Method and device for supplementing and draining water at cold end of power plant
By monitoring and adjusting the circulating water flow in real time, maintaining the cooling rate stable, the problem of fluctuations in the cooling rate of the cold junction system is solved, water consumption and wastewater discharge are reduced, and the stability and safety of power generation is ensured.
Patent Information
- Application Number
- CN202411166245.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-15
AI Technical Summary
The cooling rate of the cold end system in the gas power generation system of steel enterprises fluctuates frequently, resulting in a large fluctuation in the cooling efficiency of the condenser, affecting the power and safety of power generation, and increasing water consumption and wastewater discharge.
By monitoring the water level and water quality parameters of the circulating water tank in real time, adjust the circulating water flow and replenishing water flow according to the needs of the condenser, keep the cooling rate within the preset range, reduce unnecessary water replenishment consumption and wastewater discharge, and use the correct concentration ratio and The correction value adjusts the replenished water flow and sewage discharge to ensure stable water quality.
The water level of the circulating pool is stable, the water consumption at the cold end of the power plant is reduced, the operating cost and environmental impact are reduced, and the stability of the power generation power and the safety of the generator set are ensured.
Smart Images

Figure CN118960429A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of circulating water systems in thermal power plants, and in particular to a method and device for replenishing and draining water at the cold end of a power plant. Background Art
[0002] In the coal gas power generation system of steel enterprises, the cold end system, as an indispensable part of the power generation process, undertakes the key heat exchange and cooling functions. The system is mainly composed of a circulating water system, cooling tower, condenser and related water pumps, pipelines and other equipment.
[0003] Since the load of gas-fired power generation in steel enterprises does not directly depend on user demand, but is affected by the stability of fuel supply such as blast furnace gas and converter gas, the load of the generator set often fluctuates greatly.
[0004] With the adjustment of the steam turbine, especially the increase or decrease of load, the working state of the condenser will also change accordingly. The vacuum, temperature, pressure and other parameters in the condenser will directly affect the cooling effect, thereby causing fluctuations in the cooling rate.
[0005] The cooling ratio, that is, the ratio of the circulating water flow rate to the condensate flow rate, is an important indicator to measure the cooling efficiency of the cold-end system. When the actual cooling ratio of the cold-end system fluctuates frequently and deviates from the normal range, it is easy to cause the cooling efficiency of the condenser to fluctuate greatly, causing the turbine exhaust temperature to deviate from the normal range, thereby affecting the power generation and the safety of the generator set.
[0006] In order to maintain the stability of the cooling ratio and meet the needs of the condenser, the circulating water flow of the condenser needs to be adjusted frequently. This frequent adjustment will cause large fluctuations in the water level of the circulating water pool, which can easily lead to an increase in the consumption of make-up water and an increase in wastewater discharge, increasing the water consumption of the cold end system. Summary of the invention
[0007] The purpose of the present invention is to provide a method and device for supplementary drainage of cold end of a power plant in view of the problems existing in the prior art.
[0008] To achieve the above object, the technical solution adopted by the present invention is:
[0009] A method for replenishing and draining water at the cold end of a power plant comprises the following steps:
[0010] According to the operating conditions of the cold end of the power plant, the preset range of the concentration multiple of the circulating water is set;
[0011] Calculate the actual concentration multiple of the circulating water according to the conductivity of the circulating water and the conductivity of the supplementary water;
[0012] Calculating whether the actual concentration multiple is within the preset range;
[0013] If the actual concentration multiple is within the preset range, adjusting the sewage discharge of the circulating water pool so that the sewage discharge is equal to the ratio of the condensate flow rate to the corrected concentration multiple;
[0014] The make-up water flow rate of the circulating water pool is adjusted so that the make-up water flow rate is equal to the ratio of the condensate flow rate to the corrected concentration multiple plus the product of the cooling multiple, the condensate flow rate and the correction value.
[0015] By determining that the actual concentration multiple is within the preset range, it can be determined that the water quality of the circulating water is normal. At this time, adjusting the make-up water flow rate and the sewage discharge volume according to the method provided by the present invention can reduce the water level fluctuation of the circulating water pool. The water level of the circulating water pool is adjusted only according to the needs of the condenser, thereby reducing unnecessary make-up water consumption and wastewater discharge, reducing the water consumption of the cold end of the power plant, achieving maximum utilization of water resources, and reducing operating costs and environmental impacts.
