Pre-decomposition system for producing cement clinker from high-calorific-value coal gasification ash alternative fuel
Through the multi-stage suspension preheater and V-type swirl top combustion decomposition furnace combined with alkali removal and dechlorination system, the removal of potassium, sodium and chlorine elements in the gasified ash slag of high-calorie value coal is solved, and the cement clinker is realized Stabilize production and efficient utilization of ash slag, reducing production costs and environmental impact.
Patent Information
- Application Number
- CN202411021279.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-22
AI Technical Summary
The existing cement production process cannot effectively remove potassium, sodium and chlorine elements in the gasified ash slag of high-calorie coal, resulting in crust, blockage and clinker quality problems, and cannot directly replace fuel coal, and the gasified ash slag of high-calorie coal is insufficiently burned. .
Using a multi-stage suspension preheater and a V-type vortex top combustion decomposition furnace combined with an alkali removal and dechlorination system, the alkali chlorine element is removed through multiple decomposition and condensation treatments, extending the residence time of the ash slag in the decomposition furnace and improving combustion exhaustion. Rate.
The stable use of gasified ash slag of high-calorie value coal has been achieved, the utilization rate has been improved, the production cost has been reduced, the quality of clinker and the stable operation of the system have been ensured, and the ecological environment has been protected.
Smart Images

Figure CN118993588A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of cement preparation, and more particularly to a pre-decomposition system for producing cement clinker using high calorific value coal gasification ash as a substitute fuel. Background Art
[0002] Due to the characteristics of my country's energy structure, coal will continue to play an important role in my country's energy supply. Coal gasification is the leading technology of coal chemical industry, and plays a basic role in many clean utilization directions such as coal production of methanol, natural gas, and indirect liquefaction of coal. In comparison, the efficient and clean coal gasification process has a certain regulatory effect on my country's energy structure and the current severe environmental situation.
[0003] Coal gasification ash is waste residue produced during the coal gasification production process, with an average annual output of more than 60 million tons. Since coal gasification ash is difficult to degrade, it has not yet been widely used, and its utilization rate is about 8%. A large amount of coal gasification ash can only be piled up or landfilled, which not only occupies a large amount of land resources and causes soil and water pollution, but also causes dust and fine particles, which poses a hidden danger to human health.
[0004] The resource utilization of coal gasification ash has received great attention. There are two main ways to utilize gasification ash in the co-combustion process: one is to directly mix the gasification fine slag with high residual carbon content with raw coal of different grades for re-combustion; the other is to mix the coal gasification filter cake with raw coal for molding, and then use it for combustion in a circulating fluidized bed boiler after drying.
[0005] Coal is one of the main fuels for cement production. According to data from the National Bureau of Statistics, my country's cement production will reach 1.5 billion tons in 2023, with an annual coal consumption of 156 million tons. Therefore, how to reduce the use of coal as cement fuel is of great significance to saving coal resources and reducing cement production costs.
[0006] Coal gasification ash is different from fuel coal. Even high calorific value coal gasification ash cannot directly replace fuel coal in cement production. The main reasons are:
[0007] (1) The content of potassium K, sodium Na, chlorine Cl and other elements in coal gasification ash is relatively high. These three elements are harmful to cement production. They are easy to form a liquid film on the surface of raw material particles, hindering the flow of raw material particles, causing the cement pre-decomposition system to crust, block, and fail to operate normally. At the same time, these three elements will cause some quality problems such as high water demand and low strength of cement clinker. Therefore, the content of potassium K, sodium Na, and chlorine Cl needs to be strictly controlled during production.
[0008] (2) The existing pre-decomposition system production process for cement production cannot effectively remove elements such as potassium K, sodium Na, and chlorine Cl. In addition, the residence time of coal gasification ash in the decomposition furnace is short and it cannot be fully burned, resulting in the coal gasification ash being unable to be used as a fuel substitute for cement production, especially the high calorific value coal gasification ash resources cannot be utilized. Summary of the invention
[0009] Based on the above problems, the present invention provides a pre-decomposition system for producing cement clinker using high calorific value coal gasification ash as an alternative fuel, which is used to solve the problems of crusting, blockage, poor quality of clinker produced and incomplete combustion caused by the combustion of high calorific value coal gasification ash in the prior art.
