Mud cake preparation device and control method

By designing a device including extrusion parts, pressure bearing parts, filter parts, raw material additive parts and mud preparation parts, the accurate control of the moisture content of mud cakes and the preparation of different electrical properties is achieved, and the problem is not met in the prior art. The problems of dielectric logging experiments require improved measurement accuracy and reliability.

CN118990736APending Publication Date: 2024-11-22CHINA UNIV OF PETROLEUM (BEIJING)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411138957.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing mud cake preparation device cannot achieve accurate control of mud cake moisture content, cannot prepare mud cakes of different electrical properties, and cannot meet the needs of dielectric logging experiments.

Method used

A device including extrusion parts, pressure bearing parts, filter parts, raw material additive parts and mud preparation parts was designed. The pressure sensor is used to monitor and adjust the applied pressure strength in real time, and combine the control of raw material additive amount to achieve the accuracy of the moisture content of mud cake. Control and preparation of different electrical properties.

Benefits of technology

The accurate control of the moisture content of mud cakes and the preparation of different electrical properties is achieved, which meets the needs of dielectric logging experiments and improves the accuracy and reliability of measurement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118990736A_ABST
    Figure CN118990736A_ABST
Patent Text Reader

Abstract

The invention provides a mud cake preparation device and a control method, relates to the technical field of oil-gas exploration rock physics experiments, and aims to solve the technical problems that an existing artificial mud cake preparation device cannot accurately control the water content of a mud cake, cannot prepare mud cakes with different electrical properties and cannot meet experiment requirements. The mud cake preparation device comprises an extrusion part, a pressure bearing part, a filtering part, a raw material adding part and a mud preparation part, the upper end face of the extrusion part is connected with a telescopic rod of an electric cylinder, a pressure sensor is installed on the extrusion part, and the pressure sensor, the electric cylinder, the raw material adding part and the mud preparation part are all electrically connected with a controller. The pressure intensity of mud is monitored in real time through a pressure sensor, and the pressure intensity applied to the mud cake preparation device is adjusted, so that the mud cake preparation device can accurately control the water content of the mud cake; the mud cake preparation device can be used for preparing mud cakes with different electrical properties by changing the adding amount of various raw materials added into the mud preparation part by the raw material adding part.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of petrophysical experiments in oil and gas exploration, and in particular to a mud cake preparation device and a control method. Background Art

[0002] Dielectric logging technology can accurately obtain formation water information in unconventional reservoirs, and plays a key role in determining formation water saturation and improving oil recovery. Under different formation conditions and drilling fluid conditions, mud cakes with different electrical properties will form on the well wall. The detection depth of dielectric logging instruments is only a few inches, and is greatly affected by the wellbore and mud cake. If you want to obtain accurate formation information, you need to explore the impact of different mud cakes on dielectric measurement.

[0003] Usually, artificial mud cakes are used in the laboratory through rock physics experiments to explore the influence of different mud cakes on dielectric measurements. Most of the current artificial mud cake preparation devices prepare mud cakes with different permeabilities and different compaction strengths. The permeability of the mud cake reflects the plugging ability of the drilling fluid formula. The existing technology for preparing mud cakes with different permeabilities and compaction strengths is often used in experiments to evaluate the plugging performance of drilling fluids.

[0004] However, the existing artificial mud cake preparation device cannot achieve accurate control of the moisture content of the mud cake, cannot prepare mud cakes with different electrical properties, and cannot meet the needs of the experiment. Summary of the invention

[0005] In view of the above problems, the embodiments of the present application provide a mud cake preparation device and a control method, which can achieve accurate control of the moisture content of the mud cake and can prepare mud cakes with different electrical properties to meet the needs of the experiment.

[0006] In order to achieve the above objectives, the embodiments of the present application provide the following technical solutions:

[0007] In a first aspect, an embodiment of the present application provides a mud cake preparation device, including an extrusion member, a pressure-bearing member, a filter member, a raw material adding member, and a mud preparation member;

[0008] The pressure-bearing member is provided with a groove matched with the extrusion member, and the extrusion member is slidably connected to the groove;

[0009] A filter is placed at the bottom of the groove, and a filter hole is arranged on the wall surface of the pressure bearing member opposite to the groove, and the filter hole penetrates the pressure bearing member and is connected with the groove;

[0010] The upper end surface of the extrusion piece is connected to the telescopic rod of the electric cylinder, and a pressure sensor is installed on the extrusion piece;

[0011] The raw material adding part is communicated with the mud preparation part, and the mud preparation part is communicated with the groove;

[0012] The pressure sensor, the electric cylinder, the raw material adding component and the mud preparation component are all electrically connected to the controller.

[0013] In some embodiments of the present application, the extrusion member includes a protrusion and an extrusion portion, and the extrusion portion is slidably connected to the groove;

[0014] A protrusion is provided at one end of the extrusion part away from the pressure-bearing member, and the cross-sectional dimension of the protrusion is larger than the cross-sectional dimension of the extrusion part;

[0015] And / or, the pressure-bearing member includes a first supporting member and a receiving member, the receiving member is provided with a groove, the groove runs through the receiving member, and the lower end of the receiving member is connected to the first supporting member.

[0016] In some embodiments of the present application, a filter hole is provided on the wall surface of the first support member opposite to the groove, and the filter hole penetrates the first support member, and a filter element is placed on the upper wall surface of the first support member opposite to the groove;

[0017] And / or, the lower end surface of the extruded piece is provided with an anti-sticking piece, and the size of the anti-sticking piece is the same as the size of the lower end surface of the extruded piece.

[0018] In some embodiments of the present application, the lower end of the first support member is connected to the second support member, the second support member is smaller in horizontal dimension than the first support member, the upper and lower ends of the second support member are open, and a water flow channel is provided on the side wall of the second support member;

[0019] The lower end of the second support member is connected to the frame, the size of the frame in the horizontal direction is larger than that of the first support member, and the electric cylinder is installed at the inner upper end of the frame.

