Automatic loading arm device for automobile tank car

By adopting a two-stage rotation method and a servo motor drive design in the loading of crane pipes of the car tank truck, the problems of complex structure and unstable operation in the existing technology are solved, and a compact, high stability and precise alignment of the loading is achieved. The device improves loading efficiency and safety.

CN118978121APending Publication Date: 2024-11-19SHANGHAI RUICHEN ELECTROMECHANICAL EQUIP CO LTD

Patent Information

Application Number
CN202411297839.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The existing automobile tank trucks have complex structures, low running stability, and accurate alignment, which increases labor costs and safety hazards.

Method used

A compact automatic car tanker installation crane pipe device is designed, using the first rotary arm mechanism, the second rotary arm mechanism, the vertical displacement adjustment mechanism and the positioning mechanism to achieve accurate alignment of the docking vertical pipe through two-stage rotation method. , ensure that the butt vertical pipe is always in a vertical state, and use servo motor drive to improve operating accuracy and stability.

Benefits of technology

It achieves the effects of compact structure, high operating stability and accurate alignment, reduces the structure volume and maintenance costs of the crane pipe, and improves the loading efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118978121A_ABST
    Figure CN118978121A_ABST
Patent Text Reader

Abstract

The invention discloses an automatic loading arm device for an automobile tank truck, which belongs to the technical field of loading and mainly comprises a first rotating arm mechanism, a second rotating arm mechanism, a vertical displacement adjusting mechanism, a positioning mechanism and a controller. The positioning mechanism is used for detecting position information of a filling opening and transmitting the position information to the controller, the first rotating arm mechanism is fixedly arranged on the stand column, the second rotating arm mechanism is connected with the first rotating arm mechanism, the first rotating arm mechanism drives the second rotating arm mechanism to swing relative to the stand column, and the second rotating arm mechanism swings relative to the first rotating arm mechanism; the butt-joint vertical pipe can be moved to a designated position through two-stage adjustment, then the displacement of the vertical pipe in the Z-axis direction is adjusted through the vertical displacement adjusting mechanism, it is ensured that the butt-joint vertical pipe is always in a vertical state, and finally the butt-joint vertical pipe accurately stretches into a filling opening. Therefore, the device is compact in structure, high in operation stability and accurate in alignment, meets the requirements of loading of existing automobile tank cars, and has certain market value and economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tank truck unloading, and in particular relates to an automatic loading crane device for a tank truck. Background Art

[0002] A tank truck is a transport vehicle with a tank-shaped body, used to transport various liquids, gases, powdered goods, etc. It is generally divided into railway tank trucks and road tank trucks.

[0003] At present, for the loading operation of road transport tank trucks, it is usually necessary to manually pull the crane pipe for alignment, which means that professional personnel are required to operate, which increases labor costs and training costs. In addition, if the operator operates improperly or negligently, it may cause safety accidents. In order to solve the above problems, the invention patent with the authorization announcement number CN108946646B discloses a fully automatic automobile loading crane pipe, including a material joint, a first horizontal material pipe, a second horizontal material pipe, a vertical material pipe, a first lifting material pipe, a second lifting material pipe, a vertical pipe, a quick joint, a horizontal rotation mechanism, a rotating shaft, a slewing bearing, a transmission shaft, a horizontal telescopic mechanism, a support rod, a lifting mechanism, a vertical guide mechanism, a support column, a control box, a transverse bracket, an electric slide and a laser radar sensor; the crane pipe collects the center position of the tank mouth through the laser radar sensor, and then adjusts the horizontal rotation mechanism, the horizontal telescopic mechanism, and the lifting mechanism through the control box to complete the precise alignment of the crane pipe and the tank mouth of the tank truck; it can be seen that although the fully automatic automobile loading crane pipe solves the problem of the traditional crane pipe being highly dependent on manual alignment, its overall structure is complex, resulting in high actual use and maintenance costs. At the same time, the crane pipe of this structure relies on the horizontal telescopic mechanism and the lifting mechanism in alignment, and the telescopic mechanism and the lifting mechanism not only increase the volume of the crane pipe structure, but also have low operating accuracy, which results in poor operation stability and alignment accuracy of the crane pipe.

[0004] Therefore, designing a compact and precisely aligned automatic loading crane device for tank trucks is a technical problem to be solved urgently in this application. Summary of the invention

[0005] The purpose of the present invention is to provide an automatic loading crane device for a tank truck, which has a compact structure, high operating stability and precise positioning, and solves the shortcomings of existing loading cranes, such as complex structure, low operating stability and poor positioning accuracy.

