BIM (Building Information Modeling)-based electromechanical equipment full-life-cycle management system
Through the BIM model, the infrastructure and operation period data of electromechanical equipment is uniformly managed, and the problem of inconsistent data in the existing technology is solved, efficient management and fault positioning of the entire life cycle of electromechanical equipment is realized, and equipment operation efficiency is improved.
Patent Information
- Application Number
- CN202410928464.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-15
AI Technical Summary
The existing mechanical and electrical equipment management system has inconsistent data format, encoding method and platform interface between the infrastructure and operation period, resulting in the inability to transfer data during the infrastructure period to the production period, resulting in inefficient equipment failure positioning and maintenance efficiency, affecting the normal operation of the equipment.
Using the BIM model as the data carrier, the component information of electromechanical equipment is collected and encoded through the BIM cloud platform, the component BIM model is established, and the information is managed and shared in the entire life cycle management system, including electromechanical management modules and operation and maintenance modules to realize Data flow, storage, management and sharing.
It realizes the full life cycle management of electromechanical equipment from infrastructure to operation period, improves the reusability of information, reduces labor costs, improves equipment fault location and maintenance efficiency, and ensures the normal operation of equipment.
Smart Images

Figure CN118967006A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of equipment management, and in particular to a BIM-based electromechanical equipment full life cycle management system. Background Art
[0002] Equipment management information is usually divided into two categories according to the equipment management stage: infrastructure information and operation information. Infrastructure equipment management tracks the entire process from the signing of the equipment procurement contract to the equipment installation acceptance, and makes full preparations for the smooth transition to production equipment management. In fact, much of the data generated in the infrastructure stage is not deferred to the operation stage.
[0003] At present, due to the differences in existing management systems such as the electromechanical management system during the infrastructure period and the equipment operation and maintenance system during the operation period, and the inconsistency in data formats, encoding methods, platform interfaces, etc., the data during the infrastructure period often cannot be directly transferred to the production period.
[0004] As the scale of electromechanical equipment systems becomes increasingly large, when equipment fails, the existing technology requires a lot of manpower to verify the construction drawings on site and determine the fault location and cause in combination with construction materials and related materials such as electromechanical equipment installation, operation and maintenance. This is inefficient and affects the normal operation of the electromechanical equipment, which is not conducive to actual production needs. Summary of the invention
[0005] To solve the above problems, the present invention provides a BIM-based electromechanical equipment full life cycle management system, which uses the BIM model as a data carrier, can effectively solve the flow, storage, management and sharing of information among all stages of the project and among all parties involved in the construction, improve the reusability of information, and truly realize the full life cycle management of electromechanical equipment from the infrastructure construction period to the operation period.
[0006] The above objectives can be achieved through the following solutions:
[0007] A BIM-based electromechanical equipment life cycle management system includes a BIM cloud platform, an electromechanical management module and an operation and maintenance module; wherein the BIM cloud platform is used to collect project information of each component of the electromechanical equipment to obtain first delivery information; the BIM cloud platform is also used to use the first delivery information to model each component of the electromechanical equipment to obtain a component BIM model; the BIM cloud platform encodes each component of the electromechanical equipment to obtain a first ID code, and associates the first ID code with the component BIM model of the same component; the electromechanical management module is used to obtain the code of each component of the electromechanical equipment; the electromechanical management module calls the component BIM model, and associates the code of each component of the electromechanical equipment with the corresponding first ID code to obtain the first delivery information of the corresponding component; the electromechanical management module uploads new equipment information to the BIM cloud platform, improves the component BIM model, and obtains second delivery information; the operation and maintenance module includes a maintenance management submodule, which is used to call the component BIM model, and obtain the second delivery information of the corresponding component through the first ID code to complete the maintenance management of the electromechanical equipment.
[0008] Preferably, the second delivery information includes design information, construction information and quality information; the design information includes model information, identity information, positioning information, equipment testing and verification data; the construction information includes manufacturing information, status information, equipment quality acceptance information and trial operation data; the quality information includes factory report, test report and acceptance report.
[0009] Preferably, the BIM cloud platform is also used to manage the documents of the component BIM model
[0010] Preferably, the electromechanical management module includes an equipment acceptance and allocation unit and an equipment quality management unit; the equipment acceptance and allocation unit is used to obtain the codes of each component of the electromechanical equipment and mark them as the second ID code; the equipment acceptance and allocation unit calls the component BIM model, and associates the second ID code with the corresponding first ID code to obtain the construction information of the corresponding component; the equipment quality management unit is used to encode the WBS of the installation and commissioning of each component of the electromechanical equipment to obtain a third ID code; the equipment quality management unit calls the component BIM model, and associates the third ID code with the corresponding first ID code to obtain the quality information of the corresponding component.
