Temporary support for dismantling urban viaduct in complex environment and dismantling method

By setting up multi-stage bracket components under the viaduct and setting up a steel trest on the side, the section cutting and lifting of the viaduct are realized, solving the construction difficulty and environmental protection problems of overpass removal in complex environments, and improving the removal efficiency and safety.

CN118997031APending Publication Date: 2024-11-22ANHUI ROAD & BRIDGE GRP +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411285903.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

In complex environments, especially during the demolition of viaducts across rivers, construction difficulties and river environmental protection are difficult, and the existing technology is difficult to effectively solve.

Method used

Multi-stage bracket assembly is used to set up under the viaduct, and a rope saw is used to cut the viaduct into multiple sections, and a steel trestle hoisting platform is erected on the side, which is removed through segmented cutting and lifting to ensure the collection of fallen objects and environmental protection.

Benefits of technology

It reduces the construction difficulty, improves the protection effect of the river environment, and realizes the safe and efficient demolition of the viaduct.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997031A_ABST
    Figure CN118997031A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of viaduct reconstruction, in particular to a temporary support for dismantling an urban viaduct in a complex environment and a dismantling method. Step 2, paving a bridge deck and removing guardrails; thirdly, a beam bottom support is constructed; fourthly, the flange plates are cut and dismantled in a segmented mode; fifthly, the beam body is cut and dismantled in a segmented mode; sixthly, the pier column is cut and dismantled in a segmented mode; the viaduct has the beneficial effects that the support assemblies for supporting the viaduct body are arranged below the viaduct body, the viaduct body is cut into multiple sections through the rope saw, the cutting parts are aligned to the support assemblies, and the protective baffles are arranged between every two vertically adjacent support assemblies, so that falling objects generated by cutting can be collected, later cleaning can be facilitated, and the working efficiency is improved. The steel trestle hoisting platform is arranged on the side face of the viaduct body and used for hoisting and dismantling the cut viaduct, so that the construction difficulty is reduced, and the protection effect on the river channel environment is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of viaduct reconstruction, in particular to a temporary support for dismantling a city viaduct under a complex environment and a dismantling method. Background Art

[0002] An elevated road is a three-dimensional road that is used mainly or only for vehicles. It is a form of viaduct and is often used on highways or expressways.

[0003] At present, bridge demolition methods can be divided into two major categories: blasting demolition method and mechanical (non-blasting) demolition method. Mechanical demolition method refers to the use of mechanical equipment to crush, split, lift and other forms of bridge demolition.

[0004] However, for the viaduct ramp across the river, its surrounding environment is complex and limited, mainly because when the canal is narrow, the viaduct (ramp) cannot be operated on the water by floating boats, and the construction difficulty and river environment protection difficulty are relatively large. Therefore, the present invention proposes a temporary support and a demolition method for dismantling urban viaducts in complex environments to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to provide a temporary support and a dismantling method for urban viaducts in complex environments, so as to solve the problems of difficulty in regional construction where viaducts cross rivers and difficulty in protecting the river environment proposed in the above background technology.

[0006] To achieve the above object, the present invention provides the following technical solution: a method for dismantling an urban viaduct under a complex environment, specifically comprising the following steps:

[0007] Step 1: Preparation for construction: clean up the site, remove surrounding buildings and obstacles that hinder construction, ensure that the roads are unobstructed, fence off the construction area, and hang safety warning signs outside the fences;

[0008] Step 2: Bridge deck paving and guardrail removal. The bridge deck is paved with reinforced concrete and equipped with cold-rolled ribbed steel mesh. A small blasting machine is used to break the bridge deck, and the broken concrete and steel bars are transported to a designated location for processing. When removing the anti-collision guardrail, the steel railings on the top of the anti-collision wall are first cut off and transported away with a cutting gun. For the beam section across the river and adjacent to the Xiaoyong Railway, the anti-collision wall is cut into sections along the length of the bridge with a rope saw, and then lowered by a crane for crushing;

[0009] Step 3: Construction of the bottom support of the beam: a multi-section support assembly is set in the river channel below the viaduct body to support the viaduct body, a protective baffle for collecting fallen objects is set in the middle of the support assembly, a steel trestle hoisting platform is set up on the side of the viaduct body, and the steel trestle hoisting platform is kept fixed to the support assembly;

[0010] Step 4. Segmentally cut and remove the flange plates. The cutting of the flange plates follows the principle of segmenting longitudinally along the bridge axis and symmetrically transversely across the bridge. The cutting position is at the root of the flange plate and outside the web. When segmentally cutting, pass a steel wire rope through the drain hole to hold the flange plate, lift it with a truck crane, and remove it after segmental cutting. Crush it on-site or transport it to a designated location for crushing.

