Lithium battery-flow battery hybrid energy storage system double-layer capacity optimization configuration method

Through the dual-layer capacity optimization configuration method of lithium battery-flow battery hybrid energy storage system, combined with the characteristics of lithium-ion batteries and flow batteries, the impact of large-scale renewable energy grid connection on the power system is solved, achieving a lower integration Cost and wind and light punishment cost are significantly better than a single energy storage configuration.

CN118983841AInactive Publication Date: 2024-11-19CHINA HUADIAN GRP CO LTD QINGHAI BRANCH +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411043703.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-07-12
Filing Date
2024-07-31
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Large-scale renewable energy grid connection poses a huge challenge to the stable operation of the power system, especially the problem of wind and light abandonment. Existing lithium-ion batteries and flow batteries have their own advantages and disadvantages, and it is difficult to effectively solve the overall cost and operating costs of the system.

Method used

Using the double-layer capacity optimization configuration method of lithium battery-flow battery hybrid energy storage system, through the layered optimization model, the two-layer capacity optimization configuration model for configuration and operation is built with the goal of minimum comprehensive cost and minimum operating cost, and combined with lithium Characteristics of ion batteries and flow batteries, optimize the configuration and operation of energy storage systems.

Benefits of technology

It effectively reduces the cost of power grid purchase and the penalty cost of wind and light abandonment, significantly reduces the overall cost of the system, significantly better than a single power or capacity energy storage configuration, and achieves a lower comprehensive cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118983841A_ABST
    Figure CN118983841A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of hybrid energy storage system optimization configuration, and particularly discloses a lithium battery-flow battery hybrid energy storage system double-layer capacity optimization configuration method in order to solve the problem that large-scale renewable energy source grid connection has huge influence on an electric power system. Comprising the following specific steps: S1, establishing a lithium battery-flow battery hybrid energy storage system model; and S2, constructing a lithium battery-flow battery hybrid energy storage double-layer capacity optimization configuration model. Compared with a scene 1 and a scene 2, the system has the advantages that the power purchase cost of a power grid is reduced by 43.93% and 21.41% respectively, the wind curtailment and light curtailment penalty cost is reduced by 93.53% and 87.36% respectively, and the comprehensive cost is reduced by 1.30% and 4.75% respectively compared with the scene 1 and the scene 2; the problem of wind and light absorption can be effectively solved, the effect is obviously better than that of only configuring single power type or capacity type energy storage, and the comprehensive cost of configuration is lower.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of hybrid energy storage system optimization configuration, and in particular to a double-layer capacity optimization configuration method for a lithium battery-liquid flow battery hybrid energy storage system. Background Art

[0002] Building a new power system with new energy as the main body has become an important starting point for my country's energy low-carbon transformation. However, affected by the uncertainty of renewable energy output, the large-scale access of renewable energy to the power system poses a huge challenge to the stable operation of the system, and the serious problem of wind and solar power abandonment also needs to be solved urgently. Electrochemical battery energy storage technology is an important means to solve the above problems. Lithium-ion batteries have high energy density, long life, and are environmentally friendly and pollution-free, making them the current mainstream energy storage technology, but they have disadvantages such as safety and poor low-temperature performance; while flow batteries have the advantages of safety and reliability, high cost-effectiveness during the life cycle, environmental friendliness, and long cycle life. The power and capacity of the battery are independent of each other, and the separation of power and capacity can be achieved. The capacity can be expanded by increasing the capacity of the liquid storage tank, but flow batteries have disadvantages such as low energy density and high cost.

