2 .
[0019] The seeds in the above step S5 are mixed seeds of herbs and shrubs, including lawn grass, forage grass, and small shrubs.
[0020] The fertilization in step S6 includes applying compound fertilizer after the plants grow into lawns, 10-15 g / m each time. 2 .
[0021] The present invention is beneficial in that:
[0022] The invention discloses a slope three-dimensional blanket soil spraying greening construction method. By laying a net at the bottom of the base layer, the sprayed matrix and soil are effectively attached to the working surface of the slope. The matrix in the base layer combines with the matrix in the surface layer to provide a certain depth of nutrients for the plants, promoting the growth of the plants and the development of the root system. The three-dimensional blanket further reinforces the base layer and provides adhesion for the subsequent surface layer. The net wrapping effect of the three-dimensional blanket helps to plant plants in grids, assists in integrating slope plants into one, strengthens the fixation of grass roots, and effectively resists rain erosion. The planted plants are combined with grass and shrubs, and the roots of the grass and shrubs are connected to the three-dimensional blanket to form a whole. The tensile strength and shear strength are enhanced, the phenomenon of "gradual destruction" caused by erosion is strengthened, and the stability of the slope is improved.
[0024] The slope three-dimensional blanket soil spraying greening construction method of the present invention is suitable for hard slopes or weathered stone slopes of different slopes in highway slope protection, river slope protection, landscape greening slope protection and other related projects; it can be widely used in slope greening and vegetation restoration to prevent soil erosion, maintain ecological balance, and protect the environment. It has strong practicality and wide applicability. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 The present invention is a flow chart of the slope three-dimensional blanket soil spraying greening construction method. DETAILED DESCRIPTION
[0026] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0027] A slope three-dimensional blanket soil spraying greening construction method:
[0028] S1. Use the slope as the working surface, remove the debris on the slope and level the slope to facilitate the spraying construction.
[0029] S2. The net rolls are laid from top to bottom, and the edges of two adjacent rolls are required to overlap by at least 8 to 15 cm. The overlapping part can be tied with a cable tie so that the multiple rolls of net form a complete net body.
[0030] The entire mesh body can be further fixed with anchor rods, and a plurality of anchor rods are arranged in an orderly manner, including horizontal rows, vertical columns or oblique columns.
[0031] Keep a gap of 8 to 10 cm between the net and the working surface, and try to make it as uniform as possible.
[0032] S3. The matrix is a mixture of organic matter, compound fertilizer, water-retaining agent, soil, etc. in a certain proportion.
[0033] Organic matter includes organic fertilizer, sawdust, plant fiber, rice husk and other ingredients. It has better adhesion and water retention properties than pure wood fiber alone, and can be sprayed on slopes with thin soil layers and very poor soil or weathered rocks.
[0034] Organic fertilizers are decomposed and high-temperature sterilized chicken manure and Northeast peat as long-term fertilizers for the substrate.
[0035] The plant fiber is made of rice straw that has been chopped, retting, softening and then dried. It is about 2 cm long and is mixed with foreign soil to give it a certain strength and adhesion. Sawdust and rice husk can make the foreign soil loose and breathable, and also have the function of retaining water and moisture.
[0036] Compound fertilizer can provide quick-acting nutrients for plant growth over a long period of time. Choose high-quality compound fertilizer with N:P:K=15:15:15.
[0037] Water retainers are used to store and slowly release the large amounts of water that plants need to grow.
[0038] The soil should be made from fertile local surface soil (such as vegetable garden soil, farmland cultivated layer soil), which should be air-dried, crushed and sieved for later use.
[0039] The amount of substrate is shown in the table below:
[0040]
[0041] After mixing the matrix and foreign soil, spray it as the bottom matrix.
[0042] Before spraying, spray water to moisten the working surface, and spraying is carried out from top to bottom.
[0043] The amount of guest soil determines the thickness of the bottom substrate, and the thickness is determined based on factors such as the hardness of the slope and the degree of weathering of the rock. The minimum thickness is based on the normal growth of plants. Specifically: 4-6 cm guest soil is suitable for weathered rock slopes with red clay or weathered sand; 6-8 cm guest soil is suitable for soft rock slopes with soil and stone; 8-10 cm guest soil is suitable for hard rock slopes; 10-12 cm guest soil is suitable for plate-like stone slopes.
[0044] S4. The three-dimensional blanket is made of polymer materials and is in a mesh shape. The gaps can be filled with soil. The roots of plants can grow through the gaps, and the grown plants can effectively inhibit the erosion of the slope by rainwater.
[0045] Similar to the above-mentioned net roll, the blanket body of the three-dimensional blanket can also be fixed by a number of similar anchor rods.
[0046] S5. When spraying the surface layer, the matrix, seeds and water are mixed and sprayed by the sprayer, and the spraying thickness is 2-3 cm, in which the matrix and seeds are mixed in advance. Water is used in moderation to ensure that the matrix and seeds do not slip on the slope.
[0047] The seeds used are a mixture of lawn grass, forage grass, small shrubs, etc., to achieve a combination of herbs and shrubs, and a combination of creeping types and clumping types.
[0048] When combining grass and shrubs for slope protection, we should not only pay attention to the reasonable matching of species, but also consider the slope protection effect of different plants. During the growth process, plants achieve their soil fixation and slope protection through the spatial distribution characteristics of roots, stems, and leaves above and below the ground. The characteristics of spraying seeds and their dosage are shown in the table below:
[0049]
[0050] After spraying, cover with non-woven fabric for protection, the non-woven fabric is preferably 12g / m 2 The non-woven fabric spread over a large area can be fixed by at least one of iron nails, bamboo nails, and anchor rods.
