Automatic real-time three-dimensional digital modeling method for dike

The method of automated real-time 3D digital modeling of dikes solves the problems of high modeling cost, slow speed and low accuracy in existing technologies, realizes rapid and high-precision 3D modeling of dikes, supports complex analysis and calculation functions, and improves the application capabilities of digital twin water conservancy.

CN118982629APending Publication Date: 2024-11-19CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410876937.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

Existing dike modeling methods are unable to meet the requirements of low cost, large scale, fast real-time and high accuracy, and cannot realize calculation and analysis functions such as model editing, truncation and sectioning during runtime, thus failing to support digital twin water conservancy applications.

Method used

The method of automated real-time 3D digital modeling of dikes is adopted. By preparing input data, defining the dike feature model, constructing the cross-section and feature lines of the dike unit, and generating geometric mesh, the main body of the dike, the seepage barrier wall and the geological model of the dike base are formed, realizing rapid and high-precision 3D modeling.

Benefits of technology

It enables rapid 3D modeling of large-scale dikes, featuring short modeling cycles, low costs, and high accuracy. It supports complex analysis and calculation functions such as dike feature extraction, arbitrary sectioning, terrain fusion, mesh editing, monitoring data assignment, water level analysis, and geological analysis, thereby enhancing the value of the model and supporting smart water conservancy and digital twin water conservancy applications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982629A_ABST
    Figure CN118982629A_ABST
Patent Text Reader

Abstract

The invention discloses an automatic real-time three-dimensional digital modeling method for a dike. The method comprises the following steps: S1, preparing input data; s2, defining an embankment feature model; s3, constructing the cross section of the dike unit; s4, constructing a dike feature line; s5, based on the cross sections of the dike units and the dike characteristic lines, constructing geometric grids on the slope surfaces of the dike by dike, and generating a dike main body model; s6, on the basis of the cross sections of the dike units, feature nodes and feature lines corresponding to the anti-seepage wall are obtained, an anti-seepage wall geometric grid is constructed, and an anti-seepage wall model is generated; s7, based on the cross sections of the dike units, feature nodes and feature lines corresponding to the geological stratums are obtained, a dike-based geologic model geometric grid is constructed, and a dike-based geologic model is generated; and S8, storing model results, and finishing modeling. According to the automatic real-time three-dimensional digital modeling method for the dike, on the basis of the characteristic parameters of the dike, modeling is conducted through an automatic algorithm, and rapid three-dimensional modeling of the dike in a large range is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of embankment modeling methods, and in particular to an automated real-time three-dimensional digital modeling method for embankments. Background Art

[0002] Levee projects play a vital role in flood control and waterlogging prevention. However, due to their large spatial spans and complex foundations, and the impact of ecological activities, socioeconomic development, and other factors, their emergency response and safety management technologies are challenging. Currently, the water conservancy industry is researching the use of digital twin technology to achieve intelligent forecasting, analysis, and decision-making for flood disasters. As a major flood control project, levees are indispensable in applications such as flood control situation display, flood evolution simulation, levee risk assessment, flood control plan simulation, and disaster emergency response. Their digital models must support high-precision display, computational analysis, simulation, and other functions, placing high demands on model quality and modeling efficiency.

[0003] There are three traditional methods for levee modeling: surface approximation modeling, performed using modeling software such as 3DMAX and MAYA; BIM-based modeling, based on terrain data, design drawings, and other information, using modeling software such as REVIT and 3DE; and aerial survey modeling, which automatically generates three-dimensional surface models by collecting stereo images. While surface approximation modeling produces exquisite models, it lacks geospatial information. In complex terrain, it is difficult to align with the terrain and cannot be used for relevant calculations and analysis. Furthermore, the lack of internal features of the levee makes it impossible to conduct relevant geological analysis and assessment. BIM-based modeling, based on engineering design drawings and terrain data, offers geographic accuracy, but is costly and time-consuming to produce. Furthermore, many existing levees lack relevant design drawings, making retrofitting with BIM difficult. Aerial survey modeling, based on stereo images collected by aerial vehicles, automatically constructs a three-dimensional model using photogrammetry. This method is fast and suitable for rapid modeling of large levee surfaces. However, aerial survey models lack feature classification and identification, making analysis and calculation complex. Furthermore, they lack internal features, making them incapable of supporting geological analysis and assessment.