[0006] The present application provides a tank truck automatic loading crane device, which at least comprises:

[0007] A column, a material interface pipe, a first swing arm mechanism, a second swing arm mechanism with a docking vertical pipe at the far end, a vertical displacement adjustment mechanism, a positioning mechanism and a controller, wherein the material interface pipe is vertically arranged and fixed to the column through a support; the first swing arm mechanism is connected to the material interface pipe, and the first swing arm mechanism and the second swing arm mechanism are connected in the horizontal direction to form a material passage; the first swing arm mechanism is fixed on the column, and the first swing arm mechanism can drive the second swing arm mechanism to swing synchronously in the horizontal direction relative to the column, and at the same time, the second swing arm mechanism can swing in the horizontal direction relative to the first swing arm mechanism The second swing arm mechanism can swing in the vertical direction to achieve multi-stage adjustment of the displacement of the docking vertical pipe connected thereto in the X-axis and Y-axis directions; the vertical displacement mechanism is arranged on the second swing arm mechanism, and the vertical displacement adjustment mechanism can drive the far end of the second swing arm mechanism to swing in the vertical direction to adjust the displacement of the docking vertical pipe in the Z-axis direction, and can fine-tune the docking vertical pipe to keep it in a vertical state; the positioning mechanism is located above the second swing arm mechanism, and is used to obtain the position information of the filling port of the tank truck; the controller controls the actions of the first swing arm mechanism, the second swing arm mechanism and the vertical displacement adjustment mechanism according to the position information obtained by the positioning mechanism.

[0008] As the preferred solution of this application:

[0009] The first swing arm mechanism is located on one side of the column, and comprises a first rotary drive mechanism and a rotating outer arm tube. The first rotary drive mechanism is fixed on the column and located above the material interface tube. The first rotary drive mechanism comprises a first rotary bearing and a first servo motor. The rotating outer arm tube is horizontally arranged, and its proximal end is connected to the material interface tube through a first rotary joint. At the same time, its proximal end is also connected to the first rotary drive mechanism. The first rotary drive mechanism can drive the rotating outer arm tube to swing in the horizontal direction and then drive the second swing arm mechanism to perform a first-level swing.

[0010] As the preferred solution of this application:

[0011] The rotating outer arm pipe is composed of a main pipe and a branch pipe, the main pipe is arranged horizontally, and the branch pipe is arranged vertically and connected with one end of the main pipe close to the column. The branch pipe serves as the proximal end of the rotating outer arm pipe, and its lower end is connected to the top end of the material interface pipe through a first rotating joint to form a flow channel with the main pipe, and the upper end is connected to the first rotary drive mechanism.

[0012] As the preferred solution of this application:

[0013] The rotating outer arm tube is provided with a pipeline purge interface, which is connected to a positive pressure system to input positive pressure into the pipeline to achieve purging of residual liquid in the pipeline.

[0014] As the preferred solution of this application:

[0015] The second swing arm mechanism is located at the distal end of the rotating outer arm tube, and includes a rotating inner arm tube and a second rotary drive mechanism. The rotating inner arm tube includes a first inner arm tube and a second inner arm tube. The first inner arm tube is arranged horizontally, and the docking vertical tube is connected to the distal end of the first inner arm tube through a third rotary joint. The second inner arm tube is located between the main tube and the first inner arm tube, and its two ends are respectively connected to the main tube and the first inner arm tube through a second rotary joint and cause the axes of the main tube and the first inner arm tube to have an offset in the horizontal and vertical directions; the second rotary drive mechanism includes a second rotary bearing and a second servo motor, and its transmission end is connected to the second inner arm tube, which can drive the rotating inner arm tube and the docking vertical tube to swing in the horizontal direction for two times.

[0016] As the preferred solution of this application:

[0017] The vertical displacement adjustment mechanism is fixed on the rotating inner arm tube and can move synchronously with the rotating inner arm tube, and comprises a third rotary drive mechanism and a pitch push-pull assembly. The third rotary drive mechanism is arranged on the side of the rotating inner arm tube close to the main tube, and the third rotary drive mechanism comprises a third rotary bearing and a third servo motor. The pitch push-pull assembly can drive the first inner arm tube to swing in the vertical direction and ensure that the docking vertical tube is always in a vertical state under the drive of the third rotary drive mechanism.

[0018] As the preferred solution of this application:

[0019] The pitch push-pull assembly includes a pulling rod and a correcting rod, the pulling rod includes two connecting rods connected by a hinge shaft, wherein one connecting rod is connected to the third rotary drive mechanism, and the other connecting rod is connected to the first inner arm tube, the correcting rod includes a linkage rod and a push rod hinged end to end, the free end of the linkage rod is hinged to the second inner arm tube, the hinge point is not coaxial with the axis of the third rotary drive mechanism, and the free end of the push rod is fixed on the docking vertical tube; when the third rotary drive mechanism rotates, it can drive the first inner arm tube to make a pitch swing in the vertical direction through the pulling rod, thereby driving the docking vertical tube to produce displacement in the vertical direction, and at the same time, when the linkage rod swings synchronously with the first inner arm tube, it will transmit a reverse push-pull force to the push rod to achieve fine adjustment of the vertical tube posture.