[0010] The present invention provides a pre-decomposition system for producing cement clinker using high calorific value coal gasification ash as a substitute fuel, comprising a multi-stage suspension preheater, a V-shaped vortex top combustion decomposition furnace and an alkali removal and dechlorination subsystem;
[0011] The V-shaped vortex top combustion decomposition furnace comprises a first decomposition furnace for primary decomposition of raw meal powder, and a second decomposition furnace for secondary decomposition of raw meal powder; the bottom of the first decomposition furnace is connected to the bottom of the second decomposition furnace, so that the first decomposition furnace and the second decomposition furnace are arranged in a V-shape; the fuel added to the first decomposition furnace is high calorific value coal gasification ash;
[0012] A raw material powder inlet is provided on the air outlet pipe of the second-stage suspension preheater of the multi-stage suspension preheater, and the bottom discharge port of the second-final-stage suspension preheater of the multi-stage suspension preheater is connected to the first decomposition furnace; the top air outlet of the second decomposition furnace is connected to the air inlet of the final-stage suspension preheater of the multi-stage suspension preheater, and the bottom discharge port of the final-stage suspension preheater is connected to the smoke chamber; a hot air intake port is provided on the top of the smoke chamber, and the hot air intake port is connected to the de-alkali and dechlorination subsystem;
[0013] The alkali removal and dechlorination subsystem includes a first cooler and a second cooler which are connected in sequence; the first cooler is used for preliminarily condensing the alkali chlorine elements in the alkali, chlorine and dust-containing gas and making them adhere to the dust, and the second cooler is used for secondary enhanced condensation of the alkali chlorine elements and making them adhere to the dust; the alkali removal and dechlorination subsystem also includes an induced draft fan, which is used for drawing the alkali, chlorine and dust-containing gas extracted from the top of the smoke chamber into the alkali removal and dechlorination subsystem.
[0014] Optionally, the first decomposition furnace comprises a vortex combustion chamber at the top and a vortex decomposition chamber at the bottom, a first burner is arranged on the side wall of the vortex combustion chamber; the nozzle of the first burner is located in the vortex combustion chamber and deviates from the center of the vortex combustion chamber; the shell of the first decomposition furnace on the side opposite to the nozzle of the first burner protrudes outward;
[0015] The vortex decomposition chamber comprises a first cylindrical structure at the top and a conical structure at the bottom; a second burner and a third burner are disposed on the top sidewall of the first cylindrical structure; the shell of the first cylindrical structure on the side opposite to the nozzles of the second burner and the third burner protrudes outward; the distance between the nozzle of the third burner and the central axis of the first cylindrical structure is smaller than the distance between the nozzle of the second burner and the central axis of the first cylindrical structure;
[0016] The second decomposition furnace comprises a plurality of second columnar structures connected in sequence, and the connection between two second columnar structures is a constricted structure; the second columnar structure at the bottom of the second decomposition furnace is connected to the bottom of the conical structure.
[0017] Optionally, the first cooler is also connected to a first cooling fan for providing cold air to the first cooler.
[0018] Optionally,
[0019] The second cooler is also connected to a second cooling fan for providing cold air to the second cooler;
[0020] The second cooler comprises a cooler shell, and a spiral beam heat exchange tube is arranged in the cooler shell;
[0021] A hot gas inlet and a cold gas inlet are arranged at the bottom of the cooler shell; a cold material inlet and a cold gas outlet are arranged at the top of the cooler shell, the hot material outlet is communicated with the bottom opening of the spiral beam radiation heat exchange tube, and the cold material inlet is communicated with the top opening of the spiral beam radiation heat exchange tube;
[0022] The second cooler is also connected to a coal powder spiral pump and a coal powder buffer bin in sequence, and the coal powder spiral pump is used to pump the preheated coal powder collected in the coal powder collecting bin into the coal powder buffer bin for storage.
[0023] Optionally, a control valve for controlling the rapid opening or closing of the corresponding pipeline is provided on the pipeline between the first cooler and the first cooling fan, and on the pipeline between the second cooler and the second cooling fan.
[0024] Optionally, the storage capacity of the coal powder buffer bin is 5%-30% of the coal consumption during coal burning.
[0025] Optionally, the top outlet of the second cooler is connected to a dust collector and the induced draft fan in sequence;
[0026] The material outlet of the dust collector is connected to the dust screw pump and the kiln ash bin in sequence; the dust collector is used to capture dust under the suction force of the induced draft fan and discharge the purified gas; the dust screw pump is used to pump the dust collected by the dust collector into the kiln ash bin for collection.
[0027] Optionally, it also includes a hoist and a distribution valve, the hoist is used to lift the raw meal powder to the distribution valve; the discharge port of the distribution valve is connected to the upper air duct of the second-stage suspension preheater in the multi-stage suspension preheater, and is used to add the raw meal powder to the upper air duct of the second-stage suspension preheater, and is used to bypass the material when the multi-stage suspension preheater fails.
[0028] The present invention realizes the stable operation of producing cement clinker by using high calorific value coal gasification ash as a fuel substitute, and realizes the large amount of ash blending, large scale, and building material resource utilization effect.
[0029] The present invention has at least the following beneficial effects:
[0030] 1. Realize the use of high calorific value coal gasification ash for cement production, give full play to the high calorific value characteristics of high calorific value coal gasification ash, partially or completely replace the natural resources of fuel coal, so that high calorific value coal gasification ash can be efficiently and resourcefully utilized, which is beneficial to protecting the ecological environment and reducing the consumption of coal natural resources.
[0031] 2. Effectively remove harmful elements of alkali and chlorine in the process of utilizing high calorific value coal gasification ash, solve the problems of crusting and blockage caused by the combustion of coal gasification ash, and ensure the stable operation of the clinker calcination system, so as to achieve large-scale ash blending and building material resource utilization.
