Glue pouring device
By designing the glue filling device of the rubber storage cylinder and the air guide cylinder, the uniform glue distribution between the sleeve and the core is achieved by using air pressure, the existing problem of low glue filling efficiency is solved, the glue filling efficiency is improved, and the cost and weight are reduced. .
Patent Information
- Application Number
- CN202411044605.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-07-31
AI Technical Summary
The existing glue filling technology is inefficient, resulting in uneven distribution of glue between the casing and the core, and requires multiple glue filling, which increases the time and cost of glue filling.
A glue filling device including a rubber storage cylinder and an air guide cylinder is designed. The rubber storage cylinder has a rubber outlet and an air inlet. The air guide cylinder has a hollow cavity to form a limiting space. The sealing structure surrounds the rubber outlet and the rubber to be filled. The components interfaces can reduce glue leakage and uneven distribution through uniform air pressure.
The uniform distribution of glue is achieved, reducing the time and number of glue filling, improving the efficiency of glue filling, reducing cost and weight, and avoiding core damage and glue waste.
Smart Images

Figure CN118976654A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of glue pouring, and in particular to a glue pouring device. Background Art
[0002] The component to be filled with glue includes a sleeve and a core body. The core body is inserted into the sleeve. The core body and the sleeve may shake relative to each other, so glue needs to be poured between the sleeve and the core body to fix the relative position between the sleeve and the core body. In the related art, a syringe is usually used to pour glue into the component to be filled with glue, and the efficiency of glue pouring is low. Summary of the invention
[0003] In view of this, the present invention provides a glue pouring device to solve the problem of low glue pouring efficiency.
[0004] The present invention provides a glue filling device, comprising: a glue storage cylinder, provided with a glue outlet and an air inlet which are connected to each other, the glue outlet is suitable for covering the glue filling position of the component to be filled with glue, and the air inlet is suitable for being connected with an air source; an air guide cylinder, inserted in the glue storage cylinder, the air guide cylinder has a hollow cavity to form a limiting space suitable for inserting the component to be filled with glue; a sealing structure, arranged on the glue storage cylinder and arranged around the joint between the glue storage cylinder and the glue filling position of the component to be filled with glue.
[0005] Beneficial effect: The glue filling device of the embodiment of the present invention has a glue outlet covering the glue filling position of the component to be filled with glue, and a sealing structure surrounds the glue outlet and the glue filling position of the component to be filled with glue, that is, the sealing structure can be located between the glue storage cylinder and the sleeve, so as to achieve the effect of sealing the gap between the glue storage cylinder and the sleeve, and the glue is difficult to leak from between the glue storage cylinder and the sleeve. The amount of glue in the glue storage cylinder can be kept in a sufficient state, and the start and stop of glue filling into the component to be filled with glue can be controlled by only controlling the air intake time of the air inlet. In addition, since the glue storage cylinder surrounds the core body, the glue in the glue storage cylinder also surrounds the core body. Under the action of air pressure, glue is evenly introduced between various areas of the core body and the sleeve, and the glue of the core body and the sleeve is evenly distributed. There is no need for multiple glue filling, which can improve the glue filling efficiency and greatly reduce the glue filling time.
[0006] In an optional embodiment, the air guide cylinder includes: a threading tube, the limiting space is formed inside the threading tube; and an air guide tube, connected to the outer circumferential surface of the threading tube; wherein, in the axial direction of the rubber storage cylinder, the air guide cylinder is located between the rubber outlet and the air inlet, and the air inlet is connected to the rubber outlet at least through the air guide tube.
[0007] Beneficial effects: It can prevent the core from bending and being damaged, and can also guide the air inlet of the air inlet to the glue outlet.
[0008] In an optional embodiment, the air guide tube is arranged along the circumference of the threading tube, and the air guide tube is provided with a plurality of air guide channels, and the plurality of air guide channels are arranged at intervals along the circumference of the threading tube, and the air inlet is connected to the glue outlet through the air guide channels.
[0009] Beneficial effects: the air flow rate of the air guide tube is improved, and the glue in the glue storage cylinder is evenly stressed, ensuring that the glue is evenly distributed between the sleeve and the core body.
[0010] In an optional embodiment, the glue storage cylinder is provided with a glue injection port, and in the axial direction of the glue storage cylinder, the glue injection port is located between the air guide cylinder and the glue outlet; a one-way valve is provided at the glue injection port, and the one-way valve is used to prevent the glue in the glue storage cylinder from flowing out of the glue injection port.
[0011] Beneficial effect: glue can be added to the glue storage cylinder through the glue injection port, and the glue in the glue storage cylinder can be prevented from flowing out from the glue injection port.
[0012] In an optional embodiment, one end of the threading tube facing the glue outlet is closer to the glue outlet than one end of the air guide tube facing the glue outlet; and / or one end face of the air guide tube facing the air inlet is flush with one end face of the threading tube facing the air inlet.
