Helium supply system based on liquid helium ISO storage tank
By setting up a self-pressure unit and a TT long-tube trailer backup booster unit in the ISO storage tank, the problem of insufficient boosting capacity of the liquid helium ISO storage tank is solved, efficient and reliable helium supply is achieved, and the supply system is improved. Stability and economy.
Patent Information
- Application Number
- CN202410983823.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-15
AI Technical Summary
The existing liquid helium ISO storage tank has limited boosting capacity, resulting in unstable helium supply and poor economicality, making it difficult to meet high flow demand.
A self-pressure unit is set up in the ISO storage tank system, which leads out the liquid helium and gasifies it and then injects it back into the storage tank. Combined with the TT long-tube trailer backup boost unit to ensure sufficient pressure and provide a backup helium supply system.
It increases the pressure in the ISO storage tank, ensures smooth supply of liquid helium, enhances the reliability and economicality of helium supply, which is far higher than the supply capacity of traditional TT and cylinders.
Smart Images

Figure CN118959855A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of helium supply, and in particular relates to a helium supply system based on a liquid helium ISO storage tank. Background Art
[0002] Helium is an important bulk gas for electronics. It can be used as a carrier gas, deposition gas, etching gas, etc. With the continuous increase in the application of helium in the semiconductor field, the ability to ensure the supply of helium is extremely important for the downstream semiconductor industry. However, the content of helium in the air is low and it is not easy to liquefy. In addition, the manufacturing method using air separation equipment is not economical. Therefore, the current acquisition and supply of helium is mainly through the centralized mining of natural gas plants, which is then stored in special containers and then transported to end customers through various forms of transportation.
[0003] At present, the main storage and supply forms of helium in electronic bulk gas are: cylinders, containers and long tube trailers (TT vehicles for short). In practical applications, the capacity of these supply forms is relatively limited, affected by many factors such as gas container size, on-site space, gas source capacity, geopolitics, shipping facilities, customs policies, etc. According to actual use experience, for 1Nm 3 / h or less, it can be supplied in cylinders; for 10Nm 3 / h or less, it can be supplied in container form; for 50Nm 3 / h or less, it can be supplied in TT form. However, for more than 50Nm 3 / h usage, these traditional forms of supply will have greater risks, a single TT car only 3250Nm 3 / h of helium supply, and the supply can only last for less than 3 days. In addition, factors such as on-site parking space, transportation, weather, and supply sources affect the stability and economy of the supply. In this case, it is necessary to consider using larger capacity storage containers for supply.
[0004] Liquid helium ISO storage tank is a new large-capacity liquid helium supply system. The gas supply capacity of a single liquid helium ISO storage tank can reach 25000Nm 3 / h, which can solve the demand for large-volume supply, reduce the impact of logistics and other factors, and improve the reliability and economy of the overall supply system. However, in actual use, the pressure in the liquid helium ISO storage tank is low, and it is necessary to pressurize the liquid helium to push it out of the liquid helium ISO storage tank to complete normal supply. However, the existing liquid helium ISO storage tank is pressurized only by one coil, and the pressurization capacity is very limited. Summary of the invention
[0005] The object of the present invention is to provide a helium supply system based on a liquid helium ISO storage tank. By arranging a self-pressurizing unit in the ISO storage tank system, the liquid helium in the ISO storage tank can be drawn out and pressurized and gasified and then injected back into the ISO storage tank to enhance the pressure in the ISO storage tank, so that the liquid helium in the ISO storage tank can be smoothly ejected.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A helium supply system based on a liquid helium ISO storage tank comprises an ISO storage tank system; the ISO storage tank system comprises an ISO storage tank and a self-pressurizing unit connected to the ISO storage tank; the ISO storage tank is suitable for storing liquid helium; the self-pressurizing unit is suitable for drawing out the liquid helium in the ISO storage tank and pressurizing and gasifying it into gaseous helium, and then injecting it back into the ISO storage tank, so as to enhance the pressure in the ISO storage tank and enable the liquid helium in the ISO storage tank to be smoothly supplied.
