ISCC-based collaborative allocation system for hydrogen production by electrolysis of water
Through the coordinated allocation of photothermal, gas and waste heat power supply modules of the ISCC system, the problem of coordinated allocation of power system and water electrolysis hydrogen production is solved, the optimization of power supply and coordinated management of energy are realized, and the demand for electrolyzed hydrogen production is met. .
Patent Information
- Application Number
- CN202410861876.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-11-19
AI Technical Summary
The existing power systems mainly generate electricity from fossil fuels, which cannot meet the demand for large-scale water electrolysis and hydrogen production. How to achieve coordinated allocation of water electrolysis and hydrogen production and power systems is a key issue in realizing large-scale application of hydrogen energy.
The electrolytic water-based hydrogen production collaborative distribution system is adopted, including a photothermal power supply module, a gas power supply module and a waste heat power supply module. Through the monitoring module real-time monitoring and allocation module regulation, the optimization of power supply and coordinated energy allocation are achieved.
Real-time monitoring and regulation of power supply is achieved to meet the power demand for electrolyzed hydrogen production, and through energy storage calculation and regulation methods, coordinated allocation of energy, energy transmission and storage are realized, and power supply and energy use are optimized.
Smart Images

Figure CN118979279A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of hydrogen production by water electrolysis, and in particular to a coordinated deployment system and system for hydrogen production by water electrolysis based on ISCC. Background Art
[0002] With the global climate change and the continuous growth of energy demand, hydrogen energy, as a clean, efficient and renewable energy form, has received more and more attention. At present, the main production methods of hydrogen energy include hydrogen production by fossil fuel reforming, hydrogen production by natural gas steam reforming, hydrogen production by methanol steam reforming, and hydrogen production by water electrolysis. Among them, hydrogen production by water electrolysis is a process of decomposing water into hydrogen and oxygen. It has the advantages of cleanliness, efficiency and renewability, and is one of the important directions for the future development of hydrogen energy.
[0003] However, the process of producing hydrogen by water electrolysis consumes a lot of electricity, and the current power system is mainly based on fossil fuel power generation, which cannot meet the needs of large-scale water electrolysis hydrogen production. Therefore, how to achieve the coordinated deployment of water electrolysis hydrogen production and the power system is one of the key issues in realizing the large-scale application of hydrogen energy. Summary of the invention
[0004] The object of the present invention is to provide a coordinated deployment system and system for producing hydrogen by water electrolysis based on ISCC to solve the technical problems raised in the above background technology.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A coordinated deployment system for producing hydrogen by water electrolysis based on ISCC, comprising:
[0007] An energy supply system and an electric energy allocation system, the energy supply system includes a photothermal power supply module, a gas power supply module, and a waste heat power supply module, and the electric energy allocation system includes a first monitoring module, a second monitoring module, a third monitoring module and an allocation module; the photothermal power supply module and the gas power supply module are used for real-time power supply for hydrogen production by electrolysis of water; the waste heat power supply module is connected to the photothermal power supply module and the gas power supply module through a steam pipeline, and the waste heat power supply module is used to store excess heat of the photothermal power supply module and the gas power supply module; the first monitoring module is electrically connected to the photothermal power supply module, and is used to monitor in real time the first electric energy output value of the photothermal power supply module during operation, and to determine whether the first electric energy output value is lower than a first preset value, if the The first electric energy output value is lower than the first preset value, and the allocation module supplements electricity for real-time water electrolysis and hydrogen production according to the control of the gas power supply module and the waste heat power supply module; the second monitoring module is electrically connected to the gas power supply module, and is used to monitor the second electric energy output value of the gas power supply module in real time when it is running, and control the production capacity of water electrolysis and hydrogen production according to the second electric energy output value; the third monitoring module is electrically connected to the thermal energy storage module, and is used to monitor the third electric energy output value of the thermal energy storage module in real time when it is running; the allocation module is electrically connected to the first monitoring module, the second monitoring module and the third monitoring module, controls the power supply based on the first electric energy output value and the second electric energy output value, and regulates the gas power supply module according to the third electric energy output value.
[0008] Preferably, the allocation module is used to obtain the real-time first electric energy output value sent by the first monitoring module, and determine whether the first electric energy output value is lower than the first preset value. If the first electric energy output value is lower than the first preset value, the first steam value transmitted by the photothermal power supply module to the waste heat power supply module is obtained, and the allocation module is used to control the opening and closing of the gas power supply module. The second monitoring module is used to obtain the second electric energy output value supplied by the gas power supply module in real time to produce hydrogen by electrolysis of water, and the second monitoring module is used to obtain the second steam value transmitted by the gas power supply module to the waste heat power supply module. The waste heat power supply module obtains a third electric energy output value based on the first steam value and the second steam value, and the allocation module allocates the second electric energy output value based on the third electric energy output value.
