Pile end post-grouting expanded-base precast pile and construction method thereof
Through the post-grough-expanded prefabricated pile and its construction method, the static pressing process and grouting technology are used to solve the problems of the construction complexity of the prefabricated pile bottom and the soil damage on the pile side, achieving simple structure, low cost and The effect of improving bearing capacity.
Patent Information
- Application Number
- CN202411207067.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-19
AI Technical Summary
In the prior art, the construction process of prefabricated pile bottom expansion is complex, the equipment requirements are high, and the cost is high. During the static pressure pile sinking process, the soil on the pile side is weakened due to the extrusion of the expanded grouting pile tip of the prefabricated pile body. , it is difficult to effectively improve the carrying capacity.
The pile end grouting and expansion of the bottom prefabricated pile and its construction method are adopted. By processing the prefabricated pile body and the expanded grouting pile tip, the pile is sinked by static pressure technology, and the pile end area is injected through the grouting pipe and grouting pile tip. slurry, reinforce the soil layer, increase the contact area and side resistance between the pile end and the soil layer.
The construction process is simplified, the project cost is reduced, the overall bearing capacity of prefabricated piles is increased, the number of pile foundations is reduced, and the problem of soil damage on the pile side during the static pressure pile sinking process is solved.
Smart Images

Figure CN118979492A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of civil engineering construction, in particular to a pile end post-grouting bottom-expanding prefabricated pile and a construction method thereof. Background Art
[0002] During the stress process of precast piles, the mechanical properties of the soil in the precast pile bearing layer are generally better than those of the soil beside the pile. Therefore, how to give full play to the excellent mechanical properties of the precast pile bearing layer has become a technical problem that technicians in this field need to solve.
[0003] Japanese companies were the first to develop mixing and implanting precast piles with expanded bottoms and their construction methods (i.e., the Hyper-Mega method). They first used a single-axis mixing pile machine with a bottom expansion function to construct the expanded bottom mixing piles, and then sank the precast piles to the designed elevation. After the cement soil of the mixing piles solidified, the expanded bottom precast piles were formed. At the same time, other companies developed static drilling root pile methods based on the Hyper-Mega method. Mixing and implanting precast piles with expanded bottoms can improve the bearing capacity of precast piles, while avoiding the soil squeezing effect of precast piles, and can give full play to the mechanical properties of the precast pile bearing layer. However, the construction process of mixing and implanting precast piles with expanded bottoms is complex, the construction equipment requirements are high, and the project cost is high, making it difficult to promote and apply them in my country.
[0004] In recent years, there are relatively many technologies that use variable cross-section technology to increase the diameter of the end of precast piles to exert the mechanical properties of the bearing layer and improve the bearing capacity of precast piles. These precast piles with expanded bottoms are all expanded bottom piles. Because the pile diameters at different locations are different, different specifications of fixtures are required to sink the piles. Therefore, the traditional static pressure pile sinking process cannot be used for construction. Only mixing and implantation or hole implantation can be used. There are many construction procedures and high costs. Especially when using the implantation process, the pile end resistance is similar to that of bored piles, and the effect of expanding the bottom on the bearing capacity of precast piles is limited. Therefore, it has not been promoted and applied in engineering construction.
[0005] In order to simplify the construction of expanded bottom prefabricated piles, it is also possible to use prefabricated piles with expanded bottom end plates that are separately manufactured from the expanded bottom structure and the prefabricated piles and assembled on site. Although the above structure is simple in structure, easy to manufacture, and cost-effective, it still requires the use of a mixing and implanting process for pile sinking. The mixing and implanting process has many construction steps, high material consumption, and reduced economy.
[0006] Based on this, how to use static pressure pile driving technology for construction and solve the problem of weakening the bonding strength between the pile side soil and the prefabricated pile body due to the squeezing effect of the enlarged grouting pile tip during static pressure pile driving has become a technical problem that technical personnel in this field need to solve. Summary of the invention
[0007] The object of the present invention is to provide a precast pile with expanded bottom by post-grouting at the pile end and a construction method thereof, so that the precast pile with expanded bottom can be constructed by static pressure pile sinking technology and solve the problem that the bonding strength between the soil on the pile side and the precast pile body is weakened due to the squeezing and expansion effect of the enlarged grouting pile tip during the static pressure pile sinking process.
