Bottom plate secondary lining trolley of inclined long pilot tunnel of main cable passing section and construction method
By designing a bottom plate two-lined trolley for inclined long guide holes, combining a large tonnage hoist and a wire rope traction system, the problems of high construction difficulty and poor quality in traditional construction methods are solved, and the inclined long guide holes are realized. Stable and high-quality concrete pouring.
Patent Information
- Application Number
- CN202411235745.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-11-15
AI Technical Summary
Traditional construction methods are difficult to construct in the inclined long guide holes of the main cable through the passage of the main cable, and have poor construction quality, making it difficult to meet the design requirements.
Design a bottom plate two-lined trolley with inclined long guide holes of the main cable through the section, adopting a steel frame-shaped frame-shaped frame with vertical and vertical crisscrossing mesh, and is equipped with front legs and rear legs rollers, steel formwork and oblique braces, and is passed through a large tonnage hoist. Traction and restraint with the wire rope, and pour concrete with the cutting vibration window.
It improves construction stability and concrete penetration capacity, ensures high-quality molding of the base plate, reduces construction risks and improves construction efficiency.
Smart Images

Figure CN118959027A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of tunnel construction, and in particular to a bottom plate secondary lining trolley and a construction method for an inclined long guide tunnel of a main cable passing section. Background Art
[0002] At present, secondary lining and primary support are relatively speaking, referring to the inner lining built with concrete and other materials under the condition that the tunnel has been initially supported, in order to achieve the purpose of strengthening support, optimizing the line and drainage system. Among the secondary linings, the most representative one is the bottom plate. When the bottom plate is secondary lined, facing the inclined long guide tunnel of the main cable passing section, the construction difficulty is greatly increased, and the construction risk is increased.
[0003] In the related technologies, for the secondary lining construction, the traditional technical scheme mainly adopts ① the scaffolding construction method and ② the secondary lining trolley-assisted construction method; specifically, the scaffolding construction method mainly carries out the secondary lining construction by manually setting up scaffolds and formworks; the secondary lining trolley-assisted construction method mainly designs an auxiliary secondary lining trolley to slide and construct at the same time.
[0004] However, the traditional scaffolding construction method and the secondary lining trolley-assisted construction method are mainly applicable to the secondary lining construction of flat tunnels; for the inclined long guide tunnel of the main cable passing section, the scaffolding construction method is difficult to build in the long guide tunnel with a large inclination angle, and because of the large inclination angle, there is a high risk of tipping over during construction; at the same time, the main cable passing section will cause holes in the cross section of the secondary lining construction, which will reduce the construction quality, and the traditional scaffolding construction method makes it difficult to make the construction quality meet the design requirements; and the secondary lining trolley-assisted construction method pours concrete on the slope surface, which has poor stability, and the bottom plate is poured by the secondary lining trolley. During pouring, the whole bottom plate has strong integrity, and has poor penetration ability into the holes in the cross section of the main cable passing section, and the quality of the bottom plate after casting is poor. Summary of the invention
[0005] The present application provides a bottom plate secondary lining trolley and a construction method for an inclined long guide tunnel of a main cable passage section, which solves the problems of high construction risk and poor construction quality of the inclined long guide tunnel of a main cable passage section in existing traditional construction schemes.
[0006] In a first aspect, an embodiment of the present application provides a bottom plate secondary lining trolley for an inclined long guide tunnel of a main cable passing section, comprising:
[0007] The skeleton is in the shape of a crisscross grid steel frame, with front legs and rear legs respectively arranged at both ends, and rollers are arranged at the bottom of the front legs and the rear legs; the bottom of the rear legs is provided with a height-adjustable support foot for straddling the top surface of the two cast bottom slab segments and ensuring that the inclination of the skeleton remains unchanged;
[0008] The steel template is arranged in parallel below the frame through a plurality of first screw rods, and can realize demoulding and mold closing under the action of the plurality of first screw rods; the steel template is provided with a plurality of material unloading and vibration windows;
[0009] Two diagonal braces, the top ends of the two diagonal braces are respectively hinged to the top of the front leg and the top of the rear leg; in the normal state, the diagonal braces are turned up and placed on the top surface of the frame, and in the use state, the diagonal braces are turned down and supported against the top surface of the second cast bottom plate segment or the initial support bottom plate.