[0009] Preferably, the solar thermal power supply module is used to obtain the first electric energy output value sent by the second monitoring module, and determine whether the target heliostat area value required for power generation of the solar thermal power supply module reaches a preset heliostat area value; if the target heliostat area value is not reached, obtain an area difference between the target heliostat area value and the preset heliostat area value, and obtain an area value to be supplemented according to the area difference, obtain a heat value to be supplemented of the first steam value to be reached according to the area value to be supplemented, obtain a first adjusted energy value according to the heat value to be supplemented and the area difference, and obtain a second electric energy output value required to be output by the gas power supply module according to the first adjusted energy value.
[0010] Preferably, the second monitoring module is used to obtain the second steam value generated by the gas power supply module, the gas power supply module generates steam and transmits it to the waste heat power supply module through a pipeline, the waste heat power supply module is used to obtain a third electric energy output value based on the total amount of steam of the first steam value and the second steam value, the third electric energy output value is used to represent the electric energy output generated by the first steam value and the second steam value, and the power supply for real-time water electrolysis to produce hydrogen is adjusted according to the third electric energy output value. The excess third electric energy output value is used to represent the electric power excess value of the electric power supply for real-time water electrolysis to produce hydrogen, and the excess second electric energy output value is adjusted to be reduced according to the electric power excess value. The excess third electric energy output value decreases as the second electric energy output value decreases until the electric power excess value decreases and tends to 0, thereby reducing the output of the gas power supply mode.
[0011] Preferably, the waste heat power supply module uses binary nitrate as the heat storage medium, and obtains the total energy storage amount and the volume of the heat storage tank through the waste heat power supply module; the first monitoring module is used to obtain the thermal melting ratio and the working temperature difference of the binary nitrate; and calculates the mass of the heat storage medium according to the preset total energy storage amount, the volume of the heat storage tank, and the thermal melting ratio of the binary nitrate, wherein the calculation formula is:
[0012]
[0013] Where m is the mass of the thermal storage medium, Q y is the preset total energy storage, C p is the thermal melting ratio of binary nitrate, and ΔT is the working temperature difference.
[0014] Preferably, the second monitoring module is used to obtain the second pipeline efficiency at which the amount of steam delivered from the gas power supply module to the waste heat power supply module reaches a second preset amount within the first preset time, and obtain the rated output power and steam turbine unit efficiency of the steam turbine of the gas power supply module according to the first preset time.
[0015] The second monitoring module is used to obtain the heat storage system efficiency of the waste heat power supply module within a first preset time;
[0016] And the second storage energy generated by the waste heat power supply module according to the second steam value within the first preset time is calculated according to the first preset time, the second pipeline efficiency, the rated output power, the efficiency of the steam turbine unit and the efficiency of the heat storage system, wherein the calculation formula is:
[0017]
[0018] Among them, Q s is the second energy storage value, P e is the rated output power, μ t is the efficiency of the steam turbine unit, μ s is the efficiency of the thermal storage system, μp is the second pipeline efficiency, t s The first preset time.
[0019] Preferably, the first monitoring module is used to obtain the target heliostat area value of the solar thermal power supply module to determine the power generation according to the following three conditions:
[0020] The first condition is the output of the solar rated power;
[0021] The second condition is that the waste heat power supply module requirements should be met on a day with sufficient sunlight;
[0022] The second condition is the working state of the gas power supply module;
[0023] The first monitoring module can be used to obtain the optical efficiency of the heliostat field, the efficiency of the steam turbine unit, the efficiency of the absorber and the efficiency of the heat storage system of the solar thermal power supply module, and the heat exchange power required by the waste heat power supply module;
[0024] Wherein, the target heliostat area value model is:
[0025]
[0026] Wherein, f(A1) is the target heliostat area required for solar thermal power generation under rated conditions, f(A3) is the target heliostat area required to meet the requirements of the waste heat power supply module, f(A2) is the target heliostat area required for the gas power supply module to work, t is the heat storage time, P e is the rated output power, DNI1 is the average light intensity value of the rated sunlight, DNI2 is the average light intensity value of the gas power supply module in working state, DNI3 is the average light intensity value that meets the requirements of the waste heat power supply module, η field is the optical efficiency of the heliostat field of the CSP module, η tur is the steam turbine unit efficiency of the CSP module, η rec is the absorber efficiency of the CSP module, η stor is the thermal storage system efficiency of the CSP module, P w The heat exchange power required to power the module with waste heat.
