Foundation pit positioning device for constructional engineering
By setting up a tightly fit contact plate and an anti-slip rubber pad on the foundation pit positioning plate, combined with a reflective warning strip and a luminous lamp plate, the problems of inaccurate positioning of the foundation pit and safety hazards are solved, and the safety of foundation pit construction is improved and efficiency.
Patent Information
- Application Number
- CN202411118105.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-19
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the construction of the foundation pit, inaccurate positioning of the foundation pit leads to safety hazards, and the prior art is difficult to effectively prevent the coordinate signal positioning disc from breaking away from the foundation pit positioning disc, affecting construction safety and efficiency.
By providing a torsion spring and an anti-slip rubber pad between the first contact plate and the second contact plate on the foundation pit positioning plate, a tight fit is ensured, and the reflective warning strip of the coordinate signal positioning plate assists the light emitting lamp plate to diffuse the warning light source. , help personnel determine the location of the foundation pit.
Effectively prevent the coordinate signal positioning disc from disengaging, improve the accuracy and safety of foundation pit positioning, facilitate personnel to quickly judge the location of the foundation pit, and reduce safety hazards and risks of over-excavation or collapse during construction.
Smart Images

Figure CN118979452A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of foundation pit positioning, and more specifically, to a construction engineering foundation pit positioning device. Background Art
[0002] The foundation pit is a soil pit excavated at the foundation design location according to the base elevation and foundation plane dimensions. Before excavation, the excavation plan should be determined based on geological and hydrological data and the conditions of nearby buildings on site, and waterproofing and drainage should be done well. The foundation trench refers to a construction project that is excavated only along the base of the strip foundation. It is common in multi-story buildings without basements. The foundation trench refers to a trench with a bottom width of less than 3 meters and a trench length greater than 3 times the trench width. Before the construction of the foundation pit, the control piles and level elevations must be checked to see if there are any abnormalities, and then the layout position must be checked according to the design drawings to see if it meets the relevant requirements. Once the foundation pit is excavated, the construction must be carried out continuously and must be completed as soon as possible. In addition, relevant Relevant protective measures should be taken to prevent ground water from flowing into the foundation pit and causing landslides or damage to the foundation. In addition, when piling soil on site, the distance should be controlled and the distance from the pit edge should be kept at about 3m, and no soil should be piled in the area within 3m to avoid affecting the construction effect. During the excavation of the foundation pit, its base soil layer cannot be stirred, so the construction site must strictly manage the leveling to prevent over-excavation. If this phenomenon occurs, remedial measures should be taken immediately, especially for some important parts. After obtaining the consent of the design unit, reinforcement measures should be taken immediately. In addition, during the excavation process, if any abnormality is found, countermeasures should be taken immediately to avoid collapse.
[0003] When positioning the foundation pit, affected by site safety, it is necessary to use gantry plates or protective fences nailed on the gantry piles around the foundation pit for positioning and protection. Due to too many emergencies at the site, outsiders or staff cannot determine the approximate location of the foundation pit at the first time, and special events may easily cause safety hazards. Summary of the invention
[0004] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a construction engineering foundation pit positioning device, in which the anti-slip rubber pads on the inner walls of the first contact plate and the second contact plate are tightly fitted with the outer wall of the foundation pit positioning plate to prevent the first contact plate and the second contact plate from loosening, causing the coordinate signal positioning plate on the top of the second contact plate to be separated from the foundation pit positioning plate. After the coordinate signal positioning plate is fixed as a whole, the reflective warning strip on the outer wall of the coordinate signal positioning plate assists the light board to diffuse the warning light source. The placement position of the coordinate signal positioning plate facilitates personnel to judge the orientation of the foundation pit, thereby solving the problems raised in the above-mentioned background technology.
[0005] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: a construction engineering foundation pit positioning device, comprising a foundation pit positioning plate, a first contact plate is provided at the bottom of the foundation pit positioning plate, a second contact plate is provided at the top of the first contact plate, and the second contact plate is attached to the top of the foundation pit positioning plate, a torsion spring is fixedly connected between the first contact plate and the second contact plate, an anti-slip rubber pad is fixedly connected to the outer wall of the first contact plate and the second contact plate, and the anti-slip rubber pad is attached to the outer wall of the foundation pit positioning plate, a first hinge seat is fixedly connected to the top of the second contact plate, a coordinate signal positioning plate is fixedly connected to the top of the first hinge seat, and a part connecting ring is fixedly connected to the bottom of the foundation pit positioning plate.
