Roll changing device for patch coating machine

By designing automatic docking and feeding mechanisms on the patch coating machine, the low production efficiency and membrane belt fracture caused by shutdown and coil replacement are solved, the stable docking and tension control of the membrane belt is achieved, and the production of patch coating machine is improved Efficiency and product quality.

CN118992644APending Publication Date: 2024-11-22HEBEI HUASHENG PLASTIC & RUBBER MACHINERY CO LTD +1
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202411405147.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing patch coating machines need to shut down when replacing the coil material, resulting in a decrease in production efficiency and the film substrate is prone to breaking, affecting the glue quality and weight stability, and resulting in an increase in unqualified products.

Method used

A roll change device for patch coating machine is designed, including a frame, unwinding roller, winding assembly, traction structure and feeding mechanism, and automatic docking and buffering of membrane belts through the winding assembly and traction structure. Avoid shutdown and replacing the coils, and ensure smooth adhesion and stable tension of the membrane tape through guide rollers and adhesive sheets.

Benefits of technology

The connection between replacement of coil materials and new and old coil materials without shutting down is achieved, avoiding the occurrence of unqualified products, ensuring the stability of glue coating quality and improving production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118992644A_ABST
    Figure CN118992644A_ABST
Patent Text Reader

Abstract

The invention discloses a patch coating machine reel changing device which comprises a rack, a first unreeling roller and a second unreeling roller are rotationally arranged on the rack, and a film belt on the first unreeling roller or the second unreeling roller sequentially passes through a reel receiving assembly, a traction structure and a material buffering mechanism; a first conveying station and a second conveying station are arranged among the first unwinding roller, the second unwinding roller and the coil receiving assembly, and the first conveying station and the second conveying station are arranged on the rack in a sliding mode; the roll receiving assembly comprises a rubberizing platform and a supporting baffle, the rubberizing platform is horizontally arranged, the first guide roller and the supporting baffle are vertically arranged from top to bottom, a first rubberizing plate is arranged on the rubberizing platform, a second rubberizing plate is arranged on the opposite side of the supporting baffle, and when roll replacement is needed, the traction structure clamps the film belt, and the buffering mechanism releases the cached film belt. The device can realize the replacement of coiled materials and the butt joint of new and old coiled materials under the condition that the equipment is not stopped, does not influence the gluing quality, and avoids the generation of a large number of unqualified products.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of patch processing, in particular to a device for changing rolls of a patch coating machine. Background Art

[0002] Patches are products formed by gluing, laminating, slitting and cutting two or more substrates (such as films, papers, non-woven fabrics or spunlace fabrics, etc.). Before being processed, the substrates are large rolls stored in rolls. The unwinding mechanism needs to release the rolled substrates before the subsequent gluing, laminating, slitting and cutting processing steps can be carried out. Therefore, after the rolled substrates are released, the subsequent gluing, laminating, slitting and cutting equipment must be suspended to have enough time to replace the new rolls and connect the ends of the next substrate with the previous substrate. This will slow down the speed and affect production efficiency. In addition, for the convenience of operation, workers generally only use tape to stick on the upper surface of the substrate to connect the ends of the substrates. However, one of the substrates used in the patch is a release film, and the upper surface of the release film is a release surface that is not sticky or only slightly sticky. This makes it easy to break the ends of the two rolls of release film even after they are butt-jointed by tape because of the low viscosity.

