High-temperature casting dust removal treatment system and heat recovery method
By setting up a closed space and suction cover during the casting process, combined with a flat bag dust collector and heat exchange system, the problems of low replacement efficiency, high noise and high energy consumption of high-temperature and high concentration flue gas dust control equipment are solved, and high efficiency is achieved Dust removal and heat recovery meet strict environmental protection and production efficiency requirements.
Patent Information
- Application Number
- CN202411022571.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-15
AI Technical Summary
The existing high-temperature and high-concentration flue gas dust control equipment has problems such as low replacement efficiency, high noise, and high energy consumption, and cannot effectively meet the dust removal and heat recovery needs from smelting to cooling to vibrating sand dropping during casting.
A high-temperature casting dust removal treatment system was designed, including setting up a closed space and suction cover in the smelting, cooling and vibration sand drop areas, transporting flue gas and dust to the pretreatment dust collector for preliminary settlement, and then passing through flat The bag dust collector is subjected to secondary purification, and heat recovery is carried out using the main heat exchange pipe and heat pump to realize heat recycling.
Improve dust control efficiency to reach more than 99.9%, reduce operating costs. The initial investment is only 1/2 to 2/3 of traditional equipment, and the heat recovery and utilization rate reaches more than 70%, meeting strict environmental protection requirements and production efficiency requirements. .
Smart Images

Figure CN118960391A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of dust removal, and in particular to a high-temperature casting dust removal system and a heat recovery method. Background Art
[0002] During the current casting process, medium frequency furnaces are often used in the smelting area, and a rotating top suction hood is often used for capture and collection. However, when a cyclone suction hood is used for collection, it cannot be captured due to interference problems.
[0003] The cooling area is often cooled in an open manner to quickly dissipate the hot air to the surroundings; during the process, a lot of smoke drifts into the factory, causing smog and affecting workers' operations.
[0004] Vibratory sand removal often uses a semi-enclosed workshop, where small and medium-sized workpieces are hoisted into the workshop by a crane. The top and front are open and cannot be closed, resulting in a lot of air leakage.
[0005] For high-temperature and high-concentration flue gas dust control, three types of dust collectors are commonly used at home and abroad: round bag dust collectors, cartridge dust collectors and flat bag dust collectors. Each type has certain limitations, as shown below:
[0006] When using a round bag dust collector, when inspecting or replacing the round bags, the operation must be performed on the top of the dust collector. The operator needs to work at high altitude and take out the round bags one by one and hang them on the ground. It is very troublesome to take the round bags up and down and replace them. It takes several days to replace a device each time. The replacement efficiency is low, which seriously affects the production efficiency.
[0007] The use of cartridge dust collectors has strict manufacturing control and high one-time investment. Pulse backwashing causes a lot of noise, which affects the surrounding working environment. Especially when placed near dust-generating points, it often affects workers. For high-temperature flue gas dust, the temperature resistance of the cartridge cannot meet the working conditions, and the cleaning effect is inferior to that of bag dust collectors.
[0008] The flat bag dust collector has a suitable height, space and floor space, but the pulse back-blowing solenoid valve produces a loud back-blowing noise and requires a large amount of back-blowing compressed air. The back-blowing compressed air also needs to be heated to remove water vapor, resulting in high energy consumption.
[0009] Therefore, there is an urgent need for a high-temperature casting dust removal and control system and a heat recovery method that can meet the dust removal and heat recovery requirements of various areas from smelting to cooling to vibration sand dropping, and can improve dust control efficiency and reduce energy consumption. Summary of the invention
[0010] The purpose of the present invention is to provide a high-temperature casting dust removal system and a heat recovery method, aiming to solve the shortcomings of traditional high-temperature and high-concentration flue gas dust treatment equipment as described in the background technology.
[0011] To achieve the above-mentioned purpose, in a first aspect, the present invention provides a high-temperature casting dust removal and treatment system, comprising a smelting area, a cooling area, a vibration sand-falling area, a pre-treatment dust collector, and a flat bag dust collector arranged in sequence, and also comprising a main pipeline extending from the smelting area, the cooling area, and the vibration sand-falling area to the pre-treatment dust collector, and the outlet of the main pipeline is connected to the top inlet of the pre-treatment dust collector; the top outlet of the pre-treatment dust collector is connected to the inlet of the flat bag dust collector;
[0012] A first enclosed space for enclosing the intermediate frequency furnace is provided in the smelting area, a first coil for collecting heat and a first suction hood for collecting smoke and dust are provided above the intermediate frequency furnace in the first enclosed space, and the first suction hood is connected to the first inlet of the main pipeline;
[0013] A second enclosed space for enclosing the sand box is provided in the cooling area, a second coil for collecting heat and a second suction hood for collecting smoke are provided above the sand box in the second enclosed space, and the second suction hood is connected to the second inlet of the main pipeline;
[0014] The vibrating sand-falling area is provided with a third enclosed space for enclosing the vibrating sand-falling bed, a third coil for collecting heat and a third suction hood for collecting smoke and dust are provided above the vibrating sand-falling bed in the third enclosed space, and the third suction hood is connected to the third inlet of the main pipeline;
[0015] The inlet of the first coil is connected in series with the second coil and the third coil in sequence, and the inlet of the third coil is connected with the outlet of the flat bag dust collector; the outlet of the first coil is connected with the inlet of the flat bag dust collector;
[0016] The pre-treatment dust collector is used to collect the flue gas and / or dust collected from the smelting area, the cooling area and the vibrating sand falling area, and to collect and intercept the large dust particles through cyclone deflection to prevent them from entering the flat bag dust collector;
[0017] The flat bag dust collector is used to intercept dust in flue gas and exhaust gas, and then discharge it into the air through the fan assembly and the skylight.