[0020] As the preferred solution of this application:

[0021] The third rotary drive mechanism is fixed by a first support plate arranged on the second inner arm tube, and the free end of the linkage rod is hinged on the first support plate and arranged parallel to the second arm tube. At the same time, the length of the linkage rod is slightly smaller than the length of the first inner arm tube.

[0022] As the preferred solution of this application:

[0023] An extension frame extending in the direction of the rotary arm is arranged above the column, and the positioning mechanism is arranged above the vertical tube through the extension frame.

[0024] As the preferred solution of this application:

[0025] A material level sensor is provided on the butt-jointed vertical pipe, and the material level sensor communicates with the controller. The material level sensor can be used to monitor the amount of material in the tank truck to avoid overflow.

[0026] Compared with the prior art, the present invention has significant advantages:

[0027] The device mainly comprises a first swing arm mechanism, a second swing arm mechanism, a vertical displacement adjustment mechanism and a positioning mechanism, wherein a docking vertical pipe docking with the filling port is provided at the far end of the second swing arm mechanism, the positioning mechanism is used to detect the position information of the filling port, the first swing arm mechanism is fixed on the column, the second swing arm mechanism is connected to the first swing arm mechanism, the first swing arm mechanism can drive the second swing arm mechanism to swing in the horizontal direction relative to the column to realize the primary adjustment of the docking vertical pipe in the X-axis and Y-axis directions, and the second swing arm mechanism can swing relative to the first swing arm mechanism to realize the secondary adjustment of the docking vertical pipe in the X-axis and Y-axis directions. The docking vertical pipe can be moved to a specified position through two-stage adjustment, and then the displacement of the vertical pipe in the Z-axis direction is adjusted by the vertical displacement adjustment mechanism to ensure that the docking vertical pipe is always in a vertical state. , this can ensure that the docking vertical pipe is accurately extended into the filling port; it can be seen that the present application adopts a two-stage rotation method to adjust the displacement of the docking vertical pipe in the X-axis and Y-axis directions. Compared with the existing traditional linear telescopic movement method, on the one hand, it reduces the volume of the crane pipe structure, making the overall structure of the crane pipe more compact, and on the other hand, simplifies the crane pipe alignment procedure. There is no need to adjust the X-axis displacement and the Y-axis displacement separately, and it can be achieved with one swing; in addition, the rotation method usually uses a motor as a driving part. Compared with the existing telescopic or lifting mechanism, the motor has more reliable operating accuracy and higher operating stability, which reduces the interference of inertia on the alignment operation. Therefore, the device of the present application has a compact structure, high operating stability, and precise alignment, which meets the needs of existing tank truck loading and has certain market value and economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 A schematic diagram of the overall structure of an automatic loading crane device for a tank truck provided in an embodiment of the present invention.

[0029] Figure 2 A schematic diagram of the top structure of the automatic loading crane device for a tank truck provided in an embodiment of the present invention.

[0030] Figure 3 A schematic diagram of the structure of the location of the filling area provided in an embodiment of the present invention.

[0031] Reference numerals

[0032] 1 is a column; 2-1 is the first slewing bearing; 2-2 is the first planetary reducer; 2-3 is the first servo motor; 3 is a fixed seat; 4-1 is the main pipe, 4-2 is the branch pipe; 5 is the pipeline purge interface; 6-1 is the second slewing bearing; 6-2 is the second planetary reducer; 6-3 is the second servo motor; 7 is a pulling rod; 8 is a hinge shaft; 9 is a linkage rod; 10 is a push rod; 11 is the first inner arm pipe; 12 is the third rotary joint; 13 is a docking vertical pipe; 14 is a material level sensor; 15 is the first support plate; 16-1 is the third slewing bearing; 16-2 is the third planetary reducer; 16-3 is the third servo motor; 17 is the second support plate; 18: support plate fixing member; 19 is the material interface pipe; 20 is an extension frame; 21 is a positioning mechanism; 22 is the first rotary joint; 23 is the second rotary joint; 24 is the second inner arm pipe; 25 is a support member; 26 is the filling area. DETAILED DESCRIPTION

[0033] The present invention will be further described in detail below in conjunction with specific implementations and with reference to the accompanying drawings. It should be emphasized that the following description is merely exemplary and is not intended to limit the scope of the present invention and its application.

