Dam foundation and bedrock joint anti-seepage device and treatment process thereof
By using curtain grouting, prestressed beams and overlapping anti-seepage layers at the base joints of the dam, combined with asphalt felt technology, the problems of poor water seepage and structural stability in traditional processes are solved, and efficient anti-seepage effect and structure are achieved Improved stability.
Patent Information
- Application Number
- CN202411083609.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-19
AI Technical Summary
Due to the water seepage and safety hazards caused by material differences and construction factors at the base joints of the dam, traditional consolidation grouting process is difficult to completely prevent leakage, and the structural stability is poor due to long-term influence of water pressure loads.
A dam foundation and bedrock joint anti-seepage device was designed, using curtain grouting, prestressed beam guards and overlapping anti-seepage layer, combined with asphalt felt technology with flow-plastic asphalt and fiber floe reinforcement, and set up a drainage system and seepage monitoring system. and the temperature control system, forming a dual mechanism of active anti-seepage and passive anti-seepage.
It significantly reduces the probability of water seepage in the joint area, enhances the bonding performance and overall strength, effectively deals with structural deformation and vibration, ensures the long-term stability and safety of the dam foundation structure, and achieves better waterproofing effects.
Smart Images

Figure CN118979521A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of anti-seepage construction for joint treatment of dam foundation of water conservancy project, and in particular to an anti-seepage device for joint between dam foundation and bedrock and a treatment process thereof. Background Art
[0002] The anti-seepage construction process of dam foundation joint treatment is mainly used for joint defects caused by foundation excavation, different materials, temperature stress and construction factors. It is a professional engineering measure, often combined with high-precision joint cleaning and detection systems, selected high-performance anti-seepage materials (high-performance cement-based grouting materials, chemical grouting agents, etc.), advanced grouting technology (curtain grouting, high-pressure jet grouting, etc.), concrete anti-seepage wall construction technology, etc., to ensure the safety and stability of its structure, especially to ensure the stability of hydraulic structures during operation. Implement refined construction quality control and effect evaluation (seepage data monitoring, anti-seepage material strength testing, anti-seepage performance acceptance test, etc.) to ensure the strict anti-seepage of dam foundation joints and ensure the long-term safe and stable operation of water conservancy projects.
[0003] The commonly used process for traditional joint treatment is consolidation grouting. In the long run, different gaps may still appear between structures due to the properties of different materials, which may easily lead to water seepage and safety hazards at the joints. With the development of anti-seepage technology, the durability, flexibility and elasticity of anti-seepage materials are suitable for this type of joint treatment. Combined with other construction processes (curtain grouting), it can effectively prevent leakage safety hazards at the joints. At the same time, due to the influence of water pressure loads all year round, the stability of the structure is also extremely important. An unstable foundation can easily lead to deformation of the dam body and dam foundation.
[0004] Therefore, in order to solve the above problems, this paper proposes an anti-seepage device for the joint between dam foundation and bedrock and its treatment process. Summary of the invention
[0005] The object of the present invention is to provide a dam foundation and bedrock joint anti-seepage device that can buffer the deformation, displacement, vibration, etc. of the dam structure.
[0006] In order to achieve the above-mentioned purpose, the present invention is implemented through the following technical solutions: a dam foundation and bedrock joint anti-seepage device, including a dam A and a joint anti-seepage device B, characterized in that: an anti-seepage device B is arranged between the dam A and the bedrock, curtain grouting and drainage pipes are arranged at the bottom of the bedrock, and prestressed guard beams are arranged upstream and downstream of the dam foundation; the joint anti-seepage device B includes a corridor arranged in the dam body above the dam foundation, and a drainage system, a seepage monitoring system and a temperature control system are arranged in the corridor, the drainage system is provided with a seepage drainage pipe, and the seepage monitoring system is provided with a monitoring pipe and a piezometer; an electric melting heating port and a temperature meter are arranged in the temperature control system; a superimposed anti-seepage layer is arranged between the upstream and downstream of the dam foundation and the bedrock; and prestressed guard beams are arranged upstream and downstream of the dam foundation.
[0007] Furthermore, the drainage pipe penetrates the anti-seepage layer and enters the bedrock, and piezometers are arranged at intervals on the drainage pipe; the temperature meter and the capacitor heating port are respectively connected to the temperature sensor and the spring heating resistance wire through electrical connecting lines.