[0003] Also, the machine's downtime will cause the tension of the coil to change, affecting the stability of subsequent gluing and causing fluctuations or deviations in the weight of the patch. Especially with the improvement of standardization and parameterization of patch production, the processing requirements of patches are getting higher and higher. Therefore, after each shutdown, it is necessary to re-position and adjust, and re-sample the glue coating and test the gram weight until the gram weight is stable before production can be continued; and the patches produced before the gram weight is stable are all unqualified waste products, which will inevitably cause the problem of waste of raw materials and increased costs. Therefore, it is very necessary to replace the patch substrate without stopping the machine. The application number is CN201520858414.8, and the name is a Chinese utility model patent for a docking type non-stop unwinding and splicing machine, including an unwinding system, a splicing mechanism and a storage mechanism. The upper end of the unwinding system is connected to the splicing mechanism, and the right pressure roller presses the spare paper tape of the spare roll B on the knife plate and pastes the same tape, so that the right pressure plate is flipped close to the knife plate, and the left pressure roller stops the working paper tape, and the left shearing wheel cuts the working paper tape and pastes its upper half on the tape of the spare paper tape, that is, the left shearing wheel cuts and pastes at the same time, and then the tape on the left suction guide roller is pasted on the other side of the paper tape joint. However, after the adhesive tape is pasted on the spare paper tape, the gap between the adhesive tape on the spare paper tape and the working paper tape is very small, which generates a small electric field that attracts each other and causes the adhesive tape to stick to the working paper tape, affecting the flatness of the joint. In addition, the base material of the patch is generally very thin, and the shear wheel cuts and pastes at the same time, which can easily scratch or cut the spare paper tape or the adhesive tape. Summary of the invention

[0004] The purpose of the present invention is to provide a device for changing rolls of a patch coating machine, which can realize the replacement of rolls and the docking of new and old rolls without stopping the equipment, and does not affect the quality of glue coating, avoiding the production of a large number of defective products.

[0005] To achieve the above object, the present invention adopts the following technical solutions: The roll-changing device of a patch coating machine comprises a frame, on which a first unwinding roller and a second unwinding roller are rotatably provided, and the film tape on the first unwinding roller or the second unwinding roller passes through a take-up assembly, a traction structure and a material buffering mechanism in sequence; a first conveying station is provided between the first unwinding roller and the take-up assembly, and a second conveying station is provided between the second unwinding roller and the take-up assembly, the first conveying station and the second conveying station are fixedly arranged on the first bracket, and the first bracket is slidably arranged on the frame; the take-up assembly comprises a glue-applying platform and a supporting baffle, and a first guide roller flush with the upper surface of the glue-applying platform is provided between the glue-applying platform and the supporting baffle, the glue-applying platform is horizontally arranged, the first guide roller and the supporting baffle are vertically arranged from top to bottom, a first glue-applying plate is provided on the glue-applying platform, a second glue-applying plate is provided on the opposite side of the supporting baffle, and the upper surface of the first conveying station or the second conveying station is flush with the glue-applying platform; when the roll needs to be changed, the traction structure clamps the film tape and the material buffering mechanism releases the cached film tape.

[0006] Preferably, a first pressing rod is provided on the first conveying station and the second conveying station, a second pressing rod is provided on the glue laminating platform, and the first pressing rod and the second pressing rod are both connected to a first cylinder; a second guide roller is provided on the lower side of the support baffle, and the first guide roller, the support baffle and the second guide roller are vertically arranged from top to bottom.

[0007] Preferably, a cross bar is provided on the gluing platform, a slider is slidably connected to the cross bar, the slider is fixedly connected to a cutter via a connecting plate, the cutter is arranged on the front side of the gluing platform, and the cutter can slide in the gap between the gluing platform and the first conveying station or the second conveying station.

[0008] Preferably, the first and second rubber boards are respectively provided with a flip shaft, which is connected to a flip cylinder or a flip assembly, which drives the first and / or second rubber boards to flip; and the first and second rubber boards are both provided with a plurality of suction cups.

[0009] Preferably, the device further comprises a first detection device for monitoring the film tape on the first unwinding roller and / or the second unwinding roller.

[0010] Preferably, the traction structure comprises a driving roller and a pressure roller, and the film tape passes between the driving roller and the pressure roller; the pressure roller can move horizontally toward one side of the driving roller under the push of the second cylinder and press the film tape onto the driving roller.