[0018] As a further improvement of the above solution, the outlet of the first coil is connected to the inlet of the flat bag dust collector through the first heat exchange main pipeline;
[0019] The inlet of the first coil is connected to the outlet of the second coil through a second heat exchange main pipeline.
[0020] The inlet of the second coil is connected to the outlet of the third coil through a third heat exchange main pipeline;
[0021] The inlet of the third coil is connected to the outlet of the flat bag filter through a fourth heat exchange main pipeline.
[0022] As a further improvement of the above solution, a first electric valve is provided on the second heat exchange main pipeline.
[0023] A second electric valve is provided on the third heat exchange main pipeline;
[0024] A first heat exchange pipeline bypass is also connected between the second heat exchange main pipeline and the third heat exchange main pipeline, and a third electric valve is provided on the first heat exchange pipeline bypass;
[0025] The fourth heat exchange main pipeline is provided with a fourth electric valve and a fifth electric valve adjacent to both ends thereof, respectively.
[0026] A second heat exchange pipeline bypass is also connected between the third heat exchange main pipeline and the fourth heat exchange main pipeline, and a sixth electric valve is provided on the second heat exchange pipeline bypass.
[0027] As a further improvement of the above solution, the outlet of the flat bag dust collector is also connected to the pretreatment dust collector through a third heat exchange pipe bypass, and a seventh electric valve is provided on the third heat exchange pipe bypass.
[0028] As a further improvement of the above solution, a heat pump is provided at the outlet of the flat bag dust collector to provide power for collecting heat in various areas.
[0029] As a further improvement of the above solution, a spray pipe is provided above the coils in each area for periodically spraying the corresponding coils to prevent dust from causing blockage and affecting the heat recovery effect.
[0030] As a further improvement of the above scheme, the pre-treatment dust collector comprises a pre-treatment dust collector body and a fourth coil arranged on the pre-treatment dust collector, and the fourth coil is arranged around the inner and outer peripheries of the pre-treatment dust collector body and the middle partition;
[0031] Preferably, the fourth coil is also provided with thermal insulation cotton and an outer protective plate for support and protection.
[0032] As a further improvement of the above scheme, the flat bag dust collector includes a flat bag dust removal module, an air inlet box arranged on the top of the flat bag dust removal module, an air outlet box arranged on the side of the flat bag dust removal module, and a coil assembly;
[0033] The coil assembly includes a fifth coil, a sixth coil connected to an outlet of the fifth coil, and a seventh coil connected to an outlet of the sixth coil;
[0034] The fifth coil is arranged along the inner wall of the air inlet box, the inner wall of the air outlet box and at least part of the inner wall of the filter chamber of the flat bag dust removal module, and is used to increase the overall temperature of the flat bag dust removal device to prevent condensation from causing clogging of the device;
[0035] The sixth coil is arranged at the bottom of the air inlet box, and the seventh coil is arranged inside the air inlet box, and both are used to absorb the heat collected by the first heat exchange main pipeline again;
[0036] The outlet of the first heat exchange main pipeline is connected to the inlet of the fifth coil, and the outlet of the seventh coil is connected to the heat pump.
[0037] In a second aspect, the present invention provides a heat recovery method for a high temperature casting dust removal system, the steps of which include:
[0038] S1: The coils corresponding to the smelting area, the cooling area and the vibration sand-falling area recover the heat emitted from each area, and the heat is sent to the flat bag dust collector after being merged through the first heat exchange main pipeline and connected to the coil assembly in the flat bag dust collector;
[0039] S2: The high-temperature medium in the fifth coil of the coil assembly flows through the inner wall of the air inlet box, the inner wall of the air outlet box and at least part of the inner wall of the filter chamber of the flat bag dust collector module, and the heat is absorbed by the flat bag dust collector equipment, and the overall temperature of the flat bag dust collector equipment is increased;
[0040] The sixth coil and the seventh coil of the coil assembly absorb the heat collected by the first heat exchange main pipeline again, and the high-temperature medium in the coil assembly is cooled down to a low-temperature medium again;
[0041] S3: The low-temperature medium is sent back to the fourth coil of the pre-treatment dust collector through the heat pump to absorb the waste heat on the pre-treatment dust collector;
[0042] The medium of the fourth coil that has collected the waste heat flows through the coils in the vibration sand-falling area, the cooling area, and the smelting area to absorb the system heat again, and the cycle is repeated in sequence to achieve heat recovery and utilization.
[0043] As a further improvement of the above scheme, in step S3, the medium of the fourth coil that has collected the residual heat flows through the coils in the vibration sand-falling area, the cooling area, and the smelting area in sequence to absorb system heat again;
[0044] Alternatively, according to actual production needs, the valve corresponding to the inlet of the third coil in the vibration sand-falling area is closed, and the valve corresponding to the inlet of the third coil in the cooling area is opened; the medium of the fourth coil that has collected the residual heat flows through the coils in the cooling area and the smelting area in turn to absorb the system heat again;
[0045] Alternatively, according to actual production needs, the valve corresponding to the inlet of the third coil in the vibration sand falling area is closed, the valve corresponding to the inlet of the second coil in the cooling area is closed, and the valve corresponding to the inlet of the first coil in the smelting area is opened; the medium of the fourth coil that has collected the waste heat directly flows through the coil in the smelting area to absorb the system heat again.