[0004] The above methods each have their own advantages and disadvantages, and cannot take into account the modeling requirements of low cost, large scale, fast real-time, and high precision. At the same time, it is difficult to realize the computational analysis functions such as editing, interception, and sectioning of embankment models during runtime. There is insufficient support for digital twin applications such as simulation deduction and real-time analysis. Therefore, there is an urgent need to develop a real-time, efficient, and high-precision modeling method. Summary of the Invention

[0005] The purpose of the present invention is to overcome the shortcomings of the above-mentioned background technology and provide a method for automated real-time three-dimensional digital modeling of embankments, which can realize high-precision and rapid three-dimensional modeling of large-scale embankments and effectively support digital twin water conservancy applications.

[0006] To achieve the above-mentioned object, the present invention provides an automated real-time three-dimensional digital modeling method for dikes, comprising the following steps:

[0007] Step S1: input data preparation, including embankment characteristic parameters and background data of the embankment 3D model;

[0008] Step S2: defining the embankment characteristic model;

[0009] Step S3: constructing the cross section of the embankment unit;

[0010] Step S4: constructing embankment feature lines;

[0011] Step S5: Based on the embankment unit cross section and embankment characteristic lines, a geometric mesh is constructed for each embankment slope to generate the embankment main body model;

[0012] Step S6: Based on the cross section of the embankment unit, obtain the characteristic nodes and characteristic lines corresponding to the cut-off wall, construct the geometric mesh of the cut-off wall, and generate the cut-off wall model;

[0013] Step S7: Based on the cross section of the embankment unit, characteristic nodes and characteristic lines corresponding to each geological layer are obtained, a geometric grid of the embankment base geological model is constructed, and a embankment base geological model is generated;

[0014] Step S8: The model results are saved and the modeling is completed.

[0015] As a preferred embodiment, in step S1, the three-dimensional model of the embankment includes a main embankment model, an anti-seepage wall model and an embankment base geological model; and the characteristic parameters of the embankment include basic parameters and extended parameters.

[0016] As a preferred embodiment, in step S1, the basic parameters of the main embankment model include cross section, central axis, embankment crest elevation, embankment crest width, embankment name, and embankment stake number; wherein the cross section includes embankment slope width and embankment slope ratio; the extended parameters of the main embankment model include construction date, original ground line, design guaranteed water level, warning water level, and maximum flood level;

[0017] The basic parameters of the cut-off wall model include the thickness of the cut-off wall and the depth of the cut-off wall; the extended parameters of the cut-off wall model include the material type of the cut-off wall and the construction date of the cut-off wall;

[0018] The basic parameters of the embankment geological model include embankment geological stratification information, which includes stratification lines and geological features; the extended parameters of the embankment geological model include exploration date and risk assessment value.

[0019] As a preferred embodiment, in step S1, the background data includes watershed topography, river channel topography, embankment material texture library, high-precision orthophotos, and elevation DEM.

[0020] As a preferred embodiment, in step S2, the embankment feature model includes two parts: the embankment unit cross section and the embankment feature line. The embankment unit cross section includes the cross section coordinate system, feature nodes, and slope lines; the embankment feature line includes the embankment top center line, slope change point line, water point line, and geometric point line.

[0021] As a preferred embodiment, in step S3, a cross section of the embankment unit is constructed, the center point of the embankment top is used as the coordinate origin, a unit coordinate system is constructed according to the embankment pile number compilation direction, and a line drawing of the embankment unit cross section is constructed based on the cross section information.

[0022] As a preferred embodiment, the cross-section line drawing of the embankment unit is composed of characteristic nodes and slope lines. The characteristic nodes are divided into slope change points, water point points, and geometric points according to their types; the line segment formed by two adjacent characteristic nodes is the slope line.

