Underground powerhouse supporting structure
By using a support structure system of anchor rods, longitudinal beams, connecting columns and pier columns in underground factories, the problems of difficulty and long construction period of anchor rods when the span is large are solved, and the effect of reducing construction difficulty and shortening construction period is achieved. Concrete parts improve fire resistance and reduce costs.
Patent Information
- Application Number
- CN202411018091.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-15
AI Technical Summary
In underground factories, when the span is large, it is difficult for the existing technology to optimize the anchor support project volume, increase construction difficulty and shorten the construction period, especially on the premise of ensuring the stability of the vault and side wall surrounding rocks.
The supporting structure system is adopted including anchor rods, first longitudinal beams, second longitudinal beams, connecting columns, installation columns and pier columns. Through the synergy of these components, the number and length of anchor rods are reduced, the spacing of anchor rods is increased, and the construction difficulty is reduced. and use concrete parts to replace steel structures to improve fire resistance and reduce costs.
It effectively reduces the number of anchor rods and construction difficulty, shortens the construction period, saves the project volume of ceiling steel structures, and improves the safety and economicality of construction.
Smart Images

Figure CN118958362A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground plant buildings, and in particular to a supporting structure of an underground plant building. Background Art
[0002] According to the surrounding rock conditions of the underground powerhouse arch (including joints, cracks and faults, etc.), at present, Figure 1 As shown in the figure, anchor spraying support is used at the arch of the underground powerhouse, with an anchor spacing of 1.5m to 2m and an anchor length of 4m to 10m to form a stable arch structure. After the layered excavation of the entire underground main powerhouse cavern is completed, the processing and installation of the ceiling steel structure needs to be completed. The structural form of the steel structure usually adopts a grid structure, one of its main functions is to place ventilation equipment, air ducts, smoke exhaust pipes, etc.
[0003] There are many problems with the existing technology. The larger the span of the underground factory building, the larger the diameter of the arch anchor rod, the longer the length of the anchor rod that needs to be driven upward, and the denser the spacing between the anchor rods. The higher the construction difficulty, the more difficult it is to control the construction quality, and the longer the construction period. Summary of the invention
[0004] The technical problem to be solved by the present invention is: when the span of the underground factory building is large, how to optimize the amount of anchor support and ceiling steel structure engineering, how to reduce the difficulty of anchor construction and shorten the construction period of anchor support while ensuring the stability of the underground factory building arch and side wall surrounding rock.
[0005] In order to solve the above technical problems, the present invention uses a support structure system to balance the pressure of the underground powerhouse vault and the surrounding rock of the side walls, and provides an underground powerhouse support structure including: anchor rods, a plurality of anchor rods, and the plurality of anchor rods are embedded in the top of the underground powerhouse at intervals; a first longitudinal beam, the first longitudinal beam extends along the second direction, the number of the first longitudinal beams is two, and the plurality of first longitudinal beams are arranged at intervals along the third direction; a second longitudinal beam, the second longitudinal beam extends along the second direction, the number of the second longitudinal beams is two, and the plurality of second longitudinal beams are arranged at intervals along the third direction, and the first longitudinal beam and the second longitudinal beam are arranged at intervals along the first direction; a connecting column, the connecting column extends along the first direction, the number of the connecting column is multiple, and the plurality of connecting columns are multiple. The connecting columns are arranged at intervals along the second direction, and the two ends of the connecting columns are fixedly connected to the first longitudinal beam in a one-to-one manner; the installing columns, the number of the installing columns is multiple, and the multiple installing columns are arranged at intervals along the second direction, and the two ends of the installing columns are fixedly connected to the first longitudinal beam and the second longitudinal beam in a one-to-one manner; the pier columns, the number of the pier columns is multiple, the pier columns extend along the first direction, and the multiple pier columns are arranged at intervals along the second direction, and the two ends of the pier columns are fixedly connected to the connecting columns and the top of the underground factory building; wherein, the first direction is the height direction of the underground factory building, the second direction is the extension direction of the underground factory building, and the third direction is the width direction of the underground factory building, and the first direction, the second direction, and the third direction are perpendicular to each other.
[0006] Furthermore, the first longitudinal beam, the second longitudinal beam, the connecting column and the mounting column are concrete parts.
[0007] Furthermore, the diameter of the anchor rod is 20 mm to 22 mm.
[0008] Furthermore, the length of the anchor rod is 3m to 5m.
[0009] Furthermore, the anchor rod is divided into a first anchor rod and a second anchor rod. The first anchor rod is located in the middle of the top of the underground plant, and the second anchor rod is located at the edge of the top of the underground plant. The length of the first anchor rod is 3m to 4m, and the length of the second anchor rod is 4m to 5m.
