Fabricated horizontal warehouse wall construction method

Through the prefabricated bungalow warehouse wall construction method combining modular design and prefabricated components, the traditional problems of low construction efficiency and insufficient strength of the connecting parts are solved, and the wall design with stable structure, convenient construction and multifunctionality is achieved, which has improved the Construction efficiency and wall insulation performance and durability.

CN118979639APending Publication Date: 2024-11-19CHINA COMM GUANGHANG BUREAU FIFTH ENG CO LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411279770.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

In the construction of traditional bungalow warehouses, the lack of strength of the connection parts and the single wall function.

Method used

The wall construction method of prefabricated bungalow warehouses is adopted with a combination of modular design and prefabricated components. By inserting steel pipe piles on the ground to build a formwork cast foundation, laying the inner bottom plate of the warehouse and installing a water pump, building a formwork casting wall, and using a special lower wall The precision docking mechanism between the board and the upper wall panel has a built-in insulation layer and wear-resistant layer to enhance the connection seal and mechanical strength.

Benefits of technology

It significantly improves construction efficiency, enhances the insulation performance and durability of the wall, solves the problem of insufficient strength in the connection area, and realizes multifunctionalization of the structure and rapid assembly and disassembly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979639A_ABST
    Figure CN118979639A_ABST
Patent Text Reader

Abstract

According to the fabricated horizontal warehouse construction method provided by the invention, by adopting a mode of combining modular design and prefabricated parts, the construction efficiency is remarkably improved, the field operation time and the labor intensity are reduced, and the stability of a wall body foundation is ensured by utilizing the steel pipe piles and a matched pouring technology. A precise butt joint mechanism between the lower wallboard and the upper wallboard enhances the sealing performance and the mechanical strength of a connecting part, the problem that the strength of the connecting part is insufficient in a traditional method is solved, the design of a built-in heat preservation layer and a wear-resisting layer not only improves the heat preservation performance of the wall, but also enhances the durability of the wall, the wall structure is more multifunctional, and the service life of the wall is prolonged. The quick assembly and disassembly mechanism of the wall body components facilitates later maintenance and adjustment, and solves the problems of low construction efficiency, insufficient strength of connecting parts and single function of the wall body in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of bunk house construction, and in particular to a method for constructing a wall of an assembled bunk house. Background Art

[0002] In the traditional bungalow construction process, the wall construction is usually carried out by cast-in-place concrete or prefabricated components. Although cast-in-place concrete has better integrity, it has a long construction period, a large amount of on-site work, and is greatly affected by the weather. Although prefabricated components can partially solve the problem of low on-site construction efficiency, they are prone to damage during transportation and installation, and the sealing and strength of the connection parts are often difficult to guarantee.

[0003] Therefore, the present invention proposes a new method for constructing the wall of a prefabricated bungalow warehouse, which solves the problems of low construction efficiency, insufficient strength of the connection parts and single wall function in the prior art, and provides a prefabricated wall structure with stable structure, convenient construction and good thermal insulation and wear resistance. The thermal insulation material and wear-resistant layer are introduced into the wall, which can effectively improve the thermal insulation performance and durability of the wall. The modular assembly method is adopted, which not only speeds up the construction speed, but also improves the overall stability and safety of the wall. The existing prefabricated walls still have some problems in practical applications. Summary of the invention

[0004] The main purpose of the present invention is to provide a method for constructing the walls of an assembled bungalow warehouse, which solves the problems of low construction efficiency, insufficient strength of connecting parts and single wall function existing in the prior art.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for constructing a wall of a prefabricated flat warehouse, the method comprising: S1. Place multiple steel pipe piles on the ground, install pile caps on the top of the steel pipe piles, and then build templates on the steel pipe piles to cast the foundation; S2. Lay the inner bottom plate on the foundation, install water pumps on both sides of the inner bottom plate, and connect the water pumps to the external circulation pipe on the pile cover; S3. Build a template around the bottom plate in the warehouse for pouring to form a pouring layer, and reserve a grouting groove on the pouring layer; S4, sequentially installing a plurality of lower wall panels in the grouting trough, and inserting a clamping grouting plate between each lower wall panel; S5. Install a diagonal brace plate on one side of the lower wall plate, and inject grout through the wall plate injection holes on the lower wall plate to fill the grouting groove with slurry; S6. Splice the upper wall panel above the lower wall panel, and after the splicing is completed, grout the wall panel joints through the clamping grouting holes on the clamping grouting plate; S7. Repeat steps S4-S6 to complete the construction of all walls.