[0013] Beneficial effects: reducing cost and weight, and the core body is covered with a larger area of the threading tube, which reduces the contact area between the core body and the glue.
[0014] In an optional embodiment, the rubber storage cylinder is provided with a pressure relief port, and a pressure relief valve is provided at the pressure relief port; wherein, the rubber storage cylinder is provided with a rubber storage space, and in the axial direction of the rubber storage cylinder, the rubber storage space is located between the air guide cylinder and the rubber outlet, and the pressure relief port is located on the side of the rubber storage space facing away from the rubber outlet.
[0015] Beneficial effect: It is easy to control the air pressure range in the glue storage cylinder, and the glue is not easy to flow to the position of the pressure relief port, so as to avoid the glue blocking the pressure relief port.
[0016] In an optional embodiment, the glue filling device also includes: an air inlet nozzle, which is connected to the glue storage barrel and communicated with the air inlet, the air inlet and the glue outlet are respectively arranged at opposite ends of the glue storage barrel in the axial direction, and the air inlet nozzle is suitable for being connected to the air source.
[0017] Beneficial effect: It can not only realize the connection between the glue filling device and the air source, but also make the distance between the air inlet nozzle and the component to be glued larger, so as to avoid interference between the air source connected to the air inlet nozzle and the component to be glued.
[0018] In an optional embodiment, the sealing structure includes: a first sealing gasket, which is located between the rubber storage cylinder and the sleeve in the axial direction of the rubber storage cylinder; and / or a second sealing gasket, which is located between the rubber storage cylinder and the sleeve in the radial direction of the rubber storage cylinder.
[0019] Beneficial effect: It can avoid the glue from polluting the surrounding environment, reduce the waste of glue and improve the utilization rate of glue.
[0020] In an optional embodiment, a connecting seat is configured on the outer circumferential surface of the glue storage cylinder, and the glue pouring device further comprises a pressing plate, and along the axial direction of the glue storage cylinder, the pressing plate and the connecting seat are relatively spaced apart to clamp the glue pouring assembly.
[0021] Beneficial effect: It is easy to connect and separate the glue filling device and the component to be filled with glue.
[0022] In an optional embodiment, a notch is provided on the outer peripheral surface of the pressing plate, and the notch penetrates the pressing plate along the thickness direction of the pressing plate.
[0023] Beneficial effects: The pressure plate and the sleeve are convenient to match, simple to operate and easy to implement, and the volume of the pressure plate is reduced, which can reduce costs and weight. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 This is one of the schematic diagrams of the connection between the glue filling device and the component to be filled with glue according to the embodiment of the present invention;
[0026] Figure 2 This is the second schematic diagram of the connection between the glue filling device and the component to be filled with glue according to the embodiment of the present invention;
[0027] Figure 3 for Figure 1 The cross-sectional view along the AA direction;
[0028] Figure 4 for Figure 2 The cross-sectional view along the BB direction;
[0029] Figure 5 This is one of the structural schematic diagrams of the air guide cylinder of the glue filling device according to an embodiment of the present invention;
[0030] Figure 6 This is a second structural schematic diagram of the air guide cylinder of the glue filling device according to an embodiment of the present invention;
[0031] Figure 7 for Figure 4 Cross-sectional view along CC direction;
[0032] Figure 8 It is a structural schematic diagram of a pressing plate of a glue filling device according to an embodiment of the present invention;
[0033] Fig. 9 It is an exploded view of the connecting pipe seat and the first sealing gasket of the glue filling device according to the embodiment of the present invention.
[0034] Description of reference numerals:
[0035] 1. Glue filling device; 2. Component to be filled with glue; 21. Sleeve; 22. Pipe socket; 23. Core body; 24. Groove; 100. Glue storage cylinder; 101. Glue outlet; 102. Air inlet; 103. Glue injection port; 104. Pressure relief port; 105. Connecting seat; 200. Air guide tube; 201. Threading tube; 2011. Limiting space; 202. Air guide tube; 2021. Air guide channel; 300. Air inlet nozzle; 310. Rough section; 320. Transition section; 330. Contraction section; 400. First sealing gasket; 600. Press plate; 601. Notch; 700. One-way valve; 800. Pressure relief valve. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0037] When a syringe is used in the related art to inject glue into the component 2 to be injected with glue, it cannot be guaranteed that the glue in each area in the circumferential direction of the core 23 can be subjected to pressure, resulting in uneven distribution of glue between the sleeve 21 and the core 23. In particular, when the gap between the sleeve 21 and the core 23 is small, and when there is a curved part in the sleeve 21, the flow resistance of the glue in the component 2 to be injected with glue is large, and the fluidity of the glue is poor. Even if the syringe continuously injects glue in the direction of the component 2 to be injected with glue, since the syringe does not completely cover the opening of the sleeve 21 and lacks a sealing structure, the glue may overflow from the position of the opening of the sleeve 21 that is not subjected to pressure or the position of the pressure is relatively low. Therefore, the syringe needs to control the injection amount and injection pressure, and cannot continuously inject a large amount of glue, resulting in multiple injections required during the entire replenishment process to complete the injection process of the component 2 to be injected with glue. The injection step takes a long time and has low production efficiency.
