Safety production integrated management system

By designing a comprehensive production safety management system in the power plant, and using production building modules, calculation modules and grade compensation modules to analyze and evaluate production chain risks, the problem that traditional power plant safety management cannot predict risk levels in advance is solved, and the intelligent risk assessment is achieved and accuracy, providing data support for power plants and reducing production risks.

CN118966807AActive Publication Date: 2024-11-15HUANENG INFORMATION TECH CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202411463688.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-21
Publication Date
2024-11-15
Estimated Expiration
2044-10-21

AI Technical Summary

Technical Problem

Traditional power plant safety management cannot provide the risk level of the production chain in advance and cannot provide data support for product safety production, resulting in inadequate and inefficient in large-scale and high-risk production.

Method used

A comprehensive production safety management system was designed, including production building module, first computing module, second computing module and level compensation module. By analyzing production projects, collecting and processing historical maintenance data and production behavior data, the initial risk level is calculated and Compensation is made and determine whether to pair the project production chain and production projects.

Benefits of technology

It realizes the advance prediction of the risk level of the project production chain, ensures the intelligence and accuracy of the risk level assessment, provides data support for the safe production of power plants, reduces production risks, and improves the level of production safety management of power plants.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118966807A_ABST
    Figure CN118966807A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power plant safety management, and discloses a safety production integrated management system, which is characterized in that a production construction module analyzes a production project and constructs a project production chain based on an analysis result; the first calculation module collects historical maintenance data of each piece of production equipment on a project production chain and calculates an initial risk level of the project production chain. A second calculation module calculates a historical production influence value of the project production chain according to the historical production behavior; the grade compensation module sets a compensation factor according to the historical production influence value, and compensates the initial risk grade based on the compensation factor to obtain a target risk grade; the safety management module judges whether to pair the project production chain and the production project according to the target risk level, can predict the risk level of the project production chain in advance, guarantees the intelligence and accuracy of risk level evaluation, provides data support for the safety production of a power plant, reduces the production risk of the power plant, and improves the safety of the power plant. And the production safety management level of the power plant is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power plant safety management, and in particular to a comprehensive production safety management system. Background Art

[0002] With the continuous improvement of industrialization and automation, production activities have become more complex and efficient. However, this has also brought more safety challenges. Therefore, the integrated safety production management system came into being. It uses advanced information technology, Internet of Things technology, big data analysis and other means to achieve comprehensive perception and intelligent analysis of the production environment.

[0003] In traditional power plant safety management, the assessment of the safety level of the production chain often relies on the experience of managers and regular safety inspections, which is somewhat subjective. With the development of technology, especially the advancement of information technology and automation technology, dynamic safety level assessment has become a future development trend. Traditional power plant safety management cannot give the risk level of the production chain in advance, and cannot provide data support for product safety production. This model is incapable of coping with large-scale, high-risk production and is inefficient. Summary of the invention

[0004] The embodiment of the present invention provides a comprehensive production safety management system to solve the technical problems in the prior art that the risk level of the project production chain cannot be intelligently predicted, data support cannot be provided for the production safety of the power plant, and the production risk of the power plant is increased.

[0005] In order to achieve the above object, the present invention provides a comprehensive production safety management system, comprising: A production construction module is used to obtain input production projects, analyze the production projects, and construct a project production chain based on the analysis results; A first calculation module is used to collect historical maintenance data of each production equipment in the project production chain, and calculate the initial risk level of the project production chain according to the historical maintenance data; A second calculation module is used to obtain the historical production behavior of the project production chain, and calculate the historical production impact value of the project production chain according to the historical production behavior; A level compensation module, used to set a compensation factor of the initial risk level according to the historical production impact value, and compensate the initial risk level based on the compensation factor to obtain a target risk level; The safety management module is used to determine whether to pair the project production chain with the production project according to the target risk level.

[0006] Furthermore, the production building block is used to: The production construction module is used to analyze the production project and determine the corresponding production requirements; The production construction module is used to determine the corresponding production equipment based on the production demand; The production construction module is used to count the number of all production equipment and determine the corresponding number of connection chains, connect all production equipment based on the connection chains, and build the project production chain.

