Whole-process monitoring method for advanced water exploration influence range of water-rich area of coal mine

Through the parallel electrical monitoring system, the apparent resistivity changes in coal mine water-rich areas are monitored in real time, and the problem of difficulty in determining the impact range of drainage in advance water release projects is solved, and more accurate drainage effect evaluation and adjustment of safety production plans are achieved, improving Retrieve safety.

CN118962821APending Publication Date: 2024-11-15CHONGQING UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411061392.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing coal mine advance water exploration and release project cannot accurately determine the impact range of drilling and drainage, resulting in possible leakage of drilling or multiple discharges, increasing the workload, and subsequent mining work may lead to refilling of water in the water-rich area, threatening production safety.

Method used

The parallel electrical monitoring system is adopted to determine the apparent resistivity distribution of the water-rich area through initial and subsequent electrical data acquisition and inversion, and monitor the drainage impact range and refilling area in real time, and adjust the drainage plan.

Benefits of technology

More accurately determine the effect of water exploration and release, reduce economic losses, improve mining safety, and provide real-time data to support the adjustment of coal mine safety production plans.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118962821A_ABST
    Figure CN118962821A_ABST
Patent Text Reader

Abstract

The invention provides a coal mine water-rich area advanced water exploration influence range whole-process monitoring method. The method comprises the steps that a parallel electrical method monitoring system is arranged in a target water-rich area; the method comprises the following steps: performing initial electrical geophysical prospecting work on a target water-rich area before a drainage project is implemented, and collecting initial electrical data; performing inversion on the collected initial electrical data to obtain an original distribution condition R1 of the apparent resistivity of the water-rich area; after drainage, electrical geophysical prospecting is carried out again to obtain electrical data, and inversion is carried out to obtain an apparent resistivity distribution condition R2 of a water-rich area; comparing the two apparent resistivity distribution conditions R1 and R2, and delineating an apparent resistivity relatively increased area in the monitoring area as the influence range of the water exploration and drainage project; electrical geophysical prospecting is carried out on the monitoring area every day after the drainage project is finished, and the real-time apparent resistivity distribution condition Ri is obtained; and comparing the apparent resistivity distribution conditions R2 and Ri, delineating an apparent resistivity relatively-reduced area in the monitoring area as a water refilling area, and performing water drainage again. The water exploration and drainage effect can be determined more accurately.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mine prevention and control, and in particular to a method for monitoring the entire process of the impact range of advanced water exploration and release in a water-rich area of ​​a coal mine. Background Art

[0002] The problem of water inrush in coal mines has always been a major hidden danger to coal mine safety production. Advance exploration and water release for water-rich areas is crucial in water prevention and control in coal mine safety production. Accurate determination of the drainage effect of the advance exploration and water release project is the key to roof water inrush prevention and control work.

[0003] At present, the drainage effect of the advanced exploration and drainage project in coal mines is mostly determined based on the amount of water gushing out of the drainage borehole. When the amount of water gushing out is less than a certain threshold, the drainage is considered to be completed. However, the inventors of this application have found through research that the current method for determining the effect of exploration and drainage has the following problems: (1) It is impossible to determine the drainage influence range of the borehole. Therefore, when exploring and draining water, the borehole position is mainly set based on experience (generally equidistant setting), which is prone to missed drilling (failure to effectively treat the water-rich area) or multiple rows (increasing workload and causing unnecessary loss of manpower and material resources); (2) The impact of subsequent mining work on the water-rich area is not considered. The subsequent mining work causes stress concentration in the surrounding rock of the water-rich area, and the surrounding rock state changes, which may cause the drained water-rich area to be refilled with water, threatening safe production. Summary of the invention

[0004] In view of the technical problems existing in the existing methods for determining the drainage effects of advanced exploration and drainage projects in coal mines, the present invention provides a method for monitoring the entire process of the influence range of advanced exploration and drainage in water-rich areas of coal mines. The method determines the effective influence range of the exploration and drainage project by analyzing the spatial apparent resistivity changes in water-rich areas of coal mines, and monitors the later effects of the exploration and drainage project in real time, thereby reducing economic losses and improving mining safety.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0006] A method for monitoring the whole process of the impact range of advanced water exploration and drainage in a water-rich area of ​​a coal mine, comprising the following steps:

[0007] S1. Deploy a parallel electrical monitoring system in the target water-rich area;

[0008] S2. Conduct initial electrical geophysical exploration of the target water-rich area before the drainage project is implemented and collect initial electrical data;

[0009] S3. Invert the collected initial electrical data to obtain the original distribution of apparent resistivity in the water-rich area R 1 ;

[0010] S4. After drainage, electrical geophysical exploration is performed again to obtain electrical data, and the electrical data is inverted to obtain the apparent resistivity distribution of the water-rich area R2 ;

[0011] S5. Compare the two apparent resistivity distributions R 1 and R 2 , in the monitoring area, the area with relatively high apparent resistivity is circled as the impact range of the water exploration and release project;

[0012] S6. After the drainage project is completed, conduct electrical geophysical exploration in the monitoring area every day to obtain the real-time apparent resistivity distribution R i ;

[0013] S7. Comparison of apparent resistivity distribution R 2 and R i , in the monitoring area, the area with relatively lower apparent resistivity is circled as the refilling area, and drainage work is carried out again.