[0038] Combine the following Figures 1 to 9 , describing an embodiment of the present invention.
[0039] like Figure 1-Figure 4 As shown, according to an embodiment of the present invention, a glue pouring device 1 is provided. The glue pouring device 1 includes a glue storage cylinder 100 and an air guide cylinder 200 .
[0040] The glue storage cylinder 100 is provided with a glue outlet 101 and an air inlet 102 which are connected to each other. The glue storage cylinder 100 is used to store glue. The glue outlet 101 is suitable for being connected with the sleeve 21 of the component to be glued 2. The glue outlet 101 is suitable for covering the glue filling position of the component to be glued 2 (that is, the open end of the sleeve 21 facing the glue filling device 1), and the air inlet 102 is suitable for being connected with an air source.
[0041] The air guide cylinder 200 is inserted into the glue storage cylinder 100, and the air guide cylinder 200 has a hollow cavity to form a limited space 2011 suitable for inserting the component 2 to be glued, and the core 23 of the component 2 to be glued can be inserted into the limited space 2011. In the case of air intake at the air inlet 102, the air pressure in the glue storage cylinder 100 is increased to squeeze the glue in the glue storage cylinder 100 from the glue outlet 101 to between the sleeve 21 and the core 23.
[0042] For example, the dimension of the core body 23 extending from the sleeve 21 toward the glue pouring device 1 can be 60mm-100mm, for example, the dimension of the core body 23 extending from the sleeve 21 toward the glue pouring device 1 is 60mm, 65mm, 70mm, 75mm, 80mm, 85mm, 90mm, 95mm, or 100mm.
[0043] Among them, the core 23 of the component to be filled with glue 2 can be a wire, for example, the core 23 is a wire connected to a sensor. At this time, the component to be filled with glue 2 can be applied to the gas turbine guide to monitor the parameters of the gas turbine guide, and the glue in the glue storage cylinder 100 can be an insulating glue to improve the insulation performance between the core 23 and the sleeve 21.
[0044] When air is taken in at the air inlet 102, the air pressure in the glue storage barrel 100 increases, and the glue in the glue storage barrel 100 can easily enter between the core body 23 and the sleeve 21 under the action of pressure. Since the glue storage barrel 100 is connected to the sleeve 21, and the air guide barrel 200 is connected to the core body 23, a sealing structure is arranged on the glue storage barrel 100, and the sealing structure surrounds the glue outlet 101 and the glue filling position of the component 2 to be filled with glue, and the sealing structure surrounds the joint of the glue storage barrel 100 and the glue filling position of the component 2 to be filled with glue, that is, the sealing structure can be located between the glue storage barrel 100 and the sleeve 21, so as to achieve the effect of sealing the gap between the glue storage barrel 100 and the sleeve 21, and the glue is difficult to leak from between the glue storage barrel 100 and the sleeve 21. The amount of glue in the glue storage barrel 100 can be kept in a sufficient state, and the start and stop of glue filling into the component 2 to be filled with glue can be controlled by controlling the air intake time of the air inlet 102. Furthermore, since the glue storage tube 100 surrounds the core body 23, the glue in the glue storage tube 100 also surrounds the core body 23. Under the action of air pressure, glue is evenly introduced between each area of the core body 23 and the sleeve 21, and the glue between the core body 23 and the sleeve 21 is evenly distributed. There is no need for multiple glue injections, which can improve the glue injection efficiency and greatly reduce the glue injection time.
[0045] For example, when the glue storage cylinder 100 is connected to the sleeve 21, a certain amount of glue is introduced into the glue storage cylinder 100, wherein the glue needs to maintain a distance from the air guide cylinder 200 to prevent the glue from flowing into the air guide cylinder 200 and contacting the core 23, and then the air inlet 102 starts to take in air. The ventilation time of the air inlet 102 can be counted through the previous glue filling time. In the subsequent use process, ventilation can be directly performed according to the preset time to achieve automatic glue filling.
[0046] In addition, since flowing gas is introduced into the glue storage tube 100, the gas will push the glue to continuously flow relative to the core body 23, which can prevent the glue and the core body 23 from sticking together. While ensuring the glue filling efficiency, the problem of the core body 23 being stuck can be avoided.