[0006] In the preferred embodiment, in step S1, a plurality of tiny holes are provided on the steel pipe pile, the pile cover is threadedly connected to the steel pipe pile, a grid is provided below the pile cover, and a U-shaped external circulation pipe is provided inside the grid.

[0007] In the preferred embodiment, in step S2, the bottom plate in the bin is a grid steel plate, the grid shape is an isosceles triangle, and an inner circulation pipe is also provided inside the bottom plate in the bin, one end of the inner circulation pipe is connected to the water pump 304, and the other end is connected to the outer circulation pipe; The top of the outer circulation pipe is higher than the foundation, and the raised part is used to connect to the water pump. The coolant in the inner circulation pipe must pass through the outer circulation pipe and the water pump and then return to the inner circulation pipe. The inner circulation pipe is used to dissipate heat at the bottom of the warehouse.

[0008] In the preferred embodiment, in step S4, the lower wall panel includes a lower butt joint plate, both sides of the lower butt joint plate are provided with butt joint grouting grooves, one side of the lower butt joint plate is provided with a lower connecting pressing plate, and the other side is provided with an insulation layer, and the outer side of the insulation layer is provided with a wear-resistant layer; A grouting diverter plate is provided below the lower docking plate, the grouting diverter plate is connected with the grouting holes of the wall panel, a plurality of holes are provided on the outer side of the grouting diverter plate, and the grouting diverter plate is used for grouting reinforcement of the grouting groove.

[0009] In the preferred embodiment, a docking hole is provided on one side of the upper portion of the lower docking plate, and a retractable docking rod is provided on the other side; In step S6, the upper wall plate includes an upper butt joint plate, one side of the upper butt joint plate is provided with a lower connecting plate, the other side is provided with a heat preservation layer, and the outer side of the heat preservation layer is provided with a wear-resistant layer; A retractable docking rod is provided on one side of the lower side of the upper wall plate, and a docking hole is provided on the other side.

[0010] In the preferred embodiment, a large hole section, a clamping portion and a small hole section are sequentially arranged inside the docking hole, and the diameter of the large hole section is larger than the diameter of the small hole section; One end of the docking rod is provided with an expansion part, and the other end is provided with a threaded rod, which is threadedly connected to the docking rod, and the other end is provided with a worm wheel. One side of the worm wheel is provided with a worm, which passes through the wall and is provided with a knob. Turning the knob can control the telescopic length of the docking rod.

[0011] In a preferred embodiment, the unfolding portion includes a bottom column, a swingable card plate is provided in at least one direction of the bottom column, one end of the card plate is hinged to the unfolding portion, and a spring sheet is provided between the card plate and the middle column; A hook is provided at the rear end of the card plate, a buckle is provided between the hook and the middle column, a connecting rod is provided above the bottom column, a spring is provided between the connecting rod and the bottom column, a release pin is provided in at least one direction of the connecting rod, the release pin is arranged above the hook, and the number of the release pins corresponds to the hook; A button is provided at the top of the connecting rod, and pressing the button can make the draw hook detach from the draw buckle.

[0012] In the preferred embodiment, in step S5, the diagonal support plate includes a base, a T-shaped plate is provided on the base, the T-shaped plate is used to engage with the lower connecting platen and the upper connecting platen, the base is used to be connected to the casting layer, and the base and the casting layer are connected by expansion screws.

