Construction support for rural construction project
By designing adjustable oblique strut components and auxiliary components, the problems of insufficient installation space of oblique struts and mismatch of support angles in construction brackets are solved, ensuring the stability and ease of use of the construction platform, and preventing the failure when encountering obstacles. Stability and improve construction safety.
Patent Information
- Application Number
- CN202411284359.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the use of construction brackets, the space for installation of oblique struts is insufficient, and the support angle of the oblique struts does not match the height of the construction platform, which affects the stability of the construction brackets and is not convenient for construction personnel to use.
A construction bracket including an electric lifting rod, a diagonal brace assembly and an auxiliary assembly is designed. The diagonal brace assembly ensures that the oblique support angle of the construction platform matches the height through adjustable first and second diagonal braces, rollers and spring mechanisms. , and use auxiliary components to stop rising in time when obstacles are encountered to prevent instability.
It realizes stable support for construction brackets on smaller sites, which is convenient for construction personnel to use, and prevents unstable construction platforms when encountering obstacles, improving construction safety.
Smart Images

Figure CN118958639A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction supports, in particular to a construction support for a rural construction project. Background Art
[0002] Construction projects refer to the general term for various types of buildings and engineering facilities that provide the material and technical basis for human life and production. They are organized, purposeful, large-scale economic activities of mankind. In the construction process of rural construction projects, construction scaffolds are work platforms used to facilitate construction workers when carrying out high-altitude construction. They can support construction workers to a suitable height for construction, provide protection for the personal safety of construction workers, and are indispensable auxiliary facilities in engineering operations.
[0003] During the use of the construction scaffold, the height of the construction platform is usually adjusted by an electric lifting rod to meet the construction requirements of different heights, and diagonal braces are set at the four corners of the construction scaffold to prevent the construction scaffold from tilting and ensure the stability of the construction scaffold. However, the diagonal braces are usually installed and erected at the maximum rising height of the construction scaffold. Therefore, when the construction scaffold is supported in a smaller site, there may be insufficient space for the installation of the diagonal braces. When the supporting angle of the diagonal braces is adjusted for oblique support, the construction platform may rise too high and not match the supporting angle of the diagonal braces, which will affect the stability of the construction scaffold. In addition, the installation of the diagonal braces may be inconvenient for construction workers. For this reason, we propose a construction scaffold for rural construction projects. Summary of the invention
[0004] The object of the present invention is to provide a construction support for rural construction projects to solve the problem raised in the above-mentioned background technology that during the construction support support operation, there may be insufficient space for the installation of the diagonal brace rods, and when the supporting angle of the diagonal brace rods is adjusted for diagonal support, the construction platform may rise too high, which may not match the supporting angle of the diagonal brace rods, thereby affecting the stability of the construction support and may also be inconvenient for construction workers to use.
[0005] To achieve the above object, the present invention provides the following technical solution: a construction support for rural construction projects, comprising: a base, on which electric lifting rods are symmetrically arranged, and a construction platform is arranged on the electric lifting rods,
[0006] It also includes: a diagonal brace assembly, which is arranged at the four corners of the base and is used to provide oblique support for the construction platform;
[0007] The auxiliary component is arranged on one side of the diagonal bracing component, and is used to assist the diagonal bracing component in providing oblique support to the construction platform.
[0008] Among them, the diagonal support assembly includes a support plate symmetrically fixed on the upper ends of the four corners of the base, a first diagonal rod is rotatably arranged on the upper side of the support plate, a second diagonal rod is slidably arranged inside the first diagonal rod, a first spring is fixed between the upper end of the second diagonal rod and the inner cavity of the first diagonal rod, and a first roller is arranged at the lower end of the second diagonal rod.
[0009] Among them, the first roller member includes a mounting frame fixed to the second oblique rod, a roller is arranged on the inner side of the mounting frame, a roller shaft rotatably arranged with the mounting frame is fixed in the middle of the roller, and receiving parts are fixed on the lower sides of the four corners of the base.