[0046] Since the present invention adopts the above technical solution, the beneficial effects of this application are:
[0047] The high-temperature casting dust removal and treatment system provided by the present invention has a simple layout structure and is easy to be modified on the basis of the original production process to realize dust collection and control; on the one hand, by setting up closed spaces in each area, the exhaust gas dust generated in each area is transported to the pre-treatment dust collector through the suction hood and the main pipeline for preliminary sedimentation treatment, and then the flat bag dust collector is used to perform secondary deep purification on the preliminarily purified air, thereby improving the dust treatment efficiency (≥0.3 microns, up to 99.9% or more), thereby achieving the emission requirements for the atmosphere, and meeting the increasingly stringent environmental protection requirements in the future;
[0048] In addition, the high-temperature casting dust removal and treatment system provided by the present invention is simple to operate, can achieve high-temperature treatment, has low operating costs, and the initial investment is estimated to be only about 1 / 2 to 2 / 3 of the traditional round bag dust collection and treatment technology. It has high purification efficiency and is easy to promote to most high-temperature casting flat bag dust removal and treatment system processes;
[0049] On the other hand, each area is provided with a first coil, a second coil and a third coil for collecting the heat generated in the corresponding closed space. The collected heat then enters the flat bag dust collector for recycling, and the utilization rate of the collected heat can reach more than 70%, thereby achieving the purpose of energy saving. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying any creative work.
[0051] Figure 1 It is a schematic diagram of a main view of a high-temperature casting dust removal system disclosed in the present invention;
[0052] Figure 2 It is a top view schematic diagram of a high temperature casting dust removal system disclosed in the present invention;
[0053] Figure 3It is a schematic diagram of the main view of the smelting area of a high-temperature casting dust removal system disclosed in the present invention;
[0054] Figure 4 It is a schematic diagram of the main view of the cooling area of a high-temperature casting dust removal system disclosed in the present invention;
[0055] Figure 5 It is a schematic diagram of the main view of the vibration sand-falling area of a high-temperature casting dust removal system disclosed in the present invention;
[0056] Figure 6 It is a schematic diagram of the main view of the treatment equipment area of a high-temperature casting dust removal treatment system disclosed in the present invention;
[0057] Figure 7 It is a schematic diagram of the interior of a pretreatment dust collector of a high-temperature casting dust removal and treatment system disclosed in the present invention;
[0058] Figure 8 It is a left-side schematic diagram of a flat bag dust collector of a high-temperature casting dust removal and treatment system disclosed in the present invention;
[0059] Fig. 9 It is a left-side internal schematic diagram of a flat bag dust collector of a high-temperature casting dust removal and treatment system disclosed in the present invention;
[0060] Fig.10 A rear view of the interior of a flat bag dust collector of a high temperature casting dust removal and treatment system disclosed in the present invention Figure 1 ;
[0061] Fig.11 A rear view of the interior of a flat bag dust collector of a high temperature casting dust removal and treatment system disclosed in the present invention Figure 2 .
[0062] Reference numerals:
[0063] 1. Melting area; 11. Intermediate frequency furnace; 12. First coil; 13. First suction hood; 14. Charging trolley; 15. Lifting door;
[0064] 2. Cooling area; 21. Sand box; 22. Second coil; 23. Second suction hood;
[0065] 3. Vibrating sand-falling area; 31. Vibrating sand-falling bed; 32. The third coil; 33. The third suction hood;
[0066] 4. Pre-treatment dust collector; 41. Pre-treatment dust collector body; 42. Fourth coil;
[0067] 5. Flat bag dust collector; 51. Heat pump; 52. Flat bag dust collector module; 53. Air inlet box; 54. Air outlet box; 55. Coil assembly; 55-1. Fifth coil; 55-2. Sixth coil; 55-3. Seventh coil; 56. Dust removal mobile trolley; 57. Speed reduction motor; 58. Back-blowing machine motor; 59. Chain; 5-10. Maintenance platform; 5-11. Maintenance door;
[0068] 6. Main pipeline;
[0069] 7, first heat exchange main pipeline; 8-1, second heat exchange main pipeline; 8-11, first electric valve; 8-2, third heat exchange main pipeline; 8-21, second electric valve; 8-3, fourth heat exchange main pipeline; 8-31, fourth electric valve; 8-32, fifth electric valve; 8-4, first heat exchange pipeline bypass; 8-41, third electric valve; 8-5, second heat exchange pipeline bypass; 8-51, sixth electric valve; 8-6, third heat exchange pipeline bypass; 8-61, seventh electric valve;
[0070] 9. Blowing pipe; 10-1. Fan assembly; 10-2. Cupola;
[0071] A. The first enclosed space of the medium frequency furnace; B. The second enclosed space; C. The third enclosed space.
[0072] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with the implementation methods and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0073] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0074] It should be noted that all directional indications (such as up, down, etc.) in the embodiments of the present invention are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0075] In addition, in the present invention, the descriptions such as "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features.