[0008] Furthermore, a prestressed guard beam, an anti-seepage layer, a curtain grouting reserved hole and curtain grouting are arranged at the upstream end of the composite anti-seepage layer; a prestressed guard beam and an anti-seepage layer are arranged at the downstream end of the composite anti-seepage layer; and the curtain grouting reserved hole runs through the composite anti-seepage layer.
[0009] Furthermore, the prestressed protection beam comprises a prestressed steel wire rope and a prestressed protection beam anchor head; a prestressed anchor, a concrete sealing anchor and a prestressed steel wire for fixing the laminated anti-seepage layer are arranged on the side of the prestressed protection beam; the prestressed protection beam at the upstream end of the laminated anti-seepage layer is arranged in a tongue-and-groove style where it fits the dam foundation and is filled with polyurethane sealing paste;
[0010] The anti-seepage layer is formed by stacking asphalt felt, prestressed steel wire, asphalt protective layer, spring heating resistance wire, liquid asphalt and hemp wire in sequence;
[0011] The asphalt felt is composed of fiber wool and fluidized asphalt mixed and bonded; the prestressed steel wire passes through the prestressed guard beam and is tensioned and anchored after the complete laminated anti-seepage layer is installed;
[0012] The prestressed steel wire is provided with an asphalt protective layer on the upper and lower sides, and the prestressed steel wire is provided with two layers, the upper and lower layers;
[0013] The spring heating resistance wire is arranged between the upper and lower prestressed steel wires, and asphalt protective layers are arranged on the upper and lower parts of the spring heating resistance wire. Liquid asphalt and hemp are arranged inside the spring heating resistance wire for filling, and polyurethane sealing paste is used to seal the two ends of the spring heating resistance wire; a temperature sensor is arranged inside the spring heating resistance wire; the temperature sensor is connected in series to the electric melting heating port through an electrical connection.
[0014] Furthermore, an anti-seepage layer, a pre-buried casing for a drainage pipe, and a pre-buried casing for a monitoring pipe are arranged in the middle between the upstream and downstream of the laminated anti-seepage layer; and a plurality of the anti-seepage layer, the pre-buried casing for a drainage pipe, and the pre-buried casing for a monitoring pipe are evenly distributed.
[0015] Furthermore, asphalt felt technology is used at the contact interface between the bedrock and the dam foundation; by processing the bedrock into an irregular tongue-and-groove shape and applying cold primer oil on the surface of the bedrock, the asphalt felt is easy to bond with, and the contact surface of the asphalt felt is set to an irregular shape when the dam foundation concrete is rolled, thereby forming an active anti-seepage effect; as the dam foundation concrete is poured layer by layer and the thickness increases, the gradually accumulated gravity and the heat reaction of concrete hydration make the anti-seepage contact surface denser.
[0016] Another object of the present invention is to provide a treatment process for an anti-seepage device for a joint between a dam foundation and bedrock, characterized in that it comprises the following steps:
[0017] S1. First, excavate to the base design elevation according to the actual situation and design requirements of the foundation pit, and carry out a series of drainage operations at the same time. According to the geological conditions shown by the geological survey, trim the bedrock surface and clean the fine sand and gravel to make the bedrock surface clean; after drying, apply cold primer appropriately, and apply the uneven parts of the bedrock surface to facilitate the bonding of the asphalt felt;
[0018] S2. Arrange the embedded casings of the drainage pipe and the detection pipe according to the design drawings, reserve the reserved holes for curtain grouting, and seal the surrounding of the embedded casings; then carry out the construction of the prestressed guard beam, install the prestressed steel wire rope and casing, and after the prestressed guard beam concrete reaches a certain strength, carry out prestressing tensioning and seal the anchor head of the prestressed guard beam;
[0019] S3. Lay the bottom asphalt protective layer; first make the asphalt felt according to the drawing and paste it under the asphalt protective layer, and then start laying it on the bedrock coated with cold primer after it stabilizes;
[0020] S4, then install the prestressed steel wire on the already laid asphalt protective layer, and pass it through the reserved pipeline through the prestressed guard beam, and after prestressing, bury the prestressed anchor into the concrete anchor seal;
[0021] S5. Then, an asphalt protective layer is laid on the upper part of the prestressed steel wire. After the laying is completed, polyurethane sealant is installed at both ends to pre-block. Then, the spring heating resistance wire, temperature sensor and electrical connection wire are installed. Then, liquid asphalt and hemp are filled inside the spring heating resistance wire.