[0020] In some embodiments of the present application, the raw material adding member includes a plurality of raw material boxes, and the outlet ends of the plurality of raw material boxes are respectively connected to or closed with the mud preparation member;

[0021] The mud preparation part includes a container and an agitator, the agitator is arranged in the container, a weight sensor is arranged at the bottom of the container, the bottom of the container is connected with the groove through a hose, and a valve is arranged on the hose;

[0022] The valve and the weight sensor are both electrically connected to the controller.

[0023] In some embodiments of the present application, the parameters of the mud cake prepared by the mud cake preparation device are:

[0024] The raw materials of the mud cake include a weighting agent, a first clay, a second clay, deionized water and a soluble salt.

[0025] In a second aspect, an embodiment of the present application provides a control method for a mud cake preparation device, comprising the following steps:

[0026] injecting raw materials into the mud preparation part through the raw material adding part;

[0027] The slurry is prepared by stirring the raw materials through the slurry preparation part, and the slurry is injected into the groove of the pressure bearing part;

[0028] Obtaining a preset correspondence between the applied pressure on the mud, the pressurization time and the moisture content of the mud cake;

[0029] Obtain the required water content of the mud, and determine the simulated applied pressure and the simulated pressurization time according to the required water content and the preset corresponding relationship;

[0030] According to the simulated applied pressure and the simulated pressurization time, the mud cake preparation device is controlled to prepare the mud cake.

[0031] In some embodiments of the present application, the mud cake preparation device is controlled according to the simulated applied pressure and the simulated pressurization time, specifically including:

[0032] Obtaining the actual applied pressure in the mud cake preparation device;

[0033] determining an applied pressure difference based on the actual applied pressure and the simulated applied pressure;

[0034] According to the applied pressure difference, the applied pressure in the mud cake preparation device is adjusted.

[0035] In some embodiments of the present application, obtaining a preset correspondence between the applied pressure on the mud, the pressurization time and the moisture content of the mud cake specifically includes:

[0036] Acquire multiple sets of experimental data, including corresponding applied pressure, pressurization time and mud cake moisture content; and establish a preset corresponding relationship based on the multiple sets of experimental data.

[0037] In some embodiments of the present application, after controlling the mud cake preparation device to prepare the mud cake according to the simulated applied pressure and the simulated pressurization time, the method further includes:

[0038] Taking out the prepared mud cake;

[0039] Adjusting the amount of raw material added to obtain mud cakes with different dielectric constants; and / or,

[0040] Taking out the prepared mud cake;

[0041] Adjust the amount of raw material added to obtain mud cakes with different electrical conductivities.

[0042] The present application provides a mud cake preparation device and a control method, the mud cake preparation device includes an extrusion part, a pressure-bearing part, a filter part, a raw material adding part, and a mud preparation part; the pressure-bearing part is provided with a groove matched with the extrusion part, and the extrusion part is slidably connected to the groove; a filter part is placed at the bottom of the groove, and a filter hole is provided on the wall of the pressure-bearing part opposite to the groove, and the filter hole penetrates the pressure-bearing part and is connected to the groove; the upper end face of the extrusion part is connected to the telescopic rod of the electric cylinder, and a pressure sensor is installed on the extrusion part; the raw material adding part is connected to the mud preparation part, and the mud preparation part is connected to the groove; the pressure sensor, the electric cylinder, the raw material adding part and the mud preparation part are all electrically connected to the controller. The pressure sensor monitors the pressure of the mud in real time, and according to the difference between the actual applied pressure and the simulated applied pressure, the applied pressure in the mud cake preparation device is adjusted so that the actual applied pressure is close to the simulated applied pressure, so that the mud cake preparation device can achieve accurate control of the moisture content of the mud cake. By changing the addition amount of various raw materials added by the raw material adding part to the mud preparation part, the mud cake preparation device can prepare mud cakes with different electrical properties to meet the needs of the experiment.

[0043] In addition to the technical problems solved by the embodiments of the present application described above, the technical features that constitute the technical solutions, and the beneficial effects brought about by the technical features of these technical solutions, other technical problems that can be solved by the mud cake preparation device and control method provided by the embodiments of the present application, other technical features included in the technical solutions, and the beneficial effects brought about by these technical features will be further described in detail in the specific implementation methods. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0045] Figure 1 A schematic diagram of the structure of a mud cake preparation device provided in an embodiment of the present application;

[0046] Figure 2 A schematic diagram of the top view of the pressure-bearing member of the mud cake preparation device provided in an embodiment of the present application;

[0047] Figure 3 The spectrum diagram of dielectric constant and conductivity measurement of mud cake provided in the embodiment of the present application;

[0048] Figure 4 The spectrum diagram of dielectric constant and conductivity measurement of mud cake provided in the embodiment of the present application;

[0049] Figure 5This is a spectrum diagram of the dielectric constant and conductivity measurement of the mud cake provided in the embodiment of the present application.

[0050] Reference numerals:

[0051] 100- extrusion member; 101- protrusion; 102- extrusion portion;

[0052] 200-pressure bearing member; 201-groove; 202-filtration hole; 203-first support member; 204-accommodation member; 205-O-type sealing ring; 206-second support member;

[0053] 300-filter; 400-controller; 500-electric cylinder;

[0054] 600-raw material additive; 601-first raw material box; 602-second raw material box; 603-third raw material box; 604-fourth raw material box; 605-fifth raw material box;

[0055] 700-frame; 800-pressure sensor;

[0056] 900 - Mud preparation parts; 901 - Container; 902 - Agitator; 903 - Weight sensor; 904 - Valve. DETAILED DESCRIPTION