[0032] 3. It prolongs the residence time of high calorific value coal gasification ash in the decomposition furnace, improves the burnout rate of ash, improves the utilization rate of high calorific value coal gasification ash, and avoids the problem of incomplete ash combustion affecting the quality of clinker.
[0033] 4. It is beneficial to utilize the waste heat resources in the calcination system process, dry the coal powder material, reduce the fuel consumption in the clinker calcination process, and reduce the production cost of the enterprise.
[0034] 5. It is helpful to reduce the thermal damage to refractory materials and decomposition furnace shell, extend the service life of equipment and refractory materials, and reduce the production maintenance workload and maintenance costs.
[0035] The present invention provides a pre-decomposition system for producing cement clinker using high calorific value coal gasification ash as a substitute fuel. The secondary and final stage suspension preheaters of the multi-stage suspension preheater are connected to the first decomposition furnace of the V-shaped vortex top combustion decomposition furnace, and the final stage suspension preheater is connected to the second decomposition furnace of the V-shaped vortex top combustion decomposition furnace. The fuel used by the burner arranged in the first decomposition furnace is high calorific value coal gasification ash. The high calorific value coal gasification ash burns at the top of the first decomposition furnace to generate a high temperature zone. After the first decomposition, the material enters the second decomposition furnace for the second decomposition. At the same time, the high calorific value coal gasification ash passes through the first decomposition furnace and the second decomposition furnace, which prolongs the residence time in the decomposition furnace, ensures the burnout rate, and improves the utilization rate of the high calorific value coal gasification ash. In addition, the smoke chamber connected to the bottom of the V-shaped vortex top combustion decomposition furnace is connected to the alkali removal and dechlorination subsystem to treat the alkali chlorine elements in the dusty gas generated during the combustion of high calorific value coal gasification ash, avoid the enrichment of alkali chlorine elements in the system, realize the stable operation of high calorific value coal gasification ash as a substitute fuel for the production of cement clinker, realize the large-volume ash blending, scale, and building material resource utilization effect, protect the ecological environment, and save coal resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0037] Figure 1 A schematic diagram of a pre-decomposition system for producing cement clinker using high calorific value coal gasification ash as a substitute fuel provided by an embodiment of the present invention;
[0038] Figure 2 A schematic diagram of the AA section of a vortex combustion chamber for producing cement clinker using high calorific value coal gasification ash as a substitute fuel provided by an embodiment of the present invention;
[0039] Figure 3 A schematic cross-sectional view of a vortex decomposition chamber BB for producing cement clinker using high calorific value coal gasification ash as a substitute fuel provided by an embodiment of the present invention;
[0040] Figure 4 A schematic diagram of a second cooler for producing cement clinker using high calorific value coal gasification ash as a substitute fuel provided by an embodiment of the present invention.
[0041] The dashed line with arrow is the air flow direction; the solid line with arrow is the material flow direction.
[0042] Reference numerals:
[0043] 1. Multi-stage suspension preheater; 1a. First-stage suspension preheater; 1b. Second-stage suspension preheater; 1c. Third-stage suspension preheater; 1d. Fourth-stage suspension preheater; 1e. Fifth-stage suspension preheater; 2. First decomposition furnace; 2a. Vortex combustion chamber; 2b. Vortex decomposition chamber; 3. Second decomposition furnace; 4. Burner; 4a. First burner; 4b. Second burner; 4c. Third burner; 5. Smoke chamber; 6. Rotary kiln; 7. First cooler; 8. Second cooler ; 8a, hot gas inlet; 8b, cold gas inlet; 8c, hot material outlet; 8d, cold gas outlet; 8e, cold material inlet; 8f, cooler cavity; 8g, cooler shell; 8h, spiral beam heat exchange tube; 9, first cooling fan; 10, second cooling fan; 11, control valve; 12, dust collector; 13, dust screw pump; 14, kiln ash bin; 15, pulverized coal screw pump; 16, pulverized coal buffer bin; 17, material distribution valve; 18, elevator; 19, induced draft fan. DETAILED DESCRIPTION
[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0045] The present invention provides a pre-decomposition system for producing cement clinker using high calorific value coal gasification ash as a substitute fuel, comprising a multi-stage suspension preheater, a V-shaped vortex top combustion decomposition furnace and an alkali removal and dechlorination subsystem;
[0046] The V-shaped vortex top combustion decomposition furnace comprises a first decomposition furnace 2 for primary decomposition of raw meal powder, and a second decomposition furnace 3 for secondary decomposition of raw meal powder; the fuel added to the first decomposition furnace 2 is high calorific value coal gasification ash;
[0047] The outlet pipe of the second-stage suspension preheater 1b of the multi-stage suspension preheater is provided with a raw material powder inlet, and the bottom outlet of the second-final-stage suspension preheater 1d of the multi-stage suspension preheater is connected to the first decomposition furnace 2; the top outlet of the second decomposition furnace 3 is connected to the air inlet of the final-stage suspension preheater 1e of the multi-stage suspension preheater, and the bottom outlet of the final-stage suspension preheater 1e is connected to the smoke chamber 5; the top of the smoke chamber 5 is provided with a hot air intake, and the hot air intake is connected to the de-alkali and dechlorination subsystem;
[0048] The alkali removal and dechlorination subsystem includes a first cooler 7 and a second cooler 8 which are connected in sequence; the first cooler 7 is used for preliminarily condensing the alkali chlorine elements in the alkali, chlorine and dust-containing gas and adhering them to the dust, and the second cooler 8 is used for secondary enhanced condensation of the alkali chlorine elements and adhering them to the dust; the alkali removal and dechlorination subsystem also includes an induced draft fan 19, which is used to draw the alkali, chlorine and dust-containing gas extracted from the top of the smoke chamber 5 into the alkali removal and dechlorination subsystem.