[0014] Furthermore, the parallel electrical monitoring system in step S1 includes a monitoring host and a mine industrial ring network surface terminal arranged in the mine industrial ring network control center above ground, and a mine industrial ring network underground switch, a collection substation, a multi-core explosion-proof cable and a plurality of electrodes arranged underground. The monitoring host is electrically connected to the plurality of electrodes through the mine industrial ring network surface terminal, the mine industrial ring network underground switch, the collection substation and the multi-core explosion-proof cable in sequence. The plurality of electrodes are arranged around the drainage borehole, and the drainage borehole is connected to the water-rich area.

[0015] Furthermore, the plurality of electrodes are arranged around the drainage borehole at equal intervals of 5 meters.

[0016] Furthermore, the electrodes in the parallel electrical monitoring system are divided into current electrodes and measurement electrodes, and the measurement is performed according to the dipole profile method.

[0017] Furthermore, the geophysical exploration work in step S2 includes injection of excitation current and acquisition of spatial potential at each electrode position, and the initial electrical data is the spatial potential measured by each electrode.

[0018] Furthermore, the principle of inverting the collected initial electrical data in step S3 is as follows:

[0019]

[0020] in, is the apparent resistivity, ΔU MN is the potential difference between the electrodes MN, AM, AN, BM, BN, MN are the distances between the electrodes, and I is the magnitude of the injected current.

[0021] Furthermore, the apparent resistivity distribution R obtained in steps S3, S4 and S6 can be converted into a contour color map and displayed in real time.

[0022] Furthermore, the relatively increased apparent resistivity area in step S5 means that as the drainage proceeds, the water content in the water-rich area gradually decreases, the apparent resistivity in the water-rich area increases, and the contour color map of the apparent resistivity distribution R will also change, and the original low resistance will be transformed into high resistance, and the color of the water-rich area will gradually become consistent with the color of the surrounding space.

[0023] Compared with the prior art, the method for monitoring the whole process of the impact range of advance exploration and drainage of water-rich areas in coal mines provided by the present invention has the following advantages: (1) The apparent resistivity distribution of the target water-rich area is obtained by the parallel electrical monitoring system, and by comparing the apparent resistivity distribution at different times, the change in the effective range of the drainage project can be determined. Compared with the existing flow monitoring method, the exploration and drainage effect can be determined more accurately; (2) Since the electrodes of the parallel electrical monitoring system can be arranged in the target water-rich area at one time, and the electrical data of the target area can be obtained at any time before, during and after drainage, compared with the original single geophysical exploration method, it can provide more comprehensive reference data for water hazard prevention and control in coal mines; (3) The parallel electrical monitoring system provided by the present invention can realize real-time data collection, transmission and inversion, and visualize the results, which is conducive to the real-time adjustment of the coal mine safety production plan. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic flow chart of the whole process monitoring method of the influence range of advanced exploration and water release in water-rich areas of coal mines provided by the present invention.

[0025] Figure 2 It is a structural schematic diagram of the parallel electrical monitoring system provided by the present invention.

[0026] Figure 3 It is a schematic diagram of the working process of the parallel electrical monitoring system provided by the present invention.

[0027] Figure 4 It is a schematic diagram of the ABMN electrode layout method provided by the present invention.

[0028] Figure 5 It is a schematic diagram of a color contour map of the apparent resistivity distribution R after conversion provided by the present invention.

[0029] In the figure, 11, monitoring host; 12, mine industrial ring network aboveground terminal; 13, mine industrial ring network underground switch; 14, collection substation; 15, multi-core explosion-proof cable; 16, electrode; 17, drainage drilling hole; 18, water-rich area. DETAILED DESCRIPTION

[0030] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below with reference to specific diagrams.

[0031] In the description of the present invention, it should be understood that the terms "longitudinal", "radial", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In the description of the present invention, unless otherwise specified, "plurality" means two or more.

