Group train line data sending method, device, equipment and medium
By obtaining train location and route information and determining topological lines in combination with signal status, the problems of network dependence and high cost in railway signal transmission are solved, and efficient transmission and storage of line data are achieved.
Patent Information
- Application Number
- CN202411258525.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-09-09
AI Technical Summary
In the existing railway signal transmission technology, the train operation control system has a high dependence on the communication network, which leads to the inability to send line data in time when there is no network coverage area, and the engineering design and transformation cost is high, which cannot meet the efficient storage and use of line data. Require.
By obtaining the location information of the target train and real-time route processing information, combining the signal open status and section status, the line data and candidate topology lines in the station are determined, and based on the real-time updated route processing information and section locking conditions, determine the route processing information and section locking conditions. The only target topology line realizes real-time transmission and prediction of line data, reduces dependence on communication networks, and reduces engineering costs.
It realizes the reception of line data in advance before the network-free coverage area, reduces the dependence of communication networks and engineering design transformation costs, and meets the needs of efficient storage and use of line data.
Smart Images

Figure CN118977757A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of railway signal transmission, and in particular to a method, device, equipment and medium for sending group train line data. Background Art
[0002] Line data is one of the credentials for safe train operation in the field of railway signaling, and is mainly used to describe the basic line information ahead of the train. In the train operation control system, equipment such as the Automatic Train Protection (ATP) system will drive safely based on line data information, which can greatly improve operation efficiency while ensuring safe operation.
[0003] The mechanism for sending line data by the train operation control system in the existing technology is highly dependent on train control equipment and communication networks. When there is no network coverage in the section, it is impossible to send line data in a timely manner. In addition, the cost of engineering design, construction, and transformation and upgrading is high, and it also cannot meet the requirements of efficient storage and use of line data. Summary of the invention
[0004] The present invention provides a group train line data transmission method, device, equipment and medium, so as to reduce the dependence on communication network and reduce the cost of engineering design, construction and renovation and upgrading, while meeting the requirements of efficient storage and use of line data.
[0005] According to one aspect of the present invention, a method for sending group train line data is provided, the method comprising:
[0006] Obtaining the location information of the target train in the group train in the station yard and the real-time updated route handling information; wherein the route handling information includes the currently handled routes;
[0007] Determine the in-station line data and at least one candidate topological line corresponding to the target train according to the location information, the route handling information, the open state of each signal and the state of each section, wherein different candidate topological lines correspond to the same currently handled route and different section lines;
[0008] The in-station line data is sent to the target train, and a unique target topology line is determined from the at least one candidate topology line according to the route handling information and section locking conditions updated in real time;
[0009] The current in-station line data and the section line data corresponding to the target topology line are sent to the target train.
[0010] According to another aspect of the present invention, a group train line data sending device is provided, the device comprising:
[0011] The position and route information acquisition module is used to obtain the position information of the target train in the group train in the station and the real-time updated route handling information; wherein the route handling information includes the currently handled route;
[0012] A candidate topology line determination module is used to determine the station line data corresponding to the target train and at least one candidate topology line according to the location information, the route handling information, the open state of each signal machine and the state of each section, wherein different candidate topology lines correspond to the same currently handled route and different section lines;
[0013] A target topology line determination module is used to send the in-station line data to the target train, and determine a unique target topology line from the at least one candidate topology line according to the real-time updated route handling information and section locking conditions;
[0014] The line data sending module is used to send the current in-station line data and the section line data corresponding to the target topology line to the target train.
[0015] According to another aspect of the present invention, there is provided an electronic device, the electronic device comprising:
[0016] at least one processor; and
[0017] a memory communicatively connected to the at least one processor; wherein,
[0018] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the group train line data sending method described in any embodiment of the present invention.
[0019] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the group train line data sending method described in any embodiment of the present invention when executed.
[0020] According to another aspect of the present invention, a computer program product is provided, comprising a computer program / instruction, wherein when the computer program / instruction is executed by a processor, the computer program / instruction implements the group train line data sending method as described in any embodiment of the present invention.
[0021] In the embodiment of the present invention, when a target train in a corresponding group of trains is in the station yard, based on the position information of the target train, the route handling information updated in real time, the open state of each signal machine and the state of each section, the station line data corresponding to the target train and at least one candidate topological line are determined, and based on the corresponding real-time updated route handling information and section locking conditions, a unique target topological line is determined. While the line data of the target train running in the station is determined and sent in real time, the section line that the target train is about to enter can be predicted and determined, so that the target train can receive the user information in advance before entering the section without network coverage. The data of lines running in the section can help solve the problems of "the high degree of dependence on train control equipment and communication networks, the high cost of engineering design, construction, transformation and upgrading, and the inability to meet the requirements of efficient storage and use of line data due to the use of additional central equipment on the ground to manage and send the line data of the corresponding section, the management and transmission of line information through physical equipment on the ground, or the solidification of line data in the local memory of the on-board signal equipment through electronic maps, etc.", so as to reduce the dependence on communication networks and the cost of engineering design, construction, transformation and upgrading, and meet the requirements of efficient storage and use of line data.
[0022] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0024] Figure 1A This is a flowchart of a method for sending group train line data provided according to Embodiment 1 of the present invention.
[0025] Figure 1B It is a correlation diagram of the communication coverage range corresponding to the station, the station range and the ranges of each section associated with the station.
[0026] Figure 2A It is a flowchart of another method for sending group train line data provided according to the second embodiment of the present invention.
[0027] Figure 2B This is a line topology diagram corresponding to a station field provided according to the second embodiment of the present invention.
[0028] Figure 2C This is another station-to-field corresponding line topology diagram provided according to the second embodiment of the present invention.
[0029] Figure 2D It is a structural schematic diagram of an initial interval route prediction tree provided according to the second embodiment of the present invention.