[0022] S6. After filling, lay the asphalt protective layer on the upper part of the spring heating resistance wire, and then carry out the upper construction according to the operation steps of the prestressed steel wire on the lower layer, make the asphalt felt according to the drawing and paste it on the upper surface of the asphalt protective layer, and lay the prepared asphalt protective layer on the prestressed steel wire;
[0023] S7. Finally, the upper dam body is constructed, and the joints between the prestressed guard beam and the dam body are sealed with polyurethane sealant. In addition, the drainage pipe is connected and the detection pipe is installed. The electric melting heating port and the temperature meter are installed in the corridor, and the temperature meter and the capacitor heating port are respectively connected to the temperature sensor and the spring heating resistance wire through electrical connecting wires. The necessary curtain grouting construction can then be carried out.
[0024] The beneficial effects of the present invention are:
[0025] 1. The joint anti-seepage device innovatively combines the fluidized asphalt and fiber-strengthened asphalt felt technology at the contact interface between the bedrock and the dam foundation to form an active anti-seepage device. Compared with traditional asphalt waterproofing membranes, this technology significantly reduces the probability of water seepage in the joint area in the horizontal, longitudinal and vertical dimensions. This composite material exhibits excellent bonding properties, forming a tightly integrated dense structure with the bedrock and the dam foundation, enhancing cohesion and overall strength. For the irregular foundation surface caused by bedrock excavation, this material can flexibly adapt to complex terrain and ensure close fit with the groove surface. As the dam foundation concrete is poured layer by layer and the thickness increases, the gradually accumulated gravity and concrete hydration heat reaction cause the anti-seepage contact surface to achieve a higher density. In this process, the asphalt felt exhibits excellent deformation adaptability and effectively responds to the gravity compaction process, thereby further consolidating the stability and durability of the anti-seepage layer.
[0026] 2. The joint anti-seepage device integrates double prestressed steel wires inside the laminated anti-seepage layer, which are anchored and locked by prestressed guard beams at both ends, and waterproof coiled materials are used above and below the prestressed steel wires to protect them. When prestress is applied to the prestressed steel wires, it can effectively adapt to the deformation of the steel wires, and also enhance the overall strength of the laminated anti-seepage layer, thereby improving the durability and structural stability of the anti-seepage system;
[0027] 3. The composite anti-seepage layer is unique in structure. The middle core layer is made of liquid asphalt and hemp fiber composite material. The material is flexible in design and can naturally adapt to the structural deformation of the dam foundation and bedrock. In order to further enhance its adaptability, a spring heating resistance wire system is embedded in the layer. The system can not only effectively cope with multi-dimensional deformation, vibration and displacement, but also enhance the dynamic stability of the overall structure through integrated technology. At the same time, the piezometer installed in conjunction continuously monitors the internal seepage volume of the bedrock and provides accurate data to reflect the bottom seepage condition, which is crucial for evaluating and preventing the uplift pressure and upward seepage caused by bedrock seepage. To prevent this risk, a temperature sensor is added to the spring heating resistance wire system to achieve real-time observation and recording of the internal temperature; this sensor is connected to the electric melting heating port through an electrical connection line, allowing remote or automatic control of the heating process, thereby adjusting the density and structure of the liquid asphalt and hemp fiber mixture, strengthening its waterproof barrier function, and forming an efficient passive anti-seepage mechanism; reducing the erosion of the dam foundation concrete structure caused by the seepage at the bottom of the bedrock from the root, ensuring the long-term stability and safety of the dam foundation structure, effectively resisting various impacts caused by vibration, deformation and displacement of the dam body, and improving the durability and safety of the overall water conservancy project;
[0028] 4. The design of the laminated anti-seepage layer is flexible and supports segmented or overall laying strategies, which is convenient for construction deployment. During the laying process, underground drainage casings and curtain grouting reserved holes can be pre-buried simultaneously to facilitate subsequent pipeline connection operations. This design also takes into account the installation requirements of monitoring equipment such as electric melting heating ports, temperature meters and piezometers. By reserving interfaces and spaces, it ensures that each component can be efficiently integrated and work together. It can also be used in conjunction with curtain grouting to fully optimize the anti-seepage performance and achieve better waterproofing effects. In addition, the laminated anti-seepage layer innovatively integrates active and passive anti-seepage technologies, realizes the synergistic effect of dual protection mechanisms, and significantly improves the overall anti-seepage performance.