[0011] Preferably, the maintenance management submodule includes an operation information collection unit and an operation and maintenance information collection unit; wherein the operation information collection unit is used to collect relevant data during the operation of the electromechanical equipment to obtain operation data; the operation and maintenance information collection unit is used to collect the second delivery information, electromechanical equipment type information, and electromechanical equipment location information to obtain operation and maintenance data.
[0012] Preferably, the maintenance management submodule also includes a fault prediction module and a fault decision module, which use the operation data and the operation and maintenance data to train a neural network model to obtain a fault prediction model; wherein the fault prediction module is used to obtain the operation data and the operation and maintenance data, and based on the fault prediction model, predict the fault type and fault location to obtain fault information; the fault decision module is used to receive the fault information, output a reference processing method corresponding to the fault based on the fault information, and obtain decision information.
[0013] Preferably, the maintenance management submodule also includes a life prediction module and a life decision module, which use the operation data and the operation and maintenance data to train a neural network model to obtain a life prediction model; wherein the life prediction module is used to obtain the operation data and the operation and maintenance data, and based on the life prediction model, predict the life of the electromechanical equipment to obtain life information; the life decision module is used to receive the life information, output the electromechanical equipment maintenance operation method based on the life information, and obtain maintenance information.
[0014] Preferably, the operation and maintenance module also includes an association module, which is used to associate the decision information with the corresponding first ID code, so as to enable the corresponding decision information to be viewed through the component BIM model; the association module is also used to associate the decision information with the corresponding first ID code, so as to enable the corresponding maintenance information to be viewed through the component BIM model.
[0015] Preferably, the operation and maintenance module also includes a spare parts management submodule, which is used to collect spare parts related information and obtain spare parts information; the spare parts management submodule is also used to associate the spare parts information with the corresponding first ID code through the association module, so as to realize viewing the corresponding spare parts information through the component BIM model.
[0016] Compared with the prior art, the present invention has the following advantages:
[0017] 1. Through the BIM interface provided by the BIM cloud platform, the system can be unified managed in the electromechanical system and the operation and maintenance system. File upload, modification, model lightweight conversion, and visualization of the status of equipment at each stage can be realized directly through the BIM cloud platform. The information and data generated during the project implementation are stored in the cloud platform database. Users can view the required project information by querying the corresponding BIM model components.
[0018] 2. By making a one-to-one association between the equipment structure code and the BIM model file ID provided by the BIM interface, it is possible to view the delivery, arrival acceptance, cargo transfer and other processes according to the BIM model, and reflect the status of each business link in the model scene.
[0019] 3. By making a one-to-one association between the WBS of installation and commissioning and the BIM model file ID provided by the BIM interface, the quality inspection and evaluation results of the corresponding installation and commissioning can be viewed according to the BIM model.
[0020] 4. By making a one-to-one association between the equipment structure code of the electromechanical equipment and the BIM model file ID provided by the BIM interface, it is possible to monitor the equipment operation status according to the BIM model and predict equipment failures based on historical data.
[0021] Other features and advantages of the present disclosure will be described in the following description, and partly become apparent from the description, or be understood by implementing the present disclosure. The purpose and other advantages of the present disclosure can be realized and obtained by the structures pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the embodiments of the present disclosure or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0023] Figure 1 It is an architecture diagram of a BIM-based electromechanical equipment full life cycle management system according to an embodiment of the present invention.
[0024] Figure 2 It is a schematic diagram of a functional design model of a BIM-based electromechanical equipment full life cycle management system according to an embodiment of the present invention. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] Reference Figure 1 An embodiment of the present invention proposes a BIM-based electromechanical equipment full life cycle management system, which integrates the information of the electromechanical equipment management process into a lightweight BIM model to solve the flow, storage, management and sharing of information between various stages of the project and all parties involved in the construction, improve the reusability of information, and truly realize the full life cycle management of electromechanical equipment from the infrastructure period to the operation period.