[0027] The present application also provides a coordinated deployment method for producing hydrogen by water electrolysis based on ISCC, comprising: an energy supply system and an electric energy deployment system, wherein the energy supply system comprises a solar thermal power supply module, a gas power supply module, and a waste heat power supply module, and the electric energy deployment system comprises a first monitoring module, a second monitoring module, a third monitoring module, and a deployment module;
[0028] The solar thermal power supply module and the gas power supply module provide electricity for real-time water electrolysis and hydrogen production;
[0029] The waste heat power supply module is connected to the solar thermal power supply module and the gas power supply module through a steam pipeline, and the waste heat power supply module obtains and stores excess heat of the solar thermal power supply module and the gas power supply module;
[0030] The first monitoring module is electrically connected to the photothermal power supply module, and obtains in real time a first electric energy output value when the photothermal power supply module is in operation, and determines whether the first electric energy output value is lower than a first preset value. If the first electric energy output value is lower than the first preset value, and the allocation module controls the gas power supply module and the waste heat power supply module to supplement power for real-time water electrolysis hydrogen production;
[0031] The second monitoring module is electrically connected to the gas power supply module to obtain a second electric energy output value when the gas power supply module is in operation for real-time monitoring, and to control the production capacity of hydrogen produced by electrolysis of water according to the second electric energy output value;
[0032] The third monitoring module is electrically connected to the thermal energy storage module to obtain a third electric energy output value when the thermal energy storage module is in operation in real time;
[0033] The allocation module is electrically connected to the first monitoring module, the second monitoring module and the third monitoring module, controls the power supply based on the first power output value and the second power output value, and regulates the gas power supply module according to the third power output value.
[0034] Preferably, the waste heat power supply module uses binary nitrate as the heat storage working fluid, and the step of calculating the mass of the heat storage working fluid includes:
[0035] Obtain the total energy storage amount of the waste heat power supply module and the volume of the heat storage tank;
[0036] Obtain the thermal melting ratio and working temperature difference of binary nitrate;
[0037] The mass of the heat storage medium is calculated based on the preset total energy storage, the volume of the heat storage tank, and the thermal melting ratio of the binary nitrate, where the calculation formula is:
[0038]
[0039] Where m is the mass of the thermal storage medium, Q y is the preset total energy storage, C p is the thermal melting ratio of binary nitrate, and ΔT is the working temperature difference.
[0040] Preferably, the step of generating the second energy storage capacity according to the second steam value by the waste heat power supply module within the first preset time includes:
[0041] According to the second pipeline efficiency in which the amount of steam delivered from the gas power supply module to the waste heat power supply module within the first preset time reaches a second preset amount,
[0042] Acquire the rated output power and the efficiency of the steam turbine of the gas power supply module according to the first preset time, and acquire the efficiency of the heat storage system of the waste heat power supply module within the first preset time;
[0043] The second storage energy generated by the waste heat power supply module according to the second steam value within the first preset time is calculated by using the first preset time, the second pipeline efficiency, the rated output power, the efficiency of the steam turbine unit and the efficiency of the heat storage system, wherein the calculation formula is:
[0044]
[0045] Among them, Q s is the second energy storage value, P e is the rated output power, μ t is the efficiency of the steam turbine unit, μ s is the efficiency of the thermal storage system, μ p is the second pipeline efficiency, t s The first preset time.
[0046] The beneficial effects of the present application are as follows: the present invention monitors and regulates the power supply in real time: the method can monitor the power output values of the photothermal power supply module, the gas power supply module and the thermal energy storage module in real time, and regulate them according to the preset values to meet the power demand of real-time water electrolysis to produce hydrogen. The energy storage calculation and regulation method can calculate the quality of the heat storage working fluid according to the quality of the heat storage working fluid and the working temperature difference of the waste heat power supply module, thereby realizing the calculation and regulation of the storage energy. At the same time, it can coordinate the allocation of energy, calculate the area value to be supplemented and the heat value to be supplemented according to the power generation demand of the photothermal power supply module and the target heliostat area value, thereby controlling the power output value of the gas power supply module and realizing the coordinated allocation of energy; Energy transmission and storage: the method can realize energy transmission and storage between the photothermal power supply module, the gas power supply module and the waste heat power supply module to meet the power demand of water electrolysis to produce hydrogen. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 A system according to an embodiment of the present application Figure 1 .
[0048] Figure 2 A system according to an embodiment of the present application Figure 2 .