[0049] Specifically, the raw material powder enters the multi-stage suspension preheater 1, and the number of layers of the multi-stage suspension preheater 1 is at least 3. In the embodiment of the present invention, taking 5 layers as an example, the raw material powder is added from the upper air duct of the second-stage suspension preheater 1b. Under the action of the rising hot wind force, the material enters the first-stage suspension preheater 1a from the upper air duct of the second-stage suspension preheater 1b. The material is collected at the cone of the first-stage suspension preheater 1a, and the gas after heat exchange is discharged from the top of the first-stage suspension preheater 1a and enters the next process. The material collected at the cone of the first-stage suspension preheater 1a enters the upper air duct of the third-stage suspension preheater 1c. Under the action of the rising hot wind force, the material enters the second-stage suspension preheater 1b and is collected at the cone of the second-stage suspension preheater 1b. The gas after heat exchange is discharged from the top of the second-stage suspension preheater 1b and enters the first-stage suspension preheater 1a. The materials are circulated in sequence, collected at the cone of the final suspension preheater 1e, and enter the rotary kiln 6 for calcination; the gas after heat exchange enters the previous suspension preheater.
[0050] After the raw meal powder is collected at the cone of the secondary and final suspension preheater 1d, it enters the V-shaped vortex top combustion decomposition furnace for pre-decomposition. The pre-decomposed material enters the final suspension preheater 1e. The preheated material is collected at the cone of the final suspension preheater 1e and enters the rotary kiln 6 for calcination. The V-shaped vortex top combustion decomposition furnace includes a first decomposition furnace 2 for primary decomposition of raw meal powder and a second decomposition furnace 3 for secondary decomposition of raw meal powder, which are connected by a channel. The first decomposition furnace 2 is connected to the cone of the secondary and final suspension preheater 1d. A burner 4 is arranged in the first decomposition furnace 2. The fuel used by the burner 4 is high calorific value coal gasification ash. The high calorific value coal gasification ash is coal gasification ash with a total calorific value of 1500kCal / kg and an ash content of ≤50%. After the materials are collected at the cone of the final suspension preheater 1e, they enter the first decomposition furnace 2, where they are decomposed once under the action of heat. The heated materials enter the second decomposition furnace 3 for secondary decomposition under the action of wind. The decomposed materials enter the final suspension preheater 1e through the gas ascending decomposition pipeline. The preheated materials are collected at the cone of the final suspension preheater 1e and enter the rotary kiln 6 for calcination.
[0051] The bottom of the V-shaped vortex top combustion decomposition furnace is connected to the smoke chamber 5, and the top of the smoke chamber 5 is connected to the alkali removal and dechlorination subsystem. The hot air enters the alkali removal and dechlorination subsystem under the suction of the induced draft fan and first passes through the first cooler 7. In the first cooler 7, the alkali and chlorine elements in the alkali, chlorine and dust-containing gas are initially condensed and adhered to the dust. After the heat exchange in the first cooler 7, the dust-containing hot air enters the second cooler 8 for further cooling, and the harmful elements of alkali and chlorine are secondary strengthened and condensed and adhered to the dust surface.
[0052] Since the melting point and boiling point of chlorine-containing substances such as potassium chloride and sodium chloride are relatively low, they are very easy to volatilize in the hot field. When the temperature exceeds 600-700°C, they are in a gaseous state, and when it is lower than 600-700°C, they are in a solid state. In the present invention, air is taken from the top of the smoke chamber where the alkali-chlorine concentration is the highest, and the proportion of hot air is 5-35%. Then, cold air is used to cool down, so that the alkali-chlorine condenses on the raw material powder particles due to the temperature drop, thereby achieving the removal of alkali and chlorine in the gas of the decomposition and firing system, and avoiding the enrichment of alkali-chlorine in the system. The chlorine removal efficiency reaches 80-99.8%, and the alkali removal efficiency reaches 20-50%. After alkali removal and dechlorination, the content of harmful alkali-chlorine elements in the clinker meets the requirements of GB / T 21372-2024 "Silicate Cement Clinker": chloride ion content ≤0.06%, alkali content ≤0.6% (alkali content is expressed as Na 2 O+0.658K 2 O calculated value), will not harm the clinker performance, and at the same time, it breaks the crusting and blockage problem caused by the enrichment of alkali chloride in the system.