[0016] Preferably, if the actual concentration multiple is greater than the maximum end value of the preset range, the sewage discharge amount is increased until the actual concentration multiple returns to within the preset range.
[0017] Preferably, if the actual concentration multiple is less than the minimum end value of the preset range, the sewage discharge volume is reduced until the actual concentration multiple returns to within the preset range.
[0018] Preferably, if the actual concentration multiple exceeds the preset range, the make-up water flow rate is adjusted so that the make-up water flow rate is equal to the sum of the evaporation amount, the drift amount and the sewage discharge amount.
[0019] By monitoring the actual concentration multiple of the circulating water pool, the make-up water flow and sewage discharge are adjusted automatically to maintain the stable water quality of the circulating water. On the one hand, it avoids scaling and corrosion of equipment caused by excessively high concentrations of soluble solids in the circulating water. On the other hand, while maintaining stable water quality, it reduces unnecessary make-up water consumption and wastewater discharge.
[0020] Preferably, the corrected concentration multiple is equal to the actual concentration multiple minus one, and the correction value ranges from 0.001 to 0.003.
[0021] The corrected concentration multiple and the corrected value can reduce the variation range of the make-up water flow rate and the sewage discharge volume, so as to reduce the impact on the water level of the circulating water tank.
[0022] Preferably, if the actual water level of the circulating water pool exceeds the maximum water level of the circulating water pool, the adjustment of the sewage discharge volume and the make-up water flow rate is suspended; if the actual water level of the circulating water pool is lower than the minimum water level of the circulating water pool, the adjustment of the sewage discharge volume and the make-up water flow rate is also suspended.
[0023] The actual water level of the circulating water pool is monitored to prevent the water in the circulating water pool from being insufficient to supply the condenser, and to prevent the water in the circulating water pool from overflowing the circulating water pool.
[0024] Preferably, a target range of the cooling ratio is set based on historical operating data of the power plant's generator sets, and when the cold end of the power plant is in a stable operating state, the cooling ratio is adjusted within the target range by adjusting the circulating water flow rate.
[0025] Preferably, the cooling ratio refers to the ratio of the circulating water flow entering the condenser to the condensed water flow leaving the condenser, and the condensed water flow is proportional to the steam amount entering the turbine.
[0026] In view of the large fluctuations in coal gas power generation load in steel enterprises, the fluctuations in the cooling ratio are limited by adjusting the circulating water flow rate, thereby realizing automatic adjustment of the circulating water flow rate according to changes in the power generation load to adapt to the real-time needs of the condenser, maintain a stable cooling ratio, and ensure that the cold end system can maintain a stable cooling efficiency under different load conditions. This helps to reduce the decrease in condenser cooling efficiency caused by fluctuations in the cooling ratio, thereby keeping the turbine exhaust temperature within a reasonable range and ensuring the power generation capacity and the safety of the generator set.
[0027] A cold-end supplementary water discharge device for a power plant comprises a real-time monitoring module, a communication module, a data processing module and a control module. The data processing module reads the data obtained by the real-time monitoring module through the communication module, and the control module adjusts the discharge volume and the supplementary water flow rate according to the feedback result of the data processing module.
[0028] Preferably, the real-time monitoring module is used to monitor the conductivity of the circulating water, the conductivity of the supplementary water, the condensate flow rate, the actual water level of the circulating water pool, the sewage discharge and the circulating water flow rate.
[0029] Through the cooperation of the real-time monitoring module, the communication module, the data processing module and the control module, the water level of the circulating water pool, the water quality parameters and the operating parameters of the cold end system of the power plant are monitored in real time, and the circulating water flow, the make-up water flow and the sewage discharge are adjusted automatically. While maintaining the normal operation of the condenser, the make-up water flow required for the circulating water pool is reduced, thereby reducing unnecessary water consumption.