[0010] In combination with the first aspect, in one embodiment, the steel formwork includes a bottom plate formwork, a step formwork and a short side wall formwork in the transverse direction;
[0011] Step templates are symmetrically arranged on both lateral sides of the base plate template, and an upturned short side wall template is arranged above the step template; the short side wall template can extend outwards and shrink inwards relative to the step template.
[0012] In combination with the first aspect, in one embodiment, the bottom plate second lining trolley is also provided with a second screw rod, one end of the second screw rod is hinged to the upturned top end of the short side wall formwork, and the other end is hinged to the bottom plate formwork, and the short side wall formwork extends outward and contracts inward under the action of the second screw rod.
[0013] In combination with the first aspect, in one embodiment, a directional rail clamp is provided on the roller of the rear leg, and the directional rail clamp ensures that the roller rolls in a directional manner.
[0014] In combination with the first aspect, in one embodiment, the bottom plate secondary lining trolley further includes an anti-fall rope, and both ends of the anti-fall rope are respectively connected to the primary supporting bottom plate embedded parts and the front supporting legs.
[0015] In a second aspect, an embodiment of the present application provides a construction method based on the above-mentioned bottom plate secondary lining trolley, wherein the bottom plate of the inclined long guide tunnel is divided into n bottom plate segments, and the construction method comprises the following steps:
[0016] Install the corresponding waterproof layer and steel bars at the position of the second bottom slab segment to be poured in the i-th section; where 1≤i≤n; perform the final initial support surface treatment at the corresponding position of the i+1-th bottom slab segment;
[0017] The bottom plate secondary lining trolley is assembled at the low position of the inclined long guide tunnel, and a large-tonnage winch is arranged at the high position of the inclined long guide tunnel. The large-tonnage winch is connected to the bottom plate secondary lining trolley through a steel wire rope, and the bottom plate secondary lining trolley is pulled from the low position to the high position to the position of the i-th bottom plate segment, and the steel wire rope is released; at the same time, diagonal braces are used as constraint points at the front and rear ends of the bottom plate secondary lining trolley, and the diagonal braces are firmly welded to the steel plate embedded parts;
[0018] The i-th bottom plate segment is molded, a waterproof layer is installed at the corresponding position of the i+1-th bottom plate segment, and the final initial support surface treatment is performed at the corresponding position of the i+2-th bottom plate segment;
[0019] Pour concrete on the i-th floor slab segment and vibrate it through the material discharge vibration window, install steel bars at the corresponding position of the i+1-th floor slab segment, and install a waterproof layer on the i+2-th floor slab segment;
[0020] The secondary lining trolley of the bottom slab moves to the corresponding position of the i+1th bottom slab segment, fixes the diagonal support, closes the mold and casts, repeats the final initial support surface treatment, installs the waterproof layer and installs the steel bars, and gradually completes the secondary lining construction of each section of the bottom slab.
[0021] In combination with the second aspect, in one embodiment, before installing the corresponding waterproof layer and steel bars at the position of the i-th bottom plate segment, the method further comprises:
[0022] Carry out preliminary repair treatment on the primary support surface of the entire inclined long guide tunnel;
[0023] The primary support surface of the entire inclined long guide tunnel is initially repaired, including:
[0024] The encroaching parts are chiseled out, the protruding steel bars are removed, the grouting pipes are exposed, and the base surface pits are filled with mortar; after the treatment is completed, re-measurement is carried out to achieve the set flatness.
[0025] In combination with the second aspect, in one embodiment, the steel wire rope includes a first steel wire rope and a second steel wire rope, a clamp ring is provided at the end of the first steel wire rope, and the first steel wire rope crosses the bogie from the hoist and is connected to a plurality of forked second steel wire ropes through the clamp ring, and the plurality of forked second steel wire ropes are connected to the frame and the front leg;
[0026] The release wire rope comprises:
[0027] Remove the connection points between the second steel wire rope and the frame, and between the second steel wire rope and the front outrigger.
[0028] In combination with the second aspect, in one embodiment, the steel formwork includes a bottom plate formwork, a step formwork and a short side wall formwork in the transverse direction; the step formworks are symmetrically arranged on both sides of the bottom plate formwork in the transverse direction, and an upturned short side wall formwork is arranged above the step formwork;
[0029] The bottom plate secondary lining trolley is also provided with a second screw rod, one end of which is hinged to the upturned top end of the short side wall template, and the other end is hinged to the bottom plate template. Under the action of the second screw rod, the short side wall template extends outward and contracts inward relative to the step template;
[0030] Closing of the base plate segments, including:
[0031] Adjust the second screw rod so that the steel template reaches the appropriate horizontal width.
