Construction method for pre-assembling bracket on barrel body assembly of ore grinding machine
Through the H-shaped steel rectangular frame and support structure, the problems of low safety and accuracy during the assembly of the cylinder assembly of the ball mill are solved, and efficient and stable installation of cylinder components is achieved, avoiding ladder up and down and rolling of cylinder shells is avoided. improves assembly efficiency and accuracy.
Patent Information
- Application Number
- CN202411358443.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-26
- Publication Date
- 2024-11-22
AI Technical Summary
In the prior art, there are problems of safety adverse factors, assembly accuracy and low efficiency in the pre-assembly process of ball mill barrel assembly. Especially when installing large gears and high-position positioning pins, it is necessary to use a ladder to work up and down multiple times, and the cylinder is The shell rolls on the ground for alignment, affecting safety and accuracy.
A rectangular frame composed of H-shaped steel is used as the base to install support blocks and support wheels to form a stable support structure. The crane is used to lift the receptacle shell and manually rotate it to realize the positioning and bolt installation of the cylinder components to avoid ground rolling and ladder operations. Improve assembly accuracy and efficiency.
It improves the safety and accuracy of the assembly of the barrel assembly of the grinder, reduces safety risks, enhances assembly efficiency, and ensures a stable set of large gears, achieving a smooth and flexible assembly process.
Smart Images

Figure CN118989964A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of metallurgy and mining, and in particular to a construction method for pre-assembling a bracket of a grinding mill cylinder assembly. Background Art
[0002] As a grinding equipment in mineral processing, the ball mill will have different degrees of wear and tear on the shell, feed cover, discharge cover, large gear and other parts after several years of operation. In order to maintain the reliability of the equipment operation, the ball mill must be overhauled. During the overhaul, the prepared ball mill shell, feed cover, discharge cover and other parts should be pre-assembled into a cylinder assembly and then hoisted as a whole. In the past, the cylinder assembly was pre-assembled on a flat ground, with the shell lying flat on the ground and supported on the outside of the shell in the circumferential direction with wood or iron materials to prevent the shell from rolling and injuring people. Then the feed cover, discharge cover and other parts were hoisted with lifting equipment and gradually installed.
[0003] The full-circle large gear must be installed on the discharge end cover and the shell flange after the feed end cover and the discharge end cover are installed. The outer diameter of the full-circle large gear is larger than the outer diameter of the shell, feed end cover, and discharge end cover, and it cannot be installed on the ground. In addition, the diameter of the ball mill used for mineral processing is relatively large, and most of the positioning pins and connecting bolts of the parts are higher than the height of the human body. The installation of the positioning pins and connecting bolts requires the use of a ladder to go up and down several times. In the process, the outer support of the shell must be removed, and the shell must be rolled on the ground to achieve the alignment of the positioning pins and connecting bolts. The safety factor, assembly accuracy and efficiency in the pre-assembly process will be affected by uncertain factors. Summary of the invention
[0004] 1. Technical issues to be resolved
[0005] In view of the deficiencies in the prior art, the present invention provides a construction method for pre-assembling a bracket of a grinding mill cylinder assembly, which solves the problems existing in the prior art.
[0006] (II) Technical solution
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: A construction method for pre-assembling a bracket of a grinding mill cylinder assembly, the specific operations are as follows:
[0008] Step 1: The rectangular frame is made of 2 large H-shaped steels placed horizontally at a certain distance. The top of the large H-shaped steel is overlapped with 2 medium H-shaped steels at a 90° angle, and the 2 medium H-shaped steels are kept parallel. They are connected and fixed with 4 bolts to form a rectangular frame as the base.
[0009] Step 2: Install two pairs of support blocks and rollers at both ends of the top of the two middle H-shaped steels on the rectangular frame. The rollers are installed on the top of the support blocks, with a total of four support blocks and rollers.
[0010] Step 3: When the mill cylinder assembly is pre-assembled, the cylinder shell is lifted by a crane and placed steadily on the assembly bracket. The flanges at both ends of the cylinder shell are kept at an equal distance from the supporting wheels at both ends. The feed end cover, discharge end cover, large gear, etc. are assembled in accordance with the steps to complete the assembly of the mill cylinder assembly. During the installation process, the cylinder shell is manually rotated to realize the positioning pins, alignment and bolt installation and fixation of the mill cylinder parts, avoiding unfavorable safety factors during the assembly process, and also improving the assembly accuracy and efficiency of the cylinder assembly.