[0013] In the preferred embodiment, in step S6, when the upper wall panel is butted against the lower wall panel, the butt joint rod of the upper wall panel is connected to the butt joint hole on the lower wall panel, and the butt joint hole of the upper wall panel is connected to the butt joint rod of the lower wall panel; Before docking, press the button to unfold the cardboard on the unfolding part. The cardboard will shrink slightly when passing through the large hole section but will not cause the hook to engage. When it reaches the engaging part, the cardboard will be fully unfolded. Then, the worm will be rotated to tighten the engaging part to complete the docking of the upper wall panel and the lower wall panel. During disassembly, the worm is rotated to extend the docking rod into the small hole section, the small hole section will shrink the clamping plate, the draw hook will tighten the draw buckle, and the docking rod will be pulled out to complete the disassembly.

[0014] In the preferred embodiment, in step S6, the clamping grouting plate includes a recessed portion, and protruding portions are provided on both sides of the recessed portion. A plurality of grout outlet holes are provided on the protruding portions. A clamping grouting hole is provided on the top of the clamping grouting plate, and the clamping grouting hole is connected to the grout outlet hole. The clamping grouting plate is arranged between the transverse butt grouting grooves, the concave part is used for clamping the butt grouting groove, and a gap is arranged between the convex part and the butt grouting groove, and the gap is used for grouting reinforcement.

[0015] The butt joint surface between the upper wall plate and the lower wall plate is also provided with a plurality of grooves, and the grooves are used to increase the area and air tightness of the butt joint surface.

[0016] The present invention provides a method for constructing a prefabricated flat warehouse wall, which has the following beneficial effects: 1. The method for constructing the wall of a prefabricated bungalow warehouse provided by the present invention significantly improves the construction efficiency, reduces the on-site operation time and labor intensity, and ensures the stability of the wall foundation by using steel pipe piles and matching casting technology.

[0017] 2. The precise docking mechanism between the specially designed lower wall panel and the upper wall panel enhances the sealing and mechanical strength of the connection parts, solving the problem of insufficient strength of the connection parts in the traditional method. The design of the built-in insulation layer and wear-resistant layer not only improves the thermal insulation performance of the wall, but also enhances its durability, making the wall structure more versatile. The rapid assembly and disassembly mechanism of the wall components facilitates later maintenance and adjustment. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 This is a schematic diagram of the appearance of a flat warehouse of the present invention; Figure 2 It is a distribution diagram of the steel pipe piles of the present invention; Figure 3 is a cross-sectional view of a flat warehouse of the present invention; Figure 4 It is an axonometric view of the bottom plate in the bin of the present invention; Figure 5 is a cross-sectional view of the bottom plate in the bin of the present invention; Figure 6 is a cross-sectional view of a steel pipe pile of the present invention; Figure 7 It is a schematic diagram of the construction of the wall of the present invention; Figure 8 It is a schematic diagram of the splicing of the upper wall of the present invention; Fig. 9 It is a schematic diagram of the installation of the clamping grouting plate of the present invention; Fig.10 is a cross-sectional view of the wall of the present invention; Fig.11 It is an axonometric view of the clamping grouting plate of the present invention; Fig.12 is a cross-sectional view of a clamping grouting plate of the present invention; Fig.13 is an axonometric view of the lower wall of the present invention; Fig.14 is a cross-sectional view of the lower wall of the present invention; Fig.15 is an axonometric view of the upper wall of the present invention; Fig.16 This is a schematic diagram of the connection between the upper and lower walls of the present invention; Fig.17 It is a schematic diagram of the expansion part of the present invention; Fig.18 is a schematic diagram of the connecting rod of the large hole section of the present invention; In the figure: base layer 1; steel pipe pile 101; foundation 102; pouring layer 2; grouting groove 201; wall 3; diagonal support plate 301; ventilation device 302; bottom plate 303 in the warehouse; water pump 304; grid 305; pile cover 306; external circulation pipe 307; internal circulation pipe 308; filter screen 309; base 310; T-plate 311; top cover 4; color steel plate 401; lower wall panel 5; lower docking plate 501; insulation layer 502; wear-resistant layer 503; docking grouting groove 504; lower connecting pressure plate 505; wall panel grouting hole 506; Grouting diverter plate 507; docking hole 508; docking rod 509; large hole section 510; clamping part 511; small hole section 512; unfolding part 513; threaded rod 514; worm gear 515; worm 516; clamping plate 517; spring sheet 518; hook 519; buckle 520; bottom column 521; release needle 522; button 523; connecting rod 524; upper wall panel 6; upper docking plate 601; upper connecting pressure plate 602; clamping grouting plate 7; recessed part 701; raised part 702; slurry outlet hole 703; clamping grouting hole 704. DETAILED DESCRIPTION