[0011] Step 5. Segmentally cut and remove the beam body. Use a wire saw to segmentally cut along the transverse direction of the bridge. The cutting trajectory is directly above the support assembly. When cutting, use a steel wire rope to lift it from the bottom, and directly remove it after cutting. Crush it on-site or transport it to a designated location for crushing.

[0012] Step 6. Segmentally cut and remove the pier columns. After the upper structure of the bridge is removed, start the removal work of the pier columns. For the pier columns in the water and the pier columns adjacent to the Xiaoshan-Ningbo Railway, use a wire saw to cut and lift them in sections. Crush them on-site or transport them to a designated location for crushing. Chisel the pier columns to 50 cm below the original ground surface.

[0013] Preferably, in Step 1, set up enclosures according to different construction stages. The height of the enclosures is not less than 1.8 m. Use metal plates to make the enclosures. Set one fixed entrance and exit for the enclosures, and there shall be no gaps at other positions. Level the demolition site, remove or relocate the greenery, and relocate and protect the pipelines.

[0014] Preferably, in Step 2, the thickness of the reinforced concrete pavement is 8 cm, and the cold-rolled ribbed steel welded mesh is 8×8. For the cutting construction beam section, set up a protective support with steel pipes outside the防撞墙 (anti-collision wall). Then hang a dense mesh safety net to prevent concrete blocks from rolling into the river during the demolition of the anti-collision wall. Use a pneumatic pick to demolish the concrete of the anti-collision guardrail. Cut the steel bars after the concrete is demolished with a cutting torch, and promptly transport away the demolished concrete and cut steel bars. The demolition of the anti-collision wall follows the principle of symmetric construction on both sides.

[0015] Preferably, in Step 3, the support assembly includes four columns, and they are spliced with each other by eight tension cross bars to form a cubic structure. Diagonal braces for reinforcement are arranged between adjacent two columns. The lower end of the column is fixedly provided with a diagonal brace. The adjacent two support assemblies in the vertical direction are kept in plug-in connection through a receiving socket.

[0016] Preferably, the protective baffle is located between adjacent two support assemblies. Anti-slip waist holes are penetrated on the surface of the protective baffle, and the anti-slip waist holes are sleeved outside the end of the column. The length direction of the protective baffle is perpendicular to the length direction of the viaduct body. The cross section of the protective baffle is in a "匚" shape with the opening facing upward.

[0017] Preferably, receiving plates are fixedly arranged at both the upper and lower ends of the column. Receiving buckles I are fixedly arranged at both ends of the tension cross bar. The receiving buckle I is in a "C" shape and buckles on the outer side of the edge of the receiving plate. Insertion pin holes are vertically penetrated through both the receiving plate and the receiving buckle I. The receiving buckle I and the receiving plate are fixed by an insertion pin.

[0018] Preferably, a convex plate is fixedly connected to the surface of the receiving buckle I. A jacking hole is penetrated through the surface of the convex plate. Receiving buckles II are fixedly arranged at both ends of the diagonal bracing rod. The receiving buckle II buckles on the outer side of the convex plate and is fixedly connected to the convex plate through a pin shaft.

[0019] Preferably, the column is made of Q345A steel with an outer diameter of 48.3 mm and a wall thickness of 3.5 mm. The tension cross bar is made of Q235B steel with an outer diameter of 48.3 mm and a wall thickness of 2.5 mm. The diagonal bracing rod is made of Q235B steel with an outer diameter of 48.3 mm and a wall thickness of 2.5 mm. All are treated by hot-dip galvanizing. The span of the support assembly is 1.2×1.2 m, and the step distance is 1.5 m. Square timbers with a size of 10×10 cm are used as distribution beams at the top of the support to hold the bottom of the beam. The foundation treatment is as follows: the original ground is leveled and compacted, 20 cm of crushed stones are filled, and a 2-cm-thick steel backing plate is laid on the upper part.