[0027] The management system of this embodiment specifically includes:
[0028] BIM cloud platform, electromechanical management module and operation and maintenance module, the operation and maintenance module; wherein,
[0029] The BIM cloud platform is used to collect the first delivery information of each component of the electromechanical equipment;
[0030] Specifically, the completion delivery mainly includes two parts: one is the delivery of the project entity; the other is the delivery of the completion data. The two complement each other and are indispensable. Information data delivery is the key to connecting the infrastructure period and the operation period. The traditional delivery method is paper document delivery or delivery in the form of EXCEL tables, which is prone to data loss. Using BIM model components as the carrier, the first delivery information is integrated into the BIM cloud platform and stored in the cloud platform database. The information delivery work runs through the entire life cycle of electromechanical equipment management, and the project information is gradually supplemented and improved as the project progresses.
[0031] The BIM cloud platform is further used to model each component of the electromechanical equipment using the first delivery information to obtain a component BIM model;
[0032] Specifically, the user decomposes the BIM model of the complete set of electromechanical equipment into a physical structure, then classifies the decomposed components, determines the typical components, and establishes a component library. The user clarifies the geometric constraint relationship based on the geometric and topological relationship of the components, determines the expression relationship between the geometric parameters, and standardizes the naming of the component geometric parameters. The user establishes a geometric parameter table and a basic attribute information table for the component, then establishes a component geometric model, and adds corresponding attribute information to establish a parametric component model. This enables the use of the modeling software Autodesk Revit to establish a visual structural 3D entity model, and through the parametric processing of the components, the material information, structural dimensions, construction process and other information of the components are intuitively displayed in the model.
[0033] The BIM cloud platform also encodes each component of the electromechanical equipment to obtain a first ID code, and associates the first ID code with the component BIM model of the same component;
[0034] Specifically, users classify and manage different types of complete sets of electromechanical equipment in a hierarchical manner, and split them according to the structural type of the electromechanical equipment. For example, the first level of complete sets of electromechanical equipment can be divided into host equipment, permanent equipment, and metal structure equipment. The second level of host equipment includes turbines, generators, main transformer equipment, etc. The third level of generators includes rotors, stators, frames, bearings, etc. Large electromechanical equipment is split according to the level and adopts a unified coding structure. Each model component has a unique model code, which is used as the ID code of subsequent electromechanical equipment. The ID code of the electromechanical equipment is associated with the corresponding component. After that, each module calls the corresponding component BIM model through the ID code of the electromechanical equipment, which facilitates the unified management of electromechanical equipment.
[0035] The electromechanical management module is used to obtain the codes of each component of the electromechanical equipment; the electromechanical management module calls the component BIM model, and associates the codes of each component of the electromechanical equipment with the corresponding first ID code to obtain the first delivery information of the corresponding component; the electromechanical management module uploads new equipment information to the BIM cloud platform, improves the component BIM model, and obtains the second delivery information;
[0036] The operation and maintenance module includes a maintenance management submodule, which is used to call the component BIM model and obtain the second delivery information of the corresponding component through the first ID code to complete the maintenance management of the electromechanical equipment.
[0037] For example, Figure 2As shown, the user uploads the first delivery information to the BIM cloud platform through the system. The BIM cloud platform establishes a component BIM model based on the information, and encodes each component of the electromechanical equipment in the same way to obtain a first ID code; the user associates the first ID code with the corresponding component BIM model; the user logs in to the electromechanical management module, associates the first ID code with the code of the corresponding component, obtains the corresponding component BIM model, and thus obtains the first delivery information in the component BIM model. According to the progress of the project and acceptance, the electromechanical equipment information is uploaded, and the first delivery information is improved to obtain the second delivery information. The user obtains the second delivery information through the component BIM model, and maintains the equipment according to the equipment parameters, operation data, etc. of the second delivery information; through the BIM interface provided by the BIM cloud platform, the system realizes unified management of the electromechanical system and the operation and maintenance system, and can directly realize file upload, modification, model lightweight conversion, and visualization of the status of each stage of the equipment through the BIM cloud platform.
[0038] Preferably, the second delivery information includes design information, construction information and quality information;
[0039] The design information includes model information, identity information, positioning information, equipment testing and verification data;
[0040] The construction information includes manufacturing information, status information, equipment quality acceptance information and trial operation data;
[0041] The quality information includes factory report, test report and acceptance report.
[0042] Exemplarily, the second delivery information can be mainly divided into design information, construction information and quality information. Design information can include model information, identity information, positioning information, equipment testing and verification data, etc., where model information can be component size, identity information can be equipment number and name, and positioning information can be unit layout location; construction information includes manufacturing information, status information, quality information, equipment quality acceptance data, and trial operation data, where manufacturing information can be manufacturer, supplier, manufacturing standard, factory date, etc., where status information can be equipment production status, equipment transportation status, equipment arrival status, equipment transfer status, equipment installation status, etc.; quality information includes factory report, test report, and acceptance report, where test report can be equipment trial operation inspection and evaluation results. Information and data generated during project implementation are all stored in the cloud platform database, and users can view the required project information by querying the corresponding BIM model components.