[0010] Among them, a rotating rod is rotatably provided on one side of the first inclined rod, a supporting rod is rotatably provided on one end of the rotating rod, a connecting block is fixedly provided on the upper end of the supporting rod, a fixing rod fixed to the bottom end of the construction platform is slidably provided on one side of the connecting block, a through groove matched with the rotating rod is penetrated on the lower side of the supporting plate, the rotating rod movably penetrates the through groove, and a guide rod movably penetrates the base is fixedly provided on the lower side of the supporting rod.
[0011] Among them, a limiting groove is arranged on one side of the second inclined rod, a mounting shell is fixedly arranged on one side of the first inclined rod, a limiting block adapted to the limiting groove is slidably arranged in the mounting shell, a first electromagnetic block attracted to the limiting block is fixedly arranged on the inner side of the mounting shell, and a second spring is symmetrically fixedly arranged between the limiting block and the inner end of the mounting shell.
[0012] Among them, a toothed disc is fixed at one end of the roller, a connecting shell is arranged on one side of the toothed disc, a first connecting rod fixed to the second oblique rod is fixed on the upper side of the connecting shell, a limiter adapted to the toothed disc is slidably arranged in the connecting shell, a telescopic tube is symmetrically fixed between the limiter and the inner end of the connecting shell, a third spring is fixed in the telescopic tube, and a second electromagnetic block attracted to the limiter is fixed on the inner side of the connecting shell.
[0013] Among them, the auxiliary component includes an L-shaped rod slidably set with the guide rod, a sliding block is fixed at one end of the L-shaped rod, a sliding cavity adapted to the sliding block is set on the inner side of the guide rod, the sliding block is slidably set in the sliding cavity, and a fourth spring is fixed between the sliding block and the inner end of the sliding cavity.
[0014] Among them, a sleeve rod is fixedly arranged at one end of the L-shaped rod away from the sliding block, a sliding rod is slidably arranged inside the sleeve rod, a fifth spring is fixedly arranged between the upper end of the sliding rod and the inner cavity of the sleeve rod, and a second roller is arranged at the lower end of the sliding rod.
[0015] A button electrically connected to the electric lifting rod is installed on the upper side of the guide rod, a moving block is arranged on one side of the button, and a second connecting rod fixed to the L-shaped rod is fixed on the side of the moving block away from the button.
[0016] Among them, a groove-shaped shell is arranged on the upper side of the button, and pressure blocks are fixed at the lower ends of both sides of the groove-shaped shell. A third connecting rod fixed with the sliding rod is fixed on one side of the groove-shaped shell. A guide groove is opened through the sleeve rod at the third connecting rod, and the third connecting rod slides up and down along the guide groove.
[0017] The present invention has at least the following beneficial effects:
[0018] The present invention can provide oblique support for the construction platform through the oblique brace assembly to prevent the construction support from tilting and ensure the stability of the construction support. The angle of the oblique support provided to the construction platform by the oblique brace assembly can be adjusted according to the lifting height of the construction platform, so that the construction height of the construction platform is matched with the oblique support angle of the oblique brace assembly. Therefore, when the supporting operation of the construction support is carried out in a smaller site, the oblique support of the construction platform by the oblique brace assembly can be facilitated, and thus it can also be convenient for construction personnel to use. Through the auxiliary assembly, when the oblique support angle of the oblique brace assembly is adjusted with the lifting height of the construction platform, if an obstacle or a pit on the ground is encountered, the rising of the construction platform can be stopped in time to prevent the instability of the construction support. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the front-view stereoscopic structure of the present invention;
[0020] Figure 2 It is a schematic diagram of the overall structure of the diagonal bracing assembly and the auxiliary assembly of the present invention;
[0021] Figure 3 It is a structural schematic diagram of a cross-section of the first oblique rod of the present invention;
[0022] Figure 4 For the present invention Figure 3 The enlarged structural diagram at A in the middle;
[0023] Figure 5 It is a schematic structural diagram of the internal cross-section of the connecting shell of the present invention;
[0024] Figure 6 It is a schematic diagram of the structure of the explosion of the toothed disc and the limiting member of the present invention;
[0025] Figure 7 It is a structural schematic diagram of the auxiliary components of the present invention;
[0026] Figure 8 It is a structural schematic diagram of a partial cross-section of the guide rod of the present invention;
[0027] Fig. 9 It is a structural schematic diagram of a cross-section of the sleeve rod of the present invention.