[0020] Preferably, after the bridge is demolished, centralized crushing treatment is carried out. During the crushing process, special personnel are arranged to sprinkle water for dust removal. Relevant anti-noise, anti-dust and other safety protection work are carried out according to the relevant regulations of safe and civilized construction. After the bridge girders are demolished, a breaker is used for crushing. The waste steel bars are recycled, and the crushed concrete blocks are recycled. The crushed concrete blocks are transported by a transport vehicle to the road foundation for replacement filling or other sites for recycling.

[0021] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0022] In the present invention, a support assembly for supporting is arranged below the viaduct body. The viaduct body is cut into multiple sections by a wire saw, and the cutting part is aligned with the support assembly. A protective baffle is arranged between two vertically adjacent support assemblies, which can collect the falling objects generated by cutting and is convenient for later cleaning. A steel trestle lifting platform is arranged on the side of the viaduct body for hoisting and demolishing the cut viaduct, thereby reducing the construction difficulty and improving the protection effect on the river channel environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a front view schematic diagram of the overall structure of the present invention;

[0024] Figure 2 It is a three-dimensional schematic diagram of the overall structure of the present invention;

[0025] Figure 3 It is an exploded schematic diagram of the support assembly structure of the present invention;

[0026] Figure 4 It is a three-dimensional schematic diagram of the support assembly structure of the present invention;

[0027] Figure 5 It is an exploded schematic diagram of the tensioning crossbar and column structure of the present invention;

[0028] Figure 6 It is a schematic diagram of the construction process of the present invention.

[0029] In the figure: 1. viaduct body; 2. bracket assembly; 21. column; 22. tensioning cross bar; 23. diagonal brace; 24. receiving plug-in tube; 25. receiving plate; 26. receiving buckle 1; 261. convex plate; 262. plug hole; 27. receiving buckle 2; 28. pin hole; 3. protective baffle; 31. anti-slip waist hole. DETAILED DESCRIPTION

[0030] In order to make the purpose and technical solution of the present invention clearly and completely described, and the advantages more clearly understood, the embodiments of the present invention are further described in detail with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are part of the embodiments of the present invention, rather than all of the embodiments, and are only used to explain the embodiments of the present invention, and are not used to limit the embodiments of the present invention. All other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] In the description of the present invention, it should be noted that the terms "center", "middle", "upper", "lower", "left", "right", "inner", "outer", "top", "bottom", "side", "vertical", "horizontal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "one", "first", "second", "third", "fourth", "fifth", "sixth" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0032] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0033] For the purpose of simplicity and illustration, the principles of the embodiments are mainly described by reference to examples. In the following description, many specific details are proposed to provide a thorough understanding of the embodiments. However, it is obvious that for those of ordinary skill in the art, these embodiments may not be limited to these specific details in practice. In some instances, known methods and structures are not described in detail to avoid making these embodiments unnecessarily difficult to understand. In addition, all embodiments can be used in combination with each other.

[0034] See also Figures 1 to 6 , the present invention provides a technical solution:

[0035] Embodiment 1, a method for dismantling an urban viaduct in a complex environment, specifically comprises the following steps:

[0036] Step 1: Preparation for construction: clean up the site, remove surrounding buildings and obstacles that hinder construction, ensure that roads are unobstructed, fence the construction area, hang safety warning signs outside the fence, set up fences according to the construction stage, the fence height should not be less than 1.8m, use metal plates to make fences, set up a fixed entrance and exit, and no gaps should be left in other locations. The bridge demolition site should be leveled, greening should be removed or relocated, and pipelines should be relocated and protected;

[0037] Step 2: Bridge deck paving and guardrail removal. The bridge deck is paved with reinforced concrete and equipped with cold-rolled ribbed steel mesh. A small blasting machine is used to break the bridge deck, and the broken concrete and steel bars are transported to the designated location for processing. When removing the anti-collision guardrail, the steel railings on the top of the anti-collision wall are first cut off and transported away with a cutting gun. For the beam section across the river and adjacent to the Xiaoyong Railway, the anti-collision wall is cut into sections along the length of the bridge with a rope saw, and then lowered by a crane for crushing;

[0038] Among them, the thickness of reinforced concrete pavement is 8cm, the cold-rolled ribbed steel bar welded mesh is 8×8, and the cutting construction beam section uses steel pipes to set up protective brackets on the outside of the crash wall, and then hangs a dense safety net to prevent concrete blocks from rolling into the river during the demolition of the crash wall. The concrete of the crash barrier is broken with a pneumatic pick, and the steel bars after the concrete is broken are cut with a cutting gun, and the broken concrete and cut steel bars are transported away in time. The demolition of the crash wall follows the principle of symmetrical construction on both sides;