[0030] Compared with the prior art, the present invention has the following beneficial effects:
[0031] (1) The method and device provided by the present invention monitor the water level, water quality parameters and operating parameters of the cold end system of the circulating water pool in real time, and automatically adjust the make-up water flow and sewage discharge volume. While maintaining the water level of the circulating water pool stable, it reduces unnecessary make-up water consumption and wastewater discharge, reduces the water consumption of the cold end of the power plant, realizes the maximum utilization of water resources, and reduces operating costs and environmental impact.
[0032] (2) In view of the large load fluctuations of coal gas power generation in steel enterprises, the method and device provided by the present invention can automatically adjust the circulating water flow rate according to the load changes to adapt to the real-time needs of the condenser working state, maintain the cooling ratio stable, and ensure that the cold end system can maintain a stable cooling efficiency under different load conditions. This helps to reduce the decrease in condenser cooling efficiency caused by cooling ratio fluctuations, thereby keeping the turbine exhaust temperature within a reasonable range and ensuring the power generation capacity and the safety of the generator set. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 Schematic diagram of a method for replenishing and draining water at the cold end of a power plant according to an embodiment of the present invention;
[0034] Figure 2 It is a structural schematic diagram of a cold end system of a power plant in an embodiment of the present invention;
[0035] Figure 3 Schematic diagram of a cold-end drainage device for a power plant according to an embodiment of the present invention;
[0036] In the figure: 1. Steam turbine; 2. Condenser; 3. Circulating water pool; 4. Cooling tower; 5. Circulating water pump; 6. Condensate pump; 7. Make-up water valve; 8. Drain valve; 9. Make-up water conductivity meter; 10. Circulating water conductivity meter; 11. Circulating water flow meter; 12. Condensate flow meter; 13. Electronic water level meter. DETAILED DESCRIPTION
[0037] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0038] like Figures 1 to 3 As shown, the specific scheme of the embodiment is as follows: The present invention is applied to the cold end system of a coal gas power plant of a steel enterprise, involving a steam turbine 1, a condenser 2, a circulating water pool 3 and a cooling tower 4, and a water pump and a pipeline system for connecting various devices, including a circulating water pump 5, a condensate pump 6, a water supply valve 7 and a sewage valve 8. The operating principle of the cold end system of the power plant is as follows:
[0039] In a normal power generation process, after the steam heated by the boiler enters the steam turbine 1, it drives the blades of the steam turbine 1 to rotate and completes the energy conversion. The steam that has done work is discharged from the steam turbine 1 and enters the condenser 2. The circulating water pump 5 draws water from the circulating water pool 3 and sends the water to the condenser 2. The cooling water provided by the circulating water pool 3 in the condenser 2 condenses the exhaust steam into condensed water. The cooling tower 4 receives the hot circulating water from the condenser 2, and dissipates the heat in the water into the atmosphere through spraying, air convection and other methods to achieve water cooling. The cooled water flows back to the circulating water pool 3 and is ready to be used again. The condensate pump 6 draws out the condensed water formed in the condenser 2 and sends it to the deaerator and other subsequent equipment for treatment.
[0040] In the coal gas power generation system of a steel enterprise, when the system gas pressure decreases, the fuel supply will decrease accordingly, which will cause the load of the generator set to decrease. The load reduction will in turn affect the evaporation rate of the boiler. When the evaporation rate of the boiler decreases, the amount of steam supplied to the turbine 1 will also decrease accordingly. The reduction in the amount of steam will directly lead to a reduction in the amount of condensed water in the condenser 2.
[0041] In order to save energy and reduce operating costs, when the amount of condensed water decreases, the circulating water flow rate is usually reduced by reducing the operating frequency of the circulating water pump 5. This can reduce unnecessary circulating water consumption while ensuring the normal operation of the condenser 2. Therefore, the water level of the circulating water pool 3 needs to be regulated according to the circulating water flow rate.
[0042] On the contrary, when the system gas pressure rises and the load increases, the boiler evaporation amount and the steam intake amount of the turbine 1 increase, and the condensate amount also increases accordingly. At this time, it is necessary to increase the operating frequency of the circulating water pump 5 to increase the circulating water amount to ensure the cooling effect of the condenser 2 and the efficient operation of the turbine 1.