[0023] As a preferred implementation method, in step S4, the embankment characteristic line is constructed, and the embankment centerline described in geographic coordinates is calculated according to the embankment central axis and the embankment top elevation. Based on the embankment unit cross-section obtained in step S3, the slope change point line, water point line, and geometric point line parallel to the embankment centerline are obtained according to the positional relationship between each characteristic node of the embankment unit cross-section and the embankment top centerline. According to the given accuracy level, the interpolation point density is calculated, and the embankment top centerline, slope change point line, water point line, and geometric point line are encrypted to form a smooth characteristic line with the same number of nodes.

[0024] As a preferred embodiment, in step S5, a geometric grid is constructed for each embankment slope based on the embankment unit cross-section and embankment characteristic lines obtained in steps S3 and S4; the texture coordinates or color values ​​of the slope grid are calculated based on the material parameter information, the texture mapping and material setting of the geometric grid are completed, and the main embankment model is generated.

[0025] As a preferred implementation method, in step S6, the cross-sectional coordinates of the cut-off wall are determined based on the coordinate system of the cross section of the embankment unit constructed in step S3, the characteristic nodes and characteristic lines corresponding to the cut-off wall are obtained, and the geometric mesh of the cut-off wall is constructed based on the characteristic lines. The texture coordinates of the geometric mesh of the cut-off wall are calculated, and the material information is mapped to generate an cut-off wall model.

[0026] As a preferred implementation method, in step S7, the coordinates of the embankment base cross section are determined according to the coordinate system of the embankment unit cross section constructed in step S3, the characteristic nodes and characteristic lines corresponding to each geological layer are obtained, and the geological model geometric grid is constructed according to the characteristic lines, the texture coordinates of the geological model geometric grid are calculated, and the material information is mapped in layers according to the geological stratification characteristics to generate a embankment base geological model.

[0027] Compared with the prior art, the present invention has the following advantages:

[0028] The automated real-time three-dimensional digital modeling method for levees of the present invention is based on the characteristic parameters of the levees and realizes rapid three-dimensional modeling of large-scale levees through automated algorithm modeling. Compared with existing technical means, it has the characteristics of short modeling cycle, low modeling cost, high modeling accuracy, and adjustable modeling effect. The present invention proposes a levee characteristic model, which integrates information such as levee cross-sections, characteristic lines, and geometric grids. It can realize complex analysis and calculation functions such as levee ground feature extraction, arbitrary sectioning, terrain fusion, grid editing, monitoring data interest assignment, water level analysis, geological analysis, and internal feature query, effectively improving the value of the model and supporting the application of smart water conservancy and digital twin water conservancy. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 This is a flow chart of the method for automated real-time three-dimensional digital modeling of dikes according to the present invention;

[0030] Figure 2 This is a diagram of the dike parameter structure according to an embodiment of the present invention;

[0031] Figure 3 This is a diagram of a levee characteristic model according to an embodiment of the present invention;

[0032] Figure 4 A schematic cross-sectional view of a dike unit according to an embodiment of the present invention;

[0033] Figure 5 This is a diagram of a dike grid model according to an embodiment of the present invention;

[0034] Figure 6 This is a rendering of the embankment modeling according to an embodiment of the present invention. DETAILED DESCRIPTION

[0035] The following describes the implementation of the present invention in detail with reference to the examples, but they do not limit the present invention and are merely examples. At the same time, the advantages of the present invention will become clearer and easier to understand.