[0011] Preferably, the material deceleration mechanism comprises a fixed frame and a floating frame, both the fixed frame and the floating frame are provided with a plurality of material deceleration guide rollers, and the floating frame is movably connected to the lower side of the fixed frame through a guide rod and a third cylinder.

[0012] Preferably, the floating frame is also connected to a second detection device for detecting the lifting height of the floating frame, and the second detection device is electrically connected to the traction structure; the second detection device is a pull rope encoder; the material slowing guide rollers on the fixed frame and the floating frame are two layers.

[0013] Preferably, the frame is provided with a vertical guide column and a driving cylinder, and the first bracket reciprocates along the vertical guide column under the action of the driving cylinder; the frame is also provided with a driving motor for the first unwinding roller or the second unwinding roller.

[0014] Preferably, the first conveying station and the second conveying station are flat plates, and a third guide roller is provided on the front side of the flat plates; a plurality of fourth guide rollers are provided between the first unwinding roller and the second unwinding roller and the winding assembly, between the winding assembly and the traction structure, and between the traction structure and the material slowing mechanism.

[0015] The beneficial effects of the above technical solution are: 1. The film tape coils are stored on the first unwinding roller and the second unwinding roller respectively, and the film tape released from the coils passes through the winding assembly, the traction structure and the buffer mechanism in turn to reach the subsequent workstation, the film tape on the first unwinding roller passes through the first conveying station to reach the winding assembly, and the film tape on the second unwinding roller passes through the second conveying station to reach the winding assembly; when replacing the film tape coil, the first bracket drives the first conveying station and the second conveying station to move, so that the first conveying station or the second conveying station is docked and coordinated with the glue sticking platform, and then the glue sticking plate sticks the adhesive tape at the joint seam of the two film tape coils to realize automatic gluing and docking of the tail of the previous film tape and the end of the next film tape; and in the process of changing the roll and docking the film tape with the adhesive tape, the traction structure clamps the film tape and no longer moves forward, the floating frame of the buffer mechanism moves upward, releases the cached film tape to supply the subsequent normal production, and the movement angle of the film tape will not change during the process, thereby avoiding the impact of equipment shutdown or changes in film tape tension on the glue coating quality of the patch substrate and reducing the production of defective products.

[0016] 2. A first adhesive plate and a second adhesive plate are provided to respectively apply adhesive tape to the upper and lower surfaces of the film tape, so that the film tape is more stably butted and not easy to tear. At the same time, the first adhesive plate is arranged on the adhesive platform, so that the lower side of the butted film tape always has a support and is flatly attached to the tape, so that there is no space for the film tape to detach from the tape downward. In addition, the film tape passes through the fixed guide of the third guide roller, the first guide roller and the second guide roller, and the movement direction is always kept horizontal or vertical so that the tension on the film tape will not produce a component force, or the movement angle of the film tape will not change so that the tension on the film tape will not change. That is, the film tape and the adhesive tape 1 can have the maximum adhesive friction without breaking. Therefore, even if the film tape is a non-sticky release film, the adhesive tape 1 will not be detached and can stably reach the second adhesive plate. At the same time, the support baffle is vertically arranged with the first guide roller and the second guide roller, and the second adhesive plate is arranged on the opposite side of the support baffle, so that the adhesive tape 2 can be easily attached to the film tape without affecting the positioning effect of the adhesive tape 1. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention (adhesive board in adhesive-adhesive state); Figure 2 It is a three-dimensional structural schematic diagram of the frame of the present invention (the adhesive plate is opened); Figure 3 It is a three-dimensional structural schematic diagram of the coiling assembly and the conveying station of the present invention; Figure 4 It is a three-dimensional structural schematic diagram of the roll assembly, the conveying station and the traction structure of the present invention; Figure 5 It is a three-dimensional structural schematic diagram of the material slowing mechanism of the present invention; Figure 6 It is a schematic diagram of the three-dimensional structure inside the frame of the present invention; Figure 7 This is a schematic diagram of the unwinding state of the first unwinding roller of the present invention; Figure 8 This is a schematic diagram of the unwinding state of the second unwinding roller of the present invention; Fig. 9 Schematic diagram of the membrane tape docking process of the present invention; Fig.10 Schematic diagram of the winding state of the film tape on the material retarding mechanism in the present invention.

