Application scene demand analysis and multi-objective optimization operation method of energy storage system
By building an energy storage system application scenario demand analysis system and multi-objective optimization operation method, the problem of insufficient optimization operation of energy storage systems in the existing technology in the wind and light complementary scenarios has been solved, and the new energy consumption has been increased and the peak-to-valley difference has been reduced. Xiaohe's power quality improves the economical and reliability of the system.
Patent Information
- Application Number
- CN202411016119.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-27
- Publication Date
- 2024-11-15
AI Technical Summary
The optimized operation of existing energy storage systems in the complementary scenery scenarios mainly considers economics and safety. Failure to make full use of their flexible adjustment capabilities makes it difficult to effectively deal with the problems of peak and valley differences and new energy consumption.
By building an application scenario demand analysis system for energy storage systems, the optimized configurations in different scenarios are determined, and multi-objective optimization operation methods are proposed, combining the goals of peak and valley difference, power quality and new energy consumption, and multi-objective optimization of energy storage systems is built. Operate the model to achieve an increase in new energy consumption, a decrease in peak-to-valley difference and an improvement in power quality.
The operating cost of energy storage systems in different scenarios has been reduced, the system's economy, reliability and stability has been improved, the new energy consumption capacity has been enhanced, the peak and valley differences have been reduced, and the power quality has been improved.
Smart Images

Figure CN118971053A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to energy storage technology and the field of energy storage system optimization, and in particular to an application scenario demand analysis and multi-objective optimization operation method for an energy storage system. Background Art
[0002] With the rapid development of my country's power industry, the access ratio of renewable energy such as wind power and photovoltaic power is increasing. The anti-peaking and uncertain characteristics of wind power have widened the peak-to-valley difference of load, and the dual pressure of source and load has increased the peak-shaving burden of the power system. In order to cope with the volatility of wind and solar power output, the phenomenon of frequent start and stop of thermal power units may occur. When all wind and solar power are accepted, measures may be taken to shut down efficient thermal power units to fully accept them; if the grid-connected wind power output is restricted, a large amount of wind and solar power will be abandoned, wasting precious renewable resources. It is difficult to meet the needs of renewable energy consumption and power system peaking by relying solely on the existing regulation capacity of the system. It is necessary to establish a multi-source complementary coordination mechanism to fully tap the flexible regulation capacity of the power system and improve the consumption of renewable energy while meeting the peaking demand. Flexible regulation of power sources can complement the random fluctuations of wind power and photovoltaic power, providing a new idea for the large-scale grid-connected consumption of renewable energy. Energy storage systems have the advantages of rapid response and flexible energy throughput, and play an important role in dealing with wind power and photovoltaic fluctuations. At present, the demand analysis of energy storage system under wind-solar complementary system has been carried out, but the consideration of wind-solar scene categories is not sufficient and needs further refinement and in-depth research. In addition, the optimization operation of energy storage system is mostly calculated by considering single objectives such as economy and safety, and there is little research on multi-objective optimization operation such as peak-to-valley difference, power quality, and new energy consumption. Therefore, the present invention proposes an energy storage system operation demand method under different scenarios. On this basis, a multi-objective operation optimization model of energy storage system is constructed, and a simulation model is built to analyze the effectiveness of the strategy. Summary of the invention
[0003] In view of the above situation, in order to overcome the shortcomings of the prior art, the purpose of the present invention is to provide an application scenario demand analysis and multi-objective optimization operation method for an energy storage system. First, according to the application scenario demand system, the application scenario of wind-solar coordinated consumption is analyzed, and parameters such as penetration rate, access location, wind-solar ratio and climate distribution are clarified. On this basis, the optimal configuration of the energy storage system under different scenarios is determined; secondly, a multi-objective optimization operation method for an energy storage system is proposed. Aiming at multiple optimization objectives such as peak-valley difference, power quality, and new energy consumption, as well as constraints such as system flow, system reliability, and network topology connectivity, a multi-objective optimization operation model of the energy storage system is constructed to achieve increased new energy consumption, reduced peak-valley difference, and improved power quality.