[0043] A cold-end water supply and drainage device for a power plant comprises a real-time monitoring module, a communication module, a data processing module and a control module. The communication module, the data processing module and the control module respectively comprise different types of PLC controllers. The real-time monitoring module comprises a make-up water conductivity meter 9, a circulating water conductivity meter 10, a circulating water flow meter 11, a condensate water flow meter 12 and an electronic water level meter 13.
[0044] The make-up water conductivity meter 9 is arranged on the make-up water pipeline of the circulating water pool 3, and is used to detect the conductivity of the make-up water; the circulating water conductivity meter 10 and the circulating water flow meter 11 are arranged on the circulating water pipeline connecting the circulating water pool 3 and the condenser 2, the circulating water conductivity meter 10 is used to detect the conductivity of the circulating water, and the circulating water flow meter 11 is used to count the circulating water flow; the condensate water flow meter 12 is arranged on the condensate water pipeline of the condenser 2, and is used to count the condensate water flow; the electronic water level meter 13 is arranged in the circulating water pool 3, and is used to detect the water level of the circulating water pool 3.
[0045] The make-up water conductivity meter 9, circulating water conductivity meter 10, circulating water flow meter 11, condensate flow meter 12 and electronic water level meter 13 are respectively connected to the communication module by wired or wireless means, and the data processing module reads the data measured by each instrument in the real-time monitoring module through the communication module.
[0046] The data processing module judges the obtained data and sends the judgment result to the control module. The control module adjusts the circulating water pump 5, the water supply valve 7 and the sewage valve 8 according to the feedback result of the data processing module, so as to adjust the circulating water flow, sewage discharge and supplementary water flow respectively.
[0047] A method for replenishing and draining water at the cold end of a power plant comprises the following steps:
[0048] S1. Refer to the design values of various parameters in the cold end system of the power plant and the historical operating experience values to set the preset range of the concentration multiple of circulating water. The concentration multiple refers to the ratio of the concentration of dissolved solids in the circulating water to the concentration of dissolved solids in the make-up water.
[0049] S2. Measure the conductivity of the circulating water and the conductivity of the supplementary water, and calculate the actual concentration ratio of the circulating water according to the formula: actual concentration ratio = circulating water conductivity / supplementary water conductivity.
[0050] S3. Compare the actual concentration ratio with the preset range of concentration multiples to determine whether the actual concentration multiple is within the preset range.
[0051] S4. If the actual concentration multiple is within the preset range, the discharge volume of the circulating water pool 3 is adjusted according to the formula: discharge volume = condensate flow rate / corrected concentration multiple, wherein the corrected concentration multiple is equal to the actual concentration multiple minus one, so as to reduce the fluctuation range of the discharge volume.
[0052] According to the formula: make-up water flow = condensate flow / corrected concentration multiple + cooling ratio * condensate flow * correction value, adjust the make-up water flow of the circulating water pool 3, where the correction value is preferably 0.002, and the cooling ratio refers to the ratio of the circulating water flow entering the condenser 2 to the condensate flow leaving the condenser 2, and the condensate flow is proportional to the amount of steam entering the turbine 1.
[0053] According to the historical operating data of the power plant's generator sets, the target range of the cooling ratio is set. When the cold end of the power plant is in a stable operating state, the cooling ratio is kept within the target range by adjusting the circulating water flow rate.
[0054] S5. If the actual concentration multiple exceeds the preset range, adjust the make-up water flow rate according to the formula: make-up water flow rate = evaporation + drift + sewage discharge, where the sewage discharge is the sewage discharge of the circulating water pool 3 before the actual concentration multiple exceeds the preset range. The evaporation refers to the amount of water that escapes into the air due to the increase in temperature during the cooling process of the circulating water due to partial vaporization of water molecules. The evaporation is estimated by monitoring the temperature difference and flow rate of the inlet and outlet water of the cooling tower 4. The drift refers to the water loss caused by some fine water droplets being directly blown out of the water tower by the wind when the circulating water is sprayed in the cooling tower 4. The calculation of the drift can be estimated based on the structure of the cooling tower 4, wind speed, wind direction and other factors.
[0055] If the actual concentration multiple is greater than the maximum end value of the preset range, the discharge volume is increased until the actual concentration multiple returns to the preset range.