[0036] like Figure 1 As shown, the present invention provides an automated real-time three-dimensional digital modeling method for dikes, comprising the following steps:

[0037] Step S1: Input data preparation, including levee characteristic parameters and background data for the 3D levee model. The 3D levee model includes the main levee model, the cutoff wall model, and the levee foundation geological model. The levee characteristic parameters include basic parameters and extended parameters. The basic parameters of the main levee model include cross section, central axis, crest elevation, crest width, levee name, and levee pile number; the cross section includes levee slope width and slope ratio; the extended parameters of the main levee model include construction date, original ground line, design guaranteed water level, warning water level, and maximum flood level; the basic parameters of the cutoff wall model include cutoff wall thickness and depth; the extended parameters of the cutoff wall model include cutoff wall material type and construction date; the basic parameters of the levee foundation geological model include levee geological stratification information, including stratification lines and geological characteristics; the extended parameters of the levee foundation geological model include exploration date and risk assessment value. Background data includes watershed topography, river channel topography, levee material texture library, high-precision orthophoto imagery, and elevation DEM. The above data must adhere to a unified coordinate system.

[0038] Basic parameters are necessary parameters when modeling, and extended parameters are optional parameters. The higher the accuracy of the input characteristic parameters, the higher the accuracy of the generated embankment model; the more characteristic information is input, the more detailed the generated embankment model is (embankment parameter structure is as follows Figure 2 By analyzing the data types of the input parameters, numeric data is typically represented using double floating-point precision, metric units, and 3 decimal places to ensure millimeter-level accuracy. Proportional data is converted into array records of numerators and denominators. Point data is represented by an array describing the three directional components of the point [X, Y, Z]. Line data is represented by a sequentially stored set of points. Polygonal surface data is represented by a sequentially stored set of lines. Plane data is represented by a combination of normals and point data. Text data is represented by a character array.

[0039] Step S2: Define the levee characteristic model; the present invention proposes a levee characteristic model, which is used to describe the data specifications and modeling process involved in the three-dimensional automated modeling of the levee. The levee characteristic model contains two parts of data: unit cross-section and characteristic line. The unit cross-section contains the cross-section coordinate system, characteristic nodes, and slope lines; the characteristic lines contain the levee top center line, slope change point line, water point line, and geometric point line; model cutting, analysis, calculation, etc. are carried out based on the above characteristic model data. The automatic modeling of the levee is carried out according to the process of calculating the unit cross-section, calculating the characteristic line, and constructing the slope geometric grid. The levee main body, anti-seepage wall and levee base geological model are all modeled according to the above process (the levee characteristic model is as follows Figure 3(As shown in the figure). The levee feature model is defined and managed using an object-oriented approach, defined hierarchically: the first level includes levee feature model objects, cutoff wall feature model objects, and geological feature model objects; the second level includes unit cross-section objects, feature line objects, and levee geometry model objects; and the third level includes coordinate system objects, feature node objects, and slope line objects. Each object type has its own data structure and storage specifications defined based on its parameters.

[0040] Generating a levee model requires inputting levee characteristic parameters and preparing relevant background data. Following the levee characteristic model generation process of "unit cross-section - feature line - geometric model," the unit cross-section submodel is first generated based on the input cross-section description. The unit cross-section is based on the unit coordinate system and describes the corresponding characteristic nodes, slope lines, and other data. The characteristic line submodel is based on the generated unit cross-section submodel. Each characteristic node on a unit cross-section corresponds to a characteristic line parallel to the levee's central axis. Based on the principle of parallel lines, the point set for each characteristic line is calculated. The levee geometric mesh is generated based on the generated unit cross-sections and characteristic lines. Considering the need for independent analysis and calculation of the levee later and the large material differences between slopes, the levee geometric surfaces are generated slope by slope and then logically merged. Each slope is triangulated based on two adjacent characteristic lines. Texture coordinates are calculated for the generated triangulated mesh and the corresponding material is mapped. After all slope geometric meshes are generated, they are merged into a single large geometric mesh. The generated levee model consists of three main components: unit cross-sections, feature lines, and geometric mesh. The method for constructing the main embankment model specifically includes the following steps S3-S6:

[0041] Step S3: Construct the cross section of the embankment unit. Take the center point of the embankment top as the coordinate origin, construct the unit coordinate system according to the direction of the embankment pile number, and construct the line drawing of the embankment unit cross section based on the cross section information. The line drawing consists of characteristic nodes and broken surface lines. The characteristic nodes are divided into types: (1) slope change points, which are the intersection points of different slope sections of the embankment; (2) water point points, which are the water level elevation points corresponding to different flood emergency plans on the embankment slope line; (3) geometric points, which are auxiliary points used to improve the geometric structure of the embankment. The line segment composed of two adjacent characteristic nodes is called the slope line. (The cross section of the embankment unit is as follows: Figure 4 shown).