[0006] In a preferred embodiment, the number of the coordinate signal positioning disks is multiple, and the multiple groups of coordinate signal positioning disks are arranged in a circular array state with respect to the top of the foundation pit positioning disk.
[0007] In a preferred embodiment, a light source refraction cover is provided on the top of the foundation pit positioning plate, and the outer wall of the light source refraction cover is provided with a first protective rubber strip, the top of the light source refraction cover is fixedly connected with a first connecting arm, and one end of the first connecting arm passes through the first protective rubber strip and extends to one side of the first protective rubber strip, one end of the first connecting arm is fixedly connected with a second connecting arm, and the bottom of the second connecting arm is inserted into the interior of the coordinate signal positioning plate.
[0008] In a preferred embodiment, a light board placement groove is opened on the inner wall of the foundation pit positioning plate, a light-emitting light board is clamped inside the light board placement groove, a light source refraction plate is fixedly connected to the top of the light-emitting light board, and a reflective warning strip is fixedly connected to the outer wall of the coordinate signal positioning plate.
[0009] In a preferred embodiment, the bottom of the foundation pit positioning plate is fixedly connected to a second articulated seat, the interior of the second articulated seat is fixedly connected to a hinge head, the bottom of the hinge head is fixedly connected to a first rubber connecting arm, the outer wall of the part connecting ring is fixedly connected to a second rubber connecting arm, and one end of the second rubber connecting arm is fixedly connected to the bottom of the first rubber connecting arm, and the outer wall of the second rubber connecting arm is wrapped with a rubber friction strip.
[0010] In a preferred embodiment, the number of the first rubber connecting arms and the rubber friction strips is multiple, and the multiple groups of first rubber connecting arms and the rubber friction strips are arranged in a ring array state with respect to the outer wall of the part connection ring.
[0011] In a preferred embodiment, a load-bearing base is provided at the bottom of the foundation pit positioning plate, a weight sleeve is fixedly connected to the inside of the load-bearing base, a reinforced support rib is fixedly connected to the top of the load-bearing base, and the top of the reinforced support rib is clamped on the outer wall of the part connecting ring, and a second protective rubber strip is fixedly connected to the outer wall of the reinforced support rib.
[0012] Technical effects and advantages of the present invention: 1. Pinch the first contact plate at the bottom of the second contact plate toward the center so that one end of the first contact plate and the second contact plate expands, and clamps the first contact plate and the second contact plate on the outer wall of the foundation pit positioning plate. Anti-skid rubber pads are provided on the inner walls of the first contact plate and the second contact plate. After the foundation pit positioning plate is clamped by the first contact plate and the second contact plate, the anti-skid rubber pads on the inner walls of the first contact plate and the second contact plate are tightly fitted with the outer wall of the foundation pit positioning plate to prevent the first contact plate and the second contact plate from loosening, causing the coordinate signal positioning plate on the top of the second contact plate to be separated from the foundation pit positioning plate. After the coordinate signal positioning plate is fixed as a whole, the reflective warning strip on the outer wall of the coordinate signal positioning plate is used to assist the light-emitting lamp board to diffuse the warning light source. The placement of the coordinate signal positioning plate facilitates personnel to judge the orientation of the foundation pit. 2. When the part connection ring at the bottom of the foundation pit positioning plate is inserted into the top of the reinforced support rib, the first rubber connecting arm and the second rubber connecting arm make the part connection ring have a certain damping feeling when inserted into the top of the reinforced support rib, so as to prevent the part connection ring from being loosened when inserted between the part connection ring and the reinforced support rib, so that the part connection ring as a whole is easy to fall off. A rubber friction strip is arranged on the outer wall of the second rubber connecting arm. When the part connection ring is inserted, the rubber friction strip on the outer wall of the second rubber connecting arm is in friction contact with the inner wall of the reinforced support rib. When the part connection ring is completely inserted into the top of the reinforced support rib, the foundation pit positioning plate is rotated as a whole so that the rubber friction strip on the outer wall of the second rubber connecting arm and the gap on the inner wall of the reinforced support rib are engaged with each other. The part connection ring is fixed on the top of the reinforced support rib as a whole, and the foundation pit positioning plate is supported by the reinforced support rib as a whole, so that personnel can measure the data inside the foundation pit conveniently. 3. A light source refraction cover is provided on the top of the light board and is snap-connected with the light board, so that the light source refraction cover is fixed as a whole to the foundation pit positioning plate. When the light board emits light for warning, the light source is refracted through the light source refraction cover on the top of the light board, so that personnel can identify it. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a front view schematic diagram of the present invention.