[0032] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0033] Please refer to Figure 1 As shown, the present invention provides a method for monitoring the whole process of the influence range of advanced water exploration and release in a water-rich area of ​​a coal mine, comprising the following steps:

[0034] S1. Deploy a parallel electrical monitoring system in the target water-rich area;

[0035] S2. Conduct initial electrical geophysical exploration of the target water-rich area before the drainage project is implemented and collect initial electrical data;

[0036] S3. Invert the collected initial electrical data to obtain the original distribution of apparent resistivity in the water-rich area R 1 ;

[0037] S4. After drainage, electrical geophysical exploration is performed again to obtain electrical data, and the electrical data is inverted to obtain the apparent resistivity distribution of the water-rich area R 2 ;

[0038] S5. Compare the two apparent resistivity distributions R 1 and R 2 , in the monitoring area, the area with relatively high apparent resistivity is circled as the impact range of the water exploration and release project;

[0039] S6. After the drainage project is completed, conduct electrical geophysical exploration in the monitoring area every day to obtain the real-time apparent resistivity distribution R i ;

[0040] S7. Comparison of apparent resistivity distribution R 2 and Ri , in the monitoring area, the area with relatively lower apparent resistivity is circled as the refilling area, and drainage work is carried out again.

[0041] As a specific example, please refer to Figure 2 As shown, the parallel electrical monitoring system in step S1 includes a monitoring host 11 and a mine industrial ring network terminal 12 arranged in the mine industrial ring network control center above the well, and a mine industrial ring network underground switch 13, a collection substation 14, a multi-core explosion-proof cable 15 and a plurality of electrodes 16 arranged underground. The monitoring host 11 is electrically connected to the plurality of electrodes 16 through the mine industrial ring network terminal 12 above the well, the mine industrial ring network underground switch 13, the collection substation 14, and the multi-core explosion-proof cable 15 in sequence. The plurality of electrodes 16 are arranged around the drainage borehole 17, and the drainage borehole 17 is connected to the water-rich area 18 for draining water through the pipeline; the collection substation 14 is used for data collection, and the monitoring host is used for data storage, analysis and inversion. The parallel electrical monitoring system in this embodiment uses the electrical difference of the medium caused by the change of water content to detect the structure of the water-rich area, and obtains the electrical parameters of the medium in the monitoring area by arranging electrodes at the boundary of the monitoring area, injecting current into the monitoring area, and measuring the potential difference. The workflow of the parallel electrical monitoring system is as follows: design measurement plan, lay out electrodes, connect data acquisition system, inject current and measure potential difference, record and transmit data, process and interpret data, and obtain the apparent resistivity distribution R of the monitoring area. For details, please refer to Figure 3 shown.

[0042] As a specific embodiment, the plurality of electrodes 16 are arranged around the drainage borehole 17 at equal intervals of 5 meters, thereby enabling the electrical data of the target area to be acquired at any time, and providing more comprehensive reference data for water hazard prevention and control in coal mines.

[0043] As a specific embodiment, the electrodes in the parallel electrical monitoring system are divided into current electrodes and measuring electrodes, and the dipole profile method (ABMN method) is used for measurement. The dipole profile method is a physical exploration method, which is mainly used to understand geological structures, hydrogeology, and engineering geological problems based on the differences in the electrical properties of rock masses. This method is based on the differences in the electrical conductivity, electrochemical activity, magnetic conductivity, and dielectric properties of rock masses. The characteristics of underground structures are inferred by measuring and analyzing these properties. For details, please refer to Figure 4 As shown. A and B are current electrodes, M and N are measuring electrodes, a is the distance between electrodes A and B and between electrodes M and N, o is the midpoint of the excitation electrodes A and B, and o' is the midpoint of the measuring electrodes M and N. In this solution, the two electrodes close to the acquisition substation 14 are current electrodes A and B, and the others are measuring electrodes, which can be combined into M and N in pairs.

[0044] As a specific embodiment, the geophysical exploration work in step S2 includes the injection of excitation current and the acquisition of spatial potential at each electrode position, and the initial electrical data is the spatial potential measured at each electrode; wherein, the injection of excitation current and the acquisition of spatial potential at each electrode position are already well known to those skilled in the art, and thus will not be described in detail here.

[0045] As a specific embodiment, the principle of inverting the collected initial electrical data in step S3 is as follows:

[0046]

[0047] in, is the apparent resistivity, ΔU MN is the potential difference between the electrodes MN, AM, AN, BM, BN, MN are the distances between the electrodes, and I is the magnitude of the injected current. The inversion principle design in this embodiment can be used to adjust the electrode spacing and arrangement according to specific measurement requirements to adapt to different geological conditions and detection depths.

[0048] As a specific embodiment, the apparent resistivity distribution R obtained in steps S3, S4 and S6 can be converted into a contour color map and displayed in real time. For details, please refer to Figure 5 As shown, the coal mine security personnel can more intuitively understand the changes in the water-rich area. Among them, the number 1 is the low-resistance water-rich area, and the number 2 is the high-resistance area.

[0049] As a specific embodiment, the area with relatively increased apparent resistivity in step S5 means that as the drainage proceeds, the water content in the water-rich area gradually decreases, the apparent resistivity in the water-rich area increases, and the contour color map of the apparent resistivity distribution R will also change, and the original low resistance will be transformed into high resistance, and the color of the water-rich area will gradually become consistent with the color of the surrounding space.