[0008] Optionally, the helium supply system further comprises a TT tube trailer supply system connected to the ISO storage tank system; the TT tube trailer supply system comprises a TT tube trailer and a backup pressurizing unit connected to the TT tube trailer; the TT tube trailer is suitable for storing gas helium; the backup pressurizing unit is suitable for drawing out the gas helium in the TT tube trailer and injecting it into the ISO storage tank after adjusting the pressure, so as to enhance the pressure in the ISO storage tank and enable the liquid helium in the ISO storage tank to be smoothly supplied.
[0009] Optionally, the backup boosting unit is suitable for being activated when the self-boosting unit fails or has insufficient boosting capacity; and / or the TT tube trailer supply system is suitable for serving as a backup helium supply system when the ISO tank system fails or is replaced.
[0010] Optionally, the backup pressurizing unit is further adapted to purge the liquid helium outlet (A) of the ISO storage tank by using the gas helium in the TT long tube trailer when the ISO storage tank is replaced.
[0011] Optionally, the helium supply system further comprises an economic output pressure regulating unit connected to at least one of the self-pressurization unit and the backup pressurization unit; the economic output pressure regulating unit is suitable for directly outputting the helium gas in at least one of the self-pressurization unit and the backup pressurization unit after regulating the pressure when the ISO storage tank does not need to be pressurized.
[0012] Optionally, the self-pressurizing unit includes a self-pressurizing vaporizer and a self-pressurizing pressure regulator; the ISO storage tank, the self-pressurizing vaporizer, and the self-pressurizing pressure regulator are connected in sequence to form a self-pressurizing path; the liquid helium in the ISO storage tank enters the self-pressurizing vaporizer and is pressurized and gasified to become gaseous helium; the gaseous helium is pressure-regulated by the self-pressurizing pressure regulator and then injected back into the ISO storage tank.
[0013] Optionally, the backup boosting unit includes a backup boosting first pressure regulator and a backup boosting second pressure regulator; the TT long tube trailer, the backup boosting first pressure regulator, the backup boosting second pressure regulator and the ISO storage tank are connected in sequence to form a backup boosting path; the helium in the TT long tube trailer is pressure-regulated by the backup boosting first pressure regulator and the backup boosting second pressure regulator in sequence and then injected into the ISO storage tank.
[0014] Optionally, the ISO tank system further comprises two-way vaporizers, a POU purifier, and an ISO tank system pressure regulator connected in sequence; the liquid helium output from the ISO tank is vaporized by the two-way vaporizers to form gaseous helium; the gaseous helium sequentially purifies and pressure-regulates the POU purifier and the ISO tank system pressure regulator before being output.
[0015] Optionally, the helium supply system further comprises an additional pressurizing unit connected between the two-way vaporizer and the POU purifier; the additional pressurizing unit is suitable for pressurizing when the pressure of the ISO storage tank itself is relatively low and the pressurizing capacity is insufficient to meet the demand.
[0016] Optionally, the TT long tube trailer supply system includes a front filter, a first pressure regulator of the TT long tube trailer supply system, a second pressure regulator of the TT long tube trailer supply system, a rear filter and a flow meter connected in sequence; the helium output by the TT long tube trailer is suitable for being filtered by the front filter in sequence, pressure-regulated by the first pressure regulator of the TT long tube trailer supply system, pressure-regulated again by the second pressure regulator of the TT long tube trailer supply system, filtered again by the rear filter, and output after being measured by the flow meter.
[0017] Compared with the prior art, the technical solution of the present invention has at least the following beneficial effects.
[0018] For example, the present invention provides a self-pressurizing unit in the ISO storage tank system, so that the liquid helium in the ISO storage tank can be drawn out and pressurized and gasified and then injected back into the ISO storage tank to increase the pressure in the ISO storage tank, thereby allowing the liquid helium in the ISO storage tank to be smoothly ejected.
[0019] For another example, the present invention combines the self-pressurization of the ISO storage tank with the backup pressurization of the TT long tube trailer. When the self-pressurization of the ISO storage tank fails, the backup pressurization of the TT long tube trailer can be used, which effectively improves the reliability of the helium supply.
[0020] For another example, after the ISO storage tank is replaced, the present invention can also use the spare booster unit of the TT long tube trailer supply system to purge the liquid helium outlet of the ISO storage tank, especially the hose at the liquid helium outlet, so as to ensure that the helium quality is not affected during the replacement of the ISO storage tank.