[0053] It should be noted that the removal of alkali chlorine is not 100%. If it is 100%, the economic efficiency is too poor for the cement clinker production system. Under the condition of incomplete removal, the produced clinker meets the national standard requirements. In addition, the alkali removal and dechlorination system is to break the balance point of alkali chlorine. It is not to make the system completely free of alkali chlorine, but to make its concentration lower than the saturation concentration or high concentration of crusting, so as to ensure the stable operation of the system.
[0054] In a possible embodiment, the first decomposition furnace 2 includes a vortex combustion chamber 2a at the top and a vortex decomposition chamber 2b at the bottom, and a first burner 4a is arranged on the side wall of the vortex combustion chamber 2a perpendicular to the central axis of the first decomposition furnace 2; the nozzle of the first burner 4a is located in the vortex combustion chamber 2a and deviates from the center of the vortex combustion chamber 2a; the shell of the first decomposition furnace on the side opposite to the nozzle of the first burner 4a protrudes outward;
[0055] The vortex decomposition chamber 2b includes a first cylindrical structure at the top and a conical structure at the bottom; a second burner 4b and a third burner 4c are arranged on the top side wall of the first cylindrical structure; the shell of the first cylindrical structure on the side opposite to the nozzles of the second burner 4b and the third burner 4c protrudes outward; the distance between the nozzle of the third burner 4c and the central axis of the first cylindrical structure is smaller than the distance between the nozzle of the second burner 4b and the central axis of the first cylindrical structure;
[0056] The second decomposition furnace 3 includes a plurality of second columnar structures connected in sequence, and the connection between two second columnar structures is a constricted structure; the second columnar structure at the bottom of the second decomposition furnace 3 is connected to the bottom of the conical structure.
[0057] Specifically, a V-shaped vortex top combustion decomposition furnace comprises a first decomposition furnace 2 and a second decomposition furnace 3, which are connected by a channel and arranged in a V shape. The top of the first decomposition furnace 2 is a vortex combustion chamber 2a, and the bottom is a vortex decomposition chamber 2b. Burners 4 are arranged circumferentially on the top side walls of the vortex combustion chamber 2a and the vortex decomposition chamber 2b, with a number of 2 or more, wherein the burners 4 arranged on the top side walls of the vortex decomposition chamber 2b are multi-layered. A high-temperature buffer structure, i.e., a protruding portion of the outer shell of the first decomposition furnace 2, is arranged on the side walls of the vortex combustion chamber 2a and the vortex decomposition chamber 2b opposite to the nozzle of the burner 4, is used to buffer the thermal damage of the flame end of the burner 4 to the refractory material and the decomposition furnace shell, thereby extending the service life. In addition, the high-temperature buffer structure is arranged to increase the residence time of the high-temperature area and the gas.
[0058] Regarding the vortex combustion chamber 2a: the flame ejected from the first burner 4a, due to the partial deflection of the outer shell of the vortex combustion chamber 2a, causes the hot gas to rotate along the outer shell, and a speed difference will be generated between the hot gases in the inner and outer layers, thereby generating shear force. This shear force will cause the surrounding hot gas to continue to rotate, thereby forming a rotating area, that is, forming a vortex.
[0059] Since the first burner 4a is arranged on one side and the opposite side thereof, the shell rotates at different arcs, so that a velocity gradient appears on both sides, and the hot gas flow rate is different. The residence time on the opposite side of the first burner 4a is prolonged, and the residence time of the material in the vortex combustion chamber 2a is increased, the ash burnout rate is increased, the heat exchange time is increased, and the raw material decomposition rate is increased. At the same time, since the high temperature zone at the center of the flame of the first burner 4a is far away from the shell of the vortex combustion chamber 2a, the high temperature corrosion of the shell is reduced, the service life of the shell is extended, and the operation and maintenance costs are reduced.
[0060] The combustion-supporting air and high calorific value coal gasification ash are sprayed into the combustion chamber through the burner to form a flame. The raw meal enters the vortex combustion chamber 2a from the top, and the distance between the raw meal inlet and the outer shell of the vortex combustion chamber is 0.1 to 0.3 times the vortex radius. About the vortex decomposition chamber 2b: The same as the vortex combustion chamber 2a, the difference is that the vortex decomposition chamber 2b is provided with a second burner 4b located at the top and a third burner 4c located at the bottom, the nozzle of the second burner 4b is close to the outer shell of the vortex decomposition chamber 2b, and the nozzle of the third burner 4c is close to the vortex center. The second burner 4b increases the hot gas power to form a vortex, so that a strong vortex is formed in the vortex decomposition chamber 2b, prolonging the residence time of the hot gas in the vortex decomposition chamber 2b, and increasing the heat exchange efficiency; the third burner 4c forms a high temperature zone in the vortex center, ensuring that the raw meal falling from the center of the vortex combustion chamber 2b is fully heat exchanged, preventing the raw meal from falling directly from the center and short-circuiting into the next process equipment, thereby improving the raw meal decomposition rate.