[0076] Furthermore, the technical solutions between the various embodiments of the present invention may be combined with each other, but this must be based on the fact that they can be implemented by ordinary technicians in the field. When the combination of technical solutions is mutually contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0077] Embodiment 1:
[0078] See also Figure 1-Figure 11 The present invention provides a high-temperature casting dust removal system, comprising a smelting area 1, a cooling area 2, a vibration sand removal area 3, a pretreatment dust collector 4, and a flat bag dust collector 5, which are arranged in sequence, and also comprises a main pipeline 6 extending from the smelting area 1, the cooling area 2 and the vibration sand removal area 3 to the pretreatment dust collector 4, and the outlet of the main pipeline 6 is connected to the top inlet of the pretreatment dust collector 4; the top outlet of the pretreatment dust collector 4 is connected to the inlet of the flat bag dust collector 5;
[0079] See also Figure 1 The smelting area 1 is provided with a first enclosed space A for enclosing the intermediate frequency furnace 11, and a first coil 12 for collecting heat and a first suction hood 13 for collecting smoke and dust are provided above the intermediate frequency furnace 11 in the first enclosed space A, and the first suction hood 13 is connected to the first inlet of the main pipeline 6;
[0080] See also Figure 2 The cooling area 2 is provided with a second closed space B for enclosing the sand box 21, and a second coil 22 for collecting heat and a second air suction hood 23 for collecting smoke are provided above the sand box 21 in the second closed space B, and the second air suction hood 23 is connected to the second inlet of the main pipeline 6;
[0081] See also Figure 3 The vibrating sand-falling area 3 is provided with a third closed space C for enclosing the vibrating sand-falling bed 31, and a third coil 32 for collecting heat and a third suction hood 33 for collecting smoke and dust are provided above the vibrating sand-falling bed 31 in the third closed space C, and the third suction hood 33 is connected to the third inlet of the main pipeline 6;
[0082] See also Figure 1 , Figure 2 , the inlet of the first coil 12 is connected in series with the second coil 22 and the third coil 32 in sequence, and the inlet of the third coil 32 is connected to the outlet of the flat bag dust collector 5; the outlet of the first coil 12 is connected to the inlet of the flat bag dust collector 5;
[0083] The pre-treatment dust collector 4 is used to collect the flue gas and / or dust collected from the smelting area 1, the cooling area 2 and the vibration sand falling area 3, and collect and intercept the large dust particles through cyclone deflection to prevent them from entering the flat bag dust collector 5;
[0084] The flat bag dust collector 5 is used to intercept dust in the flue gas and exhaust gas, and then discharge it into the air through the fan assembly 10-1 and the dome pipe 10-2;
[0085] Specifically, in the smelting area 1, the raw steel materials and scrap steel are first melted and placed on the charging trolley 14 by a crane, and then transferred to the first closed space A. When the charging trolley 14 approaches the preset workroom, the lifting door 15 is quickly opened to facilitate the entry and exit of the charging trolley 14. The raw materials on the charging trolley 14 are poured into the medium frequency furnace 11, and then the charging trolley 14 withdraws and the lifting door 15 is closed. During the smelting process of the medium frequency furnace 11, a large amount of high-temperature flue gas dust is generated, and heat is exchanged through the first upper coil 12 to recover heat from the production process; the exhaust gas dust is extracted through the first suction hood 13 and the main pipeline 6, and transferred to the pre-treatment dust collector 4;
[0086] In the cooling area 2, the sand box 21 after casting is sent to the cooling area 2 by a conveyor belt. The cooling area 2 has a transparent second closed space B. A large amount of high-temperature flue gas and dust is generated during the production process. Heat is exchanged through the second coil 22 at the top to recover the heat during the production process. A second suction hood 23 is set above the cooling area 2 to extract a large amount of flue gas and dust emitted during the cooling process through the second suction hood 23 at the top and the main pipeline 6, and transfer it to the pre-treatment dust collector 4;
[0087] After the sand box 21 is cooled, it is sent to the vibrating sand-falling area 3 by a conveyor belt;
[0088] In the vibration sand-falling area 3, the vibration sand-falling area 3 has a third closed space C, and the conveyor belt drops the sand box 21 onto the vibration sand-falling bed 31. Due to the drop, dust is generated, and a large amount of high-temperature flue gas emitted from the inside during the vibration sand-falling process is heat-exchanged through the third coil 32 at the top to recover the heat during the production process. The dust generated during the vibration sand-falling process is removed by the third suction hood 33 at the top and the main pipeline 6, and transferred to the pre-treatment dust collector 4;
[0089] The waste gas dust generated in the smelting area 1, the cooling area 2 and the vibrating sand dropping area 3 is first moved to the pre-treatment dust collector 4, and the large particles of dust are settled and collected in the pre-treatment dust collector 4 by cyclone deflection, thereby effectively preventing the sparks generated in the production process from entering the flat bag dust collector 5, thereby achieving the purpose of pre-treating the flue gas dust; after being treated by the pre-treatment dust collector 4, the dust is effectively intercepted (≥2 microns).