[0043] Preferably, the BIM cloud platform is also used to manage the documents of the component BIM model.
[0044] Specifically, the model documents are managed in the BIM cloud platform, and the BIM cloud platform provides folder directory tree management functions and file management functions; the electromechanical management module calls the component BIM model through an interface to obtain the folder directory tree, and the electromechanical management module provides a file upload function, and the file is uploaded to the BIM cloud platform through the interface, thereby completing the first delivery information and obtaining the second delivery information.
[0045] For example, the user can open the folder tree and create, delete, and rename folders in the folder tree through the interface. The user can click on a folder in the folder tree, and the document list can display all files and folders under the folder; the user can upload files to the BIM cloud platform through the interface, and delete and rename files in the folder through the interface.
[0046] Preferably, the electromechanical management module includes an equipment acceptance and allocation unit and an equipment quality management unit;
[0047] The equipment acceptance and allocation unit is used to obtain the code of each component of the electromechanical equipment and mark it as a second ID code; the equipment acceptance and allocation unit calls the component BIM model and associates the second ID code with the corresponding first ID code to obtain the construction information of the corresponding component;
[0048] Specifically, the equipment structure code is associated one-to-one with the first ID code of the component BIM model file provided by the BIM interface, so that the equipment component delivery, arrival acceptance, cargo transfer and other processes can be viewed according to the component BIM model, and the status of each business link can be reflected in the model scene.
[0049] For example, the coloring of the model component is used to indicate the status of the component in the arrival and acceptance stage of the unit. For example, green can be used to indicate all arrivals, orange to indicate partial arrivals, gray to indicate non-arrival, and semi-transparent to indicate non-association. Users can view the corresponding data of the component through the component BIM model, click on the component node in the component structure tree, and request the arrival details of the component corresponding to the electromechanical system, such as material code, box number, unit number, equipment name, unit, quantity, etc.
[0050] The equipment quality management unit is used to encode the WBS of installation and commissioning of each component of the electromechanical equipment to obtain a third ID code; the equipment quality management unit calls the component BIM model and associates the third ID code with the corresponding first ID code to obtain the quality information of the corresponding component.
[0051] Specifically, by making a one-to-one association between the WBS of installation and commissioning and the first ID code of the component BIM model provided by the BIM interface, it is possible to view the corresponding quality inspection and evaluation results of installation and commissioning according to the component BIM model.
[0052] Exemplarily, the status of the component of the unit during the installation phase is indicated by coloring the model component, for example, light blue indicates being installed, blue indicates completed installation, gray indicates not installed, and semi-transparent indicates not associated. The user logs in to the system, and the system requests the installation and commissioning WBS review list and review results corresponding to the component BIM model from the equipment quality management unit through the BIM cloud platform. The user clicks on a node in the component tree to obtain the installation and commissioning WBS review list and review results corresponding to the model, such as the installation WBS structure, structure type, status, and assessment results.
[0053] Preferably, the maintenance management submodule includes an operation information collection unit and an operation and maintenance information collection unit; wherein,
[0054] The operation information collection unit is used to collect relevant data during the operation of the electromechanical equipment to obtain operation data;
[0055] Exemplarily, the operation information collection module collects the operation data of the electromechanical equipment through various sensor devices installed on the electromechanical equipment, such as the standby operation time, the temperature, humidity, air quality of the equipment environment, the equipment current, voltage and other data reflecting the operation of the equipment and the environment in which it is located.
[0056] The operation and maintenance information collection unit is used to collect the second delivery information, electromechanical equipment type information, and electromechanical equipment location information to obtain operation and maintenance data.
[0057] Exemplarily, the second delivery information includes design information, construction information and quality information, and the second delivery information is uploaded to the BIM cloud platform database through the BIM cloud platform interface as historical data storage. For example, the test data and verification data of electromechanical equipment in its design phase, the quality acceptance and trial operation data in the construction phase, will all be used as historical data for operation monitoring and as a basis for judgment during the operation of electromechanical equipment.