[0029] 5. The prestressed protective beam is connected to the composite anti-seepage system. The composite anti-seepage layer has built-in prestressed steel wire cables to apply prestress, so that the prestressed protective beam fits closely to the side wall of the dam foundation to achieve efficient contact sealing. Polyurethane sealant is used for precise sealing at the upper tongue and groove, which significantly improves the overall anti-seepage performance. As a prestressed component, the protective beam not only demonstrates excellent water pressure bearing capacity on the upstream water-facing surface, but also has good resistance to dam foundation deformation, ensuring the stability and safety of the structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0031] Figure 1 It is a general schematic diagram of the joint between the dam and the bedrock of the present invention;
[0032] Figure 2 It is a schematic diagram of the joint treatment between the dam foundation and the bedrock of the present invention;
[0033] Figure 3 It is a transverse cross-sectional view of the joint between the dam foundation and the bedrock of the present invention;
[0034] Figure 4 For the present invention Figure 3 The enlarged schematic diagram at C in the middle;
[0035] Figure 5 For the present invention Figure 3 The enlarged schematic diagram at D in the middle;
[0036] Figure 6 It is a schematic diagram of the detailed structure of the asphalt felt of the present invention;
[0037] Figure 7 It is a longitudinal cross-sectional view of the joint between the dam foundation and the bedrock of the present invention;
[0038] Figure 8 It is a plan view of the laminated anti-seepage material of the present invention.
[0039] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0040] 1. Dam body; 11. Corridor; 111. Electric melting heating port; 112. Osmometer; 113. Monitoring pipe; 114. Electrical connection line; 115. Temperature meter; 12. Drain pipe; 13. Polyurethane sealant; 14. Prestressed beam guard; 15. Prestressed anchor; 16. Concrete anchor seal; 17. Dam foundation; 18. Prestressed beam guard anchor head; 19. Prestressed steel wire rope; 2. Composite anti-seepage layer; 21. Asphalt felt; 211. Fiber wool; 212. Flow plastic asphalt; 22. Asphalt protective layer; 23. Prestressed steel wire; 24. Spring heating resistance wire; 241. Liquid asphalt; 242. Temperature sensor; 243. Hemp silk; 25. Pre-buried casing; 26. Cold primer; 3. Bedrock; 4. Curtain grouting; 41. Curtain grouting reserved hole; DETAILED DESCRIPTION
[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] Example 1
[0043] See also Figures 1 to 8 As shown, a joint anti-seepage device for a dam foundation and bedrock comprises a dam A and a joint anti-seepage device B. The anti-seepage device B is arranged between the dam A and the bedrock 3. The bottom of the bedrock 3 is provided with a curtain grouting 4, a drainage pipe 12, etc., and prestressed guard beams 14 are arranged upstream and downstream of the dam foundation 3. The joint anti-seepage device B is intended to prevent water seepage caused by shrinkage deformation and displacement of the joint due to the different materials of the dam foundation and the bedrock. The joint anti-seepage device B comprises:
[0044] The gallery 11 is arranged in the dam body 1 above the dam foundation 17, and includes a drainage system, a seepage monitoring system, a temperature control system, etc. The drainage system is provided with a seepage drainage pipe 12, the seepage monitoring system is provided with a monitoring pipe 113 and a piezometer 112, which are used to monitor the seepage volume of the joint between the dam foundation 17 and the bedrock 3 and the underground part, and the temperature control system is provided with an electric melting heating port 111 and a temperature meter 115;
[0045] The laminated anti-seepage layer 2 is arranged between the dam foundation 17 and the bedrock 3 at the lower part of the dam body 1;
[0046] The prestressed protection beam 14 is arranged upstream and downstream of the dam foundation 17 .
[0047] In this embodiment, a corridor 11 is set inside the dam A, and a drainage pipe 12 is connected to the corridor 11, penetrating the anti-seepage layer into the bedrock 3, and piezometers 112 are arranged at intervals for seepage monitoring. A temperature meter 115 and a capacitor heating port 111 are installed in the corridor 11, which are connected to the spring heating resistor 24 and the temperature sensor 242 through an electrical connecting line 114, so as to monitor the internal temperature of the anti-seepage layer.
