Water conservancy dam ant nest treatment method

By filling medicine and grouting at the split holes of the ants affected by water conservancy dams, grouting is done using gravity steel balls to force and multiple grouting pipes to pressurize grouting, the problem of incomplete filling of ant nests in traditional management methods is solved, and simplicity is achieved. Timely, thorough and safe ant nest management reduces costs.

CN118985574AInactive Publication Date: 2024-11-22ZHEJIANG TONGJI VOCATIONAL COLLEGE OF SCI & TECH
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411234265.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The traditional water conservancy dam ant nest management method is difficult to completely fill the ant-affected spots, especially in soil with poor water permeability, which leads to poor management results, large engineering volume and high investment.

Method used

The medicine and grouting are carried out by filling the dike ant-affected hole at the dam ants, and the grouting pipe is extended into the depth using gravity steel balls, and multiple grouting pipes and pressurized grouting are combined with the anti-treatment medicine to achieve precise grouting and Living termites are cured.

Benefits of technology

It has achieved simple construction, timely management, thorough, safe and reliable ant nest management, reduced costs, improved management effect and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118985574A_ABST
    Figure CN118985574A_ABST
Patent Text Reader

Abstract

The invention relates to a water conservancy dam ant nest treatment method which comprises a dam, ant-affected points, drenching equipment and grouting equipment, and the ant-affected points comprise ant nests, branch flying holes, ant channels and living termites. The filling equipment comprises a sharp-nose pot and liquid medicine; the grouting equipment comprises a grouting pipe, a gravity steel ball, a connecting rope, a turning joint, a hole sealing material, a grouting material, a grouting machine, a slurry mixer and a mobile power supply; double treatment measures of drenching and grouting are adopted when the branch flying holes are found through dam ant disease inspection, living termites are killed through drenching, accurate grouting is conducted on ant nest cavities through the branch flying holes, the drilling link is omitted, the drilling workload is reduced, meanwhile, the usage amount of slurry is saved, killing medicine is prepared in the slurry, and the cost is reduced. Termites are prevented from migrating at the place in the later period; the method has the advantages of being easy and convenient to construct, timely and thorough in treatment, safe, reliable and low in cost, is suitable for the termite flying period, and can meet the requirement for timely treatment of dam termite diseases.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of dam termite control in water conservancy and hydropower engineering, and in particular to a method for controlling ant nests in water conservancy and hydropower engineering. Background Art

[0002] With the continuous construction of water conservancy and hydropower projects in my country, some long-built dams often suffer from termite damage to varying degrees. The ant infestation has brought great safety hazards to the dams, causing infiltration damage such as pipe bursts at the least and dam breach at the worst.

[0003] Ant nests are the key parts of ant infestation. Traditional treatment methods are mostly injection and grouting. Injection can kill living termites in ant nests, and dam cavities caused by ant nests are filled with grouting measures. The traditional grouting method is to carry out grouting in a large number of holes around the ant infestation points. This grouting method is often difficult to fill all ant nests in the ant infestation point, resulting in poor treatment effect. Especially when the dam filling material uses soil with poor permeability, the grouting effect is even more difficult to guarantee. In addition, this grouting method has a large amount of engineering work and high investment.

[0004] Therefore, it is necessary to propose a method for controlling ant nests on dams that is simple to construct, timely and thorough, safe, reliable and low-cost.

[0005] Based on this, this case is brought forward. Summary of the invention

[0006] The purpose of the present invention is to provide a method for controlling ant nests in water conservancy dams, which has the characteristics of simple construction, timely and thorough control, safety and reliability, and low cost. It is suitable for the termite swarming period and can meet the needs of timely control of ant infestations on dams.

[0007] In order to achieve the above object, the technical solution of the present invention is as follows:

[0008] A method for treating ant nests in a water conservancy dam comprises the following steps:

[0009] S1. Repair of the fly holes at the ant-infested spots of water conservancy dams;

[0010] S2. Injection of medicine into the fly hole;

[0011] S3. Arrange grouting pipes in the fly holes;

[0012] S31. The head of the grouting pipe is tied with a gravity steel ball through a connecting rope, and the grouting pipe with the gravity steel ball is extended into the highest point of the fly hole, and the medicine is poured into the fly hole of the grouting pipe inserted into the fly hole;

[0013] S32. When no medicine is coming out of other holes or living termites are not forced out of the holes during the injection, a grouting pipe with a gravity steel ball tied to the pipe head is inserted into the holes where no medicine is coming out or no living termites are forced out, and then the injection is continued;

[0014] S33. Extend the multiple grouting pipes that have been extended into the deep holes to the grouting machine through the bending joints;

[0015] S4. Grouting into the fly holes through the grouting pipe;

[0016] S5. Refilling of the fly holes;

[0017] S6. Pull out the grouting pipe and seal the branch hole with sealing material.