[0032] In combination with the second aspect, in one embodiment, a directional rail clamp is provided on the roller of the rear leg, and the directional rail clamp ensures that the roller rolls in a directional manner; the bottom plate secondary lining trolley further comprises an anti-fall rope, and the two ends of the anti-fall rope are respectively connected to the primary support bottom embedded part and the front leg;
[0033] While using the diagonal brace as a restraint point, tension the anti-fall rope.
[0034] The beneficial effects brought by the technical solution provided by the embodiment of the present application include at least:
[0035] The bottom plate second lining trolley of the present application has a steel formwork arranged in parallel below the frame through a plurality of first screw rods, which can meet the functions of mold closing and demoulding. On this basis, the adjustable diagonal brace makes the bottom plate second lining trolley have good stability in the inclined long guide tunnel. Furthermore, the steel formwork is provided with a plurality of material unloading and vibration windows, which can vibrate the concrete in different areas when pouring concrete. It has a strong penetration ability to the cross-sectional holes of the main cable passing section, and the quality of the bottom plate after casting is good.
[0036] The bottom plate secondary lining trolley of the present application has step templates symmetrically arranged on both lateral sides of the bottom plate template of the steel template, and a slidable low side wall template is arranged above the step template, so that the lateral width of the steel template is adjustable to meet a variety of lateral widths, with a wide range of applicability and strong versatility.
[0037] The construction method of the bottom plate secondary lining trolley of the present application performs the preparation work before pouring section by section, and finally performs the initial support surface treatment, installation of the waterproof layer and installation of the steel bars in a staggered and progressive manner, and the construction efficiency is high; at the same time, the winch pulls the bottom plate secondary lining trolley from a low position to a high position through a steel wire rope, and each time it reaches a position to be poured, it is constrained and fixed by an oblique brace, so that stable construction can be carried out in an inclined long guide tunnel; at the same time, each time a bottom plate segment is poured, it is vibrated through the material discharge vibration window, so the penetration ability of the cross-sectional holes of the main cable passing section is strong, and the quality of the bottom plate after pouring is good. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0039] Figure 1 A schematic diagram of a bottom plate secondary lining trolley provided in an embodiment of the present application;
[0040] Figure 2 for Figure 1AA section view in;
[0041] Figure 3 A schematic diagram of a state in which the bottom plate secondary lining trolley provided in an embodiment of the present application moves to a target position via a steel wire rope;
[0042] Figure 4 A schematic diagram of a state in which the bottom plate secondary lining trolley provided in an embodiment of the present application moves to a position of a bottom plate segment to be cast, and then the diagonal support is fixed and the mold is closed for casting;
[0043] Figure 5 A schematic diagram of a state where the bottom plate secondary lining trolley provided in an embodiment of the present application has been cast and formed at the target position;
[0044] Figure 6 A schematic diagram of the state of the bottom plate second lining trolley provided in the embodiment of the present application, after the previous bottom plate segment has been cast and formed, moving to the position of the next bottom plate segment to be cast, and then fixing the diagonal support and closing the mold for casting;
[0045] Figure 7 Schematic diagram of the wire rope, bogie and winch provided in the embodiment of the present application (simplified bottom plate secondary lining trolley)
[0046] Figure 8 A schematic diagram of the arrangement of the blanking and vibrating windows of the steel formwork provided in the embodiment of the present application;
[0047] Fig. 9 A schematic diagram of the sequence of material feeding and vibration provided in the embodiment of the present application;
[0048] In the figure: 1. Bottom plate second lining trolley; 11. Frame; 12. Front support leg; 13. Rear support leg; 14. First screw rod; 15. Steel formwork; 16. Roller; 17. Second screw rod; 18. Diagonal brace; 151. Bottom plate formwork; 152. Step formwork; 153. Low side wall formwork; 154. Unloading and vibrating window; 2. Winch; 3. Wire rope; 31. First wire rope; 32. Second wire rope; 33. Clamp; 4. Bogie; 100. Initial support bottom plate; 101. Second bottom plate segment to be poured; 102. Second bottom plate segment already poured. DETAILED DESCRIPTION
[0049] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0050] The embodiment of the present application provides a bottom plate secondary lining trolley and construction method for an inclined long guide tunnel of a main cable passage section, which can solve the problems of high construction risk and poor construction quality of the existing traditional construction scheme for the inclined long guide tunnel of the main cable passage section.