[0034] like Figure 1-2As shown, an automatic loading crane device for a tank truck provided in this embodiment at least comprises a column 1, a material interface pipe 19, a first swing arm mechanism, a second swing arm mechanism with a docking vertical pipe 13 at the far end, a vertical displacement adjustment mechanism, a positioning mechanism 21 and a controller; the material interface pipe 19 is an inlet pipe for connecting with a material system, the material interface pipe 19 is vertically arranged and fixed on the column 1 through a support 25; the first swing arm mechanism is connected to the material interface pipe 19, and the first swing arm mechanism and the second swing arm mechanism are connected in the horizontal direction to form a material passage, that is, the material can enter the tank truck through the material passage formed by the material interface pipe 19, the first swing arm mechanism and the second swing arm mechanism to realize the loading operation; the first swing arm mechanism is fixed on the column 1 through a fixing seat 3, and the first swing arm mechanism can drive the second swing arm mechanism to move horizontally relative to the column 1 The second arm mechanism is hinged to the second arm mechanism and can swing in the horizontal direction relative to the first arm mechanism to achieve multi-stage adjustment of the displacement of the docking vertical pipe 13 connected thereto in the X-axis and Y-axis directions; the vertical displacement mechanism is arranged on the second arm mechanism, and the vertical displacement adjustment mechanism can drive the far end of the second arm mechanism to swing in the vertical direction, that is, to make a pitching motion to adjust the displacement of the docking vertical pipe 13 in the Z-axis direction, and can fine-tune the docking vertical pipe 13 so that it is always in a vertical state; the positioning mechanism 21 is located above the second arm mechanism, and the positioning mechanism 21 is a laser ranging system or an optical positioning system or a combination of a laser ranging system and an optical positioning system, which is used to obtain the position information of the filling port of the tank truck; the controller controls the actions of the first arm mechanism, the second arm mechanism and the vertical displacement adjustment mechanism according to the position information obtained by the positioning mechanism.

[0035] Before use, the device is in an initial state. After the tank truck stops in place, the device is started. The positioning mechanism 21 is first used to detect the position information of the filling port and transmit it to the controller. Then the controller formulates action instructions for the first swing arm mechanism, the second swing arm mechanism and the vertical displacement adjustment mechanism according to the position information. The action instruction can be understood as the displacement information of the movement of each mechanism. Finally, the first swing arm mechanism, the second swing arm mechanism and the vertical displacement adjustment mechanism are driven to act according to the action instruction; specifically, it includes: first driving the first swing arm mechanism through the action instruction to drive the second swing arm mechanism to rotate relative to the column 1 by a specified angle to realize the first-level adjustment of the docking vertical pipe 13. It can be understood that the first-level adjustment is to rotate around the hinge point between the first swing arm mechanism and the column 1. , so the radius of the running trajectory is larger, and a larger adjustment of the displacement of the docking vertical pipe 13 in the X-axis and Y-axis directions is achieved. After completing the first-level adjustment, the second swing arm mechanism is driven to perform a second-level rotation through an action instruction. The second-level rotation rotates around the hinge point between the first swing arm mechanism and the second swing arm mechanism. It can be understood that the running radius of the second-level rotation is smaller, and it is used to achieve fine adjustment of the docking vertical pipe 13 in the X-axis and Y-axis directions; it can be understood that after the tank truck is parked in place, the filling port should be located at the intersection of two concentric arcs formed by the horizontal rotation of the distal end of the first swing arm mechanism and the distal end of the second swing arm mechanism relative to the column 1 and the arc trajectory formed by the horizontal rotation of the second swing arm mechanism relative to the first swing arm mechanism, such as Figure 3 As shown, the marked area in the figure is the intersection area, also known as the filling port area 26; in this embodiment, after completing the first and second level adjustments, the docking vertical pipe 13 is not located at the upper end of the filling port, but is located at a certain position above the filling port. At this time, the vertical displacement adjustment mechanism is driven by the action instruction to drive the distal end of the second swing arm mechanism to move downward. Since the downward movement also moves in an arc trajectory, the distal end of the second vertical pipe will shrink and retreat, which just makes up for the displacement difference of the docking vertical pipe 13 located above the filling port. After a certain downward displacement, the docking vertical pipe 13 can be extended into the designated position in the filling port. In this embodiment, the distance that the docking vertical pipe 13 extends into the filling port is preferably about 20-30cm below the plane of the tank mouth; in this implementation, the docking vertical pipe 13 is preferably located at a horizontal distance of 5 from the filling port. -10cm above the filling port, and the specific distance can be determined according to the vertical spacing between the docking drop tube 13 and the filling port, so that when the docking drop tube 13 is extended into the filling port, the contraction and retreat displacement just compensates for the displacement difference of the docking drop tube 13 located above the filling port, thereby ensuring that the docking drop tube 13 is accurately extended into the filling port. Since the size of the filling port is usually between 10-25cm, that is, the size is relatively large, there will be no phenomenon that the docking drop tube 13 retreats and shrinks until the docking drop tube 13 contacts the filling port arm but still fails to reach the required designated position; the above is a preferred alignment method of this embodiment. In other embodiments of the present application, during the process of the docking drop tube 13 extending into the filling port, the first swing arm mechanism or the second swing arm mechanism structure can be started again to fine-tune the position of the docking drop tube 13 relative to the filling port.