[0057] In the related technology, dielectric logging technology is used to detect the dielectric constant and conductivity of the formation at a very high frequency (20MHz-1GHz), and then evaluate the properties of the formation to determine the parameters such as water saturation and salinity that are the focus of oil exploration and development, thereby improving the recovery of crude oil and solving the difficulties encountered in the logging process of complex formations. Mud cakes with different electrical properties in the formation will cause errors in the calculation of saturation and salinity by dielectric logging technology. When the electrical properties of the mud cake are very different from the actual formation, it will cause a large error in the results of dielectric logging. Usually, artificial mud cakes are used in the laboratory through rock physics experiments to explore the influence of different mud cakes on dielectric measurement. Most of the current artificial mud cake preparation devices prepare mud cakes with different permeabilities and different compaction strengths. The permeability of the mud cake reflects the plugging ability of the drilling fluid formula. The existing technology for preparing mud cakes with different permeabilities and compaction strengths is often used in experiments to evaluate the plugging performance of drilling fluids. However, the existing artificial mud cake preparation device cannot achieve accurate control of the moisture content of the mud cake, cannot prepare mud cakes with different electrical properties, and cannot meet the needs of the experiment.

[0058] In view of this, the present application provides a mud cake preparation device and a control method, the mud cake preparation device includes an extrusion part, a pressure-bearing part, a filter part, a raw material adding part, and a mud preparation part; the pressure-bearing part is provided with a groove matched with the extrusion part, and the extrusion part is slidably connected to the groove; a filter part is placed at the bottom of the groove, and a filter hole is provided on the wall of the pressure-bearing part opposite to the groove, and the filter hole penetrates the pressure-bearing part and is connected to the groove; the upper end surface of the extrusion part is connected to the telescopic rod of the electric cylinder, and a pressure sensor is installed on the extrusion part; the raw material adding part is connected to the mud preparation part, and the mud preparation part is connected to the groove; the pressure sensor, the electric cylinder, the raw material adding part and the mud preparation part are all electrically connected to the controller. The pressure sensor monitors the pressure of the mud in real time, and according to the difference between the actual applied pressure and the simulated applied pressure, the applied pressure in the mud cake preparation device is adjusted so that the actual applied pressure is close to the simulated applied pressure, so that the mud cake preparation device can achieve accurate control of the moisture content of the mud cake. By changing the addition amount of various raw materials added by the raw material adding part to the mud preparation part, the mud cake preparation device can prepare mud cakes with different electrical properties to meet the needs of the experiment.

[0059] In order to make the above-mentioned purposes, features and advantages of the embodiments of the present application more obvious and understandable, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work belong to the scope of protection of this application.

[0060] See also Figure 1-Figure 2 The embodiment of the present application provides a mud cake preparation device, including: an extrusion component 100, a pressure-bearing component 200, a filter component 300, a raw material adding component 600, and a mud preparation component 900.

[0061] In some embodiments of the present application, the raw material adding member 600 can be used to add various raw materials into the mud preparation member 900. The mud preparation member 900 can be used to make various raw materials into mud, and inject the made mud into the pressure-bearing member 200. Mud can be placed in the pressure-bearing member 200. The extrusion member 100 can extrude the mud in the pressure-bearing member 200 and extrude the mud into a mud cake.

[0062] In some embodiments of the present application, the pressure-bearing member 200 is provided with a groove 201 that cooperates with the extrusion member 100, and the extrusion member 100 is slidably connected to the groove 201. The extrusion member 100 can move along the axial direction of the pressure-bearing member 200, and the extrusion member 100 can be closely fitted with the pressure-bearing member 200 after processing.

[0063] In some embodiments of the present application, a filter element 300 is placed at the bottom of the groove 201 , and a filtration hole 202 is provided on the wall of the pressure-bearing member 200 opposite to the groove 201 . The filtration hole 202 passes through the pressure-bearing member 200 and is connected to the groove 201 .

[0064] In some embodiments of the present application, the filtration holes 202 may be a plurality of dense small holes, and the filter element 300 may be located above the filtration holes 202. The mud entering the groove 201 falls on the filter element 300, and the filter element 300 only allows the liquid phase in the mud to pass through but does not allow the solid phase in the mud to pass through.

[0065] In some embodiments of the present application, the upper end surface of the extrusion member 100 is connected to the telescopic rod of the electric cylinder 500, and the pressure sensor 800 is installed on the extrusion member 100. The detection part of the pressure sensor 800 can detect the pressure in the groove 201 through the vertical hole on the extrusion member 100, and the vertical hole is connected to the groove 201. The pressure sensor 800 can be used to monitor the pressure of the mud in the pressure-bearing member 200 in real time.

[0066] In some embodiments of the present application, the extrusion member 100 is driven by the telescopic rod of the electric cylinder 500 to move up and down to squeeze the mud in the pressure-bearing member 200 .

[0067] In some embodiments of the present application, the raw material adding component 600 is in communication with the mud preparation component 900 , and the mud preparation component 900 is in communication with the groove 201 .

[0068] In some embodiments of the present application, the slurry prepared by the slurry preparation part 900 is injected into the groove 201 of the pressure-bearing part 200 .

[0069] In some embodiments of the present application, the pressure sensor 800, the electric cylinder 500, the raw material adding component 600 and the mud preparation component 900 are all electrically connected to the controller 400. The controller 400 can control the pressure sensor 800 to monitor the pressure of the mud in the pressure-bearing component 200 in real time, can control the telescopic rod of the electric cylinder 500 to move up and down to squeeze the mud in the pressure-bearing component 200, and can control the raw material adding component 600 to inject various raw materials into the mud preparation component 900.

[0070] See also Figure 1-Figure 2 In some embodiments of the present application, the extrusion member 100 includes a protrusion 101 and an extrusion portion 102 , and the extrusion portion 102 is slidably connected to the groove 201 .

[0071] In some embodiments of the present application, the cross-sectional shapes of the groove 201 and the extrusion portion 102 may be the same, and the cross-sectional shapes of the groove 201 and the extrusion portion 102 may be rectangular.