[0051] like Figures 1 to 4 As shown, the present application discloses an embodiment of a bottom plate secondary lining trolley for an inclined long guide tunnel of a main cable passing section. The bottom plate secondary lining trolley 1 comprises a frame 11 , a steel formwork 15 and two diagonal braces 18 .
[0052] The frame 11 is in the shape of a crisscross grid steel frame, with front legs 12 and rear legs 13 respectively disposed at both ends of the frame 11, and rollers 16 disposed at the bottom of the front legs 12 and the rear legs 13. A height-adjustable support foot is disposed at the bottom of the rear leg 13, and the height-adjustable support foot can be placed on the top surface of the cast second bottom plate segment 102 and ensure that the inclination of the frame 11 remains unchanged, so that the frame 11 is always parallel to the primary bottom plate 100.
[0053] Specifically, during actual construction, the front legs 12 and the rear legs 13 need to be one high and one low, and the height-adjustable support legs can meet this function, so that the frame 11 of the bottom plate secondary lining trolley is always parallel to the primary support bottom plate.
[0054] The steel template 15 is arranged in parallel below the frame 11 through a plurality of first screw rods 14, and can realize demoulding and mold closing under the action of the plurality of first screw rods 14. The steel template 15 is provided with a plurality of material discharge and vibration windows 154, which can vibrate concrete in different areas during concrete pouring, and has a strong penetration ability to the cross-sectional holes of the main cable passing section, and the bottom plate after pouring and forming has a good quality.
[0055] The top ends of the two diagonal braces 18 are hinged to the top ends of the front legs 12 and the rear legs 13 respectively. The diagonal braces 18 in the normal state are turned up and placed on the top surface of the frame 11. The diagonal braces 18 in the use state are turned down and supported against the top surface of the second cast bottom plate segment 102 or the initial support bottom plate.
[0056] Preferably, the skeleton 11 is in the shape of a criss-cross grid steel frame, and the steel sections are arranged at a longitudinal spacing of 1.2 m and a transverse spacing of 1.0 m.
[0057] Specifically, after the diagonal brace 18 is folded down to support, it is also welded and fixed to the embedded part.
[0058] The bottom plate secondary lining trolley of the present application has a steel template 15 which is arranged in parallel below the frame 11 through a plurality of first screw rods 14, which can meet the functions of mold closing and demoulding. On this basis, the adjustable diagonal support 18 makes the bottom plate secondary lining trolley 1 have good stability in the inclined long guide tunnel. Furthermore, the steel template 15 is provided with a plurality of material unloading and vibration windows 154, which can vibrate the concrete in different areas when pouring concrete, and has a strong penetration ability to the cross-sectional holes of the main cable passing section, and the quality of the bottom plate after casting is good.
[0059] like Figure 2 As shown, in one embodiment, the steel formwork 15 includes a bottom plate formwork 151, a step formwork 152 and a short side wall formwork 153 in the transverse direction. The step formwork 152 is symmetrically arranged on both sides of the bottom plate formwork 151 in the transverse direction, and an upwardly tilted short side wall formwork 153 is arranged above the step formwork 152. The short side wall formwork 153 can extend outward and contract inward relative to the step formwork 152.
[0060] Specifically, Figure 1 The left-right direction is vertical, Figure 2 The left-right direction in is the horizontal direction.
[0061] Specifically, the total length of the steel formwork is 6 m and the width is 7.1 m; the bottom plate formwork 151, the step formwork 152 and the low side wall formwork 153 are connected in pairs by bolts.
[0062] Specifically, the bottom plate formwork 151 and the low side wall formwork 153 are both made of 4mm steel plates, and are both reinforced and supported by steel bars with a diameter of 10mm and a tensile strength of 300 MPa. They are also reinforced with 2 HPB235 steel bars with a diameter of 16mm, and the structure is stable and reliable.
[0063] The bottom plate secondary lining trolley of the present application has step templates 152 symmetrically arranged on both lateral sides of the bottom plate template 151 of the steel template 15, and a slidable low side wall template 153 is arranged above the step template 152, so that the lateral width of the steel template 15 is adjustable to meet a variety of lateral widths, with a wide range of applicability and strong versatility.
[0064] like Figure 2 As shown, further, the bottom plate second lining trolley is also provided with a second screw rod 17, one end of the second screw rod 17 is hinged to the upturned top end of the short side wall template 153, and the other end is hinged to the bottom plate template 151. The short side wall template 153 extends outward and contracts inward under the action of the second screw rod 17.