[0014] Figure 2 It is a bottom view schematic diagram of the present invention.
[0015] Figure 3It is a schematic diagram of the explosion of the present invention.
[0016] Figure 4 It is a schematic diagram of the partial structure of the foundation pit positioning plate of the present invention.
[0017] Figure 5 For the present invention Figure 4 Enlarged schematic diagram at point A in the middle.
[0018] Figure 6 For the present invention Figure 4 Enlarged schematic diagram of point B in the middle.
[0019] Figure 7 For the present invention Figure 2 Enlarged schematic diagram at C in the middle.
[0020] Figure 8 For the present invention Figure 3 Enlarged schematic diagram at D in the middle.
[0021] The accompanying drawings are marked as: 1 foundation pit positioning plate, 2 first contact plate, 3 second contact plate, 4 torsion spring, 5 anti-slip rubber pad, 6 first hinge seat, 7 coordinate signal positioning plate, 71 light source refraction cover, 72 first protective rubber strip, 73 first connecting arm, 74 second connecting arm, 8 light board placement groove, 9 light-emitting light board, 10 light source refraction plate, 11 reflective warning strip, 12 part connecting ring, 13 second hinge seat, 14 hinge head, 15 first rubber connecting arm, 16 second rubber connecting arm, 17 rubber friction strip, 18 load-bearing base, 19 weight sleeve, 20 reinforced support rib, 21 second protective rubber strip. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] Refer to the instruction manual Figure 1-8A construction engineering foundation pit positioning device according to an embodiment of the present invention comprises a foundation pit positioning plate 1, a first contact plate 2 is provided at the bottom of the foundation pit positioning plate 1, a second contact plate 3 is provided on the top of the first contact plate 2, and the second contact plate 3 is fitted on the top of the foundation pit positioning plate 1, a torsion spring 4 is fixedly connected between the first contact plate 2 and the second contact plate 3, an anti-skid rubber pad 5 is fixedly connected to the outer wall of the first contact plate 2 and the second contact plate 3, and the anti-skid rubber pad 5 is fitted to the outer wall of the foundation pit positioning plate 1, and the top of the second contact plate 3 is fixedly connected to A first hinge seat 6 is connected, and a coordinate signal positioning disk 7 is fixedly connected to the top of the first hinge seat 6. The number of coordinate signal positioning disks 7 is multiple groups, and the multiple groups of coordinate signal positioning disks 7 are arranged in a circular array state about the top of the foundation pit positioning disk 1. A light source refraction cover 71 is provided on the top of the foundation pit positioning disk 1. The outer wall of the light source refraction cover 71 is provided with a first protective rubber strip 72. The top of the light source refraction cover 71 is fixedly connected to a first connecting arm 73, and one end of the first connecting arm 73 passes through the first protective rubber strip 72 and extends to the first protective rubber strip 72. On one side, one end of the first connecting arm 73 is fixedly connected to the second connecting arm 74, and the bottom of the second connecting arm 74 is inserted into the interior of the coordinate signal positioning disk 7, and the first contact plate 2 at the bottom of the second contact plate 3 is pinched toward the center, so that one end of the first contact plate 2 and the second contact plate 3 expands, and the first contact plate 2 and the second contact plate 3 are clamped on the outer wall of the foundation pit positioning disk 1. Anti-slip rubber pads 5 are provided on the inner walls of the first contact plate 2 and the second contact plate 3, and the foundation pit is clamped by the first contact plate 2 and the second contact plate 3 After the positioning plate 1 is positioned, the anti-skid rubber pads 5 on the inner walls of the first contact plate 2 and the second contact plate 3 are tightly fitted with the outer wall of the foundation pit positioning plate 1 to prevent the first contact plate 2 and the second contact plate 3 from loosening, causing the coordinate signal positioning plate 7 on the top of the second contact plate 3 to be separated from the foundation pit positioning plate 1. After the coordinate signal positioning plate 7 is fixed as a whole, the reflective warning strip 11 on the outer wall of the coordinate signal positioning plate 7 assists the light board 9 to diffuse the warning light source, wherein the placement of the coordinate signal positioning plate 7 facilitates personnel to judge the orientation of the foundation pit; Refer to the instruction manual Figure 1-4 Furthermore, a light board placement groove 8 is provided on the inner wall of the foundation pit positioning plate 1, and a light board 9 is clamped inside the light board placement groove 8, and a light source refraction plate 10 is fixedly connected