[0010] Furthermore, one end of the anchor rod protrudes from the top of the underground powerhouse by 80 mm to 120 mm.
[0011] Furthermore, the angle between the connecting column and the third direction is 30° to 45°.
[0012] Furthermore, an air duct is installed on the mounting column.
[0013] Furthermore, there are multiple air ducts, and the multiple air ducts are arranged on the mounting column at intervals.
[0014] Furthermore, the pier column, the connecting column and the first longitudinal beam are integrally formed.
[0015] Compared with the prior art, the supporting structure of an underground powerhouse in the embodiment of the present invention has the following beneficial effects: Compared with the anchor spraying support in the prior art, the present solution supports the vault structure of the underground powerhouse through the support structure, the first longitudinal beam, the second longitudinal beam, the connecting column, the installation column and the pier column, which greatly reduces the number of anchor rods, thereby increasing the spacing between the anchor rods, reducing the construction difficulty, and accelerating the progress of anchor rod construction. Compared with the suspended ceiling steel structure in the prior art, the present solution saves the construction period of the suspended ceiling steel structure and saves the engineering volume of the suspended ceiling steel structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a view of the prior art;
[0017] Figure 2 is a cross-sectional view of an embodiment of the present invention;
[0018] Figure 3 It is an axonometric view of an embodiment of the present invention.
[0019] In the figure, 1, anchor rod; 11, first anchor rod; 12, second anchor rod;
[0020] 2. The first longitudinal beam; 3. The second longitudinal beam; 4. Connecting column; 5. Mounting column; 6. Pier column; 7. Air duct; 8. The top of the underground factory building. DETAILED DESCRIPTION
[0021] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0022] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "vertical", "horizontal", "up", "down", "front", "back", "left", "right", "top", "bottom", "inside" and "outside" used in the present invention to indicate the orientation or position relationship are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0023] In the description of the invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0024] like Figure 2-Figure 3 As shown, the underground plant support structure of the preferred embodiment of the present invention includes: an anchor rod 1, the number of the anchor rods 1 is multiple, and the multiple anchor rods 1 are embedded in the top 8 of the underground plant at intervals; a first longitudinal beam 2, the first longitudinal beam 2 extends along the second direction, the number of the first longitudinal beams 2 is two, and the multiple first longitudinal beams 2 are arranged at intervals along the third direction; a second longitudinal beam 3, the second longitudinal beam 3 extends along the second direction, the number of the second longitudinal beams 3 is two, and the multiple second longitudinal beams 3 are arranged at intervals along the third direction, and the first longitudinal beam 2 and the second longitudinal beam 3 are arranged at intervals along the first direction; a connecting column 4, the connecting column 4 extends along the first direction, the number of the connecting column 4 is multiple, and the multiple connecting columns 4 are arranged at intervals along the second direction, The two ends of the connecting column 4 are fixedly connected to the first longitudinal beam 2 in one-to-one correspondence; the mounting column 5, there are multiple mounting columns 5, and the multiple mounting columns 5 are arranged at intervals along the second direction, and the two ends of the mounting column 5 are fixedly connected to the first longitudinal beam 2 and the second longitudinal beam 3 in one-to-one correspondence; the pier column 6, there are multiple pier columns 6, the pier columns 6 extend along the first direction, and the multiple pier columns 6 are arranged at intervals along the second direction, and the two ends of the pier columns 6 are fixedly connected to the connecting column 4 and the top 8 of the underground factory building; wherein, the first direction is the height direction of the underground factory building, the second direction is the extension direction of the underground factory building, and the third direction is the width direction of the underground factory building, and the first direction, the second direction, and the third direction are perpendicular to each other.
[0025] Further preferably, concrete is filled in the space enclosed by the vault of the underground powerhouse, multiple connecting columns 4, multiple first longitudinal beams 2 and multiple piers 6, so as to further stabilize the vault and side wall surrounding rock of the underground powerhouse when the number of anchor rods is small or the length is short.
[0026] Based on the above scheme, by arranging the first longitudinal beam 2, the second longitudinal beam 3, the connecting column 4, the mounting column 5 and the pier column 6 for combined support, the weight of the arch is directly transmitted from the pier column 6 to the first longitudinal beam 2, and further transmitted to the second longitudinal beam 3 through the first longitudinal beam 2 mounting column 5, and then transmitted to the walls on both sides of the underground factory building through the second longitudinal beam 3. Compared with the underground factory building in the prior art, there is more support for the arch of the underground factory building, and the number of supports for the anchor rods 1 is reduced. Specifically, the number of anchor rods 1 can be reduced by 20% to 30%. Under the premise of meeting the stability of the arch of the underground factory building and the surrounding rock of the side walls, the construction process is simplified, the construction cost is reduced, and the construction speed is accelerated.