[0019] Example 1 like Figure 1-18 As shown, a method for constructing a prefabricated flat warehouse wall comprises: S1, placing a plurality of steel pipe piles 101 on the ground, installing a pile cap 306 on the top of the steel pipe piles 101, and then building a template on the steel pipe piles 101 to cast the foundation 102; S2, laying a warehouse bottom plate 303 on the foundation 102, installing water pumps 304 on both sides of the warehouse bottom plate 303, and connecting the water pumps 304 to the external circulation pipes 307 on the pile caps 306; S3, build a template around the bottom plate 303 in the warehouse for pouring to form a pouring layer 2, and reserve a grouting groove 201 on the pouring layer 2; S4, sequentially installing multiple lower wall panels 5 in the grouting groove 201, and inserting the clamping grouting plate 7 between each lower wall panel 5; S5, installing the diagonal support plate 301 on one side of the lower wall plate 5, and injecting grout through the wall plate injection hole 506 on the lower wall plate 5, so that the grouting groove 201 is filled with slurry; S6, splicing the upper wall panel 6 on the upper side of the lower wall panel 5, and after the splicing is completed, grouting the wall panel joints through the clamping grouting holes 704 on the clamping grouting plate 7; S7, repeat steps S4-S6 to complete the construction of all walls 3; S8. After the wall 3 is constructed, a top cover 4 is hoisted on top of it. A plurality of wind heat dissipation pipes are arranged on the top cover 4. A color steel plate 401 is also laid on the top cover 4. In the preferred embodiment, in step S1, a plurality of fine holes are provided on the steel pipe pile 101, a pile cover 306 is threadedly connected to the steel pipe pile 101, a grid 305 is provided below the pile cover 306, and a U-shaped external circulation pipe 307 is provided inside the grid 305; The outer circulation pipe 307 is arranged inside the steel pipe pile 101. The groundwater outside the steel pipe pile 101 will penetrate into the steel pipe pile 101 through the small holes to cool the condensate in the outer circulation pipe 307. The cooled condensate is then transported to the water pump 304 through the external cooling room and then transported to the bottom plate 303 in the warehouse. In the preferred embodiment, in step S2, the bottom plate 303 in the warehouse is a grid steel plate, and the grid shape is an isosceles triangle. Preferably, the vertex of the isosceles triangle is downward, and the other end is in contact with the storage in the warehouse, which has a better heat dissipation area. The bottom plate 303 in the warehouse is also provided with an internal circulation pipe 308, one end of the internal circulation pipe 308 is connected to the water pump 304, and the other end is connected to the external circulation pipe 307; A plurality of small compartments are also provided inside the wall 3, and the panels of the compartments are also made of the warehouse bottom plate 303. The air outlet pipe of the ventilation device 302 is passed through the grid of the warehouse bottom plate 303 to reduce the temperature of the side of the internal storage. The ventilation device 302 is a heat dissipation fan.

[0020] The top of the outer circulation pipe 307 is higher than the foundation 102, and the raised part is used to connect to the water pump 304. The coolant in the inner circulation pipe 308 must pass through the outer circulation pipe 307 and the water pump 304 and then return to the inner circulation pipe 308. The inner circulation pipe 308 is used to dissipate heat at the bottom of the warehouse.

[0021] In the preferred embodiment, in step S4, the lower wall panel 5 includes a lower docking plate 501, and docking grouting grooves 504 are provided on both sides of the lower docking plate 501. A lower connecting pressing plate 505 is provided on one side of the lower docking plate 501, and an insulation layer 502 is provided on the other side. A wear-resistant layer 503 is provided on the outer side of the insulation layer 502; A grouting diverter plate 507 is provided below the lower docking plate 501 . The grouting diverter plate 507 is connected to the wall panel grouting hole 506 . A plurality of holes are provided on the outer side of the grouting diverter plate 507 . The grouting diverter plate 507 is used for grouting reinforcement of the grouting groove 201 .