[0039] Step 3: Construction of the bottom support of the beam: a multi-section support assembly 2 is set in the river channel below the viaduct body 1 to support the viaduct body 1, a protective baffle 3 for collecting fallen objects is set in the middle of the support assembly 2, a steel trestle hoisting platform is set up on the side of the viaduct body 1, and the steel trestle hoisting platform is kept fixed to the support assembly 2;

[0040] Step 4: Cut and remove the flange plate in sections. The cutting of the flange plate follows the principle of longitudinal section and transverse symmetry. The cutting position is at the root of the flange plate and the outside of the web. When cutting in sections, use a wire rope to pass through the drainage hole to hold the flange plate, and use a car crane to lift it. After the section cutting is completed, it is lifted and crushed on the spot or transported to a designated location for crushing;

[0041] Step 5: Cut and remove the beam in sections. Cut the beam in sections along the transverse direction of the bridge with a rope saw. The cutting track is located directly above the bracket assembly 2. When cutting, use a wire rope to hang it from the bottom. After cutting, directly remove it and crush it on the spot or transport it to a designated location for crushing.

[0042] Step 6: Cut and remove the piers in sections. After the bridge superstructure is removed, the pier removal work begins. The underwater piers and the piers adjacent to the Xiaoyong Railway are cut and removed in sections using a rope saw, crushed on site or transported to a designated location for crushing, and the piers are chiseled out to 50cm below the original ground.

[0043] In order to describe the structure of the bracket assembly 2 in detail, in step three of the present application, the bracket assembly 2 includes four columns 21, and the four columns 21 are distributed at the four corners in a "mouth" shape. The four columns 21 are all vertically arranged and spliced ​​with each other through eight tensioning cross bars 22 to form a cubic structure. The eight tensioning cross bars 22 are divided into two groups, each group includes four tensioning cross bars 22 and spliced ​​into a "mouth" shaped structure. The two groups of tensioning cross bars 22 are respectively located at the upper and lower ends of the columns 21, and a diagonal brace 23 for reinforcement is arranged between two adjacent columns 21. The two ends of the diagonal brace 23 connect the upper and lower groups of tensioning cross bars 22 and connect the two adjacent columns 21 at the same time. The lower end of the column 21 is fixedly provided with a diagonal brace 23, and the two vertically adjacent bracket assemblies 2 are plug-in connected by a receiving plug tube 24, such as Figure 3 As shown, the number and height of the bracket assembly 2 can be selected according to actual needs;

[0044] Among them, the column 21 is made of Q345A steel, with an outer diameter of 48.3mm and a wall thickness of 3.5mm. The tension cross bar 22 is made of Q235B steel, with an outer diameter of 48.3mm and a wall thickness of 2.5mm. The diagonal brace 23 is made of Q235B steel, with an outer diameter of 48.3mm and a wall thickness of 2.5mm. All of them have been hot-dip galvanized. The span of the bracket assembly 2 is 1.2×1.2m, and the step distance is 1.5m. The top of the bracket uses 10×10cm square wood as a distribution beam to hold the bottom of the beam. The foundation treatment is: the original ground is leveled and compacted, filled with 20cm slag, and a 2cm thick steel pad is laid on the top.

[0045] For collecting falling objects, the protective baffle 3 of the present application is located between two adjacent upper and lower support assemblies 2. The surface of the protective baffle 3 is penetrated with anti - detachment waist - shaped holes 31, and the anti - detachment waist - shaped holes 31 are sleeved on the outer side of the end of the upright column 21. The setting of the protective baffle 3 can be used to collect the falling objects generated when the rope saw cuts the viaduct body 1, reducing the pollution and even blockage of the lower river by the falling objects. After the viaduct body 1 is demolished, the support assembly 2 above the protective baffle 3 is demolished. Without other objects blocking above the protective baffle 3, construction workers can easily clean the objects on the surface of the protective baffle 3. The length direction of the protective baffle 3 is perpendicular to the length direction of the viaduct body 1, that is, the length direction of the protective baffle 3 is consistent with the cutting direction of the rope saw. The cross - section of the protective baffle 3 is in a "C" shape with the opening upward, which can prevent the falling objects from rolling off the surface of the protective baffle 3.