[0047] In some embodiments, Figure 5-Figure 7 As shown, the air guide cylinder 200 includes a threading tube 201 and an air guide tube 202 , wherein the threading tube 201 and the air guide tube 202 may be an integrally formed structure to ensure the structural strength and sealing of the air guide cylinder 200 .
[0048] A limiting space 2011 is formed inside the threading tube 201, and the threading tube 201 is suitable for sleeve-mounting the core body 23, and the air guide tube 202 is connected to the outer peripheral surface of the threading tube 201. In the axial direction of the rubber storage cylinder 100, the air guide cylinder 200 is located between the rubber outlet 101 and the air inlet 102, and the air inlet 102 is connected to the rubber outlet 101 at least through the air guide tube 202.
[0049] For example, the outer circumference of the air duct 202 and the inner circumference of the rubber storage barrel 100 can be sealed and connected, for example, the outer circumference of the air duct 202 and the inner circumference of the rubber storage barrel 100 are welded, or a sealing structure such as a sealing ring is provided between the air duct 202 and the inner circumference of the rubber storage barrel 100 to prevent the gas in the rubber storage barrel 100 from leaking from between the air duct 202 and the inner circumference of the rubber storage barrel 100, thereby ensuring that the air pressure in the rubber storage barrel 100 can be reliably increased, and further ensuring that the rubber in the rubber storage barrel 100 can be squeezed between the sleeve 21 and the core body 23.
[0050] By setting up the threading tube 201, on the one hand, it can support the core body 23 to prevent the core body 23 from bending and damage. On the other hand, the threading tube 201 can separate the core body 23 and the glue, reducing the surface area of the core body 23 wrapped by the glue, which facilitates the separation of the glue filling device 1 and the component to be filled with glue 2 after the glue filling is completed.
[0051] By setting up the air guide tube 202, the air intake of the air inlet 102 can be guided to move in the direction of the glue outlet 101, and because the inner diameter of the air guide tube 202 is smaller than the inner diameter of the glue storage cylinder 100, the gas flows faster in the air guide tube 202, so that the gas flows out of the air guide tube 202 at a faster speed, which produces a greater impact force on the glue, which is beneficial to squeezing the glue into the component 2 to be filled with glue.
[0052] In order to prevent the glue from being squeezed into the threading tube 201, a sealing structure such as a sealing ring can be provided between the threading tube 201 and the core body 23, or the gas at the air inlet 102 can also flow to the glue outlet 101 through the gap between the threading tube 201 and the core body 23. In other words, the gap between the threading tube 201 and the core body 23 can also play a role in guiding air, thereby preventing the glue from being squeezed between the threading tube 201 and the core body 23.
[0053] In some embodiments, Figure 6 and Figure 7 As shown, the air guide tube 202 extends along the circumference of the threading tube 201 , and is provided with a plurality of air guide channels 2021 , which are arranged at intervals along the circumference of the threading tube 201 , and the air inlet 102 is connected to the glue outlet 101 through the air guide channels 2021 .
[0054] In this way, on the one hand, the overall cross-sectional area of the air guide channel 2021 is increased, and more gas can be guided to the glue outlet 101 per unit time, which is beneficial to improving the efficiency of squeezing the glue into the component 2 to be glued; on the other hand, multiple air guide channels 2021 can be arranged at equal intervals, and the glue is more evenly stressed, which is beneficial to making the glue distribution between the sleeve 21 and the core body 23 more uniform, and the insulation effect and positioning effect between the sleeve 21 and the core body 23 better.
[0055] In some embodiments, Figure 5-Figure 7 As shown, the length of the air guide tube 202 is smaller than the length of the threading tube 201. The length of the air guide tube 202 is relatively small. While ensuring that the relative position between the air guide tube 200 and the rubber storage tube 100 is fixed, the volume of the air guide tube 202 can be reduced, the cost and weight can be reduced, and the contact area between the air guide tube 202 and the rubber storage tube 100 is reduced. When the air guide tube 200 and the rubber storage tube 100 are relatively displaced, the friction between the air guide tube 200 and the rubber storage tube 100 is relatively small, which can improve the convenience of disassembly and assembly between the air guide tube 200 and the rubber storage tube 100.
[0056] In addition, the end of the threading tube 201 facing the glue outlet 101 is closer to the glue outlet 101 than the end of the air guide tube 202 facing the glue outlet 101. In this way, the threading tube 201 is longer, and the length of the core 23 that can be covered by the threading tube 201 is increased, which can more effectively support the core 23 and prevent the core 23 from bending and being damaged. In addition, since the threading tube 201 and the glue outlet 101 are close to each other, the length of the core 23 exposed to the threading tube 201 and the glue outlet 101 is smaller, thereby reducing the contact area between the core 23 and the glue, thereby preventing the core 23 and the glue pouring device 1 from being bonded together.