[0003] Therefore, according to the different technical characteristics of electrochemical batteries, it is possible to consider using a hybrid configuration of lithium-ion batteries with fast response speed and flow batteries with large storage capacity to build a lithium-flow battery hybrid energy storage system and achieve complementary advantages between the two energy storage technologies. Summary of the invention

[0004] The purpose of the present invention is to solve the problem that large-scale renewable energy grid connection has a huge impact on the power system, and a double-layer capacity optimization configuration method for a lithium battery-liquid flow battery hybrid energy storage system is proposed. A hierarchical optimization mode is adopted, and a double-layer capacity optimization configuration model is constructed with the minimum comprehensive cost as the upper target and the minimum operating cost as the lower target. The problems of configuration and operation at two different time scales are hierarchically optimized, avoiding the confusion of time scales and reducing the impact of renewable energy grid connection on the power system to a certain extent.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] A double-layer capacity optimization configuration method for a lithium-liquid flow battery hybrid energy storage system comprises the following specific steps:

[0007] S1: Establish a lithium-liquid flow battery hybrid energy storage system model:

[0008] S1a: The state of charge of a lithium-ion battery expressed by the charge and discharge power is:

[0009]

[0010] S1b: The mathematical model of flow battery is similar to that of lithium-ion battery, and is expressed by the state of charge:

[0011]

[0012] S2: Construct a double-layer capacity optimization configuration model for lithium-liquid flow battery hybrid energy storage:

[0013] S2a: The variables that affect the upper-level optimization are the configuration of the hybrid energy storage system, including the configuration capacity, the configuration energy storage type, and the maximum input and output power of the equipment. The objective function is:

[0014] minC com =C inv +C ope ;

[0015] S2b: In order to solve the problem of different life depreciation of different equipment in the hybrid energy storage system, the model uses "day" as the cycle for settlement, so as to verify the constructed model, so that C inv It is determined by the daily investment cost of flow battery energy storage and lithium-ion battery energy storage in the hybrid energy storage system, and is affected by the purchase cost, maintenance cost and replacement cost of each energy storage system equipment, specifically:

[0016] C inv =C inv,FB +C inv,Li

[0017] C inv,FB =C B,FB +C M,FB +C A,FB

[0018] C inv,Li =C B,Li +C M,Li +C A,Li ;

[0019] S2c: The upper-level optimization model determines the energy storage configuration with the goal of minimizing the total investment cost, including the power and capacity of the hybrid energy storage system. On this basis, the lower-level optimization mainly considers the comprehensive operating cost of the hybrid energy storage system in actual operation, including equipment output cost, wind and solar power abandonment penalty cost, and grid power purchase cost. The objective function is to minimize the comprehensive operating cost of the hybrid energy storage system, specifically:

[0020] minC ope =C sto +f pun +C buy

[0021] C sto =C sto,Li +C sto,FB

[0022] C sto,Li =C P,Li P all,Li +C S,Li S all,Li

[0023] C sto,FB =C P,FB P all,FB +C S,FB S all,FB

[0024]

[0025] As a further technical solution of the present invention, in said S1a, wherein: S Li (t), S Li (t0) represents the power storage of the lithium-ion battery at time t and time t0 respectively; P Li,c , P Li,d Respectively represent the charging and discharging power of lithium-ion batteries; Li,c , δ Li,d They represent the efficiency of the charging and discharging process of lithium-ion batteries.

[0026] As a further technical solution of the present invention, in said S1b, wherein: S FB (t), S FB (t0) represents the power storage of the flow battery at time t and time t0 respectively; P FB,c , P FB,d Respectively represent the charge and discharge power of the flow battery; δ FB,c , δ FB,d They represent the efficiency of the charge and discharge process of the flow battery respectively.

[0027] As a further technical solution of the present invention, in said S2a, wherein: C com is the comprehensive cost of the hybrid energy storage system; C inv is the total investment cost of the hybrid energy storage system; C ope is the comprehensive operating cost of the hybrid energy storage system.

[0028] As a further technical solution of the present invention, in said S2b, wherein: C inv,FB is the investment cost of flow battery energy storage; C inv,Li is the investment cost of lithium-ion battery energy storage; C B,FB , C M,FB , C A,FB They are the initial purchase cost, equipment maintenance cost, and equipment replacement cost of liquid flow battery energy storage equipment; C B,Li , C M,Li , C A,LiThey are the initial purchase cost of lithium-ion battery equipment, equipment maintenance cost, and equipment replacement cost.