[0008] In order to achieve the above object, the present invention provides a construction method of a prefabricated pile with post-grouting and bottom expansion, comprising:
[0009] Processing a precast pile body and a grouting pile tip, wherein the cross-sectional dimension of the grouting pile tip is larger than the cross-sectional dimension of the precast pile body;
[0010] After the first section of the precast pile body passes through the static pile driver fixture, the grouting pile tip and the grouting pipe are installed to form a bottom-enlarged precast pile;
[0011] The bottom-enlarged prefabricated piles are sunk to the designed elevation by using a static pressure process, and the grouting pipes are extended at the same time;
[0012] Grouting is performed into the pile end region of the prefabricated pile body through the grouting pipe and the grouting pile tip to reinforce the soil layer in the pile end region;
[0013] The grouting is continued to the pile end area, and the grouting returns along the pile side to reinforce the soil layer in the pile side area, thereby completing the construction of the pile end rear grouting and bottom expansion prefabricated pile.
[0014] Optionally, the first section of the precast pile body passes through the static pressure pile driver clamp and is welded to the grouting pile tip, and the grouting pipe is arranged inside the precast pile body and connected to the grouting pile tip. Optionally, the bottom-enlarged precast pile is sunk to the designed elevation by a static pressure pile driver, and the grouting pipe is extended during the pile sinking process.
[0015] Optionally, the grouting pipe and the grouting pile tip are used to inject grout into the pile end area of the expanded base precast pile to reinforce the soil layer near the pile end.
[0016] Optionally, the grouting pipe and the grouting pile tip are used to continue grouting into the pile end area of the expanded base precast pile, and the slurry flows back along the pile side to reinforce the pile side soil damaged by the squeezing and expansion effect of the enlarged grouting pile tip during the static pressure pile sinking process.
[0017] Optionally, the precast pile body is a precast pile of uniform cross-section, and the static pile driver fixture does not need to be replaced during the static pile driving process.
[0018] In order to achieve the above object, the present invention also provides a precast pile with post-grouting and bottom expansion at the pile end, which is applied to the construction method of the precast pile with post-grouting and bottom expansion at the pile end as described above, comprising: a precast pile body, a grouting pipe and a grouting pile tip;
[0019] The grouting pile tip is connected to the bottom of the precast pile body, and the grouting pipe extends from the top of the precast pile body into the interior of the precast pile body and is connected to the grouting pile tip, so as to grout the pile end area of the precast pile body through the grouting pile tip;
[0020] Wherein, the cross-sectional dimension of the grouting pile tip is larger than the cross-sectional dimension of the precast pile body.
[0021] Optionally, the ratio of the cross-sectional dimension of the grouting pile tip to the cross-sectional dimension of the precast pile body is between 1.2 and 1.8.
[0022] Optionally, the precast pile body of the first section of the uniform cross section passes through the static pile driver clamp and is welded to the enlarged grouting pile tip to form an enlarged bottom precast pile;
[0023] Optionally, a grouting hole is provided on the grouting pile tip, and after the slurry flows to the grouting pile tip through the grouting pipe, it seeps into the pile end area at the grouting hole.
[0024] Compared with the existing prefabricated piles, the pile end post-grouting and bottom expansion prefabricated piles and the construction method thereof provided in the present application have the following advantages:
[0025] The construction method of precast piles with post-grouting and bottom expansion provided in the present application realizes the bottom expansion function of the precast pile by separately processing the precast pile body and the expanded grouting pile tip, and assembling them on site, which has a simple structure, is easy to manufacture, and is quick to install; the expanded grouting pile tip is adopted, so that the precast pile body can be constructed using a static pressure method, which simplifies the construction process; at the same time, the expanded grouting pile tip increases the contact area between the precast pile end and the soil layer, thereby improving the end resistance of the precast pile; grouting is performed into the pile end area of the precast pile through the grouting pile tip, and the cement slurry reinforces the soil layer in this area, thereby further improving the end resistance of the precast pile; the cement slurry returns along the pile side to reinforce the pile side soil layer damaged during the sinking process of the expanded bottom precast pile, thereby improving the side resistance of the precast pile, thereby improving the overall bearing capacity of the precast pile, reducing the number of pile foundations, and reducing the project cost.