[0048] In this embodiment, the prestressed protection beam 14 is arranged close to the upstream of the dam foundation 17, and is provided with a prestressed steel wire rope 19 and a prestressed protection beam anchor head 18. The upstream part that fits the dam foundation is arranged in a tongue-and-groove style and filled with polyurethane sealant 13 for water-stopping sealing. Prestressed anchors 15 and concrete sealing anchors 16 are arranged on the side of the prestressed protection beam 14 for fixing and anchoring the prestressed steel wire 23 of the laminated anti-seepage layer 2.
[0049] Among them, the specification of the prestressed steel wire 23 is φ1.0-2.0mm, the specification of the prestressed steel wire rope 19 is φ10-12mm, and the concrete strength of the prestressed protective beam 14 should be at least two levels greater than the strength of the dam body.
[0050] In this embodiment, the upstream end of the laminated anti-seepage layer 2 is provided with a prestressed guard beam 14, an anti-seepage layer 2, a curtain grouting reserved hole 41 and a curtain grouting 4. The anti-seepage layer is laminated, and includes an asphalt felt 21, a prestressed steel wire 23, an asphalt protective layer 22, a spring heating resistor 24, liquid asphalt 241 and hemp 243. The asphalt felt 21 is composed of a mixture of fiber wool 211 and flow-molded asphalt 212, and is bonded to the surface layer of the asphalt protective layer 22. The prestressed steel wire 23 passes through the prestressed guard beam 14, and is tensioned and anchored after the complete laminated anti-seepage layer 2 is installed. The asphalt protective layer 22 is set on the upper and lower parts of the prestressed steel wire 23, and the prestressed steel wire 23 is set in two upper and lower parts. The spring heating resistor 24 is set in the middle of the entire laminated anti-seepage layer, and is sandwiched in the middle of the asphalt protective layer 22. Liquid asphalt 241 and hemp 243 are set in the middle for filling, and polyurethane sealant 13 is used to seal the two ends. The bedrock 3 is irregularly tongue-and-groove shaped and is coated with cold primer 26, which makes it easy for the asphalt felt 21 to bond. When the concrete of the dam foundation 17 is rolled, the contact surface with the asphalt felt 21 is also irregular, which makes it easy to avoid water infiltration. The curtain grouting reserved hole 41 runs through the laminated anti-seepage layer 2, which is convenient for the later curtain grouting 4 operation and forms a good connection.
[0051] In this embodiment, an impermeable layer and a pre-buried sleeve 25 of a drainage pipe are arranged in the middle between the upstream and downstream of the laminated impermeable layer 2. The impermeable system adopts a composite laminated structure design, which specifically includes the following key components: the asphalt felt 21 is made of fiber flocs and liquid asphalt mixed and bonded, and is tightly attached to the surface of the outer asphalt protective layer 22; the prestressed steel wire 23 reinforcement system is provided with an asphalt protective layer 22 on both the upper and lower layers, and is arranged in double channels; the middle layer integrates a spring heating resistance wire 24 network, which is embedded in the central area of the asphalt protective layer 22, and is sealed and filled by pouring liquid asphalt and embedding hemp wire. The spring heating resistance wire 24 element integrates a temperature sensor 242, and the resistance wire is directly connected in series to the electric melting heating port 111 by electrical connection to realize the integrated design of temperature monitoring and heating control. The bedrock 3 interface is treated as a special irregular tongue-and-groove structure, which is intended to optimize the bonding performance with the asphalt felt 21 and enhance the sealing effect. At the same time, considering the shape adaptability of the concrete of the dam foundation 17 during the rolling process, its contact surface also presents an irregular shape to naturally fit the surface of the asphalt felt 21 to form a tighter waterproof barrier. The embedded sleeves 25 of the drainage pipe are arranged at a fixed interval to facilitate the installation of the drainage pipe 12 in the later stage.
[0052] The composite center area composed of the spring heating resistor wire 24 integrated in the middle layer and the liquid asphalt layer and the hemp 243 reinforcing fibers contained therein needs to be designed with a reserved space of 2-5 mm. This space configuration is intended to optimize the stability of the overall structure, and to ensure that the overall anti-seepage layer can maintain its structural integrity and performance stability during temperature changes, material expansion or contraction by providing the necessary expansion margin and thermal stress buffer.