[0004] The technical solution provided by the present invention is:
[0005] An application scenario demand analysis and multi-objective optimization operation method for an energy storage system includes the following steps:
[0006] Step 1: Determine the application scenario requirements of the energy storage system
[0007] In order to achieve the optimal configuration of energy storage systems in various scenarios, appropriate demand variables are selected to construct the energy storage system application scenario demand system. The system includes multiple first-level parameters, specifically system parameters, equipment parameters and environmental parameters, and further subdivides these first-level parameters into a series of specific second-level parameters. The second-level parameters corresponding to environmental parameters include new energy penetration rate, new energy access location and new energy distribution density; the second-level parameters corresponding to equipment parameters include wind-solar ratio, maintenance cycle, operating performance and load tracking capability; the second-level parameters corresponding to environmental parameters include regional wind energy resources, regional lighting conditions, regional altitude and climate distribution changes, so as to ensure a comprehensive evaluation and analysis of each parameter. The corresponding parameter division is shown in Table 1; According to the actual scenario requirements of wind-solar coordinated consumption, the corresponding demand parameters are selected to form the energy storage system application scenario;
[0008] Table 1 Application scenario requirement system
[0009]
[0010] Step 2: Optimal configuration of energy storage system considering operating costs
[0011] In order to achieve the optimal configuration of energy storage system capacity in different application scenarios, the objective function and constraints considering the operating cost are designed. The objective function adopted is the wind abandonment cost f wind , abandoned light cost f pv and energy storage investment cost f ess The sum is the smallest, specifically:
[0012]
[0013] Among them, C wind is the unit wind power abandonment price, P wind,j,t are the maximum output power and actual output power of wind farm j in time period t, Ω wind It is the set of all wind farms in the application scenario;
[0014]
[0015] Among them, C pv is the unit curtailment price, P pv,j,t are the maximum output power and actual output power of photovoltaic field j in time period t, Ω pv It is the set of all photovoltaic electric fields in the application scenario;
[0016]
[0017] The investment cost of energy storage is composed of fixed installation cost C fess,k and variable cost C vess,k The variable cost is calculated by the full life cycle cost and converted into annual average cost; among them, C fess,k and C vess,k are the fixed cost and variable cost of energy storage at node k; X ess,k 0-1 decision variable for configuring energy storage for node k; k de k is the annual depreciation coefficient of energy storage; oc , k mc , k dc are the energy storage operation, maintenance, and disposal cost coefficients, which are selected as 0.015, 0, and 0 respectively; c p 、c e They are the unit power and unit capacity cost of energy storage respectively; is the continuous decision variable for the energy storage configuration power and configuration capacity at node k; Ω ess Allows configuration of node sets for energy storage;
[0018] The corresponding constraints are:
[0019] (1) Node power balance constraints
[0020]
[0021] Where A represents the node branch matrix; P line,ij,t represents the active power of line ij in time period t; P gen,i,t represents the active power of thermal power plant i in period t; P wind,i,t represents the active power of wind farm i in time period t; P pv,i,t represents the active power of photovoltaic field i in time period t; P ess,i,t represents the active power of energy storage i in time period t; P load,t It represents the power of the load in time period t; T is the total time period;
[0022] (2) Branch flow constraints
[0023]
[0024]
[0025] Among them, b ij is the per-unit value of the reactance of line ij, defined as the reciprocal of the per-unit value of the reactance of line ij; n line,ij is the number of parallel lines of line ij; θ i,tis the phase angle of node i in time period t; θ j,t is the phase angle of node j in time period t; θ ref,t is the phase angle of the equilibrium node, defined as 0;
[0026] (3) Branch power does not exceed the limit constraint
[0027]
[0028] in, represents the maximum transmission power of line ij;
[0029] (4) Output constraints for thermal power plants, wind farms and photovoltaic power plants
[0030]
[0031] Among them, ω u,i and ω d,i is the maximum up / down ramp rate of the thermal power unit, and the ramp rate of the thermal power unit cannot exceed this range; Δt is the duration of one period; and The maximum and minimum output of thermal power units; is the maximum output of the wind farm during period t; is the maximum output of the photovoltaic field during period t;
[0032] (5) Energy storage operation constraints
[0033]
[0034] in, Indicates the maximum charging and discharging power of the energy storage system; X ess,i Indicates whether the node is configured with energy storage; E ess,i,t , Respectively represent the actual value and maximum value of the SOC of the energy storage system; The maximum number of energy storage configurations;
[0035]
[0036] The above is the equation constraint of energy storage SOC, Q represents the rated capacity of the energy storage system;
[0037] (6) System spinning reserve constraints
[0038]
[0039] Among them, R t The system spare capacity requirement;
[0040] Step 3: Construct an energy storage system optimization operation model considering multiple objectives.