[0049] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0050] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0051] like Figure 1 and Figure 2 As shown, the present application provides a coordinated deployment system for water electrolysis and hydrogen production based on ISCC, including: an energy supply system and an electric energy deployment system, the energy supply system includes a photothermal power supply module, a gas power supply module, and a waste heat power supply module, and the electric energy deployment system includes a first monitoring module, a second monitoring module, a third monitoring module and a deployment module; the photothermal power supply module and the gas power supply module are used for real-time power supply for water electrolysis and hydrogen production; the waste heat power supply module is connected to the photothermal power supply module and the gas power supply module through a steam pipe, and the waste heat power supply module is used to store excess heat of the photothermal power supply module and the gas power supply module; the first monitoring module is electrically connected to the photothermal power supply module, and is used to monitor in real time the first electric energy output value of the photothermal power supply module during operation, and to determine whether the first electric energy output value is lower than a first preset value, if the first electric energy output value is lower than the first preset value, A preset value, and the allocation module supplements power for real-time water electrolysis and hydrogen production according to the control of the gas power supply module and the waste heat power supply module; the second monitoring module is electrically connected to the gas power supply module, and is used to monitor the second power output value of the gas power supply module in real time, and control the production capacity of water electrolysis and hydrogen production according to the second power output value; the third monitoring module is electrically connected to the thermal energy storage module, and is used to monitor the third power output value of the thermal energy storage module in real time when it is running; the allocation module is electrically connected to the first monitoring module, the second monitoring module and the third monitoring module, and controls the power supply based on the first power output value and the second power output value, and regulates the gas power supply module according to the third power output value, and can monitor the power output values of the photothermal power supply module and the gas power supply module in real time, and regulate according to the preset value to meet the power demand of real-time water electrolysis and hydrogen production. The method optimizes the power supply by regulating the second power output value through the allocation module.
[0052] In one embodiment, the allocation module is used to obtain the real-time first power output value sent by the first monitoring module, and determine whether the first power output value is lower than the first preset value. If the first power output value is lower than the first preset value, the first steam value transmitted by the photothermal power supply module to the waste heat power supply module is obtained, and the allocation module is used to control the opening and closing of the gas power supply module. The second monitoring module is used to obtain the second power output value supplied by the gas power supply module in real time for electrolysis of water to produce hydrogen, and the second monitoring module is used to obtain the second steam value transmitted by the gas power supply module to the waste heat power supply module. The waste heat power supply module obtains a third power output value based on the first steam value and the second steam value. The allocation module allocates the second power output value based on the third power output value, and can calculate the area value to be supplemented and the heat value to be supplemented according to the power generation demand of the photothermal power supply module and the target heliostat area value, thereby controlling the power output value of the gas power supply module. The method optimizes the power supply by regulating the second power output value through the allocation module.
[0053] In one embodiment, the photothermal power supply module is used to obtain the first electric energy output value sent by the second monitoring module, and determine whether the target heliostat area value required for power generation of the photothermal power supply module reaches the preset value of the heliostat area. If the target heliostat area value is not reached, the area difference between the target heliostat area value and the preset value of the heliostat area is obtained, and the area value to be supplemented is obtained according to the area difference, and the heat value to be supplemented of the first steam value to be reached is obtained according to the area value to be supplemented, and the first adjustment energy value is obtained according to the heat value to be supplemented and the area difference, and the second electric energy output value required to be output by the gas power supply module is obtained according to the first adjustment energy value, and the excess third electric energy output value can be generated according to the second electric energy output value of the gas power supply module and the first electric energy output value of the waste heat power supply module, and adjusted according to the real-time power demand for hydrogen production by electrolysis of water, thereby realizing the optimization of power supply. The method adjusts the second electric energy output value by the allocation module to achieve the optimization of power supply, and can calculate the quality of the heat storage medium according to the quality of the heat storage medium of the waste heat power supply module and the working temperature difference, thereby realizing the calculation and regulation of the storage energy. The method calculates the mass of the heat storage medium through a calculation formula, thereby realizing the calculation and regulation of the storage energy.