[0051] S6. Specific maintenance
[0052] Before the seeds emerge, water them once in the morning or once in the morning and evening, preferably with misted water. After the seeds emerge, reduce the number of watering as appropriate. When the seeds are young, use broad-spectrum fungicides for prevention and control.
[0053] After the plants have grown into a lawn, start routine management and remove the non-woven fabric.
[0054] After the lawn grows, it can be fertilized appropriately, preferably with high-quality compound fertilizer, 10-15g / m each time. 2 .
[0055] Example 1
[0056] Greening and landscape supporting project on the east side of the Huanghai Forest Park sewage treatment station
[0057] The project will start in March 2022 and be completed in April 2022.
[0058] The slope protection adopts the slope three-dimensional blanket soil spraying greening construction method of the present invention, laying a three-dimensional blanket on the slope surface, and using the hydraulic spraying method to spray vegetation, which increases the greening area and saves a total of about 106,000 yuan.
[0059] Example 2
[0060] Huanghai Forest Park Rural Complex Project Underwood Greening Project
[0061] Construction will begin in June 2022 and be completed in July 2022.
[0062] The three-dimensional blanket soil spraying greening construction method for slopes of the present invention is adopted. The three-dimensional blanket can be filled with planting soil and grass seeds, and also has two major functions of preventing scouring and being conducive to plant growth.
[0063] Before the turf grows, it can protect the slope from surface water erosion; after the turf grows, the grass roots, mesh mats and soil together form an interlocking system with composite mechanical properties, which improves the function of the original damaged ecosystem and increases the overall productivity and stability of the restored ecosystem, saving a total of about 125,000 yuan.
[0064] Benefit Analysis
[0065] A. Economic Benefits
[0066] Mainly reflected in the cost, the practice test proves that the slope three-dimensional blanket soil spraying greening technology has obvious advantages in material cost, machine unit cost, etc., and the ecological effect is obvious; the economic benefits of several different slope protection schemes are compared as shown in the following table:
[0067]
[0068]
[0069] B. Ecological benefits
[0070] The three-dimensional carpet soil spraying greening construction on the slope not only ensures the stability of the original terrain, but also forms a unique mountain landscape, rationally utilizes land resources, increases regional greening area, reduces dust and sand, significantly improves the ecological environment quality, and realizes the sustainable development of land resources.
[0071] C. Social benefits
[0072] The three-dimensional carpet soil spraying greening applied to the slope of the highway can form a good ecological effect and landscape effect, which is in harmony with the natural landscape and beautifies the surrounding environment. It overcomes the defects of the single gray-black color of the concrete slope and the cracking and warping of the concrete slope due to long-term sunshine and rain, and increases the overall aesthetic effect. On the one hand, it improves the original damaged ecological environment, realizes reclamation and greening, improves the environmental quality, and improves the overall productivity of the ecosystem; on the other hand, the restored ecology brings certain social and economic benefits, promotes economic development, and realizes the coordinated development of ecology, economy, and environment.
[0073] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the above embodiments do not limit the present invention in any form, and any technical solution obtained by equivalent replacement or equivalent transformation falls within the protection scope of the present invention.
Claims
1. A three-dimensional blanket soil spraying greening construction method for slopes, characterized in that: The following steps are involved: S1. Clear away debris and level the slope to prepare the working surface; S2. Lay the net on the working surface and fix it, keeping the gap between the net and the working surface at 8 to 10 cm; S3, moisten the working surface, mix the matrix and the foreign soil, and spray it as the bottom matrix; the matrix includes organic matter, compound fertilizer, water retaining agent, and cooked soil, and the amount is: S4, laying the three-dimensional blanket and fixing it; S5, mixing the substrate and seeds evenly as a surface layer, spraying with water at the same time, and covering with non-woven fabric; the thickness of the surface layer is 2 to 3 cm; S6. Fertilization and maintenance.
2. The construction method according to claim 1, characterized in that: If the slope is unstable in step S1, prestressed anchor rods and cables are used for reinforcement.
3. The construction method according to claim 1, characterized in that: When laying the net in step S2, the net is unrolled from top to bottom, and the edges of two adjacent net rolls are required to overlap by at least 8 to 15 cm, and the overlap is not less than 10 cm; the fixing tool includes an anchor rod.
4. The construction method according to claim 1, characterized in that: The covering thickness of the guest soil in step S3 is determined by the soil quality of the slope: 4-6 cm guest soil is suitable for weathered rock slopes with red clay or weathered sand; 6-8 cm guest soil is suitable for soft rock slopes with soil and stone; 8-10 cm guest soil is suitable for hard rock slopes; 10-12 cm guest soil is suitable for plate-like stone slopes.
5. The construction method according to claim 1, characterized in that: The three-dimensional blanket is laid along the slope from top to bottom, or fixed by at least one of iron nails, bamboo nails and anchor rods.
6. The construction method according to claim 1, characterized in that: The amount of water used in step S5 is such that the matrix and seeds adhere to the slope and do not slip off.
7. The construction method according to claim 1, characterized in that: In step S5, the non-woven fabric is evenly covered from top to bottom, or fixed with at least one of iron nails, bamboo nails, and anchor rods; the non-woven fabric is 12g / m 2 .
8. The construction method according to claim 1, characterized in that: The seeds in step S5 are mixed seeds of herbs and shrubs, including lawn grass, forage grass, and small shrubs.
9. The construction method according to claim 1, characterized in that: The fertilization in step S6 includes applying compound fertilizer after the plants grow into lawns, 10-15 g / m each time. 2 .