[0090] The gas initially purified by the pre-treatment dust collector 4 is sent to the flat bag dust collector 5 through a pipeline for secondary deep treatment;
[0091] Preferably, the flat bag dust collector 5 includes a flat bag dust removal module 52, an air inlet box 53 arranged on the top of the flat bag dust removal module 52, an air outlet box 54 arranged on the side of the flat bag dust removal module 52, and a coil assembly 55;
[0092] The dust-laden gas enters the dust collector through the top air inlet box 53, and first passes through the coil assembly 55 for heat exchange to collect the heat in the exhaust gas. Then it passes through the flat bag dust removal module 52 for filtration and separation, and the evolved clean air passes through the coil assembly 55 for heat exchange again to collect the heat in the exhaust gas again, and finally is discharged from the air outlet box 54;
[0093] The clean air evolved from the flat bag dust collector 5 is discharged into the air through the fan assembly 10-1 and the sky pipe 10-2;
[0094] The high-temperature casting dust removal and treatment system provided by the present invention has a simple layout structure and is easy to be modified on the basis of the original production process to realize dust collection and control; on the one hand, by setting up closed spaces in each area, the exhaust gas dust generated in each area is transported to the pre-treatment dust collector 4 through the suction hood and the main pipeline 6 for preliminary sedimentation treatment, and then the flat bag dust collector 5 is used to perform secondary deep purification on the preliminarily purified air, thereby improving the dust treatment efficiency (≥0.3 microns, up to 99.9% or more), thereby achieving the emission requirements for the atmosphere, and meeting the increasingly stringent environmental protection requirements in the future;
[0095] In addition, the high-temperature casting dust removal and treatment system provided by the present invention is simple to operate, can achieve high-temperature treatment, has low operating costs, and the initial investment is estimated to be only about 1 / 2 to 2 / 3 of the traditional round bag dust collection and treatment technology. It has high purification efficiency and is easy to promote to most high-temperature casting flat bag dust removal and treatment system processes;
[0096] On the other hand, each area is provided with a first coil 12, a second coil 22 and a third coil 32 for collecting the heat generated in the corresponding closed space. The collected heat then enters the flat bag dust collector 5 for recycling, and the utilization rate of the collected heat can reach more than 70%, thereby achieving the purpose of energy saving.
[0097] As a preferred embodiment, see Figure 1-Figure 6 , the outlet of the first coil 12 is connected to the inlet of the flat bag dust collector 5 through the first heat exchange main pipeline 7;
[0098] The inlet of the first coil 12 and the outlet of the second coil 22 are connected through a second heat exchange main pipe 8-1.
[0099] The inlet of the second coil 22 and the outlet of the third coil 32 are connected via a third heat exchange main pipe 8-2;
[0100] The inlet of the third coil 32 is connected to the outlet of the flat bag dust collector 5 through the fourth heat exchange main pipeline 8-3;
[0101] The second heat exchange main pipeline 8-1 is provided with a first electric valve 8-11, and the third heat exchange main pipeline 8-2 is provided with a second electric valve 8-21;
[0102] A first heat exchange pipeline bypass 8-4 is also connected between the second heat exchange main pipeline 8-1 and the third heat exchange main pipeline 8-2, and a third electric valve 8-41 is provided on the first heat exchange pipeline bypass 8-4;
[0103] The fourth heat exchange main pipe 8-3 is provided with a fourth electric valve 8-31 and a fifth electric valve 8-32 near both ends thereof.
[0104] A second heat exchange pipe bypass 8-5 is also connected between the third heat exchange main pipe 8-2 and the fourth heat exchange main pipe 8-3, and a sixth electric valve 8-51 is provided on the second heat exchange pipe bypass 8-5;
[0105] The arrangement of each electric valve, as well as the arrangement of the first heat exchange pipe bypass 8-4 and the second heat exchange pipe bypass 8-5, facilitates adjusting the connectivity of the corresponding heat exchange main pipe 6 according to actual production conditions, thereby improving heat utilization.
[0106] As a preferred embodiment, a heat pump 51 is provided at the outlet of the flat bag filter 5 to provide power for collecting heat in various areas.
[0107] As a further improvement of the above scheme, a spray pipe 9 is provided above the coils in each area for periodically spraying the corresponding coils to prevent dust from causing blockage and affecting the heat recovery effect;
[0108] When the corresponding coils above the smelting area 1, cooling area 2, and vibrating sand falling area 3 workshops are clogged with dust due to long-term use, the solenoid valve on the blowing pipe 9 can be opened regularly to allow the high-pressure compressed air in the pipeline system to blow the coils in reverse flow to clean the dust.
[0109] As a further improvement of the above scheme, see 1 and Figure 7 The pre-treatment dust collector 4 includes a pre-treatment dust collector body 41 and a fourth coil 42 arranged on the pre-treatment dust collector 4, and the fourth coil 42 is arranged around the inner and outer peripheries of the pre-treatment dust collector body 41 and the middle partition;
[0110] Preferably, the fourth coil 42 is also provided with heat-insulating cotton (not shown in the drawings) and an outer protective plate (not shown in the drawings) for support and protection;
[0111] The outlet of the flat bag dust collector 5 is also connected to the pre-treatment dust collector 4 through the third heat exchange pipeline bypass 8-6, and the third heat exchange pipeline bypass 8-6 is provided with a seventh electric valve 8-61;
[0112] The setting of the third heat exchange pipe bypass 8-6 and the seventh electric valve 8-61 can also allow the low-temperature medium that has completed heat exchange in the flat bag dust collector 5 to flow into the fourth coil 42, thereby effectively collecting the waste heat generated by the pretreatment dust collector 4, thereby improving the utilization rate of waste heat.
[0113] As a preferred embodiment, the coil assembly 55 includes a fifth coil 55-1, a sixth coil 55-2 connected to the outlet of the fifth coil 55-1, and a seventh coil 55-3 connected to the outlet of the sixth coil 55-2;
[0114] The fifth coil 55-1 is arranged along the inner wall of the air inlet box 53, the inner wall of the air outlet box 54 and at least part of the inner wall of the filter chamber of the flat bag dust removal module 52. The outside of the fifth coil 55-1 is affixed with thermal insulation cotton and an outer protective plate to increase the overall temperature of the flat bag dust removal device 5 to prevent condensation from causing blockage of the device;
[0115] The sixth coil 55-2 is arranged at the bottom of the air inlet box 53 and is located at the air inlet of the flat bag dust collector 5 module. The seventh coil is arranged on the side of the flat bag dust collector 5 module and is located at the air outlet of the flat bag dust collector 5 module. Both coils are used to absorb the heat collected by the first heat exchange main pipeline 7 again.