[0021] For another example, the present invention further provides an economic output pressure regulating unit connected to at least one of the self-pressurization unit and the backup pressurization unit, so that when the ISO storage tank does not need to be pressurized, the gas helium in at least one of the self-pressurization unit and the backup pressurization unit can be directly output as a helium product after pressure regulation, thereby reducing gas helium loss.
[0022] For another example, the TT long tube trailer supply system of the present invention has diversified functions. It can not only be used as a backup helium supply form and a backup pressurization form, but also can purge the liquid helium outlet of the ISO storage tank, especially the hose at the liquid helium outlet, thereby improving the reliability of helium supply while being economical.
[0023] For another example, the present invention not only combines three self-pressurization methods, namely, ISO storage tank self-pressurization, TT long tube trailer standby pressurization, and ISO storage tank built-in coil pressurization, but also can use additional pressurization, namely, use a booster pump to increase pressure, when the ISO storage tank self-pressurization, TT long tube trailer standby pressurization, and ISO storage tank built-in coil pressurization are not sufficient to meet the supply pressure, so as to improve the reliability of helium supply.
[0024] For another example, the supply capacity of the liquid helium supply system based on the ISO storage tank provided by the present invention is much higher than the supply capacity of the traditional TT and steel cylinder. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 Schematic diagram of a helium supply system based on a liquid helium ISO storage tank in an embodiment of the present invention.
[0026] Description of reference numerals:
[0027] 1.1-TT long tube trailer, 1.2-front filter, 1.3-TT long tube trailer supply system first pressure regulator, 1.4-TT long tube trailer supply system second pressure regulator, 1.5-rear filter, 1.6-flow meter, 1.7-standby boost first pressure regulator, 1.8-standby boost second pressure regulator;
[0028] 2.1-ISO storage tank, 2.2-two-way vaporizer, 2.3 additional boosting unit, 2.4-POU purifier, 2.5-ISO storage tank system regulator, 2.6-self-pressurizing vaporizer, 2.7-self-pressurizing regulator, 2.8-economic output regulator; A-liquid helium outlet, B-gas helium inlet, C-self-pressurizing input point, D-boosting intersection point, E-economic input point, F-economic output point, G-purge input point, H-purge output point, I-extra boosting input point, J-extra boosting output point;
[0029] 3.1-Client end. DETAILED DESCRIPTION
[0030] In order to make the purpose, features and beneficial effects of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below with reference to the accompanying drawings. It is understood that the specific embodiments described below are only used to explain the present invention, rather than to limit the present invention. In addition, the description of the same or similar elements in different embodiments and the description of the prior art elements, features, effects, etc. may be omitted.
[0031] Reference Figure 1 , an embodiment of the present invention provides a helium supply system based on a liquid helium ISO storage tank.
[0032] Specifically, the helium supply system includes an ISO tank system. The ISO tank system further includes an ISO tank 2.1 and a self-pressurizing unit connected to the ISO tank 2.1. The ISO tank 2.1 is suitable for storing liquid helium; the self-pressurizing unit is suitable for drawing out the liquid helium in the ISO tank 2.1 and pressurizing it to gaseous helium and then injecting it back into the ISO tank 2.1, so as to increase the pressure in the ISO tank 2.1 and enable the liquid helium in the ISO tank 2.1 to be ejected smoothly.
[0033] Usually, the pressure of liquid helium in ISO storage tank 2.1 is low, and self-pressurization is required to push the liquid helium out of ISO storage tank 2.1 to complete normal supply. In addition, a reliable self-pressurization system can minimize the remaining amount of liquid helium supplied each time and reduce the waste of liquid helium. Although ISO storage tank 2.1 has a self-pressurization function, its structure is only a coil and its self-pressurization capacity is limited. In order to ensure the reliability of self-pressurization, the present invention adds a self-pressurization unit.
[0034] In some embodiments, the self-pressurizing unit includes a self-pressurizing vaporizer 2.6 and a self-pressurizing pressure regulator 2.7. In addition, the ISO storage tank 2.1, the self-pressurizing vaporizer 2.6, and the self-pressurizing pressure regulator 2.7 are sequentially connected to form a self-pressurizing path.