[0041] Based on the energy storage system application scenarios constructed in steps (1) and (2), the multi-objective optimization operation of the energy storage system is carried out. The optimization objectives include peak-to-valley difference, power quality and new energy consumption. Specifically,
[0042] The peak-to-valley difference is represented by the difference between the maximum and minimum values of the sum of the output of energy storage and new energy photovoltaic and wind turbines:
[0043]
[0044] Among them, P d,t , P c,t are the discharge power and charging power of energy storage in time period t respectively; P wind,t , P pv,t are the output power of wind farm and photovoltaic farm in time period t respectively;
[0045] The amount of new energy consumption is represented by the sum of the abandoned wind power and abandoned photovoltaic power in the dispatching period. The present invention considers the coordinated optimization of energy storage to reduce the abandoned wind and photovoltaic power and improve the absorption capacity of new energy;
[0046]
[0047] in, are the abandoned wind power and abandoned solar power of the wind farm and photovoltaic power plant in time period t, respectively; Δt is the duration of each time period, which is 1h in this paper;
[0048] The constraints include power quality constraints, node power balance constraints, branch power flow constraints, branch power limit constraints, thermal power plant, wind farm and photovoltaic power plant output constraints, energy storage operation constraints and system spinning reserve constraints;
[0049] The power quality constraint is that the power generation of wind farms and photovoltaic power plants is volatile. The power generation of the wind-solar-storage system at the current moment deviates greatly from the power generation of the wind-solar-storage system at the previous moment, and the volatility is obvious, which has a greater impact on the power grid. The energy storage system has the characteristic of bidirectional power regulation, so the energy storage system can be used to smooth the power fluctuation of the wind farm and improve the power quality:
[0050] -α<=P d,t -P c,t +P wind,t +P pv,t -(P d,t-1 -P c,t-1 +P wind,t-1 +P pv,t-1 )<=α (19)
[0051] Among them, α represents the set allowable fluctuating power;
[0052] The remaining constraint expressions are consistent with the constraints in step (2), as shown in equations (5) to (16).
[0053] Compared with the prior art, the present invention has the following beneficial technical effects:
[0054] 1) The present invention analyzes the operation requirements of the energy storage system under different application scenarios of wind-solar coordinated consumption, reduces the operating costs, and improves the economy, reliability and stability of the system operation.
[0055] 2) The present invention proposes a multi-objective optimization operation method for an energy storage system, which takes peak-to-valley difference, power quality, and new energy consumption as optimization targets, constructs a multi-objective operation optimization model for a cascaded battery energy storage system, and achieves increased new energy consumption, reduced peak-to-valley difference, and improved power quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] Figure 1 This is a topology diagram of the Garver-6 node system according to an embodiment of the present invention.
[0057] Figure 2 This is a demand analysis result diagram of an embodiment of the present invention in which the new energy penetration rate is 30% and energy storage is set.
[0058] Figure 3 This is a demand analysis result diagram of an embodiment of the present invention in which the new energy penetration rate is 30% and no energy storage is provided.
[0059] Figure 4 This is a demand analysis result diagram of an embodiment of the present invention when the new energy penetration rate is 50%.
[0060] Figure 5 System topology diagram when a wind turbine is connected to node 6 and a photovoltaic is connected to node 1 according to an embodiment of the present invention.
[0061] Figure 6 This is a demand analysis result diagram of the wind turbine access node 6 and the photovoltaic access node 1 according to an embodiment of the present invention.
[0062] Figure 7 This is a demand analysis result diagram of an embodiment of the present invention with a wind-solar ratio of 3:2.
[0063] Figure 8 This is a demand analysis result diagram of an embodiment of the present invention with a wind-solar ratio of 1:1.
[0064] Fig. 9 This is a demand analysis result diagram of the wind turbine and photovoltaic connected to node 6 at the same time according to an embodiment of the present invention.