[0046] To facilitate the later demolition of the tensioning cross - bar 22 and the upright column 21, the present application also has receiving plates 25 fixedly arranged at both the upper and lower ends of the upright column 21. Receiving buckles one 26 are fixedly arranged at both ends of the tensioning cross - bar 22. The receiving buckle one 26 is in a "C" shape and buckles on the outer side of the edge of the receiving plate 25. Insertion holes 28 are vertically penetrated through both the receiving plate 25 and the receiving buckle one 26. The receiving buckle one 26 and the receiving plate 25 are fixed by an insertion pin, as Figure 4 and Figure 5 shown. The tensioning cross - bar 22 and the upright column 21 are fixedly connected by inserting an insertion pin, which can facilitate later demolition.

[0047] To facilitate the demolition of the diagonal brace 23, the present application also has a convex plate 261 fixedly connected to the surface of the receiving buckle one 26. The surface of the convex plate 261 is penetrated with a jack 262. Receiving buckles two 27 are fixedly arranged at both ends of the diagonal brace 23. The receiving buckle two 27 buckles on the outer side of the convex plate 261 and is fixedly connected to the convex plate 261 through a pin shaft, as Figure 5 shown. The diagonal brace 23 and the tensioning cross - bar 22 are connected by inserting a pin shaft, which can facilitate the later demolition of the diagonal brace 23.

[0048] In order to clean up construction waste in the later stage of construction, after the bridge of the present application is demolished, it is subjected to centralized crushing treatment. During the crushing process, special personnel are arranged to sprinkle water for dust removal, and relevant anti - noise, anti - dust - raising and other safety protection work is carried out according to the relevant regulations of safe and civilized construction. After the bridge girders are demolished, a breaker is used for crushing, the waste steel bars are recycled, and the crushed concrete blocks are recycled. The crushed concrete blocks are transported to the road foundation for replacement filling or other sites for recycling by a transport vehicle.

[0049] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A temporary support for dismantling an urban viaduct in a complex environment, characterized by: It includes a support assembly (2). The support assembly (2) includes four columns (21) and is spliced with each other by eight tension cross bars (22) to form a cubic structure. A diagonal brace (23) for reinforcement is arranged between two adjacent columns (21). The lower end of the column (21) is fixedly provided with a diagonal brace (23). The two vertically adjacent support assemblies (2) are kept in plug-in connection through a receiving socket (24). A protective baffle (3) is arranged between two adjacent support assemblies (2). A waist-shaped anti-disengagement hole (31) is penetrated through the surface of the protective baffle (3), and the waist-shaped anti-disengagement hole (31) is sleeved on the outer side of the end of the column (21). The length direction of the protective baffle (3) is perpendicular to the length direction of the viaduct body (1). The cross section of the protective baffle (3) is in a "C" shape with the opening upward.

2. The temporary support for dismantling an urban viaduct under a complex environment according to claim 1, characterized in that: Receiving plates (25) are fixedly arranged at both the upper and lower ends of the column (21). Receiving buckles one (26) are fixedly arranged at both ends of the tension cross bar (22). The receiving buckle one (26) is in a "C" shape and buckles on the outer side of the edge of the receiving plate (25). Plug holes (28) are vertically penetrated through both the receiving plate (25) and the receiving buckle one (26). The receiving buckle one (26) and the receiving plate (25) are fixed by a pin.

3. The temporary support for dismantling an urban viaduct under a complex environment according to claim 2 is characterized by: A convex plate (261) is fixedly connected to the surface of the receiving buckle one (26). A jack hole (262) is penetrated through the surface of the convex plate (261). Receiving buckles two (27) are fixedly arranged at both ends of the diagonal brace (23). The receiving buckle two (27) buckles on the outer side of the convex plate (261) and is fixedly connected to the convex plate (261) through a pin shaft.