[0030] Figure 2E It is a schematic diagram of the structure of a pruned initial interval route prediction tree provided according to the second embodiment of the present invention.
[0031] Figure 3 It is a flowchart of another method for sending group train line data provided according to Embodiment 3 of the present invention.
[0032] Figure 4 It is a structural diagram of a group train line data sending device provided according to Embodiment 4 of the present invention.
[0033] Figure 5 It is a structural schematic diagram of an electronic device for implementing the group train line data sending method according to an embodiment of the present invention. DETAILED DESCRIPTION
[0034] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0035] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0036] Figure 1AThis is a flow chart of a group train line data transmission method provided by an embodiment of the present invention. This embodiment can be applied to the group control center in the station yard to send line data to any train in the group train before it enters the section. The method can be executed by a group train line data transmission device, which can be implemented in the form of hardware and / or software. The device can be configured in an electronic device, which can be a group control center. Figure 1A Said method comprises:
[0037] S110. Obtaining the location information of the target train in the group train in the station and the real-time updated route handling information; wherein the route handling information includes the currently handled routes.
[0038] Among them, the group control center (Group Control Center, GCC) can be a control center or system for controlling and managing group trains. The group control center can be set in a central machine room, and the central machine room can be located in a station. The target train can be any train included in the group train. The route processing information can be the route information of the corresponding target train processed by Computer Based Interlocking (CBI). The corresponding route can include at least one turnout and / or section in the station yard. The route can be a long route or a short route. The position information can be the position information uploaded by the target train based on the location of the preset transponder when the target train passes through the preset transponder in the station yard. The preset transponder can be a positioning transponder, and the position of the positioning transponder can be set according to experience or needs. The currently processed route can include the processed route corresponding to the target train, and can also include the processed routes of other trains other than the target train.
[0039] S120. Determine the in-station line data and at least one candidate topology line corresponding to the target train based on the location information, the route handling information, the open status of each signal and the status of each section, wherein different candidate topology lines correspond to the same currently handled route and different section lines.
[0040] Among them, the signal open state can be used to indicate whether the position corresponding to the signal is in a passable state, and the signal open state can correspond to the indicator light color of the signal, and the indicator light color can include green, red and yellow. The red color can be a stop signal, which is used to indicate that the train must not pass the signal; the green color can be a permission signal, which is used to indicate that the train can pass the signal at a specified speed; the yellow color can also be a permission signal, which is used to indicate that the train needs to slow down. The section state can be used to indicate the current operation or occupation of the corresponding section, and can be specifically used to determine whether the corresponding section is in a passable state. The section state can include at least one of the states of idle state, occupied state, fault state and route locking state. The in-station line data can be the line data corresponding to the line composed of the currently processed routes. The travel direction corresponding to the candidate topology line is the current travel direction of the target train, and the current travel direction of the target train can be actively uploaded by the target train. The starting point of each candidate topology line can be the position corresponding to the corresponding position information. The same path can exist in different candidate topology lines, and the same path can be the line composed of the currently processed routes. The corresponding station yard may correspond to at least one section, and each section may correspond to a unique section line. Different section lines are provided with different signal machines at the corresponding section entrances of the corresponding station yard.
[0041] Specifically, a first mapping relationship database between different location information, route handling information, the opening status of each signal, the status of each section and the in-station line data and at least one candidate topological line can be established in advance. Accordingly, when determining the corresponding location information, route handling information, the opening status of each signal and the status of each section, the corresponding in-station line data and at least one candidate topological line can be matched by traversing the first mapping relationship database, and the matched in-station line data and at least one candidate topological line can be used as the in-station line data and at least one candidate topological line corresponding to the corresponding target train.
[0042] S130, sending the in-station line data to the target train, and determining a unique target topology line from the at least one candidate topology line according to the real-time updated route handling information and section locking conditions.
[0043] Among them, the section locking condition may be a condition that needs to be met when locking the section. The section locking condition may include at least one of the following condition types: section occupancy, section failure, associated turnout position locking, and associated turnout position fixing. The status of each of the above sections may be associated with the real-time update of the currently processed routes. Section occupancy may be the situation where other trains stay in the corresponding section or the route corresponding to the section has been processed by other trains. The section where the candidate topology line is extended may be the section where the target train may run, and the section where the target topology line is extended may be the section where the target train will run. Different route processing information may correspond to different in-station line data.
[0044] Specifically, a second mapping relationship database between each route handling information, section locking conditions and each candidate topology route in the real-time update process can be established in advance. Accordingly, the in-station route data determined before the current update can be sent to the target train, and in the process of real-time update of the corresponding route handling information, based on the corresponding section locking conditions and each route handling information in the real-time update process, the corresponding second mapping relationship database is traversed, and the corresponding candidate topology routes are matched in real time until the matched candidate topology route only includes a unique candidate topology route, and the unique candidate topology route is used as the corresponding target topology route. Among them, the above-mentioned at least one candidate topology route includes each candidate topology route.
[0045] S140. Send the current in-station line data and the section line data corresponding to the target topology line to the target train.
[0046] The target topology line may be a line corresponding to a section in which the target topology line extends. The section line data may be line data corresponding to the line. The line data may include at least one of the data types such as static speed, static slope, transponder link information, phase separation area, track section information, and temporary speed limit information. The current in-station line data may be new in-station line data formed by each processed route in the updated route processing information when the corresponding target topology line is determined.
[0047] Specifically, based on the communication network associated with the station, the current in-station line data and the interval line data corresponding to the target topology line can be sent to the corresponding target train. Among them, the stable network coverage of the communication network corresponding to the station can include the station and the nearby interval. For example, the range that meets the stable communication conditions between the train and the ground equipment can include the station range and the partial interval area connected to the exit. The size of the partial interval area can be set as needed, and is not specifically limited here.