[0018] In the figure: 1 frame; 11 cutter; 12 first bracket; 13 vertical guide column; 14 fourth guide roller; 15 cross bar; 16 slider; 17 connecting plate; 18 driving cylinder; 19 driving motor; 2 first unwinding roller; 21 first conveying station; 22 first pressing rod; 23 first cylinder; 24 third guide roller; 3 second unwinding roller; 31 second conveying station; 4 rewinding assembly; 41 glue sticking platform; 411 second pressing rod; 42 supporting baffle; 43 first glue sticking board; 44 second glue sticking board; 45 first guide roller; 46 second guide roller; 47 turning shaft; 48 turning assembly; 5 traction structure; 51 driving roller; 52 pressing roller; 53 second cylinder; 6 material buffer mechanism; 61 fixed frame; 62 floating frame; 63 material buffer guide roller; 64 third cylinder; 7 first detection device; 8 film tape; 81 adhesive tape one; 82 adhesive tape two. DETAILED DESCRIPTION

[0019] The present invention will be further described below in conjunction with the accompanying drawings: like Figures 1 to 10 As shown, a device for changing rolls of a patch coating machine includes a frame 1, on which a first unwinding roller 2 and a second unwinding roller 3 for placing film strip coils are rotatably arranged, and the rolled patch substrate is unwound from the first unwinding roller 2 or the second unwinding roller 3 to form a film strip 8, which passes through a take-up assembly 4, a traction structure 5 and a buffer mechanism 6 in sequence; the take-up assembly 4 connects the first section and the end of the coils on the first unwinding roller 2 and the second unwinding roller 3 together, and the traction structure 5 pulls the film strip 8 forward, and the buffer mechanism 6 caches and reserves enough film strips so that the take-up assembly 4 has enough time to complete the cutting and pasting of the film strips.

[0020] A first conveying station 21 is provided between the first unwinding roller 2 and the roll-taking assembly 4, and a second conveying station 31 is provided between the second unwinding roller 3 and the roll-taking assembly 4. The first conveying station 21 and the second conveying station 31 are fixedly arranged on the first bracket 12, and the first bracket 12 is slidably arranged on the frame 1. Furthermore, a vertical guide column 13 and a driving cylinder 18 are provided on the frame 1, and the first bracket 12 reciprocates along the vertical guide column 13 under the action of the driving cylinder 18. The roll-joining assembly 4 includes a glue-joining platform 41 and a supporting baffle 42, and a cutter 11 is slidably arranged on the front side of the glue-joining platform 41. The glue-joining platform 41 is arranged horizontally, and the supporting baffle 42 is arranged vertically. A first glue-joining plate 43 is arranged on the glue-joining platform 41, and a first adhesive tape 81 is arranged on the first glue-joining plate 43. A second glue-joining plate 44 is arranged on the opposite side of the supporting baffle 42, and a second adhesive tape 82 is arranged on the second glue-joining plate 44. When the coil on the first unwinding roller 2 is released, the traction structure 5 clamps the film tape 8 and the coil on the first unwinding roller 2 is no longer released. At the same time, the material changing mechanism 6 starts to release the cached film tape material to support subsequent production. The cutter 11 is The first conveying station 21 slides out from between the gluing platform 41 to cut off the film tape 8, and then the first bracket 12 moves up to make the second conveying station 31 and the gluing platform 41 docked flush, and the first gluing plate 43 is pressed tightly on the gluing platform 41 and the second conveying station 31, and the tape 1 81 is pasted on the upper surface of the tail end of the previous film tape 8 and the head end of the next film tape 8, and then the traction structure 5 continues to pull the film tape 8 forward, that is, it is switched to the second unwinding roller 3 to start unwinding, and when the docking position of the film tape 8 moves to the support baffle 42, the second gluing plate 44 presses the film tape 8 on the support baffle 42, so that the tape 2 82 is pasted on the lower surface of the docking position. When the coil on the second unwinding roller 3 is released, the traction structure 5 clamps the film tape 8 and the coil on the second unwinding roller 3 is no longer released. At the same time, the material changing mechanism 6 starts to release the cached film tape material to support subsequent production. The cutter 11 slides out between the second conveying station 21 and the gluing platform 41 to cut off the film tape 8 released by the second unwinding roller 3. The first bracket 12 moves downward to make the first conveying station 21 flush with the gluing platform 41, and then the process of gluing the adhesive tape is completed.