[0072] In some embodiments of the present application, the cross-sectional shape of the groove 201 and the extrusion portion 102 may be circular, that is, the extrusion portion 102 may be a cylindrical piston structure, and the circular cross-section can facilitate the removal of the prepared mud cake.

[0073] In some embodiments of the present application, a protrusion 101 is provided at one end of the extrusion portion 102 away from the pressure-bearing member 200 , and a cross-sectional dimension of the protrusion 101 is greater than a cross-sectional dimension of the extrusion portion 102 .

[0074] In some embodiments of the present application, the protrusion 101 and the extrusion part 102 can be fixedly connected by welding. The protrusion 101 and the extrusion part 102 can be integrally formed, so that the protrusion 101 and the extrusion part 102 are not easy to loosen and the connection is relatively stable.

[0075] The protruding portion 101 and the extruding portion 102 can be fixed by screw connection, and the protruding portion 101 and the extruding portion 102 are easy to disassemble, so that damaged parts can be easily replaced.

[0076] In some embodiments of the present application, the protrusion 101 and the extrusion portion 102 can be arranged into a combined structure, and a center hole can be arranged on the protrusion 101 and the extrusion portion 102, the center hole can penetrate the protrusion 101 and the extrusion portion 102, and the center hole can be sealed by a detachable material.

[0077] In some embodiments of the present application, the outer layer material of the protrusion 101 and the extrusion portion 102 and the detachable material in the middle portion can be the same material, or can be two different materials; after the center hole is sealed by the detachable material, the extrusion portion 102 can be used for extruding mud; after the detachable material in the center hole is taken out, the protrusion 101 and the extrusion portion 102 are cylindrical structures with openings at both ends, and at this time, the extrusion portion 102 and the protrusion 101 can be used for other operations in the laboratory.

[0078] In some embodiments of the present application, the pressure-bearing member 200 includes a first support member 203 and a receiving member 204 . The receiving member 204 is provided with a groove 201 . The groove 201 passes through the receiving member 204 . The lower end of the receiving member 204 is connected to the first support member 203 .

[0079] In some embodiments of the present application, the lower end of the container 204 can be fixedly connected to the first support member 203 by welding. The container 204 and the first support member 203 can also be integrally formed, and the container 204 and the first support member 203 are not easy to loosen, so that the connection between the container 204 and the first support member 203 is relatively stable.

[0080] In some embodiments of the present application, the lower end of the container 204 can be fixedly connected to the first support member 203 by screw connection, and the container 204 and the first support member 203 can be easily disassembled to facilitate the removal of the mud cake in the container 204.

[0081] In some embodiments of the present application, the receiving member 204 may be a cylindrical structure with two ends open. The length of the receiving member 204 may be similar to and slightly greater than the length of the extrusion portion 102 of the extrusion member 100, so that the extrusion portion 102 can completely contact the mud after entering the groove 201 and squeeze the mud into shape.

[0082] In some embodiments of the present application, an O-ring 205 is disposed on the inner wall of the container 204 , and the O-ring 205 can be used to improve the sealing effect between the container 204 and the extrusion portion 102 .

[0083] See also Figure 1-Figure 2 In some embodiments of the present application, a filter hole 202 is provided on the wall surface of the first support member 203 opposite to the groove 201, and the filter hole 202 penetrates the first support member 203. A filter element 300 is placed on the upper wall surface of the first support member 203 opposite to the groove 201.

[0084] The filtration holes 202 may penetrate the wall surface of the first support member 203 opposite to the groove 201 , and the liquid phase in the mud may be filtered out from the receiving member 204 through the filtration holes 202 .

[0085] In order to effectively reduce or prevent the solid phase in the mud from being lost from the container 204 through the filtration hole 202, a filter element 300 is arranged above the plane where the filtration hole 202 is located. The filter element 300 is preferably a filter paper with a pore size of about 25μm. The mud entering the container 204 falls on the filter paper. The filter paper allows the liquid phase in the mud to pass through but does not allow the solid phase in the mud to pass through. The liquid phase in the mud passes through the filter paper and is lost from the container 204 through the filtration hole 202.

[0086] In some embodiments of the present application, when the telescopic rod of the electric cylinder 500 moves downward, the extruding member 100 is driven to move downward. The extruding portion 102 of the extruding member 100 squeezes the slurry in the receiving member 204. When the extruding force of the extruding member 100 on the slurry in the receiving member 204 is too large, the filter paper may be broken, and part of the slurry may leak out from the broken part.

[0087] In some embodiments of the present application, a anti-sticking member is provided on the lower end surface of the extrusion member 100 .

[0088] In some embodiments of the present application, both the anti-sticking member and the filter member 300 can be filter paper, and the lower end surface of the extrusion part 102 does not directly contact the mud, but contacts the mud through the filter paper. After the mud is compressed to form a mud cake, the extrusion member 100 is removed from the pressure-bearing member 200. Since both the upper and lower ends of the mud cake are in contact with the filter paper, the upper end of the formed mud cake will not adhere to the lower end surface of the extrusion member 100, so that the formed mud cake will not be damaged by the extrusion member 100.

[0089] In some embodiments of the present application, the size of the anti-sticking member is the same as the size of the lower end surface of the extrusion member 100 .

[0090] The size of the anti-sticking member is matched with the size of the lower end surface of the extrusion member 100, so that the shape of the mud cake matches the shape of the groove 201, and does not affect the forming of the mud cake.

[0091] See also Figure 1-Figure 2 In some embodiments of the present application, the lower end of the first support member 203 is connected to the second support member 206. The first support member 203 can be fixedly connected to the second support member 206 by screw connection, welding, etc. The first support member 203 can be integrally formed with the second support member 206.

[0092] In some embodiments of the present application, the second support member 206 is smaller in horizontal dimension than the first support member 203 , the upper and lower ends of the second support member 206 are open, and a water flow channel is provided on the side wall of the second support member 206 .