[0018] Furthermore, the step S1 includes the following processes: clearing weeds on the surface of the dam, using a cutter to gently pry open the branching holes at the ant-infested points, and trimming the shape of the branching holes to make the surface of the branching holes smooth and the soil firm.

[0019] Furthermore, the medicine pouring in step S2 and step S3 is to use a pointed-mouthed pot to pour the medicine into the flying holes.

[0020] Further, the step S4 includes the following process:

[0021] S41. Pour the grouting material into the grout mixer, start the mobile power supply, grout mixer and grouting machine of the grouting equipment, and grout the grouting pipe in the highest fly hole. When other fly holes at lower elevations begin to emit grout, use plugging materials to plug the openings of the fly holes that are emitting grout, and continue grouting;

[0022] S42. After grouting for a period of time, if there are still no grouting holes, grouting should be carried out separately for these holes. If the grouting pipe has not been inserted into the holes in advance, the grouting pipe with a gravity steel ball tied to the pipe head should be inserted into the holes before grouting.

[0023] S43. Until all the fly holes are filled with slurry.

[0024] Furthermore, step S5 includes the following process: when all the branch holes are filled with slurry, observe the slurry level in the branch holes corresponding to each grouting pipe. If the slurry level drops, refilling should be carried out in time until the slurry level in the branch holes is stable or enough slurry is poured in.

[0025] Furthermore, the grouting of the flyholes should be gradually pressurized from thin to thick according to the actual grouting situation.

[0026] Furthermore, the portion of the grouting pipe extending into the branch hole is made of a soft pipe, and the portion outside the branch hole is made of a hard pipe.

[0027] The advantages of the present invention are:

[0028] 1. Simple construction and timely treatment: When termite holes are found during the dam ant infestation inspection, injection and grouting measures are taken. The injection measures are simple and convenient to operate, and the grouting measures save the drilling process. The construction is simple, and treatment is carried out on the spot during the termite inspection, which is timely.

[0029] 2. Thorough, safe and reliable control: through the dual control of dam ant infestation by injection of medicine and grouting, living termites are killed by injection of medicine, and the ant nest cavity is accurately grouted through the branch holes. Multiple grouting pipes are extended into the deep of the branch holes under the action of the gravity of the steel ball and the impact force of the injection of medicine. The grouting effect is better through pressurized grouting, and the killing medicine is prepared in the slurry to prevent the later termites from migrating here; at the same time, the killing medicine is also prepared in the slurry to prevent the later termites from migrating here, and the extermination of dam ant infestation is more thorough, safe and reliable; 3. Low cost: the ant nest grouting of the present invention is directly injected through the branch holes, the grouting is more accurate, the drilling workload is reduced, and the use of slurry is saved. Compared with the traditional drilling and grouting measures around the ant nest, the extermination cost is significantly reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a flowchart of the method for managing ant nests in water conservancy dams in the embodiment;

[0031] Figure 2 is a schematic longitudinal section diagram of a dam during the repair process of an embodiment scheme;

[0032] Figure 3 yes Figure 2 Detailed drawing A;

[0033] Figure 4 yes Figure 3 Detailed drawing B;

[0034] Figure 5 yes Figure 3 Detailed drawing C;

[0035] Description of symbols

[0036] 1- embankment; 2- ant infestation point; 21- ant nest; 22- flight hole; 23- ant tunnel; 24- living termites;

[0037] 3-medicine filling equipment; 31-pointed spout pot; 32-medicine solution;

[0038] 4- grouting equipment; 41- grouting pipe; 42- gravity steel ball; 43- connecting rope; 44- turning joint; 45- sealing material; 46- grouting material; 47- grouting machine; 48- grout mixing machine; 49- mobile power supply. DETAILED DESCRIPTION

[0039] The present invention is further described in detail below in conjunction with the embodiments. It should be understood that the directions or positional relationships indicated by the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside" and "outside" herein are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention.