[0007] Furthermore, the first calculation module is used for: The first calculation module is used to classify the historical maintenance data corresponding to all production equipment into the same type to obtain multiple maintenance data sets; The first calculation module is used to respectively determine the maintenance data comparison range corresponding to each maintenance data set, wherein the maintenance data comparison range includes a safety maintenance data value and a risk maintenance data value; The first calculation module is used to divide the corresponding maintenance data set based on the maintenance data comparison range, and divide all historical maintenance data in the maintenance data set that is less than the safety maintenance data value into the safety maintenance data set; The first calculation module is used to classify the historical maintenance data in the maintenance data set that is greater than or equal to the safety maintenance data value and less than the risk maintenance data value into the standard maintenance data set; The first calculation module is used to classify the historical maintenance data in the maintenance data set that is greater than or equal to the risk maintenance data value into the risk maintenance data set; The first calculation module is used to calculate the historical maintenance factor of the corresponding maintenance data set according to the safety maintenance data set, the standard maintenance data set and the risk maintenance data set; The first calculation module is used to calculate the historical maintenance factors of all remaining maintenance data sets, and generate a historical maintenance factor sequence according to all historical maintenance factors; The first calculation module is used to calculate the initial risk level of the project production chain according to the historical maintenance factor sequence.

[0008] Furthermore, the first calculation module is used for: The first calculation module is used to calculate the historical maintenance factor of the maintenance data set according to the following formula: ; Where P is the historical maintenance factor of the maintenance data set, h is the adjustment coefficient of the historical maintenance factor, e1 is the first calculation constant, n is the number of historical maintenance data in the standard maintenance data set, s i is the i-th historical maintenance data in the standard maintenance data set, k1 安 is the safety inspection data value, fi is the weight corresponding to the i-th historical maintenance data in the standard maintenance data set, e2 is the second calculation constant, m is the number of historical maintenance data in the risk maintenance data set, g j is the i-th historical maintenance data in the risk maintenance data set, k2 风 is the risk maintenance data value, b j is the weight corresponding to the i-th historical maintenance data in the risk maintenance data set; The first calculation module is used to determine the adjustment coefficient h of the historical maintenance factor according to the following steps: Counting the number L of historical risk data in the safety maintenance data set; Presetting a first preset adjustment coefficient c1, a second preset adjustment coefficient c2 and a third preset adjustment coefficient c3; When L<m+n, the first preset adjustment coefficient is used as the adjustment coefficient of the historical maintenance factor, that is, h=c1; When L=m+n, the second preset adjustment coefficient is used as the adjustment coefficient of the historical maintenance factor, that is, h=c2; When m+n<L, the third preset adjustment coefficient is used as the adjustment coefficient of the historical maintenance factor, that is, h=c3.

[0009] Furthermore, the first calculation module is used for: The first calculation module is used to extract the same historical maintenance factor from the historical maintenance factor sequence and obtain multiple sub-historical maintenance factor sequences; The first calculation module is used to count the number R1 of the first subsequence of the sub-historical maintenance factor sequence; The first calculation module is used to extract a historical maintenance factor from all sub-historical maintenance factor sequences respectively, and calculate the first factor and value T1; The first calculation module is used to obtain a preset historical maintenance factor threshold, delete all sub-historical maintenance factor sequences that are less than the historical maintenance factor threshold, and count the number of second sub-sequences R2 of the remaining sub-historical maintenance factor sequences; The first calculation module is used to extract a historical maintenance factor from the remaining sub-historical maintenance factor sequences respectively, and calculate the second factor and value T2; The first calculation module is used to calculate the initial risk level of the project production chain according to the first subsequence quantity R1, the first factor and value T1, the second subsequence quantity R2 and the second factor and value T2; The first calculation module is used to calculate the initial risk level of the project production chain according to the following formula: ; Among them, U is the initial risk level of the project production chain, and w is the historical maintenance factor threshold.