[0026] The precast pile with post-grouting and bottom expansion provided in the present application enables the precast pile to be sunk by static pressure implantation by adding an enlarged grouting pile tip, thereby simplifying the construction process; at the same time, the enlarged grouting pile tip increases the contact area between the precast pile end and the soil layer, thereby improving the end resistance of the precast pile; grouting is performed into the precast pile end area through the grouting pile tip, and the soil layer in this area is reinforced by cement slurry, thereby further improving the end resistance of the precast pile; the cement slurry returns along the pile side to reinforce the soil layer on the pile side that is damaged during the sinking process of the enlarged bottom precast pile, thereby improving the side resistance of the precast pile, thereby improving the overall bearing capacity of the precast pile, reducing the number of pile foundations, and reducing the project cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 A flow chart of a construction method for precast piles with post-grouting and bottom expansion provided by an embodiment of the present invention;
[0028] Figure 2 A schematic diagram of step S1 of the construction method provided by an embodiment of the present invention;
[0029] Figure 3 A schematic diagram of step S2 of the construction method provided by an embodiment of the present invention;
[0030] Figure 4 A schematic diagram of step S3 of the construction method provided by an embodiment of the present invention;
[0031] Figure 5 A schematic diagram of steps S4 and S5 of the construction method provided by an embodiment of the present invention;
[0032] Figure 6 A schematic diagram of the structure of a prefabricated pile with post-grouting and bottom expansion provided by an embodiment of the present invention;
[0033] Figure 7 A schematic diagram of the connection relationship between the grouting pile tip and the precast pile body provided in an embodiment of the present invention;
[0034] The description of each reference numeral is as follows:
[0035] 10-precast pile body; 100-pile end area; 101-pile side area;
[0036] 20- Grouting pipe;
[0037] 30-grouting pile tip; 301-first rib; 302-second rib; 303-chamfer; 304-grouting hole;
[0038] 40-Reinforced soil;
[0039] X- axial direction of the precast pile body. DETAILED DESCRIPTION
[0040] In order to make the purpose, advantages and features of the present invention clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the drawings are all in a very simplified form and are not drawn to scale, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. In addition, the structure shown in the drawings is often a part of the actual structure. In particular, the emphasis of each drawing is different, and sometimes different scales are used.
[0041] As used in this specification, the singular forms "a", "an" and "the" include plural objects, the term "or" is generally used to include the meaning of "and / or", the term "several" is generally used to include the meaning of "at least one", and the term "at least two" is generally used to include the meaning of "two or more". In addition, the terms "first", "second" and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first", "second" and "third" may explicitly or implicitly include one or at least two of the features, "one end" and "the other end" and "the proximal end" and "the distal end" generally refer to two corresponding parts, which include not only the endpoints, and the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral body; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. In addition, as used in this specification, an element disposed on another element generally only indicates that there is a connection, coupling, cooperation or transmission relationship between the two elements, and the connection, coupling, cooperation or transmission between the two elements may be direct or indirect through an intermediate element, and it cannot be understood as indicating or implying the spatial position relationship between the two elements, that is, one element may be in any orientation such as inside, outside, above, below or on one side of another element, unless the content clearly indicates otherwise. The terms "upper", "lower", "top" and "bottom" are generally relative position relationships arranged in the direction of gravity; the terms "vertical, vertical direction" generally refer to the direction of gravity, which is generally perpendicular to the ground, and "horizontal, horizontal plane direction" generally refers to the direction parallel to the ground; for ordinary technicians in this field, the specific meanings of the above terms in this specification can be understood according to specific circumstances.