to the top of the light board 9. A light board 9 is provided on the inner wall of the foundation pit positioning plate 1 and clamped inside the light board placement groove 8, and a light source refraction plate 10 is provided on the top of the light board 9 to clamp the light board 9, so that the light source refraction plate 10 is fixed to the foundation pit positioning plate 1 as a whole. When the light board 9 emits light for warning, the light source is refracted by the light source refraction plate 10 on the top of the light board 9, so that personnel can identify it, and the user is positioning the foundation pit; Refer to the instruction manual Figure 1-4Furthermore, a reflective warning strip 11 is fixedly connected to the outer wall of the coordinate signal positioning disk 7, a part connecting ring 12 is fixedly connected to the bottom of the foundation pit positioning disk 1, a second hinge seat 13 is fixedly connected to the bottom of the second hinge seat 13, a hinge head 14 is fixedly connected to the inside of the second hinge seat 13, a first rubber connecting arm 15 is fixedly connected to the bottom of the hinge head 14, a second rubber connecting arm 16 is fixedly connected to the outer wall of the part connecting ring 12, and one end of the second rubber connecting arm 16 is fixedly connected to the bottom of the first rubber connecting arm 15, a rubber friction strip 17 is wrapped around the outer wall of the second rubber connecting arm 16, and the number of the first rubber connecting arm 15 and the rubber friction strip 17 is multiple groups, and the multiple groups of first rubber connecting arms 15 and rubber friction strips 17 are about the part connecting ring 12. The outer wall is arranged in a circular array state, and the part connection ring 12 at the bottom of the foundation pit positioning plate 1 is inserted into the top of the reinforced support rib 20. A second hinge seat 13 is arranged at the bottom of the foundation pit positioning plate 1, and a hinge head 14 is arranged inside the second hinge seat 13. The second hinge seat 13 at the bottom of the hinge head 14 is connected to the second rubber connecting arm 16 on the outer wall of the part connection ring 12. When the part connection ring 12 at the bottom of the foundation pit positioning plate 1 is inserted into the top of the reinforced support rib 20, the first rubber connecting arm 15 and the second rubber connecting arm 16 make the part connection ring 12 have a certain damping feeling when inserted into the top of the reinforced support rib 20, so as to prevent the part connection ring 12 from being loosened when inserted into the reinforced support rib 20, so that the part connection ring 12 as a whole is easy to fall off; Refer to the instruction manual Figure 1-8Furthermore, a load-bearing base 18 is provided at the bottom of the foundation pit positioning plate 1, and a weight sleeve 19 is fixedly connected inside the load-bearing base 18, and a reinforced support rib 20 is fixedly connected to the top of the load-bearing base 18, and the top of the reinforced support rib 20 is clamped on the outer wall of the part connecting ring 12, and the outer wall of the reinforced support rib 20 is fixedly connected with a second protective rubber strip 21. Multiple load-bearing bases 18 prevent water or sand from being injected into the inside of the weight sleeve 19 at the corners of the foundation pit, so that the load-bearing base 18 is weighted as a whole. A reinforced support rib 20 is provided on the top of the load-bearing base 18, so that after a foreign object hits the reinforced support rib 20, the reinforced support rib 20 recovers to its original state through its own toughness, and a second protective rubber strip 21 is provided on the outer wall of the reinforced support rib 20, so that the reinforced support rib 20 and the foreign object collide. When colliding or rubbing, the main body of the reinforced support rib 20 is protected to prevent the reinforced support rib 20 from being deformed and affecting the original state of the reinforced support rib 20 used by the user. A rubber friction strip 17 is set on the outer wall of the second rubber connecting arm 16. When the part connecting ring 12 is inserted, the rubber friction strip 17 on the outer wall of the second rubber connecting arm 16 is in friction contact with the inner wall of the reinforced support rib 20. When the part connecting ring 12 is completely inserted into the top of the reinforced support rib 20, the rubber friction strip 17 on the outer wall of the second rubber connecting arm 16 and the gap on the inner wall of the reinforced support rib 20 are engaged with each other by rotating the foundation pit positioning plate 1 as a whole. The part connecting ring 12 is fixed as a whole to the top of the reinforced support rib 20, and the foundation pit positioning plate 1 is set off by the reinforced support rib 20 as a whole, so that personnel can measure the data inside the foundation pit.