[0035] In a specific implementation, the liquid helium in the ISO storage tank 2.1 enters the self-boosting vaporizer 2.6 and is pressurized and vaporized to become gaseous helium; the gaseous helium is pressure-regulated by the self-boosting pressure regulator 2.7 and then injected back into the ISO storage tank 2.1 to increase the pressure in the ISO storage tank 2.1, so that the liquid helium in the ISO storage tank 2.1 can be smoothly ejected.
[0036] In some embodiments, the ISO storage tank 2.1 has a liquid helium outlet A and a gas helium inlet B. The liquid helium in the ISO storage tank 2.1 is suitable for flowing out through the liquid helium outlet A and entering the self-pressurizing vaporizer 2.6, and is pressurized and gasified by the self-pressurizing vaporizer 2.6 to become gas helium; the gas helium is pressure-regulated by the self-pressurizing pressure regulator 2.7 and then injected back into the ISO storage tank 2.1 through the gas helium inlet B.
[0037] In some embodiments, the helium supply system further comprises a TT tube trailer supply system connected to the ISO tank system.
[0038] In some embodiments, the TT tube trailer supply system further comprises a TT tube trailer 1.1 and a standby pressurizing unit connected to the TT tube trailer 1.1. The TT tube trailer 1.1 is suitable for storing gas helium; the standby pressurizing unit is suitable for drawing out the gas helium in the TT tube trailer 1.1 and injecting it into the ISO storage tank 2.1 after adjusting the pressure, so as to increase the pressure in the ISO storage tank 2.1 and enable the liquid helium in the ISO storage tank 2.1 to be ejected smoothly.
[0039] In some embodiments, the backup boosting unit includes a backup boosting first pressure regulator 1.7 and a backup boosting second pressure regulator 1.8. Furthermore, the TT tube trailer 1.1, the backup boosting first pressure regulator 1.7, the backup boosting second pressure regulator 1.8 and the ISO storage tank 2.1 are sequentially connected to form a backup boosting path.
[0040] In a specific implementation, the helium gas in the TT long tube trailer 1.1 can be, for example, high-pressure helium gas, which is pressure-regulated by the standby booster first pressure regulator 1.7 and the standby booster second pressure regulator 1.8 in sequence and then injected into the ISO storage tank 2.1 through the helium gas inlet B to enhance the pressure in the ISO storage tank 2.1 so that the liquid helium in the ISO storage tank 2.1 can be smoothly ejected.
[0041] In some embodiments, the self-boosting path and the backup boosting path are adapted to converge at a boosting junction D, and the boosting junction D is located after the self-boosting pressure regulator 2.7 and the backup boosting second pressure regulator 1.8 and before the helium inlet B.
[0042] In some embodiments, the backup pressurization unit is adapted to be activated when the self-pressurization unit of the ISO tank system fails.
[0043] In some embodiments, the backup booster unit is also suitable for purging the liquid helium outlet A of the ISO storage tank 2.1, especially the hose at the liquid helium outlet A, through the helium in the TT long tube trailer 1.1 after the ISO storage tank 2.1 is replaced, so as to ensure that the helium quality is not affected during the replacement of the ISO storage tank 2.1.
[0044] In some embodiments, a purge input point G may be provided before the boost junction D of the backup boost path and after the backup boost second pressure regulator 1.8. At the same time, a purge output point H is provided at the liquid helium outlet A of the ISO storage tank 2.1. Furthermore, the purge input point G and the purge output point H are connected to form a purge path.
[0045] When the ISO storage tank 2.1 is replaced, helium gas is introduced through the purge path to purge the liquid helium outlet A of the ISO storage tank 2.1, especially the hose at the liquid helium outlet A, to ensure that the helium quality is not affected during the replacement of the ISO storage tank 2.1.
[0046] In some embodiments, the TT tube trailer supply system is also adapted to be used as a backup helium supply system when the ISO tank system fails or the ISO tank is replaced.
[0047] In some embodiments, the TT tube trailer supply system comprises a front filter 1.2, a first pressure regulator 1.3, a second pressure regulator 1.4, a rear filter 1.5 and a flow meter 1.6 connected in sequence.