[0056] If the actual concentration multiple is less than the minimum end value of the preset range, the discharge volume is reduced until the actual concentration multiple returns to the preset range.
[0057] During the execution of the cold-end drainage method, if the actual water level of the circulating water pool 3 exceeds the maximum water level of the circulating water pool 3, the adjustment of the sewage discharge volume and the make-up water flow rate will be suspended; if the actual water level of the circulating water pool 3 is lower than the minimum water level of the circulating water pool 3, the adjustment of the sewage discharge volume and the make-up water flow rate will also be suspended.
[0058] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for replenishing and draining water at the cold end of a power plant, characterized in that: The following steps are involved: According to the operating conditions of the cold end of the power plant, the preset range of the concentration multiple of the circulating water is set; Calculate the actual concentration multiple of the circulating water according to the conductivity of the circulating water and the conductivity of the supplementary water; Calculating whether the actual concentration multiple is within the preset range; If the actual concentration multiple is within the preset range, adjusting the sewage discharge of the circulating water pool so that the sewage discharge is equal to the ratio of the condensate flow rate to the corrected concentration multiple; The make-up water flow rate of the circulating water pool is adjusted so that the make-up water flow rate is equal to the ratio of the condensate flow rate to the corrected concentration multiple plus the product of the cooling multiple, the condensate flow rate and the correction value.
2. A method for supplementing and draining water at the cold end of a power plant according to claim 1, characterized in that: If the actual concentration multiple is greater than the maximum end value of the preset range, the sewage discharge amount is increased until the actual concentration multiple returns to within the preset range.
3. A method for supplementing and draining water at the cold end of a power plant according to claim 1, characterized in that: If the actual concentration multiple is less than the minimum end value of the preset range, the sewage discharge amount is reduced until the actual concentration multiple returns to within the preset range.
4. A method for supplementing and draining water at the cold end of a power plant according to claim 1, characterized in that: If the actual concentration multiple exceeds the preset range, the make-up water flow rate is adjusted so that the make-up water flow rate is equal to the sum of the evaporation amount, the drift amount and the sewage discharge amount.
5. A method for supplementing and draining water at the cold end of a power plant according to claim 1, characterized in that: The corrected concentration multiple is equal to the actual concentration multiple minus one, and the correction value ranges from 0.001 to 0.
003.
6. A method for supplementing and draining water at the cold end of a power plant according to claim 1, characterized in that: If the actual water level of the circulating water pool exceeds the maximum water level of the circulating water pool, the adjustment of the sewage discharge volume and the make-up water flow rate will be suspended. If the actual water level of the circulating water pool is lower than the minimum water level of the circulating water pool, the adjustment of the sewage discharge volume and the make-up water flow rate will also be suspended.
7. A method for supplementing and draining water at the cold end of a power plant according to claim 1, characterized in that: According to the historical operation data of the power plant generator set, a target range of the cooling ratio is set. When the cold end of the power plant is in a stable operation state, the circulating water flow rate is adjusted so that the cooling ratio is within the target range.
8. A method for supplementary drainage of cold end of a power plant according to claim 7, characterized in that: The cooling ratio refers to the ratio of the circulating water flow entering the condenser to the condensed water flow leaving the condenser, and the condensed water flow is proportional to the amount of steam entering the turbine.
9. A cold end drainage device for a power plant, used to implement the method according to any one of claims 1 to 8, characterized in that: It includes a real-time monitoring module, a communication module, a data processing module and a control module. The data processing module reads the data obtained by the real-time monitoring module through the communication module, and the control module adjusts the sewage discharge volume and the make-up water flow rate according to the feedback result of the data processing module.
10. A power plant cold end drainage device according to claim 9, characterized in that: The real-time monitoring module is used to monitor the conductivity of the circulating water, the conductivity of the supplementary water, the condensate flow rate, the actual water level of the circulating water pool, the sewage discharge and the circulating water flow rate.
Citation Information
Cited By
Automatic water replenishing and draining system and method for circulating water cooling system
CN120722964A
Method and system for predicting water drainage amount and water supplement amount of circulating water cooling system
CN120722965A