[0116] The outlet of the first heat exchange main pipe 7 is connected to the inlet of the fifth coil 55-1, and the outlet of the seventh coil 55-3 is connected to the heat pump 51;
[0117] Specifically, the heat recovered from the coils of the smelting area 1, the cooling area 2 and the vibration sand-falling area 3 is combined and sent to the flat bag dust collector 5 through the first heat exchange main pipeline 7;
[0118] The recovered heat first enters the fifth coil 55-1 of the flat bag filter 5 to increase the overall temperature of the flat bag filter 5 to prevent condensation from causing blockage of the equipment. Then it passes through the sixth coil 55-2 and the seventh coil 55-3 to absorb the heat in the flue gas pipeline again, and finally the medium with lower temperature is sent back to the heat exchange pipeline loop through the heat pump 51.
[0119] It should be noted that see Figure 8-Figure 11 The flat bag dust collector 5 can be combined with flat bag modules according to the actual needs of the site. When the dust volume is small, the filtration wind speed can be appropriately increased and the number of modules can be reduced; when the dust volume is large, the filtration wind speed can be appropriately reduced and the number of modules can be reduced. The development of the height space does not need to increase the floor space and affect the customer's on-site use needs;
[0120] For the single module flat bag dust collector 5, the dust-laden gas enters the single module flat bag dust collector 5 from the top under the negative pressure of the fan. Under the action of inertial force, the larger dust particles quickly settle in the middle of the flat bag and fall directly into the ash hopper under the action of gravity, while the fine dust is filtered and separated by the flat bag. The purified air is discharged through the rear side plate and the air outlet.
[0121] In the flat bag dust collector 5, the air inlet box 53 is fixed to the top of the flat bag dust collector 5 module by bolts, and the air outlet box 54 is fixed to the side of the flat bag dust collector 5 module by bolts; it also includes an inspection platform 5-10 and an inspection door 5-11, and the inspection platform 5-10 is fixed to the other side of the flat bag dust collector 5 module by bolts. The inspection door 5-11 is fixed to the other side of the flat bag dust collector 5 module by bolts, which is convenient for operators to enter the flat bag dust collector 5 to inspect the backflush system. The flat bag is fixed to the shell plate of the flat bag dust collector 5 module by a snap ring, and the cleaning mobile trolley 56 is installed on the rear side of the shell plate of the flat bag dust collector 5 module by bolts, and the backflush motor 58 is installed on the cleaning mobile trolley 56 by bolts;
[0122] See also Fig. 9 and Fig.10 When the pressure difference of the flat bags in the flat bag dust removal module 52 reaches a certain level, the cleaning mobile trolley 56 is turned on to backflush the flat bags. By controlling the reduction motor 57, the cleaning mobile trolley 56 is dragged by the chain 59 to move together under the power of the reduction motor 57. According to the electrical control program, the moving position and time of the cleaning mobile trolley 56 are controlled so that the backflush center is aligned with the center of the flat bag.
[0123] When another set of cleaning mobile carriages 56 moves to the other end, it is sensed by the travel switch at the same time, and the reduction motor 57 is quickly controlled to reverse, so that the cleaning mobile carriages 56 quickly move to the starting position, realizing repeated continuous cleaning.
[0124] The dust is blocked on the surface of the flat bags in the flat bag dust removal module 52 and continuously accumulated. The pressure difference between the inside and outside of the flat bags in the flat bag dust removal module 52 continuously increases. The back-blowing air generated by the back-blowing motor 58 is used to back-blow the air on the inner surface of the flat bags in the flat bag dust removal module 52, so that the whole row of flat bags in this area forms a countercurrent, and the dust deposited on the outer surface of the flat bags in the flat bag dust removal module 52 is blown off into the ash hopper and discharged through the screw conveyor and the ash discharge valve.
[0125] The entire cleaning process can be carried out online. The back-blowing motor 58 is wrapped in the shell of the flat cloth bag dust collector 5, eliminating the need for a soundproof cover and effectively reducing noise. Basically, no sound can be heard from the outside of the dust collector, thus achieving the purpose of silence. In addition, the back-blowing air taken by the back-blowing motor 58 is clean air after purification, and the temperature difference with the internal air is small. The flat cloth bag is not prone to condensation, ensuring that the filter bag works under normal conditions.