[0061] The second decomposition furnace 3 comprises a plurality of second columnar structures connected in sequence from top to bottom, and the connection between the columnar structures is in a constricted shape.
[0062] Material flow: Raw material powder is collected in the secondary and final suspension preheater 1d, and enters the first decomposition furnace 2 through the conical discharge pipe of the secondary and final suspension preheater 1d. After being heated once, it moves downward and enters the vortex decomposition chamber 2b from the vortex combustion chamber 2a, and the material is decomposed once under the action of heat. The second decomposition furnace 3 is in a negative pressure zone, and the smoke chamber 5 is a slightly positive pressure zone. The heated material enters the second decomposition furnace 3 under the action of wind, and the material moves from bottom to top for secondary decomposition. The decomposed material continues to move upward and enters the final suspension preheater 1e through the gas rising decomposition pipeline. The pre-decomposed material moves from top to bottom under the action of centrifugal force, gathers at the cone of the final suspension preheater 1e, and enters the rotary kiln 6 for calcination.
[0063] Gas flow: clean air enters the vortex combustion chamber 2a and vortex decomposition chamber 2b from the burner 4. The gas flows from top to bottom in the vortex decomposition chamber 2b in a spiral shape, and fully exchanges heat until it reaches the bottom of the second decomposition furnace 3. The second decomposition furnace 3 is in a negative pressure zone, and the smoke chamber 5 is a slightly positive pressure zone. The gas flows from bottom to top in the second decomposition furnace 3, and enters the final suspension preheater 1e from the top of the second decomposition furnace 3, and continues to exchange heat in the final suspension preheater 1e. The gas after heat exchange moves from bottom to top under the action of centrifugal force, and then is discharged from the center and top of the final suspension preheater 1e, and enters the next final suspension preheater 1d.
[0064] Among them, the vortex decomposition chamber 2b is mainly based on the combustion of high calorific value coal gasification ash, providing the main combustion zone, generating a high temperature zone, and ensuring the burnout rate of ash. The vortex combustion chamber is supplemented by the combustion of high calorific value coal gasification ash, providing the main decomposition zone, generating a local high temperature zone, ensuring the burnout rate of ash and sufficient heat exchange of materials. The second decomposition furnace 3 is the core area of material decomposition, which increases the residence time of materials in the decomposition chamber, ensures sufficient heat exchange and decomposition of materials, and has no combustion zone or high temperature zone inside.
[0065] In a possible implementation manner, the first cooler 7 is further connected to a first cooling fan 9 for providing cold air to the first cooler 7 .
[0066] Specifically, the first cooler 7 is a rapid cooling chamber connected to the first cooling fan 9. The first cooling fan 9 blows cold air into the first cooler 7, and the first cooler 7 rapidly cools the alkali, chlorine and dust-containing gas extracted from the top of the smoke chamber 5 by the cold air.
[0067] In a possible implementation manner, the second cooler 8 is further connected to a second cooling fan 10 for providing cold air to the second cooler 8;
[0068] The second cooler 8 is also connected to a second cooling fan 10 for providing cold air to the second cooler 8;
[0069] The second cooler 8 comprises a cooler shell 8g, and a spiral beam heat exchange tube 8h is arranged in the cooler shell 8g;
[0070] The bottom of the cooler shell 8g is provided with a hot gas inlet 8a and a cold gas inlet 8b; the top of the cooler shell 8g is provided with a cold material inlet 8e and a cold gas outlet 8d, the hot material outlet 8c is connected to the bottom opening of the spiral beam heat exchange tube 8h, and the cold material inlet 8e is connected to the top opening of the spiral beam heat exchange tube 8h.
[0071] The second cooler 8 is also connected in sequence to a pulverized coal spiral pump 15 and a pulverized coal buffer bin 16 . The pulverized coal spiral pump 15 is used to pump the preheated pulverized coal collected in the pulverized coal collecting bin into the pulverized coal buffer bin 16 for storage.
[0072] Specifically, the second cooler 8 is connected to the second cooling fan 10, and the second cooling fan 10 provides cold air for the second cooler 8. The hot air after heat exchange in the first cooler 7 enters the cooler cavity 8f of the second cooler 8 from the hot gas inlet 8a at the bottom of the second cooler 8, and the cold air provided by the second cooling fan 10 enters the cooler cavity 8f from the cold gas inlet 8d. At the same time, the coal powder that needs to be preheated enters the spiral beam heat exchange tube 8h from the cold material inlet 8e at the top of the second cooler 8. The hot gas exchanges heat with the cold coal powder in the spiral beam heat exchange tube 8h through the spiral beam heat exchange tube 8h. At the same time, the cold air provided by the second cooling fan 10 also cools and exchanges heat with the hot gas in the cooler cavity 8f. The gas after heat exchange is discharged from the cold gas outlet 8d at the top of the second cooler 8, and the coal powder with increased temperature after heat exchange is discharged from the hot material outlet 8c.