[0065] Fig.10 This is the case of wind and solar power abandonment without energy storage configuration in the embodiment of the present invention.
[0066] Fig.11The energy storage is configured at node 4 in the embodiment of the present invention, and the optimization result diagram is only aimed at maximizing the new energy consumption.
[0067] Fig.12 In the embodiment of the present invention, energy storage is configured at node 4, and the output result diagram is optimized only with the maximum new energy consumption as the goal.
[0068] Figure 13-Figure 15 For the embodiment of the present invention, energy storage is configured at node 4, with the maximum amount of new energy consumption and the minimum peak-to-valley difference as the objective function, while considering the power quality constraints;
[0069] in Fig.13 It is a graph of multi-objective optimization results; Fig.14 Output result diagram for multi-objective optimization; Fig.15 Comparison results of peak-to-valley difference and whether power quality is considered for multi-objective optimization. DETAILED DESCRIPTION
[0070] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.
[0071] The results are analyzed by taking the improved Garver-6 node system as an example. The maximum load of the power grid is 640MW. The system topology is shown in the figure below. Figure 1 shown.
[0072] 1) Analysis of energy storage system demand results with different penetration rates
[0073] Renewable energy penetration rate generally refers to the proportion of renewable energy installed capacity to the maximum load of the power grid. The optimization configuration results and wind and solar power abandonment costs are analyzed when the renewable energy penetration rate is 30% and 50%.
[0074] a. New energy penetration rate is 30%
[0075] like Figure 2 As shown in the figure, the maximum active output of the wind farm is 150MW, the maximum active output of the photovoltaic power plant is 42MW, the maximum number of energy storage connections is 1, and the energy storage cost coefficient gamma = 1.
[0076] Energy storage is configured at node 5, and the rated power and energy of energy storage at node 5 are: 1.4704MW1.4704MWh. At this time, the annual wind curtailment cost is 41.78698 million yuan, the annual solar curtailment cost is 8.52313 million yuan, the annualized investment cost of energy storage is 3.96747 million yuan, and the total cost is 54.27757 million yuan.
[0077] like Figure 3 As shown in the figure, the maximum active output of the wind farm is 150MW, the maximum active output of the photovoltaic power plant is 42MW, the maximum number of energy storage connections is 0, and the energy storage cost coefficient gamma = 1.
[0078] Without energy storage configuration, the annual cost of wind power abandonment is 44.90513 million yuan, the annual cost of solar power abandonment is 13.6404 million yuan, the annualized investment cost of energy storage is 0 yuan, and the total cost is 58.54553 million yuan.
[0079] Through the above analysis of the comparison results of whether or not to set up energy storage, it can be concluded that by rationally configuring energy storage, the amount of wind and solar power curtailment can be reduced, the cost of curtailment can be reduced, and the total cost can be reduced.
[0080] b. New energy penetration rate is 50%
[0081] like Figure 4 As shown in the figure, the maximum active output of the wind farm is 150MW, the maximum active output of the photovoltaic power plant is 170MW, the maximum number of energy storage connections is 1, and the energy storage cost coefficient gamma = 1.
[0082] Energy storage is configured at node 4, and the rated power and energy of energy storage at node 4 are: 8.3708MW38.099MWh. At this time, the annual wind curtailment cost is 158.53215 million yuan, the annual solar curtailment cost is 98.27672 million yuan, the annualized investment cost of energy storage is 76.49096 million yuan, and the total cost is 333.29984 million yuan.
[0083] To sum up, as the penetration rate of new energy increases, the abandonment of wind and solar power can be reduced through the reasonable allocation of energy storage, but the investment cost of energy storage will increase accordingly, and the total cost will also increase accordingly.
[0084] 2) Analysis of energy storage system demand results at different access locations
[0085] When the penetration rate of renewable energy is 50%, the location of wind and solar access nodes is changed, and the wind turbine is connected to node 6 and the photovoltaic is connected to node 1. The topology diagram is as follows: Figure 5 shown.
[0086] like Figure 6 As shown in the figure, the maximum active output of the wind farm is 150MW, the maximum active output of the photovoltaic power plant is 170MW, the maximum number of energy storage connections is 1, and the energy storage cost coefficient gamma = 1.