[0048] In a specific implementation, the helium gas output by the TT long tube trailer 1.1 can be, for example, high-pressure helium gas suitable for being filtered in sequence by a front filter 1.2, pressure-regulated by a first pressure regulator 1.3 of a TT long tube trailer supply system, pressure-regulated again by a second pressure regulator 1.4 of a TT long tube trailer supply system, filtered again by a post-filter 1.5, and measured by a flow meter 1.6 before being output to a customer end 3.1.
[0049] In some embodiments, the accuracy of the front filter 1.2 is 0.1 um; the accuracy of the rear filter 1.5 is 0.003 um.
[0050] In some embodiments, 210 kg of high-pressure helium can be taken from the TT long tube trailer 1.1, first filtered through a 0.1 um front filter 1.2, and then pressure-regulated twice by the first pressure regulator 1.3 of the TT long tube trailer supply system and the second pressure regulator 1.4 of the TT long tube trailer supply system to reduce the pressure to 8.5 kg, and then filtered through a 0.003 um post-filter 1.5, and finally measured by a flow meter 1.6 and output to the customer end 3.1.
[0051] In some embodiments, the ISO tank system further comprises a two-way vaporizer 2.2, a POU purifier 2.4 and an ISO tank system pressure regulator 2.5 which are connected in sequence.
[0052] In the specific implementation, the two vaporizers 2.2 are one for use and one for backup. In addition, an air bath type can be adopted, that is, the liquid helium inside exchanges heat with the outside air through the vaporizer fins, thereby evaporating into helium. Since the vaporizer will freeze after long-term use, resulting in performance degradation, a backup machine is required. When one vaporizer freezes severely, it is switched to another vaporizer, and the cycle is repeated to ensure the vaporization performance.
[0053] In a specific implementation, the liquid helium in the ISO storage tank 2.1 flows out through the liquid helium outlet A and enters the two-way vaporizer 2.2, and is heated and vaporized by the two-way vaporizer 2.2 to form gaseous helium; the gaseous helium enters the POU purifier 2.4 to remove gaseous impurities, and then the pressure is adjusted to the value required by the customer by the ISO storage tank system pressure regulator 2.5, and then connected to the after-filter 1.5 of the TT long tube trailer supply system, and finally measured by the flow meter 1.6 and output to the customer end 3.1.
[0054] In some embodiments, a self-pressurization input point C may be provided between the liquid helium outlet A and the two-way vaporizer 2.2. The liquid helium outlet A, the self-pressurization input point C, the self-pressurization vaporizer 2.6, the self-pressurization regulator 2.7, the pressurization intersection point D and the gas helium inlet B are sequentially connected to form a self-pressurization path.
[0055] In some embodiments, the helium supply system further includes an economic output pressure regulating unit connected to at least one of the self-pressurization unit and the backup pressurization unit.
[0056] In a specific implementation, the economic output pressure regulating unit is suitable for directly outputting the helium gas in at least one of the self-pressurizing unit and the backup pressurizing unit after pressure regulation when the ISO storage tank 2.1 does not need to be pressurized.
[0057] In some embodiments, the economic output pressure regulating unit comprises an economic output pressure regulator 2.8. The economic output pressure regulator 2.8 is suitable for directly outputting the helium gas in at least one of the self-pressurization unit and the backup pressurization unit after pressure regulation when the ISO storage tank 2.1 does not need to be pressurized.
[0058] In some embodiments, the economic output pressure regulator 2.8 is suitable for regulating the pressure of the helium in at least one of the self-boosting unit and the backup boosting unit and connecting it to the after-filter 1.5 of the TT long tube trailer supply system when the ISO storage tank 2.1 does not need to be pressurized, and finally outputting it to the customer end 3.1 after being measured by the flow meter 1.6.
[0059] In some embodiments, an economic input point E may be set on the backup pressurization path, and the economic input point E is located after the pressurization intersection point D and before the helium inlet B; at the same time, an economic output point F is set after the ISO tank system pressure regulator 2.5. The economic input point E and the economic output point F are connected to form an economic output path.
[0060] In a specific implementation, the economic output pressure regulator 2.8 is located on the economic output path, and is suitable for regulating the pressure of the helium in at least one of the self-boosting unit and the backup boosting unit and connecting it to the after-filter 1.5 of the TT long-tube trailer supply system when the ISO storage tank 2.1 does not need to be pressurized, and finally outputting it to the customer end 3.1 after being measured by the flow meter 1.6.