[0093] In some embodiments of the present application, when the liquid phase in the groove 201 flows downward, it flows through the inner cavity of the second support member 206 and flows out along the water flow channel on the side wall of the second support member 206. The inner cavity of the second support member 206 has a horizontal size larger than the cross-sectional area of ​​the groove 201, so that the liquid phase flowing out of the groove 201 can all enter the inner cavity of the second support member 206.

[0094] In some embodiments of the present application, the lower end of the second support member 206 is connected to the frame 700. The second support member 206 can be fixedly connected to the frame 700 by screw connection, welding, etc. The second support member 206 can be integrally formed with the frame 700.

[0095] In some embodiments of the present application, the size of the frame 700 in the horizontal direction is larger than that of the first support member 203 .

[0096] In some embodiments of the present application, the horizontal dimension of the inner cavity of the frame 700 is larger than the outer diameter of the first support member 203, so that the first support member 203 and the second support member 206 are all within the supporting range of the frame 700; a guard plate is provided at the edge of the frame 700, and the guard plate is arranged around the outer periphery of the second support member 206, so that the liquid phase flowing out of the inner cavity of the second support member 206 can all enter the frame 700 and be collected by the frame 700, so as to prevent the outflowing liquid phase from flowing onto the table top and causing pollution to the table top.

[0097] In some embodiments of the present application, the electric cylinder 500 is installed at the upper end of the inner part of the frame 700. The frame 700 can be used to support the electric cylinder 500.

[0098] See also Figure 1-Figure 2 In some embodiments of the present application, the raw material adding component 600 includes a plurality of raw material boxes, and the outlet ends of the plurality of raw material boxes are respectively connected to or closed to the mud preparation component 900 .

[0099] In some embodiments of the present application, the number of raw material boxes can be adapted to the type of raw materials. One raw material box can hold one type of raw material. Each raw material box can be provided with an opening toward the mud preparation part 900 to facilitate the input of raw materials into the mud preparation part 900.

[0100] In some embodiments of the present application, an electric baffle can be provided on each raw material box. By blocking the opening with the electric baffle, the outlet end of the raw material box can be disconnected from the mud preparation part 900; by moving the electric baffle away from the opening, the outlet end of the raw material box can be connected with the mud preparation part 900, thereby realizing the delivery of the raw materials.

[0101] In some embodiments of the present application, the mud preparation component 900 includes a container 901 and an agitator 902 , and the agitator 902 is disposed in the container 901 .

[0102] In some embodiments of the present application, the stirrer 902 may include a motor and a stirring rod. The motor may be fixed to the outer surface of the raw material adding member 600, and the motor may be located at the upper end of the stirring rod. The rotating shaft of the motor may be fixedly connected to the stirring rod. The stirring rod may be driven to rotate while the motor rotates to stir the raw materials in the container 901. A stirring blade may be provided on the stirring rod to improve the stirring efficiency.

[0103] In some embodiments of the present application, a weight sensor 903 is disposed at the bottom of the container 901. The weight sensor 903 can measure the weight of the raw material dropped into the container 901.

[0104] In some embodiments of the present application, the bottom of the container 901 is connected to the groove 201 through a hose, and a valve 904 is provided on the hose. The hose can move together with the extrusion member 100. By opening the valve 904, the slurry in the container 901 can enter the groove 201 through the hose; by closing the valve 904, the injection of slurry into the groove 201 can be stopped.

[0105] In some embodiments of the present application, a valve may be further provided at one end of the hose close to the extrusion piece 100. Before the extrusion piece 100 pressurizes the mud in the groove 201, the valve is closed to improve the sealing effect of the groove 201 and facilitate maintaining the mud pressure in the groove 201.

[0106] In some embodiments of the present application, the valve 904 and the weight sensor 903 are both electrically connected to the controller 400. The opening and closing of the valve 904 can be controlled by the controller 400. A variety of raw materials are respectively put into the mud preparation part 900 at different time periods. Close the valve 904, and put the raw materials into the container 901 in sequence according to the preset weights of each raw material. Control the raw material adding part 600 to open the opening of one of the raw material boxes and put in the corresponding raw material. When the weight sensor 903 measures that the raw material put into the container 901 reaches the set value, the controller 400 controls the corresponding electric baffle to cover the corresponding raw material box opening, and then opens the opening of the next raw material box and delivers the next raw material until all raw materials are added.

[0107] See also Figure 1-Figure 2 In some embodiments of the present application, the parameters of the mud cake prepared by the mud cake preparation device are: the raw materials of the mud cake include a weighting agent, a first clay, a second clay, deionized water and a soluble salt.

[0108] Weighting agents are materials that increase the density of mud. They can increase the density of mud cakes to make them closer to actual working conditions. They have no effect on the conductivity and dielectric constant of mud cakes. Weighting agents include one or more of barite and calcium carbonate.

[0109] The first clay and the second clay are both clay minerals used to bind the mud cake. Changing the components of the first clay and the second clay can change the dielectric constant of the mud cake. The first clay includes one or more of bentonite, kaolinite, illite and chlorite. The second clay includes one or more of bentonite, kaolinite, illite and chlorite. The second clay and the first clay can be selected from the same clay mineral or different clay minerals.

[0110] Deionized water is nearly pure water obtained by removing ionic impurities in water through ion exchange resin. It is used to simulate the water in the mud cake. Changing the composition of deionized water can change the dielectric constant of the mud cake.

[0111] Soluble salts generally have a large solubility and are used to simulate salts in formations and drilling fluids. Changing the composition of soluble salts can change the conductivity of mud cakes. Soluble salts include one or more of sodium chloride, sodium carbonate, sodium sulfate, sodium bicarbonate, potassium chloride, potassium carbonate, potassium bicarbonate and potassium sulfate.

[0112] The dielectric constant of the mud cake is changed by changing the composition of at least one of the deionized water, the first clay and the second clay, and the conductivity of the mud cake is changed by changing the composition of the soluble salt. Mud cakes with different dielectric constants and conductivity can be prepared without adding additional raw materials.