[0048] For easier understanding, please refer to Figure 1BThe specific examples of the relationship between the communication coverage area of the station, the station area and the intervals associated with the station are provided. Figure 1B The corresponding interval settings involved are only for illustrative purposes and should not be construed as specific limitations of the present invention.
[0049] Figure 1B It is a relationship diagram between the communication coverage area of the station, the station area, and the area of each section associated with the station. Figure 1B As shown in , the communication coverage range corresponding to the station location corresponding to the corresponding station may include the station range, a partial area of the range corresponding to interval 1, and a partial area of the range corresponding to interval 2. Among them, the communication coverage range may be equivalent to the network coverage range. X may be the signal corresponding to the left boundary of the corresponding station, and SN may be the signal corresponding to the right boundary of the corresponding station.
[0050] In the embodiment of the present invention, when a target train in a corresponding group of trains is in the station yard, based on the position information of the target train, the route handling information updated in real time, the open state of each signal machine and the state of each section, the station line data corresponding to the target train and at least one candidate topological line are determined, and based on the corresponding real-time updated route handling information and section locking conditions, a unique target topological line is determined. While the line data of the target train running in the station is determined and sent in real time, the section line that the target train is about to enter can be predicted and determined, so that the target train can receive the user information in advance before entering the section without network coverage. The data of lines running in the section can help solve the problems of "the high degree of dependence on train control equipment and communication networks, the high cost of engineering design, construction, transformation and upgrading, and the inability to meet the requirements of efficient storage and use of line data due to the use of additional central equipment on the ground to manage and send the line data of the corresponding section, the management and transmission of line information through physical equipment on the ground, or the solidification of line data in the local memory of the on-board signal equipment through electronic maps, etc.", so as to reduce the dependence on communication networks and the cost of engineering design, construction, transformation and upgrading, and meet the requirements of efficient storage and use of line data.
[0051] Figure 2A This is a flow chart of a group train line data transmission method provided in Embodiment 2 of the present invention. This embodiment is further optimized based on the above embodiments. It should be noted that for the parts not described in detail in this embodiment, please refer to the relevant descriptions in other embodiments.
[0052] Further, "determine at least one candidate topological route corresponding to the target train according to the location information, the route handling information, the open status of each signal and the status of each section" is refined into "determine the passable turnouts and sections in the station yard according to the open status of each signal and the status of each section; based on the topological relationship between each turnout and section in the station yard, construct an initial section route prediction tree according to the passable turnouts and sections, the position of the positioning transponder corresponding to the location information, the currently handled routes and the positions of the signals at each section entrance; wherein the root node of the initial section route prediction tree is the positioning transponder, and the leaf nodes of the section route prediction tree are the turnouts and the signals at the section entrance; the route corresponding to at least one path formed by the root node and each leaf node in the initial section route prediction tree is used as the at least one candidate topological route corresponding to the target train" to improve the determination mechanism of the corresponding candidate topological routes.
[0053] refer to Figure 2A , the method specifically comprises the following steps:
[0054] S210. Obtaining the location information of the target train in the group train in the station and the real-time updated route handling information; wherein the route handling information includes the currently handled routes.
[0055] S220. Determine the passable turnouts and sections in the station yard according to the opening status of each signal and the status of each section.
[0056] Among them, the passable turnouts and sections can be the turnouts and sections within the station yard that allow the target train to pass.
[0057] Specifically, a correspondence between different signal opening states, section states and passable turnouts and sections in the station yard can be established in advance. Accordingly, when determining the corresponding signal opening states and section states, the correspondence can be traversed to determine the passable turnouts and sections that match the signal opening states and section states, and the matched passable turnouts and sections can be used as the passable turnouts and sections in the station yard.
[0058] S230. Based on the topological relationship between each switch and section in the station yard, an initial section line prediction tree is constructed according to the passable switch and section, the position of the positioning transponder corresponding to the position information, the currently processed route and the position of each section entrance signal; wherein the root node of the initial section line prediction tree is the positioning transponder, and the leaf nodes of the section line prediction tree are the switch and the section entrance signal.
[0059] Among them, the topological relationship between each turnout and section can be associated with the planning and design of the corresponding station yard of the station. The positioning transponder can be any transponder with a positioning function set up in the station yard. For example, the positioning transponder can be the Latest Relevant Balise Group (LRBG) that the target train currently passes. The target can upload the current position information based on the latest positioning transponder passed as the reference point. The positions corresponding to the passable turnouts can include positioning, reverse position and before the turnout. The initial section line prediction tree can be a section line prediction tree constructed based on the corresponding position information and the currently processed route. When the section entrance signal is a leaf node of the path in the corresponding section line prediction tree, the section entrance signal can be the node corresponding to the end point of the path. If the leaf node of the path in the corresponding section line prediction tree contains a section entrance signal, the node corresponding to the end point of the path can be terminated.
[0060] Specifically, the positioning transponder corresponding to the corresponding position information can be used as the root node, and each turnout included in the currently processed route can be a leaf node with a fixed node position. In the current running direction of the target train, starting from the last turnout among the turnouts corresponding to the leaf nodes with determined node positions, based on the status of each passable section and each passable turnout, the next leaf node connected to the leaf node corresponding to the last turnout can be determined in sequence until the next leaf node connected is determined to be a section entrance signal or terminates.
[0061] S240. Use the route corresponding to at least one path formed by the root node and each leaf node in the initial interval route prediction tree as at least one candidate topological route corresponding to the target train; wherein different candidate topological routes correspond to the same currently processed routes and different interval routes.
[0062] Specifically, based on the leaf nodes connected to the root node and the association relationship between the leaf nodes, at least one path in the initial interval route prediction tree can be determined, and accordingly, the at least one path can be used as at least one candidate topology route corresponding to the target train.