[0042] The purpose of the present invention is to provide a precast pile with expanded bottom by post-grouting at the pile end and a construction method thereof, so that the expanded bottom precast pile can be constructed by static pressure pile sinking technology and solve the problem that the bonding strength between the soil on the pile side and the precast pile body is weakened due to the squeezing and expansion effect of the enlarged grouting pile tip.
[0043] Please refer to Figures 1 to 5 The present invention provides a construction method for a prefabricated pile with post-grouting and bottom expansion, comprising:
[0044] Step S1: Processing the precast pile body 10 and the grouting pile tip 30, wherein the cross-sectional dimension of the grouting pile tip 30 is larger than the cross-sectional dimension of the precast pile body 10 (e.g. Figure 2 shown);
[0045] Step S2: After the first section of the precast pile body 10 passes through the static pile driver fixture (not shown in the figure), the grouting pile tip 30 and the grouting pipe 20 are installed to form a bottom-enlarged precast pile (such as Figure 3 shown);
[0046] Step S3: Use static pressure technology to sink the bottom-enlarged prefabricated pile to the designed elevation, and at the same time extend the grouting pipe 20 (such as Figure 4 shown);
[0047] Step S4: Grouting is performed into the pile end region 100 of the precast pile body 10 through the grouting pipe 20 and the grouting pile tip 30 to reinforce the soil layer (such as Figure 5 shown);
[0048] Step S5: Continue to grout the pile end area 100, and the grout returns along the pile side to reinforce the soil layer in the pile side area 101, completing the construction of the pile end rear grouting and bottom expansion prefabricated pile (such as Figure 5 shown).
[0049] It should be noted that in step S1, the cross-sectional shape of the prefabricated grouting pile tip 30 is circular, and the cross-sectional shape of the prefabricated pile body 10 is also circular. Therefore, in the present embodiment, the cross-sectional dimension is the diameter of the grouting pile tip 30 and the diameter of the prefabricated pile body 10. In other embodiments, the cross-sectional shape of the prefabricated pile body 10 may also be rectangular or other shapes, and correspondingly, the cross-sectional dimension is the side length of the prefabricated pile body 10. The ratio of the cross-sectional dimension of the grouting pile tip 30 to the cross-sectional dimension of the prefabricated pile body 10 is between 1.2 and 1.8, which can not only give full play to the role of the enlarged grouting pile tip 30, but also avoid the damage to the soil layer and the increase in cost caused by the excessively large grouting pile tip 30. In step S2, in order to facilitate prefabrication and transportation, a whole prefabricated pile is usually divided into multiple prefabricated pile sections for processing, and the grouting pipe 20 can also be divided into multiple sections; therefore, after the first section of the prefabricated pile body 10 passes through the static pressure pile driver clamp, it is necessary to weld the grouting pile tip 30 to the bottom of the first section of the prefabricated pile body 10, and at the same time, place the first section of the grouting pipe 20 inside the prefabricated pile body 10 and connect it to the prefabricated pile tip 30, so as to form a bottom-expanded prefabricated pile; the grouting pipe 20 can be inserted into the grouting pile tip 30, or it can be engaged with the grouting pile tip 30, and it can also be welded to the grouting pile tip 30. In step S3, a static pressure pile driver is used to perform pile sinking operation on the assembled expanded bottom precast pile, and each section of the precast pile body 10 is connected to the previous section of the precast pile body 10. At the same time, each section of the grouting pipe 20 is sequentially connected to the previous section of the grouting pipe 20. Finally, the grouting pipe 20 extends out of the precast pile body 10 and is connected to the grouting pump to form a grouting system. In some other embodiments, a component with the same function as the static pressure pile driver can also be used for pile sinking operation, and this embodiment does not limit this. As an optional embodiment, in this embodiment, the precast pile body 10 is a precast pile of equal cross-section. Therefore, during the pile sinking process, it is not necessary to change the size of the static pressure pile driver clamp, which can further improve the construction efficiency and avoid the time-consuming and labor-intensive situation caused by changing the clamp back and forth.