[0054] In one embodiment, the second monitoring module is used to obtain the second steam value generated by the gas power supply module, the gas power supply module generates steam and transmits it to the waste heat power supply module through a pipeline, the waste heat power supply module is used to obtain a third electric energy output value according to the total steam of the first steam value and the second steam value, the third electric energy output value is used to represent the electric energy output generated by the first steam value and the second steam value, the power supply of real-time water electrolysis hydrogen production is adjusted according to the third electric energy output value, the excess third electric energy output value is used to represent the power excess value of the power supply of real-time water electrolysis hydrogen production, the excess second electric energy output value is adjusted according to the power excess value, the excess third electric energy output value is reduced as the second electric energy output value decreases, until the power excess value decreases to 0, and the output of the gas power supply mode is reduced, and the beneficial effect of this method is that it can determine the power generation according to the target heliostat area value and other conditions of the photothermal power supply module, and meet the requirements of the waste heat power supply module and the gas power supply module, thereby realizing the coordinated allocation of energy. The method realizes the coordinated allocation of energy by calculating the power generation and adjusting the power supply by the allocation module.
[0055] In one embodiment, the waste heat power supply module uses binary nitrate as the heat storage medium, and obtains the total energy storage amount and the volume of the heat storage tank through the waste heat power supply module; the first monitoring module is used to obtain the thermal melting ratio and the working temperature difference of the binary nitrate; and the mass of the heat storage medium is calculated according to the preset total energy storage amount, the volume of the heat storage tank, and the thermal melting ratio of the binary nitrate, wherein the calculation formula is:
[0056]
[0057] Where m is the mass of the thermal storage medium, Q y is the preset total energy storage, C p is the thermal melting ratio of binary nitrate, and ΔT is the working temperature difference.
[0058] According to the third electric energy output value of the thermal energy storage module, the operating state of the thermal energy storage module is monitored in real time, and the gas power supply module is regulated according to the value. This method realizes the monitoring and regulation of the operating state of the thermal energy storage module by monitoring the third electric energy output value and adjusting the gas power supply module by the deployment module.
[0059] In one embodiment, the second monitoring module is used to obtain the second pipeline efficiency of the gas power supply module for the steam amount delivered to the waste heat power supply module through the first preset time to reach the second preset amount, and obtain the rated output power and steam turbine unit efficiency of the steam turbine of the gas power supply module according to the first preset time.
[0060] The second monitoring module is used to obtain the heat storage system efficiency of the waste heat power supply module within a first preset time;
[0061] And the second storage energy generated by the waste heat power supply module according to the second steam value within the first preset time is calculated according to the first preset time, the second pipeline efficiency, the rated output power, the efficiency of the steam turbine unit and the efficiency of the heat storage system, wherein the calculation formula is:
[0062]
[0063] Among them, Q s is the second energy storage value, P e is the rated output power, μ t is the efficiency of the steam turbine unit, μ s is the efficiency of the thermal storage system, μ p is the second pipeline efficiency, t s The first preset time.
[0064] Based on the first power output value and the second power output value, the power supply is controlled, and the gas power supply module is regulated according to the third power output value. The method controls the power supply through the allocation module, realizing the coordinated allocation of power.
[0065] In one embodiment, the first monitoring module is used to obtain the target heliostat area value of the solar thermal power supply module to determine the power generation according to the following three conditions:
[0066] The first condition is the output of the solar rated power;
[0067] The second condition is that the waste heat power supply module requirements should be met on a day with sufficient sunlight;
[0068] The second condition is the working state of the gas power supply module;
[0069] Obtain the heliostat field optical efficiency, steam turbine unit efficiency, absorber efficiency and thermal storage system efficiency of the CSP module;
[0070] Obtain the heat exchange power required by the waste heat power supply module;
[0071] Wherein, the target heliostat area value model is:
[0072]
[0073]
[0074] Wherein, f(A1) is the target heliostat area required for solar thermal power generation under rated conditions, f(A3) is the target heliostat area required to meet the requirements of the waste heat power supply module, f(A2) is the target heliostat area required for the gas power supply module to work, t is the heat storage time, P e is the rated output power, DNI1 is the average light intensity value of the rated sunlight, DNI2 is the average light intensity value of the gas power supply module in working state, DNI3 is the average light intensity value that meets the requirements of the waste heat power supply module, η field is the optical efficiency of the heliostat field of the CSP module, η tur is the steam turbine unit efficiency of the CSP module, η rec is the absorber efficiency of the CSP module, η stor is the thermal storage system efficiency of the CSP module, P w The heat exchange power required to power the module with waste heat.