[0058] Preferably, the maintenance management submodule further includes a fault prediction module and a fault decision module, which trains a neural network model using the operation data and the operation and maintenance data to obtain a fault prediction model; wherein,
[0059] The fault prediction module is used to obtain the operation data and the operation and maintenance data, and based on the fault prediction model, predict the fault type and fault location to obtain fault information;
[0060] Exemplarily, by making a one-to-one association between the equipment structure code of the electromechanical equipment and the first ID code of the component BIM model file provided by the BIM interface, it is possible to monitor the equipment operation status according to the BIM model and predict equipment failures according to historical data; the fault information includes the fault data accumulated during the infrastructure construction period, and the fault prediction module issues an early warning through the fault prediction model. For example, if the temperature of a component of the equipment rises and reaches the limit at a certain time point according to the temperature rise rate, the equipment will overheat, and the location of the component will be given to remind the operation and maintenance personnel to perform maintenance inspections on the component.
[0061] The fault decision module is used to receive the fault information, output a reference processing method corresponding to the fault based on the fault information, and obtain decision information.
[0062] Exemplarily, a fault knowledge base can be established, and various types of faults corresponding to various components of electromechanical equipment can be stored in a fault database. When fault information appears, the fault decision module searches for the corresponding fault cause and treatment method from the fault knowledge base based on the fault information, and outputs the matching fault cause and treatment method as a reference, thereby assisting operation and maintenance personnel to perform maintenance inspections on equipment components.
[0063] Preferably, the maintenance management submodule further includes a life prediction module and a life decision module, which trains a neural network model using the operation data and the operation and maintenance data to obtain a life prediction model; wherein,
[0064] The life prediction module is used to obtain the operation data and the operation and maintenance data, and based on the life prediction model, predict the life of the electromechanical equipment to obtain life information;
[0065] Exemplarily, the life prediction module can calculate the remaining usage time or number of times of the electromechanical equipment according to the operating time and damage degree of the electromechanical equipment based on the life prediction model, thereby obtaining life information.
[0066] The life decision module is used to receive the life information, output the maintenance operation method of the electromechanical equipment based on the life information, and obtain maintenance information.
[0067] Exemplarily, a life knowledge base can be established, and the different remaining lives corresponding to the components of the electromechanical equipment can be stored in the life knowledge base, and the remaining life information can be maintained regularly; the life decision module outputs whether the electromechanical equipment with the corresponding life needs maintenance through the remaining life information, as well as the maintenance operation method of the electromechanical equipment with the corresponding life.
[0068] Preferably, the operation and maintenance module further includes an association module, which is used to associate the decision information with the corresponding first ID code, so as to enable viewing the corresponding decision information through the component BIM model;
[0069] The association module is also used to associate the decision information with the corresponding first ID code, so as to view the corresponding maintenance information through the component BIM model.
[0070] Exemplarily, the association module is associated with the component BIM model to display fault information and decision information, such as associating the fault location, fault type, fault cause and fault handling method with the corresponding component BIM model through the association module, and visually displaying them through the component BIM model; similarly, the association module displays life information and maintenance information, such as associating the remaining life of electromechanical equipment and the maintenance method corresponding to the remaining life with the corresponding component BIM model through the association module, and visually displaying them through the component BIM model.
[0071] Preferably, the operation and maintenance module further includes a spare parts management submodule, which is used to collect spare parts related information and obtain spare parts information;
[0072] The spare parts management submodule is also used to associate the spare parts information with the corresponding first ID code through the association module, so as to view the corresponding spare parts information through the component BIM model.
[0073] Exemplarily, the spare parts management submodule may include spare parts procurement plan management functions, spare parts inventory status management functions, and spare parts qualified supplier management functions. The spare parts management submodule can integrate complete spare parts information, such as the name, quantity, storage location, and management personnel of spare parts. When the operation and maintenance personnel perform inspection and maintenance operations, they can query the corresponding spare parts information through the spare parts management submodule to quickly extract materials and spare parts for maintenance. In addition, after the inspection and maintenance work is completed, the operation and maintenance personnel should promptly count the material consumption and replenish it in time, and can upload the updated file information to the component BIM model to ensure the validity of the data.
[0074] The above is only an exemplary embodiment of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, it will be easy for those skilled in the art to think of other embodiments of the present disclosure. This application is intended to cover any variation, use or adaptive change of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field that are not recorded in the present disclosure.