[0011] Preferably, the support block is welded from steel plates. The supporting wheel is composed of a wheel shell, a bearing, a gland, a wheel axle, and a supporting wheel bracket, and the wheel shell rotates freely around the axle through the bearing.
[0012] Preferably, the axial directions of the four supporting wheels are symmetrically arranged in the same direction as the symmetry axes of the two large H-shaped steels at the bottom of the rectangular frame, and the directions of the four supporting wheels are consistent.
[0013] Preferably, the centers of the two supporting wheels on each pair of support blocks and the center of the mill shell to be assembled form a right-angled isosceles triangle to maintain the stability of each pair of supports. The supporting wheels on the two pairs of support blocks are in contact with the outer circumference of the mill shell and are kept at a certain distance from the flanges at both ends of the mill shell to ensure that a space is reserved when the mill shell is placed on the supporting wheels for installation.
[0014] Preferably, each support block installed at both ends of the top of the two H-shaped steels is connected and fixed by 4 bolts, and the supporting wheel on the top of each support block is also connected and fixed by 4 bolts.
[0015] Preferably, after the mill cylinder assembly is pre-assembled with a bracket to hold up the mill cylinder shell, the distance between the center of the cylinder and the ground should be 10cm-20cm greater than the radius of the large gear to be assembled, so as to ensure the ground clearance of the full-circle large gear set.
[0016] (III) Beneficial effects
[0017] The present invention provides a construction method for pre-assembling a bracket of a grinding mill cylinder assembly.
[0018] Beneficial effects:
[0019] (1) The construction method of the pre-assembly bracket of the mill cylinder assembly is to make a pre-assembly bracket of the mill cylinder assembly. The pre-assembly bracket is composed of a rectangular frame made of H-shaped steel as the base. Two pairs of support blocks and support wheels are installed above the two ends of the rectangular frame. There are a total of four support block and support wheels. The directions of the four support wheels are consistent. The center of each pair of support block and support wheels and the center of the mill cylinder shell to be assembled form a right-angled isosceles triangle to maintain the stability of each pair of supports. The outer sides of the two pairs of support wheels and support blocks should be kept at a certain distance from the flanges at both ends of the mill cylinder shell to be assembled to ensure that space is reserved when the mill cylinder shell is placed on the support wheels for installation. The cylinder shell to be installed is lifted by a crane and placed on the support wheels of the pre-assembly bracket. The mill cylinder assembly is assembled according to the steps. The cylinder shell is manually rotated during the installation process to achieve the alignment of the locating pins of the mill cylinder components and the installation and tightening of the bolts, thereby avoiding safety adverse factors during the assembly process and also improving the assembly accuracy and efficiency of the cylinder assembly.
[0020] The mill cylinder assembly is pre-assembled with bracket size, which can be adjusted according to the diameter and length of the mill cylinder, but the center of each pair of support wheels and the center of the cylinder shell must form a right-angled isosceles triangle to ensure the stability of the support. For mill cylinders with multi-stage cylinder shells extended and spliced, additional support block support wheel pairs can be added to achieve multi-stage cylinder shell docking installation;
[0021] The H-shaped steel rectangular frame is used, and the structure is stable; the center of the supporting wheel and the center of the cylinder shell form a right-angled isosceles triangle, which ensures the stability of the support; the supporting wheel is supported by contact with the outer circumference of the mill cylinder shell, and it can be manually turned freely according to needs during assembly, which facilitates the precise alignment of the mill cylinder shell and other components, improves the installation accuracy, and also avoids the safety of working up and down with the help of ladders and the rolling of the cylinder on the ground, thereby improving the installation efficiency. After the cylinder shell is supported, the distance from the center of the cylinder to the ground is greater than the radius of the large gear to be assembled by 10cm, which ensures the ground clearance of the full-circle large gear set. This invention was used in the overhaul of the MQG2736 ball mill this year. When the ball mill cylinder assembly with a full-circle large gear was pre-installed, the support was stable, the rotation was flexible, and it was safe and reliable, completing the assembly task with quality and efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 Front view of the bracket assembly, 1. Large H-beam 2. Medium H-beam 3. Support block 4. Support wheel
[0023] Figure 2 Top view of the bracket assembly, 1. Large H-beam 2. Medium H-beam 3. Support block 4. Support wheel
[0024] Figure 3 Side view of the bracket assembly, 1. Large H-beam 2. Medium H-beam 3. Support block 4. Support wheel
[0025] Figure 4 Support block
[0026] Figure 5 Supporting wheel, 4-1, wheel housing 4-2, bearing 4-3, gland 4-4, wheel axle 4-5, supporting wheel bracket
[0027] Figure 6 Schematic diagram of the mounting bracket for the grinding mill, 5, cylinder shell 6, feed end cover 7, discharge end cover 8, and large gear. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] See also Figure 1-6 The present invention provides a technical solution: a construction method for pre-assembling a bracket of a grinding mill cylinder assembly, and the specific operation is as follows:
[0030] Step 1: The rectangular frame is made of 2 large H-shaped steels 1 placed horizontally and in parallel at a certain distance. The top of the large H-shaped steel is overlapped with 2 medium H-shaped steels 2 at a 90° angle, and the 2 medium H-shaped steels are kept parallel. They are connected and fixed with 4 bolts to form a rectangular frame as the base.