[0050] With such configuration, the precast pile body 10 and the grouting pile tip 30 are processed separately, and the bottom expansion function of the precast pile is realized by on-site assembly, which has a simple structure, is easy to manufacture, and is quick to install; the enlarged grouting pile tip 30 is adopted, so that the precast pile body 10 can be constructed using a static pressure method, which simplifies the construction process; at the same time, the enlarged grouting pile tip 30 increases the contact area between the precast pile end and the soil layer, thereby improving the end resistance of the precast pile; the grouting pile tip 30 is used to grout the precast pile end area 100, and the cement slurry reinforces the soil layer in this area, and the reinforced soil body 40 further improves the end resistance of the precast pile; the cement slurry returns along the pile side to reinforce the pile side soil layer damaged during the sinking process of the bottom-expanded precast pile, thereby improving the side resistance of the precast pile, thereby improving the overall bearing capacity of the precast pile, reducing the number of pile foundations, and reducing the project cost.
[0051] In another embodiment, please refer to Figure 6 to Figure 7 The present invention provides a precast pile with post-grouting and bottom expansion, comprising: a precast pile body 10, a grouting pipe 20 and a grouting pile tip 30; the grouting pile tip 30 is connected to the bottom of the precast pile body 10, the grouting pile tip 30 grouting pipe 20 extends from the top of the precast pile body 10 into the interior of the precast pile body 10 and is connected to the grouting pile tip 30, and is used for grouting the pile end area 100 of the precast pile body 10 through the grouting pile tip 30; wherein the cross-sectional dimension of the grouting pile tip 30 is greater than the cross-sectional dimension of the precast pile body 10. It should be noted that in the prior art, whether the variable cross-section precast pile relies on the pile body diameter change or the end plate diameter change to achieve the change of the cross-sectional area, it is necessary to adopt the mixing implantation or hole implantation method to sink the pile, which has many construction procedures and high cost, especially when the hole implantation process is used for construction, the pile end resistance is similar to that of the bored pile, and the bottom expansion has limited effect on improving the bearing capacity of the precast pile. Based on this, the present application adopts the form of grouting pile tip 30 to expand the bottom, that is, by setting the grouting pile tip 30 with a diameter larger than the diameter of the precast pile body 10 at the bottom of the precast pile body 10 (in this embodiment, the cross-sectional shapes of the precast pile body 10 and the grouting pile tip 30 are both circular, so the corresponding cross-sectional size is the diameter), so that during the pile sinking process, the grouting pile tip can be used to squeeze into the soil layer. At the same time, the precast pile body is a precast pile of equal cross-section. Therefore, the bottom-expanding precast pile proposed in this embodiment can be sunk by static pressure, which simplifies the construction process and reduces material consumption. At the same time, the enlarged grouting pile tip 30 increases the contact area between the end of the precast pile and the soil layer, thereby improving the end resistance of the precast pile; after the precast pile body 10 is sunk into place, grouting is injected into the soil layer at the pile end through the grouting pipe 20 and the grouting pile tip 30, and the cement slurry reinforces the soil layer in this area. The reinforced soil body 40 further improves the end resistance of the precast pile; as the grouting amount continues to increase, the cement slurry returns along the outer side of the precast pile body 10, reinforces the pile side area 101 of the precast pile body 10, and strengthens the pile side soil layer damaged during the sinking process of the precast pile body 10, thereby improving the side resistance of the precast pile, thereby improving the overall bearing capacity of the pile foundation, and can reduce the number of pile foundations and reduce the project cost.
[0052] In an optional embodiment, the ratio of the diameter of the grouting pile tip 30 to the diameter of the precast pile body 10 is between 1.2 and 1.8. In one embodiment, a precast pile body 10 with a diameter of 600 mm is used with a grouting pile tip 30 with a diameter of 800 mm. It is calculated that the pile end bearing area can be increased by about 78%, and the pile end resistance can be greatly improved. Therefore, in this embodiment, an enlarged grouting pile tip 30 is used, and the pile end post-grouting method is used to reinforce the pile end soil layer. The cement slurry is returned along the pile side to reinforce the pile side soil layer damaged during the pile sinking process of the precast pile body 10, further improving the pile end bearing capacity and side resistance, thereby improving the overall bearing capacity of the pile foundation.