[0075] The present application also provides a coordinated deployment method for producing hydrogen by water electrolysis based on ISCC, comprising: an energy supply system and an electric energy deployment system, wherein the energy supply system comprises a solar thermal power supply module, a gas power supply module, and a waste heat power supply module, and the electric energy deployment system comprises a first monitoring module, a second monitoring module, a third monitoring module, and a deployment module;
[0076] S1, the photothermal power supply module and the gas power supply module are used to supply electricity for real-time water electrolysis to produce hydrogen;
[0077] S2. The waste heat power supply module is connected to the solar thermal power supply module and the gas power supply module through a steam pipeline, and the waste heat power supply module obtains and stores excess heat from the solar thermal power supply module and the gas power supply module;
[0078] S3, the first monitoring module is electrically connected to the photothermal power supply module, and obtains in real time the first power output value of the photothermal power supply module when it is running, and determines whether the first power output value is lower than the first preset value. If the first power output value is lower than the first preset value, and the allocation module controls the gas power supply module and the waste heat power supply module to supplement power for real-time water electrolysis hydrogen production;
[0079] S4, the second monitoring module is electrically connected to the gas power supply module, obtains a second electric energy output value when the gas power supply module is in operation for real-time monitoring, and controls the production capacity of hydrogen produced by electrolysis of water according to the second electric energy output value;
[0080] S5, the third monitoring module is electrically connected to the thermal energy storage module to obtain a third electric energy output value when the thermal energy storage module is running in real time;
[0081] S6. The allocation module is electrically connected to the first monitoring module, the second monitoring module and the third monitoring module, controls the power supply based on the first power output value and the second power output value, and regulates the gas power supply module according to the third power output value.
[0082] In one embodiment, the waste heat power supply module uses binary nitrate as a heat storage medium, and the step of calculating the mass of the heat storage medium includes:
[0083] S7, obtaining the total energy storage amount of the waste heat power supply module and the volume of the heat storage tank;
[0084] S8. Obtaining the thermal melting ratio and working temperature difference of the binary nitrate;
[0085] S9. Calculate the mass of the heat storage medium according to the preset total energy storage amount, the volume of the heat storage tank, and the thermal melting ratio of the binary nitrate, wherein the calculation formula is:
[0086]
[0087] Where m is the mass of the thermal storage medium, Q y is the preset total energy storage, C p is the thermal melting ratio of binary nitrate, ΔT is the working temperature difference
[0088] In one embodiment, the step of generating the second stored energy by the waste heat power supply module according to the second steam value within the first preset time includes:
[0089] S10, according to the second pipeline efficiency in which the amount of steam delivered from the gas power supply module to the waste heat power supply module within the first preset time reaches a second preset amount,
[0090] S11, obtaining the rated output power and the efficiency of the steam turbine of the gas power supply module according to the first preset time, and obtaining the efficiency of the heat storage system of the waste heat power supply module within the first preset time;
[0091] S12, calculating the second storage energy generated by the waste heat power supply module according to the second steam value within the first preset time by using the first preset time, the second pipeline efficiency, the rated output power, the turbine unit efficiency and the heat storage system efficiency, wherein the calculation formula is:
[0092]
[0093] Among them, Q s is the second energy storage value, P e is the rated output power, μ t is the efficiency of the steam turbine unit, μ s is the efficiency of the thermal storage system, μ p is the second pipeline efficiency, t s The first preset time.
[0094] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media provided in this application and used in the embodiments may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (SSRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.
[0095] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, device, article or method including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, device, article or method. In the absence of further restrictions, an element defined by the sentence "includes a ..." does not exclude the presence of other identical elements in the process, device, article or method including the element.
[0096] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent results or equivalent process changes made using the contents of the present invention description and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A coordinated deployment system for hydrogen production by water electrolysis based on ISCC, It is characterized in that include: An energy supply system and an electric energy allocation system, wherein the energy supply system includes a solar thermal power supply module, a gas power supply module, and a waste heat power supply module, and the electric energy allocation system includes a first monitoring module, a second monitoring module, a third monitoring module, and an allocation module; The photothermal power supply module and the gas power supply module are used to supply electricity for real-time water electrolysis to produce hydrogen; The waste heat power supply module is connected to the photothermal power supply module and the gas power supply module through a steam pipeline, and the waste heat power supply module is used to store excess heat of the photothermal power supply module and the gas power supply module; The first monitoring module is electrically connected to the photothermal power supply module, and is used to monitor in real time the first power output value of the photothermal power supply module during operation, and to determine whether the first power output value is lower than a first preset value. If the first power output value is lower than the first preset value, and the allocation module controls the gas power supply module and the waste heat power supply module to supplement power for real-time water electrolysis and hydrogen production; The second monitoring module is electrically connected to the gas power supply module, and is used to monitor in real time the second electric energy output value when the gas power supply module is in operation, and control the production capacity of hydrogen produced by electrolyzing water according to the second electric energy output value; The third monitoring module is electrically connected to the thermal energy storage module and is used to monitor in real time the third electric energy output value when the thermal energy storage module is in operation; The allocation module is electrically connected to the first monitoring module, the second monitoring module and the third monitoring module, controls the power supply based on the first power output value and the second power output value, and regulates the gas power supply module according to the third power output value.