[0063] S250, sending the in-station line data to the target train, and determining a unique target topology line from the at least one candidate topology line based on the real-time updated route handling information and section locking conditions; wherein the in-station line data is determined based on the location information, the route handling information, the opening status of each signal and the status of each section.
[0064] Exemplarily, determining a unique target topology route from the at least one candidate topology route according to the route handling information and the section locking condition updated in real time may include:
[0065] According to the real-time updated route processing information and section locking conditions, determine the paths including hostile routes and / or paths that meet the section locking conditions in the initial section route prediction tree; based on the paths including hostile routes and / or paths that meet the section locking conditions, prune the initial section route prediction tree until there is a unique path in the pruned section route prediction tree, and use the route corresponding to the unique path as the target topology route.
[0066] Among them, the hostile route can be the route handled by other trains other than the target train, which interferes or conflicts with the routes corresponding to the initial section route prediction tree. The route corresponding to the path that meets the section locking condition can include at least one section that meets the section locking condition during the real-time update of the route handling information. The at least one section that meets the section locking condition can be determined when the status of each section corresponding to the path between each node in the initial section route prediction tree is re-determined during the real-time update of the route handling information.
[0067] Specifically, if the corresponding path in the initial interval route prediction tree includes a hostile route and / or a section that meets the section locking conditions, it can be indicated that the path cannot meet the requirements for the smooth passage of the target train. Accordingly, the corresponding initial interval route prediction tree can be pruned based on each leaf node corresponding to the path, so that each path in the pruned interval route prediction tree meets the requirements for the smooth passage of the target train. Furthermore, the initial interval route prediction tree can be pruned in real time based on real-time updated progress management information until it is determined that there is a unique path in the pruned interval route prediction tree. This indicates that the interval in which the target train is to run is certain and unique. Accordingly, the line corresponding to the unique path can be used as the target topology line.
[0068] It can be understood that by determining the paths including hostile routes and / or paths satisfying the section locking conditions in the initial section route prediction tree according to the real-time updated route processing information and section locking conditions, the initial section route prediction tree is subjected to corresponding continuous pruning processing to obtain a unique path corresponding to the initial section route prediction tree, and the unique path is used as the target topology route, thereby eliminating the need to pre-establish a database of mapping relationships between different route processing information, section locking conditions and candidate topology routes, which can further simplify the process of determining the corresponding target topology route and improve the efficiency of determining the target topology route. At the same time, by timely pruning the relevant data of the candidate topology route that does not meet the requirements for the smooth passage of the target train, it helps to avoid the process of continuing to obtain and send the corresponding route data of the candidate topology route when it has been determined that a certain candidate topology route does not meet the conditions for the smooth passage of the target train, thereby helping to reduce the waste of computing resources and storage resources.
[0069] S260. Send the current in-station line data and the section line data corresponding to the target topology line to the target train.
[0070] In an optional implementation, the corresponding line data is received by the Automatic Train Protection (ATC) in the target train, and the line data may include station line data and section line data. It is understandable that the equipment such as the automatic train control system will drive safely according to the corresponding line data information, and greatly improve the operation efficiency under the premise of ensuring safe operation.
[0071] In an embodiment of the present invention, through the topological relationship between each turnout and section in the station yard, according to the passable turnout and section, the position of the positioning transponder corresponding to the position information, the currently processed route and the position of each section entrance signal, the positioning transponder is used as the root node and the turnout and the section entrance signal are used as leaf nodes to construct an initial section line prediction tree, and the line corresponding to at least one path formed by the root node and each leaf node in the initial section line prediction tree is used as at least one candidate topological line corresponding to the target train, thereby avoiding the need to establish a relationship database between the corresponding candidate topological line and various types of data, helping to simplify the process of determining the corresponding candidate topological line and improving the efficiency of determining the corresponding candidate topological line. At the same time, by establishing a tree structure corresponding to the corresponding initial section line prediction tree, it supports fast traversal and search operations on the corresponding data, and has high flexibility and scalability, thereby helping to improve the efficiency of the subsequent corresponding data processing process when determining the corresponding target topological structure.
[0072] For easier understanding, please refer to Figure 2B The specific example of the station line topology relationship provided. It should be noted that Figure 2B The relevant settings of the corresponding sections, transponders, sections, signals and other relevant line information involved are only for exemplary description and should not be understood as specific limitations of the present invention.
[0073] Figure 2B It is a topological relationship diagram of the line corresponding to the station field. Figure 2BAs shown, the corresponding station yard may include turnouts, sections, signals and transponders. The turnouts may include turnouts 1-12, turnouts 14, turnouts 16 and turnouts 18. The corresponding sections of the lines in the station may include IBG, IIBG, 2-8DG, 4-6DG, 10DG, 12DG, 14DG, 16DG, 18DG, IG, IIG, 3G, 4G, 9DG, 11DG, 1-7DG, 3-5DG, IAG, IIAG, etc. The corresponding sections of the interval lines may include X1LQG-X3LQG and S1JG-S3JG. The signals corresponding to the lines in the station may include X, XN, S1-S4, X1-X4, V2, V4, V6, V8, V9, V11, V13, SN and S, etc. S and SN may be signals at the interval entrances. X and XN may be the section entrance signals corresponding to the section entrances on the left side of the corresponding stations. The signals corresponding to the section lines may include 3554, 3555, 3573 and 3754, etc. The transponders set on the lines within the station may include BS1-BS4, and BX1-BX4, etc. The transponders set on the sections corresponding to the lines may include BS, BSN, B3554, B3555, B3573 and B3754, etc. The station range 01 may be the range between the signal X and the signal SN or the range between the signal XN and the signal S, etc. The section range 02 may start from the signal SN or from the signal S. The line range corresponding to the section line data range 03 may start from the signal BSN or from the signal BS. The end point of the line range corresponding to the station line data range 04 may exceed the signal BSN or the signal BS.