[0036] It can be understood that the controller of the present embodiment can be a field controller or a remote controller, which can be selected according to actual needs; the controller can preferably be an existing PLC controller, and the corresponding control program and control instructions should be preset in the controller. In the present embodiment, the PLC controller can generate an action instruction for completing the alignment at one time according to the position information collected by the positioning mechanism 21, and the action instruction can be used to control the actions of the first swing arm mechanism, the second swing arm mechanism and the vertical displacement adjustment mechanism in sequence to achieve precise alignment, or the PLC controller generates a dynamically changing action instruction according to the multiple position information collected by the positioning mechanism 21, and uses the dynamically changing action instruction to dynamically adjust the required mechanism to operate until the alignment is completed; in the present embodiment, after the loading is completed, the vertical displacement adjustment mechanism adopts the opposite operation steps of the alignment operation to remove the docking vertical pipe 13 from the filling port, and controls the first swing arm mechanism and the second swing arm mechanism to move until they are reset to the initial state, and the cycle is repeated in sequence.

[0037] It can be seen that the present embodiment adopts a two-stage rotation method to adjust the displacement of the docking vertical pipe 13 in the X-axis and Y-axis directions. Compared with the existing traditional linear telescopic movement method, on the one hand, it reduces the volume of the crane pipe structure, making the overall structure of the crane pipe more compact, and on the other hand, simplifies the crane pipe alignment procedure. There is no need to adjust the X-axis displacement and the Y-axis displacement separately, and it can be achieved with one swing; in addition, the rotation method usually uses a motor as a driving part. Compared with the existing telescopic or lifting mechanism, the motor has more reliable operating accuracy and higher operating stability, which reduces the interference of inertia on the alignment operation. Therefore, the device of the present application has a compact structure, high operating stability, and precise alignment, which meets the needs of existing tank truck loading and has certain market value and economic benefits.

[0038] Furthermore, in this embodiment, the first swing arm mechanism is located on one side of the column 1, such as Figure 1As shown, it includes a first rotary drive mechanism and a rotary outer arm tube. The first rotary drive mechanism is fixed on the column 1 through a fixed seat 3 and is located above the material interface tube 19. The first rotary drive mechanism includes a first rotary bearing 2-1 and a first servo motor 2-3. The power output shaft end of the servo motor is connected to a first planetary reducer 2-2. The first rotary bearing 2-1 is arranged horizontally; the rotary outer arm tube is arranged horizontally, and its proximal end is connected to the material interface tube 19 through a first rotary joint 22. At the same time, its proximal end is also connected to the first rotary drive mechanism. The first rotary drive mechanism can drive the rotary outer arm tube to swing in the horizontal direction and then drive the second The swing arm mechanism performs a first-stage swing; it can be understood that since the rotating outer arm tube is connected to the material interface tube 19 through the first rotating joint 22, the first swing arm mechanism is not disturbed by the material interface tube 19 during its rotation. In addition, the support 25 and the fixed seat 3 are used to support and fix the first swing arm mechanism and the second swing arm mechanism, thereby improving the stability of operation; this embodiment adopts the first servo motor 2-3 as the power mechanism, which can improve the operation accuracy on the one hand and facilitate precise positioning, and can further enhance the operation stability on the other hand, thereby avoiding the problem of unstable operation and inertial interference of traditional telescopic or lifting mechanisms.

[0039] In this embodiment, the rotating outer arm pipe is composed of a main pipe 4-1 and a branch pipe 4-2. The main pipe 4-1 is arranged horizontally, and the branch pipe 4-2 is arranged vertically and connected with one end of the main pipe 4-1 close to the column 1 to form a "T"-shaped pipe. The branch pipe 4-2 serves as the proximal end of the rotating outer arm pipe, and its lower end is connected to the top end of the material interface pipe 19 through the first rotating joint 22 to form a flow channel with the main pipe 4-1, and the upper end is connected to the power output end of the first slewing bearing 2-1. It can be understood that the end of the branch pipe 4-2 connected to the first slewing bearing 2-1 should be a blind pipe.