[0065] The bottom plate secondary lining trolley of the present application adjusts the lateral width of the entire steel template 15 through the second screw rod 17, and the adjustment is flexible.
[0066] In one embodiment, a directional rail clamp is provided on the roller 16 of the rear leg 13, and the directional rail clamp ensures that the roller 16 can roll in a directional manner. In actual use, the directional rail clamp can ensure that the bottom plate secondary lining trolley 1 can only slide in the longitudinal direction; at other times, the directional rail clamp can also be used to ensure that the bottom plate secondary lining trolley 1 can only slide in the transverse direction.
[0067] In one embodiment, the bottom plate secondary lining trolley further includes an anti-falling rope, and the two ends of the anti-falling rope are respectively connected to the primary support bottom plate embedded parts and the front support legs 12. Specifically, the anti-falling rope is in a taut state, and the anti-falling rope further ensures the stability of the bottom plate secondary lining trolley in the inclined long guide tunnel on the basis of the diagonal support 18, which is beneficial to the construction.
[0068] The bottom plate secondary lining trolley of the present application, the anti-fall rope, the directional rail clamp and the diagonal brace form a self-stabilizing system of the entire bottom plate secondary lining trolley, and has strong stability in the inclined long guide tunnel.
[0069] Specifically, the body of the bottom slab secondary lining trolley is equipped with a monitoring and early warning system. During the running and pouring conditions of the bottom slab secondary lining trolley, the walking posture, final position fitting, wire rope damage, trolley structure safety, etc. of the bottom slab secondary lining trolley are remotely monitored in real time. When the bottom slab secondary lining trolley operates abnormally, emergency alarm and remote braking will be implemented. The system can be connected to the bridge information platform, authorizing managers at all levels to realize remote safety prevention and control and intelligent management functions.
[0070] like Figure 8 and Fig. 9 As shown, further, the bottom template has windows of 30×20cm arranged in a plum blossom shape at a spacing of 1.4m. The step template has ф50mm round holes, one for each step. Fig. 9 The arrows in the figure indicate the order of material feeding and vibration.
[0071] like Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown, the present application also discloses a construction method based on the above-mentioned bottom plate secondary lining trolley, the bottom plate of the inclined long guide tunnel is divided into n bottom plate segments, and the construction method comprises the following steps:
[0072] Install the corresponding waterproof layer and steel bars at the position 101 of the second bottom slab segment to be poured in the i-th section, and make preparations before pouring; where 1≤i≤n; perform the final initial support surface treatment at the corresponding position of the i+1-th bottom slab segment;
[0073] The bottom plate secondary lining trolley 1 is assembled at the low position of the inclined long guide tunnel, and a large-tonnage winch 2 is arranged at the high position of the inclined long guide tunnel. The large-tonnage winch 2 is connected to the bottom plate secondary lining trolley 1 through a wire rope 3, and pulls the bottom plate secondary lining trolley 1 from the low position to the high position to the i-th bottom plate segment position (see Figure 3 ), install diagonal braces 18 at the front and rear ends of the bottom plate secondary lining trolley 1 as restraint points, the diagonal braces 18 are welded firmly to the steel plate embedded parts, and the steel wire rope 3 (see Figure 4 Specifically, the front diagonal brace 18 can prevent the bottom plate second lining trolley from being accidentally pulled by the wire rope 3, and the rear diagonal brace 18 can prevent the bottom plate second lining trolley from sliding down, so that it stays at the position of the second bottom plate segment 101 to be cast.
[0074] The i-th bottom plate segment is molded together, a waterproof layer is installed at the corresponding position of the i+1-th bottom plate segment, and the final initial support surface treatment is performed at the corresponding position of the i+2-th bottom plate segment.
[0075] Pour concrete into the bottom slab section of section i (see Figure 5 ), and vibrate through the material discharge vibration window 154, install steel bars at the corresponding position of the i+1th section bottom plate segment, and make preparations before pouring; and prepare for the start of the next section, and install a waterproof layer on the i+2th section bottom plate segment.
[0076] The bottom plate secondary lining trolley 1 moves to the corresponding position of the i+1th bottom plate segment and is fixed with diagonal braces (see Figure 6 ), close the mold and cast, repeat the final initial support surface treatment, install the waterproof layer and install the steel bars, and gradually complete the secondary lining construction of each section of the base plate.