[0053] In this embodiment, the prestressed protective beam 14 of the downstream part of the composite anti-seepage layer 2 is also precisely placed on the downstream side of the dam foundation 17, tightly fitting the dam foundation 17, and is internally provided with a prestressed steel wire rope 19 and a corresponding prestressed protective beam anchor head 18. The side of the prestressed protective beam 14 is provided with a professional prestressed anchor 15 and a concrete sealing anchor 16. These design elements work together in the composite anti-seepage system to fix and anchor the prestressed steel wire 23, thereby enhancing the overall strength and stability of the anti-seepage layer.
[0054] In this embodiment, the laminated anti-seepage layer 2 material integrates asphalt felt 21, asphalt protective layer 22, spring heating resistor wire 24, etc. The asphalt felt 21 is made of a mixture of fiber wool 211 and flow-molded asphalt 212; the prestressed steel wire 23 is arranged in two paths, with asphalt protective layer 22 on the upper and lower sides; the spring heating resistor wire 24 is centered in the anti-seepage layer, sandwiched between the asphalt protective layer 22, and filled with liquid asphalt 241 and hemp 243, and the spring heating resistor wire 24 is provided with a temperature sensor 242 and an electrical connection line 114; thus, an integrated laminated anti-seepage layer is formed, and this laminated anti-seepage layer can be used in sections or as a whole, or it can be set only within a certain range at the upstream end joint.
[0055] When it is only set at the upstream end, the width of the laminated anti-seepage layer 2 can be controlled between 3-5m, and the width can also be increased according to the on-site conditions, but it needs to be laid longitudinally through the dam body to ensure the overall closure of the anti-seepage system.
[0056] In this embodiment, at the contact interface between the bedrock 3 and the dam foundation 17, the asphalt felt 21 technology enhanced by the flow-molded asphalt 212 and the fiber wool 211 is combined, which is conducive to bonding with the contact surface to form an active anti-seepage. With the layer-by-layer pouring and thickness increase of the concrete of the dam foundation 17, the gradually accumulated gravity and the heat reaction of concrete hydration cause the anti-seepage contact surface to reach a higher density. The core layer in the middle of the laminated anti-seepage layer 2 adopts a composite material of liquid asphalt 241 and hemp silk 243, which can naturally conform to the structural deformation of the dam foundation 17 and the bedrock 3. In order to further enhance its adaptability, a spring heating resistance wire 24 system is embedded in this layer. At the same time, the osmometer 112 installed in conjunction with the bedrock continuously monitors the internal seepage volume of the bedrock and provides accurate data to reflect the bottom seepage condition, which is crucial for evaluating and preventing the uplift pressure and upward seepage caused by the seepage of the bedrock 3. To prevent the occurrence of this risk, a temperature sensor 242 is added to the spring heating resistance wire 24 system to achieve real-time observation and recording of the internal temperature. This sensor is connected to the electric melting heating port 111 via an electrical connection line 114, allowing remote or automatic control of the heating process, thereby adjusting the density and structure of the mixture of liquid asphalt 241 and hemp 243, strengthening its waterproof barrier function, and forming an efficient passive anti-seepage mechanism. The laminated anti-seepage layer 2 innovatively integrates active and passive anti-seepage technologies, realizes the synergistic effect of the dual protection mechanism, and thus significantly improves the overall anti-seepage performance.
[0057] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0058] Example 2
[0059] This embodiment describes a treatment process of a dam foundation and bedrock joint anti-seepage device according to the present invention, which is specifically as follows:
[0060] During the work, firstly, excavate to the design elevation of the base according to the actual situation of the foundation pit and the design requirements, and carry out a series of drainage operations at the same time, and trim the three sides of the bedrock according to the geological conditions shown by the geological survey, and clean up the fine sand and gravel to make the three sides of the bedrock clean. After drying, apply cold primer 26 appropriately, and the uneven parts of the three sides of the bedrock should be painted in place to facilitate the bonding of the upper layer of asphalt felt 21.
[0061] Secondly, the embedded sleeves 25 of the drainage pipe 12 and the detection pipe 113 are arranged according to the design, and the curtain grouting reserved holes 41 are reserved, and the surrounding of the embedded sleeves 25 are sealed. Then the prestressed guard beam 14 is constructed, and the prestressed steel wire rope 19 and the sleeve are installed. After the concrete of the prestressed guard beam 14 reaches a certain strength, the prestressing tensioning and the anchor head 18 of the prestressed guard beam are sealed. In addition, when laying the bottom asphalt protective layer 22, the asphalt felt 21 should be made according to the drawings and pasted and installed under the asphalt protective layer 22. After it is stable, it is laid on the bedrock 17 coated with cold primer 26.