[0021] In one embodiment, a first guide roller 45 is provided between the glue-applying platform 41 and the support baffle 42, the upper surface of the first guide roller 45 is flush with the surface of the glue-applying platform 41, and a second guide roller 46 is provided on the lower side of the support baffle 42. The first guide roller 45, the support baffle 42, and the second guide roller 46 are arranged vertically in sequence from top to bottom, so that after the first glue-applying plate 43 sticks the adhesive tape 1 81 on the upper surface of the film tape 8, the film tape 8 moves forward on the glue-applying platform 41 or the first guide roller 45 so that the lower side of the film tape 8 has support, and the film tape 8 will be flatly attached to the adhesive tape 1, and there is no space for the film tape 8 to be separated from the adhesive tape 1. At the same time, the tension of the film tape 8 itself is kept horizontal or vertical without generating a component force, and then the film tape 8 and the adhesive tape 1 81 have the maximum adhesive friction force without disconnection, so as to ensure that the docking position of the film tape 8 stably reaches the second glue-applying plate 44, and the adhesive tape 2 82 is stuck on the lower surface of the film tape 8. Therefore, even if the upper surface of the film tape 8 is a non-sticky release film, it is easy to complete the butt-jointing and pasting of the upper and lower coils.

[0022] In one embodiment, a cross bar 15 is provided on the gluing platform 41, a slider 16 is slidably connected to the cross bar 15, and the slider 16 is connected to a driving device, and the driving device drives the slider 16 to slide on the cross bar 15. The slider 16 is fixedly connected to a cutter 11 through a connecting plate 17, and the cutter 11 is arranged at the front side of the gluing platform 41, and the cutter 11 can slide in the gap between the gluing platform 41 and the first conveying station 21 or in the gap between the gluing platform 41 and the second conveying station 31.

[0023] In one embodiment, the first glue plate 43 and the second glue plate 44 are respectively provided with a flip shaft 47, and the flip shaft 47 is connected to a flip cylinder or a flip assembly 48. The flip cylinder or the flip assembly 48 drives the flip shaft 47 to drive the first glue plate 43 to flip to the left in the vertical direction so that the first glue plate 43 is pressed at the docking position between the first conveying station 21 or the second conveying station 31 and the glue platform 41. The flip cylinder or the flip assembly 48 drives the flip shaft 47 to drive the second glue plate 44 to flip to the right in the vertical direction, so that the docking position of the film strip 8 is pressed onto the support baffle 42.

[0024] In one embodiment, a plurality of negative pressure suction cups are provided on the first adhesive plate 43 and the second adhesive plate 44, which can adsorb tape 1 81 or tape 2 82 on the first adhesive plate 43 and the second adhesive plate 44 with the adhesive surface of the tape facing outward, so that the tape can be conveniently pasted on the film tape 8.

[0025] In a preferred case, the first conveying station 21 and the second conveying station 31 are flat plates, and a third guide roller 24 is provided on the front side of the flat plate. The lowest end of the third guide roller 24 is substantially flush with the upper surface of the flat plate, so that the film strip 8 is adjacent to the upper surface of the platform after passing through the third guide roller 24, thereby ensuring horizontal transmission of the film strip 8.