[0028] In the figure: 11, base; 12, electric lifting rod; 13, construction platform; 2, diagonal support assembly; 21, support plate; 22, first diagonal rod; 23, second diagonal rod; 24, first roller member; 241, mounting frame; 242, roller; 243, roller; 25, receiving member; 26, rotating rod; 27, supporting rod; 28, connecting block; 29, fixing rod; 210, guide rod; 211, first spring; 212, mounting shell; 213, first electromagnetic block; 214, limit block; 215, limit groove; 216, second spring; 21 7. Toothed disc; 218. Limiting member; 219. Connecting shell; 220. Second electromagnetic block; 221. Telescopic tube; 222. Third spring; 223. First connecting rod; 224. Through groove; 3. Auxiliary component; 31. L-shaped rod; 32. Sliding block; 33. Fourth spring; 34. Sliding cavity; 35. Sleeve rod; 36. Sliding rod; 37. Second roller member; 38. Button; 39. Moving block; 310. Second connecting rod; 311. Grooved shell; 312. Pressing block; 313. Third connecting rod; 314. Guide groove; 315. Fifth spring. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] Embodiment 1
[0031] See also Figures 1 to 9 The present invention provides a technical solution: a construction support for a rural construction project, comprising: a base 11, on which electric lifting rods 12 are symmetrically arranged, and on which a construction platform 13 is arranged,
[0032] It also includes: a diagonal brace assembly 2, which is arranged at the four corners of the base 11 and is used to diagonally support the construction platform 13;
[0033] The auxiliary component 3 is arranged on one side of the diagonal support component 2 , and is used to assist the diagonal support component 2 in providing diagonal support to the construction platform 13 .
[0034] During the use of the construction scaffold, the height of the construction platform 13 is adjusted by the electric lifting rod 12 to meet the construction requirements of different height positions. The diagonal support assembly 2 can be used to support the construction platform 13 diagonally to prevent the construction scaffold from tilting and ensure the stability of the construction scaffold. The angle of the diagonal support assembly 2 for the construction platform 13 can be adjusted according to the lifting height of the construction platform 13, so that the construction height of the construction platform 13 matches the diagonal support angle of the diagonal support assembly 2. Therefore, when the construction scaffold is supported in a smaller site, the diagonal support of the construction platform 13 by the diagonal support assembly 2 can be facilitated, which can also be convenient for construction personnel to use. Through the auxiliary assembly 3, when the diagonal support angle of the diagonal support assembly 2 is adjusted with the lifting height of the construction platform 13, if an obstacle or a pit on the ground is encountered, the rise of the construction platform 13 can be stopped in time to prevent the construction scaffold from being unstable.
[0035] Embodiment 2
[0036] The diagonal support assembly 2 includes a support plate 21 symmetrically fixed on the upper ends of the four corners of the base 11, a first diagonal rod 22 is rotatably arranged on the upper side of the support plate 21, a second diagonal rod 23 is slidably arranged in the first diagonal rod 22, and guide blocks are arranged on both sides of the second diagonal rod 23, and guide grooves are arranged on both sides of the inner cavity of the first diagonal rod 22, and the second diagonal rod 23 is guided to slide in the first diagonal rod 22 by sliding the guide blocks along the guide grooves, a first spring 211 is fixed between the upper end of the second diagonal rod 23 and the inner cavity of the first diagonal rod 22, the first spring 211 is in a compressed state, and a first roller member 24 is arranged at the lower end of the second diagonal rod 23.