[0040] Further, in this embodiment, the second rotary arm mechanism is located at the distal end of the rotating outer arm tube, which includes a rotating inner arm tube and a second rotary drive mechanism, such as Figure 2As shown, the rotating inner arm tube includes a first inner arm tube 11 and a second inner arm tube 24. The first inner arm tube 11 is arranged horizontally, and the docking vertical tube 13 is connected to the distal end of the first inner arm tube 11 through a third rotating joint 12 to realize the rotation of the docking vertical tube 13 relative to the first inner arm tube 11. The second inner arm tube 24 is an L-shaped elbow, which is located between the main tube 4-1 and the first inner arm tube 11. Its two ends are respectively connected to the main tube 4-1 and the first inner arm tube 11 through the second rotating joint 23, so that the axes of the main tube 4-1 and the first inner arm tube 11 are offset in the horizontal and vertical directions. It can be understood that the existence of the offset provides conditions for the vertical displacement adjustment mechanism to drive the first inner arm tube 11 to perform pitching operation in the vertical direction. In addition, through the setting of the second rotating joint 23, conditions can be provided for the rotating inner arm tube to perform secondary rotation; the second rotary drive mechanism includes It includes a second slewing bearing 6-1 and a second servo motor 6-3, the power output end of the second servo motor 6-3 is connected to the second planetary reducer 6-2, and the transmission end of the second slewing bearing 6-1 is connected to the second inner arm tube 24, which can drive the entire rotating inner arm tube and the docking vertical tube 13 to swing in the horizontal direction for two stages; in this embodiment, the second slewing drive mechanism is preferably supported by a second support plate 17, and the second support plate 17 is fixed to the column 1 by a support plate fixing member 18, so as to further reinforce and support the second swing arm mechanism and improve the stability of the swing arm operation. At the same time, in this embodiment, the second servo motor 6-3 is used as the power mechanism, which can improve the operation accuracy on the one hand and facilitate precise positioning, and can further enhance the operation stability on the other hand, avoiding the problem of unstable operation and inertial interference of traditional telescopic or lifting mechanisms.

[0041] Furthermore, in this embodiment, the vertical displacement adjustment mechanism is fixed on the rotating inner arm tube and can move synchronously with the rotating inner arm tube, which includes a third rotary drive mechanism and a pitch push-pull assembly. The third rotary drive mechanism is arranged on the side of the rotating inner arm tube close to the main pipe 4-1 through the first support plate 15. In this embodiment, the first support plate 15 is preferably fixed on the second inner arm tube 24 to support the third rotary drive mechanism. The third rotary drive mechanism includes a third rotary bearing 16-1 and a third servo motor 16-3. The power output end of the third servo motor 16-3 is connected to a third star reducer 16-2. , the third slewing bearing 16-1 is arranged vertically; the pitch push-pull assembly can drive the first inner arm tube 11 to swing in the vertical direction and ensure that the docking vertical tube 13 is always in a vertical state under the drive of the third slewing drive mechanism. It can be seen from the above analysis that the first inner arm tube 11 and the second inner arm tube 24 are connected by the second swivel joint 23, and under the action of the second inner arm tube 24, the first inner arm tube 11 and the main tube 4-1 have an offset (or spacing) in the horizontal and vertical directions. Therefore, the first inner arm tube 11 swings alone in the vertical direction without being interfered by the second inner arm tube 24 and the main tube 4-1.

[0042] In this embodiment, the pitch push-pull assembly includes a pulling rod 7 and a correcting rod. The pulling rod 7 includes two connecting rods connected by a hinge shaft 8, wherein one connecting rod is connected to the power output end of the third slewing bearing 16-1, and the other connecting rod is connected to the first inner arm tube 11 near the middle or distal end; the correcting rod includes a linkage rod 9 and a push rod 10 hinged at the head and tail. Preferably, the length of the linkage rod 9 is less than or equal to the length of the first inner arm tube 11, and the free end of the linkage rod 9 is hinged to the second inner arm tube 24, and the hinge point is not on the same straight line as the axis of the third slewing drive mechanism, that is, the first inner arm tube 11 is not concentric with the linkage rod 9 during swinging rotation. For details, see Figure 2 The free end of the push rod 10 is fixed on the docking vertical tube 13. Preferably, in the initial state, the angle between the linkage rod 9 and the push rod 10 is a right angle; when the third rotary drive mechanism rotates, it can drive the first inner arm tube 11 to make a pitch swing in the vertical direction through the pulling rod 7, thereby driving the docking vertical tube 13 to produce displacement in the vertical direction. At the same time, when the linkage rod 9 swings synchronously with the first inner arm tube 11, it will transmit a reverse push-pull force to the push rod 10 to achieve fine adjustment of the vertical tube posture.