[0026] In one embodiment, the first conveying station 21 and the second conveying station 31 are further provided with a first pressing rod 22, and the glue-applying platform 41 is provided with a second pressing rod 411, and the first pressing rod 22 and the second pressing rod 411 are respectively connected to the first cylinder 23 at both ends. The first cylinder 23 drives the first pressing rod 22 or the second pressing rod 411 to rise or fall. When the cutter 11 cuts the film strip 8, the first pressing rod 22 and the second pressing rod 411 on the glue-applying platform 41 simultaneously press down to compact the film strip 8, ensuring that the cutter 11 cuts the film strip 8 evenly. When the first unwinding roller 12 is a spare roll, the end of the film strip 8 released from the spare roll is aligned with the edge of the first conveying station 21 close to the glue-applying platform 4, and the first pressing rod 22 on the first conveying station 21 is pressed down to compact the film strip 8. When the second unwinding roller 13 is a spare roll, the end of the film tape 8 released from the spare roll is aligned with the edge of the second conveying station 31 on the side close to the adhesive laminating platform 4, and the first pressing rod 22 on the second conveying station 31 is pressed down to press the film tape 8. After the cutting is completed, the first bracket moves up or down to complete the docking of the adhesive tape and the film tape 8, and then the two first pressing rods 22 and the second pressing rods 411 can be opened, which can prevent the film tape from moving or wrinkling during the switching of the conveying stations, affecting the smoothness of the pasting.

[0027] In a preferred case, a first detection device 7 is also included, which is arranged on the frame 1 and near the first unwinding roller 2 and the second unwinding roller 3, and is used to monitor the thickness of the film strip on the first unwinding roller 2 or the second unwinding roller 3, so that the reel assembly 4 and the traction structure 5 can be operated in time to complete the reel changing and reeling actions; or the first detection device 7 is arranged on the first conveying station 21 and / or the second conveying station 31, and the reel assembly 4 and the traction structure 5 are triggered to work according to the mark on the film strip 8. The first detection device 7 is preferably a laser rangefinder, which determines the remaining material on the coil by detecting the thickness of the coil.

[0028] In a preferred case, the traction structure 5 includes a driving roller 51 and a pressure roller 52, and the film strip 8 passes between the driving roller 51 and the pressure roller 52, and the driving roller 51 and the pressure roller 52 jointly pull the film strip 8 forward to release the film strip 8 from the unwinding roller. When the roll needs to be changed, the pressure roller 52 will move horizontally toward the side of the driving roller 51 under the push of the second cylinder 53 to press the film strip 8 against the driving roller 51, so that the first unwinding roller 12 or the second unwinding roller 13 stops unwinding, and will not affect the release of the cached material by the slow-down mechanism 6.

[0029] In a preferred case, the material buffer mechanism 6 includes a fixed frame 61 and a floating frame 62. The fixed frame 61 and the floating frame 62 are both provided with a plurality of material buffer guide rollers 63. The material buffer guide rollers 63 on the fixed frame 61 and the floating frame 62 are two-layered. The film strip 8 is wound back and forth on the material buffer guide rollers 63 to cache the material, so that the reel assembly 4 has enough time to complete the reel change and docking. The floating frame 62 is movably connected to the lower side of the fixed frame 61 through the third cylinder 64 and the guide rod 66. When the film strip 8 on the first unwinding roller 12 or the second unwinding roller 13 is released normally, the floating frame 62 is at the lowest position. When the traction structure 5 presses the film strip 8 and the reel assembly 4 starts to change the reel, the floating frame 62 moves up to release the cached material to support subsequent production.