[0029] As a further technical solution of the present invention, in said S2c, wherein: C sto The output cost of the hybrid energy storage system; pun Penalty cost for wind and solar curtailment; C buy The cost of purchasing electricity from the power grid; C sto,Li The operating cost of lithium-ion battery energy storage; C sto,FB is the operating cost of flow battery energy storage; P all,Li , P all,FB are the total operating power of lithium-ion batteries and flow batteries in a typical day; C P,Li , C P,FB are the unit power costs of lithium-ion batteries and flow batteries respectively; C S,Li , C S,FB are the unit capacity costs of lithium-ion batteries and flow batteries, respectively, both converted into “daily” costs for calculation; S all,Li is the daily charge and discharge capacity of the lithium-ion battery; S all,FB is the daily charge and discharge capacity of the flow battery; μ w , μ pv are the unit penalty costs for wind and solar abandonment respectively; are the actual input power of wind power and photovoltaic power in the system at time t; are the output power of wind power and photovoltaic units at time t; C e,t is the time-of-use electricity price at time t, P buy,t is the power purchased by the grid at time t.

[0030] The beneficial effects of the present invention are:

[0031] 1. Compared with Scenario 1 and Scenario 2, the present invention reduces the grid power purchase cost by 43.93% and 21.41% respectively, reduces the wind and solar power abandonment penalty cost by 93.53% and 87.36% respectively, and reduces the comprehensive cost by 1.30% and 4.75% compared with Scenario 1 and Scenario 2.

[0032] 2. The method proposed in the present invention can effectively solve the problem of wind and solar power consumption, and the effect is significantly better than only configuring a single power-type or capacity-type energy storage, and the overall configuration cost is lower. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 This is a flow chart of a double-layer capacity optimization configuration method for a lithium battery-liquid flow battery hybrid energy storage system proposed by the present invention. DETAILED DESCRIPTION

[0034] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0035] Please refer to the attached Figure 1 , a double-layer capacity optimization configuration method for a lithium battery-liquid flow battery hybrid energy storage system, comprising the following specific steps:

[0036] S1: Establish a lithium-liquid flow battery hybrid energy storage system model:

[0037] S1a: The state of charge of a lithium-ion battery expressed by the charge and discharge power is:

[0038]

[0039] S1b: The mathematical model of flow battery is similar to that of lithium-ion battery, and is expressed by the state of charge:

[0040]

[0041] S2: Construct a double-layer capacity optimization configuration model for lithium-liquid flow battery hybrid energy storage:

[0042] S2a: The variables that affect the upper-level optimization are the configuration of the hybrid energy storage system, including the configuration capacity, the configuration energy storage type, and the maximum input and output power of the equipment. The objective function is:

[0043] minC com =C inv +C ope ;

[0044] S2b: In order to solve the problem of different life depreciation of different equipment in the hybrid energy storage system, the model uses "day" as the cycle for settlement, so as to verify the constructed model, so that C inv It is determined by the daily investment cost of flow battery energy storage and lithium-ion battery energy storage in the hybrid energy storage system, and is affected by the purchase cost, maintenance cost and replacement cost of each energy storage system equipment, specifically:

[0045] C inv =C inv,FB +C inv,Li

[0046] C inv,FB =C B,FB +C M,FB +C A,FB

[0047] C inv,Li =C B,Li +C M,Li +C A,Li ;

[0048] S2c: The upper-level optimization model determines the energy storage configuration with the goal of minimizing the total investment cost, including the power and capacity of the hybrid energy storage system. On this basis, the lower-level optimization mainly considers the comprehensive operating cost of the hybrid energy storage system in actual operation, including equipment output cost, wind and solar power abandonment penalty cost, and grid power purchase cost. The objective function is to minimize the comprehensive operating cost of the hybrid energy storage system, specifically:

[0049] minC ope =C sto +f pun +C buy

[0050] C sto =C sto,Li +C sto,FB

[0051] C sto,Li =C P,Li P all,Li +C S,Li S all,Li

[0052] C sto,FB =C P,FB P all,FB +C S,FB S all,FB

[0053]

[0054] In a preferred embodiment, S1a, wherein: S Li (t), S Li (t0) represents the power storage of the lithium-ion battery at time t and time t0 respectively; P Li,c , P Li,d Respectively represent the charging and discharging power of lithium-ion batteries; Li,c , δ Li,d They represent the efficiency of the charging and discharging process of lithium-ion batteries.

[0055] In a preferred embodiment, S1b, wherein: S FB (t), S FB (t0) represents the power storage of the flow battery at time t and time t0 respectively; P FB,c , P FB,d Respectively represent the charge and discharge power of the flow battery; δ FB,c , δ FB,d They represent the efficiency of the charge and discharge process of the flow battery respectively.

[0056] In a preferred embodiment, in S2a, wherein: C com is the comprehensive cost of the hybrid energy storage system; Cinv is the total investment cost of the hybrid energy storage system; C ope is the comprehensive operating cost of the hybrid energy storage system.

[0057] In a preferred embodiment, in S2b, wherein: C inv,FB is the investment cost of flow battery energy storage; C inv,Li is the investment cost of lithium-ion battery energy storage; C B,FB , C M,FB , C A,FB They are the initial purchase cost, equipment maintenance cost, and equipment replacement cost of liquid flow battery energy storage equipment; C B,Li , C M,Li , C A,Li They are the initial purchase cost of lithium-ion battery equipment, equipment maintenance cost, and equipment replacement cost.

[0058] In a preferred embodiment, in S2c, wherein: C sto The output cost of the hybrid energy storage system; pun Penalty cost for wind and solar curtailment; C buy The cost of purchasing electricity from the power grid; C sto,Li The operating cost of lithium-ion battery energy storage; C sto,FB is the operating cost of flow battery energy storage; P all,Li , P all,FB are the total operating power of lithium-ion batteries and flow batteries in a typical day; C P,Li , C P,FB are the unit power costs of lithium-ion batteries and flow batteries respectively; C S,Li , C S,FB are the unit capacity costs of lithium-ion batteries and flow batteries, respectively, both converted into “daily” costs for calculation; S all,Li is the daily charge and discharge capacity of the lithium-ion battery; S all,FB is the daily charge and discharge capacity of the flow battery; μ w , μ pv are the unit penalty costs for wind and solar abandonment respectively; are the actual input power of wind power and photovoltaic power in the system at time t; are the output power of wind power and photovoltaic units at time t; C e,t is the time-of-use electricity price at time t, P buy,t is the power purchased by the grid at time t.

[0059] Specific example: Taking the wind, solar and electricity load data of a certain area in Qinghai Province as a simulation example, the energy supply side of the area includes centralized wind power and centralized photovoltaic power, of which the installed capacity of centralized wind power is 350MW and the installed capacity of centralized photovoltaic power is 250MW. The specific data are shown in the following table:

[0060] Table 1 Wind and solar output curve and power load on a typical day

[0061] time 1 2 3 4 5 6 Wind power output / Kwh 239.7824 261.105632 241.207712 229.278368 208.486688 173.01312 Photovoltaic output / Kwh 0 0 0 0 0 0 Power load / Kwh 80 79 78 78 81 85 time 7 8 9 10 11 12 Wind power output / Kwh 93.811872 16.04064 27.908832 21.26208 32.612832 30.15264 Photovoltaic output / Kwh 9.2 46.132 84.268 120.132 122.8 120.132 Power load / Kwh 96.665 126.665 185.365 210 220 240 time 13 14 15 16 17 18 Wind power output / Kwh 32.83392 61.683552 62.51616 48.437088 46.771872 46.339104 Photovoltaic output / Kwh 125.732 136.268 123.268 122.8 61.188 25.64 Power load / Kwh 242.314 250.366 230 230 210 220 time 19 20 21 22 23 24 Wind power output / Kwh 40.26624 32.819808 35.030688 82.992672 160.561632 250.615008 Photovoltaic output / Kwh 0 0 0 0 0 0 Power load / Kwh 210 210 180 140.888 90.666 76.258