[0077] The construction method of the bottom plate secondary lining trolley of the present application performs the preparation work before pouring step by step, and finally performs the initial support surface treatment, installation of the waterproof layer and installation of the steel bars in a staggered and progressive manner, and the construction efficiency is high; at the same time, the winch 2 pulls the bottom plate secondary lining trolley 1 from a low position to a high position through the wire rope 3, and each time it reaches a position to be poured, it is constrained and fixed by the diagonal brace 18, so that stable construction can be carried out in the inclined long guide tunnel; at the same time, each time a bottom plate segment is poured, it is vibrated through the material discharge vibration window 154, so the penetration ability of the cross-sectional holes of the main cable passing section is strong, and the quality of the bottom plate after pouring is good.
[0078] Specifically, the hoisting machine 2 is a large-tonnage hoisting machine of 20 tons or more.
[0079] In one embodiment, before installing the corresponding waterproof layer and steel bars at the position of the i-th bottom plate segment, the method further comprises:
[0080] Carry out preliminary repair treatment on the primary support surface of the entire inclined long guide tunnel;
[0081] The primary support surface of the entire inclined long guide tunnel is initially repaired, including:
[0082] The encroaching part (referring to the redundant part) is chiseled out, the protruding steel bar is processed (mainly cut off), the grouting pipe is exposed, and the base surface pits are filled with mortar. After the processing is completed, re-measurement is carried out to achieve the set flatness. Specifically, the flatness is required to be monitored by a 1m ruler, and the maximum concave and convex height is less than 5cm.
[0083] like Figure 7As shown, in one embodiment, the steel wire rope 3 includes a first steel wire rope 31 and a second steel wire rope 32, a clamp ring 33 is provided at the end of the first steel wire rope 31, and the first steel wire rope 31 crosses the bogie 4 from the hoist 2 and is connected to a plurality of forked second steel wire ropes 32 through the clamp ring 33, and the plurality of forked second steel wire ropes 32 are connected to the frame 11 and the front leg 12;
[0084] Release the wire rope 3, including:
[0085] The connection points between the second steel wire rope 32 and the frame 11 , and between the second steel wire rope 32 and the front supporting leg 12 are removed.
[0086] The construction method of the present application adopts a plurality of second steel wire ropes 32 for tensioning and fixing, so that the traction is more stable and reliable.
[0087] Specifically, the steel wire rope 2 is selected from 4 And 6×37S+FC steel wire rope. 6 means that the steel wire rope is a 6-strand steel wire rope; 37 means that there are 37 6x37S+FC steel wire rope wires in each steel strand, which is a point contact structure. The steel wires in the strand are arranged as follows: 1 (1 steel wire in the center) + 6 (6 steel wires in the inner layer) + 12 (12 steel wires in the second outer layer) + 18 (18 steel wires in the outer layer); FC- means that the rope core of the steel wire rope is a fiber rope core. Indicates that the diameter of the wire rope is 32mm. Wire rope 1 is selected One end of the wire rope is coiled into the winch drum, and the other end is converted and connected to the wire rope 2 through a 50t clamp.
[0088] like Figure 2 As shown, in one embodiment, the steel formwork 15 includes a bottom plate formwork 151, a step formwork 152 and a short side wall formwork 153 in the transverse direction. The step formwork 152 is symmetrically arranged on both sides of the bottom plate formwork 151 in the transverse direction, and an upwardly tilted short side wall formwork 153 is arranged above the step formwork 152. The short side wall formwork 153 can extend outward and contract inward relative to the step formwork 152.
[0089] Furthermore, the second lining trolley of the base plate is also provided with a second screw rod 17, one end of the second screw rod 17 is hinged to the upturned top end of the short side wall template 153, and the other end is hinged to the base plate template 151. Under the action of the second screw rod 17, the short side wall template 153 extends outward and contracts inward relative to the step template 152.
[0090] Closing of the base plate segments, including:
[0091] The second screw rod 17 is adjusted so that the steel template 15 reaches a suitable transverse width.
[0092] In the construction method of the present application, step templates 152 are symmetrically arranged on both sides of the bottom plate template 151 of the steel template 15, and a slidable short side wall template 153 is arranged above the step template 152, so that the lateral width of the steel template 15 is adjustable, which can meet various lateral widths, has a wide range of applications, and is highly versatile. In the construction method of the present application, the lateral width of the entire steel template 15 is adjusted by the second screw rod 17, and the adjustment is flexible.