[0053] Please refer to Figures 5 to 7 During the process of the grouting pile tip 30 sinking into the soil layer, the soil of the pile side area 101 of the precast pile body 10 is damaged by the squeezing and expansion effect of the enlarged grouting pile tip. After the grouting has reinforced the pile end area 100, it flows back along the pile body to reinforce the pile side area 101. Further, the grouting pile tip 30 is provided with a grouting hole 304. After the grouting flows to the grouting pile tip 30 through the grouting pipe 20, it penetrates into the pile end area 100 at the grouting hole 304. Furthermore, the grouting pile tip 30 protrudes in a direction away from the precast pile body 10 so that it can be squeezed into the soil layer during the pile sinking process. It should be noted that in this embodiment, the grouting pile tip 30 is a cross-shaped pile tip, which has a first rib 301 and a second rib 302 protruding outward, and chamfers 303 are also provided at both ends of the first rib 301 and the second rib 302. During the pile sinking process, the ribs cooperate with the chamfers 303, and the grouting pile tip 30 can be squeezed into the soil layer. At the same time, a grouting hole 304 is also provided on the grouting pile tip 30. After the slurry (cement slurry in this embodiment) flows to the grouting pile tip 30 through the grouting pipe 20, it is grouted into the pile end area 100 through the grouting hole 304, thereby increasing the pile end resistance of the precast pile. After the pile end area 100 is reinforced, the slurry returns along the pile body and penetrates into the pile side area 101 of the precast pile body 10 to strengthen the pile side soil layer damaged during the pile sinking process, thereby improving the side resistance of the precast pile body 10, thereby improving the overall bearing capacity of the pile foundation.
[0054] In summary, in the precast pile with post-grouting and bottom expansion and its construction method provided in the embodiment of the present invention, the construction method of the precast pile with post-grouting and bottom expansion at the pile end includes: processing the precast pile body and the grouting pile tip, the cross-sectional size of the grouting pile tip is larger than the cross-sectional size of the precast pile body; after the first section of the precast pile body passes through the static pressure pile driver clamp, the grouting pile tip and the grouting pipe are installed to form a precast pile with a bottom expansion; the precast pile with a bottom expansion is sunk to the designed elevation by the static pressure process, and the grouting pipe is extended at the same time; grouting is injected into the pile end area of the precast pile body through the grouting pipe and the grouting pile tip to reinforce the soil layer in the pile end area; grouting is continuously injected into the pile end area, and the slurry returns along the pile side to reinforce the soil layer in the pile side area, thereby completing the construction of the precast pile with post-grouting and bottom expansion at the pile end.
[0055] With such configuration, the precast pile body and the grouting pile tip are processed separately and assembled on site to achieve the bottom expansion function of the precast pile, which has a simple structure, is easy to manufacture and quick to install; the enlarged grouting pile tip enables the precast pile body to be constructed using a static pressure method, which simplifies the construction process; at the same time, the enlarged grouting pile tip increases the contact area between the precast pile end and the soil layer, thereby improving the end resistance of the precast pile; grouting is performed into the precast pile end area through the grouting pile tip, and the cement slurry reinforces the soil layer in this area, further improving the end resistance of the precast pile; the cement slurry returns along the pile side to reinforce the pile side soil layer damaged during the sinking process of the bottom-expanded precast pile, thereby improving the side resistance of the precast pile, thereby improving the overall bearing capacity of the precast pile, reducing the number of pile foundations and reducing the project cost. Furthermore, by adding an enlarged grouting pile tip, the above-mentioned precast piles can be sunk by static pressure implantation, which simplifies the construction process; at the same time, the enlarged grouting pile tip increases the contact area between the precast pile end and the soil layer, thereby improving the end resistance of the precast pile; grouting is performed into the precast pile end area through the grouting pile tip, and the cement slurry reinforces the soil layer in this area, thereby further improving the end resistance of the precast pile; the cement slurry returns along the pile side to reinforce the soil layer on the pile side that is damaged during the sinking process of the expanded bottom precast pile, thereby improving the side resistance of the precast pile, thereby improving the overall bearing capacity of the precast pile, reducing the number of pile foundations, and reducing the project cost.