4. A method for dismantling an urban viaduct under a complex environment as claimed in any one of claims 1 to 3, characterized in that: Specifically, it includes the following steps: Step 1: Construction preparation. Clean the site, demolish the surrounding buildings and obstacles that hinder construction, ensure the smoothness of the road, fence the construction area, and hang safety warning signs outside the fence. Step 2: Bridge deck paving and guardrail demolition. Pave reinforced concrete on the bridge deck, with cold-rolled ribbed steel welded mesh inside. Use a small breaker to break the bridge deck, and transport the broken concrete and steel bars to a designated location for treatment. When demolishing the anti-collision guardrail, first use a cutting torch to cut off the steel railing on the top of the anti-collision wall and transport it away. For the bridge sections across the river and adjacent to the Xiaonong Railway, use a wire saw to cut the anti-collision wall in sections along the bridge length direction, and then use a crane to lift it down for crushing. Step 3: Beam bottom support construction. Set multi-section support assemblies (2) for supporting the viaduct body (1) in the river under the viaduct body (1). A protective baffle (3) for collecting falling objects is arranged in the middle of the support assembly (2). A steel trestle hoisting platform is erected on the side of the viaduct body (1), and the steel trestle hoisting platform is fixed to the support assembly (2). Step 4: Segment cutting and demolition of the flange plate. The cutting of the flange plate follows the principle of longitudinal segmentation and transverse symmetry. The cutting position is at the root of the flange plate and the outside of the web. When cutting in segments, pass a steel wire rope through the drain hole to hold the flange plate, lift it with a truck crane, and after the segmented cutting is completed, lift it off and crush it on the spot or transport it to a designated location for crushing. Step 5: The beam body is cut and removed in sections. The beam body is cut in sections along the transverse direction of the bridge using a rope saw. The cutting track is located directly above the bracket assembly (2). The beam body is suspended from the bottom with a steel wire rope during cutting. After cutting, the beam body is directly removed by lifting and crushed on the spot or transported to a designated location for crushing. Step 6: Cut and remove the piers in sections. After the bridge superstructure is removed, the pier removal work begins. The underwater piers and the piers adjacent to the Xiaoyong Railway are cut and removed in sections using a rope saw, crushed on site or transported to a designated location for crushing, and the piers are chiseled out to 50cm below the original ground.

5. The method for dismantling an urban viaduct under a complex environment according to claim 4, characterized in that: In the step 1, fences are set up according to the construction stage. The height of the fences is not less than 1.8m. Metal plates are used for the fences. The fences have one fixed entrance and exit, and no gaps are allowed in other locations. The bridge demolition site is leveled, greenery is removed or relocated, and pipelines are relocated and protected.

6. The method for dismantling an urban viaduct under a complex environment according to claim 5, characterized in that: In the step 2, the thickness of the reinforced concrete paving is 8 cm, the cold-rolled ribbed steel bar welded mesh is 8×8, and a protective bracket is set up on the outside of the crash wall using steel pipes for cutting the construction beam section. Then a dense safety net is hung to prevent concrete blocks from rolling into the river during the demolition of the crash wall. The concrete of the crash guardrail is broken with a jackhammer, and the steel bars are cut off with a cutting gun after the concrete is broken. The broken concrete and the cut steel bars are transported away in time. The demolition of the crash wall follows the principle of symmetrical construction on both sides.

7. The method for dismantling an urban viaduct under a complex environment according to claim 6, characterized in that: The column (21) is made of Q345A steel, with an outer diameter of 48.3mm and a wall thickness of 3.5mm. The tension crossbar (22) is made of Q235B steel, with an outer diameter of 48.3mm and a wall thickness of 2.5mm. The diagonal brace (23) is made of Q235B steel, with an outer diameter of 48.3mm and a wall thickness of 2.5mm. All of them are hot-dip galvanized. The span of the bracket assembly (2) is 1.2×1.2m and the step distance is 1.5m. The top of the bracket uses 10×10cm square wood as a distribution beam to hold the bottom of the beam. The foundation treatment is: the original ground is leveled and compacted, 20cm of slag is filled, and a 2cm thick steel pad is laid on the top.

8. The method for dismantling an urban viaduct under a complex environment according to claim 7, characterized in that: After the bridge is dismantled, it will be crushed in a centralized manner. During the crushing process, special personnel will be arranged to sprinkle water and remove dust. According to the relevant regulations on safe and civilized construction, relevant noise prevention, dust prevention and other safety protection work will be carried out. After the bridge beams and slabs are dismantled, they will be crushed with a breaker, and the scrap steel bars will be recycled. The crushed concrete blocks will be recycled and transported by transport vehicles to the road foundation for replacement, or to other required sites for recycling.

Citation Information

Cited By

  • Bridge demolition and reconstruction treatment process under traffic keeping condition

    CN120026566A

  • Dismantling construction method of prestressed concrete continuous box girder

    CN121321521A