[0031] Step 2: Install two pairs of support blocks 3 and supporting wheels 4 at both ends of the top of the two middle H-shaped steels on the rectangular frame. The supporting wheels are installed on the top of the support blocks, with a total of 4 support blocks and supporting wheels.
[0032] Step 3: When the mill cylinder assembly is pre-assembled, use a crane to lift the cylinder shell 5 and place it steadily on the assembly bracket. The flanges at both ends of the cylinder shell are kept at an equal distance from the supporting wheels at both ends. Follow the steps to assemble the feed end cover 6, the discharge end cover 7, the large gear 8, etc. to complete the assembly of the mill cylinder assembly. During the installation process, the cylinder shell is manually rotated to achieve the positioning pins, alignment and bolt installation and fixation of the mill cylinder parts, avoiding safety adverse factors during the assembly process, and also improving the assembly accuracy and efficiency of the cylinder assembly;
[0033] The support block 3 is welded by steel plates. The supporting wheel is composed of a wheel shell 4-1, a bearing 4-2, a pressure cover 4-3, a wheel axle 4-4, and a supporting wheel bracket 4-5. The wheel shell rotates freely around the axle through the bearing;
[0034] The axial directions of the four supporting rollers are symmetrically placed in the same direction as the symmetry axes of the two large H-shaped steels at the bottom of the rectangular frame, and the directions of the four supporting rollers are consistent;
[0035] The centers of the two supporting wheels on each pair of support blocks and the center of the mill shell to be assembled form a right-angled isosceles triangle to maintain the stability of each pair of supports. The supporting wheels on the two pairs of support blocks are in contact with the outer circumference of the mill shell and are kept at a certain distance from the flanges at both ends of the mill shell to ensure that there is a reserved space when the mill shell 5 is placed on the supporting wheels for installation;
[0036] Each support block installed at both ends of the top of the 2 middle H-shaped steels is connected and fixed by 4 bolts, and the supporting wheel on the top of each support block is also connected and fixed by 4 bolts;
[0037] After the mill cylinder assembly is pre-assembled with a bracket to lift the mill cylinder shell, the distance between the center of the cylinder and the ground should be 10cm-20cm greater than the radius of the large gear to be assembled to ensure the ground clearance of the full-circle large gear 8 set.
[0038] Example:
[0039] (1) A rectangular frame made of H-shaped steel is used as the base. The rectangular frame is made of two large H-shaped steels (1) placed horizontally and parallel to each other at a certain distance. The top of the large H-shaped steel is overlapped with two medium H-shaped steels (2) at a 90° angle, and the two medium H-shaped steels are kept parallel. The rectangular frame is fixed with four bolts to form a rectangular frame as the base. See attached Figure 1 , Figure 2 , Figure 3 .
[0040] (2) Two pairs of support blocks (3) and supporting wheels (4) are installed at both ends of the top of the two middle H-shaped steels on the rectangular frame. The supporting wheels are installed on the top of the support blocks, with a total of 4 support blocks and supporting wheels. Figure 1 , Figure 2 , Figure 3 .