[0074] Continuing with the previous example, when the position reported by Train 1 informs GCC that the LRBG it passes through is balise BX3, GCC determines that CBI has processed the short routes of X3->V9, V9->V11, V11->SN and all sections are locked. At this time, GCC can search and calculate the candidate topological lines corresponding to the short routes of X3->V9, V9->V11, V11->SN with balise BX3 as the starting point and calculate the line data in the station in real time. Correspondingly, Train 1 can calculate the line data in the station in real time based on the starting and ending points such as Figure 2B The red arrow line indicates the in-station line data. When Train 2 reports its position to inform GCC that the LRBG it passes is balise BX2, GCC determines that CBI only handles the short route corresponding to X2->V2. At this time, GCC can search and calculate the candidate topological route suitable for the short route corresponding to X2->V2 with balise BX2 as the starting point and calculate the in-station line data in real time. Correspondingly, Train 2 can calculate the in-station line data in real time based on the starting and ending points. Figure 2B The green arrow line shows the train data in the station. Both train 1 and 2 can be used as the target train.
[0075] For ease of understanding, continuing with the previous example, you can refer to Figure 2C Another specific example of the topological relationship of the station line is provided. It should be noted that Figure 2C The relevant settings of the corresponding sections, transponders, sections, signals and other relevant line information involved are only for exemplary description and should not be understood as specific limitations of the present invention.
[0076] Continuing with the previous example, Figure 2C The station field corresponds to the line topology relationship diagram shown. The corresponding turnouts may also include turnout 21, turnout 17, turnout 15, turnout 13 and turnout 19, etc. The signals corresponding to the lines in the station may also include X5, V5, V7, V1, V3, SA, V10, V12 and SC, etc. The sections corresponding to the lines in the station may also include 5G, 21DG, IVAG, 17DG, 15DG, 13DG, 19DG and IIIAG, etc. The transponders set on the lines in the station may also include BX5, etc. The intervals corresponding to the corresponding station field may include interval 1, interval 2, interval 3 and interval 4, etc. SA may be the interval entrance signal corresponding to interval 1, SN may be the interval entrance signal corresponding to interval 2, S may be the interval entrance signal corresponding to interval 3, and SC may be the interval entrance signal corresponding to interval 4. Exemplarily, when train 1 reports its position based on the BX5 balise, it can search all possible section entrances based on the running direction reported by train 1 and the position of the key switch ahead, taking BX5 as the starting point of the line in the station, and obtain 3 possible lines. Among them, line 1 can correspond to section 1, specifically BX5 balise->positioned switch 21->SA signal; line 2 can correspond to section 2, specifically BX5 balise->reversed switch 21->switch 17 before the switch->switch 9 before the switch->positioned switch 7->positioned switch 1->SN signal, and line 3 can correspond to section 3, specifically BX5 balise->reversed switch 21->switch 17 before the switch->switch 9 before the switch->reversed switch 7->reversed switch 5->S signal.
[0077] For ease of understanding, continuing with the previous example, you can refer to Figure 2D as well as Figure 2E The specific examples of the initial interval route prediction tree and the pruned interval route prediction tree are provided. It should be noted that Figure 2D as well as Figure 2E The related settings of the association relationship between the corresponding transponders, signal machines and switches involved in the present invention are only for illustrative purposes and should not be understood as specific limitations of the present invention.
[0078] like Figure 2DThe schematic diagram of the structure of the initial section line prediction tree is shown. When train 1 informs GCC that the LRBG it passes through is balise BX5, GCC can use balise BX5 as the starting point and search for all possible section entrances according to the running direction reported by the train, that is, it can establish an operation section prediction tree with balise BX5 as the root node and turnouts and section entrance signals as leaf nodes. The positions of turnouts can include positioning, reverse position, and before the turnout.
[0079] like Figure 2E The schematic diagram of the structure of the initial interval route prediction tree after pruning is shown. If CBI does not handle any route, GCC can send the corresponding interval marks and interval balise messages of the above-mentioned lines 1, 2 and 3 to train 1 at the same time, so that train 1 can store the balise message data corresponding to each interval in advance; if CBI handles the X5->V5 short route, turnout 21 can be in reverse position. Further, it can be determined that route 1 in the initial interval prediction tree of train 1 no longer meets the train operation conditions, and the prediction tree can be pruned, such as Figure 2E As shown by the dotted line on the left, only the section marks and section transponder messages corresponding to line 2 and line 3 are retained and sent to train 1; if CBI handles the short routes of S->V8, V8->V4, V4->S2 at this time, the S->V8 short route in this sequence of routes has a hostile route relationship with line 3 predicted by the section prediction tree, so the section prediction tree of train 1 can be pruned again, as shown in Figure 2E As shown by the dotted line on the right, at this time, GCC can determine that the interval prediction tree path is unique, and only continue to send the interval mark and interval transponder message corresponding to line 2; when CBI has completely handled all the short routes corresponding to line 2, GCC can send an interval confirmation message to train 1 for the train to verify the interval mark to confirm the operating interval, and continue to send the transponder message data of the remaining intervals corresponding to line 2 until the data is sent. The train operation condition can be a condition that meets the requirements for smooth passage of the train.
[0080] Figure 3 This is a flow chart of a group train line data transmission method provided in Embodiment 3 of the present invention. This embodiment is further optimized based on the above embodiments. It should be noted that for the parts not described in detail in this embodiment, please refer to the relevant descriptions in other embodiments.
[0081] Furthermore, "obtaining the position information of the target train in the group of trains in the station yard" is refined into "responding to a registration request sent by the target train in the group of trains, and establishing a communication connection with the target train based on the registration request; receiving the train position information sent by the target train when it passes a preset positioning transponder, and using the train position information as the position information of the target train in the station yard; wherein, the train position information is the position information of the preset positioning transponder", so as to improve the mechanism for obtaining the corresponding position information.