[0087] Without energy storage configuration, the annual cost of wind power abandonment is 185.80789 million yuan, the annual cost of solar power abandonment is 19.78026 million yuan, the annualized investment cost of energy storage is 0 yuan, and the total cost is 205.58814 million yuan.
[0088] In summary, by comparing and analyzing the new energy penetration rate of 50%, it can be seen that when wind turbines and photovoltaics are connected to node 6 at the same time, a storage unit is configured at node 4, and the total cost is 33,329,984 yuan. When wind turbines are connected to node 6 and photovoltaics are connected to node 1, the optimization result is that no storage unit is configured, and the total cost is 20,558,814 yuan. Therefore, the different access locations of new energy sources such as wind turbines and photovoltaics in the system will affect the energy storage configuration results. Therefore, the reasonable setting of the new energy access location can effectively reduce the system cost.
[0089] 3) Analysis of energy storage system demand results for different wind and solar ratios
[0090] a. The ratio of wind and sunlight is 3:2
[0091] like Figure 7 As shown in the figure, the maximum active output of the wind farm is 150MW, the maximum active output of the photovoltaic power plant is 100MW, the maximum number of energy storage connections is 1, and the energy storage cost coefficient gamma = 1.
[0092] The energy storage is configured at node 1, and the rated power and energy of the energy storage at node 1 are: 10.1753MW10.1753MWh. At this time, the annual wind curtailment cost is 59.67982 million yuan, the annual solar curtailment cost is 21.23363 million yuan, the annualized investment cost of energy storage is 26.93949 million yuan, and the total cost is 107.85293 million yuan.
[0093] b. The ratio of wind and light is 1:1
[0094] like Figure 8 As shown in the figure, the maximum active output of the wind farm is 150MW, the maximum active output of the photovoltaic power plant is 150MW, the maximum number of energy storage connections is 1, and the energy storage cost coefficient gamma=1.
[0095] Energy storage is configured at node 4, and the rated power and energy of energy storage at node 4 are: 15.7071MW38.5372MWh. At this time, the annual wind curtailment cost is 82.88905 million yuan, the annual solar curtailment cost is 26.3895 million yuan, the annualized investment cost of energy storage is 83.24858 million yuan, and the total cost is 192.52712 million yuan.
[0096] In summary, through the above comparative analysis, it can be known that when the wind-solar ratio is 3:2, a storage unit is configured at node 1, and the total cost is 107.85293 million yuan. When the wind-solar ratio is 1:1, a storage unit is configured at node 4, and the total cost is 192.52712 million yuan. Therefore, different wind-solar ratios will affect the energy storage configuration results, so a reasonable setting of the wind-solar ratio can effectively reduce system costs.
[0097] 4) Analysis of energy storage system demand on rainy days
[0098] like Fig. 9 As shown, the maximum active output of the wind farm is 150MW, the maximum active output of the photovoltaic power plant is 0MW, the maximum number of energy storage connections is 1, and the energy storage cost coefficient gamma = 1.
[0099] The energy storage is configured at node 5, and the rated power and energy of the energy storage at node 5 are: 2.3483MW2.3483MWh. At this time, the annual wind abandonment cost is 29.15897 million yuan, the annual solar abandonment cost is 0 yuan, the annualized investment cost of energy storage is 6.28414 million yuan, and the total cost is 35.44311 million yuan.
[0100] In summary, through analysis with the penetration rate of new energy, it can be seen that the photovoltaic output is 0 on rainy days, so there is no cost of abandoned light, and the total cost is reduced. Therefore, considering climate change to set energy storage configuration constraints, and then configure it can effectively reduce system costs.
[0101] (2) Multi-objective optimization operation method of energy storage system
[0102] like Fig.10 As shown in the figure, the energy storage system application scenario constructed when the new energy penetration rate is 50% is taken as an example to further study the optimal operation scheme of the energy storage system. At this time, the maximum active output of the wind farm is 150MW, the maximum active output of the photovoltaic power plant is 170MW, and the energy storage is configured at node 4.
[0103] 1) Wind and solar power curtailment without energy storage configuration
[0104] In the absence of energy storage, the optimization goal is to maximize the consumption of new energy, that is, to minimize the total amount of wind and solar power abandoned. The optimization solution shows that the amount of wind abandoned is 304.5238MW, the amount of solar abandoned is 96.7712MW, and the total amount of wind and solar abandoned is 401.2949MW.