[0073] The second cooler 8 is a countercurrent cooler. The material is inside the spiral beam heat exchange tube 8h and the gas is outside the spiral beam heat exchange tube 8h. The material and the gas do not contact each other. The material moves downward from the top and the gas moves upward from the bottom. The heat exchange between the material and the gas is achieved through countercurrent movement.
[0074] The spiral beam heat exchange tube 8h starts from the upper cold material inlet and is composed of a plurality of thin tubes distributed in a bundle shape. The spiral beam heat exchange tube 8h is distributed in a spiral downward and disc shape in the cooler cavity 8f to the lower hot material outlet 8c.
[0075] The pulverized coal enters the second cooler 8 from the upper cold material inlet 8e, moves from top to bottom, and is discharged at the lower hot material outlet 8c; the hot gas enters the second cooler 8 from the lower hot gas inlet 8a, moves from bottom to top, and is discharged at the upper cold gas outlet 8d. The lower hot material outlet 8c and the lower hot gas inlet 8a can be at the same position.
[0076] The hot material discharged from the second cooler 8 is pumped into the coal powder buffer bin 16 through the coal powder screw pump 15 for storage, so that the hot coal powder can be directly used in the next process.
[0077] In a possible implementation, a control valve 11 for controlling the rapid opening or closing of the corresponding pipeline is provided on the pipeline between the first cooler 7 and the first cooling fan 9 and on the pipeline between the second cooler 8 and the second cooling fan 10.
[0078] Specifically, when an emergency occurs or the residence time of the hot air in the rapid cooling chamber needs to be extended, the rapid closing valve is activated to close the valve to prevent the gas from flowing, thereby ensuring the residence time of the gas in the first cooler 7.
[0079] In a possible implementation, the storage capacity of the pulverized coal buffer bin 16 is 5%-30% of the coal usage during coal burning.
[0080] Specifically, an appropriate amount of coal powder reserves can reduce the risk of coal powder accumulation and dust explosion. By controlling the storage capacity of the coal powder bin, the suspension and accumulation of coal powder in the air can be reduced, thereby reducing safety risks.
[0081] In a possible implementation manner, the top outlet of the second cooler 8 is connected to the dust collector 12 and the gravity fan in sequence;
[0082] The material outlet of the dust collector 12 is connected to the dust screw pump 13 and the kiln ash bin 14 in sequence; the dust collector 12 is used to capture dust under the suction force of the induced draft fan and discharge the purified gas; the dust screw pump 13 is used to pump the dust collected by the dust collector 12 into the kiln ash bin 14 for collection.
[0083] Specifically, the dust collector 12 in the present application is a bag dust collector 12, which can effectively filter out the dust and fine particles generated during the cooling process. The dust-containing gas discharged from the top outlet of the second cooler 8 enters the bag dust collector 12 for dust removal and purification, and the purified gas is discharged into the air. The collected alkaline chlorine-containing dust enters the kiln ash bin 14 from the material outlet of the dust collector through the dust screw pump 13 for storage in order to be used in the next process.
[0084] In a possible embodiment, it also includes a hoist 18 and a distribution valve 17, wherein the hoist 18 is used to lift the raw material powder to the distribution valve 17; the discharge port of the distribution valve 17 is connected to the upper air duct of the second-stage suspension preheater 1b in the multi-stage suspension preheater, so as to add the raw material powder to the upper air duct of the second-stage suspension preheater 1b, and to allow the material to bypass when the multi-stage suspension preheater fails.
[0085] Specifically, the main function of the material distribution valve 17 is to ensure that the material enters the second-stage suspension preheater 1b under normal production conditions. When the preheater is blocked by crusting or other faults occur, the material distribution valve 17 can bypass the material and prevent it from entering the preheater.
[0086] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0087] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A precalcination system for producing cement clinker using high calorific value coal gasification ash as a substitute fuel, comprising a multi-stage suspension preheater, characterized in that: It also includes a V-shaped vortex top combustion decomposition furnace and a de-alkali and de-chlorination subsystem; The V-shaped vortex top combustion decomposition furnace comprises a first decomposition furnace for primary decomposition of raw meal powder, and a second decomposition furnace for secondary decomposition of raw meal powder; the bottom of the first decomposition furnace is connected to the bottom of the second decomposition furnace, so that the first decomposition furnace and the second decomposition furnace are arranged in a V-shape; the fuel added to the first decomposition furnace is high calorific value coal gasification ash; A raw material powder inlet is provided on the air outlet pipe of the second-stage suspension preheater of the multi-stage suspension preheater, and the bottom discharge port of the second-final-stage suspension preheater of the multi-stage suspension preheater is connected to the first decomposition furnace; the top air outlet of the second decomposition furnace is connected to the air inlet of the final-stage suspension preheater of the multi-stage suspension preheater, and the bottom discharge port of the final-stage suspension preheater is connected to the smoke chamber; a hot air intake port is provided on the top of the smoke chamber, and the hot air intake port is connected to the de-alkali and dechlorination subsystem; The alkali removal and dechlorination subsystem includes a first cooler and a second cooler which are connected in sequence; the first cooler is used for preliminarily condensing the alkali chlorine elements in the alkali, chlorine and dust-containing gas and making them adhere to the dust, and the second cooler is used for secondary enhanced condensation of the alkali chlorine elements and making them adhere to the dust; the alkali removal and dechlorination subsystem also includes an induced draft fan, which is used for drawing the alkali, chlorine and dust-containing gas extracted from the top of the smoke chamber into the alkali removal and dechlorination subsystem.