[0061] In some embodiments, when the pressure of the ISO tank 2.1 itself is relatively low, especially when the pressure at the rear end of the two-way gasifier 2.2 is lower than 8.5 barg, and the boosting capacity of the ISO tank self-pressurization, the TT long tube trailer backup boosting, and the ISO tank's own coil boosting cannot meet the supply demand, additional boosting and pressure stabilization measures can be used.
[0062] In some embodiments, the helium supply system further includes an additional pressurization unit 2.3 connected between the two-way vaporizer 2.2 and the POU purifier 2.4 to perform additional pressurization and pressure stabilization.
[0063] In some embodiments, the additional boosting unit 2.3 includes a boosting pump and a buffer tank. The liquid helium flowing out of the ISO storage tank 2.1 is heated and vaporized by the two-way vaporizer 2.2 to form gaseous helium; the gaseous helium enters the boosting pump for boosting. The pressure of the gaseous helium after passing through the boosting pump is prone to fluctuation. Adding a buffer tank after the boosting pump allows the pressurized gaseous helium to enter the buffer tank for buffering, which can stabilize the supply pressure and prevent the fluctuation of the boosting pump outlet pressure from affecting the pressure of the product in the rear-end pipeline.
[0064] Since the booster pump requires electricity and impurities may be introduced through the booster pump, it is best to give priority to the self-pressurization of ISO tanks, the backup booster of TT long tube trailers, and the booster of ISO tanks with coils. When these three boosting methods fail, use the booster pump and pressure-stabilizing tank.
[0065] As described above, impurities may be introduced through the booster pump, and therefore, the booster pump and the surge tank are arranged before the POU purifier 2.4 so as to be purified by the POU purifier 2.4.
[0066] In some embodiments, an additional pressurization input point I and an additional pressurization output point J may be sequentially arranged between the two-way gasifier 2.2 and the POU purifier 2.4. Furthermore, the additional pressurization input point I and the additional pressurization output point J are connected to form an additional pressurization path.
[0067] In a specific implementation, the additional pressurization unit 2.3 is arranged on the additional pressurization path.
[0068] It is understandable that each pressure regulator in the embodiment of the present invention is suitable for adjusting the pressure from high to low. The specific adjustment value can be set according to actual needs. Since this part of the content belongs to the common knowledge in the field, it will not be repeated here.
[0069] Although specific embodiments have been described above, these embodiments are not intended to limit the scope of the present disclosure, even when only a single embodiment is described with respect to specific features. The feature examples provided in the present disclosure are intended to be illustrative rather than limiting, unless otherwise stated. In specific implementations, the technical features of one or more dependent claims may be combined with the technical features of the independent claims, based on actual needs and where technically feasible, and the technical features from the corresponding independent claims may be combined in any appropriate manner rather than just by the specific combinations listed in the claims.
[0070] Although the present invention is disclosed as above, the present invention is not limited thereto. Any person skilled in the art can make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the scope defined by the claims.
Claims
1. A helium supply system based on a liquid helium ISO storage tank, characterized in that: The invention comprises an ISO storage tank system; the ISO storage tank system comprises an ISO storage tank (2.1) and a self-pressurizing unit connected to the ISO storage tank (2.1); the ISO storage tank (2.1) is suitable for storing liquid helium; the self-pressurizing unit is suitable for drawing out the liquid helium in the ISO storage tank (2.1), pressurizing it to gasify it into gaseous helium, and then injecting it back into the ISO storage tank (2.1), so as to increase the pressure in the ISO storage tank (2.1) and enable the liquid helium in the ISO storage tank (2.1) to be smoothly supplied.
2. The helium supply system according to claim 1, characterized in that: It also comprises a TT long tube trailer supply system connected to the ISO storage tank system; the TT long tube trailer supply system comprises a TT long tube trailer (1.1) and a backup pressurizing unit connected to the TT long tube trailer (1.1); the TT long tube trailer (1.1) is suitable for storing gas helium; the backup pressurizing unit is suitable for drawing out the gas helium in the TT long tube trailer (1.1), regulating its pressure and injecting it into the ISO storage tank (2.1), so as to increase the pressure in the ISO storage tank (2.1) and enable the liquid helium in the ISO storage tank (2.1) to be smoothly supplied.