[0057] In some embodiments, Figure 5 and Figure 7 As shown, one end surface of the air guide tube 202 facing the air inlet 102 is flush with one end surface of the threading tube 201 facing the air inlet 102. In this way, the end surface of the air guide tube 200 facing away from the glue outlet 101 can be constructed as a plane, which is conducive to reducing the processing difficulty of the air guide tube 200 and improving production efficiency.
[0058] Since one end face of the air guide tube 202 facing the air inlet 102 does not exceed one end face of the threading tube 201 facing the air inlet 102, the axial length of the air guide tube 200 is the same as the axial length of the threading tube 201, thereby avoiding an increase in the axial length of the air guide tube 200, thereby avoiding an increase in the axial length of the glue storage tube 100, and reducing the volume, weight and cost of the glue filling device 1.
[0059] Since the end surface of the threading tube 201 facing the air inlet 102 does not exceed the end surface of the air guide tube 202 facing the air inlet 102, the threading tube 201 will not affect the connection between the air guide tube 202 and the rubber storage cylinder 100, thereby reducing the difficulty of operation when connecting the air guide tube 202 and the rubber storage cylinder 100, and it is more convenient to fix the relative position between the air guide cylinder 200 and the rubber storage cylinder 100.
[0060] In some embodiments, Figure 1 and Figure 3 As shown, the glue storage cylinder 100 is provided with a glue injection port 103, which is located between the air guide cylinder 200 and the glue outlet 101 in the axial direction of the glue storage cylinder 100. A one-way valve 700 is provided at the glue injection port 103, which is used to prevent the glue in the glue storage cylinder 100 from flowing out of the glue injection port 103.
[0061] By providing the glue injection port 103 , glue can be injected into the glue storage tube 100 . Thus, the glue injection device 1 can be connected to the component to be injected with glue 2 first, and then glue can be injected into the glue storage tube 100 . The glue injection device 1 is more convenient to use.
[0062] By setting a one-way valve 700, while ensuring that external glue can be injected into the glue storage tube 100 through the one-way valve 700, the glue in the glue storage tube 100 is prevented from flowing out through the glue injection port 103. The glue can only flow into the component to be filled with glue 2 through the glue outlet 101, thereby improving the utilization rate of the glue, reducing waste, ensuring that a sufficient amount of glue is injected into the component to be filled with glue 2, preventing the glue from flowing out and polluting the surrounding environment, and improving cleanliness.
[0063] In some embodiments, Figure 1 and Figure 3 As shown, the glue storage cylinder 100 is provided with a pressure relief port 104, and a pressure relief valve 800 is provided at the pressure relief port 104. When the air source is continuously ventilated into the glue storage cylinder 100, the air pressure of the glue storage cylinder 100 is continuously increased to drive the glue in the glue storage cylinder 100 into the component to be filled with glue 2, and fill the gap between the core body 23 and the sleeve 21. When the air pressure in the glue storage cylinder 100 is greater than the preset air pressure, the pressure relief valve 800 is opened, and the gas in the glue storage cylinder 100 can flow out through the pressure relief port 104, reducing the air pressure in the glue storage cylinder 100, so as to keep the air pressure in the glue storage cylinder 100 within the preset air pressure range, so as to control the volume of the glue flowing into the component to be filled with glue 2 per unit time. Therefore, it is only necessary to control the ventilation time into the glue storage cylinder 100 to control the total volume of the glue flowing into the component to be filled with glue 2, so as to realize the automatic control of the filling of the component to be filled with glue 2, reduce the difficulty of operation, and improve the utilization rate of glue.
[0064] Specifically, the glue storage cylinder 100 is provided with a glue storage space, and in the axial direction of the glue storage cylinder 100, the glue storage space is located between the air guide cylinder 200 and the glue outlet 101, and the pressure relief port 104 is located on the side of the glue storage space facing away from the glue outlet 101. In this way, the glue is prevented from flowing to the pressure relief port 104, and the glue is prevented from blocking the pressure relief port 104, so that the glue storage cylinder 100 cannot realize the pressure relief operation, thereby ensuring the normal operation of the glue filling device 1.
[0065] Furthermore, if Figure 1 and Figure 3 As shown, the pressure relief port 104 is further away from the glue outlet 101 than the glue injection port 103. Usually, the glue outlet 101 is located at the lower end of the glue storage tube 100, so the glue injected from the glue injection port 103 flows toward the glue outlet 101, preventing the glue from flowing to the pressure relief port 104, preventing the glue from blocking the pressure relief port 104 and causing the glue storage tube 100 to be unable to achieve pressure relief operation, thereby ensuring the normal operation of the glue filling device 1.