2. The pre-decomposition system for producing cement clinker using high calorific value coal gasification ash as a substitute fuel according to claim 1 is characterized in that: The first decomposition furnace comprises a vortex combustion chamber at the top and a vortex decomposition chamber at the bottom, and a first burner is arranged on the side wall of the vortex combustion chamber; the nozzle of the first burner is located in the vortex combustion chamber and deviates from the center of the vortex combustion chamber; the shell of the first decomposition furnace on the side opposite to the nozzle of the first burner protrudes outward; The vortex decomposition chamber comprises a first cylindrical structure at the top and a conical structure at the bottom; a second burner and a third burner are disposed on the top sidewall of the first cylindrical structure; the shell of the first cylindrical structure on the side opposite to the nozzles of the second burner and the third burner protrudes outward; the distance between the nozzle of the third burner and the central axis of the first cylindrical structure is smaller than the distance between the nozzle of the second burner and the central axis of the first cylindrical structure; The second decomposition furnace comprises a plurality of second columnar structures connected in sequence, and the connection between two second columnar structures is a constricted structure; the second columnar structure at the bottom of the second decomposition furnace is connected to the bottom of the conical structure.
3. The pre-decomposition system for producing cement clinker using high calorific value coal gasification ash as a substitute fuel according to claim 1, characterized in that: The first cooler is also connected to a first cooling fan for providing cold air to the first cooler.
4. The pre-decomposition system for producing cement clinker using high calorific value coal gasification ash as a substitute fuel according to claim 1, characterized in that: The second cooler is also connected to a second cooling fan for providing cold air to the second cooler; The second cooler comprises a cooler shell, and a spiral beam heat exchange tube is arranged in the cooler shell; A hot gas inlet and a cold gas inlet are arranged at the bottom of the cooler shell; a cold material inlet and a cold gas outlet are arranged at the top of the cooler shell, the hot material outlet is communicated with the bottom opening of the spiral beam radiation heat exchange tube, and the cold material inlet is communicated with the top opening of the spiral beam radiation heat exchange tube; The second cooler is also connected to a coal powder spiral pump and a coal powder buffer bin in sequence, and the coal powder spiral pump is used to pump the preheated coal powder collected in the coal powder collecting bin into the coal powder buffer bin for storage.
5. A pre-decomposition system for producing cement clinker using high calorific value coal gasification ash as a substitute fuel according to claim 3 or 4, characterized in that: A control valve for controlling the rapid opening or closing of the corresponding pipeline is arranged on the pipeline between the first cooler and the first cooling fan, and on the pipeline between the second cooler and the second cooling fan.
6. The precalcination system for producing cement clinker using high calorific value coal gasification ash as a substitute fuel according to claim 4, characterized in that: The storage capacity of the coal powder buffer bin is 5%-30% of the coal consumption during the coal burning.
7. The precalcination system for producing cement clinker using high calorific value coal gasification ash as a substitute fuel according to claim 4, characterized in that: The top outlet of the second cooler is connected to the dust collector and the induced draft fan in sequence; The material outlet of the dust collector is connected to the dust screw pump and the kiln ash bin in sequence; the dust collector is used to capture dust under the suction force of the induced draft fan and discharge the purified gas; the dust screw pump is used to pump the dust collected by the dust collector into the kiln ash bin for collection.
8. The precalcination system for producing cement clinker using high calorific value coal gasification ash as a substitute fuel according to claim 1, characterized in that: It also includes a hoist and a distribution valve, wherein the hoist is used to lift the raw material powder to the distribution valve; the discharge port of the distribution valve is connected to the upper air duct of the second-stage suspension preheater in the multi-stage suspension preheater, so as to add the raw material powder to the upper air duct of the second-stage suspension preheater, and to allow the material to bypass when the multi-stage suspension preheater fails.
Citation Information
Patent Citations
Method for calcining cement by carbide slag replacing whole limestone
CN101182142A
Dry desulfurization system based on calcium cycle of cement clinker production line
CN110052158A
Powdered lime calcination reforming system based on novel dry-process cement clinker sintering system
CN111977995A
Low-carbon production method and system for cement clinker
CN114735956A
Fluidized bed reactor-based carbonate co-thermal decomposition coupling hydrogen donor molecular catalytic reduction system and method
CN116983912A