[0040] like Figure 1 to Figure 5 As shown, this embodiment proposes a method for controlling ant nests in water conservancy dams, and the specific steps are as follows.

[0041] S1. Clear the weeds on the surface of the embankment 1, use a cutter to gently pry open the branch hole 22 of the ant-infested point 2, and trim the shape of the hole mouth of the branch hole 22 to make the surface of the hole mouth of the branch hole 22 smooth and the soil compact, providing good basic conditions for subsequent injection of medicine.

[0042] S2. Filling the branch holes 22 with medicine: The medicine 32 of the medicine filling device 3 is loaded into the pointed pot 31, and the medicine is poured into each of the trimmed branch holes 22 to kill the living termites 24 in the ant nest 21, the branch holes 22 and the ant tunnel 23. At the same time, the process of pouring medicine can also open the smaller diameter channel inside the branch holes 22 to facilitate the subsequent layout of the grouting pipe 41.

[0043] S3. Laying out grouting pipe 41;

[0044] S31. The head of the grouting pipe 41 is tied to the gravity steel ball 42 through the connecting rope 43, and the grouting pipe 41 tied with the gravity steel ball 42 is extended into a high-elevation fly hole 22, and the medicine is continued to be poured using the pointed pot 31 at the fly hole 22. Under the impact force of the poured medicine 32 and the gravity of the gravity steel ball 42, the grouting pipe 41 is extended into the depth of the fly hole 22;

[0045] S32. When the filling process is found that no medicine 32 emerges from other sub-holes 22 or living termites 24 are not forced out of the sub-holes 22, the grouting pipe 41 of the gravity steel ball 42 is inserted into the sub-holes 22 where no medicine emerges or no living termites are forced out, and then the filling continues;

[0046] S33. The plurality of grouting pipes 41 extending deep into the branch holes 22 are extended to the grouting machine 46 through the turning joint 44 for subsequent grouting.

[0047] S4, grouting of sub-hole 22:

[0048] S41. Pour the grouting material 46 into the grout mixer 48, start the mobile power supply 49, the grout mixer 48 and the grouting machine 47 of the grouting equipment 3, and grout the grouting pipe 41 in the highest fly hole 22. When the other fly holes 22 with lower elevations begin to slurry, use the plugging material 45 to plug the hole opening of the fly hole 22 that is slurrying, and continue grouting;

[0049] S42. After grouting for a period of time, if there is still a branch hole 22 without grouting, the branch hole 22 should be grouted separately. If the grouting pipe 41 is not inserted into the branch hole 22 in advance, the grouting pipe 41 with a gravity steel ball 42 tied to the pipe head should be inserted into the branch hole 22 before grouting. At the same time, the grouting process should be gradually pressurized and the slurry should be adjusted from dilute to concentrated;

[0050] S43. Repeat the above steps until all the fly holes 22 are filled with slurry.

[0051] S5. Refilling the sub-holes 22: Observe the slurry in the sub-holes 22 corresponding to each grouting pipe 41. If the slurry level drops, refilling should be performed in time until the slurry level in the sub-holes 22 is stable or enough slurry is poured into the holes.

[0052] S6. Pull out the grouting pipe 41 and seal the hole with the plugging material 45.

[0053] like Figure 5 As shown, a gravity steel ball 42 is tied to the head of the grouting pipe 41 so that the grouting pipe 41 can be better extended into the depth of the branch hole 22 under the impact force of the injection. During actual construction, direct extension or other measures such as introducing other objects can be taken according to the patency of the branch hole 22 to achieve a better grouting effect.

[0054] The grouting of the fly hole 22 should be gradually pressurized from thin to thick according to the actual grouting situation, so that the slurry can be poured into the deeper ant nest 21 under the pressure, and the slurry will be denser after final setting, thereby achieving a more ideal grouting effect.

[0055] The grouting material 46 of the grouting equipment 4 should include (but not limited to) water, pest control chemicals, soil, cement and micro-expansion agent, so as to ensure that the slurry has pest control effect and can be better combined with the original dam material after solidification.