[0062] Furthermore, the prestressed steel wire 23 is installed on the asphalt protective layer 22 that has been laid, and passes through the prestressed guard beam 14 through the reserved pipeline, and after prestressing, the prestressed anchor 15 is buried in the concrete anchor 16. Then, the asphalt protective layer 22 on the upper part of the prestressed steel wire 23 is laid, and the polyurethane sealant 13 at both ends is installed for pre-sealing, and then the spring heating resistor wire 24, the temperature sensor 242 and the electrical connection line 114 are installed, and then the liquid asphalt 241 and the hemp 243 are filled in this space.
[0063] Afterwards, lay the asphalt protective layer 22 on the top of the spring heating resistor wire 24, and then carry out the upper construction according to the operating steps of the lower prestressed steel wire 23, make the asphalt felt 21 according to the drawing and paste it on the upper surface of the asphalt protective layer 22, and lay the prepared asphalt protective layer on the prestressed steel wire 23 before the construction of the upper dam foundation 17 can be carried out.
[0064] Finally, the upper dam body 1 is constructed, and the connection between the prestressed guard beam 14 and the dam body 1 is sealed with polyurethane sealant 13. In addition, the drainage pipe 12 is connected and the detection pipe 113 is installed, and the electric melting heating port 111, the temperature meter 115 and the electrical connection line 114 are installed in the corridor. The necessary curtain grouting 4 is constructed.
[0065] It is worth noting that the laminated anti-seepage layer 2 can be made on-site according to the process or prefabricated in the factory. If the laminated anti-seepage layer 2 is a prefabricated part, many process steps of on-site construction can be reduced, but it is still necessary to reasonably choose prefabrication or on-site production and installation according to the process according to the actual situation on site. On-site production and installation also need to be reasonably organized in combination with various factors such as bedrock geological conditions and environment.
[0066] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0067] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A dam foundation and bedrock joint anti-seepage device, comprising a dam A and a joint anti-seepage device B, characterized in that: An anti-seepage device B is arranged between the dam A and the bedrock, curtain grouting and drainage pipes are arranged at the bottom of the bedrock, and prestressed guard beams are arranged upstream and downstream of the dam foundation; the joint anti-seepage device B includes a corridor arranged in the dam body above the dam foundation, and the corridor is provided with a drainage system, a seepage monitoring system and a temperature control system, the drainage system is provided with a seepage drainage pipe, and the seepage monitoring system is provided with a monitoring pipe and a piezometer; an electric melting heating port and a temperature meter are arranged in the temperature control system; a superimposed anti-seepage layer is arranged between the upstream and downstream of the dam foundation and the bedrock; and prestressed guard beams are arranged upstream and downstream of the dam foundation.
2. The anti-seepage device for the joint between dam foundation and bedrock according to claim 1, characterized in that: The drainage pipe penetrates the anti-seepage layer and enters the bedrock. The piezometers are arranged at intervals on the drainage pipe. The temperature meter and the capacitor heating port are respectively connected to the temperature sensor and the spring heating resistance wire through electrical connecting wires.
3. The anti-seepage device for the joint between dam foundation and bedrock according to claim 1, characterized in that: A prestressed guard beam, an anti-seepage layer, a curtain grouting reserved hole and curtain grouting are arranged at the upstream end of the composite anti-seepage layer; a prestressed guard beam and an anti-seepage layer are arranged at the downstream end of the composite anti-seepage layer; the curtain grouting reserved hole penetrates the composite anti-seepage layer.