[0010] Furthermore, the second calculation module is used for: The second calculation module is used to analyze the historical production behavior and determine the historical risky production behavior and the historical safe production behavior; The second calculation module is used to obtain the production loss value corresponding to each historical risky production behavior from the power plant database; The second calculation module is used to calculate the historical production impact value of the project production chain according to the historical risky production behavior, the historical safe production behavior and all production loss values; The second calculation module is used to calculate the historical production impact value of the project production chain according to the following formula: ; Among them, d is the historical production impact value of the project production chain, v1 is the number of historical safety production behaviors, v2 is the number of historical risky production behaviors, and Y x is the production loss value corresponding to the x-th historical risk production behavior, and Ymax is the maximum production loss value corresponding to the historical risk production behavior.

[0011] Furthermore, the level compensation module is used to: The grade compensation module is used to preset a first preset historical production impact value and a second preset historical production impact value; The level compensation module is used to preset a first preset compensation factor, a second preset compensation factor and a third preset compensation factor; The level compensation module is used for compensating the initial risk level based on the first preset compensation factor to obtain a target risk level when a first preset condition is identified; The level compensation module is used for compensating the initial risk level based on the second preset compensation factor to obtain a target risk level when a second preset condition is identified; The level compensation module is used to compensate the initial risk level based on the third preset compensation factor to obtain a target risk level when a third preset condition is identified; wherein, the first preset condition is that the historical production impact value is less than the first preset historical production impact value, the second preset condition is that the historical production impact value is greater than or equal to the first preset historical production impact value and less than the second preset historical production impact value, and the third preset condition is that the historical production impact value is greater than or equal to the second preset historical production impact value.

[0012] Furthermore, the security management module is used to: The safety management module is used to obtain a preset target risk level threshold, and determine whether to pair the project production chain with the production project according to the relationship between the target risk level and the target risk level threshold; The safety management module is used for pairing the project production chain and the production project when the target risk level is less than the target risk level threshold; The safety management module is used for not pairing the project production chain and the production project when the target risk level is greater than or equal to the target risk level threshold.

[0013] Compared with the prior art, the present invention has the following beneficial effects: The present invention discloses a comprehensive management system for safe production. The production construction module analyzes production projects and constructs a project production chain based on the analysis results; the first calculation module collects historical maintenance data of each production equipment on the project production chain and calculates the initial risk level of the project production chain; the second calculation module calculates the historical production impact value of the project production chain according to the historical production behavior; the level compensation module sets a compensation factor according to the historical production impact value, compensates the initial risk level based on the compensation factor, and obtains a target risk level; the safety management module determines whether to pair the project production chain with the production project according to the target risk level, and can predict the risk level of the project production chain in advance, ensure the intelligence and accuracy of risk level assessment, provide data support for safe production of power plants, reduce production risks of power plants, and greatly improve the production safety management level of power plants. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings: Figure 1 A schematic structural diagram of a comprehensive production safety management system in an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0015] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0016] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0017] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0018] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0019] The following is a description of preferred embodiments of the present invention with reference to the accompanying drawings.

[0020] like Figure 1 As shown, an embodiment of the present invention discloses a comprehensive safety production management system, including: A production construction module is used to obtain input production projects, analyze the production projects, and construct a project production chain based on the analysis results; A first calculation module is used to collect historical maintenance data of each production equipment in the project production chain, and calculate the initial risk level of the project production chain according to the historical maintenance data; A second calculation module is used to obtain the historical production behavior of the project production chain, and calculate the historical production impact value of the project production chain according to the historical production behavior; A level compensation module, used to set a compensation factor of the initial risk level according to the historical production impact value, and compensate the initial risk level based on the compensation factor to obtain a target risk level; The safety management module is used to determine whether to pair the project production chain with the production project according to the target risk level.

[0021] The beneficial effect of the above technical solution is that the present invention can predict the risk level of the project production chain in advance, ensure the intelligence and accuracy of risk level assessment, provide data support for power plant production safety, reduce power plant production risks, and greatly improve the level of power plant production safety management.

[0022] In some embodiments of the present application, the production building block is used to: The production construction module is used to analyze the production project and determine the corresponding production requirements; The production construction module is used to determine the corresponding production equipment based on the production demand; The production construction module is used to count the number of all production equipment and determine the corresponding number of connection chains, connect all production equipment based on the connection chains, and build the project production chain.