[0056] The portion of the grouting pipe 41 extending into the branch hole 22 can be a soft hose, while the portion outside the branch hole 22 can be a hard pipe and fixed to prevent the grouting pipe 41 in the branch hole 22 from being thrown out due to the high grouting pressure during grouting.

[0057] like Figure 3As shown, in this embodiment, multiple grouting pipes 41 are used for grouting, mainly because the connecting ant tunnels 23 between the ant nests 21 are small in diameter and a single grouting pipe 41 cannot grout the slurry into all the ant nests 21 .

[0058] In this embodiment, the blocking material 45 can be made of soft materials such as rubber, foam board, or clay.

[0059] The grouting material 46, grouting machine 47, slurry mixer 48 and mobile power supply 49 of the grouting equipment 4 can be carried on the vehicle, the construction is simple, the ant infestation can be treated in time, and the problem that the remote location of the dam 1 of the water conservancy project is difficult to implement is solved.

[0060] The above embodiments are only used to explain the concept of the present invention, rather than to limit the protection of the rights of the present invention. Any non-substantial changes to the present invention using this concept shall fall within the protection scope of the present invention.

Claims

1. A method for treating ant nests in water conservancy dams, characterized in that: The following steps are involved: S1. Repair of the fly holes at the ant-infested spots of water conservancy dams; S2. Injection of medicine into the fly hole; S3. Arrange grouting pipes in the fly holes; S31. The head of the grouting pipe is tied with a gravity steel ball through a connecting rope, and the grouting pipe with the gravity steel ball is extended into the highest point of the fly hole, and the medicine is poured into the fly hole of the grouting pipe inserted into the fly hole; S32. When no medicine is coming out of other holes or living termites are not forced out of the holes during the injection, a grouting pipe with a gravity steel ball tied to the pipe head is inserted into the holes where no medicine is coming out or no living termites are forced out, and then the injection is continued; S33. Extend the multiple grouting pipes that have been extended into the deep holes to the grouting machine through the bending joints; S4. Grouting into the fly holes through the grouting pipe; S5. Refilling of the fly holes; S6. Pull out the grouting pipe and seal the branch hole with sealing material.

2. A method for treating ant nests in water conservancy dams as claimed in claim 1, characterized in that: The step S1 includes the following processes: clearing weeds on the surface of the dam, using a cutter to gently pry open the fly holes at the ant-infested points, and trimming the shapes of the fly holes to make the surfaces of the fly holes smooth and the soil firm.

3. A method for treating ant nests in water conservancy dams as claimed in claim 1, characterized in that: The medicine pouring in step S2 and step S3 is to pour the medicine into the flying hole by using a pointed-mouth pot.

4. A method for treating ant nests in water conservancy dams as claimed in claim 1, characterized in that: The step S4 includes the following process: S41. Pour the grouting material into the grout mixer, start the mobile power supply, grout mixer and grouting machine of the grouting equipment, and grout the grouting pipe in the highest fly hole. When other fly holes at lower elevations begin to emit grout, use plugging materials to plug the openings of the fly holes that are emitting grout, and continue grouting; S42. After grouting for a period of time, if there are still no grouting holes, grouting should be carried out separately for these holes. If the grouting pipe has not been inserted into the holes in advance, the grouting pipe with a gravity steel ball tied to the pipe head should be inserted into the holes before grouting. S43. Until all the fly holes are filled with slurry.

5. A method for treating ant nests in water conservancy dams as claimed in claim 4, characterized in that: Step S5 The process includes the following: when all the branch holes are filled with slurry, observe the slurry level in the branch holes corresponding to each grouting pipe. If the slurry level drops, it should be supplemented in time until the slurry level in the branch holes is stable or enough slurry is poured in.

6. A method for treating ant nests in water conservancy dams as claimed in claim 1, characterized in that: The grouting of the flyholes should be done from thin to thick and the pressure should be increased gradually according to the actual grouting situation.

7. A method for treating ant nests in water conservancy dams as claimed in claim 1, characterized in that: The portion of the grouting pipe extending into the split hole is a soft pipe, and the portion outside the split hole is a hard pipe.

Citation Information

Cited By

  • Complete method for dam termite cave positioning, termite killing and termite cave blocking

    CN119547774A