[0062] The values ​​of the parameters related to the operation of the hybrid energy storage system are shown in the following table:

[0063] Table 2 Hybrid energy storage system operation related parameters

[0064]

[0065] In order to better verify the economy and environmental protection of the proposed lithium-liquid flow hybrid energy storage double-layer capacity optimization configuration model, three application scenarios are proposed for comparative analysis of the results after capacity configuration optimization. Scenario 1: Only lithium-ion battery energy storage device is configured; Scenario 2: Only flow battery energy storage system is configured; Scenario 3: Lithium-liquid flow battery hybrid energy storage system is configured.

[0066] Table 3 Optimization configuration results for each scenario

[0067] parameter Scenario 1 Scenario 2 Scene 3 Lithium-ion battery power / MW 159.73 0 127.19 Lithium-ion battery capacity / MWh 312 0 153 Flow battery power / MW 0 182.11 122.11 Flow battery capacity / MWh 0 420 247

[0068] Table 4 Running results of each scenario

[0069] parameter Scenario 1 Scenario 2 Scene 3 System comprehensive cost / 10,000 yuan 4957.29 5136.40 4892.62 Investment cost / 10,000 yuan 3770.03 4189.84 4214.73 Equipment output cost / 10,000 yuan 198.75 365.35 428.45 Power grid purchase cost / 10,000 yuan 373.99 266.85 209.71 Penalty cost for wind and solar curtailment / 10,000 yuan 614.52 314.36 39.73 Wind and solar curtailment rate 12.62% 7.05% 1.06%

[0070] Based on the double-layer capacity optimization configuration method of the lithium battery-liquid flow battery hybrid energy storage system provided by the present invention, the system's grid power purchase cost is reduced by 43.93% and 21.41% respectively compared with scenario 1 and scenario 2, and the penalty cost for wind and solar power abandonment is reduced by 93.53% and 87.36% respectively. The comprehensive cost is reduced by 1.30% and 4.75% compared with scenario 1 and scenario 2.

[0071] The method proposed in the present invention can effectively solve the problem of wind and solar power consumption, and the effect is significantly better than only configuring a single power-type or capacity-type energy storage, and the overall configuration cost is lower.

[0072] Those skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present invention (including the claims) is limited to these examples. Under the concept of the present invention, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of the different aspects of the present invention as described above, which are not provided in detail for the sake of simplicity.