[0126] Embodiment 2:
[0127] The present invention also provides a heat recovery method for a high-temperature casting dust removal system, the steps of which include:
[0128] S1: The coils corresponding to the smelting area 1, the cooling area 2 and the vibration sand-falling area 3 recover the heat emitted from each area, and the heat is sent to the flat bag dust collector 5 after being merged through the first heat exchange main pipeline 7, and connected to the coil assembly 55 in the flat bag dust collector 5;
[0129] S2: The high-temperature medium in the fifth coil 55-1 of the coil assembly 55 flows through the inner wall of the air inlet box 53, the inner wall of the air outlet box 54 and at least part of the inner wall of the filter chamber of the flat bag dust collector module 52, and the heat is absorbed by the flat bag dust collector 5 device, and the overall temperature of the flat bag dust collector 5 device is increased;
[0130] The sixth coil 55-2 and the seventh coil 55-3 of the coil assembly 55 absorb the heat collected by the first heat exchange main pipe 7 again, and the high-temperature medium in the coil assembly 55 is cooled down to a low-temperature medium again;
[0131] S3: The low-temperature medium is sent back to the fourth coil 42 of the pre-treatment dust collector 4 through the heat pump 51 to absorb the residual heat on the pre-treatment dust collector 4;
[0132] The medium of the fourth coil 42 that has collected the residual heat flows through the coils in the vibration sand-falling area 3, the cooling area 2, and the smelting area 1 to absorb the system heat again, and the cycle is carried out in sequence to realize the heat recovery and utilization;
[0133] Preferably, the medium of the fourth coil 42 that has collected the residual heat flows through the coils in the vibration sand-falling area 3, the cooling area 2, and the smelting area 1 in sequence to absorb the system heat again;
[0134] Alternatively, according to actual production needs, the valve corresponding to the entrance of the third coil 32 of the vibration sand-falling area 3 is closed, and the valve corresponding to the entrance of the third coil 32 of the cooling area 2 is opened; the medium of the fourth coil 42 that has collected the residual heat flows through the coils in the cooling area 2 and the smelting area 1 in turn to absorb the system heat again;
[0135] Alternatively, according to actual production needs, the valve corresponding to the inlet of the third coil 32 of the vibration sand shaking area 3 is closed, the valve corresponding to the inlet of the second coil 22 of the cooling area 2 is closed, and the valve corresponding to the inlet of the first coil 12 of the smelting area 1 is opened; the medium of the fourth coil 42 that has collected the residual heat directly flows through the coil in the smelting area 1 to absorb the system heat again;
[0136] Specifically, in step S3, when the low-temperature medium is pumped back to the pre-treatment dust collector 4 through the heat pump 51, it is first sent to the inlet of the fourth coil 42 through the seventh electric valve 8-61 and the third heat exchange pipeline bypass 8-6 to absorb the residual heat on the pre-treatment dust collector 4; at the same time, the residual heat recovery amount of the pre-treatment dust collector 4 (4) can be adjusted according to the actual needs on site, and the fifth electric valve 8-32 on the fourth heat exchange main pipeline 8-3 can be adjusted to achieve the regulation purpose;
[0137] The medium of the fourth coil 42 that has collected the waste heat flows through the fourth heat exchange main pipeline 8-3, and then flows through the coils of the vibration sand-falling area 3, the cooling area 2, and the smelting area 1 to circulate and absorb the system heat, so as to achieve the purpose of energy saving, heat preservation, condensation prevention, and double carbonization;
[0138] Similarly, when flowing through the vibrating sand-falling area 3, the fourth electric valve 8-31 on this section of the heat exchange pipe can be adjusted to be closed according to the actual situation on site (when the production output is adjusted or this station is temporarily not in production), and the sixth electric valve 8-51 on the bypass 8-5 of the second heat exchange pipe is opened, and the low-temperature medium directly enters the coil corresponding to the cooling area 2 to circulate and absorb the system heat; when flowing through the cooling area 2, the corresponding valves can be closed and the relevant valves can be opened according to the actual situation on site (when the production output is adjusted or this station is temporarily not in production), so that the heat exchange medium can gradually flow through the coil of the corresponding area to collect the heat of the corresponding area, and no further details will be given again;
[0139] The temperature of the medium in the heat exchange pipe is increased each time it flows through a zone until it reaches the last zone, i.e., the smelting zone 1, and the temperature of the medium in the heat exchange pipe is greatly increased. Then, the medium enters the inlet of the coil assembly 55 of the flat bag filter 5 through the first heat exchange main pipe 7, and circulates in sequence, so that the heat generated in each zone is effectively collected and enters the fifth coil 55-1 of the flat bag filter 5 to increase the overall temperature of the flat bag filter 5 equipment to prevent condensation and blockage of the equipment; then, the collected heat is absorbed again through the sixth coil 55-2 and the seventh coil 55-3, so that the temperature of the medium in the coil assembly 55 is effectively reduced, and finally, the medium with a lower temperature is sent back to the heat exchange pipe loop through the heat pump 51; such cyclic heat collection, release and utilization make the waste heat utilization rate of each zone reach more than 70%, thereby achieving the purpose of energy saving.
[0140] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. All equivalent structural changes made using the contents of the present invention's specification and drawings, or directly / indirectly applied in other related technical fields, are included in the patent protection scope of the present invention.
Claims
1. A high temperature casting dust removal system, characterized in that: It includes a smelting area, a cooling area, a vibration sand-falling area, a pre-treatment dust collector, and a flat bag dust collector which are arranged in sequence, and a main pipeline extending from the smelting area, the cooling area and the vibration sand-falling area to the pre-treatment dust collector, and the outlet of the main pipeline is connected to the top inlet of the pre-treatment dust collector; the top outlet of the pre-treatment dust collector is connected to the inlet of the flat bag dust collector; A first enclosed space for enclosing the intermediate frequency furnace is provided in the smelting area, a first coil for collecting heat and a first suction hood for collecting smoke and dust are provided above the intermediate frequency furnace in the first enclosed space, and the first suction hood is connected to the first inlet of the main pipeline; A second enclosed space for enclosing the sand box is provided in the cooling area, a second coil for collecting heat and a second suction hood for collecting smoke are provided above the sand box in the second enclosed space, and the second suction hood is connected to the second inlet of the main pipeline; The vibrating sand-falling area is provided with a third enclosed space for enclosing the vibrating sand-falling bed, a third coil for collecting heat and a third suction hood for collecting smoke and dust are provided above the vibrating sand-falling bed in the third enclosed space, and the third suction hood is connected to the third inlet of the main pipeline; The inlet of the first coil is connected in series with the second coil and the third coil in sequence, and the inlet of the third coil is connected with the outlet of the flat bag dust collector; the outlet of the first coil is connected with the inlet of the flat bag dust collector; The pre-treatment dust collector is used to collect and trap large dust particles in the smoke and / or dust collected in each area to prevent them from entering the flat bag dust collector; The flat bag dust collector is used to intercept dust in flue gas and exhaust gas, and then discharge it into the air through the fan assembly and the skylight.