3. The helium supply system according to claim 2, characterized in that: The backup boost unit is suitable for being activated when the self-boost unit fails or has insufficient boost capacity; and / or The TT tube trailer supply system is suitable for serving as a backup helium supply system when the ISO tank system fails or is replaced.
4. The helium supply system according to claim 2, characterized in that: The standby pressurizing unit is also suitable for purging the liquid helium outlet (A) of the ISO storage tank (2.1) through the gas helium in the TT long tube trailer (1.1) when the ISO storage tank (2.1) is replaced.
5. The helium supply system according to claim 2, characterized in that: It also includes an economic output pressure regulating unit connected to at least one of the self-pressurization unit and the backup pressurization unit; the economic output pressure regulating unit is suitable for directly outputting the helium gas in at least one of the self-pressurization unit and the backup pressurization unit after regulating the pressure when the ISO storage tank (2.1) does not need to be pressurized.
6. The helium supply system according to any one of claims 1 to 5, characterized in that: The self-pressurizing unit comprises a self-pressurizing vaporizer (2.6) and a self-pressurizing pressure regulator (2.7); the ISO storage tank (2.1), the self-pressurizing vaporizer (2.6), and the self-pressurizing pressure regulator (2.7) are connected in sequence to form a self-pressurizing path; the liquid helium in the ISO storage tank (2.1) enters the self-pressurizing vaporizer (2.6) and is pressurized and gasified to become gaseous helium; the gaseous helium is pressure-regulated by the self-pressurizing pressure regulator (2.7) and then injected back into the ISO storage tank (2.1).
7. The helium supply system according to any one of claims 2 to 5, characterized in that: The standby pressurization unit comprises a standby pressurization first pressure regulator (1.7) and a standby pressurization second pressure regulator (1.8); the TT long tube trailer (1.1), the standby pressurization first pressure regulator (1.7), the standby pressurization second pressure regulator (1.8) and the ISO storage tank (2.1) are connected in sequence to form a standby pressurization path; the helium in the TT long tube trailer (1.1) is pressure-regulated in sequence by the standby pressurization first pressure regulator (1.7) and the standby pressurization second pressure regulator (1.8) and then injected into the ISO storage tank (2.1).
8. The helium supply system according to any one of claims 1 to 5, characterized in that: The ISO storage tank system further comprises two-way vaporizers (2.2), a POU purifier (2.4), and an ISO storage tank system pressure regulator (2.5) which are connected in sequence; the liquid helium output from the ISO storage tank (2.1) is vaporized by the two-way vaporizers (2.2) to form gaseous helium; the gaseous helium is purified and pressure-regulated by the POU purifier (2.4) and the ISO storage tank system pressure regulator (2.5) in sequence before being output.
9. The helium supply system according to claim 8, characterized in that: It also includes an additional pressurizing unit (2.3) connected between the two-way gasifier (2.2) and the POU purifier (2.4); the additional pressurizing unit (2.3) is suitable for boosting the pressure when the pressure of the ISO storage tank (2.1) itself is relatively low and the boosting capacity is insufficient to meet the demand.
10. The helium supply system according to any one of claims 2 to 5, characterized in that: The TT long tube trailer supply system comprises a front filter (1.2), a first pressure regulator (1.3) of the TT long tube trailer supply system, a second pressure regulator (1.4) of the TT long tube trailer supply system, a rear filter (1.5) and a flow meter (1.6) which are connected in sequence; the helium gas outputted from the TT long tube trailer (1.1) is suitable for being filtered in sequence by the front filter (1.2), pressure-regulated by the first pressure regulator (1.3) of the TT long tube trailer supply system, pressure-regulated again by the second pressure regulator (1.4) of the TT long tube trailer supply system, filtered again by the rear filter (1.5), and output after being measured by the flow meter (1.6).
Citation Information
Patent Citations
Methods and systems for bulk ultra-high purity helium supply and usage
CN102575809A
Helium purification device and helium purification method
CN111288748A
Optimized L-CNG gas station storage tank pressurization system and pressurization method
CN113324163A
Novel liquid nitrogen and liquid carbon dioxide fire preventing and extinguishing system and method
CN113606492A
Civilian LNG air feeder
CN205402231U