[0113] Increasing the component of deionized water will increase the dielectric constant of the mud cake, increasing the components of the first clay and the second clay will increase the dielectric constant of the mud cake, and increasing the component of soluble salt will increase the conductivity of the mud cake.

[0114] The dielectric constant of the mud cake can be changed by changing the composition of deionized water, the first clay and the second clay, while the conductivity of the mud cake is almost not affected; the conductivity of the mud cake can be changed by changing the composition of soluble salts, while the dielectric constant of the mud cake at a frequency greater than 100MHz is almost not affected. Mud cakes with different electrical properties can be prepared according to the required conditions.

[0115] The mud cake preparation method is carried out at room temperature, without the need to use large-scale equipment such as a high-temperature and high-pressure dehydration instrument, thereby reducing the cost of mud cake production.

[0116] In some embodiments of the present application, the raw material additive 600 may include five raw material boxes, namely a first raw material box 601, a second raw material box 602, a third raw material box 603, a fourth raw material box 604 and a fifth raw material box 605, and deionized water, a first clay, a second clay, a soluble salt and a weighting agent may be placed in the five raw material boxes respectively.

[0117] See also Figure 1-Figure 2 , the present application embodiment provides a control method for a mud cake preparation device, comprising the following steps:

[0118] S10: injecting raw materials into the mud preparation part 900 through the raw material adding part 600.

[0119] Specifically, the valve 904 is closed, and the raw material adding part 600 is controlled by the controller 400 to sequentially add different raw materials into the mud preparation part 900;

[0120] The different raw materials sequentially added into the mud preparation part 900 may include 5-20 parts of a weighting agent, 5-20 parts of a first clay, 0-15 parts of a second clay, 15-25 parts of deionized water, and 0-2 parts of a soluble salt.

[0121] S20 : ​​The slurry is prepared by stirring the raw materials through the slurry preparation part 900 , and the slurry is injected into the groove 201 of the pressure bearing part 200 .

[0122] Specifically, the agitator 902 is started, and the raw materials are stirred and mixed uniformly by the agitator 902 to form mud. The agitator 902 is turned off, and the mud is left to stand for 24h-48h to allow the first clay and the second clay to fully absorb water and expand. The cured mud is stirred uniformly again by the agitator 902; then the valve 904 is opened, and the mud enters the groove 201.

[0123] It should be noted that the static curing time cannot be too short, otherwise the first clay and the second clay will not be able to fully absorb water and expand, affecting the production of mud cakes.

[0124] S30: Obtaining a preset correspondence between the applied pressure on the mud, the pressurization time, and the moisture content of the mud cake.

[0125] S40: Obtain the required water content of the mud, and determine the simulated applied pressure and the simulated pressurization time according to the required water content and a preset corresponding relationship.

[0126] S50: According to the simulated applied pressure and the simulated pressurization time, the mud cake preparation device is controlled to prepare the mud cake.

[0127] See also Figure 1-Figure 2 In some embodiments of the present application, the mud cake preparation device is controlled according to the simulated applied pressure and the simulated pressurization time, specifically including:

[0128] Obtaining the actual applied pressure in the mud cake preparation device;

[0129] determining an applied pressure difference based on the actual applied pressure and the simulated applied pressure;

[0130] According to the applied pressure difference, the applied pressure in the mud cake preparation device is adjusted.

[0131] Specifically, after the mud enters the groove 201, the valve 904 is closed, and the extrusion piece 100 is driven by the telescopic rod of the electric cylinder 500 to move downward to squeeze the mud in the groove 201. The pressure range of the mud is 0.1MPa-0.5MPa, and it is left to stand for 2h-4h to wait for filtration loss; after 2h-4h, the telescopic rod of the electric cylinder 500 moves upward, the extrusion piece 100 is pulled out, and the mud cake is completed.

[0132] It should be noted that when the mud is subjected to too much force, some of the mud may leak; when the pressure of pressurized filtration is too low, the mud loss process is slow, and the produced mud cake contains a large amount of water, and may even still appear to be in a mud state, rather than the soft mud cake state of a real mud cake.

[0133] When the mud is subjected to stress for too long, the water content in the mud cake is too low and the mud cake becomes a hard lump, which is inconsistent with the actual situation; when the mud is subjected to stress for too short a time, the water content in the mud cake is too high and the mud cake becomes a muddy state.

[0134] See also Figure 1-Figure 2 In some embodiments of the present application, obtaining the preset corresponding relationship between the applied pressure on the mud, the pressurization time and the moisture content of the mud cake specifically includes:

[0135] Acquire multiple sets of experimental data, including corresponding applied pressure, pressurization time and mud cake moisture content; and establish a preset corresponding relationship based on the multiple sets of experimental data.

[0136] See also Figure 1-Figure 2 In some embodiments of the present application, after controlling the mud cake preparation device to prepare the mud cake according to the simulated applied pressure and the simulated pressurization time, the method further includes:

[0137] Taking out the prepared mud cake;

[0138] Adjust the amount of raw material added to obtain mud cakes with different dielectric constants.

[0139] In some embodiments of the present application, the dielectric constant of the mud cake can be increased by increasing the component of deionized water, and the dielectric constant of the mud cake can be increased by increasing the components of the first clay and the second clay.

[0140] In some embodiments of the present application, after the mud cake is prepared, the following steps are further included:

[0141] Taking out the prepared mud cake;

[0142] Adjust the amount of raw material added to obtain mud cakes with different electrical conductivities.

[0143] In some embodiments of the present application, the conductivity of the mud cake can be increased by increasing the component of soluble salt.

[0144] In some embodiments of the present application, after the mud cake is prepared, the following steps are further included:

[0145] Taking out the prepared mud cake;

[0146] The amount of raw material added is adjusted to obtain mud cakes with different dielectric constants and different conductivity.