[0030] In another preferred case, a second detection device is provided on the floating frame 62, and the second detection device is preferably a draw-wire encoder, which is used to detect the lifting height of the floating frame 62 and is electrically connected to the traction structure 5, so that the traction structure 5 can replenish materials in a timely and rapid manner. In this embodiment, the production speed of the patch coating machine is v1, and remains unchanged; the speed of the floating frame 62 moving the cache or releasing the material is v2, and the traction speed of the traction structure 5 is the speed v3. During normal operation and production, v1=v3, v2=0; during the process of changing rolls and docking, v1=v2, v3=0; after the roll change is completed, v1+v2=v3, and the traction structure 5 adjusts the traction speed according to the height of the floating frame 62 detected by the second detection device.

[0031] In a preferred case, a plurality of fourth guide rollers 14 are provided between the first unwinding roller 2 and the take-up assembly 4, between the second unwinding roller 3 and the take-up assembly 4, between the take-up assembly 4 and the traction structure 5, and between the traction structure 5 and the material slowing mechanism 6 to guide the film tape 8 to move forward.

[0032] During use, when the film tape 8 on the first unwinding roller 2 is in use, the first conveying station 21 is docked with the glue laminating platform 41, the traction structure 5 pulls the film tape 8 forward and the traction speed matches the production speed of the coating machine, the floating frame 62 is at the lowest position, and the film tape 8 on the second unwinding roller 3 is laid flat on the second conveying station 31 after being guided by the fourth guide roller 14 and the third guide roller 24, and the end of the film tape 8 is aligned with the edge of the second conveying station 31, and then the first pressing rod 22 on the second conveying station 31 is pressed down to press the in-use film tape 8 onto the second conveying station 31; at the same time, the second glue laminating board 44 adsorbs the second tape 82, and the first glue laminating board 43 adsorbs the first tape 81.

[0033] When the first detection device 7 detects that the film tape 8 on the first unwinding roller 2 has been released, the first pressing rod 22 and the second pressing rod 411 on the first conveying station 21 will press the rolled film tape 8 against the first conveying station 21 and the glue laminating platform 41, and at the same time, the pressing roller 52 approaches the driving roller 51 to press the film tape 8, and the coating machine continues to produce using the material buffered on the buffer mechanism 6, and the floating frame 62 moves upward as the buffered material decreases.

[0034] The cutter 11 extends from the gap between the first conveying station 21 and the glue-applying platform 41 to cut off the film tape 8 to be rolled for reuse. Then, the first bracket 12 moves upward along the vertical guide column 13 to dock the second conveying station 31 with the glue-applying platform 41. The first glue-applying plate 43 flips over to stick the adhesive tape 1 81 to the upper surface of the film tape 8 on the first conveying station 21 and the glue-applying platform 41. The first pressing rod 22 on the second conveying station 31 and the second pressing rod 411 on the glue-applying platform 41 are lifted, and the traction structure 5 pulls the docked film tape 8 to move. When the docking position of the film tape 8 moves to the support baffle 42, the second glue-applying plate 44 flips over to press the film tape 8 onto the support baffle 42, that is, to stick the adhesive tape 2 82 to the lower surface of the docking position of the film tape 8. The traction structure 5 continues to pull the film tape 8 to move. At this time, the traction speed is greater than the production speed, and the floating frame 62 moves downward to cache the material. When there is a lack of material on the second unwinding roller 3, the above process is repeated again to complete the re-rolling.

[0035] This embodiment is only an illustration of the concept and implementation of the present invention, and does not limit it. Under the concept of the present invention, technical solutions that have not been substantially changed are still within the scope of protection.