[0022] In the preferred embodiment, a docking hole 508 is provided on one side of the upper portion of the lower docking plate 501, and a retractable docking rod 509 is provided on the other side; In step S6, the upper wall plate 6 includes an upper butt joint plate 601, one side of the upper butt joint plate 601 is provided with a lower connecting plate 505, and the other side is provided with a heat preservation layer 502, and the outer side of the heat preservation layer 502 is provided with a wear-resistant layer 503; A retractable docking rod 509 is provided on one side of the lower side of the upper wall plate 6, and a docking hole 508 is provided on the other side.

[0023] In the preferred embodiment, a large hole section 510, a clamping portion 511 and a small hole section 512 are sequentially arranged inside the docking hole 508, and the diameter of the large hole section 510 is larger than the diameter of the small hole section 512; One end of the docking rod 509 is provided with an expansion portion 513, and the other end is provided with a threaded rod 514, the threaded rod 514 is threadedly connected to the docking rod 509, and the other end is provided with a worm gear 515, one side of the worm gear 515 is provided with a worm 516, the worm 516 passes through the wall and is provided with a knob, and turning the knob can control the telescopic length of the docking rod 509.

[0024] In a preferred embodiment, the unfolding portion 513 includes a bottom column 521, and a swingable clamping plate 517 is provided on the bottom column 521 in at least one direction. One end of the clamping plate 517 is hinged to the unfolding portion 513, and a spring sheet 518 is provided between the clamping plate 517 and the middle column. A hook 519 is provided at the rear end of the clamping plate 517, a buckle 520 is provided between the hook 519 and the middle column, a connecting rod 524 is provided above the bottom column 521, a spring is provided between the connecting rod 524 and the bottom column 521, and a release pin 522 is provided in at least one direction of the connecting rod 524, the release pin 522 is arranged above the hook 519, and the number of the release pins 522 corresponds to the hook 519. A button 523 is provided at the top of the connecting rod 524 , and pressing the button 523 can cause the hook 519 to be separated from the buckle 520 .

[0025] In the preferred embodiment, in step S5, the diagonal support plate 301 includes a base 310, on which a T-shaped plate 311 is provided, and the T-shaped plate 311 is used to engage with the lower connecting pressure plate 505 and the upper connecting pressure plate 602, and the base 310 is used to be connected to the casting layer 2, and the base 310 and the casting layer 2 are connected by expansion screws.

[0026] In the preferred embodiment, in step S6, when the upper wall panel 5 is butted against the lower wall panel 5, the butt joint rod 509 of the upper wall panel 5 is connected to the butt joint hole 508 on the lower wall panel 5, and the butt joint hole 508 of the upper wall panel 5 is connected to the butt joint rod 509 of the lower wall panel 5; Before docking, the button 523 is pressed to expand the clamping plate 517 on the expansion portion 513. The clamping plate 517 slightly contracts when passing through the large hole section 510 but does not cause the hook 519 to engage. When reaching the engaging portion 511, the clamping plate 517 is fully expanded. Then, the worm 516 is rotated to tighten the engaging portion 511, thereby completing the docking of the upper wall panel 5 and the lower wall panel 5. During disassembly, the worm 516 is rotated to allow the docking rod 509 to extend into the small hole section 512, and the small hole section 512 will cause the clamping plate 517 to shrink, and the draw hook 519 will tighten the draw buckle 520, and the docking rod 509 will be pulled out to complete the disassembly.

[0027] In the preferred embodiment, in step S6, the clamping grouting plate 7 includes a recessed portion 701, and protruding portions 702 are provided on both sides of the recessed portion 701. The protruding portions 702 are provided with a plurality of grout outlet holes 703. A clamping grouting hole 704 is provided on the top of the clamping grouting plate 7, and the clamping grouting hole 704 is connected to the grout outlet hole 703. The clamping grouting plate 7 is arranged between the transverse butt grouting grooves 504, the recessed portion 701 is used for clamping the butt grouting groove 504, and a gap is provided between the raised portion 702 and the butt grouting groove 504, and the gap is used for grouting reinforcement. The butt joint surface between the upper wall plate 5 and the lower wall plate 5 is also provided with a plurality of grooves, and the grooves are used to increase the area and air tightness of the butt joint surface.