[0043] Specifically, when the third rotary drive mechanism drives the first inner arm tube 11 to swing in the vertical direction through the pulling rod 7, the distal end of the first inner arm tube 11 and the distal end of the linkage rod 9 will make a circular motion in the vertical direction with the corresponding length of the first inner arm tube 11 and the length of the linkage rod 9 as the radius. When the first inner arm tube 11 is driven to swing downward, the linkage rod 9 will also swing downward synchronously. Since the distal end of the linkage rod 9 is connected to the push rod 10 through the hinge shaft 8, and the push rod 10 is fixedly connected to the docking vertical tube 13, when the linkage rod 9 swings downward, a pulling force will be provided to the push rod 10, and the push rod 10 drives the docking vertical tube 13 to swing in the opposite direction under the action of the pulling force to achieve the correction function. It can be understood that when the first inner arm tube 11 is driven to swing upward, the linkage rod 9 will provide a thrust to the push rod 10 when it swings upward, and the push rod 10 drives the docking vertical tube 13 to swing in the opposite direction under the action of the thrust to achieve the correction function.

[0044] In this embodiment, the third rotary drive mechanism is fixed by a first support plate 15 arranged on the second inner arm tube 24, and the free end of the linkage rod 9 is hinged on the first support plate 15 and arranged parallel to the second arm tube. At the same time, the length of the linkage rod 9 is slightly smaller than the length of the first inner arm tube 11.

[0045] Furthermore, in the present embodiment, an extension frame 20 extending in the direction of the swing arm is provided above the column 1, and the positioning mechanism 21 is arranged above the vertical tube through the extension frame 20. In the present embodiment, the positioning mechanism 21 only collects the position information once during specific use. Of course, in other embodiments of the present application, the positioning mechanism 21 may also periodically collect the position information multiple times to calibrate the positioning accuracy, which is selected according to actual needs.

[0046] Furthermore, in this embodiment, a material level sensor 14 is provided on the docking vertical pipe 13, through which the material amount in the tank truck can be monitored to avoid overflow. The probe of the material level sensor 14 is located about 20 cm below the plane of the tank mouth, which effectively prevents overflow.

[0047] In this embodiment, the first rotary drive mechanism, the second rotary drive mechanism and the third rotary drive mechanism all include a rotary support and a servo motor. The servo motor is indirectly connected to the rotary support through a planetary reducer. Specifically, the servo motor drives the rotary support to rotate by driving the gear set. In this way, low-speed and stable operation of each mechanism can be achieved, and the positioning accuracy and operation stability can be improved. It can be understood that the specific model of the servo motor is selected based on actual tests, and this embodiment does not make any specific limitations here.

[0048] Furthermore, in this embodiment, a pipeline purge interface 5 is provided on the rotating outer arm pipe, and the pipeline purge interface 5 is connected to a positive pressure system for inputting positive pressure into the pipeline to achieve purging of residual liquid in the pipeline.

[0049] The above is only an embodiment of the present invention, and the common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several improvements can be made without departing from the present invention, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of the claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. A tank truck automatic loading crane device, characterized in that: The invention comprises at least a column, a material interface pipe, a first swing arm mechanism, a second swing arm mechanism with a docking vertical pipe at the far end, a vertical displacement adjustment mechanism, a positioning mechanism and a controller, wherein the material interface pipe is vertically arranged and fixed to the column through a support; the first swing arm mechanism is connected to the material interface pipe, and the first swing arm mechanism and the second swing arm mechanism are connected in the horizontal direction to form a material passage; the first swing arm mechanism is fixed on the column, the first swing arm mechanism can drive the second swing arm mechanism to swing synchronously in the horizontal direction relative to the column, and at the same time, the second swing arm mechanism can swing horizontally relative to the first swing arm mechanism The second swing arm mechanism can swing in the horizontal direction to realize multi-level adjustment of the displacement of the docking vertical pipe connected thereto in the X-axis and Y-axis directions; the vertical displacement mechanism is arranged on the second swing arm mechanism, and the vertical displacement adjustment mechanism can drive the far end of the second swing arm mechanism to swing in the vertical direction to adjust the displacement of the docking vertical pipe in the Z-axis direction, and can fine-tune the docking vertical pipe to keep it in a vertical state at all times; the positioning mechanism is located above the second swing arm mechanism, and is used to obtain the position information of the filling port of the tank truck; the controller controls the actions of the first swing arm mechanism, the second swing arm mechanism and the vertical displacement adjustment mechanism according to the position information obtained by the positioning mechanism.

2. The automatic loading crane device for tank trucks according to claim 1 is characterized in that: The first swing arm mechanism is located on one side of the column, and comprises a first rotary drive mechanism and a rotating outer arm tube. The first rotary drive mechanism is fixed on the column and located above the material interface tube. The first rotary drive mechanism comprises a first rotary bearing and a first servo motor. The rotating outer arm tube is horizontally arranged, and its proximal end is connected to the material interface tube through a first rotary joint. At the same time, its proximal end is also connected to the first rotary drive mechanism. The first rotary drive mechanism can drive the rotating outer arm tube to swing in the horizontal direction and then drive the second swing arm mechanism to perform a first-level swing.