Claims

1. A device for changing rolls in a patch coating machine, comprising a frame, on which a first unwinding roller and a second unwinding roller are rotatably provided, It is characterized in that The film tape on the first unwinding roller or the second unwinding roller passes through a take-up assembly, a traction structure and a material buffer mechanism in sequence; a first conveying station is provided between the first unwinding roller and the take-up assembly, and a second conveying station is provided between the second unwinding roller and the take-up assembly, the first conveying station and the second conveying station are fixedly arranged on the first bracket, and the first bracket is slidably arranged on the frame; the take-up assembly includes a glue laminating platform and a supporting baffle, a first guide roller flush with the upper surface of the glue laminating platform is provided between the glue laminating platform and the supporting baffle, the glue laminating platform is horizontally arranged, the first guide roller and the supporting baffle are vertically arranged from top to bottom, a first glue laminating board is provided on the glue laminating platform, a second glue laminating board is provided on the opposite side of the supporting baffle, and the upper surface of the first conveying station or the second conveying station is flush with the glue laminating platform; when the roll needs to be changed, the traction structure clamps the film tape and the material buffer mechanism releases the cached film tape.

2. The device for changing the roll of a patch coating machine as claimed in claim 1, It is characterized in that The first conveying station and the second conveying station are both provided with a first pressing rod, the glue laminating platform is provided with a second pressing rod, and the first pressing rod and the second pressing rod are both connected to a first cylinder; a second guide roller is provided on the lower side of the support baffle, and the first guide roller, the support baffle and the second guide roller are vertically arranged from top to bottom.

3. The device for changing the roll of a patch coating machine as claimed in claim 1, It is characterized in that A cross bar is provided on the gluing platform, a slider is slidably connected to the cross bar, the slider is fixedly connected to a cutter through a connecting plate, the cutter is arranged on the front side of the gluing platform, and the cutter can slide in the gap between the gluing platform and the first conveying station or the second conveying station.

4. The device for changing the roll of a patch coating machine as claimed in claim 1, It is characterized in that The first and second adhesive sheets are respectively provided with a flip shaft, which is connected to a flip cylinder or a flip assembly, and the flip cylinder or the flip assembly drives the first and / or second adhesive sheets to flip; the first and second adhesive sheets are both provided with a plurality of suction cups.

5. The device for changing rolls of a patch coating machine as claimed in claim 1, It is characterized in that The invention also comprises a first detection device for monitoring the film tape on the first unwinding roller and / or the second unwinding roller.

6. The device for changing rolls of a patch coating machine as claimed in claim 1, It is characterized in that The traction structure comprises a driving roller and a pressing roller, and the film tape passes between the driving roller and the pressing roller; the pressing roller can move horizontally toward one side of the driving roller under the push of the second cylinder and press the film tape onto the driving roller.

7. The device for changing rolls of a patch coating machine as claimed in claim 1, It is characterized in that The material deceleration mechanism comprises a fixed frame and a floating frame, both of which are provided with a plurality of material deceleration guide rollers, and the floating frame is movably connected to the lower side of the fixed frame through a third cylinder.

8. The device for changing rolls of a patch coating machine as claimed in claim 7, It is characterized in that The floating frame is also connected to a second detection device for detecting the lifting height of the floating frame, and the second detection device is electrically connected to the traction structure; the second detection device is a pull rope encoder; the material slowing guide rollers on the fixed frame and the floating frame are two layers.

9. The device for changing rolls of a patch coating machine as claimed in claim 1, It is characterized in that The frame is provided with a vertical guide column and a driving cylinder, and the first bracket reciprocates along the vertical guide column under the action of the driving cylinder; the frame is also provided with a driving motor for the first unwinding roller or the second unwinding roller.

10. The device for changing rolls of a patch coating machine as claimed in claim 1, It is characterized in that The first conveying station and the second conveying station are flat plates, and a third guide roller is provided on the front side of the flat plates; a plurality of fourth guide rollers are provided between the first unwinding roller or the second unwinding roller and the winding assembly, between the winding assembly and the traction structure, and between the traction structure and the material slowing mechanism.

Citation Information

Cited By

  • Pole piece processing device and pole piece processing method

    CN120413595A

  • Belt-shaped object attaching device, attaching method and material changing method

    CN120583782A

  • A strip-shaped material attaching device, attaching method and material changing method

    CN120583782B