[0037] The first roller member 24 includes a mounting frame 241 fixed to the second inclined rod 23, a roller 242 is arranged on the inner side of the mounting frame 241, a roller shaft 243 rotatably arranged with the mounting frame 241 is fixed to the middle of the roller 242, and a receiving member 25 is fixed to the lower side of the four corners of the base 11. Initially, the roller 242 of the first roller member 24 is located on the receiving member 25, so that when the construction support moves through the rolling wheel on the lower side of the base 11, the roller 242 of the first roller member 24 will not hinder the movement of the construction support. When the construction platform 13 rises, the roller 242 will roll out of the receiving member 25 to support it on the ground. When the construction platform 13 descends to the lowest position, the roller 242 will roll back to the receiving member 25 along the inclined surface on the lower side of the receiving member 25.
[0038] A rotating rod 26 is rotatably provided on one side of the first inclined rod 22, and a support rod 27 is rotatably provided on one end of the rotating rod 26. A connecting block 28 is fixedly provided on the upper end of the support rod 27, and a fixing rod 29 is slidably provided on one side of the connecting block 28. The upper end of the fixing rod 29 is fixedly provided with the bottom end of the construction platform 13, and the fixing rod 29 is inclinedly provided. A through slot 224 adapted to the rotating rod 26 is penetrated and opened on the lower side of the support plate 21, and the rotating rod 26 movably penetrates the through slot 224. A guide rod 210 movably penetrates the base 11 is fixedly provided on the lower side of the support rod 27 to guide and limit the movement of the support rod 27.
[0039] When the electric lifting rod 12 is controlled by the controller on the construction platform 13 to drive the construction platform 13 to rise, the fixing rod 29 will be driven to move upward with the construction platform 13, so that the connecting block 28 moves close to the support plate 21, and the support rod 27 and the guide rod 210 move close to the support plate 21, so that the first inclined rod 22 can be pushed to rotate outward through the rotating rod 26, and the rotating rod 26 can be rotated upward along the through groove 224. Under the elastic force of the first spring 211, the second inclined rod 23 slides downward along the inner cavity of the first inclined rod 22, so that the roller 242 of the first roller member 24 rolls out of the receiving member 25 and is supported on the ground. Through the first spring 211, the supporting effect between the roller 242 of the first roller member 24 and the ground can be always maintained during the rising process of the construction platform 13, so that the construction platform 13 is obliquely supported by the first roller member 24, the first oblique rod 22 and the second oblique rod 23, and the oblique support angle of the first oblique rod 22 and the second oblique rod 23 can be adjusted with the rising height of the construction platform 13.
[0040] A limiting groove 215 is provided on one side of the second oblique rod 23, and the limiting grooves 215 are densely arranged. A mounting shell 212 is fixedly provided on one side of the first oblique rod 22. A limiting block 214 adapted to the limiting groove 215 is slidably provided in the mounting shell 212. A through groove is provided at the limiting block 214 of the first oblique rod 22 so that the limiting block 214 can be inserted into the limiting groove 215. A first electromagnetic block 213 is fixedly provided on the inner side of the mounting shell 212. After power is turned on, the first electromagnetic block 213 can be attracted by the limiting block 214. A second spring 216 is symmetrically fixedly provided between the limiting block 214 and the inner end of the mounting shell 212.
[0041] When the electric lifting rod 12 is controlled to start, the first electromagnetic block 213 can be energized at the same time, generating attraction for the limit block 214, so that the limit block 214 moves close to the first electromagnetic block 213 and moves out of the limit groove 215, and the second spring 216 is compressed to release the restriction on the second inclined rod 23, so that the second inclined rod 23 can slide downward along the inner cavity of the first inclined rod 22 under the elastic force of the first spring 211. After the construction platform 13 rises to a suitable height, the electric lifting rod 12 is controlled to close, and the first electromagnetic block 213 is de-energized at the same time. Under the elastic force of the second spring 216, the limit block 214 moves close to the second inclined rod 23 and is inserted into the limit groove 215 to limit the sliding of the second inclined rod 23, thereby ensuring the oblique support of the first oblique rod 22 and the second oblique rod 23 to the construction platform 13.