[0023] In this embodiment, the production projects include thermal power generation, wind power generation, etc.

[0024] In this embodiment, the production requirements include power generation time, power generation amount, power generation efficiency, etc.

[0025] In this embodiment, if the production project is thermal power generation, the corresponding production equipment includes boilers, steam turbines, generators, coal mills, blowers, induced draft fans, etc.

[0026] In this embodiment, if the number of production equipment is 8, the number of connection chains is 7; if the number of production equipment is 6, the number of connection chains is 5; the rest are not shown.

[0027] The beneficial effect of the above technical solution is that the present invention connects all production equipment based on the connection chain, constructs a project production chain, thereby laying a foundation for safe production management and providing support for the prediction of risk levels.

[0028] In some embodiments of the present application, the first computing module is used to: The first calculation module is used to classify the historical maintenance data corresponding to all production equipment into the same type to obtain multiple maintenance data sets; The first calculation module is used to respectively determine the maintenance data comparison range corresponding to each maintenance data set, wherein the maintenance data comparison range includes a safety maintenance data value and a risk maintenance data value; The first calculation module is used to divide the corresponding maintenance data set based on the maintenance data comparison range, and divide all historical maintenance data in the maintenance data set that is less than the safety maintenance data value into the safety maintenance data set; The first calculation module is used to classify the historical maintenance data in the maintenance data set that is greater than or equal to the safety maintenance data value and less than the risk maintenance data value into the standard maintenance data set; The first calculation module is used to classify the historical maintenance data in the maintenance data set that is greater than or equal to the risk maintenance data value into the risk maintenance data set; The first calculation module is used to calculate the historical maintenance factor of the corresponding maintenance data set according to the safety maintenance data set, the standard maintenance data set and the risk maintenance data set; The first calculation module is used to calculate the historical maintenance factors of all remaining maintenance data sets, and generate a historical maintenance factor sequence according to all historical maintenance factors; The first calculation module is used to calculate the initial risk level of the project production chain according to the historical maintenance factor sequence.

[0029] In this embodiment, the historical maintenance data includes the number of historical maintenance times, historical maintenance frequency, historical maintenance time, etc.

[0030] In this embodiment, each production equipment has corresponding historical maintenance data. Therefore, the historical maintenance times corresponding to all production equipment are extracted as the same type of data, such as the historical maintenance times, historical maintenance frequencies, and historical maintenance times mentioned above, to obtain a historical maintenance times set, a historical maintenance frequency set, and a historical maintenance time set.

[0031] In this embodiment, the maintenance data comparison range is determined by comprehensive analysis of the equipment operation status, working environment and historical fault data, and the specific value is quantitatively set according to factors such as the importance of the equipment, the severity of the consequences of the fault and the probability of occurrence. For example, for the set of historical maintenance times, the corresponding safety maintenance data value is preferably 4, and the risk maintenance data value is preferably 7.

[0032] The beneficial effect of the above technical solution is: the present invention calculates the historical maintenance factors of the corresponding maintenance data set according to the safety maintenance data set, the standard maintenance data set and the risk maintenance data set, which can provide reliable data support for calculating the initial risk level of the project production chain, and calculates the initial risk level of the project production chain according to the historical maintenance factor sequence, thereby achieving accurate calculation of the initial risk level, avoiding errors existing in manual calculations, and achieving early prediction of the project production chain.