[0082] refer to Figure 3 , the method specifically comprises the following steps:
[0083] S310: Respond to a registration request sent by a target train in the group train, and establish a communication connection with the target train based on the registration request.
[0084] Wherein, the registration request can be initiated by the driver of the target train or automatically sent by the target train through the corresponding ATP when it passes over the preset registration transponder. The registration request can at least include the identification information of the target train. The registration request can be used to request to establish a communication connection between the target train and the group control center. The position of the registration transponder in the station can be set according to needs or experience. The same transponder can be used as a registration transponder and a positioning transponder at the same time.
[0085] Specifically, after receiving the registration request sent by the target train, the registration request may be responded to, and a registration confirmation message may be fed back to the target train to establish a communication connection with the target train.
[0086] S320, receiving the train position information sent by the target train when it passes over a preset positioning transponder, and using the train position information as the position information of the target train in the station; wherein the train position information is the position information of the preset positioning transponder.
[0087] The preset positioning transponder may be a preset positioning transponder in the station yard. The preset registered transponder may also be used as the preset positioning transponder. The positioning transponder may be used to reflect the current location of the target train.
[0088] S330, obtaining real-time updated route handling information; wherein the route handling information includes currently handled routes.
[0089] S340. Determine the in-station line data and at least one candidate topology line corresponding to the target train based on the location information, the route handling information, the open status of each signal and the status of each section, wherein different candidate topology lines correspond to the same currently handled route and different section lines.
[0090] S350, sending the in-station line data to the target train, and determining a unique target topology line from the at least one candidate topology line according to the real-time updated route handling information and section locking conditions.
[0091] Exemplarily, after determining the in-station line data corresponding to the target train and at least one candidate topological line, the method may further include:
[0092] The section line data corresponding to the at least one candidate topology line are sent to the target train so that the target train pre-stores the section line data; if the target topology line is determined, the sending of the section line data corresponding to other candidate topology lines other than the target topology line is cancelled.
[0093] Specifically, after at least one candidate topology route is determined, all the section route data corresponding to the at least one candidate topology route can be sent to the corresponding target train in advance, so that the target train can use the section route data sent in advance as a storage backup. In addition, after the target topology route is determined, the sending of section route data corresponding to other candidate topology routes other than the target topology route can be cancelled, and only the sending of section route data corresponding to the target topology route can be maintained.
[0094] It can be understood that by sending the interval line data corresponding to all candidate topology lines to the target train for storage and backup in advance before determining the target topology line, it can effectively avoid the situation where the target train is unable to fully receive the corresponding line data of the interval to be traveled when the interval line data transmission is not completed when the target train leaves the corresponding network coverage of the station. This greatly improves the timing of completing the line data transmission and helps to reduce the requirements for interval network coverage.
[0095] For example, after determining the target topology route, it can be determined whether the interval route data corresponding to other candidate topology routes other than the target topology route have been sent. Correspondingly, if so, the target train can be controlled to delete the pre-stored interval route data corresponding to other candidate topology routes other than the target topology route; if not, the sending of the interval route data corresponding to other candidate topology routes other than the target topology route can be canceled, and the interval route data corresponding to other candidate topology routes other than the target topology route stored in the target train can be deleted.
[0096] S360. Send the current in-station line data and the section line data corresponding to the target topology line to the target train.
[0097] In an optional embodiment, sending the section line data to the target train may include:
[0098] The section line data is sent to the target train in the form of a transponder group message, so that the target train enables the corresponding section line data after crossing the physical transponder on the section line corresponding to the target topology line; wherein each group of transponder group messages corresponds to a group of ground physical transponders.
[0099] Among them, each group of balises may contain at least one balise group message, and each balise group message may be used to describe one or more line data within the jurisdiction of the balise group. The physical balise may be a balise laid at a preset position on the interval line. The preset position may be set as required, and the number of physical balises may be at least one group. The physical balise may contain a balise group message corresponding to the interval line data for locating and allowing the train to use the interval line data. The physical balise may not contain the interval line data of the line and may not transmit the interval line data.
[0100] It can be understood that when the target train is within the network coverage of the station, the corresponding section line data is first sent to the target train in the form of a transponder group message, and each group of transponder group messages is corresponded to the ground physical transponder, so that the physical transponder laid on the corresponding section line does not need to assume the function of transmitting or storing the section line data, but only performs the key function of positioning and allowing the train to use the transponder group message in the section line data, thereby helping to avoid the high design, construction, management and update costs caused by arranging a large amount of line data in the ground physical equipment on the section line, and thus helping to meet the requirements of efficient storage and use of line data.
[0101] In an optional embodiment, the in-station line data corresponding to the station field and the section line data may have overlapping parts, and the in-station line data corresponding to the overlapping parts may pass through the starting point of the section line corresponding to the section line data.
[0102] The starting point of the section line may be the position corresponding to the first transponder group in the current section in the direction of the target train. The station line data corresponding to the station yard and the section line data may have overlapping parts, which may indicate that the line corresponding to the station line data and the line corresponding to the section line data have the same part. The same part may be the line corresponding to the overlapping part.
[0103] It can be understood that by making the corresponding in-station line data and the section line data overlap, and the line corresponding to the overlapping part passes through the starting point of the corresponding section line, it can be avoided that the section line data with the section entrance transponder group as the starting point cannot describe the data of the gap between the section entrance transponder group and the actual station boundary due to the section transponder being set outside the exit, thereby helping to ensure that the line data received by the target train can cover the entire line.