[0042] One end of the roller 243 extends to the outside of the mounting frame 241 and is fixed with a toothed disc 217. A connecting shell 219 is provided on one side of the toothed disc 217. A first connecting rod 223 fixed to the second oblique rod 23 is fixed on the upper side of the connecting shell 219 to support and fix the connecting shell 219. A limiting member 218 adapted to the toothed disc 217 is slidably provided in the connecting shell 219. The tooth grooves on the outside of the toothed disc 217 are densely arranged. The inner side of the limiting member 218 is arranged to be adapted to the toothed disc 217. The toothed part 218 and the inner end of the connecting shell 219 are symmetrically fixed with a telescopic tube 221, which can guide and limit the movement of the limiting part 218. A third spring 222 is fixed in the telescopic tube 221, and a second electromagnetic block 220 is fixed on the inner side of the connecting shell 219. After power is turned on, the second electromagnetic block 220 can attract the limiting part 218. The second electromagnetic block 220 and the first electromagnetic block 213 are both electrically connected to the electric lifting rod 12 in the circuit;
[0043] When the electric lifting rod 12 is controlled to start, the second electromagnetic block 220 can be energized at the same time, generating attraction for the limiter 218, so that the limiter 218 moves closer to the second electromagnetic block 220 and moves out of the toothed disc 217 to release the restriction on the toothed disc 217, and the third spring 222 is compressed, so that the roller 242 of the first roller member 24 can roll along the ground to adjust the diagonal support angles of the first diagonal rod 22 and the second diagonal rod 23. After the construction platform 13 reaches a suitable height position, the electric lifting rod 12 is closed. , the second electromagnetic block 220 will be powered off. Under the elastic force of the third spring 222, the limit member 218 will move away from the second electromagnetic block 220 and get stuck on the outer side of the toothed disc 217, against the side of the toothed disc 217 close to the connecting shell 219, so as to limit the rotation of the toothed disc 217, thereby limiting the rotation of the roller 243, and further limiting the rolling of the roller 242 of the first roller member 24 along the ground, thereby further ensuring the oblique support of the first oblique rod 22 and the second oblique rod 23 to the construction platform 13, and ensuring the stability of the construction support.
[0044] Embodiment 3
[0045] The auxiliary component 3 includes an L-shaped rod 31 slidably arranged with the guide rod 210, the L-shaped rod 31 is located at one end of the guide rod 210 away from the support rod 27, a sliding block 32 is fixedly arranged at one end of the L-shaped rod 31, a sliding cavity 34 adapted to the sliding block 32 is arranged on the inner side of the guide rod 210, the sliding block 32 is slidably arranged in the sliding cavity 34, the cross section of the sliding block 32 is larger than the cross section of the L-shaped rod 31, so as to prevent the L-shaped rod 31 from being separated from the guide rod 210, and a fourth spring 33 is fixedly arranged between the sliding block 32 and the inner end of the sliding cavity 34;
[0046] A sleeve rod 35 is fixedly provided at one end of the L-shaped rod 31 away from the sliding block 32, a sliding rod 36 is slidably provided inside the sleeve rod 35, a fifth spring 315 is fixedly provided between the upper end of the sliding rod 36 and the inner cavity of the sleeve rod 35, a second roller member 37 is provided at the lower end of the sliding rod 36, the second roller member 37 has the same structure as the first roller member 24, a mounting frame 241 of the second roller member 37 is fixed to the lower end of the sliding rod 36, the second roller member 37 is located outside the first roller member 24, and the roller 242 of the second roller member 37 has the same rolling path as the roller 242 of the first roller member 24, under the elastic force of the fifth spring 315, the roller 242 of the second roller member 37 can roll along the supporting ground;
[0047] A button 38 electrically connected to the electric lifting rod 12 is installed on the upper side of the guide rod 210, and a moving block 39 is arranged on one side of the button 38. The side of the moving block 39 close to the button 38 is arranged as an inclined surface, and the side of the moving block 39 away from the button 38 is fixedly provided with a second connecting rod 310 fixed to the L-shaped rod 31. When the construction platform 13 is driven to rise by the electric lifting rod 12, the movement of the guide rod 210 outward can drive the L-shaped rod 31 and the second roller member 37 to move outward at the same time. When the site is small or encounters an obstacle, the second roller member 37 will touch the obstacle first. Under the resistance of the obstacle to the second roller member 37, the guide rod 210 Continuing to move outward will cause the L-shaped rod 31 and the sliding block 32 to move toward the inside of the sliding cavity 34, and the fourth spring 33 will be compressed, and the moving block 39 will move close to the button 38 through the second connecting rod 310. The inclined surface on one side of the moving block 39 is set to facilitate the moving block 39 to move to the button 38 and press the button 38, so that the electric lifting rod 12 is powered off and the construction platform 13 is stopped from continuing to rise in time to prevent it from touching obstacles, and the diagonal support angles of the first diagonal rod 22 and the second diagonal rod 23 cannot be adjusted further, which may cause the construction bracket to become unstable, so as to ensure the safety of the construction bracket during support operations.