[0033] In some embodiments of the present application, the first computing module is used to: The first calculation module is used to calculate the historical maintenance factor of the maintenance data set according to the following formula: ; Where P is the historical maintenance factor of the maintenance data set, h is the adjustment coefficient of the historical maintenance factor, e1 is the first calculation constant, n is the number of historical maintenance data in the standard maintenance data set, s i is the i-th historical maintenance data in the standard maintenance data set, k1 安 is the safety inspection data value, f i is the weight corresponding to the i-th historical maintenance data in the standard maintenance data set, e2 is the second calculation constant, m is the number of historical maintenance data in the risk maintenance data set, g j is the i-th historical maintenance data in the risk maintenance data set, k2 风 is the risk maintenance data value, b j is the weight corresponding to the i-th historical maintenance data in the risk maintenance data set; The first calculation module is used to determine the adjustment coefficient h of the historical maintenance factor according to the following steps: Counting the number L of historical risk data in the safety maintenance data set; Presetting a first preset adjustment coefficient c1, a second preset adjustment coefficient c2 and a third preset adjustment coefficient c3; When L<m+n, the first preset adjustment coefficient is used as the adjustment coefficient of the historical maintenance factor, that is, h=c1; When L=m+n, the second preset adjustment coefficient is used as the adjustment coefficient of the historical maintenance factor, that is, h=c2; When m+n<L, the third preset adjustment coefficient is used as the adjustment coefficient of the historical maintenance factor, that is, h=c3.

[0034] In this embodiment, the first preset adjustment coefficient c1 is smaller than the second preset adjustment coefficient c2 and smaller than the third preset adjustment coefficient c3, which are set in advance. In this application, c1=0.8, c2=1, and c3=1.2.

[0035] The beneficial effect of the above technical solution is that the present invention realizes fine-tuning of the historical maintenance factor through the number L of historical risk data in the safety maintenance data set, and further ensures the accuracy of the initial risk level.

[0036] In some embodiments of the present application, the first computing module is used to: The first calculation module is used to extract the same historical maintenance factor from the historical maintenance factor sequence and obtain multiple sub-historical maintenance factor sequences; The first calculation module is used to count the number R1 of the first subsequence of the sub-historical maintenance factor sequence; The first calculation module is used to extract a historical maintenance factor from all sub-historical maintenance factor sequences respectively, and calculate the first factor and value T1; The first calculation module is used to obtain a preset historical maintenance factor threshold, delete all sub-historical maintenance factor sequences that are less than the historical maintenance factor threshold, and count the number of second sub-sequences R2 of the remaining sub-historical maintenance factor sequences; The first calculation module is used to extract a historical maintenance factor from the remaining sub-historical maintenance factor sequences respectively, and calculate the second factor and value T2; The first calculation module is used to calculate the initial risk level of the project production chain according to the first subsequence quantity R1, the first factor and value T1, the second subsequence quantity R2 and the second factor and value T2; The first calculation module is used to calculate the initial risk level of the project production chain according to the following formula: ; Among them, U is the initial risk level of the project production chain, and w is the historical maintenance factor threshold.

[0037] In this embodiment, if the historical maintenance factor sequence is {0.4, 0.4, 0.5, 0.6, 0.6, 0.8, 0.9, 0.9}, then the sub-historical maintenance factor sequence is {0.4, 0.4}, {0.6, 0.6}, {0.9, 0.9}, {0.5}, {0.8}, the number of first sub-sequences R1 is 5, the first factor sum T1=0.4+0.6+0.9+0.5+0.8, the historical maintenance factor threshold is 0.7, the remaining sub-historical maintenance factor sequences are {0.8}, {0.9, 0.9}, the number of second sub-sequences R2 is 2, and the second factor sum T2 is 0.8+0.9.

[0038] The beneficial effect of the above technical solution is: the present invention calculates the initial risk level of the project production chain according to the first subsequence quantity R1, the first factor sum value T1, the second subsequence quantity R2 and the second factor sum value T2, thereby achieving accurate prediction of the risk level of the project production chain, laying the foundation for the execution of the production project and ensuring the production quality of the production project.

[0039] In some embodiments of the present application, the second computing module is used to: The second calculation module is used to analyze the historical production behavior and determine the historical risky production behavior and the historical safe production behavior; The second calculation module is used to obtain the production loss value corresponding to each historical risky production behavior from the power plant database; The second calculation module is used to calculate the historical production impact value of the project production chain according to the historical risky production behavior, the historical safe production behavior and all production loss values; The second calculation module is used to calculate the historical production impact value of the project production chain according to the following formula: ; Among them, d is the historical production impact value of the project production chain, v1 is the number of historical safety production behaviors, v2 is the number of historical risky production behaviors, and Y x is the production loss value corresponding to the x-th historical risk production behavior, and Ymax is the maximum production loss value corresponding to the historical risk production behavior.