[0028] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A method for constructing a prefabricated flat warehouse wall, characterized by: The method includes: S1, placing a plurality of steel pipe piles (101) on the ground, installing pile caps (306) on the tops of the steel pipe piles (101), and then building a formwork on the steel pipe piles (101) to cast the foundation (102); S2, laying a warehouse bottom plate (303) on the foundation (102), installing water pumps (304) on both sides of the warehouse bottom plate (303), and connecting the water pumps (304) to the external circulation pipes (307) on the pile caps (306); S3, building a template around the bottom plate (303) in the warehouse for pouring to form a pouring layer (2), and reserving a grouting groove (201) on the pouring layer (2); S4, sequentially installing a plurality of lower wall panels (5) in the grouting tank (201), and inserting a snap-fit ​​grouting plate (7) between each lower wall panel (5); S5, installing a diagonal support plate (301) on one side of the lower wall plate (5), and injecting grout through the wall plate injection hole (506) on the lower wall plate (5) so that the grouting groove (201) is filled with slurry; S6, splicing the upper wall panel (6) above the lower wall panel (5), and after the splicing is completed, grouting is performed on the wall panel joints through the snap-fit ​​grouting holes (704) on the snap-fit ​​grouting plate (7); S7. Repeat steps S4-S6 to complete the construction of all walls (3).

2. According to claim 1, a method for constructing a prefabricated flat warehouse wall is characterized by: In step S1, a plurality of fine holes are provided on the steel pipe pile (101), a pile cover (306) is threadedly connected to the steel pipe pile (101), a grid net (305) is provided below the pile cover (306), and a U-shaped external circulation pipe (307) is provided inside the grid net (305).

3. According to the method for constructing a prefabricated flat warehouse wall according to claim 1, it is characterized by: In step S2, the bottom plate (303) in the bin is a mesh steel plate, the mesh shape is an isosceles triangle, and an inner circulation pipe (308) is also provided inside the bottom plate (303) in the bin, one end of the inner circulation pipe (308) is connected to the water pump 304, and the other end is connected to the outer circulation pipe (307); The top of the outer circulation pipe (307) is higher than the foundation (102), and the raised part is used to connect to the water pump (304). The coolant in the inner circulation pipe (308) passes through the outer circulation pipe (307) and the water pump (304) and then returns to the inner circulation pipe (308). The inner circulation pipe (308) is used to dissipate heat at the bottom of the warehouse.

4. According to claim 1, a method for constructing a prefabricated flat warehouse wall is characterized by: In step S4, the lower wall panel (5) comprises a lower butt joint plate (501), both sides of the lower butt joint plate (501) are provided with butt joint grouting grooves (504), one side of the lower butt joint plate (501) is provided with a lower connecting pressing plate (505), and the other side is provided with a heat-insulating layer (502), and the outer side of the heat-insulating layer (502) is provided with a wear-resistant layer (503); A grouting diverter plate (507) is provided below the lower butt joint plate (501), the grouting diverter plate (507) is connected to the wall panel grouting hole (506), a plurality of holes are provided on the outer side of the grouting diverter plate (507), and the grouting diverter plate (507) is used to perform grouting reinforcement on the grouting groove (201).

5. A method for constructing a prefabricated flat warehouse wall according to claim 4, characterized in that: A docking hole (508) is provided on one side of the upper portion of the lower docking plate (501), and a retractable docking rod (509) is provided on the other side; In step S6, the upper wall plate (6) comprises an upper butt joint plate (601), one side of the upper butt joint plate (601) is provided with a lower connecting plate (505), and the other side is provided with a heat-insulating layer (502), and the outer side of the heat-insulating layer (502) is provided with a wear-resistant layer (503); A retractable docking rod (509) is provided on one side of the lower side of the upper wall plate (6), and a docking hole (508) is provided on the other side.