[0048] A groove-shaped shell 311 is provided on the upper side of the button 38, and pressure blocks 312 are fixedly provided at the lower ends of both sides of the groove-shaped shell 311. When the groove-shaped shell 311 moves downward and the pressure blocks 312 are pressed against the button 38, the upper end surface of the moving block 39 is located at the lower side of the top end surface of the inner cavity of the groove-shaped shell 311, and the two side end surfaces of the moving block 39 are located between the pressure blocks 312 on both sides so as not to hinder the normal movement of the moving block 39. The setting of the groove-shaped shell 311 can also prevent the sundries dropped from the upper side from accidentally touching the button 38. A third connecting rod 313 fixedly provided with the slide rod 36 is fixedly provided on one side of the groove-shaped shell 311, and a guide groove 314 is provided through the sleeve rod 35 at the third connecting rod 313, and the third connecting rod 313 slides up and down along the guide groove 314.
[0049] When the construction platform 13 is lifted up by the electric lifting rod 12, if a pit or a mud puddle on the ground is encountered, the second roller member 37 will first reach the pit or the mud puddle on the ground, and under the elastic force of the fifth spring 315, the slide rod 36 will drive the second roller member 37 to move down a greater distance, so that the third connecting rod 313 will move down along the guide groove 314, thereby driving the groove shell 311 to move down and press against the button 38, so that the electric lifting rod 12 is powered off and closed, and the construction platform 13 is stopped from continuing to rise in time to prevent the construction platform 13 from continuing to rise, and the first roller member 24 will reach the pit or the mud puddle on the ground, thereby causing the construction support to become unstable.
[0050] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0051] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction support for a rural construction project, comprising: A base (11), wherein an electric lifting rod (12) is symmetrically arranged on the base (11), and a construction platform (13) is arranged on the electric lifting rod (12). The invention is characterized in that it further comprises: an oblique brace assembly (2), wherein the oblique brace assembly (2) is arranged at four corners of the base (11), and the oblique brace assembly (2) is used to obliquely support the construction platform (13); An auxiliary component (3) is arranged on one side of the diagonal bracing component (2), and is used to assist the diagonal bracing component (2) in providing oblique support to the construction platform (13).
2. The construction support for rural construction projects according to claim 1 is characterized by: The diagonal support assembly (2) comprises a support plate (21) symmetrically fixed on the upper ends of four corners of the base (11); a first diagonal rod (22) is rotatably arranged on the upper side of the support plate (21); a second diagonal rod (23) is slidably arranged inside the first diagonal rod (22); a first spring (211) is fixed between the upper end of the second diagonal rod (23) and the inner cavity of the first diagonal rod (22); and a first roller member (24) is arranged at the lower end of the second diagonal rod (23).