2. A high temperature casting dust removal system according to claim 1, characterized in that: The outlet of the first coil is connected to the inlet of the flat bag dust collector through the first heat exchange main pipeline; The inlet of the first coil is connected to the outlet of the second coil through a second heat exchange main pipeline, and the inlet of the second coil is connected to the outlet of the third coil through a third heat exchange main pipeline; The inlet of the third coil is connected to the outlet of the flat bag filter through a fourth heat exchange main pipeline.
3. A high temperature casting dust removal system according to claim 2, characterized in that: The second heat exchange main pipeline is provided with a first electric valve, A second electric valve is provided on the third heat exchange main pipeline; A first heat exchange pipeline bypass is also connected between the second heat exchange main pipeline and the third heat exchange main pipeline, and a third electric valve is provided on the first heat exchange pipeline bypass; The fourth heat exchange main pipeline is provided with a fourth electric valve and a fifth electric valve adjacent to both ends thereof, respectively. A second heat exchange pipeline bypass is also connected between the third heat exchange main pipeline and the fourth heat exchange main pipeline, and a sixth electric valve is provided on the second heat exchange pipeline bypass.
4. A high temperature casting dust removal system according to any one of claims 1 to 3, characterized in that: The outlet of the flat bag dust collector is also connected to the pre-treatment dust collector through a third heat exchange pipeline bypass, and a seventh electric valve is provided on the third heat exchange pipeline bypass.
5. A high temperature casting dust removal system according to claim 2, characterized in that: A heat pump is provided at the outlet of the flat bag dust collector to provide power for collecting heat in various areas.
6. A high temperature casting dust removal system according to any one of claims 1 to 3, characterized in that: There is a spray pipe above the coils in each area, which is used to spray the corresponding coils regularly to prevent dust from clogging the coils.
7. A high temperature casting dust removal system according to any one of claims 1 to 3, characterized in that: The pre-processing dust collector comprises a pre-processing dust collector body and a fourth coil arranged on the pre-processing dust collector, wherein the fourth coil is arranged around the inner and outer peripheries of the pre-processing dust collector body and the middle partition.
8. A high temperature casting dust removal system according to claim 5, characterized in that: The flat bag dust collector comprises a flat bag dust removal module, an air inlet box arranged on the top of the flat bag dust removal module, an air outlet box arranged on the side of the flat bag dust removal module, and a coil assembly; The coil assembly includes a fifth coil, a sixth coil connected to an outlet of the fifth coil, and a seventh coil connected to an outlet of the sixth coil; The fifth coil is arranged along the inner wall of the air inlet box, the inner wall of the air outlet box and at least part of the inner wall of the filter chamber of the flat bag dust removal module, and is used to increase the overall temperature of the flat bag dust removal device; The sixth coil is arranged at the bottom of the air inlet box, and the seventh coil is arranged inside the air inlet box, for absorbing the heat collected by the first heat exchange main pipeline again; The outlet of the first heat exchange main pipeline is connected to the inlet of the fifth coil, and the outlet of the seventh coil is connected to the heat pump.
9. A heat recovery method for a high temperature casting dust removal system according to any one of claims 1 to 8, characterized in that: The steps include: S1: The coils corresponding to the smelting area, the cooling area and the vibration sand-falling area recover the heat emitted from each area, and the heat is sent to the flat bag dust collector after being merged through the first heat exchange main pipeline and connected to the coil assembly in the flat bag dust collector; S2: The high-temperature medium in the fifth coil of the coil assembly flows through the inner wall of the air inlet box, the inner wall of the air outlet box and at least part of the inner wall of the filter chamber of the flat bag dust collector module, and the heat is absorbed by the flat bag dust collector equipment, and the overall temperature of the flat bag dust collector equipment is increased; The sixth coil and the seventh coil of the coil assembly absorb the heat collected by the first heat exchange main pipeline again, and the high-temperature medium in the coil assembly is cooled down to a low-temperature medium again; S3: The low-temperature medium is sent back to the fourth coil of the pre-treatment dust collector through the heat pump to absorb the waste heat on the pre-treatment dust collector; The medium of the fourth coil that has collected the waste heat flows through the coils in the vibration sand-falling area, the cooling area, and the smelting area in sequence to absorb the system heat again, and the cycle is repeated to achieve heat recovery and utilization.
10. The heat recovery method according to claim 9, characterized in that: The steps include: in step S3, the medium of the fourth coil that has collected the residual heat flows through the coils in the vibration sand-falling area, the cooling area, and the smelting area in sequence to absorb system heat again; Alternatively, according to actual production needs, the valve corresponding to the inlet of the third coil in the vibration sand-falling area is closed, and the valve corresponding to the inlet of the third coil in the cooling area is opened; the medium of the fourth coil that has collected the residual heat flows through the coils in the cooling area and the smelting area in turn to absorb the system heat again; Alternatively, according to actual production needs, the valve corresponding to the inlet of the third coil in the vibration sand falling area is closed, the valve corresponding to the inlet of the second coil in the cooling area is closed, and the valve corresponding to the inlet of the first coil in the smelting area is opened; the medium of the fourth coil that has collected the waste heat directly flows through the coil in the smelting area to absorb the system heat again.