6. A method for constructing a prefabricated flat warehouse wall according to claim 5, characterized in that: A large hole section (510), a clamping portion (511) and a small hole section (512) are sequentially arranged inside the docking hole (508); the diameter of the large hole section (510) is larger than the diameter of the small hole section (512); One end of the docking rod (509) is provided with an expansion portion (513), and the other end is provided with a threaded rod (514), the threaded rod (514) is threadedly connected to the docking rod (509), and the other end is provided with a worm wheel (515), one side of the worm wheel (515) is provided with a worm (516), the worm (516) passes through the wall and is provided with a knob, and the telescopic length of the docking rod (509) can be controlled by turning the knob.

7. A method for constructing a prefabricated flat warehouse wall according to claim 6, characterized in that: The unfolding portion (513) comprises a bottom column (521), the bottom column (521) is provided with a swingable clamping plate (517) in at least one direction, one end of the clamping plate (517) is hinged to the unfolding portion (513), and a spring sheet (518) is provided between the clamping plate (517) and the middle column; A hook (519) is provided at the rear end of the clamping plate (517), a buckle (520) is provided between the hook (519) and the middle column, a connecting rod (524) is provided above the bottom column (521), a spring is provided between the connecting rod (524) and the bottom column (521), a release pin (522) is provided in at least one direction of the connecting rod (524), the release pin (522) is arranged above the hook (519), and the number of the release pins (522) corresponds to the number of the hooks (519); A button (523) is provided at the top end of the connecting rod (524); pressing the button (523) can cause the draw hook (519) to be separated from the draw buckle (520).

8. A method for constructing a prefabricated flat warehouse wall according to claim 7, characterized in that: In step S5, the diagonal support plate (301) includes a base (310), a T-shaped plate (311) is provided on the base (310), the T-shaped plate (311) is used to engage with the lower connecting plate (505) and the upper connecting plate (602), the base (310) is used to be connected to the casting layer (2), and the base (310) and the casting layer (2) are connected by expansion screws.

9. The method for constructing a prefabricated flat warehouse wall according to claim 7 is characterized by: In step S6, when the upper wall panel (5) is butt-jointed with the lower wall panel (5), the butt-jointing rod (509) of the upper wall panel (5) is connected to the butt-jointing hole (508) on the lower wall panel (5), and the butt-jointing hole (508) of the upper wall panel (5) is connected to the butt-jointing rod (509) of the lower wall panel (5); Before docking, the button (523) is pressed to expand the clamping plate (517) on the expansion portion (513). The clamping plate (517) slightly contracts when passing through the large hole section (510) but does not cause the hook (519) to engage. When reaching the engaging portion (511), the clamping plate (517) is fully expanded. Then, the worm (516) is rotated to cause the clamping plate (517) to tighten the engaging portion (511), thereby completing the docking of the upper wall panel (5) and the lower wall panel (5). During disassembly, the worm (516) is rotated to allow the docking rod (509) to extend into the small hole section (512), the small hole section (512) causes the clamping plate (517) to contract, the draw hook (519) tightens the draw buckle (520), and the docking rod (509) is pulled out to complete the disassembly.

10. The method for constructing a prefabricated flat warehouse wall according to claim 1, characterized in that: step S6 In the embodiment, the clamping grouting plate (7) comprises a recessed portion (701), protruding portions (702) are provided on both sides of the recessed portion (701), a plurality of grout outlet holes (703) are provided on the protruding portions (702), a clamping grouting hole (704) is provided on the top of the clamping grouting plate (7), and the clamping grouting hole (704) is connected to the grout outlet hole (703); The clamping grouting plate (7) is arranged between the transverse butt-jointed grouting grooves (504); the recessed portion (701) is used for clamping the butt-jointed grouting grooves (504); a gap is provided between the raised portion (702) and the butt-jointed grouting grooves (504); the gap is used for grouting reinforcement; The butt joint surface between the upper wall plate (5) and the lower wall plate (5) is also provided with a plurality of grooves, and the grooves are used to increase the area and air tightness of the butt joint surface.

Citation Information

Cited By

  • Bulk horizontal warehouse airtight structure

    CN120608558A

  • Bulk flat warehouse airtight structure

    CN120608558B