[0073] The present invention is intended to cover all such substitutions, modifications and variations that fall within the broad scope of the claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A double-layer capacity optimization configuration method for a lithium-liquid flow battery hybrid energy storage system, characterized in that: The specific steps include: S1: Establish a lithium-liquid flow battery hybrid energy storage system model: S1a: The state of charge of a lithium-ion battery expressed by the charge and discharge power is: S1b: The mathematical model of flow battery is similar to that of lithium-ion battery, and is expressed by the state of charge: S2: Construct a double-layer capacity optimization configuration model for lithium-liquid flow battery hybrid energy storage: S2a: The variables that affect the upper-level optimization are the configuration of the hybrid energy storage system, including the configuration capacity, the configuration energy storage type, and the maximum input and output power of the equipment. The objective function is: minC com =C inv +C ope ; S2b: In order to solve the problem of different life depreciation of different equipment in the hybrid energy storage system, the model uses "day" as the cycle for settlement, so as to verify the constructed model, so that C inv It is determined by the daily investment cost of flow battery energy storage and lithium-ion battery energy storage in the hybrid energy storage system, and is affected by the purchase cost, maintenance cost and replacement cost of each energy storage system equipment, specifically: C inv =C inv,FB +C inv,Li C inv,FB =C B,FB +C M,FB +C A,FB C inv,Li =C B,Li +C M,Li +C A,Li ; S2c: The upper-level optimization model determines the energy storage configuration with the goal of minimizing the total investment cost, including the power and capacity of the hybrid energy storage system. On this basis, the lower-level optimization mainly considers the comprehensive operating cost of the hybrid energy storage system in actual operation, including equipment output cost, wind and solar power abandonment penalty cost, and grid power purchase cost. The objective function is to minimize the comprehensive operating cost of the hybrid energy storage system, specifically: minC ope =C sto +f pun +C buy C sto =C sto,Li +C sto,FB C sto,Li =C P,Li P all,Li +C S,Li S all,Li C sto,FB =C P,FB P all,FB +C S,FB S all,FB 2. A double-layer capacity optimization configuration method for a lithium-liquid flow battery hybrid energy storage system according to claim 1, characterized in that: In the S1a, where: S Li (t), S Li (t0) represents the power storage of the lithium-ion battery at time t and time t0 respectively; P Li,c , P Li,d Respectively represent the charging and discharging power of lithium-ion batteries; Li,c , δ Li,d They represent the efficiency of the charging and discharging process of lithium-ion batteries.

3. A double-layer capacity optimization configuration method for a lithium-liquid flow battery hybrid energy storage system according to claim 1, characterized in that: In the S1b, where: S FB (t), S FB (t0) represents the power storage of the flow battery at time t and time t0 respectively; P FB,c , P FB,d Respectively represent the charge and discharge power of the flow battery; δ FB,c , δ FB,d They represent the efficiency of the charge and discharge process of the flow battery respectively.

4. A double-layer capacity optimization configuration method for a lithium-liquid flow battery hybrid energy storage system according to claim 1, characterized in that: In the S2a, where: C com is the comprehensive cost of the hybrid energy storage system; C inv is the total investment cost of the hybrid energy storage system; C ope is the comprehensive operating cost of the hybrid energy storage system.

5. The method for optimizing the double-layer capacity of a lithium-liquid flow battery hybrid energy storage system according to claim 1, characterized in that: In the S2b, where: C inv,FB is the investment cost of flow battery energy storage; C inv,Li is the investment cost of lithium-ion battery energy storage; C B,FB , C M,FB , C A,FB They are the initial purchase cost, equipment maintenance cost, and equipment replacement cost of liquid flow battery energy storage equipment; C B,Li , C M,Li , C A,Li They are the initial purchase cost of lithium-ion battery equipment, equipment maintenance cost, and equipment replacement cost.

6. A double-layer capacity optimization configuration method for a lithium-liquid flow battery hybrid energy storage system according to claim 1, characterized in that: In the S2c, where: C sto The output cost of the hybrid energy storage system; pun Penalty cost for wind and solar curtailment; C buy The cost of purchasing electricity from the power grid; C sto,Li The operating cost of lithium-ion battery energy storage; C sto,FB is the operating cost of flow battery energy storage; P all,Li , P all,FB are the total operating power of lithium-ion batteries and flow batteries in a typical day; C P,Li , C P,FB The unit power costs of lithium-ion batteries and flow batteries, respectively; C S,Li , C S,FB are the unit capacity costs of lithium-ion batteries and flow batteries, respectively, both converted into "daily" costs for calculation; S all,Li is the daily charge and discharge capacity of the lithium-ion battery; S all,FB is the daily charge and discharge capacity of the flow battery; μ w , μ pv are the unit penalty costs for wind and solar abandonment respectively; are the actual input power of wind power and photovoltaic power in the system at time t; are the output power of wind power and photovoltaic units at time t; C e,t is the time-of-use electricity price at time t, P buy,t is the power purchased by the grid at time t.

Citation Information

Patent Citations

  • Hybrid energy storage system capacity and power configuration method and system

    CN116094000A