[0093] In one embodiment, a directional rail clamp is provided on the roller 16 of the rear leg 13, and the directional rail clamp ensures that the roller 16 can roll in a directional manner. In actual use, the directional rail clamp can ensure that the bottom plate secondary lining trolley 1 can only slide in the longitudinal direction; at other times, the directional rail clamp can also be used to ensure that the bottom plate secondary lining trolley 1 can only slide in the transverse direction.
[0094] The bottom plate secondary lining trolley also includes an anti-fall rope, and the two ends of the anti-fall rope are respectively connected to the primary support bottom plate embedded parts and the front support legs 12. Specifically, the anti-fall rope is in a taut state. On the basis of the diagonal support 18, the anti-fall rope further ensures the stability of the bottom plate secondary lining trolley in the inclined long guide tunnel, which is conducive to construction.
[0095] In the construction method of the present application, the anti-fall rope, the directional rail clamp and the diagonal brace form a self-stabilizing system for the entire bottom plate second lining trolley, which has strong stability in the inclined long guide tunnel.
[0096] While using the diagonal brace 18 as a restraint point, the anti-fall rope is tensioned.
[0097] Furthermore, in order to protect the finished product, after pouring a base plate segment and removing the formwork, anti-slip stickers are installed on the steps in the middle of the cross bridge, and reflective stickers are installed on the corners of the short side walls on both sides of the cross bridge.
[0098] Further, when pouring concrete, Fig. 9 The materials are discharged in order, and after being discharged and vibrated through a window each time, they are sealed in time with steel covers of equal sizes.
[0099] Specifically, vibration is performed by using an inserted vibrating rod, an attached vibrator, and a combination of striking the outside of the formwork.
[0100] When vibrating, the vibrating rod should be inserted into the next layer to a certain depth (usually 5 to 10 cm); each vibration time is about 30 seconds to avoid under-vibration or over-vibration. After the vibration is completed, the vibrating rod should be slowly pulled out while vibrating. Concrete should be vibrated and compacted. Signs of compacted concrete: concrete no longer sinks, no longer bubbles, and the surface begins to overflow.
[0101] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.
[0102] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0103] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
Claims
1. A bottom plate secondary lining trolley for an inclined long guide tunnel of a main cable passing section, characterized in that: Include: A frame (11) in the shape of a crisscross grid steel frame, with front legs (12) and rear legs (13) respectively arranged at both ends, and rollers (16) are arranged at the bottom of the front legs (12) and the rear legs (13); a height-adjustable support foot is arranged at the bottom of the rear legs (13) for straddling the top surface of the cast two substrate plate segments (102) and ensuring that the inclination of the frame (11) remains unchanged; A steel template (15) is arranged in parallel below the frame (11) through a plurality of first screw rods (14), and can realize demoulding and mold closing under the action of the plurality of first screw rods (14); the steel template (15) is provided with a plurality of material discharge vibration windows (154); Two diagonal braces (18), the top ends of the two diagonal braces (18) are respectively hinged to the top of the front leg (12) and the top of the rear leg (13); in a normal state, the diagonal braces (18) are turned up and placed on the top surface of the frame (11); in a use state, the diagonal braces (18) are turned down and supported on the top surface of the cast second substrate plate segment (102) or the primary support bottom plate (100).
2. A bottom plate secondary lining trolley for an inclined long guide tunnel of a main cable passage section as claimed in claim 1, characterized in that: The steel formwork (15) comprises a bottom plate formwork (151), a step formwork (152) and a low side wall formwork (153) in the transverse direction; Stepping templates (152) are symmetrically arranged on both sides of the bottom plate template (151), and an upward-curved short side wall template (153) is arranged above the stepping template (152); The short side wall formwork (153) can extend outwards and contract inwards relative to the step formwork (152).
3. A bottom plate secondary lining trolley for an inclined long guide tunnel of a main cable passage section as claimed in claim 2, characterized in that: The bottom plate secondary lining trolley is also provided with a second screw rod (17), one end of the second screw rod (17) is hinged to the upturned top end of the short side wall template (153), and the other end is hinged to the bottom plate template (151). The short side wall template (153) extends outward and contracts inward under the action of the second screw rod (17).
4. The bottom plate secondary lining trolley of the inclined long guide tunnel of the main cable passing section as claimed in claim 1, characterized in that: A directional rail clamp is arranged on the roller (16) of the rear supporting leg (13), and the directional rail clamp ensures that the roller (16) rolls in a directional manner.