Claims
1. A BIM-based electromechanical equipment full life cycle management system, characterized in that: The system includes: BIM cloud platform, electromechanical management module and operation and maintenance module; The BIM cloud platform is used to collect project information of each component of the electromechanical equipment to obtain the first delivery information; The BIM cloud platform is further used to model each component of the electromechanical equipment using the first delivery information to obtain a component BIM model; the BIM cloud platform encodes each component of the electromechanical equipment to obtain a first ID code, and associates the first ID code with the component BIM model of the same component; The electromechanical management module is used to obtain the codes of each component of the electromechanical equipment; the electromechanical management module calls the component BIM model, and associates the codes of each component of the electromechanical equipment with the corresponding first ID code to obtain the first delivery information of the corresponding component; the electromechanical management module uploads new equipment information to the BIM cloud platform, improves the component BIM model, and obtains the second delivery information; The operation and maintenance module includes a maintenance management submodule, which is used to call the component BIM model and obtain the second delivery information of the corresponding component through the first ID code to complete the maintenance management of the electromechanical equipment.
2. According to claim 1, a BIM-based electromechanical equipment full life cycle management system is characterized in that: The second delivery information includes design information, construction information and quality information; The design information includes model information, identity information, positioning information, equipment testing and verification data; The construction information includes manufacturing information, status information, equipment quality acceptance information and trial operation data; The quality information includes factory report, test report and acceptance report.
3. According to the BIM-based electromechanical equipment full life cycle management system of claim 1, it is characterized in that: The BIM cloud platform is also used to manage the documents of the component BIM model.
4. According to claim 2, a BIM-based electromechanical equipment full life cycle management system is characterized in that: The electromechanical management module includes an equipment acceptance and allocation unit and an equipment quality management unit; The equipment acceptance and allocation unit is used to obtain the code of each component of the electromechanical equipment and mark it as a second ID code; the equipment acceptance and allocation unit calls the component BIM model and associates the second ID code with the corresponding first ID code to obtain the construction information of the corresponding component; The equipment quality management unit is used to encode the WBS of installation and commissioning of each component of the electromechanical equipment to obtain a third ID code; the equipment quality management unit calls the component BIM model and associates the third ID code with the corresponding first ID code to obtain the quality information of the corresponding component.
5. According to claim 1, a BIM-based electromechanical equipment full life cycle management system is characterized in that: The maintenance management submodule includes an operation information collection unit and an operation and maintenance information collection unit; wherein, The operation information collection unit is used to collect relevant data during the operation of the electromechanical equipment to obtain operation data; The operation and maintenance information collection unit is used to collect the second delivery information, electromechanical equipment type information, and electromechanical equipment location information to obtain operation and maintenance data.
6. The BIM-based electromechanical equipment full life cycle management system according to claim 5 is characterized in that: The maintenance management submodule also includes a fault prediction module and a fault decision module, which use the operation data and the operation and maintenance data to train a neural network model to obtain a fault prediction model; wherein, The fault prediction module is used to obtain the operation data and the operation and maintenance data, and based on the fault prediction model, predict the fault type and fault location to obtain fault information; The fault decision module is used to receive the fault information, output a reference processing method corresponding to the fault based on the fault information, and obtain decision information.
7. The BIM-based electromechanical equipment full life cycle management system according to claim 5 is characterized in that: The maintenance management submodule also includes a life prediction module and a life decision module, which use the operation data and the operation and maintenance data to train a neural network model to obtain a life prediction model; wherein, The life prediction module is used to obtain the operation data and the operation and maintenance data, and based on the life prediction model, predict the life of the electromechanical equipment to obtain life information; The life decision module is used to receive the life information, output the maintenance operation method of the electromechanical equipment based on the life information, and obtain maintenance information.
8. A BIM-based electromechanical equipment full life cycle management system according to claim 6 or 7, characterized in that: The operation and maintenance module further includes an association module for associating the decision information with the corresponding first ID code, so as to enable viewing the corresponding decision information through the component BIM model; The association module is also used to associate the decision information with the corresponding first ID code, so as to view the corresponding maintenance information through the component BIM model.
9. The BIM-based electromechanical equipment full life cycle management system according to claim 8 is characterized in that: The operation and maintenance module also includes a spare parts management submodule for collecting spare parts related information and obtaining spare parts information; The spare parts management submodule is also used to associate the spare parts information with the corresponding first ID code through the association module, so as to view the corresponding spare parts information through the component BIM model.
Citation Information
Patent Citations
Intelligent electromechanical equipment management system and method based on BIM (building information modeling)
CN103246951A
Asset full life cycle data modeling method based on SG-CIM model
CN110009172A
Equipment operation and maintenance management method based on BIM model
CN114037097A
Method and system for managing fabricated components
CN114881392A
Digital delivery method of high-precision three-dimensional model and management system based on gas station full life cycle management