[0147] In some embodiments of the present application, the dielectric constant of the mud cake can be increased by increasing the component of deionized water, the dielectric constant of the mud cake can be increased by increasing the components of the first clay and the second clay; the conductivity of the mud cake can be increased by increasing the component of soluble salt.

[0148] The mud cake preparation method is described below in conjunction with specific embodiments.

[0149] Embodiment 1:

[0150] The valve 904 is closed, and the raw material adding part 600 is controlled by the controller 400 to add the following into the mud preparation part 900 in sequence: 15 g barite, 5 g bentonite, 5 g kaolin, 20 ml deionized water and 0.9 g sodium chloride.

[0151] Start the agitator 902, and use the agitator 902 to mix all the raw materials evenly to form mud. Turn off the agitator 902, and let it stand for 24 hours to allow the bentonite to fully absorb water and expand. Use the agitator 902 to stir the cured mud evenly again. Then open the valve 904, and the mud enters the groove 201.

[0152] After the mud enters the groove 201, the extrusion piece 100 moves downward under the drive of the telescopic rod of the electric cylinder 500 to squeeze the mud in the groove 201. The pressure on the mud is 0.1MPa. It is left to stand for 3 hours to wait for filtration loss. After 3 hours, the telescopic rod of the electric cylinder 500 moves upward, and the extrusion piece 100 is pulled out, and the mud cake is made. The pressure on the mud is monitored in real time by the pressure sensor 800, and the applied pressure in the mud cake preparation device is adjusted according to the difference between the actual applied pressure and the simulated applied pressure, so that the actual applied pressure is close to the simulated applied pressure, so that the mud cake preparation device can achieve accurate control of the moisture content of the mud cake. It should be noted that when the difference between the actual applied pressure and the simulated applied pressure is within 0.01MPa, it can be considered to be relatively close.

[0153] The dielectric constant and conductivity of the prepared mud cake were measured by impedance analyzer in the laboratory, and the obtained spectrum is shown in Figure 3 .

[0154] Embodiment 2:

[0155] A method for preparing artificial mud cake with high dielectric constant and low conductivity

[0156] The valve 904 is closed, and the raw material adding part 600 is controlled by the controller 400 to add the following into the mud preparation part 900 in sequence: 5 g of barite, 20 g of bentonite, 20 ml of deionized water and 0.3 g of sodium chloride.

[0157] Start the agitator 902, and use the agitator 902 to mix all the raw materials evenly to form mud. Turn off the agitator 902, and let it stand for 24 hours to allow the bentonite to fully absorb water and expand. Use the agitator 902 to stir the cured mud evenly again. Then open the valve 904, and the mud enters the groove 201.

[0158] After the mud enters the groove 201, the extrusion piece 100 moves downward under the drive of the telescopic rod of the electric cylinder 500 to squeeze the mud in the groove 201. The pressure on the mud is 0.1Mpa. It is left to stand for 3 hours to wait for filtration loss. After 3 hours, the telescopic rod of the electric cylinder 500 moves upward, and the extrusion piece 100 is pulled out, and the mud cake is made. The pressure on the mud is monitored in real time by the pressure sensor 800, and the applied pressure in the mud cake preparation device is adjusted according to the difference between the actual applied pressure and the simulated applied pressure, so that the actual applied pressure is close to the simulated applied pressure, so that the mud cake preparation device can achieve accurate control of the moisture content of the mud cake. It should be noted that when the difference between the actual applied pressure and the simulated applied pressure is within 0.01MPa, it can be considered to be relatively close.

[0159] The dielectric constant and conductivity of the prepared mud cake were measured by an impedance analyzer in the laboratory, and the obtained spectrum is shown in Figure 4 .

[0160] Embodiment 3:

[0161] A method for preparing artificial mud cake with high electrical conductivity and low dielectric constant

[0162] The valve 904 is closed, and the raw material adding part 600 is controlled by the controller 400 to add the following into the mud preparation part 900 in sequence: 20 g of barite, 5 g of bentonite, 20 ml of deionized water and 2 g of sodium chloride.

[0163] Start the agitator 902, and use the agitator 902 to mix all the raw materials evenly to form mud. Turn off the agitator 902, and let it stand for 24 hours to allow the bentonite to fully absorb water and expand. Use the agitator 902 to stir the cured mud evenly again. Then open the valve 904, and the mud enters the groove 201.

[0164] After the mud enters the groove 201, the extrusion piece 100 moves downward under the drive of the telescopic rod of the electric cylinder 500 to squeeze the mud in the groove 201. The pressure on the mud is 0.1MPa. It is left to stand for 3 hours to wait for filtration loss. After 3 hours, the telescopic rod of the electric cylinder 500 moves upward, and the extrusion piece 100 is pulled out, and the mud cake is made. The pressure on the mud is monitored in real time by the pressure sensor 800, and the applied pressure in the mud cake preparation device is adjusted according to the difference between the actual applied pressure and the simulated applied pressure, so that the actual applied pressure is close to the simulated applied pressure, so that the mud cake preparation device can achieve accurate control of the moisture content of the mud cake. It should be noted that when the difference between the actual applied pressure and the simulated applied pressure is within 0.01MPa, it can be considered to be relatively close.

[0165] The dielectric constant and conductivity of the prepared mud cake were measured by impedance analyzer in the laboratory, and the obtained spectrum is shown in Figure 5 .

[0166] By comparison Figure 3 and Figure 4 It can be seen that when the frequency of the experimental equipment is 300MHz-1GHz, increasing the components of the first clay and the second clay will increase the dielectric constant of the mud cake; by comparison Figure 3 and Figure 5 It can be seen that increasing the component of soluble salt will increase the conductivity of the mud cake, that is, it is verified through experimental equipment that increasing the components of the first clay and the second clay will increase the dielectric constant of the mud cake, and increasing the component of soluble salt will increase the conductivity of the mud cake. Mud cakes with different dielectric constants and conductivities can be prepared without adding additional types of raw materials.