5. The bottom plate secondary lining trolley of the inclined long guide tunnel of the main cable passing section as claimed in claim 1, characterized in that: The bottom plate secondary lining trolley also comprises an anti-falling rope, the two ends of which are respectively connected to the primary supporting bottom plate embedded parts and the front supporting legs (12).
6. A construction method based on the bottom plate secondary lining trolley according to claim 1, characterized in that: The bottom plate of the inclined long guide tunnel is divided into n bottom plate segments, and the construction method comprises the following steps: Installing corresponding waterproof layer and steel bars at the position of the i-th section of the second bottom slab segment (101) to be poured; wherein 1≤i≤n; performing final primary support surface treatment at the corresponding position of the i+1-th section of the bottom slab segment; A bottom plate secondary lining trolley (1) is assembled at a low position of the inclined long guide tunnel, and a large-tonnage winch (2) is arranged at a high position of the inclined long guide tunnel. The large-tonnage winch (2) is connected to the bottom plate secondary lining trolley (1) through a steel wire rope (3), and pulls the bottom plate secondary lining trolley (1) from a low position to a high position to the position of the i-th bottom plate segment, and releases the steel wire rope (3); at the same time, diagonal braces (18) are used as restraint points at the front and rear ends of the bottom plate secondary lining trolley (1), and the diagonal braces (18) are firmly welded to the steel plate embedded parts; The i-th bottom plate segment is molded, a waterproof layer is installed at the corresponding position of the i+1-th bottom plate segment, and the final initial support surface treatment is performed at the corresponding position of the i+2-th bottom plate segment; Concrete is poured on the i-th floor slab segment, and vibrated through the material discharge vibration window (154), steel bars are installed at corresponding positions of the i+1-th floor slab segment, and a waterproof layer is installed on the i+2-th floor slab segment; The bottom plate secondary lining trolley (1) moves to the corresponding position of the i+1th bottom plate segment, fixes the diagonal support, closes the mold and casts, repeats the final initial support surface treatment, installs the waterproof layer and installs the steel bars, and gradually completes the construction of each bottom plate secondary lining.
7. The construction method according to claim 6, characterized in that: Before installing the corresponding waterproof layer and steel bars at the position of the i-th bottom plate segment, the method further comprises: Carry out preliminary repair treatment on the primary support surface of the entire inclined long guide tunnel; The primary support surface of the entire inclined long guide tunnel is initially repaired, including: The encroaching parts are chiseled out, the protruding steel bars are removed, the grouting pipes are exposed, and the base surface pits are filled with mortar; after the treatment is completed, re-measurement is carried out to achieve the set flatness.
8. The construction method according to claim 6, characterized in that: The steel wire rope (3) comprises a first steel wire rope (31) and a second steel wire rope (32), a clamping ring (33) is provided at the end of the first steel wire rope (31), and the first steel wire rope (31) crosses from the winch (2) to the bogie (4) and is then connected to a plurality of forked second steel wire ropes (32) through the clamping ring (33), and the plurality of forked second steel wire ropes (32) are connected to the frame (11) and the front leg (12); The release wire rope (3) comprises: The connection points between the second steel wire rope (32) and the frame (11), and between the second steel wire rope (32) and the front supporting leg (12) are removed.
9. The construction method according to claim 6, characterized in that: The steel formwork (15) comprises a bottom plate formwork (151), a step formwork (152) and a short side wall formwork (153) in the transverse direction; the step formworks (152) are symmetrically arranged on both sides of the bottom plate formwork (151) in the transverse direction, and an upwardly tilted short side wall formwork (153) is arranged above the step formwork (152); The bottom plate secondary lining trolley is also provided with a second screw rod (17), one end of the second screw rod (17) is hinged to the upturned top end of the short side wall template (153), and the other end is hinged to the bottom plate template (151). Under the action of the second screw rod (17), the short side wall template (153) extends outward and contracts inward relative to the step template (152); Closing of the base plate segments, including: The second screw rod (17) is adjusted so that the steel template (15) reaches a suitable transverse width.
10. The construction method according to claim 6, characterized in that: A directional rail clamp is provided on the roller (16) of the rear leg (13), and the directional rail clamp ensures that the roller (16) rolls in a directional manner; The bottom plate secondary lining trolley also comprises an anti-falling rope, the two ends of which are respectively connected to the primary support bottom embedded part and the front support leg (12); While using the diagonal brace (18) as a restraining point, the anti-falling rope is tensioned.