[0041] (3) The support block (3) is welded from steel plates. The supporting wheel is composed of a wheel shell (4-1), a bearing (4-2), a pressure cover (4-3), a wheel axle (4-4), and a supporting wheel bracket (4-5). The wheel shell rotates freely around the axle through the bearing. Figure 4 , Figure 2 ,
[0042] (4) The axial directions of the four supporting rollers are symmetrically arranged in the same direction as the symmetry axes of the two large H-shaped steels at the bottom of the rectangular frame, and the directions of the four supporting rollers are consistent.
[0043] (5) The centers of the two supporting wheels on each pair of supporting blocks and the center of the mill shell to be assembled form a right-angled isosceles triangle to maintain the stability of each pair of supports. The supporting wheels on the two pairs of supporting blocks are in contact with the outer circumference of the mill shell and are supported at a certain distance from the flanges at both ends of the mill shell to ensure that a space is reserved when the mill shell (5) is placed on the supporting wheels for installation.
[0044] (6) Each support block installed at both ends of the top of the two H-shaped steel bars is connected and fixed by 4 bolts, and the support wheel on the top of each support block is also connected and fixed by 4 bolts.
[0045] (7) After a pre-assembled bracket of a grinding mill cylinder assembly holds up the grinding mill cylinder shell, the distance between the center of the cylinder and the ground should be 10 cm to 20 cm greater than the radius of the large gear to be assembled, so as to ensure the ground clearance of the full-circle large gear (8) assembly.
[0046] (8) When the mill cylinder assembly is pre-assembled, the cylinder shell (5) is lifted by a crane and placed steadily on the assembly bracket. The flanges at both ends of the cylinder shell are kept at an equal distance from the supporting wheels at both ends. The feed end cover (6), the discharge end cover (7), the large gear (8) and the like are assembled in steps to complete the assembly of the mill cylinder assembly. During the installation process, the cylinder shell is manually rotated to realize the positioning pins, alignment and bolt installation and fixing of the mill cylinder parts, thereby avoiding safety adverse factors during the assembly process and also improving the assembly accuracy and efficiency of the cylinder assembly.
[0047] (9) The size of the bracket of the mill cylinder assembly is pre-assembled and can be adjusted accordingly according to the diameter and length of the mill cylinder, but the center of each pair of rollers and the center of the shell must form a right-angled isosceles triangle to ensure the stability of the support. For mill cylinders with multi-stage shell extensions, additional support block and roller pairs can be added to achieve multi-stage shell docking installation.
[0048] In summary, the construction method of the pre-assembly bracket of the mill cylinder assembly is to manufacture a pre-assembly bracket of the mill cylinder assembly. The pre-assembly bracket is composed of a rectangular frame made of H-shaped steel as a base, and two pairs of support blocks and supporting wheels are installed above the two ends of the rectangular frame, with a total of four support block and supporting wheels. The four supporting wheels are in the same direction, and the center of each pair of support block and supporting wheels and the center of the mill cylinder shell to be assembled form a right-angled isosceles triangle to maintain the stability of each pair of supports. The outer sides of the two pairs of supporting wheels and support blocks should be kept at a certain distance from the flanges at both ends of the mill cylinder shell to be assembled to ensure that the mill cylinder shell is placed on the supporting wheels for installation. The cylinder shell to be installed is lifted by a crane and placed on the supporting wheels of the pre-assembly bracket. The mill cylinder assembly is assembled according to the steps. The locating pins of the mill cylinder components can be aligned and the bolts can be installed and tightened by manually rotating the cylinder shell during the installation process, thereby avoiding safety adverse factors during the assembly process and also improving the assembly accuracy and efficiency of the cylinder assembly.
[0049] The mill cylinder assembly is pre-assembled with bracket size, which can be adjusted according to the diameter and length of the mill cylinder, but the center of each pair of support wheels and the center of the cylinder shell must form a right-angled isosceles triangle to ensure the stability of the support. For mill cylinders with multi-stage cylinder shells extended and spliced, additional support block support wheel pairs can be added to achieve multi-stage cylinder shell docking installation;
[0050] The H-shaped steel rectangular frame is used, and the structure is stable; the center of the supporting wheel and the center of the cylinder shell form a right-angled isosceles triangle, which ensures the stability of the support; the supporting wheel is supported by contact with the outer circumference of the mill cylinder shell, and it can be manually turned freely according to needs during assembly, which facilitates the precise alignment of the mill cylinder shell and other components, improves the installation accuracy, and also avoids the safety of working up and down with the help of ladders and the rolling of the cylinder on the ground, thereby improving the installation efficiency. After the cylinder shell is supported, the distance from the center of the cylinder to the ground is greater than the radius of the large gear to be assembled by 10cm, which ensures the ground clearance of the full-circle large gear set. This invention was used in the overhaul of the MQG2736 ball mill this year. When the ball mill cylinder assembly with a full-circle large gear was pre-installed, the support was stable, the rotation was flexible, and it was safe and reliable, completing the assembly task with quality and efficiency.