[0167] The present application changes the amount of various raw materials added to the mud preparation part by the raw material adding part, so that the mud cake preparation device can prepare mud cakes with different electrical properties to meet the needs of the experiment. It can be applied to rock physics experiments to explore the influence of dielectric logging, and can also be applied to other rock physics experiments that need to consider the electrical properties of mud cakes.

[0168] The various embodiments or implementation methods in this specification are described in a progressive manner. Each embodiment focuses on the differences from other embodiments, and the same or similar parts between the various embodiments can be referenced to each other.

[0169] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiments or examples are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0170] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

Claims

1. A mud cake preparation device, It is characterized in that include: An extrusion part (100), a pressure-bearing part (200), a filter part (300), a raw material adding part (600), and a mud preparation part (900); The pressure-bearing member (200) is provided with a groove (201) that matches the extrusion member (100), and the extrusion member (100) is slidably connected to the groove (201); The filter element (300) is placed at the bottom of the groove (201), and a filter loss hole (202) is provided on the wall surface of the pressure-bearing member (200) opposite to the groove (201), and the filter loss hole (202) passes through the pressure-bearing member (200) and is in communication with the groove (201); The upper end surface of the extrusion piece (100) is connected to the telescopic rod of the electric cylinder (500), and a pressure sensor (800) is installed on the extrusion piece (100); The raw material adding component (600) is in communication with the mud preparation component (900), and the mud preparation component (900) is in communication with the groove (201); The pressure sensor (800), the electric cylinder (500), the raw material adding component (600) and the mud preparation component (900) are all electrically connected to the controller (400).

2. The mud cake preparation device according to claim 1, It is characterized in that The extrusion piece (100) comprises a protruding portion (101) and an extrusion portion (102), and the extrusion portion (102) is slidably connected to the groove (201); The protruding portion (101) is provided at one end of the extruding portion (102) away from the pressure-bearing member (200), and the cross-sectional dimension of the protruding portion (101) is greater than the cross-sectional dimension of the extruding portion (102); And / or, the pressure-bearing member (200) comprises a first supporting member (203) and a receiving member (204), the receiving member (204) is provided with the groove (201), the groove (201) passes through the receiving member (204), and the lower end of the receiving member (204) is connected to the first supporting member (203).

3. The mud cake preparation device according to claim 2, It is characterized in that The filter loss hole (202) is provided on the wall surface of the first support member (203) opposite to the groove (201), and the filter loss hole (202) passes through the first support member (203); and the filter element (300) is placed on the upper wall surface of the first support member (203) opposite to the groove (201); And / or, the lower end surface of the extruded piece (100) is provided with an anti-sticking piece, and the size of the anti-sticking piece is the same as the size of the lower end surface of the extruded piece (100).

4. The mud cake preparation device according to claim 3, It is characterized in that The lower end of the first support member (203) is connected to a second support member (206); the second support member (206) is smaller in horizontal dimension than the first support member (203); the upper and lower ends of the second support member (206) are open and a water flow channel is provided on the side wall of the second support member (206); The lower end of the second support member (206) is connected to a frame (700), the size of the frame (700) in the horizontal direction is larger than that of the first support member (203), and the electric cylinder (500) is installed at the inner upper end of the frame (700).

5. The mud cake preparation device according to claim 4, It is characterized in that The raw material adding component (600) comprises a plurality of raw material boxes, and the outlet ends of the plurality of raw material boxes are respectively connected to or closed with the mud preparation component (900); The mud preparation component (900) comprises a container (901) and an agitator (902), wherein the agitator (902) is arranged in the container (901), a weight sensor (903) is arranged at the bottom of the container (901), the bottom of the container (901) is connected to the groove (201) via a hose, and a valve (904) is arranged on the hose; The valve (904) and the weight sensor (903) are both electrically connected to the controller (400).

6. The mud cake preparation device according to claim 1, It is characterized in that The parameters of the mud cake prepared by the mud cake preparation device are: The raw materials of the mud cake include a weighting agent, a first clay, a second clay, deionized water and a soluble salt.

7. A control method for a mud cake preparation device, It is characterized in that Applied to the mud cake preparation device according to any one of claims 1 to 6, the control method comprises the following steps: Injecting raw materials into the mud preparation part (900) through the raw material adding part (600); The raw materials are stirred by a slurry preparation member (900) to obtain slurry, and the slurry is injected into the groove (201) of the pressure bearing member (200); Obtaining a preset correspondence between the applied pressure on the mud, the pressurization time and the moisture content of the mud cake; Obtain the required water content of the mud, and determine the simulated applied pressure and the simulated pressurization time according to the required water content and the preset corresponding relationship; According to the simulated applied pressure and the simulated pressurization time, the mud cake preparation device is controlled to prepare the mud cake.

8. The control method according to claim 7, It is characterized in that The method of controlling the mud cake preparation device according to the simulated applied pressure and the simulated pressurization time specifically includes: Obtaining the actual applied pressure in the mud cake preparation device; determining an applied pressure difference based on the actual applied pressure and the simulated applied pressure; The applied pressure in the mud cake preparation device is adjusted according to the applied pressure difference.

9. The control method according to claim 8, It is characterized in that The obtaining of the preset corresponding relationship between the applied pressure on the mud, the pressurization time and the moisture content of the mud cake specifically includes: Acquire multiple sets of experimental data, wherein the experimental data include corresponding applied pressure, pressurization time and mud cake moisture content; and establish the preset corresponding relationship according to the multiple sets of experimental data.

10. The control method according to claim 7, It is characterized in that After controlling the mud cake preparation device to prepare the mud cake according to the simulated applied pressure and the simulated pressurization time, the method further includes: Taking out the prepared mud cake; Adjusting the amount of raw material added to obtain mud cakes with different dielectric constants; and / or, Taking out the prepared mud cake; Adjust the amount of raw material added to obtain mud cakes with different conductivity.