4. The anti-seepage device for the joint between dam foundation and bedrock according to claim 3, characterized in that: The prestressed protection beam comprises a prestressed steel wire rope and a prestressed protection beam anchor head; a prestressed anchor, a concrete sealing anchor and a prestressed steel wire for fixing the laminated anti-seepage layer are arranged on the side of the prestressed protection beam; the prestressed protection beam at the upstream end of the laminated anti-seepage layer is arranged in a tongue-and-groove style at the location where it fits the dam foundation and is filled with polyurethane sealing paste; The anti-seepage layer is formed by stacking asphalt felt, prestressed steel wire, asphalt protective layer, spring heating resistance wire, liquid asphalt and hemp wire in sequence; The asphalt felt is composed of fiber wool and fluidized asphalt mixed and bonded; the prestressed steel wire passes through the prestressed guard beam and is tensioned and anchored after the complete laminated anti-seepage layer is installed; The prestressed steel wire is provided with an asphalt protective layer on the upper and lower sides, and the prestressed steel wire is provided with two layers, the upper and lower layers; The spring heating resistance wire is arranged between the upper and lower prestressed steel wires, and asphalt protective layers are arranged on the upper and lower parts of the spring heating resistance wire. Liquid asphalt and hemp are arranged inside the spring heating resistance wire for filling, and polyurethane sealing paste is used to seal the two ends of the spring heating resistance wire; a temperature sensor is arranged inside the spring heating resistance wire; the temperature sensor is connected in series to the electric melting heating port through an electrical connection.
5. The anti-seepage device for the joint between dam foundation and bedrock according to claim 1, characterized in that: The middle part between the upstream and downstream of the laminated anti-seepage layer is provided with an anti-seepage layer, a pre-buried casing of a drainage pipe and a pre-buried casing of a monitoring pipe; the anti-seepage layer, the pre-buried casing of the drainage pipe and the pre-buried casing of the monitoring pipe are evenly distributed in a plurality.
6. The anti-seepage device for the joint between dam foundation and bedrock according to claim 1, characterized in that: Asphalt felt technology is used at the contact interface between the bedrock and the dam foundation. The bedrock is processed into an irregular tongue-and-groove shape and cold primer is applied on the surface of the bedrock to facilitate bonding of the asphalt felt. When the dam foundation concrete is rolled, the contact surface of the asphalt felt is set to an irregular shape to form active anti-seepage. As the dam foundation concrete is poured layer by layer and the thickness increases, the gradually accumulated gravity and the heat reaction of concrete hydration make the anti-seepage contact surface denser.
7. A treatment process for an anti-seepage device for a joint between a dam foundation and bedrock according to any one of claims 1 to 6, characterized in that: The steps include: S1. First, excavate to the base design elevation according to the actual situation and design requirements of the foundation pit, and carry out a series of drainage operations at the same time. According to the geological conditions shown by the geological survey, trim the bedrock surface and clean the fine sand and gravel to make the bedrock surface clean; after drying, apply cold primer appropriately, and apply the uneven parts of the bedrock surface to facilitate the bonding of the asphalt felt; S2. Arrange the embedded casings of the drainage pipe and the detection pipe according to the design drawings, reserve the reserved holes for curtain grouting, and seal the surrounding of the embedded casings; then carry out the construction of the prestressed guard beam, install the prestressed steel wire rope and casing, and after the prestressed guard beam concrete reaches a certain strength, carry out prestressing tensioning and seal the anchor head of the prestressed guard beam; S3. Lay the bottom asphalt protective layer; first make the asphalt felt according to the drawing and paste it under the asphalt protective layer, and then start laying it on the bedrock coated with cold primer after it stabilizes; S4, then install the prestressed steel wire on the already laid asphalt protective layer, and pass it through the reserved pipeline through the prestressed guard beam, and after prestressing, bury the prestressed anchor into the concrete anchor seal; S5. Then, an asphalt protective layer is laid on the upper part of the prestressed steel wire. After the laying is completed, polyurethane sealant is installed at both ends to pre-block. Then, the spring heating resistance wire, temperature sensor and electrical connection wire are installed. Then, liquid asphalt and hemp are filled inside the spring heating resistance wire. S6. After filling, lay the asphalt protective layer on the upper part of the spring heating resistance wire, and then carry out the upper construction according to the operation steps of the prestressed steel wire on the lower layer, make the asphalt felt according to the drawing and paste it on the upper surface of the asphalt protective layer, and lay the prepared asphalt protective layer on the prestressed steel wire; S7. Finally, the upper dam body is constructed, and the joints between the prestressed guard beam and the dam body are sealed with polyurethane sealant. In addition, the drainage pipe is connected and the detection pipe is installed. The electric melting heating port and the temperature meter are installed in the corridor, and the temperature meter and the capacitor heating port are respectively connected to the temperature sensor and the spring heating resistance wire through electrical connecting wires. The necessary curtain grouting construction can then be carried out.