3. The construction support for rural construction projects according to claim 2 is characterized by: The first roller member (24) comprises a mounting frame (241) fixedly mounted on the second oblique rod (23); a roller (242) is arranged inside the mounting frame (241); a roller shaft (243) is fixedly mounted in the middle of the roller (242) and rotatably mounted on the mounting frame (241); and receiving members (25) are fixedly mounted on the lower sides of the four corners of the base (11).
4. The construction support for rural construction projects according to claim 3 is characterized by: A rotating rod (26) is rotatably provided on one side of the first inclined rod (22), a supporting rod (27) is rotatably provided on one end of the rotating rod (26), a connecting block (28) is fixedly provided on the upper end of the supporting rod (27), a fixing rod (29) fixedly provided on one side of the connecting block (28) and fixed to the bottom end of the construction platform (13) is slidably provided, a through slot (224) adapted to the rotating rod (26) is penetrated through the lower side of the supporting plate (21), the rotating rod (26) movably penetrates the through slot (224), and a guide rod (210) movably penetrates the base (11) is fixedly provided on the lower side of the supporting rod (27).
5. The construction support for rural construction projects according to claim 2, characterized in that: A limiting groove (215) is provided on one side of the second oblique rod (23); a mounting shell (212) is fixedly provided on one side of the first oblique rod (22); a limiting block (214) adapted to the limiting groove (215) is slidably provided in the mounting shell (212); a first electromagnetic block (213) attracted to the limiting block (214) is fixedly provided on the inner side of the mounting shell (212); and a second spring (216) is symmetrically fixedly provided between the limiting block (214) and the inner end of the mounting shell (212).
6. The construction support for rural construction projects according to claim 3, characterized in that: A toothed disc (217) is fixedly provided at one end of the roller (243), a connecting shell (219) is provided at one side of the toothed disc (217), a first connecting rod (223) fixedly provided with the second inclined rod (23) is fixedly provided on the upper side of the connecting shell (219), a limiting member (218) adapted to the toothed disc (217) is slidably provided inside the connecting shell (219), a telescopic tube (221) is symmetrically fixedly provided between the limiting member (218) and the inner end of the connecting shell (219), a third spring (222) is fixedly provided inside the telescopic tube (221), and a second electromagnetic block (220) attracted to the limiting member (218) is fixedly provided inside the connecting shell (219).
7. The construction support for rural construction projects according to claim 4, characterized in that: The auxiliary component (3) comprises an L-shaped rod (31) slidably arranged with the guide rod (210), a sliding block (32) is fixedly arranged at one end of the L-shaped rod (31), a sliding cavity (34) adapted to the sliding block (32) is arranged on the inner side of the guide rod (210), the sliding block (32) is slidably arranged in the sliding cavity (34), and a fourth spring (33) is fixedly arranged between the sliding block (32) and the inner end of the sliding cavity (34).
8. The construction support for rural construction projects according to claim 7, characterized in that: A sleeve rod (35) is fixedly provided at one end of the L-shaped rod (31) away from the sliding block (32), a sliding rod (36) is slidably provided inside the sleeve rod (35), a fifth spring (315) is fixedly provided between the upper end of the sliding rod (36) and the inner cavity of the sleeve rod (35), and a second roller member (37) is provided at the lower end of the sliding rod (36).
9. The construction support for rural construction projects according to claim 8, characterized in that: A button (38) electrically connected to the electric lifting rod (12) is installed on the upper side of the guide rod (210), a moving block (39) is arranged on one side of the button (38), and a second connecting rod (310) fixed to the L-shaped rod (31) is fixed on the side of the moving block (39) away from the button (38).
10. The construction support for rural construction projects according to claim 9, characterized in that: A groove-shaped shell (311) is provided on the upper side of the button (38), and pressure blocks (312) are fixedly provided at the lower ends of both sides of the groove-shaped shell (311). A third connecting rod (313) fixedly provided with the sliding rod (36) is fixedly provided on one side of the groove-shaped shell (311), and a guide groove (314) is provided through the sleeve rod (35) at the third connecting rod (313), and the third connecting rod (313) slides up and down along the guide groove (314).