[0066] Furthermore, if Figure 1 and Figure 3 As shown, the pressure relief port 104 and the glue injection port 103 are located on opposite sides of the glue storage barrel 100 in the radial direction of the glue storage barrel 100. In this way, the radial distance between the pressure relief port 104 and the glue injection port 103 in the glue storage barrel 100 is increased, further reducing the probability of glue flowing to the pressure relief port 104, so as to more effectively prevent the glue from blocking the pressure relief port 104 and causing the glue storage barrel 100 to be unable to achieve pressure relief operation, thereby ensuring the normal operation of the glue filling device 1.
[0067] The glue storage space and the air guide cylinder 200 may be spaced apart in the axial direction of the glue storage cylinder 100 .
[0068] In some embodiments, Figure 1-Figure 4 As shown, the glue filling device 1 also includes an air inlet nozzle 300, which is connected to the glue storage cylinder 100 and communicated with the air inlet 102, and the air inlet nozzle 300 is suitable for being connected to an air source, wherein the air inlet 102 and the air inlet nozzle 300 are detachable, for example, the air inlet 102 and the air inlet nozzle 300 are pluggable connected, or the air inlet 102 and the air inlet nozzle 300 are connected by threaded fitting, so that the air inlet nozzle 300 is easy to replace.
[0069] Among them, the air inlet nozzle 300 may include a thick section 310, a transition section 320 and a contraction section 330. The thick section 310 is sleeved on the rubber storage barrel 100, and the transition section 320 is connected between the thick section 310 and the contraction section 330. The inner diameter of the transition section 320 is smaller than the inner diameter of the thick section 310, and the inner diameter of the transition section 320 gradually increases toward the direction approaching the rubber storage barrel 100. The inner diameter of the transition section 320 is smaller than the air inlet 102, and the inner diameter of the contraction section 330 is not larger than the inner diameter of the transition section 320. The inner diameter of the contraction section 330 can remain unchanged, and the outer diameter of the contraction section 330 gradually decreases toward the direction away from the rubber storage barrel 100 to play a guiding role, so as to facilitate the connection of the air inlet nozzle 300 with the air source.
[0070] The air inlet 102 and the glue outlet 101 are arranged at opposite ends of the glue storage barrel 100 in the axial direction. In this way, the distance between the air inlet nozzle 300 and the component to be glued 2 is relatively large, which avoids the interference between the air source (such as the air storage device, the gas generator, and the related gas transmission pipeline and other structures) connected to the air inlet nozzle 300 and the component to be glued 2, and fully utilizes the space of the glue storage barrel 100.
[0071] The air guide cylinder 200 is located between the air inlet 102 and the glue outlet 101, and the air guide cylinder 200 is spaced apart from the glue outlet 101. In other words, the air guide cylinder 200 is located inside the glue storage cylinder 100 and does not extend outside the glue storage cylinder 100.
[0072] In this way, on the one hand, when the core body 23 is inserted into the air guide cylinder 200, one end of the air guide cylinder 200 facing the air inlet 102 may extend out, so that the air guide cylinder 200 is located inside the glue storage cylinder 100. Even if the core body 23 passes through the air guide cylinder 200, it is still inside the glue storage cylinder 100 and will not be exposed to the outside, thereby reducing the probability of wear of the core body 23 during the glue filling process. On the other hand, the axial length of the air guide cylinder 200 can be reduced, thereby reducing cost and weight.
[0073] In some embodiments, Figure 3 , Figure 4 and Fig. 9 As shown, the sealing structure includes a first sealing gasket 400, which is located between the rubber storage cylinder 100 and the sleeve 21 in the axial direction of the rubber storage cylinder 100, that is, the first sealing gasket 400 is clamped between the end surface of the rubber storage cylinder 100 and the end surface of the sleeve 21. The first sealing gasket 400 can be an elastic member, for example, the first sealing gasket 400 can be made of rubber material or silicone material, and the first sealing gasket 400 can be elastically deformed to fill the gap between the end surface of the rubber storage cylinder 100 and the end surface of the sleeve 21.
[0074] In this way, the glue can be prevented from leaking between the end surface of the glue storage tube 100 and the end surface of the sleeve 21, which can not only avoid the glue from polluting the surrounding environment, but also reduce the waste of glue and improve the utilization rate of glue.
[0075] In some embodiments, the sealing structure further includes a second sealing gasket (not shown in the figure), which is located between the rubber storage cylinder 100 and the sleeve 21 in the radial direction of the rubber storage cylinder 100. The second sealing gasket can be an elastic member, for example, the second sealing gasket can be made of rubber material or silicone material.