[0104] In an embodiment of the present invention, a communication connection is first established with the target train through a registration request sent by a target train, and then based on the communication connection, the train position information sent by the target train when it passes over a preset positioning transponder is used as the current position information of the corresponding target train. This can ensure that after the target train is actually registered, the information sent by the target train is received based on a specific communication connection, thereby helping to avoid erroneous reception of information from other trains or failure to search for the target train in a timely manner, thereby helping to improve the accuracy and timeliness of receiving and sending corresponding information of the corresponding target train. At the same time, by allowing the target train to report its own position information based on the position of the preset positioning transponder when it passes over the preset positioning transponder, it helps to timely grasp the position of the target train and determine and obtain the corresponding line data based on the position of the target train, thereby helping to further advance the timing of completing the sending of the corresponding line data.
[0105] Figure 4 This is a schematic diagram of the structure of a group train line data sending device provided in the fourth embodiment of the present invention. This embodiment can be applied to the group control center in the station yard to send line data to any train in the group train before it enters the section. The device can be implemented in the form of hardware and / or software. The device can be configured in an electronic device, which can be a group control center. Figure 4 Said device comprises:
[0106] The position and route information acquisition module 410 is used to acquire the position information of the target train in the group train in the station yard and the route handling information updated in real time; wherein the route handling information includes the currently handled routes;
[0107] A candidate topology line determination module 420 is used to determine the in-station line data corresponding to the target train and at least one candidate topology line according to the location information, the route handling information, the open state of each signal machine and the state of each section, wherein different candidate topology lines correspond to the same currently handled route and different section lines;
[0108] A target topology line determination module 430 is used to send the in-station line data to the target train, and determine a unique target topology line from the at least one candidate topology line according to the real-time updated route handling information and section locking conditions;
[0109] The line data sending module 440 is used to send the current in-station line data and the section line data corresponding to the target topology line to the target train.
[0110] In the embodiment of the present invention, when a target train in a corresponding group of trains is in the station yard, based on the position information of the target train, the route handling information updated in real time, the open state of each signal machine and the state of each section, the station line data corresponding to the target train and at least one candidate topological line are determined, and based on the corresponding real-time updated route handling information and section locking conditions, a unique target topological line is determined. While the line data of the target train running in the station is determined and sent in real time, the section line that the target train is about to enter can be predicted and determined, so that the target train can receive the user information in advance before entering the section without network coverage. The data of lines running in the section can help solve the problems of "the high degree of dependence on train control equipment and communication networks, the high cost of engineering design, construction, transformation and upgrading, and the inability to meet the requirements of efficient storage and use of line data due to the use of additional central equipment on the ground to manage and send the line data of the corresponding section, the management and transmission of line information through physical equipment on the ground, or the solidification of line data in the local memory of the on-board signal equipment through electronic maps, etc.", so as to reduce the dependence on communication networks and the cost of engineering design, construction, transformation and upgrading, and meet the requirements of efficient storage and use of line data.
[0111] Optionally, the candidate topology line determination module 420 may include:
[0112] A passable turnout and section determination unit, used to determine the passable turnout and section in the station yard according to the opening status of each signal and the status of each section;
[0113] The initial section route prediction tree construction unit is used to construct the initial section route prediction tree based on the topological relationship between each turnout and section in the station yard, according to the passable turnout and section, the position of the positioning transponder corresponding to the position information, the currently processed route and the position of each section entrance signal; wherein the root node of the initial section route prediction tree is the positioning transponder, and the leaf nodes of the section route prediction tree are the turnout and the section entrance signal;
[0114] The candidate topology route determination unit is used to use the route corresponding to at least one path formed by the root node and each leaf node in the initial interval route prediction tree as at least one candidate topology route corresponding to the target train.
[0115] Optionally, the target topology line determination module 430 may include:
[0116] A path determination unit, configured to determine, based on the real-time updated route handling information and section locking conditions, a path including hostile routes and / or a path satisfying the section locking conditions in the initial section route prediction tree;
[0117] The target topology route determination unit is used to prune the initial section route prediction tree based on the path including the hostile route and / or the path that satisfies the section locking condition, until there is a unique path in the pruned section route prediction tree, and the route corresponding to the unique path is used as the target topology route.
[0118] Optionally, the location and route information acquisition module 410 may include:
[0119] A communication connection establishing unit, configured to respond to a registration request sent by a target train in the group of trains, and to establish a communication connection with the target train based on the registration request;
[0120] A position information receiving unit is used to receive the train position information sent by the target train when it passes over a preset positioning transponder, and use the train position information as the position information of the target train in the station; wherein the train position information is the position information of the preset positioning transponder.
[0121] Optionally, the corresponding device may further include:
[0122] A line data pre-storage module is used to send each section line data corresponding to the at least one candidate topological line to the target train after determining the station line data and at least one candidate topological line corresponding to the target train, so that the target train pre-stores the each section line data;
[0123] The line data sending cancellation module is used to cancel the sending of the section line data corresponding to other candidate topology lines other than the target topology line if the target topology line is determined.
[0124] Optionally, sending the section line data to the target train may include:
[0125] The section line data is sent to the target train in the form of a transponder group message, so that the target train enables the corresponding section line data after crossing the physical transponder on the section line corresponding to the target topology line; wherein each group of transponder group messages corresponds to a group of ground physical transponders.
[0126] Optionally, there may be overlapping parts between the in-station line data and the interval line data corresponding to the station field, and the line corresponding to the overlapping part may pass through the starting point of the interval line corresponding to the interval line data.
[0127] The group train line data sending device provided in the embodiment of the present invention can execute any one of the group train line data sending methods provided in the embodiment of the present invention, and has the corresponding functional modules and beneficial effects of executing each group train line data sending method. For the contents not described in detail in the embodiment of the present invention, reference can be made to the description in any one of the group train line data sending method embodiments of the present invention.
[0128] According to an embodiment of the present invention, the present invention also provides an electronic device, a readable storage medium and a computer program product.
[0129] Figure 5 A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0130] like Figure 5 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0131] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0132] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as a group train line data sending method.