3. The automatic loading crane device for tank trucks according to claim 2 is characterized in that: The rotating outer arm pipe is composed of a main pipe and a branch pipe, the main pipe is arranged horizontally, and the branch pipe is arranged vertically and connected with one end of the main pipe close to the column. The branch pipe serves as the proximal end of the rotating outer arm pipe, and its lower end is connected to the top end of the material interface pipe through a first rotating joint to form a flow channel with the main pipe, and the upper end is connected to the first rotary drive mechanism.

4. The automatic loading crane device for tank trucks according to claim 2 is characterized in that: The rotating outer arm tube is provided with a pipeline purge interface, which is connected to a positive pressure system to input positive pressure into the pipeline to achieve purging of residual liquid in the pipeline.

5. The automatic loading crane device for tank trucks according to claim 2 is characterized in that: The second rotary arm mechanism is located at the distal end of the rotating outer arm tube, and comprises a rotating inner arm tube and a second rotary drive mechanism. The rotating inner arm tube comprises a first inner arm tube and a second inner arm tube. The first inner arm tube is arranged horizontally, and the docking vertical tube is connected to the distal end of the first inner arm tube through a third rotary joint. The second inner arm tube is located between the main tube and the first inner arm tube, and its two ends are respectively connected to the main tube and the first inner arm tube through a second rotary joint, so that the axes of the main tube and the first inner arm tube are offset in the horizontal direction and the vertical direction. The second rotary drive mechanism includes a second rotary bearing and a second servo motor, a transmission end of which is connected to the second inner arm tube and can drive the rotating inner arm tube and the docking vertical tube to swing in the horizontal direction.

6. The automatic loading crane device for tank trucks according to claim 5 is characterized in that: The vertical displacement adjustment mechanism is fixed on the rotating inner arm tube and can move synchronously with the rotating inner arm tube, and comprises a third rotary drive mechanism and a pitch push-pull assembly. The third rotary drive mechanism is arranged on the side of the rotating inner arm tube close to the main tube, and the third rotary drive mechanism comprises a third rotary bearing and a third servo motor. The pitch push-pull assembly can drive the first inner arm tube to swing in the vertical direction and ensure that the docking vertical tube is always in a vertical state under the drive of the third rotary drive mechanism.

7. The automatic loading crane device for tank trucks according to claim 6 is characterized in that: The pitch push-pull assembly includes a pulling rod and a correcting rod, the pulling rod includes two connecting rods connected by a hinge shaft, wherein one connecting rod is connected to the third rotary drive mechanism, and the other connecting rod is connected to the first inner arm tube, the correcting rod includes a linkage rod and a push rod hinged end to end, the free end of the linkage rod is hinged to the second inner arm tube, the hinge point is not coaxial with the axis of the third rotary drive mechanism, and the free end of the push rod is fixed on the docking vertical tube; when the third rotary drive mechanism rotates, it can drive the first inner arm tube to make a pitch swing in the vertical direction through the pulling rod, thereby driving the docking vertical tube to produce displacement in the vertical direction, and at the same time, when the linkage rod swings synchronously with the first inner arm tube, it will transmit a reverse push-pull force to the push rod to achieve fine adjustment of the vertical tube posture.

8. The automatic loading crane device for tank trucks according to claim 6 is characterized in that: The third rotary drive mechanism is fixed by a first support plate arranged on the second inner arm tube, and the free end of the linkage rod is hinged on the first support plate and arranged parallel to the second arm tube. At the same time, the length of the linkage rod is slightly smaller than the length of the first inner arm tube.

9. The automatic loading crane device for tank trucks according to claim 1 is characterized in that: An extension frame extending in the direction of the rotary arm is arranged above the column, and the positioning mechanism is arranged above the vertical tube through the extension frame.

10. The automatic loading crane device for tank trucks according to claim 1 is characterized in that: A material level sensor is provided on the butt-jointed vertical pipe, and the material level sensor communicates with the controller. The material amount in the tank truck can be monitored through the material level sensor.

Citation Information

Patent Citations

  • Stacking type fluid medium loading-unloading device

    CN110116981A

  • Automatic cantilever type closed loading crane pipe and control method thereof

    CN112919398A

  • Full-automatic alignment crane pipe for tank car

    CN115818553A

  • Multifunctional automatic oil product loading arm and loading system

    CN116946961A

  • One-button type full-automatic intelligent loading arm and control system thereof

    CN117023500A

Cited By

  • Tandem-driven automatic fluid loading and unloading arm and using method

    CN119660661A

  • Automatic loading arm device for caustic soda liquid

    CN223496194U