2. The ISCC-based coordinated deployment system for producing hydrogen from water electrolysis according to claim 1, It is characterized in that The allocation module is used to obtain the real-time first electric energy output value sent by the first monitoring module, and determine whether the first electric energy output value is lower than the first preset value. If the first electric energy output value is lower than the first preset value, the first steam value transmitted by the photothermal power supply module to the waste heat power supply module is obtained. The allocation module is used to control the opening and closing of the gas power supply module. The second monitoring module is used to obtain the second electric energy output value supplied by the gas power supply module in real time to produce hydrogen by electrolysis of water, and the second monitoring module is used to obtain the second steam value transmitted by the gas power supply module to the waste heat power supply module. The waste heat power supply module obtains a third electric energy output value based on the first steam value and the second steam value, and the allocation module allocates the second electric energy output value based on the third electric energy output value.
3. The coordinated deployment system for producing hydrogen from water electrolysis based on ISCC according to claim 2, It is characterized in that The solar thermal power supply module is used to obtain the first electric energy output value sent by the second monitoring module, and determine whether the target heliostat area value required for power generation of the solar thermal power supply module reaches a preset heliostat area value; if the target heliostat area value is not reached, obtain an area difference between the target heliostat area value and the preset heliostat area value, and obtain an area value that needs to be supplemented according to the area difference; obtain a heat value to be supplemented of a first steam value that needs to be reached according to the area value to be supplemented; obtain a first adjustment energy value according to the heat value to be supplemented and the area difference; and obtain a second electric energy output value that the gas power supply module needs to output according to the first adjustment energy value.
4. The ISCC-based coordinated deployment system for producing hydrogen from water electrolysis according to claim 3, It is characterized in that The second monitoring module is used to obtain the second steam value generated by the gas power supply module. The gas power supply module generates steam and transmits it to the waste heat power supply module through a pipeline. The waste heat power supply module is used to obtain a third electric energy output value based on the total amount of steam of the first steam value and the second steam value. The third electric energy output value is used to represent the electric energy output generated by the first steam value and the second steam value. The power supply for real-time water electrolysis to produce hydrogen is adjusted according to the third electric energy output value. The excess third electric energy output value is used to represent the excess value of the power supply for real-time water electrolysis to produce hydrogen. The excess second electric energy output value is adjusted to be reduced according to the excess power value. The excess third electric energy output value decreases as the second electric energy output value decreases until the excess power value decreases and tends to 0, thereby reducing the output of the gas power supply mode.
5. The ISCC-based coordinated deployment system for producing hydrogen from water electrolysis according to claim 4, It is characterized in that The waste heat power supply module uses binary nitrate as the heat storage medium, and obtains the total energy storage amount and the volume of the heat storage tank through the waste heat power supply module; the first monitoring module is used to obtain the thermal melting ratio and the working temperature difference of the binary nitrate; and calculates the mass of the heat storage medium according to the preset total energy storage amount, the volume of the heat storage tank, and the thermal melting ratio of the binary nitrate, wherein the calculation formula is: Where m is the mass of the thermal storage medium, Q y is the preset total energy storage, C p is the thermal melting ratio of binary nitrate, and ΔT is the working temperature difference.
6. The ISCC-based coordinated deployment system for producing hydrogen from water electrolysis according to claim 1, It is characterized in that The second monitoring module is used to obtain the second pipeline efficiency when the amount of steam delivered from the gas power supply module to the waste heat power supply module within the first preset time reaches the second preset amount, and obtain the rated output power and steam turbine unit efficiency of the steam turbine of the gas power supply module according to the first preset time. The second monitoring module is used to obtain the heat storage system efficiency of the waste heat power supply module within a first preset time; And the second storage energy generated by the waste heat power supply module according to the second steam value within the first preset time is calculated according to the first preset time, the second pipeline efficiency, the rated output power, the efficiency of the steam turbine unit and the efficiency of the heat storage system, wherein the calculation formula is: Among them, Q s is the second energy storage value, P e is the rated output power, μ t is the efficiency of the steam turbine unit, μ s is the efficiency of the thermal storage system, μ p is the second pipeline efficiency, t s The first preset time.