[0056] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of protection of the claims.
Claims
1. A construction method for prefabricated piles with post-grouting and bottom expansion, characterized in that: include: Processing a precast pile body and a grouting pile tip, wherein the cross-sectional dimension of the grouting pile tip is larger than the cross-sectional dimension of the precast pile body; After the precast pile body of the first section passes through the static pile driver clamp, the grouting pile tip and the grouting pipe are installed to form a bottom-enlarged precast pile; The bottom-enlarged prefabricated piles are sunk to the designed elevation by using a static pressure process, and the grouting pipes are extended at the same time; Grouting is performed into the pile end region of the prefabricated pile body through the grouting pipe and the grouting pile tip to reinforce the soil layer in the pile end region; The grouting is continued to the pile end area, and the grouting returns along the pile side to reinforce the soil layer in the pile side area, thereby completing the construction of the pile end rear grouting and bottom expansion prefabricated pile.
2. The construction method of the pile end post-grouting and bottom-expanding prefabricated pile according to claim 1, characterized in that: The first section of the precast pile body passes through the static pressure pile driver clamp and is welded to the grouting pile tip. The grouting pipe is arranged inside the precast pile body and is connected to the grouting pile tip.
3. The construction method of prefabricated piles with post-grouting and bottom expansion as claimed in claim 1, characterized in that: The bottom-enlarged prefabricated pile is sunk to the designed elevation by using a static pile driver, and the grouting pipe is extended during the pile sinking process.
4. The construction method of prefabricated piles with post-grouting and bottom expansion as claimed in claim 1, characterized in that: The grouting pipe and the grouting pile tip are used to inject grout into the pile end area of the expanded bottom precast pile to reinforce the soil layer at the pile end.
5. The construction method of prefabricated piles with post-grouting and bottom enlargement as claimed in claim 1, characterized in that: The grouting pipe and the grouting pile tip are used to continue grouting into the pile end area of the expanded bottom precast pile, and the grouting returns along the pile side to reinforce the pile side soil damaged during the pile sinking process of the expanded bottom precast pile.
6. The construction method of prefabricated piles with post-grouting and bottom enlargement as claimed in claim 1, characterized in that: The precast pile body is a precast pile of uniform cross-section, and the static pile driver fixture does not need to be replaced during the static pile sinking process.
7. A prefabricated pile with post-grouting and bottom expansion, characterized in that: The precast pile with post-grouting and bottom enlargement applied to any one of claims 1 to 6 comprises: a precast pile body, a grouting pipe and a grouting pile tip; The grouting pile tip is connected to the bottom of the precast pile body, and the grouting pipe extends from the top of the precast pile body into the interior of the precast pile body and is connected to the grouting pile tip, so as to grout the pile end area of the precast pile body through the grouting pile tip; Wherein, the cross-sectional dimension of the grouting pile tip is larger than the cross-sectional dimension of the precast pile body.
8. The prefabricated pile with post-grouting and bottom enlargement as claimed in claim 7, characterized in that: The ratio of the cross-sectional dimension of the grouting pile tip to the cross-sectional dimension of the precast pile body is between 1.2 and 1.
8.
9. The prefabricated pile with post-grouting and bottom enlargement as claimed in claim 7, characterized in that: After the precast pile body described in the first section passes through the static pressure pile driver clamp, it is welded to the enlarged grouting pile tip to form an enlarged bottom precast pile.
10. The prefabricated pile with post-grouting and bottom enlargement as claimed in claim 7, characterized in that: The grouting pile tip is provided with a grouting hole. After the slurry flows to the grouting pile tip through the grouting pipe, it infiltrates into the pile end area at the grouting hole.