[0040] In this embodiment, historical risky production behavior refers to the behavior of the project production chain in which production equipment failure occurs during the production process, and historical safe production behavior refers to the behavior of the project production chain in which no production equipment failure occurs during the production process.

[0041] In this embodiment, the power plant database mainly supports the daily operation and management of the power plant through data collection, data analysis, data reporting, etc. It has the main functions of collecting, recording, analyzing and reporting power plant operation data to support the maintenance, operation and improvement of production efficiency of the power plant. The power plant database contains information such as power generation, load data, fuel consumption, equipment operating status and maintenance records. These data are crucial for the operation, management and maintenance of the power plant. The production loss value refers to the economic evaluation value caused by the failure of production equipment during the production process of the power plant, and these data are stored in the power plant database.

[0042] The beneficial effect of the above technical solution is: the historical production impact value of the project production chain is calculated based on the historical risk production behavior, the historical safe production behavior and all production loss values. By calculating the historical production impact value of the project production chain, the objectivity and accuracy of the risk level assessment can be further guaranteed, avoiding a relatively single assessment process.

[0043] In some embodiments of the present application, the level compensation module is used to: The grade compensation module is used to preset a first preset historical production impact value and a second preset historical production impact value; The level compensation module is used to preset a first preset compensation factor, a second preset compensation factor and a third preset compensation factor; The level compensation module is used for compensating the initial risk level based on the first preset compensation factor to obtain a target risk level when a first preset condition is identified; The level compensation module is used for compensating the initial risk level based on the second preset compensation factor to obtain a target risk level when a second preset condition is identified; The level compensation module is used to compensate the initial risk level based on the third preset compensation factor to obtain a target risk level when a third preset condition is identified; wherein, the first preset condition is that the historical production impact value is less than the first preset historical production impact value, the second preset condition is that the historical production impact value is greater than or equal to the first preset historical production impact value and less than the second preset historical production impact value, and the third preset condition is that the historical production impact value is greater than or equal to the second preset historical production impact value.

[0044] In this embodiment, the first preset historical production impact value is less than the second preset historical production impact value. The first preset historical production impact value and the second preset historical production impact value are measurement standards based on historical data analysis and mathematical model calculations, which are used to evaluate the potential impact of specific production behaviors on power plant production. In this application, the first preset historical production impact value is preferably 4, and the second preset historical production impact value is preferably 7.

[0045] In this embodiment, the first preset compensation factor, the second preset compensation factor and the third preset compensation factor are set in advance. In this application, the first preset compensation factor is preferably 0.85, the second preset compensation factor is preferably 1, and the third preset compensation factor is preferably 1.15.

[0046] In this embodiment, the initial risk level is compensated based on the first preset compensation factor. When the target risk level is obtained, the product value of the first compensation factor and the initial risk level is calculated, and the product value is used as the target risk level.

[0047] The beneficial effect of the above technical solution is that the present invention selects the corresponding compensation factor according to the historical production impact value and calculates the target risk level, which can ensure the safe production of the production project, ensure the stability and reliability of the production process, avoid risks and reduce unnecessary losses.

[0048] In some embodiments of the present application, the security management module is used to: The safety management module is used to obtain a preset target risk level threshold, and determine whether to pair the project production chain with the production project according to the relationship between the target risk level and the target risk level threshold; The safety management module is used for pairing the project production chain and the production project when the target risk level is less than the target risk level threshold; The safety management module is used for not pairing the project production chain and the production project when the target risk level is greater than or equal to the target risk level threshold.

[0049] In this embodiment, the setting of the target risk level threshold is usually based on comprehensive evaluation and analysis, mainly considering historical data, potential consequences, regulatory requirements and industry standards. The target risk level threshold is a key indicator used to define what level of risk requires special attention and management. In industrial environments such as power plants, reasonable risk level thresholds can help managers effectively allocate resources and prioritize high-risk events, thereby ensuring the safety and efficiency of operations. In this application, the target risk level threshold is preferably 6.