[0076] That is to say, when the sleeve 21 is sleeved with the rubber storage cylinder 100, the second sealing gasket is clamped between the outer circumference of the rubber storage cylinder 100 and the inner circumference of the sleeve 21, and the second sealing gasket can be elastically deformed to fill the gap between the outer circumference of the rubber storage cylinder 100 and the inner circumference of the sleeve 21, so as to prevent the rubber from leaking from the gap between the outer circumference of the rubber storage cylinder 100 and the inner circumference of the sleeve 21;
[0077] When the rubber storage cylinder 100 is sleeved with the sleeve 21, the second sealing gasket is clamped between the inner circumference of the rubber storage cylinder 100 and the outer circumference of the sleeve 21. The second sealing gasket can undergo elastic deformation to fill the gap between the inner circumference of the rubber storage cylinder 100 and the outer circumference of the sleeve 21, thereby preventing the rubber from leaking from the gap between the inner circumference of the rubber storage cylinder 100 and the outer circumference of the sleeve 21.
[0078] In this way, it can not only avoid the glue from polluting the surrounding environment, but also reduce the waste of glue and improve the utilization rate of glue.
[0079] It should be noted that the first sealing pad 400 and the second sealing pad can be provided at the same time, and the first sealing pad 400 and the second sealing pad can be integrally formed for easy assembly and disassembly. At this time, a double seal is formed between the sleeve 21 and the rubber storage tube 100, the sealing effect is further improved, and the probability of rubber leakage is further reduced.
[0080] In some embodiments, Figure 1-Figure 4 as well as Figure 8 As shown, the glue pouring device 1 further includes a pressing plate 600, a pipe connection seat 22 is provided on the outer circumference of the sleeve 21, and a connecting seat 105 is provided on the outer circumference of the glue storage cylinder 100. The pressing plate 600 and the connecting seat 105 are arranged relatively spaced apart along the axial direction of the glue storage cylinder 100 to clamp the component to be poured with glue 2. The pressing plate 600 is sleeved on the sleeve 21 and connected to the connecting seat 105, and the pressing plate 600 and the connecting seat 105 jointly clamp the pipe connection seat 22. The pressing plate 600 and the connecting seat 105 can be connected by a detachable structure such as a threaded fastener (bolt, nut, screw), a snap structure, etc.
[0081] In this way, the connection between the glue pouring device 1 and the component to be poured 2 can be realized, and the separation between the glue pouring device 1 and the component to be poured 2 can be realized. In addition, the connection and positioning between the glue pouring device 1 and the component to be poured 2 utilizes the original pipe seat 22 of the sleeve 21, and there is no need to change the structural state of the component to be poured 2, and the structure is relatively simple.
[0082] Among them, the connecting pipe seat 22 can be provided with a groove 24, the rubber storage cylinder 100 is inserted into the groove 24, the first sealing gasket 400 is arranged between the end face of the rubber storage cylinder 100 and the bottom wall of the groove 24, and the second sealing gasket is arranged between the end face of the rubber storage cylinder 100 and the inner wall of the groove 24.
[0083] Furthermore, if Figure 2 and Figure 8 As shown, the outer circumferential surface of the pressing plate 600 is provided with a notch 601, the notch 601 penetrates the pressing plate 600 along the thickness direction of the pressing plate 600, and the sleeve 21 is inserted into the notch 601. The sleeve 21 can be inserted into the notch 601 along the radial direction of the pressing plate 600, and can be removed from the notch 601 along the radial direction of the pressing plate 600.
[0084] In this way, the press plate 600 and the sleeve 21 are convenient to cooperate, simple to operate, and easy to implement. In addition, the processing of the press plate 600 is relatively simple, the production efficiency is improved, the volume of the press plate 600 is reduced, and the cost and weight can be reduced.
[0085] The assembly process between the glue filling device 1 and the component to be filled with glue 2 in this embodiment is as follows:
[0086] First, connect the air inlet nozzle 300 to the rubber storage cylinder 100;
[0087] Then, the core 23 is inserted into the limiting space 2011 of the threading tube 201;
[0088] Then put the component 2 to be glued into the notch 601 of the pressing plate 600;
[0089] Finally, the pressing plate 600 and the connecting seat 105 are connected, and the pressing plate 600 and the connecting seat 105 gradually approach each other and clamp the connecting pipe seat 22 to fix the relative position between the glue storage cylinder 100 and the sleeve 21. At this time, the glue filling device 1 and the component to be filled with glue 2 are assembled.
[0090] The glue pouring process of the glue pouring device 1 of this embodiment into the component 2 to be poured with glue is as follows:
[0091] First, a certain amount of glue is injected into the glue storage space of the glue storage cylinder 100 through the glue injection port 103;
[0092] Then, the air source is ventilated into the glue storage cylinder 100 through the air inlet nozzle 300, and the gas moves toward the glue storage space through the air guide channel 2021 of the air guide tube 202 and the threading tube 201, and the air pressure of the glue storage cylinder 100 is continuously increased, and the glue in the glue storage space is continuously squeezed between the sleeve 21 and the pipe seat 22;
[0093] When the air pressure in the rubber storage cylinder 100 exceeds a predetermined air pressure value, the pressure relief valve 800 opens, and the gas in the rubber storage cylinder 100 is discharged from the pressure relief valve 800 to maintain the air pressure in the rubber storage cylinder 100 within a predetermined air pressure range;
[0094] Finally, when the ventilation time reaches a predetermined time, the air source stops ventilating the rubber storage cylinder 100 through the air inlet nozzle 300 .