[0042] Step S4, construct the embankment characteristic line. The embankment characteristic line includes four categories: embankment crest center line, slope change point line, water point line, and geometric point line. According to the embankment central axis and the embankment crest elevation, calculate the embankment crest center line described by geographic coordinates (with elevation). Based on the embankment unit cross section calculated in step S3, calculate the slope change point line, water point line, and geometric point line parallel to the embankment crest center line according to the positional relationship between each node of the unit cross section and the embankment crest center point. According to the given accuracy level, calculate the interpolation point density, and encrypt the embankment crest center line, slope change point line, water point line, and geometric point line to form a smooth characteristic line with the same number of nodes (embankment characteristic line such as Figure 3 shown).

[0043] Step S5: Construct the dike mesh surface. Based on the dike unit cross section and characteristic lines constructed in steps S3 and S4, construct the geometric mesh for each dike slope surface; calculate the texture coordinates or color values ​​of the slope mesh based on the input material parameter information, and complete the texture mapping and material setting of the geometric mesh (the dike mesh model is as follows: Figure 5 The generated embankment main body model includes unit cross section, embankment feature line, and geometric grid (the effect after embankment modeling is as shown in the figure). Figure 6 shown).

[0044] Step S6: Construct the dike cutoff wall model. After entering the cutoff wall parameters, the cutoff wall is constructed. Using the unit cross-section coordinate system constructed in Step S3, the cross-sectional coordinates of the cutoff wall are determined. The corresponding nodes and feature lines are calculated. The cutoff wall geometry is then constructed based on the feature lines. The texture coordinates of the geometry are calculated, and the material information is mapped. The resulting dike cutoff wall model includes the cutoff wall unit cross-sections, feature lines, and geometry.

[0045] Step S7: Construct a geological model of the embankment base. Enter the geological layering parameters to construct a geological layering model. Using the unit cross-section coordinate system constructed in Step S3, determine the embankment base cross-section coordinates. Calculate the nodes and feature lines corresponding to each geological layer. Construct a geological model mesh based on the feature lines. Calculate the texture coordinates of the geological model mesh. Map material information layer by layer based on the geological layering characteristics. The resulting embankment base geological model includes the embankment base cross-section, feature lines, and geometric mesh.

[0046] Step S8: The model results are saved and the modeling is completed.

[0047] The above is only a specific embodiment of the present invention. It should be pointed out that any changes or substitutions that can be easily thought of by any technician familiar with the field within the technical scope disclosed by the present invention should be covered by the protection scope of the present invention. The rest not described in detail belong to the prior art.

Claims

1. A method for automated real-time three-dimensional digital modeling of dikes, characterized by: The steps include: Step S1: input data preparation, including levee characteristic parameters and background data of the levee 3D model; Step S2: define the embankment characteristic model; Step S3: constructing the dike unit cross section; Step S4: constructing embankment feature lines; Step S5: Based on the dike unit cross section and dike characteristic line, geometric mesh is constructed for each dike slope to generate the dike main body model; Step S6: based on the cross section of the dike unit, obtain the characteristic nodes and characteristic lines corresponding to the cut-off wall, construct the geometric mesh of the cut-off wall, and generate the cut-off wall model; Step S7: based on the cross section of the dike unit, obtain the characteristic nodes and characteristic lines corresponding to each geological layer, construct the geometric grid of the dike base geological model, and generate the dike base geological model; Step S8: The model results are saved and the modeling is completed.

2. The method for automated real-time three-dimensional digital modeling of dikes according to claim 1, characterized in that: In the step S1, the three-dimensional model of the levee includes a main levee model, an anti-seepage wall model and a levee base geological model; the characteristic parameters of the levee include basic parameters and extended parameters.