[0027] Preferably, the first longitudinal beam 2, the second longitudinal beam 3, the connecting column 4 and the mounting column 5 are concrete parts. In the prior art, large-span underground factories all use steel structure ceilings. However, in the event of a fire, the steel structure is prone to yield above 480 degrees and cannot support the air duct and the ceiling. Even if a fire-retardant coating is applied to the outer layer of the steel structure, the fire resistance of concrete cannot be achieved. The use of concrete parts eliminates the hidden danger of insufficient support for underground factories during fires. On the other hand, the cost of concrete parts is lower than that of steel structures, saving costs.
[0028] Preferably, the diameter of the anchor rod 1 is 20 mm to 22 mm. In this embodiment, the diameter of the anchor rod 1 is 20 mm, while the diameter of the anchor rod 1 in the prior art is 25 mm to 28 mm. Under the premise of meeting the mechanical verification of the underground powerhouse, the diameter of the anchor rod 1 is smaller than that of the existing anchor rod 1, and multiple anchor rods 1 are not easy to interfere with each other.
[0029] Preferably, the length of the anchor rod 1 is 3m to 5m. In this embodiment, the length of the anchor rod 1 is 3.5m to 4.5m. In the prior art, the length of the anchor rod 1 is 7m to 9m. Since the anchor rods 1 in the prior art are too long or too dense, the anchor rods 1 will interfere with each other during construction, so the construction is difficult. In this solution, the vault of the underground powerhouse is supported by the coordinated action of each component and the anchor rod 1. Therefore, the stability of the surrounding rock of the vault and side wall of the underground powerhouse can be met on the basis of reducing the anchor rod 1, further reducing the difficulty of underground powerhouse construction.
[0030] Preferably, the anchor rod 1 is divided into a first anchor rod 11 and a second anchor rod 12. The first anchor rod 11 is located in the middle of the top 8 of the underground powerhouse, and the second anchor rod 12 is located at the edge of the top 8 of the underground powerhouse. The length of the first anchor rod 11 is 3m to 4m, and the length of the second anchor rod 12 is 4m to 5m. In this embodiment, the length of the first anchor rod 11 is 3.5m, and the length of the second anchor rod 12 is 4.5m. The setting of the first anchor rod 11 is intended to strengthen the central support of the top of the underground powerhouse to prevent structural deformation or damage to the top of the underground powerhouse caused by concentrated loads, and to ensure that the first anchor rod 11 provides sufficient support while not increasing the construction difficulty and cost due to excessive length; since the force on the edge area of the top 8 of the underground powerhouse is more complex, the second anchor rod 12 needs to be longer to provide sufficient anchoring force and stability to ensure that it meets both engineering requirements and is economically reasonable.
[0031] Further preferably, the number of first anchor rods 11 arranged in the vault of the underground factory building between two piers 6 is set less than the number of other first anchor rods 11. Since the piers 6 play a supporting role in the vault of the corresponding underground factory building, fewer anchor rods 1 can be set.
[0032] Preferably, one end of the anchor rod 1 protrudes from the top 8 of the underground powerhouse by 80 mm to 120 mm. In this embodiment, one end of the anchor rod 1 protrudes from the top 8 of the underground powerhouse by 100 mm. In underground projects, due to complex geological conditions and various load changes, relative displacement or loosening is likely to occur between the anchor rod 1 and the surrounding rock and soil. Protruding one end of the anchor rod 1 from the top by a certain length can limit this displacement or loosening to a certain extent, preventing the anchor rod 1 from falling off or failing due to long-term stress.
[0033] Preferably, the angle between the connecting column 4 and the third direction is 30° to 45°. In this embodiment, the angle between the connecting column 4 and the third direction is α, α=37°, which can not only meet the stability of the surrounding rock of the vault and side wall of the underground powerhouse, but also take into account the height space of the underground powerhouse.
[0034] Preferably, the mounting column 5 is provided with an air duct 7. Compared with the prior art, in the prior art, a steel frame is fixed on the top of the two side walls of the underground factory building, and the air duct 7 is installed on the steel frame. However, this design does not make good use of the height space of the underground factory building, and the air duct 7 and production equipment can only be reasonably placed by further increasing the height of the underground factory building. In this embodiment, the air duct 7 is installed on the mounting column 5, and does not occupy the height space of the underground factory building, which further optimizes the height of the underground factory building, reduces the excavation amount of the underground factory building, and further shortens the construction period of the overall underground factory building.