[0105] 2) Configure energy storage at node 4, with the maximum consumption of new energy as the objective function
[0106] The optimization results are as follows Fig.11 As shown in the figure, when energy storage is configured at node 4, the optimization goal is to maximize the consumption of new energy, that is, minimize the total amount of wind and solar power abandoned. The optimization solution obtains that the wind abandonment is 47.7035MW, the solar abandonment is 71.2139MW, and the total amount of wind and solar power abandoned is 118.9174MW. By coordinating energy storage with wind farms and photovoltaic farms, and taking advantage of the flexible charging and discharging characteristics of energy storage, the amount of wind and solar power abandoned can be reduced and the consumption of new energy can be increased. Fig.12 This is the output result of each device after optimization.
[0107] 3) Configure energy storage at node 4, with the maximum new energy consumption and the minimum peak-to-valley difference as the objective function, while considering the power quality constraints.
[0108] like Figure 13-15 As shown, when energy storage is configured at node 4, the objective function is to maximize the consumption of new energy and minimize the peak-to-valley difference, and the power quality constraints are considered. The optimization solution obtains that the amount of wind abandoned is 124.6049MW, the amount of solar abandoned is 32.3061MW, and the total amount of wind and solar abandoned is 156.9110MW. Compared with only considering the maximum consumption of new energy, the total amount of wind and solar abandoned increases after considering the peak-to-valley difference and power quality constraints, but the total amount of wind and solar abandoned is greatly reduced compared with not configuring energy storage. And by coordinating the output of energy storage with wind farms and photovoltaic farms, the peak-to-valley difference is reduced from the original 84.24MW to 73.4MW. At the same time, according to Fig.15 Whether the wind, solar and storage synergy output considers the power quality, the comparison results of 16-24h show that the fluctuation of wind, solar and storage synergy output is reduced, the impact on the power grid is reduced, and the power quality is improved. From the above comparison results, it can be concluded that the strategy proposed in the present invention can effectively increase the consumption of new energy, reduce the peak-to-valley difference, and improve the power quality, which verifies the effectiveness of the strategy proposed in the present invention.
Claims
1. An application scenario demand analysis and multi-objective optimization operation method for an energy storage system, characterized in that: The following steps are involved: Step 1: Determine the application scenario requirements of the energy storage system In order to achieve the optimal configuration of energy storage systems in various scenarios, appropriate demand variables are selected to construct the energy storage system application scenario demand system. The system includes multiple first-level parameters, specifically system parameters, equipment parameters and environmental parameters, and further subdivides these first-level parameters into a series of specific second-level parameters. The second-level parameters corresponding to environmental parameters include new energy penetration rate, new energy access location and new energy distribution density; the second-level parameters corresponding to equipment parameters include wind-solar ratio, maintenance cycle, operating performance and load tracking capability; the second-level parameters corresponding to environmental parameters include regional wind energy resources, regional lighting conditions, regional altitude and climate distribution changes. According to the actual scenario requirements of wind-solar coordinated consumption, the corresponding demand parameters are selected to form the energy storage system application scenario; Step 2: Optimal configuration of energy storage system considering operating costs In order to achieve the optimal configuration of energy storage system capacity in different application scenarios, the objective function and constraints considering the operating cost are designed. The objective function adopted is the wind abandonment cost f wind , abandoned light cost f pv and energy storage investment cost f ess The sum is the smallest, specifically: Among them, C wind is the unit wind power abandonment price, P wind,j,t are the maximum output power and actual output power of wind farm j in time period t, Ω wind It is the set of all wind farms in the application scenario; Among them, C pv is the unit curtailment price, P pv,j,t are the maximum output power and actual output power of photovoltaic field j in time period t, Ω pv It is the set of all photovoltaic electric fields in the application scenario; The investment cost of energy storage is composed of fixed installation cost C fess,k and variable cost C vess,k The variable cost is calculated by the full life cycle cost and converted into annual average cost; among them, C fess,k and C vess,k are the fixed cost and variable cost of energy storage at node k; X ess,k 0-1 decision variable for configuring energy storage for node