[0095] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A glue filling device, characterized in that: include: The glue storage cylinder (100) is provided with a glue outlet (101) and an air inlet (102) which are connected to each other, the glue outlet (101) is suitable for covering the glue filling position of the component (2) to be filled with glue, and the air inlet (102) is suitable for being connected to an air source; An air guide cylinder (200) is inserted into the glue storage cylinder (100), and the air guide cylinder (200) has a hollow cavity to form a limiting space (2011) suitable for inserting the component to be filled with glue (2); The sealing structure is arranged on the glue storage cylinder (100) and is arranged around the joint between the glue storage cylinder (100) and the glue injection position of the component to be injected with glue (2).
2. The glue pouring device according to claim 1, characterized in that: The air guide cylinder (200) comprises: A threading tube (201), wherein the limiting space (2011) is formed inside the threading tube (201); An air guide tube (202) connected to the outer peripheral surface of the threading tube (201); Wherein, in the axial direction of the rubber storage cylinder (100), the air guide cylinder (200) is located between the rubber outlet (101) and the air inlet (102), and the air inlet (102) is connected to the rubber outlet (101) at least through the air guide pipe (202).
3. The glue pouring device according to claim 2, characterized in that: The air guide tube (202) is arranged along the circumference of the threading tube (201), and the air guide tube (202) is provided with a plurality of air guide channels (2021). The plurality of air guide channels (2021) are arranged at intervals along the circumference of the threading tube (201), and the air inlet (102) is connected to the glue outlet (101) through the air guide channels (2021).
4. The glue pouring device according to any one of claims 1 to 3, characterized in that: The glue storage cylinder (100) is provided with a glue injection port (103), and in the axial direction of the glue storage cylinder (100), the glue injection port (103) is located between the air guide cylinder (200) and the glue outlet (101); A one-way valve (700) is provided at the glue injection port (103), and the one-way valve (700) is used to prevent the glue in the glue storage cylinder (100) from flowing out of the glue injection port (103).
5. The glue pouring device according to claim 2, characterized in that: One end of the threading tube (201) facing the glue outlet (101) is closer to the glue outlet (101) than one end of the air guide tube (202) facing the glue outlet (101); and / or One end of the air guide tube (202) facing the air inlet (102) is flush with one end of the threading tube (201) facing the air inlet (102).
6. The glue pouring device according to claim 4, characterized in that: The rubber storage cylinder (100) is provided with a pressure relief port (104), and a pressure relief valve (800) is provided at the pressure relief port (104); The rubber storage cylinder (100) is provided with a rubber storage space, and in the axial direction of the rubber storage cylinder (100), the rubber storage space is located between the air guide cylinder (200) and the rubber outlet (101), and the pressure relief port (104) is located on a side of the rubber storage space that is away from the rubber outlet (101).
7. The glue pouring device according to any one of claims 1 to 3, characterized in that: The glue pouring device (1) further comprises: An air inlet nozzle (300), the air inlet nozzle (300) is connected to the rubber storage cylinder (100) and communicated with the air inlet (102), the air inlet (102) and the rubber outlet (101) are respectively arranged at two opposite ends of the rubber storage cylinder (100) in the axial direction, and the air inlet nozzle (300) is suitable for being connected to the air source.
8. The glue pouring device according to any one of claims 1 to 3, characterized in that: The sealing structure comprises: a first sealing gasket (400), wherein in the axial direction of the rubber storage cylinder (100), the first sealing gasket (400) is located between the rubber storage cylinder (100) and the sleeve (21); and / or A second sealing gasket is located between the rubber storage cylinder (100) and the sleeve (21) in the radial direction of the rubber storage cylinder (100).
9. The glue pouring device according to any one of claims 1 to 3, characterized in that: The outer peripheral surface of the glue storage cylinder (100) is configured with a connecting seat (105), and the glue pouring device (1) further comprises a pressing plate (600), and along the axial direction of the glue storage cylinder (100), the pressing plate (600) and the connecting seat (105) are arranged relatively spaced apart to clamp the component to be poured with glue (2).
10. The glue pouring device according to claim 9, characterized in that: A notch (601) is provided on the outer peripheral surface of the pressing plate (600), and the notch (601) penetrates the pressing plate (600) along the thickness direction of the pressing plate (600).
Citation Information
Patent Citations
Glue injection machine
CN107680752A
Coil sealant encapsulating device
CN110732465A
Linear substrate, linear substrate infusion compartment and system
CN209675005U
Potting device
JP2008062137A
Device for sealing and injecting the inlet of container
KR101557224B1