[0024] Working principle: When the equipment is in use, multiple load-bearing bases 18 are placed at the corners of the foundation pit, and water or sand is injected into the inside of the weighted sleeve 19 to weight the load-bearing base 18 as a whole. A reinforced support rib 20 is set on the top of the load-bearing base 18, so that after a foreign object hits the reinforced support rib 20, the reinforced support rib 20 recovers to its original state through its own toughness. A second protective rubber strip 21 is set on the outer wall of the reinforced support rib 20, so that when the reinforced support rib 20 collides or rubs with a foreign object, the body of the reinforced support rib 20 is protected to prevent the deformation of the reinforced support rib 20 from affecting the original state of the reinforced support rib 20 used by the user; A light emitting lamp board 9 is arranged on the inner wall of the foundation pit positioning plate 1 and is clamped in the lamp board placement groove 8. A light source refraction plate 10 is arranged on the top of the light emitting lamp board 9 and is clamped in the light emitting lamp board 9, so that the light source refraction plate 10 is fixed between the foundation pit positioning plate 1 as a whole. When the light emitting lamp board 9 emits light for warning, the light source is refracted by the light source refraction plate 10 on the top of the light emitting lamp board 9, so that personnel can identify it. When positioning the foundation pit, the user pinches the first contact plate 2 at the bottom of the second contact plate 3 toward the center, so that one end of the first contact plate 2 and the second contact plate 3 expands, and the first contact plate 2 and the second contact plate 3 are clamped on the outer wall of the foundation pit positioning plate 1. The inner walls of the contact plate 2 and the second contact plate 3 are both provided with anti-skid rubber pads 5. After the foundation pit positioning plate 1 is clamped by the first contact plate 2 and the second contact plate 3, the anti-skid rubber pads 5 on the inner walls of the first contact plate 2 and the second contact plate 3 are tightly fitted with the outer wall of the foundation pit positioning plate 1 to prevent the first contact plate 2 and the second contact plate 3 from loosening, causing the coordinate signal positioning plate 7 on the top of the second contact plate 3 to be separated from the foundation pit positioning plate 1. After the coordinate signal positioning plate 7 is fixed as a whole, the reflective warning strip 11 on the outer wall of the coordinate signal positioning plate 7 assists the light-emitting lamp board 9 to diffuse the warning light source, wherein the placement of the coordinate signal positioning plate 7 facilitates personnel to judge the orientation of the foundation pit; Secondly, the part connecting ring 12 at the bottom of the foundation pit positioning plate 1 is inserted into the top of the reinforced support rib 20, a second hinge seat 13 is set at the bottom of the foundation pit positioning plate 1, and a hinge head 14 is set inside the second hinge seat 13, and the second hinge seat 13 at the bottom of the hinge head 14 is connected to the second rubber connecting arm 16 on the outer wall of the part connecting ring 12. When the part connecting ring 12 at the bottom of the foundation pit positioning plate 1 is inserted into the top of the reinforced support rib 20, the first rubber connecting arm 15 and the second rubber connecting arm 16 make the part connecting ring 12 have a certain damping feeling when inserted into the top of the reinforced support rib 20, so as to prevent the part connecting ring 12 from being loosened when inserted into the reinforced support rib 20, so that the part connecting ring 12 as a whole is easy to fall off. A rubber friction strip 17 is provided on the outer wall of the second rubber connecting arm 16. When the part connecting ring 12 is inserted, the rubber friction strip 17 on the outer wall of the second rubber connecting arm 16 is in friction contact with the inner wall of the reinforced support rib 20. When the part connecting ring 12 is completely inserted into the top of the reinforced support rib 20, the foundation pit positioning plate 1 is rotated as a whole so that the rubber friction strip 17 on the outer wall of the second rubber connecting arm 16 and the gap on the inner wall of the reinforced support rib 20 are engaged with each other. The part connecting ring 12 is fixed as a whole to the top of the reinforced support rib 20. The foundation pit positioning plate 1 is supported as a whole by the reinforced support rib 20, which is convenient for personnel to measure the data inside the foundation pit. At the same time, the light source is generated by the light-emitting lamp board 9 inside the foundation pit positioning plate 1, which is convenient for personnel to identify at the site.