[0050] Compared with the prior art, the method for monitoring the whole process of the impact range of advance exploration and drainage of water-rich areas in coal mines provided by the present invention has the following advantages: (1) The apparent resistivity distribution of the target water-rich area is obtained by the parallel electrical monitoring system, and by comparing the apparent resistivity distribution at different times, the change in the effective range of the drainage project can be determined. Compared with the existing flow monitoring method, the exploration and drainage effect can be determined more accurately; (2) Since the electrodes of the parallel electrical monitoring system can be arranged in the target water-rich area at one time, and the electrical data of the target area can be obtained at any time before, during and after drainage, compared with the original single geophysical exploration method, it can provide more comprehensive reference data for water hazard prevention and control in coal mines; (3) The parallel electrical monitoring system provided by the present invention can realize real-time data collection, transmission and inversion, and visualize the results, which is conducive to the real-time adjustment of the coal mine safety production plan.

[0051] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A method for monitoring the whole process of the impact range of advanced water exploration and release in water-rich areas of coal mines, characterized in that: The following steps are involved: S1. Deploy a parallel electrical monitoring system in the target water-rich area; S2. Conduct initial electrical geophysical exploration of the target water-rich area before the drainage project is implemented and collect initial electrical data; S3, invert the collected initial electrical data to obtain the original distribution of apparent resistivity R1 in the water-rich area; S4. After drainage, electrical geophysical exploration is performed again to obtain electrical data, and the electrical data are inverted to obtain the apparent resistivity distribution R2 of the water-rich area; S5. Compare the two apparent resistivity distributions R1 and R2, and circle the area with relatively high apparent resistivity in the monitoring area, which is the impact range of the water exploration and release project; S6. After the drainage project is completed, conduct electrical geophysical exploration in the monitoring area every day to obtain the real-time apparent resistivity distribution R i ; S7. Compare the apparent resistivity distribution R2 and R i , in the monitoring area, the area with relatively lower apparent resistivity is circled as the refilling area, and drainage work is carried out again.

2. The method for monitoring the whole process of the influence range of advanced exploration and drainage in water-rich areas of coal mines according to claim 1 is characterized in that: The parallel electrical monitoring system in step S1 includes a monitoring host and a mine industrial ring network aboveground terminal arranged in the mine industrial ring network control center, and a mine industrial ring network underground switch, a collection substation, a multi-core explosion-proof cable and a plurality of electrodes arranged underground. The monitoring host is electrically connected to the plurality of electrodes in turn through the mine industrial ring network aboveground terminal, the mine industrial ring network underground switch, the collection substation and the multi-core explosion-proof cable. The plurality of electrodes are arranged around the drainage borehole, and the drainage borehole is connected to the water-rich area.

3. The method for monitoring the whole process of the influence range of advanced water exploration and drainage in water-rich areas of coal mines according to claim 2 is characterized in that: The plurality of electrodes are arranged around the drainage borehole at equal intervals of 5 meters.

4. The method for monitoring the whole process of the influence range of advanced water exploration and drainage in water-rich areas of coal mines according to claim 2 is characterized in that: The electrodes in the parallel electrical monitoring system are divided into current electrodes and measurement electrodes, and the measurement is performed according to the dipole profile method.

5. The method for monitoring the whole process of the influence range of advanced water exploration and drainage in water-rich areas of coal mines according to claim 2 is characterized in that: The geophysical exploration work in step S2 includes injection of excitation current and acquisition of spatial potential at each electrode position, and the initial electrical data is the spatial potential measured at each electrode.

6. The method for monitoring the whole process of the influence range of advanced water exploration and drainage in water-rich areas of coal mines according to claim 1 is characterized in that: The principle of inverting the collected initial electrical data in step S3 is as follows: in, is the apparent resistivity, ΔU MN is the potential difference between the electrodes MN, AM, AN, BM, BN, MN are the distances between the electrodes, and I is the magnitude of the injected current.

7. The method for monitoring the whole process of the influence range of advanced exploration and drainage in water-rich areas of coal mines according to claim 1 is characterized in that: The apparent resistivity distribution R obtained in steps S3, S4 and S6 can be converted into a contour color map and displayed in real time.

8. The method for monitoring the whole process of the influence range of advanced water exploration and drainage in water-rich areas of coal mines according to claim 1 is characterized in that: The relatively increased apparent resistivity area in step S5 means that as the drainage proceeds, the water content in the water-rich area gradually decreases, the apparent resistivity in the water-rich area increases, and the contour color map of the apparent resistivity distribution R will also change, and the original low resistance will be transformed into high resistance, and the color of the water-rich area will gradually become consistent with the color of the surrounding space.