[0051] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0052] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction method for pre-assembling a bracket of a grinding mill cylinder assembly, characterized in that: The specific operations are as follows: Step 1: A rectangular frame is formed by placing two large H-shaped steels (1) in parallel with a certain distance, and the top of the large H-shaped steel is overlapped with two medium H-shaped steels (2) at a 90° angle, and the two medium H-shaped steels are kept parallel, and connected and fixed with four bolts to form a rectangular frame as a base. Step 2: Install two pairs of support blocks (3) and supporting wheels (4) at both ends of the top of the two middle H-shaped steels on the rectangular frame. The supporting wheels are installed on the top of the support blocks, with a total of four support blocks and supporting wheels. Step 3: When the mill cylinder assembly is pre-assembled, the cylinder shell (5) is lifted by a crane and placed steadily on the assembly bracket. The flanges at both ends of the cylinder shell are kept at an equal distance from the supporting wheels at both ends. The feed end cover (6), the discharge end cover (7), the large gear (8) and the like are assembled in accordance with the steps to complete the assembly of the mill cylinder assembly. During the installation process, the cylinder shell is manually rotated to realize the positioning pins, alignment and bolt installation and fixing of the mill cylinder parts, thereby avoiding safety adverse factors during the assembly process and also improving the assembly accuracy and efficiency of the cylinder assembly.
2. The construction method of pre-assembling the bracket of the grinding mill cylinder assembly according to claim 1 is characterized in that: The support block (3) is welded from steel plates. The supporting wheel is composed of a wheel shell (4-1), a bearing (4-2), a pressure cover (4-3), a wheel axle (4-4), and a supporting wheel bracket (4-5), and the wheel shell is freely rotated around the axle through the bearing.
3. The construction method of pre-assembling the bracket of the grinding mill cylinder assembly according to claim 1 is characterized in that: The axial directions of the four supporting wheels are symmetrically arranged in the same direction as the symmetry axes of the two large H-shaped steels at the bottom of the rectangular frame, and the directions of the four supporting wheels are consistent.
4. The construction method of pre-assembling the bracket of the grinding mill cylinder assembly according to claim 1 is characterized in that: The centers of the two supporting wheels on each pair of support blocks and the center of the mill shell to be assembled form a right-angled isosceles triangle to maintain the stability of each pair of supports. The supporting wheels on the two pairs of support blocks are in contact with the outer circumference of the mill shell and are kept at a certain distance from the flanges at both ends of the mill shell to ensure that a space is reserved when the mill shell (5) is placed on the supporting wheels for installation.
5. The construction method of pre-assembling the bracket of the grinding mill cylinder assembly according to claim 1 is characterized in that: Each support block installed at both ends of the top of the two H-shaped steels is connected and fixed by 4 bolts, and the supporting wheel on the top of each support block is also connected and fixed by 4 bolts.
6. The construction method of pre-assembling the bracket of the grinding mill cylinder assembly according to claim 1 is characterized in that: After the mill cylinder assembly is pre-assembled with a bracket to lift the mill cylinder shell, the distance between the center of the cylinder and the ground should be 10cm-20cm greater than the radius of the large gear to be assembled, so as to ensure the ground clearance of the full-circle large gear (8) assembly.
Citation Information
Patent Citations
Universal horizontal overturn assembly platform and assembly process for aero-engine
CN103567739A
Automatic cylinder lining board assembly platform and control method thereof
CN104416353A
Assembling method for factory test run of split-structure multi-section combined type large ball mill
CN115255924A
Robot overturning type positioning, assembling and welding clamp
CN213531354U
Metal filing rotary supporting machining device
CN213828868U