[0035] Preferably, there are multiple air ducts 7, and multiple air ducts 7 are arranged at intervals on the mounting column 5. Further, by arranging more air ducts 7 to achieve uniform distribution of airflow, the problem of insufficient ventilation or excessive ventilation in local areas is avoided, and the ventilation efficiency of the underground factory building is improved as a whole. The uniform and spaced layout of the air ducts 7 not only meets the requirements of engineering aesthetics, but also improves the overall aesthetics of the underground factory building, so that the entire support structure and the ventilation system are integrated with each other, improving the aesthetics.
[0036] In a parallel embodiment of the above scheme, when there is no installation column 5 at the position where the air duct 7 needs to be buried, a small secondary beam is connected between two adjacent installation columns 5, and the small secondary beam extends along the second direction. The air duct 7 is fixedly connected to the small secondary beam, thereby further improving the flexibility of setting the air duct 7 and meeting the airflow ventilation needs of the underground factory.
[0037] Preferably, the pier column 6, the connecting column 4 and the first longitudinal beam 2 are integrally formed and cast at one time, so that the mechanical properties at the connection are better and meet the mechanical verification requirements.
[0038] In summary, the embodiment of the present invention provides an underground factory building support structure. Compared with the anchor spraying support in the prior art, this solution supports the vault structure of the underground factory building through the support structure, through the cooperation of the first longitudinal beam 2, the second longitudinal beam 3, the connecting column 4, the installation column 5 and the pier column 6, which greatly reduces the number of anchor rods 1, thereby increasing the spacing between the anchor rods 1, reducing the construction difficulty, and accelerating the progress of the anchor rod construction.
[0039] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. An underground plant support structure, characterized in that: include: Anchor rods, the number of the anchor rods is multiple, and the multiple anchor rods are embedded in the top of the underground powerhouse at intervals; a first longitudinal beam, the first longitudinal beam extending along the second direction, the number of the first longitudinal beams being two, and a plurality of the first longitudinal beams being arranged at intervals along the third direction; a second longitudinal beam, the second longitudinal beam extending along a second direction, the number of the second longitudinal beams being two, the plurality of the second longitudinal beams being arranged at intervals along a third direction, and the first longitudinal beam and the second longitudinal beam being arranged at intervals along the first direction; A connecting column, the connecting column extends along the first direction, the number of the connecting columns is multiple, the multiple connecting columns are arranged at intervals along the second direction, and both ends of the connecting column are fixedly connected to the first longitudinal beam in a one-to-one correspondence; There are multiple mounting columns, and the plurality of mounting columns are arranged at intervals along the second direction, and two ends of the mounting columns are fixedly connected to the first longitudinal beam and the second longitudinal beam respectively in a one-to-one correspondence; A pier column, wherein the number of the pier columns is multiple, the pier columns extend along a first direction, the multiple pier columns are spaced apart along a second direction, and the two ends of the pier columns are respectively fixedly connected to the connecting column and the top of the underground powerhouse; Among them, the first direction is the height direction of the underground factory building, the second direction is the extension direction of the underground factory building, and the third direction is the width direction of the underground factory building. The first direction, the second direction, and the third direction are perpendicular to each other.
2. The underground plant support structure according to claim 1, characterized in that: The first longitudinal beam, the second longitudinal beam, the connecting column and the mounting column are concrete members.
3. The underground plant support structure according to claim 1, characterized in that: The diameter of the anchor rod is 20 mm to 22 mm.
4. The underground plant support structure according to claim 1, characterized in that: The length of the anchor rod is 3m to 5m.
5. The underground plant support structure according to claim 4, characterized in that: The anchor rod is divided into a first anchor rod and a second anchor rod. The first anchor rod is located in the middle of the top of the underground factory building, and the second anchor rod is located at the edge of the top of the underground factory building. The length of the first anchor rod is 3m to 4m, and the length of the second anchor rod is 4m to 5m.
6. The underground plant support structure according to claim 1, characterized in that: One end of the anchor rod protrudes from the top of the underground factory building by 80 mm to 120 mm.
7. The underground plant support structure according to claim 1, characterized in that: The angle between the connecting column and the third direction is 30° to 45°.
8. The underground plant support structure according to claim 1, characterized in that: An air duct is installed on the installation column.
9. The underground plant support structure according to claim 8, characterized in that: There are multiple air ducts, and the multiple air ducts are arranged on the mounting column at intervals.
10. The underground plant support structure according to claim 1, characterized in that: The pier column, the connecting column and the first longitudinal beam are integrally formed.