[0025] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change; Secondly: In the drawings of the embodiments disclosed in the present invention, only the structures related to the embodiments disclosed in the present invention are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present invention can be combined with each other; Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A construction engineering foundation pit positioning device, comprising a foundation pit positioning plate (1), characterized in that: The bottom of the foundation pit positioning plate (1) is provided with a first contact plate (2), the top of the first contact plate (2) is provided with a second contact plate (3), and the second contact plate (3) is fitted on the top of the foundation pit positioning plate (1), a torsion spring (4) is fixedly connected between the first contact plate (2) and the second contact plate (3), an anti-slip rubber pad (5) is fixedly connected to the outer walls of the first contact plate (2) and the second contact plate (3), and the anti-slip rubber pad (5) is fitted on the outer wall of the foundation pit positioning plate (1), the top of the second contact plate (3) is fixedly connected to a first hinge seat (6), the top of the first hinge seat (6) is fixedly connected to a coordinate signal positioning plate (7), and the bottom of the foundation pit positioning plate (1) is fixedly connected to a parts connecting ring (12).
2. A construction engineering foundation pit positioning device according to claim 1, characterized in that: The number of the coordinate signal positioning disks (7) is multiple, and the multiple groups of coordinate signal positioning disks (7) are arranged in a ring array state with respect to the top of the foundation pit positioning disk (1).
3. A construction engineering foundation pit positioning device according to claim 1, characterized in that: A light source refraction cover (71) is provided on the top of the foundation pit positioning disk (1); a first protective rubber strip (72) is sleeved on the outer wall of the light source refraction cover (71); a first connecting arm (73) is fixedly connected to the top of the light source refraction cover (71); one end of the first connecting arm (73) passes through the first protective rubber strip (72) and extends to one side of the first protective rubber strip (72); one end of the first connecting arm (73) is fixedly connected to a second connecting arm (74); and the bottom of the second connecting arm (74) is inserted into the interior of the coordinate signal positioning disk (7).
4. A construction engineering foundation pit positioning device according to claim 1, characterized in that: The inner wall of the foundation pit positioning plate (1) is provided with a light board placement groove (8), a light emitting light board (9) is clamped inside the light board placement groove (8), a light source refraction plate (10) is fixedly connected to the top of the light emitting light board (9), and a reflective warning strip (11) is fixedly connected to the outer wall of the coordinate signal positioning plate (7).
5. A construction engineering foundation pit positioning device according to claim 1, characterized in that: The bottom of the foundation pit positioning plate (1) is fixedly connected to a second hinge seat (13), the interior of the second hinge seat (13) is fixedly connected to a hinge head (14), the bottom of the hinge head (14) is fixedly connected to a first rubber connecting arm (15), the outer wall of the part connecting ring (12) is fixedly connected to a second rubber connecting arm (16), one end of the second rubber connecting arm (16) is fixedly connected to the bottom of the first rubber connecting arm (15), and the outer wall of the second rubber connecting arm (16) is wrapped with a rubber friction strip (17).
6. A construction engineering foundation pit positioning device according to claim 5, characterized in that: The number of the first rubber connecting arms (15) and the rubber friction strips (17) is multiple, and the multiple groups of first rubber connecting arms (15) and rubber friction strips (17) are arranged in a ring array state with respect to the outer wall of the part connection ring (12).
7. A construction engineering foundation pit positioning device according to claim 1, characterized in that: A load-bearing base (18) is provided at the bottom of the foundation pit positioning plate (1), a weight sleeve (19) is fixedly connected to the inside of the load-bearing base (18), a reinforced support rib (20) is fixedly connected to the top of the load-bearing base (18), and the top of the reinforced support rib (20) is clamped on the outer wall of the part connection ring (12), and the outer wall of the reinforced support rib (20) is fixedly connected to a second protective rubber strip (21).