7. The ISCC-based coordinated deployment system for producing hydrogen from water electrolysis according to claim 6, It is characterized in that The first monitoring module is used to obtain the target heliostat area value of the solar thermal power supply module and determine the power generation according to the following three conditions: The first condition is the output of the solar rated power; The second condition is that the waste heat power supply module requirements should be met on a day with sufficient sunlight; The second condition is the working state of the gas power supply module; The first monitoring module can be used to obtain the optical efficiency of the heliostat field, the efficiency of the steam turbine unit, the efficiency of the absorber and the efficiency of the heat storage system of the solar thermal power supply module, and the heat exchange power required by the waste heat power supply module; Wherein, the target heliostat area value model is: Wherein, f(A1) is the target heliostat area required for solar thermal power generation under rated conditions, f(A3) is the target heliostat area required to meet the requirements of the waste heat power supply module, f(A2) is the target heliostat area required for the gas power supply module to work, t is the heat storage time, P e is the rated output power, DNI 1 DNI is the average illuminance value of the sun's rated illuminance. 2 is the average light intensity value of the gas power supply module in working state, DNI is the average light intensity value that meets the requirements of the waste heat power supply module, η field is the optical efficiency of the heliostat field of the CSP module, η tur is the steam turbine unit efficiency of the CSP module, η rec is the absorber efficiency of the CSP module, η stor is the thermal storage system efficiency of the CSP module, P w The heat exchange power required to power the module with waste heat.
8. A coordinated deployment method for producing hydrogen from water electrolysis based on ISCC, based on the coordinated deployment system for producing hydrogen from water electrolysis based on ISCC according to claims 1-7, It is characterized in that include: An energy supply system and an electric energy allocation system, wherein the energy supply system includes a solar thermal power supply module, a gas power supply module, and a waste heat power supply module, and the electric energy allocation system includes a first monitoring module, a second monitoring module, a third monitoring module, and an allocation module; The solar thermal power supply module and the gas power supply module provide electricity for real-time water electrolysis and hydrogen production; The waste heat power supply module is connected to the solar thermal power supply module and the gas power supply module through a steam pipeline, and the waste heat power supply module obtains and stores excess heat of the solar thermal power supply module and the gas power supply module; The first monitoring module is electrically connected to the photothermal power supply module, and obtains in real time a first electric energy output value when the photothermal power supply module is in operation, and determines whether the first electric energy output value is lower than a first preset value. If the first electric energy output value is lower than the first preset value, and the allocation module controls the gas power supply module and the waste heat power supply module to supplement power for real-time water electrolysis hydrogen production; The second monitoring module is electrically connected to the gas power supply module to obtain a second electric energy output value when the gas power supply module is in operation for real-time monitoring, and to control the production capacity of hydrogen produced by electrolysis of water according to the second electric energy output value; The third monitoring module is electrically connected to the thermal energy storage module to obtain a third electric energy output value when the thermal energy storage module is in operation in real time; The allocation module is electrically connected to the first monitoring module, the second monitoring module and the third monitoring module, controls the power supply based on the first power output value and the second power output value, and regulates the gas power supply module according to the third power output value.
9. The coordinated deployment method for producing hydrogen from water electrolysis based on ISCC according to claim 8, It is characterized in that The waste heat power supply module uses binary nitrate as a heat storage medium, and the step of obtaining the quality of the heat storage medium includes: Obtain the total energy storage amount of the waste heat power supply module and the volume of the heat storage tank; Obtain the thermal melting ratio and working temperature difference of binary nitrate; The mass of the heat storage medium is calculated based on the preset total energy storage, the volume of the heat storage tank, and the thermal melting ratio of the binary nitrate, where the calculation formula is: Where m is the mass of the thermal storage medium, Q y is the preset total energy storage, C p is the thermal melting ratio of binary nitrate, and ΔT is the working temperature difference.
10. The coordinated deployment method for producing hydrogen from water electrolysis based on ISCC according to claim 9, It is characterized in that The step of generating a second amount of stored energy by the waste heat power supply module according to the second steam value within the first preset time includes: According to the second pipeline efficiency in which the amount of steam delivered from the gas power supply module to the waste heat power supply module within the first preset time reaches a second preset amount, Acquire the rated output power and the efficiency of the steam turbine of the gas power supply module according to the first preset time, and acquire the efficiency of the heat storage system of the waste heat power supply module within the first preset time; The second storage energy generated by the waste heat power supply module according to the second steam value within the first preset time is calculated by using the first preset time, the second pipeline efficiency, the rated output power, the efficiency of the steam turbine unit and the efficiency of the heat storage system, wherein the calculation formula is: Among them, Q s is the second energy storage value, P e is the rated output power, μ t is the efficiency of the steam turbine unit, μ s is the efficiency of the thermal storage system, μ p is the second pipeline efficiency, t s The first preset time.