3. The method for automated real-time three-dimensional digital modeling of dikes according to claim 2 is characterized by: In step S1, the basic parameters of the main levee model include cross section, central axis, levee crest elevation, levee crest width, levee name, and levee pile number; wherein the cross section includes levee slope width and levee slope ratio; the extended parameters of the main levee model include construction date, original ground line, design guaranteed water level, warning water level, and maximum flood level; The basic parameters of the anti-seepage wall model include the thickness of the anti-seepage wall and the depth of the anti-seepage wall; the extended parameters of the anti-seepage wall model include the material type of the anti-seepage wall and the construction date of the anti-seepage wall; The basic parameters of the dike foundation geological model include dike geological stratification information, which includes stratification lines and geological features; the extended parameters of the dike foundation geological model include exploration date and risk assessment value.

4. The method for automated real-time three-dimensional digital modeling of dikes according to claim 3 is characterized by: In step S1, the background data includes watershed topography, river channel topography, embankment material texture library, high-precision orthophoto, and elevation DEM.

5. The method for automated real-time three-dimensional digital modeling of dikes according to claim 4 is characterized by: In step S2, the levee feature model includes two parts: the levee unit cross section and the levee feature line. The levee unit cross section includes the cross section coordinate system, feature nodes, and slope lines; the levee feature line includes the levee crest center line, slope change point line, water point line, and geometric point line.

6. The method for automated real-time three-dimensional digital modeling of dikes according to claim 5, characterized in that: In the step S3, a levee unit cross section is constructed, with the center point of the levee top as the coordinate origin, a unit coordinate system is constructed according to the levee pile number compilation direction, and a levee unit cross section line drawing is constructed based on the cross section information; the levee unit cross section line drawing consists of characteristic nodes and slope lines, and the characteristic nodes are divided into slope change points, water point points, and geometric points according to their types; a line segment composed of two adjacent characteristic nodes is a slope line.

7. The method for automated real-time three-dimensional digital modeling of dikes according to claim 6, characterized in that: In the step S4, the levee characteristic line is constructed, and the center line of the levee top described by geographic coordinates is calculated according to the central axis of the levee and the elevation of the levee top. Based on the levee unit cross section obtained in step S3, the slope change point line, water point line, and geometric point line parallel to the levee top center line are obtained according to the positional relationship between each characteristic node of the levee unit cross section and the levee top center point. According to the given accuracy level, the density of interpolation points is calculated, and the levee top center line, slope change point line, water point line, and geometric point line are encrypted to form smooth characteristic lines with the same number of nodes.

8. The method for automated real-time three-dimensional digital modeling of dikes according to claim 7, characterized in that: In step S5, a geometric mesh is constructed on each embankment slope according to the embankment unit cross section and embankment characteristic line obtained in steps S3 and S4; texture coordinates or color values ​​of the slope mesh are calculated according to material parameter information, texture mapping and material setting of the geometric mesh are completed, and a main embankment model is generated.

9. The method for automated real-time three-dimensional digital modeling of dikes according to claim 8, characterized in that: In step S6, according to the coordinate system of the cross section of the embankment unit constructed in step S3, the cross-sectional coordinates of the cut-off wall are determined, the characteristic nodes and characteristic lines corresponding to the cut-off wall are obtained, and the geometric mesh of the cut-off wall is constructed according to the characteristic lines. The texture coordinates of the geometric mesh of the cut-off wall are calculated, and the material information is mapped to generate the cut-off wall model.

10. The method for automated real-time three-dimensional digital modeling of dikes according to claim 9, characterized in that: In step S7, according to the coordinate system of the cross section of the levee unit constructed in step S3, the coordinates of the cross section of the levee base are determined, the characteristic nodes and characteristic lines corresponding to each geological layer are obtained, and the geometric grid of the geological model is constructed according to the characteristic lines, and the texture coordinates of the geometric grid of the geological model are calculated. According to the geological stratification characteristics, the material information is mapped in layers to generate a geological model of the levee base.