[0050] In this embodiment, the project production chain and the production project are paired, that is, the project production chain is used to perform production work on the production project.

[0051] In the description of the above embodiments, specific features, structures, materials or characteristics may be combined in a suitable manner in any one or more embodiments or examples.

[0052] Although the present invention has been described above with reference to the embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the various features in the embodiments disclosed by the present invention may be used in combination with each other in any manner, and the fact that these combinations are not fully described in this specification is only for the sake of omitting space and saving resources.

[0053] Those skilled in the art can understand that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions recorded in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A comprehensive safety production management system, characterized in that: include: A production construction module is used to obtain input production projects, analyze the production projects, and construct a project production chain based on the analysis results; A first calculation module is used to collect historical maintenance data of each production equipment in the project production chain, and calculate the initial risk level of the project production chain according to the historical maintenance data; A second calculation module is used to obtain the historical production behavior of the project production chain, and calculate the historical production impact value of the project production chain according to the historical production behavior; A level compensation module, used to set a compensation factor of the initial risk level according to the historical production impact value, and compensate the initial risk level based on the compensation factor to obtain a target risk level; The safety management module is used to determine whether to pair the project production chain with the production project according to the target risk level.

2. The integrated production safety management system according to claim 1 is characterized in that: The production building blocks are used to: The production construction module is used to analyze the production project and determine the corresponding production requirements; The production construction module is used to determine the corresponding production equipment based on the production demand; The production construction module is used to count the number of all production equipment and determine the corresponding number of connection chains, connect all production equipment based on the connection chains, and build the project production chain.

3. The integrated production safety management system according to claim 1 is characterized in that: The first calculation module is used for: The first calculation module is used to classify the historical maintenance data corresponding to all production equipment into the same type to obtain multiple maintenance data sets; The first calculation module is used to respectively determine the maintenance data comparison range corresponding to each maintenance data set, wherein the maintenance data comparison range includes a safety maintenance data value and a risk maintenance data value; The first calculation module is used to divide the corresponding maintenance data set based on the maintenance data comparison range, and divide all historical maintenance data in the maintenance data set that is less than the safety maintenance data value into the safety maintenance data set; The first calculation module is used to classify the historical maintenance data in the maintenance data set that is greater than or equal to the safety maintenance data value and less than the risk maintenance data value into the standard maintenance data set; The first calculation module is used to classify the historical maintenance data in the maintenance data set that is greater than or equal to the risk maintenance data value into the risk maintenance data set; The first calculation module is used to calculate the historical maintenance factor of the corresponding maintenance data set according to the safety maintenance data set, the standard maintenance data set and the risk maintenance data set; The first calculation module is used to calculate the historical maintenance factors of all remaining maintenance data sets, and generate a historical maintenance factor sequence according to all historical maintenance factors; The first calculation module is used to calculate the initial risk level of the project production chain according to the historical maintenance factor sequence.

4. The integrated production safety management system according to claim 3 is characterized in that: The first calculation module is used for: The first calculation module is used to calculate the historical maintenance factor of the maintenance data set according to the following formula: ; Where P is the historical maintenance factor of the maintenance data set, h is the adjustment coefficient of the historical maintenance factor, e1 is the first calculation constant, n is the number of historical maintenance data in the standard maintenance data set, s i is the i-th historical maintenance data in the standard maintenance data set, k1 安 is the safety inspection data value, f i is the weight corresponding to the i-th historical maintenance data in the standard maintenance data set, e2 is the second calculation constant, m is the number of historical maintenance data in the risk maintenance data set, g j is the i-th historical maintenance data in the risk maintenance data set, k2 风 is the risk maintenance data value, b j is the weight corresponding to the i-th historical maintenance data in the risk maintenance data set; The first calculation module is used to determine the adjustment coefficient h of the historical maintenance factor according to the following steps: Counting the number L of historical risk data in the safety maintenance data set; Presetting a first preset adjustment coefficient c1, a second preset adjustment coefficient c2 and a third preset adjustment coefficient c3; When L<m+n, the first preset adjustment coefficient is used as the adjustment coefficient of the historical maintenance factor, that is, h=c1; When L=m+n, the second preset adjustment coefficient is used as the adjustment coefficient of the historical maintenance factor, that is, h=c2; When m+n<L, the third preset adjustment coefficient is used as the adjustment coefficient of the historical maintenance factor, that is, h=c3.