k; k de is the annual depreciation coefficient of energy storage; k oc , k mc , k dc are the energy storage operation, maintenance, and disposal cost coefficients, which are selected as 0.015, 0, and 0 respectively; c p 、c e They are the unit power and unit capacity cost of energy storage respectively; is the continuous decision variable for the energy storage configuration power and configuration capacity at node k; Ω ess Allows configuration of node sets for energy storage; The corresponding constraints are: (1) Node power balance constraints Where A represents the node branch matrix; P line,ij,t represents the active power of line ij in time period t; P gen,i,t represents the active power of thermal power plant i in period t; P wind,i,t represents the active power of wind farm i in time period t; P pv,i,t represents the active power of photovoltaic field i in time period t; P ess,i,t represents the active power of energy storage i in time period t; P load,t It represents the power of the load in time period t; T is the total time period; (2) Branch flow constraints Among them, b ij is the per-unit value of the reactance of line ij, defined as the reciprocal of the per-unit value of the reactance of line ij; n line,ij is the number of parallel lines of line ij; θ i,t is the phase angle of node i in time period t; θ j,t is the phase angle of node j in time period t; θ ref,t is the phase angle of the equilibrium node, defined as 0; (3) Branch power does not exceed the limit constraint in, represents the maximum transmission power of line ij; (4) Output constraints for thermal power plants, wind farms and photovoltaic power plants Among them, ω u,i and ω d,i is the maximum up / down ramp rate of the thermal power unit, and the ramp rate of the thermal power unit cannot exceed this range; Δt is the duration of one period; and The maximum and minimum output of thermal power units; is the maximum output of the wind farm during period t; is the maximum output of the photovoltaic field during period t; (5) Energy storage operation constraints in, Indicates the maximum charging and discharging power of the energy storage system; X ess,i Indicates whether the node is configured with energy storage; E ess,i,t , Respectively represent the actual value and maximum value of the SOC of the energy storage system; The maximum number of energy storage configurations; The above is the equation constraint of energy storage SOC, Q represents the rated capacity of the energy storage system; (6) System spinning reserve constraints Among them, R t The system spare capacity requirement; Step 3: Construct an energy storage system optimization operation model considering multiple objectives. Based on the energy storage system application scenarios constructed in steps (1) and (2), the multi-objective optimization operation of the energy storage system is carried out. The optimization objectives include peak-to-valley difference, power quality and new energy consumption. Specifically, The peak-to-valley difference is represented by the difference between the maximum and minimum values of the sum of the output of energy storage and new energy photovoltaic and wind turbines: Among them, P d,t , P c,t are the discharge power and charging power of energy storage in time period t respectively; P wind,t , P pv,t are the output power of wind farm and photovoltaic farm in time period t respectively; The amount of new energy absorbed is represented by the sum of the abandoned wind power and abandoned solar power in the dispatching period. Considering the coordinated optimization of energy storage, the amount of abandoned wind and abandoned solar power can be reduced, and the absorption capacity of new energy can be improved. in, are the abandoned wind power and abandoned solar power of the wind farm and photovoltaic power plant in time period t, respectively; Δt is the duration of each time period, which is 1h in this paper; The constraints include power quality constraints, node power balance constraints, branch power flow constraints, branch power limit constraints, thermal power plant, wind farm and photovoltaic power plant output constraints, energy storage operation constraints and system spinning reserve constraints; The power quality constraint is that the power generation of wind farms and photovoltaic power plants is volatile. The power generation of the wind-solar-storage system at the current moment deviates greatly from the power generation of the wind-solar-storage system at the previous moment, and the volatility is obvious, which has a greater impact on the power grid. The energy storage system has the characteristic of bidirectional power regulation, so the energy storage system can be used to smooth the power fluctuation of the wind farm and improve the power quality: -α<=P d,t -P c,t +P wind,t +P pv,t -(P d,t-1 -P c,t-1 +P wind,t-1 +P pv,t-1 )<=α (19) Wherein, α represents the set allowable fluctuating power; The remaining constraint expressions are consistent with the constraints in step (2), as shown in equations (5) to (16).
Citation Information
Cited By
Multi-objective collaborative optimization control method for new energy station and energy storage system
CN121150218A
A Multi-Objective Collaborative Optimization Control Method for New Energy Power Stations and Energy Storage Systems
CN121150218B