[0133] In some embodiments, the group train line data transmission method can be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program can be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the group train line data transmission method described above can be performed. Alternatively, in other embodiments, the processor 11 can be configured to execute the group train line data transmission method in any other appropriate manner (for example, by means of firmware).
[0134] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0135] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0136] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0137] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0138] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0139] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0140] Artificial intelligence is a discipline that studies how to use computers to simulate certain human thought processes and intelligent behaviors (such as learning, reasoning, thinking, planning, etc.). It includes both hardware-level and software-level technologies. Artificial intelligence hardware technologies generally include technologies such as sensors, dedicated artificial intelligence chips, cloud computing, distributed storage, and big data processing; artificial intelligence software technologies mainly include computer vision technology, speech recognition technology, natural language processing technology, machine learning / deep learning technology, big data processing technology, knowledge graph technology, and other major directions.
[0141] Cloud computing refers to a technology system that uses network access to elastically scalable shared physical or virtual resource pools. Resources can include servers, operating systems, networks, software, applications, and storage devices, and can be deployed and managed on demand and in a self-service manner. Cloud computing technology can provide efficient and powerful data processing capabilities for technical applications such as artificial intelligence and blockchain, as well as model training.
[0142] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this disclosure can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution provided by this disclosure can be achieved, and this document does not limit this.
[0143] The above specific implementations do not constitute a limitation on the protection scope of the present disclosure. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present disclosure shall be included in the protection scope of the present disclosure.
Claims
1. A method for sending group train line data, characterized in that: include: Obtaining the location information of the target train in the group train in the station yard and the real-time updated route handling information; wherein the route handling information includes the currently handled routes; Determine the in-station line data and at least one candidate topological line corresponding to the target train according to the location information, the route handling information, the open state of each signal and the state of each section, wherein different candidate topological lines correspond to the same currently handled route and different section lines; The in-station line data is sent to the target train, and a unique target topology line is determined from the at least one candidate topology line according to the route handling information and section locking conditions updated in real time; The current in-station line data and the section line data corresponding to the target topology line are sent to the target train.
2. The method according to claim 1, characterized in that: Determining at least one candidate topological route corresponding to the target train according to the location information, the route handling information, the open state of each signal machine, and the state of each section, including: Determine the passable turnouts and sections in the station yard according to the opening status of each signal and the status of each section; Based on the topological relationship between each turnout and section in the station yard, an initial section line prediction tree is constructed according to the passable turnouts and sections, the position of the positioning transponder corresponding to the position information, the currently processed routes and the positions of the signals at each section entrance; wherein the root node of the initial section line prediction tree is the positioning transponder, and the leaf nodes of the section line prediction tree are the turnouts and the signals at the section entrance; The route corresponding to at least one path formed by the root node and each leaf node in the initial section route prediction tree is used as at least one candidate topological route corresponding to the target train.
3. The method according to claim 2, characterized in that According to the route handling information and the section locking condition updated in real time, a unique target topology route is determined from the at least one candidate topology route, including: According to the real-time updated route handling information and section locking conditions, determine the paths including hostile routes and / or paths satisfying the section locking conditions in the initial section route prediction tree; Based on the path including the hostile route and / or the path satisfying the section locking condition, the initial section route prediction tree is pruned until there is a unique path in the pruned section route prediction tree, and the route corresponding to the unique path is used as the target topology route.
4. The method according to claim 1, characterized in that: Get the location information of the target train in the train group within the station, including: Responding to a registration request sent by a target train in the group of trains, and establishing a communication connection with the target train based on the registration request; Receive the train position information sent by the target train when it passes over a preset positioning transponder, and use the train position information as the position information of the target train in the station; wherein the train position information is the position information of the preset positioning transponder.
5. The method according to claim 1, characterized in that After determining the in-station line data corresponding to the target train and at least one candidate topological line, the method further includes: Sending each section line data corresponding to the at least one candidate topological line to the target train, so that the target train pre-stores the each section line data; If the target topology line is determined, canceling the sending of the section line data corresponding to other candidate topology lines other than the target topology line, and determining whether the section line data corresponding to the target topology line has been sent; If not, continue to send the section line data corresponding to the target topology line until the section line data is sent completely.
6. The method according to any one of claims 1 to 5, characterized in that: The section line data is sent to the target train, including: The section line data is sent to the target train in the form of a transponder group message, so that the target train enables the corresponding section line data after crossing the physical transponder on the section line corresponding to the target topology line; wherein each group of transponder group messages corresponds to a group of ground physical transponders.
7. The method according to any one of claims 1 to 5, characterized in that: There is an overlapping part between the in-station line data corresponding to the station yard and the section line data, and the in-station line data corresponding to the overlapping part passes through the starting point of the section line corresponding to the section line data.
8. A group train line data sending device, characterized in that: include: The position and route information acquisition module is used to obtain the position information of the target train in the group train in the station and the real-time updated route handling information; wherein the route handling information includes the currently handled route; A candidate topology line determination module is used to determine the station line data corresponding to the target train and at least one candidate topology line according to the location information, the route handling information, the open state of each signal machine and the state of each section, wherein different candidate topology lines correspond to the same currently handled route and different section lines; A target topology line determination module is used to send the in-station line data to the target train, and determine a unique target topology line from the at least one candidate topology line according to the real-time updated route handling information and section locking conditions; The line data sending module is used to send the current in-station line data and the section line data corresponding to the target topology line to the target train.
9. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the group train line data sending method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the group train line data sending method according to any one of claims 1 to 7 when executed.
Citation Information
Patent Citations
Train operation control system data modeling method based on access
CN107933620A
Weighting and identifying method for train track in turnout area based on satellite positioning
CN109085631A
Method and device for automatically generating station yard graph and computer readable medium
CN110516354A
Railway junction station train operation route selection method
CN111098897A
Cooperative control method, device and system
CN111391897A
Cited By
Simulation control method, device and equipment for vehicle operation and storage medium
CN119911310A