5. The integrated production safety management system according to claim 4 is characterized in that: The first calculation module is used for: The first calculation module is used to extract the same historical maintenance factor from the historical maintenance factor sequence and obtain multiple sub-historical maintenance factor sequences; The first calculation module is used to count the number R1 of the first subsequence of the sub-historical maintenance factor sequence; The first calculation module is used to extract a historical maintenance factor from all sub-historical maintenance factor sequences respectively, and calculate the first factor and value T1; The first calculation module is used to obtain a preset historical maintenance factor threshold, delete all sub-historical maintenance factor sequences that are less than the historical maintenance factor threshold, and count the number of second sub-sequences R2 of the remaining sub-historical maintenance factor sequences; The first calculation module is used to extract a historical maintenance factor from the remaining sub-historical maintenance factor sequences respectively, and calculate the second factor and value T2; The first calculation module is used to calculate the initial risk level of the project production chain according to the first subsequence quantity R1, the first factor and value T1, the second subsequence quantity R2 and the second factor and value T2; The first calculation module is used to calculate the initial risk level of the project production chain according to the following formula: ; Among them, U is the initial risk level of the project production chain, and w is the historical maintenance factor threshold.

6. The integrated production safety management system according to claim 1, characterized in that: The second calculation module is used for: The second calculation module is used to analyze the historical production behavior and determine the historical risky production behavior and the historical safe production behavior; The second calculation module is used to obtain the production loss value corresponding to each historical risky production behavior from the power plant database; The second calculation module is used to calculate the historical production impact value of the project production chain according to the historical risky production behavior, the historical safe production behavior and all production loss values; The second calculation module is used to calculate the historical production impact value of the project production chain according to the following formula: ; Among them, d is the historical production impact value of the project production chain, v1 is the number of historical safety production behaviors, v2 is the number of historical risky production behaviors, and Y x is the production loss value corresponding to the x-th historical risk production behavior, and Ymax is the maximum production loss value corresponding to the historical risk production behavior.

7. The integrated production safety management system according to claim 1, characterized in that: The level compensation module is used for: The grade compensation module is used to preset a first preset historical production impact value and a second preset historical production impact value; The level compensation module is used to preset a first preset compensation factor, a second preset compensation factor and a third preset compensation factor; The level compensation module is used for compensating the initial risk level based on the first preset compensation factor to obtain a target risk level when a first preset condition is identified; The level compensation module is used for compensating the initial risk level based on the second preset compensation factor to obtain a target risk level when a second preset condition is identified; The level compensation module is used to compensate the initial risk level based on the third preset compensation factor to obtain a target risk level when a third preset condition is identified; wherein, the first preset condition is that the historical production impact value is less than the first preset historical production impact value, the second preset condition is that the historical production impact value is greater than or equal to the first preset historical production impact value and less than the second preset historical production impact value, and the third preset condition is that the historical production impact value is greater than or equal to the second preset historical production impact value.

8. The integrated production safety management system according to claim 1 is characterized in that: The security management module is used for: The safety management module is used to obtain a preset target risk level threshold, and determine whether to pair the project production chain with the production project according to the relationship between the target risk level and the target risk level threshold; The safety management module is used for pairing the project production chain and the production project when the target risk level is less than the target risk level threshold; The safety management module is used for not pairing the project production chain and the production project when the target risk level is greater than or equal to the target risk level threshold.

Citation Information

Patent Citations

  • A multi-dimensional power distribution network system operation risk level evaluation system and a method thereof

    CN109829603A

  • Risk assessment method and device based on maintenance plan, terminal and storage medium

    CN113361729A

  • Large-scale industrial gas production intelligent system

    CN113869712A

  • Operation data processing method and device for power distribution network maintenance and computer equipment

    CN115481767A

  • Plastic packaging material management method and system

    CN117151657A